Thermal management system of water electrolysis hydrogen production and hydrogenation station

The thermal management equipment combined with heat pumps and heat exchange tubes solves the problem of inaccurate temperature control of equipment in electrolyzed water hydrogenation and refueling stations, achieves comprehensive thermal management of electrolyzed water equipment and compressors, and improves temperature control accuracy and System integration reduces costs and energy consumption.

CN112944206BActive Publication Date: 2024-10-22SICHUAN ENERGY INTERNET RES INST TSINGHUA UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110372526.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-04-07
Publication Date
2024-10-22
Estimated Expiration
2041-04-07

AI Technical Summary

Technical Problem

Existing electrolysis water hydrogenation and refueling stations lack comprehensive thermal management technology, resulting in inaccurate equipment temperature control, increasing equipment life damage and excessively high hydrogen temperatures affecting filling efficiency.

Method used

Thermal management equipment uses a combination of heat pumps, heat exchange tubes and heat exchangers. The heat pump absorbs the heat generated by the electrolyzed water equipment and air pipes, uses coolant for cooling, and combines the controller to adjust the motor power of the pump to control the temperature to achieve electrolyzed water Comprehensive thermal management of equipment and compressors.

Benefits of technology

It effectively avoids the damage to the life of the equipment due to excessive temperature, reduces the hydrogen filling efficiency, improves the integration and accuracy of the thermal management system, and reduces the cost and energy consumption caused by redundant equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112944206B_ABST
    Figure CN112944206B_ABST
Patent Text Reader

Abstract

The present invention provides a thermal management system for a water electrolysis hydrogenation station, and relates to the field of hydrogen production technology. The system includes a water electrolysis hydrogenation station and a thermal management device, wherein the water electrolysis hydrogenation station includes a water electrolysis hydrogenation device, a gas purification device, a first compressor, and a first hydrogenation gun; the thermal management device includes a heat pump, a first heat exchange tube, a second heat exchange tube, a heat exchanger, a first liquid pump, and a second liquid pump, wherein one end of the first heat exchange tube is connected to the heat pump, and the other end is connected to the heat exchanger, the heat exchanger is installed on the air pipe and used to cool the air pipe, one end of the second heat exchange tube is connected to the heat pump, and the other end is connected to the water electrolysis hydrogenation device, and is used to absorb heat in the cooling circuit of the water electrolysis hydrogenation device to avoid excessive temperature of the hydrogenation device. The system can control the temperature of the water electrolysis hydrogenation device, and make the hydrogen temperature meet the requirements during the hydrogenation process, so as to avoid the equipment temperature exceeding the limit to cause damage to the equipment life and avoid excessive hydrogen temperature affecting the filling efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of hydrogen production, and in particular to a thermal management system for a hydrogenation station using water electrolysis to produce hydrogen. Background Art

[0002] With the rapid development of the hydrogen energy automobile industry, hydrogen refueling stations as the infrastructure of hydrogen energy transportation have become a hot spot for research and development. At present, the main mode of hydrogen refueling stations is to supply hydrogen from outside, but there is a problem of high cost of storing and transporting hydrogen.

[0003] On-site hydrogen production and refueling stations can effectively save hydrogen transportation costs and have become one of the development focuses in the industry. As one of the technical routes for on-site hydrogen production and refueling stations, water electrolysis hydrogenation stations have entered the demonstration application stage. At present, there are multiple manufacturers' products in the market for water electrolysis equipment and compressor equipment in water electrolysis hydrogenation stations, and the thermal management of the two has not yet been comprehensively managed from the perspective of the station-level system.

[0004] It can be seen that there is no integrated comprehensive thermal management technology for water electrolysis hydrogen production and hydrogenation stations. Therefore, innovative thermal management technology is urgently needed to improve the accuracy of equipment temperature control and reduce the additional costs brought by redundant thermal management systems. Summary of the invention

[0005] The purpose of the present invention includes providing a thermal management system for a hydrogenation station for electrolysis of water to produce hydrogen, which can control the temperature of the electrolysis of water to produce hydrogen and ensure that the hydrogen temperature meets the requirements during the hydrogenation process, thereby avoiding damage to the equipment life caused by exceeding the equipment temperature limit and avoiding excessively high hydrogen temperature affecting the filling efficiency.

[0006] The embodiments of the present invention can be implemented as follows:

[0007] In a first aspect, the present invention provides a thermal management system for a hydrogenation station for electrolysis of water to produce hydrogen, the system comprising:

[0008] The water electrolysis hydrogenation station comprises a water electrolysis hydrogenation device, a gas purification device, a first compressor, a first hydrogen storage tank, a first pressure reducing valve and a first hydrogenation gun which are sequentially connected through a gas pipe;

[0009] The thermal management device comprises a heat pump, a first heat exchange tube, a second heat exchange tube, a heat exchanger, a first liquid pump and a second liquid pump, wherein the first liquid pump is installed on the first heat exchange tube, one end of the first heat exchange tube is connected to the heat pump, the first heat exchange tube and the second heat exchange tube are filled with coolant, the other end of the first heat exchange tube is connected to the heat exchanger, the heat exchanger is installed on the air pipe, the heat exchanger is used to cool the air pipe, the second liquid pump is installed on the second heat exchange tube, one end of the second heat exchange tube is connected to the heat pump, the other end of the second heat exchange tube is connected to the water electrolysis hydrogen production equipment, and the second heat exchange tube is used to absorb the heat generated during the operation of the water electrolysis hydrogen production equipment.

[0010] In an optional embodiment, the water electrolysis hydrogen production equipment includes a transformer, an inverter and an electrolyzer electrically connected in sequence, wherein the transformer is used to access the power grid, the electrolyzer is used to produce hydrogen and oxygen and transport them to the gas purification device, and the gas purification device is used to separate hydrogen and oxygen and transport the hydrogen to the first compressor.

[0011] In an optional embodiment, the pressure range of the first hydrogen storage tank is: 35MPa ~ 45MPa.

[0012] In an optional embodiment, the pressure range of the first hydrogen storage tank is: 70MPa ~ 85MPa.

[0013] In an optional embodiment, the water electrolysis hydrogen production and hydrogenation station further includes a second compressor, a second hydrogen storage tank, a second pressure reducing valve, and a second hydrogenation gun which are sequentially connected through an air pipe, wherein the second compressor is connected to the first hydrogen storage tank.

[0014] In an optional embodiment, the pressure range of the first hydrogen storage tank is 35 MPa to 45 MPa, and the pressure range of the second hydrogen storage tank is 70 MPa to 85 MPa.

[0015] In an optional embodiment, a first temperature sensor is installed at the coolant outlet of the water electrolysis hydrogen production equipment, a second temperature sensor is installed at the heat source outlet of the heat pump, a third temperature sensor is installed at the cold source outlet of the heat pump, and a fourth temperature sensor is installed in the heat exchanger.

[0016] In an optional embodiment, a fourth temperature sensor is installed in the heat exchanger at the outlet of the first compressor, and a fifth temperature sensor is installed in the heat exchanger at the outlet of the second compressor.

[0017] In an optional embodiment, the system further includes a controller electrically connected to the heat pump, the first liquid pump, the second liquid pump, the first temperature sensor, the second temperature sensor, the third temperature sensor, the fourth temperature sensor, and the fifth temperature sensor.

[0018] In an optional embodiment, the controller is used to control the motor power of the first liquid pump to be proportional to the detected temperature of the third temperature sensor, and to control the motor power of the second liquid pump to be proportional to the detected temperature of the first temperature sensor.

[0019] The beneficial effects of the thermal management system for the hydrogenation station provided by the embodiment of the present invention include:

[0020] 1. The first liquid pump, the first heat exchange pipe and the heat exchanger in the thermal management device are connected end to end in sequence and connected between the heat pump and the gas pipe of the electrolytic water hydrogenation station. The heat pump can be used to absorb the heat of the gas pipe to avoid excessive temperature of the gas pipe and reduce the hydrogen filling efficiency;

[0021] 2. The second liquid pump and the second heat exchange tube in the thermal management device are connected end to end and connected between the heat pump and the water electrolysis hydrogen production equipment. The heat pump can be used to absorb heat in the cooling circuit of the water electrolysis hydrogen production equipment to avoid the temperature of the equipment exceeding the limit and causing damage to the life of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0023] Figure 1 A schematic diagram of the composition of a thermal management system for a hydrogenation station for electrolysis of water to produce hydrogen according to the first embodiment of the present invention;

[0024] Figure 2 It is a schematic diagram of the composition of the hydrogenation station for producing hydrogen by electrolysis of water in the first embodiment;

[0025] Figure 3 This is a connection diagram of the controller in the first embodiment;

[0026] Figure 4 A schematic diagram of the composition of a thermal management system for a hydrogenation station for electrolysis of water to produce hydrogen according to a second embodiment of the present invention;

[0027] Figure 5 It is a schematic diagram of the composition of the hydrogenation station for producing hydrogen by electrolysis of water in the second embodiment;

[0028] Figure 6 Schematic diagram of the connection of the controller in the second embodiment.

[0029] Icons: 1- Thermal management system of water electrolysis hydrogenation station; 2- Water electrolysis hydrogenation station; 21- Gas pipe; 22- Water electrolysis hydrogenation equipment; 221- Transformer; 222- Inverter; 223- Electrolyzer; 23- Gas purification device; 24- First compressor; 25- First hydrogen storage tank; 26- First pressure reducing valve; 27- First hydrogenation gun; 28- Second compressor; 29- Second hydrogen storage tank; 30- Second pressure reducing valve; 31- Second hydrogenation gun; 4- Thermal management equipment; 41- Heat pump; 42- First heat exchange tube; 43- Second heat exchange tube; 44- Heat exchanger; 45- First liquid pump; 46- Second liquid pump; 5- First temperature sensor; 6- Second temperature sensor; 7- Third temperature sensor; 8- Fourth temperature sensor; 9- Fifth temperature sensor; 10- Controller; 11- Station control system. DETAILED DESCRIPTION

[0030] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0031] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0033] In the description of the present invention, it should be noted that if the terms "upper", "lower", "inside", "outside", etc. appear to indicate an orientation or position relationship, they are based on the orientation or position relationship shown in the accompanying drawings, or are the orientation or position relationship in which the product of the invention is usually placed when used. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0034] In addition, the terms “first”, “second”, etc., if used, are merely used to distinguish between the descriptions and should not be understood as indicating or implying relative importance.

[0035] It should be noted that, in the absence of conflict, the features in the embodiments of the present invention may be combined with each other.

[0036] The electrolysis water equipment in the market is mainly divided into alkaline electrolysis water equipment, proton exchange membrane electrolysis water equipment, and solid oxide electrolysis water equipment. At present, the thermal management system of electrolysis water equipment mainly adopts two thermal management technologies: water circulation cooling and air natural convection cooling. Among them, water circulation cooling technology faces the problem of freezing in low-temperature areas, and it is necessary to preheat and insulate the circulating water in a low-temperature environment; the cooling capacity of air natural convection cooling technology in low-temperature and high-temperature areas varies greatly, and the temperature control ability of the electrolysis water hydrogen production and hydrogenation station is poor, but the cost is lower.

[0037] After the hydrogen is produced and purified and dried at the electrolysis water hydrogenation station, a compressor is needed to compress the gas into a high-pressure hydrogen storage tank. The hydrogen in the high-pressure hydrogen storage tank needs to be further compressed to provide hydrogenation services for hydrogen fuel cell vehicles. Since the volume density of hydrogen is relatively small, but the storage and refueling pressure of hydrogen is relatively high, the compression ratio of the compressor during the compression process is relatively large, which makes the gas temperature rise during the hydrogen compression process relatively high and requires cooling. At present, compressors are mainly divided into diaphragm compressors, hydraulic piston compressors and ionic liquid compressors, and the cooling methods they use include liquid circulation cooling and air natural convection cooling.

[0038] At present, there are problems with the thermal management technology solution in the electrolysis water hydrogenation station:

[0039] 1. The thermal management of the electrolysis equipment and the compressor equipment in the electrolysis water hydrogenation station is separate, resulting in redundancy of the thermal management equipment, high purchase cost of the thermal management equipment and high operation and maintenance cost of the hydrogenation station, and there is a large room for optimization and improvement;

[0040] 2. The circulating water cooling technology of the electrolytic water hydrogenation station has the problem of freezing under low temperature conditions. The circulating water needs to be preheated before the equipment is started, which increases the difficulty and cost of equipment operation and maintenance. The air natural convection cooling technology of the electrolytic water hydrogenation station has poor thermal management capabilities and limits the equipment use area;

[0041] 3. The circulating liquid cooling technology in the compressor's thermal management technology has the problems of large equipment redundancy and high cost, while the air cooling technology used in the compressor has poor thermal management capabilities, which will cause equipment overheating and hydrogen overheating during continuous operation, posing a major safety hazard.

[0042] 4. The safe operating temperature range of the water electrolysis hydrogen production and hydrogenation station is 60℃~95℃, and the compressor outlet temperature needs to be controlled below 110℃. The different temperature spaces of the equipment require a comprehensive thermal management system for optimization.

[0043] First embodiment

[0044] Please refer to Figure 1 This embodiment provides a water electrolysis hydrogen production and hydrogenation station thermal management system 1 (hereinafter referred to as the "system"), which is mainly used for 35MPa or 70MPa level hydrogen production and hydrogenation stations. The system includes a water electrolysis hydrogen production and hydrogenation station 2 and a thermal management device 4.

[0045] Specifically, the water electrolysis hydrogenation station 2 includes a water electrolysis hydrogenation device 22, a gas purification device 23, a first compressor 24, a first hydrogen storage tank 25, a first pressure reducing valve 26 and a first hydrogenation gun 27 which are sequentially connected through a gas pipe 21.

[0046] The thermal management device 4 includes a heat pump 41, a first heat exchange tube 42, a second heat exchange tube 43, a heat exchanger 44, a first liquid pump 45 and a second liquid pump 46, wherein the first liquid pump 45 is installed on the first heat exchange tube 42, one end of the first heat exchange tube 42 is connected to the heat pump 41, the other end of the first heat exchange tube 42 is connected to the heat exchanger 44, the heat exchanger 44 is installed on the gas pipe 21, the heat exchanger 44 is used to cool the gas pipe 21, the second liquid pump 46 is installed on the second heat exchange tube 43, one end of the second heat exchange tube 43 is connected to the heat pump 41, the other end of the second heat exchange tube 43 is connected to the water electrolysis hydrogen production equipment 22, and the second heat exchange tube 43 is used to absorb heat in the cooling circuit of the water electrolysis hydrogen production equipment 22 to prevent the hydrogen production equipment from overheating.

[0047] The first heat exchange tube 42 and the second heat exchange tube 43 are filled with a coolant, which may be an ethylene glycol aqueous solution or a calcium chloride aqueous solution. The concentration of ethylene glycol or calcium chloride is determined according to the lowest ambient temperature to prevent the coolant from solidifying under low temperature conditions.

[0048] A first temperature sensor 5 is installed at the coolant outlet of the water electrolysis hydrogen production equipment 22, a second temperature sensor 6 is installed at the heat source end outlet of the heat pump 41, a third temperature sensor 7 is installed at the cold source end outlet of the heat pump 41, and a fourth temperature sensor 8 is installed in the heat exchanger 44.

[0049] See also Figure 2 The electrolysis water hydrogen production equipment 22 includes a transformer 221, an inverter 222 and an electrolyzer 223 which are electrically connected in sequence, wherein the transformer 221 is used to access the power grid, the electrolyzer 223 uses electricity to electrolyze water into hydrogen and oxygen, and delivers the hydrogen to the gas purification device 23, the gas purification device 23 is used to separate hydrogen and oxygen, and deliver the hydrogen to the first compressor 24, the first compressor 24 is used to compress the hydrogen and store it in the first hydrogen storage tank 25, the hydrogen in the first hydrogen storage tank 25 is decompressed to 35MPa by the first pressure reducing valve 26, and the hydrogen is filled into the hydrogen energy vehicle by the first hydrogen filling gun 27. Among them, the oxygen can be discharged into the air or stored in the oxygen tank through the compressor to supply high-purity oxygen for industrial users.

[0050] The high cost of hydrogen transportation and storage makes it difficult for hydrogen refueling stations to make profits and limits the development of the hydrogen energy transportation industry. The water electrolysis hydrogenation station 2 used in this embodiment can use electricity transmission instead of hydrogen transmission, reduce hydrogen energy storage costs, and effectively improve the profitability of hydrogen refueling stations.

[0051] Among them, the types of electrolyzers 223 in the electrolysis water hydrogenation station 2 include alkaline water electrolysis water hydrogenation tank, proton exchange membrane water electrolysis water hydrogenation tank, and high-temperature solid medium water electrolysis water hydrogenation tank. The electrolyzer 223 in this embodiment is a low-temperature water electrolysis water hydrogenation tank, including an alkaline water electrolysis water hydrogenation tank and a proton exchange membrane water electrolysis water hydrogenation tank. The low-temperature water electrolysis water hydrogenation tank needs to be kept within the set temperature range to ensure the stability of the internal material structure of the electrolyzer 223 and avoid equipment life attenuation. The operating temperature range of the alkaline water electrolysis water hydrogenation tank is: 60℃~95℃, and the operating temperature range of the proton exchange membrane water electrolysis water hydrogenation tank is: 50℃~80℃. The low-temperature water electrolysis water hydrogenation equipment needs to be controlled within the above range to avoid the attenuation of the internal material performance of the equipment and affect the service life of the equipment.

[0052] At present, the hydrogen refueling pressure levels of external hydrogen supply refueling stations are divided into two specifications: 35MPa and 70MPa. Therefore, it is necessary to adopt a multi-stage pressure storage method in the hydrogen refueling station. The commonly used configurations are long tube storage for transportation (20MPa), low-pressure hydrogen storage tanks (20MPa~30MPa), medium-pressure hydrogen storage tanks (35MPa~45MPa), and high-pressure hydrogen storage tanks (70MPa~85MPa). The use of multi-stage pressure hydrogen storage tanks can improve the hydrogen refueling efficiency.

[0053] In this embodiment, the first hydrogen storage tank 25 can be a medium-pressure hydrogen storage tank or a high-pressure hydrogen storage tank. The pressure range of the medium-pressure hydrogen storage tank is 35MPa to 45MPa, and the pressure range of the high-pressure hydrogen storage tank is 70MPa to 85MPa.

[0054] The types of the first compressor 24 include a piston hydrogen compressor, a diaphragm hydrogen compressor and an ion liquid hydrogen compressor.

[0055] The hydrogen output by the electrolyzer 223 is compressed into the compressor in the first hydrogen storage tank 25 and needs to be pre-cooled, and then the hydrogen is naturally cooled in the first hydrogen storage tank 25. Due to the large compression of hydrogen, the outlet temperature of the first compressor 24 is relatively high, about 110°C to 135°C, and needs to be cooled to room temperature in time before hydrogen can be added to the hydrogen-powered vehicle. Therefore, in this embodiment, the heat exchanger 44 covers the air pipe 21 between the first compressor 24 and the first hydrogen storage tank 25, so as to timely reduce the temperature of the hydrogen output by the first compressor 24, and also realize the pre-cooling of the hydrogen before compression.

[0056] The conversion temperature of hydrogen is -68.55℃. The expansion process above this temperature is a heating process. Even if it is cooled to -40℃, the hydrogen decompression and expansion process during the hydrogenation process is also a heating process. Therefore, the high-pressure hydrogen storage tank decompression hydrogenation process needs to be precooled. The first compressor 24 needs to compress the hydrogen from 1MPa to 3MPa to the medium-pressure hydrogen storage tank of 35MPa to 45MPa. The hydrogen compression in this process is relatively large, so the gas temperature rises significantly. During the hydrogen filling process of a 35MPa hydrogen-powered vehicle, hydrogen is filled from the decompression of the medium-pressure hydrogen storage tank of 35MPa to 45MPa to the 35MPa on-board hydrogen storage tank. This process is a decompression process, and the hydrogen temperature increase in this process is limited. During the hydrogen filling process of a 70MPa hydrogen-powered vehicle, hydrogen is filled from the decompression of the high-pressure hydrogen storage tank of 70MPa to 85MPa to the 70MPa on-board hydrogen storage tank. This process is a decompression process, and the hydrogen temperature increase in this process is also limited.

[0057] Therefore, the temperature of the hydrogen at the outlet of the first compressor 24 during the hydrogen filling process needs to be cooled, and the hydrogen at the outlet of the first pressure reducing valve 26 also needs to be cooled to meet the technical standards of the hydrogen filling industry. In this regard, in this embodiment, the heat exchanger 44 not only covers the air pipe 21 at the outlet of the first compressor 24, but also covers the air pipe 21 between the first pressure reducing valve 26 and the first hydrogen filling gun 27, so as to complete the cooling of the hydrogen before filling into the hydrogen-powered vehicle.

[0058] See also Figure 3 The system also includes a controller 10, which communicates with the heat pump 41, the first liquid pump 45, the second liquid pump 46, the first temperature sensor 5, the second temperature sensor 6, the third temperature sensor 7, the fourth temperature sensor 8, the water electrolysis hydrogen production equipment 22, the first compressor 24, the station control system 11, the first hydrogen storage tank 25, the first hydrogenation gun 27 and the inverter 222.

[0059] The controller 10 obtains data from the equipment and temperature sensors in the station, including the pressure data of the first hydrogen storage tank 25 and the temperature data of the first temperature sensor 5, the second temperature sensor 6, the third temperature sensor 7 and the fourth temperature sensor 8. The controller 10 sends control instructions to the first liquid pump 45, the second liquid pump 46 and the heat pump 41 according to the thermal management control algorithm to control the speed of the first liquid pump 45 and the second liquid pump 46 and the cooling capacity of the heat pump 41, thereby adjusting the temperature of the electrolyzer 223, the hydrogen temperature at the outlet of the first compressor 24 and the outlet of the first pressure reducing valve 26. The operating data of the inverter 222 collected by the thermal management device 4 includes data such as start-stop status, power, voltage, current, fault status, etc. The operating data of the water electrolysis hydrogen production equipment 22 collected by the thermal management device 4 includes data such as start-stop status, temperature, alkali solution flow, oxygen flow, hydrogen flow, fault status, etc. The operating data of the first compressor 24 collected by the thermal management device 4 includes data such as start-stop status, power, gas flow, fault status, etc. The operation data of the control system 11 of the hydrogen production and hydrogenation station collected by the thermal management device 4 includes the operation plan of the water electrolysis hydrogen production device 22 and the hydrogenation load forecast of hydrogen energy vehicles. There is a two-way communication between the control system 11 and the thermal management device 4. The control system 11 can directly send control instructions to the thermal management device 4 in an emergency to control the thermal management device 4 to meet the thermal management needs in an emergency.

[0060] Take the first hydrogen storage tank 25 as a medium-pressure hydrogen storage tank and the electrolysis water hydrogenation station 2 as an example:

[0061] The heat pump 41 in the thermal management device 4 absorbs heat energy from the coolant passing through the electrolyzer 223 and converts it into cold energy to cool the hydrogen in the hydrogenation step.

[0062] For alkaline electrolysis hydrogen production equipment, the coolant temperature at the outlet of the second heat exchange tube 43 on the water electrolysis hydrogen production equipment 22 is 80°C to 95°C. It is driven by the second liquid pump 46 to enter the heat source end of the heat pump 41. After the heat exchange is completed inside the heat pump 41, the temperature of the coolant drops to 55°C, and then the coolant enters the alkaline electrolytic cell 223 to cool it.

[0063] For the proton exchange membrane electrolysis hydrogen production equipment, the coolant temperature at the outlet of the second heat exchange tube 43 on the water electrolysis hydrogen production equipment 22 is 65°C~80°C, and is driven by the second liquid pump 46 to enter the heat source end of the heat pump 41. After the heat exchange is completed inside the heat pump 41, the temperature of the coolant drops to 45°C, and then the coolant enters the proton exchange membrane electrolyzer 223 to cool it.

[0064] The coolant in the first heat exchange tube 42 of the hydrogenation link is driven by the first liquid pump 45. The temperature of the coolant at the outlet of the heat pump 41 is -5°C. The coolant then goes to the heat exchanger 44 at the outlet of the first compressor 24 and the first pressure reducing valve 26 to cool the hydrogen there. The coolant then flows back to the heat pump 41.

[0065] The 35MPa-level water electrolysis hydrogenation station 2 produces and stores hydrogen during the off-peak electricity price period, and then provides fuel filling services for hydrogen-powered vehicles with high-pressure hydrogen in the first hydrogen storage tank 25. Since the temperature of the high-pressure hydrogen in the first hydrogen storage tube is close to the ambient temperature, and the temperature increase during the decompression and filling process is limited, the thermal management device 4 mainly manages the comprehensive heat management issues during the joint operation of water electrolysis hydrogenation and the compressor.

[0066] There are two thermal management modes for the 35MPa-level water electrolysis hydrogen production and refueling station 2. The first mode is for the off-peak electricity price period, when the water electrolysis hydrogen production equipment 22 and the compressor work together to raise the hydrogen pressure in the medium-pressure hydrogen storage pipe to 45MPa. This process requires joint control of the heat pump 41, the first liquid pump 45, and the second liquid pump 46. The second mode is when the hydrogen in the medium-pressure hydrogen storage tank reaches 45MPa, the high-pressure hydrogen in the medium-pressure hydrogen storage tank is reduced in pressure to provide hydrogen refueling services for hydrogen-powered vehicles. This process only requires controlling the speed of the first liquid pump 45, and the heat pump 41 and the second liquid pump are in a shutdown state.

[0067] The control method of the thermal management device 4 of the 35MPa level water electrolysis hydrogenation station 2 in the first mode is as follows:

[0068] [Mode 1] For the alkaline water electrolysis hydrogen production device 22, the controller 10 needs to control the operating power of the heat pump 41 to achieve the temperature of the second temperature sensor 6 at 55°C and the temperature of the third temperature sensor 7 at -5°C, and the motor power of the second liquid pump 46 is proportional to the temperature of the first temperature sensor 5.

[0069] The power control formula of the heat pump 41 is:

[0070] P 3hpALK (Δt 1 ,Δt 2 )=a 11a *Δt 1 2 +a 12a *Δt 1 +b 11a *Δt 2 2 +b 12a *Δt 2 +c 11a

[0071] Among them, a 11a 、a 12a 、b11a 、b 12a 、c 11a are parameter factors in the power control formula of the heat pump 41, which are calculated based on the equipment operation data; Δt 1 , Δt 2 The inlet and outlet temperatures are the temperature differences of the heat source end and the cold source end of the heat pump 41, respectively. The heat pump 41 has the function of monitoring the inlet and outlet temperatures.

[0072] Δt 1 =T hi- T ho

[0073] Δt 1 =T ci -T co

[0074] The motor power control formula of the second liquid pump 46 is:

[0075] P 3p1ALK (T 1 ) = d 11a *T 1 +e 11a

[0076] Among them, d 11a 、e 11a are parameter factors in the power control formula of the second liquid pump 46, which are calculated based on the equipment operation data, T 1 is the temperature data of the first temperature sensor 5, and the temperature range is 80°C to 95°C.

[0077] The motor power control formula of the first liquid pump 45 is:

[0078] P 3p2ALK (T 3 ) = d 12a *T 3 +e 12a

[0079] Among them, d 12a 、e 12a are parameter factors in the power control formula of the first liquid pump 45, which are calculated based on the equipment operation data, T 3 is the temperature data of the third temperature sensor 7 , and the temperature data is related to the operating power of the first compressor 24 .

[0080] For the proton exchange membrane water electrolysis hydrogen production device 22 , the controller 10 needs to control the operating power of the heat pump 41 to achieve the temperature of the second temperature sensor 6 at 45° C. and the temperature of the third temperature sensor 7 at −5° C. The motor power of the second liquid pump 46 is proportional to the temperature of the first temperature sensor 5 .

[0081] The power control formula of the heat pump 41 is:

[0082] P 3hpPEM (Δt 1 ,Δt 2 )=a 11p *Δt 1 2 +a 12p *Δt 1 +b 11p *Δt 2 2 +b 12p *Δt 2 +c 11p

[0083] Among them, a 11p 、a 12p 、b 11p 、b 12p 、c 11p are parameter factors in the power control formula of the heat pump 41, which are calculated based on the equipment operation data; Δt 1 , Δt 2 The inlet and outlet temperatures are the temperature differences of the heat source end and the cold source end of the heat pump 41, respectively. The heat pump 41 has the function of monitoring the inlet and outlet temperatures.

[0084] The motor power control formula of the second liquid pump 46 is:

[0085] P 3p1PEM (T 1 ) = d 11p *T 1 +e 11p

[0086] Among them, d 11p 、e 11p are parameter factors in the power control formula of the second liquid pump 46, which are calculated based on the equipment operation data, T 1 is the temperature data of the first temperature sensor 5, and the temperature range is: 65°C ~ 80°C.

[0087] The motor power control formula of the first liquid pump 45 is:

[0088] P 3p2PEM (T 3 ) = d 12p *T 3 +e 12p

[0089] Among them, d 12p 、e 12p are parameter factors in the power control formula of the first liquid pump 45, which are calculated based on the equipment operation data, T3 is the temperature data of the third temperature sensor 7.

[0090] The control method of the thermal management device 4 of the 35MPa level water electrolysis hydrogenation station 2 in the second mode is as follows:

[0091] [Mode 2] In this mode, the controller 10 controls the rotation speed of the first liquid pump 45 to control the temperature increase of the hydrogen in the first gas storage tank during the decompression process.

[0092] The motor power control formula of the first liquid pump 45 is:

[0093] P 3p2 (T 4 ) = d 1p *T 4 +e 1p

[0094] Among them, d 1p 、e 1p are parameter factors in the power control formula of the first liquid pump 45, which are calculated based on the equipment operation data, T 4 is the temperature data of the fourth temperature sensor 8.

[0095] Take the first hydrogen storage tank 25 as a high-pressure hydrogen storage tank and the electrolysis water hydrogenation station 2 as an example:

[0096] The heat pump 41 in the thermal management device 4 absorbs heat energy from the coolant passing through the electrolyzer 223 and converts it into cold energy to cool the hydrogen in the hydrogenation step.

[0097] For alkaline electrolysis hydrogen production equipment, the coolant temperature at the outlet of the second heat exchange tube 43 on the water electrolysis hydrogen production equipment 22 is 80°C to 95°C. It is driven by the second liquid pump 46 to enter the heat source end of the heat pump 41. After the heat exchange is completed inside the heat pump 41, the temperature of the coolant drops to 55°C, and then the coolant enters the alkaline electrolytic cell 223 to cool it.

[0098] For the proton exchange membrane electrolysis hydrogen production equipment, the coolant temperature at the outlet of the second heat exchange tube 43 on the water electrolysis hydrogen production equipment 22 is 60°C to 80°C. It is driven by the second liquid pump 46 to enter the heat source end of the heat pump 41. After the heat exchange is completed inside the heat pump 41, the temperature of the coolant drops to 45°C, and then the coolant enters the proton exchange membrane electrolyzer 223 to cool it.

[0099] The coolant in the first heat exchange tube 42 of the hydrogenation link is driven by the first liquid pump 45. The temperature of the coolant at the outlet of the heat pump 41 is -10°C. The coolant then goes to the heat exchanger 44 at the outlet of the first compressor 24 and the first pressure reducing valve 26 to cool the hydrogen there. The coolant then flows back to the heat pump 41.

[0100] Since there are two hydrogen compressors and multiple pressure reducing valves in the 70MPa-level water electrolysis hydrogenation station 2, the coolant temperature in the hydrogenation process needs to be lower in order to achieve the expected designed refrigeration effect.

[0101] The 70MPa-level water electrolysis hydrogenation station 2 produces and stores hydrogen during the off-peak electricity price period, and then provides fuel filling services for hydrogen-powered vehicles with high-pressure hydrogen in the first hydrogen storage tank 25. Since the temperature of the high-pressure hydrogen in the first hydrogen storage tube is close to the ambient temperature, and the temperature increase during the decompression and filling process is limited, the thermal management device 4 mainly manages the comprehensive heat management issues during the joint operation of water electrolysis hydrogenation and the compressor.

[0102] There are two thermal management modes of the 70MPa-level water electrolysis hydrogen production and refueling station 2. The first mode is during the valley electricity price period, when the water electrolysis hydrogen production equipment 22 and the compressor work together to increase the hydrogen pressure in the high-pressure hydrogen storage pipe to 85MPa. This process requires the joint control of the heat pump 41, the first liquid pump 45, and the second liquid pump 46. The second mode is that after the hydrogen in the high-pressure hydrogen storage tank reaches 85MPa, the high-pressure hydrogen in the high-pressure hydrogen storage tank is reduced in pressure to provide hydrogen refueling services for hydrogen-powered vehicles. This process only requires controlling the speed of the first liquid pump 45, and the heat pump 41 and the second liquid pump are in a shutdown state.

[0103] The methods of the two thermal management modes of the 70MPa level water electrolysis hydrogenation station 2 are the same as the methods of the two thermal management modes of the 35MPa level water electrolysis hydrogenation station 2, and will not be repeated here.

[0104] Second embodiment

[0105] See also Figure 4 This embodiment provides a thermal management system 1 for a water electrolysis hydrogen production and hydrogenation station, which is similar to the system provided in the first embodiment, except that the system provided in this embodiment is mainly used for 35MPa and 70MPa level hydrogen production and hydrogenation stations.

[0106] Based on the structure of the system provided in the first embodiment, the water electrolysis hydrogen production and hydrogenation station 2 in this embodiment also includes a second compressor 28, a second hydrogen storage tank 29, a second pressure reducing valve 30 and a second hydrogenation gun 31 which are connected in sequence through the gas pipe 21, wherein the second compressor 28 is connected to the first hydrogen storage tank 25.

[0107] In this embodiment, the first hydrogen storage tank 25 is a medium-pressure hydrogen storage tank, and the pressure range of the medium-pressure hydrogen storage tank is: 35MPa~45MPa, and the second hydrogen storage tank 29 is a high-pressure hydrogen storage tank, and the pressure range of the high-pressure hydrogen storage tank is: 70MPa~85MPa.

[0108] A fifth temperature sensor 9 is installed in the heat exchanger 44 at the outlet of the second compressor 28. The fifth temperature sensor 9 is electrically connected to the controller 10.

[0109] The gas pipe 21 between the second compressor 28 and the second hydrogen storage tank 29 and the gas pipe 21 between the second pressure reducing valve 30 and the second hydrogenation gun 31 are both covered with a heat exchanger 44 .

[0110] See also Figure 5 The electrolysis water hydrogen production equipment 22 includes a transformer 221, an inverter 222 and an electrolyzer 223 which are electrically connected in sequence, wherein the transformer 221 is used to access the power grid, the electrolyzer 223 uses electricity to electrolyze water into hydrogen and oxygen, and delivers the water to the gas purification device 23, the gas purification device 23 is used to separate hydrogen and oxygen, and deliver the hydrogen to the first compressor 24, the first compressor 24 is used to compress the hydrogen and store it in the first hydrogen storage tank 25, the hydrogen in the first hydrogen storage tank 25 is depressurized to 35MPa by the first pressure reducing valve 26, and the hydrogen is filled into the hydrogen energy vehicle by the first hydrogenation gun 27. The second compressor 28 is used to compress the hydrogen in the first hydrogen storage tank 25 and store it in the second hydrogen storage tank 29, the hydrogen in the second hydrogen storage tank 29 is depressurized to 70MPa by the second pressure reducing valve 30, and the hydrogen is filled into the hydrogen energy vehicle by the second hydrogenation gun 31. Among them, the oxygen can be discharged into the air or stored in the oxygen tank through the compressor to supply high-purity oxygen to industrial users.

[0111] See also Figure 6 The system also includes a controller 10, which communicates with the heat pump 41, the first liquid pump 45, the second liquid pump 46, the first temperature sensor 5, the second temperature sensor 6, the third temperature sensor 7, the fourth temperature sensor 8, the fifth temperature sensor 9, the water electrolysis hydrogen production equipment 22, the first compressor 24, the second compressor 28, the station control system 11, the first hydrogen storage tank 25, the second hydrogen storage tank 29, the first hydrogenation gun 27, the second hydrogenation gun 31 and the inverter 222.

[0112] The controller 10 obtains data from the equipment and temperature sensors in the station, including the pressure data of the first hydrogen storage tank 25 and the second hydrogen storage tank 29, and the temperature data of the first temperature sensor 5, the second temperature sensor 6, the third temperature sensor 7, the fourth temperature sensor 8, and the fifth temperature sensor 9. The controller 10 sends control instructions to the first liquid pump 45, the second liquid pump 46, and the heat pump 41 according to the thermal management control algorithm to control the speed of the first liquid pump 45 and the second liquid pump 46 and the cooling capacity of the heat pump 41, thereby adjusting the temperature of the electrolyzer 223, the hydrogen temperature at the outlet of the first compressor 24, and the outlet of the first pressure reducing valve 26. The operating data of the inverter 222 collected by the thermal management device 4 includes data such as start-stop status, power, voltage, current, and fault status. The operating data of the water electrolysis hydrogen production equipment 22 collected by the thermal management device 4 includes data such as start-stop status, temperature, alkali solution flow, oxygen flow, hydrogen flow, and fault status. The operating data of the first compressor 24 and the second compressor 28 collected by the thermal management device 4 include data such as start-stop status, power, gas flow, fault status, etc. The operating data of the in-station control system 11 of the hydrogen production and hydrogenation station collected by the thermal management device 4 include the operation plan of the water electrolysis hydrogen production equipment 22 and the hydrogenation load forecast of hydrogen energy vehicles. There is two-way communication between the in-station control system 11 and the thermal management device 4. The in-station control system 11 can directly issue control instructions to the thermal management device 4 in an emergency to control the thermal management device 4 to meet the thermal management needs in an emergency.

[0113] The 35MPa and 70MPa level water electrolysis hydrogen production and refueling station 2 produces and stores hydrogen during the valley electricity price period, and then the high-pressure hydrogen in the hydrogen storage tank provides fuel filling services for hydrogen-powered vehicles. Since the temperature of high-pressure hydrogen in the hydrogen storage tube is close to the ambient temperature, and the temperature increase during the decompression and refueling process is limited, the thermal management system in the hydrogen production and refueling station mainly manages the comprehensive heat management issues during the joint operation of water electrolysis hydrogen production and compressors.

[0114] There are two thermal management modes for this level of electrolytic water hydrogenation station 2. The first mode is during the valley electricity price period, when the electrolytic water hydrogenation equipment 22 and the compressor operate together to make the hydrogen pressure in the medium-pressure hydrogen storage tank and the high-pressure hydrogen storage tank reach 45MPa and 85MPa respectively. This process requires the joint control of the heat pump 41, the first liquid pump 45, and the second liquid pump 46; the second mode is that after the hydrogen in the hydrogen storage tank reaches the preset pressure, the high-pressure hydrogen in the hydrogen storage tank is decompressed to provide hydrogenation services for hydrogen-powered vehicles of the corresponding pressure level. This process only requires the control of the speed of the first liquid pump 45, and the heat pump 41 and the second liquid pump are in a shutdown state. Since the second compressor 28 can be temporarily started as needed during the operation of the hydrogenation station, it is necessary to ensure that there is enough hydrogen in the high-pressure hydrogen storage tank.

[0115] The control method of the thermal management device 4 of the 35MPa and 70MPa level water electrolysis hydrogenation station 2 in the first mode is as follows:

[0116] [Mode 1] For the alkaline water electrolysis hydrogen production device 22, the controller 10 controls the operating power of the heat pump 41 to achieve the temperature of the second temperature sensor 6 at 55°C and the temperature of the third temperature sensor 7 at -10°C, and the motor power of the second liquid pump 46 is proportional to the temperature of the first temperature sensor 5.

[0117] The power control formula of the heat pump 41, the motor power control formula of the second liquid pump 46, and the motor power control formula of the first liquid pump 45 are the same as those in the first embodiment.

[0118] For the proton exchange membrane water electrolysis hydrogen production device 22 , the controller 10 controls the operating power of the heat pump 41 to achieve the temperature of the second temperature sensor 6 at 45° C. and the temperature of the third temperature sensor 7 at −10° C. The motor power of the second liquid pump 46 is proportional to the temperature of the first temperature sensor 5 .

[0119] The power control formula of the heat pump 41, the motor power control formula of the second liquid pump 46, and the motor power control formula of the first liquid pump 45 are the same as those in the first embodiment.

[0120] [Mode 2] In this mode, the thermal management device 4 controls the rotation speed of the first liquid pump 45 to control the temperature rise during the decompression of the hydrogen in the hydrogen tank. Since there are two pressure levels of hydrogen storage tanks, the first compressor 24 in the station will start when the pressure in the high-pressure hydrogen storage tank is insufficient, and compress the hydrogen in the medium-pressure hydrogen storage tank into the high-pressure hydrogen storage tank.

[0121] The motor power control formula of the first liquid pump 45 is:

[0122] P 2p2 (T 4 , T 5 ) = d 31p *T 4 +d 32p *T 5 +e 3p

[0123] Among them, d 31p d 32p 、e 3p are parameter factors in the power control formula of the first liquid pump 45, which are calculated based on the equipment operation data, T 4 , T 5 They are the temperature data of the fourth temperature sensor 8 and the fifth temperature sensor 9 respectively.

[0124] In addition to the above two control modes, the thermal management device 4 can also accept the operating status of the heat pump 41 and the liquid pump dynamically adjusted by the operating status of other equipment in the hydrogen production and hydrogenation station.

[0125] For example 1: When the hydrogen pressure in the medium-pressure hydrogen storage tank is ≤37MPa, in order to ensure that there is enough hydrogen in the hydrogen production and refueling station to provide hydrogenation services, the water electrolysis hydrogen production equipment 22 and the compressor need to be started to provide temporary hydrogen production and storage. In this case, the hydrogen production and refueling station can start the heat pump 41 according to the instructions issued by the station control software or monitor the start-up of the water electrolysis hydrogen production equipment 22 and the start-up of the compressor to ensure that the thermal management achieves the expected effect.

[0126] Example 2: When the ambient temperature is high in summer, the thermal management device 4 can receive instructions from the station control software and increase the operating power to ensure that the thermal management achieves the expected effect.

[0127] The effective effects of the thermal management system 1 of the hydrogenation station for electrolysis of water provided by the above embodiments of the present invention include:

[0128] 1. The first liquid pump 45, the first heat exchange pipe 42 and the heat exchanger 44 in the thermal management device 4 are connected end to end in sequence and connected between the heat pump 41 and the gas pipe 21 of the electrolytic water hydrogenation station 2. The heat pump 41 can be used to absorb the heat of the gas pipe 21 to avoid the gas pipe 21 from being too high in temperature and reducing the hydrogen filling efficiency;

[0129] 2. The second liquid pump 46 and the second heat exchange tube 43 in the heat management device 4 are connected end to end and connected between the heat pump 41 and the water electrolysis hydrogen production device 22. The heat pump 41 can be used to absorb the heat in the cooling circuit of the water electrolysis hydrogen production device 22 to avoid the hydrogen production device from being overheated and causing damage to the device life;

[0130] 3. The integrated heat management of the water electrolysis hydrogen production equipment 22, compressor, pressure reducing valve and other equipment is realized, the integration of the thermal management system is improved, and the equipment redundancy problem caused by the separate configuration of thermal management equipment 4 for different equipment is reduced. The system improves the thermal management accuracy and effectively reduces the poor accuracy problem of the air-cooling thermal management system;

[0131] 4. The heat pump 41 is used to absorb the heat energy generated during the operation of the water electrolysis hydrogen production equipment 22 to provide a cold source for the compressor and the pressure reducing valve, which effectively reduces the energy consumption of the equipment refrigeration process. At the same time, fine control is performed according to the operation mode of the hydrogen production and hydrogenation station, which effectively reduces the operating energy consumption of the thermal management system during the standby process;

[0132] 5. The system adopts antifreeze coolant design, which effectively avoids the problem of water freezing in the water cooling system;

[0133] 6. The system can accept instructions from the station control software of the hydrogen production and refueling station, dynamically adjust the operating status of the thermal management system according to the operation of the entire station, and effectively improve the flexibility of the thermal management system.

[0134] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims

1. A thermal management system for a hydrogenation station using electrolysis of water, It is characterized in that The system comprises: The water electrolysis hydrogenation station (2) comprises a water electrolysis hydrogenation device (22), a first compressor (24), a first hydrogen storage tank (25) and a first pressure reducing valve (26) which are connected via a gas pipe (21); A heat management device (4), comprising a heat pump (41), a first heat exchange tube (42), a second heat exchange tube (43), a heat exchanger (44), a first liquid pump (45) and a second liquid pump (46), wherein the first liquid pump (45) is installed on the first heat exchange tube (42), one end of the first heat exchange tube (42) is connected to the heat pump (41), the first heat exchange tube (42) and the second heat exchange tube (43) are filled with coolant, the other end of the first heat exchange tube (42) is connected to the heat exchanger (44), and the heat exchanger (44) is connected to the first heat exchange tube (42). ) is installed on the gas pipe (21) at the outlet position of the first compressor (24) and the first pressure reducing valve (26), the heat exchanger (44) is used to cool the gas pipe (21), the second liquid pump (46) is installed on the second heat exchange tube (43), one end of the second heat exchange tube (43) is connected to the heat pump (41), the other end of the second heat exchange tube (43) is connected to the water electrolysis hydrogen production equipment (22), and the second heat exchange tube (43) is used to absorb the heat generated by the water electrolysis hydrogen production equipment (22) during operation; A first temperature sensor (5) is installed at the coolant outlet of the water electrolysis hydrogen production equipment (22), a second temperature sensor (6) is installed at the heat source end outlet of the heat pump (41), and a third temperature sensor (7) is installed at the cold source end outlet of the heat pump (41); When the water electrolysis hydrogen production equipment (22) is an alkaline water electrolysis hydrogen production equipment, the power control formula of the heat pump (41) is: P 3hpALK (Δt 1 ,Δt 2 )=a 11a *Δt 1 2 +a 12a *Δt 1 +b 11a *Δt 2 2 +b 12a *Δt 2 +c 11a Among them, a 11a 、a 12a 、b 11a 、b 12a 、c 11a are parameter factors in the power control formula of the heat pump (41); Δt 1 , Δt 2 are the temperature differences between the inlet and outlet of the heat source end and the cold source end of the heat pump (41); The motor power control formula of the second liquid pump (46) is: P 3p1ALK (T 1 )=d 11a *T 1 +e 11a Among them, d 11a 、e 11a are the parameter factors in the power control formula of the second liquid pump (46), T 1 is the temperature data of the first temperature sensor (5); The motor power control formula of the first liquid pump (45) is: P 3p2ALK (T 3 )=d 12a *T 3 +e 12a Among them, d 12a 、e 12a are parameter factors in the power control formula of the first liquid pump (45), T 3 is the temperature data of the third temperature sensor (7); When the water electrolysis hydrogen production equipment (22) is a proton exchange membrane water electrolysis hydrogen production equipment, the power control formula of the heat pump (41) is: P 3hpPEM (Δt 1 ,Δt 2 )=a 11p *Δt 1 2 +a 12p *Δt 1 +b 11p *Δt 2 2 +b 12p *Δt 2 +c 11p Among them, a 11p 、a 12p 、b 11p 、b 12p 、c 11p are respectively parameter factors in the power control formula of the heat pump (41); The motor power control formula of the second liquid pump (46) is: P 3p1PEM (T 1 )=d 11p *T 1 +e 11p Among them, d 11p 、e 11p are parameter factors in the power control formula of the second liquid pump (46); The motor power control formula of the first liquid pump (45) is: P 3p2PEM (T 3 )=d 12p *T 3 +e 12p Among them, d 12p 、e 12p They are respectively parameter factors in the power control formula of the first liquid pump (45).

2. The thermal management system of the water electrolysis hydrogenation station according to claim 1, It is characterized in that The water electrolysis hydrogenation station (2) also includes a gas purification device (23), and the water electrolysis hydrogenation equipment (22) includes a transformer (221), an inverter (222) and an electrolyzer (223) which are electrically connected in sequence, wherein the transformer (221) is used to access the power grid, the electrolyzer (223) is used to produce hydrogen and oxygen and transport them to the gas purification device (23), and the gas purification device (23) is used to separate the hydrogen and the oxygen and transport the hydrogen to the first compressor (24).

3. The thermal management system of the water electrolysis hydrogenation station according to claim 1, It is characterized in that The pressure range of the first hydrogen storage tank (25) is 35 MPa to 45 MPa.

4. The thermal management system of the water electrolysis hydrogenation station according to claim 1, It is characterized in that The water electrolysis hydrogenation station (2) further comprises a second compressor (28), a second hydrogen storage tank (29), a second pressure reducing valve (30) and a second hydrogenation gun (31) which are sequentially connected via an air pipe (21), wherein the second compressor (28) is connected to the first hydrogen storage tank (25).

5. The thermal management system of the water electrolysis hydrogenation station according to claim 4, It is characterized in that The pressure range of the first hydrogen storage tank (25) is 35 MPa to 45 MPa, and the pressure range of the second hydrogen storage tank (29) is 70 MPa to 85 MPa.

6. The thermal management system of the water electrolysis hydrogenation station according to claim 5, It is characterized in that A fourth temperature sensor (8) is installed in the heat exchanger (44).

7. The thermal management system of the water electrolysis hydrogenation station according to claim 6, It is characterized in that The fourth temperature sensor (8) is installed in the heat exchanger (44) at the outlet of the first compressor (24), and a fifth temperature sensor (9) is installed in the heat exchanger (44) at the outlet of the second compressor (28).

8. The thermal management system of the water electrolysis hydrogenation station according to claim 7, It is characterized in that The system further comprises a controller (10), wherein the controller (10) is electrically connected to the heat pump (41), the first liquid pump (45), the second liquid pump (46), the first temperature sensor (5), the second temperature sensor (6), the third temperature sensor (7), the fourth temperature sensor (8) and the fifth temperature sensor (9).

9. The thermal management system of the water electrolysis hydrogenation station according to claim 8, It is characterized in that The controller (10) is used to control the motor power of the first liquid pump (45) to be proportional to the detected temperature of the third temperature sensor (7), and to control the motor power of the second liquid pump (46) to be proportional to the detected temperature of the first temperature sensor (5).