[0002]朱家峁煤矿属地质类型中等矿井,主采煤层为3号煤层,煤层赋存1000m-800m,矿井生产以来,偶有古河流冲刷及小型断层发育,虽然断层落差一般在3m以下,但由于煤层较薄,有时综采工作面会出现大面积割矸现象,对生产影响较大
[0019] Compared with the existing technology, the beneficial effects of the present invention are: the present invention utilizes different locations such as along the trough and working surface, and uses different types of drilling rigs for advance detection, thereby determining the direction of the fault, the drop at different spatial locations, and the roof and floor in advance. Lithology, and finally based on the comprehensive detection results, a construction method for crossing the fault is reasonably formulated, a reasonable location is selected near the fault in the two troughs of the working face, and a water exploration drill is used to conduct preliminary detection of the direction and drop of the fault; when the working face is advanced to When the fault level is about 20m away, a pneumatic drill is used to conduct precise detection on the working surface (one drilling hole is constructed for every five supports), and the direction of the fault is accurately controlled according to the depth of gangue seen in the drilling hole; simple detection tools such as anchor drills and pneumatic drills are used to detect the top of the coal seam. Detect the lithology of the floor and find out the rock hardness, integrity and other conditions in advance. While ensuring construction safety and improving the mining efficiency of the working face, it can also increase the mining speed of the working face and avoid the fire of leftover coal in the goaf due to slow mining speed.
Smart Images

Figure CN113027440B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mine fully-mechanized mining working face passing through faults, and in particular to a construction method for a fully-mechanized mining working face passing through oblique faults. Background Art
[0002] Zhujiamao Coal Mine is a medium-sized mine with the main mining coal seam being the No. 3 coal seam, which is distributed at a depth of 1000m-800m. Since the mine was put into production, there have been occasional ancient river erosion and the development of small faults. Although the fault drop is generally less than 3m, due to the thin coal seam, sometimes large-scale gangue cutting will occur in the comprehensive mining working face, which has a great impact on production.
[0003] During the excavation of the two drifts of the working face, the F1 fault (with a drop of about 3m) was exposed. The strike of the fault was at an angle of about 45° to the working face. Since the width of the working face was 200m, it was difficult to accurately predict the strike and drop changes of the fault inside the working face using geophysical exploration methods. In addition, the hardness of the coal seam roof and floor were both sandy mudstone with a hardness of f=6-7, making it difficult for coal mining machines to cut. In order to safely and quickly pass through the fault, we designed a construction method for a fully mechanized mining face crossing an oblique fault. Summary of the invention
[0004] The present invention provides a method for construction of a fully mechanized mining face passing through an oblique fault, which can solve the problems in the above-mentioned background technology. The present invention is easy to use, scientifically and reliably applied, and brings high safety and economic benefits.
[0005] To achieve the above object, the present invention provides the following technical solutions: a method for construction of a fully-mechanized mining face passing through an oblique fault, comprising preliminary exploration of the fault direction and drop, finding out the specific direction and drop of the fault, analyzing the fault docking layer and formulating a fault crossing plan, the method for construction of a fully-mechanized mining face passing through an oblique fault comprises the following steps:
[0006] Step S1, preliminary exploration of fault strike and fall: reasonably select a location near the fault exposed in the two trenches of the working face, use a water exploration drill to conduct preliminary exploration of the fault strike and fall, and gain a macroscopic understanding of the development of the fault inside the working face;
[0007] Step S2, find out the specific direction and height difference of the fault: when the working face is advanced to about 20m near the fault surface, use a pneumatic drill to conduct precise detection on the working face, specifically, drill a probe hole every 5-10m along the inclination of the coal seam, and accurately control the fault direction according to the depth of gangue seen by the probe hole (i.e. the position of the fault surface);
[0008] Step S3, analyzing the fault docking layer: using simple detection tools such as anchor drills and pneumatic drills to detect the rock properties of the top and bottom plates of the coal seam, and find out the hardness and integrity of the rock in advance;
[0009] Step S4, formulate a fault crossing plan: Based on the above-mentioned comprehensive detection means, the fault strike, dip, drop and rock layer where the fault surface is connected can be obtained. In order to ensure the rapid advancement of the working face, the "avoid hard and go for soft" method is adopted to formulate a fault crossing construction plan. According to the actual situation, the method of raising the horizontal cutter in advance or passively raising the horizontal cutter can be adopted.
[0010] Preferably, in step S1, since the oblique fault is exposed at different positions during the excavation of the two drifts of the working face, appropriate detection positions can be selected in the drift to arrange drilling holes, and the drilling holes can be used to detect the fault strike and drop.
[0011] Preferably, in step S1, due to the long detection length, the detection in this stage generally requires the use of a high-power water or coal drilling rig, through which the development of the fault inside the working face can be obtained from a macroscopic perspective, so as to prepare for crossing the fault in advance.
[0012] Preferably, in step S2, when the working face is advanced to about 20m near the fault plane, it is necessary to consider whether to raise the horizontal cutter in advance, so a pneumatic drill (a pressure relief drill may be used) is used to perform precise detection on the working face in this stage.
[0013] Preferably, in step S2, precise detection is performed by constructing a probe hole every 5-10m along the inclination of the coal seam, and cyclically carrying out detection work as the working face advances, and accurately controlling the direction of the fault according to the depth of gangue seen in the probe hole (i.e., the position of the fault surface).
[0014] Preferably, in step S3, simple detection tools such as anchor drills and pneumatic drills are used to detect the rock properties within 5 m above and below the roof and floor plates of the coal seam in the working face, so as to find out the hardness and integrity of the rock in advance, keep records, and draw rock columnar diagrams of the roof and floor plates.
[0015] Preferably, in step S4, the fault strike, dip, fall and rock layer where the fault plane abuts can be obtained according to the comprehensive detection means in the above three stages.
[0016] Preferably, in step S4, in order to ensure rapid advancement of the working face, the method of "avoiding hard rock and going for soft rock" is adopted, that is, the method of lifting the horizontal cutter in advance or passively lifting the horizontal cutter is adopted to allow the coal machine to cut soft rock as much as possible and cut less hard rock, so as to avoid the phenomenon that the coal machine has difficulty in cutting or needs blasting.
[0017] Preferably, in step S1, the design of the drilling hole should take into account the detection of the fault drop and direction at the same time, and the design of the drilling hole detection results should evenly cover the working surface to achieve effective control.
[0018] Preferably, when the working face advances to about 20 m from the fault plane, step S2 detection is started.
[0019] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention utilizes different positions such as the drift and the working face, and adopts different types of drilling rigs for advanced detection, so as to determine in advance the direction of the fault, the height difference at different spatial positions, and the rock properties of the top and bottom plates, and finally reasonably formulates a construction method for crossing the fault according to the comprehensive detection results, reasonably selects a position near the fault exposed in the two drifts of the working face, and uses a water exploration drill to conduct preliminary detection of the fault direction and height difference; when the working face is advanced to about 20m near the fault surface, a pneumatic drill is used to conduct precise detection on the working face (one exploration eye is constructed for every 5 supports), and the fault direction is accurately controlled according to the depth of gangue seen in the exploration eye; the rock properties of the top and bottom plates of the coal seam are detected by using simple detection tools such as anchor drilling rigs and pneumatic drills, so as to find out the hardness and integrity of the rock in advance, and improve the recovery speed of the working face while ensuring construction safety and improving the recovery efficiency of the working face, so as to avoid the ignition of coal in the goaf caused by slow recovery speed. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a flow chart of the construction method of the fully mechanized mining working face passing through the oblique fault of the present invention;
[0021] Figure 2 This is an example plan view of the present invention.
[0022] Figure 3 This is a plan view illustrating an example of the present invention. DETAILED DESCRIPTION
[0023] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] Example 1
[0026] See also Figure 1-3 The present invention provides a technical solution: a construction method for a fully-mechanized mining face passing through an oblique fault, and a comprehensive advance detection and analysis method for a fully-mechanized mining face passing through an oblique fault, including preliminary exploration of the fault direction and drop, finding out the specific direction and drop of the fault, analyzing the fault docking layer and formulating a fault crossing plan, including the following steps:
[0027] Step S1, select appropriate detection positions in the drift and arrange drilling holes to detect the development of faults in advance. Through detection, the development of faults inside the working face can be obtained from a macroscopic perspective. This work is the preliminary detection stage.
[0028] The detection position should be near the fault plane, and the site should be convenient for construction inside the working surface. The design of drilling holes should take into account the detection of fault drop and direction.
[0029] The drilling detection results should be designed to evenly cover the working surface to achieve effective control.
[0030] After the detection is completed, the data is collected and the plan section is drawn using CAD software.
[0031] Step S2, when the working face advances to about 20m near the fault plane, the detection of this stage begins. This distance is not fixed according to the size of the fault drop and can be flexibly adjusted.
[0032] In this stage, a pneumatic drill (a pressure relief drill can be used) is used to conduct precise detection on the working surface.
[0033] Specifically, a probe hole is constructed every 5-10m along the inclination of the coal seam, and the depth of the gangue position seen by the probe hole is accurately recorded.
[0034] The depth of gangue seen by the exploration eye (i.e. the position of the fault plane) is drawn on the CAD plane map to accurately control the direction of the fault.
[0035] Step S3, use simple detection tools such as anchor drills and pneumatic drills to detect the rock properties within 5m above and below the roof and floor of the coal seam in the working face, find out the rock hardness, integrity, etc. in advance, keep records, and draw a rock column diagram of the roof and floor.
[0036] In step S4, the fault strike, dip, fall and rock layer where the fault plane abuts can be obtained according to the comprehensive detection means in the above three stages.
[0037] In order to ensure rapid advancement of the working face, the method of "avoiding hard rock and going for soft rock" is adopted. Reasonable methods of raising the horizontal cutter in advance or passively raising the horizontal cutter are adopted to allow the coal machine to cut soft rock as much as possible and cut less hard rock, so as to avoid the phenomenon that the coal machine has difficulty in cutting or needs blasting.
[0038] By adopting the above-mentioned comprehensive detection and analysis methods and formulating reasonable measures, we can improve the mining speed of the working face while ensuring construction safety and improving the mining efficiency of the working face, thereby avoiding the fire of coal in the goaf caused by slow mining speed.
[0039] As an implementation example of the present invention, when the 1314 working face passes through the F1 fault, the following steps are specifically followed:
[0040] Step S1, firstly, by selecting a construction site in the auxiliary transport drift and the belt drift of the 1314 working face, the drilling holes for detecting the fault direction and height difference were organized.
[0041] The borehole for detecting the direction is drilled along the inclination of the coal seam and stops when gangue is seen, which is the fault plane.
[0042] The elevation angle of the boreholes for detecting the drop is arranged, and the fault drop is analyzed and calculated by drilling through the disk (the lithology of the boreholes is coal---gangue---coal).
[0043] If drilling through the disc cannot be achieved (the rock properties of the drill hole change from coal---gangue---coal), it is necessary to adjust the construction angle and re-construction.
[0044] According to the detection situation, after the detection is completed, the data is collected and the plan section diagram is drawn using CAD software as the basis for fault analysis.
[0045] Step S2, when the working face advances to about 20m near the fault plane, the detection of this stage begins. This distance is not fixed according to the size of the fault drop and can be flexibly adjusted.
[0046] On the working face at this location, an exploration hole is constructed every 5-10m in the area 20-30m away from the expected fault plane, and the detection work is carried out cyclically as the working face advances.
[0047] Since the construction space on the working surface is limited, lightweight pneumatic drilling rigs should be used as much as possible during the construction process.
[0048] When gangue is found in the drilling hole, it can generally be considered as the fault plane location. If there is any abnormality, additional verification holes need to be added.
[0049] By plotting the depth of gangue seen by the exploration eye (i.e. the position of the fault plane) on the CAD plane diagram, data for accurately controlling the direction of the fault can be generated.
[0050] Step S3, use simple detection tools such as anchor drills and pneumatic drills to detect the rock properties within 5m above and below the roof and floor of the coal seam in the working face, find out the rock hardness, integrity, etc. in advance, keep records, and draw a rock column diagram of the roof and floor.
[0051] In step S4, the fault strike, dip, fall and rock layer where the fault plane abuts can be obtained according to the comprehensive detection means in the above three stages.
[0052] In order to ensure the rapid advancement of the working face, the method of "avoiding hard rock and going for soft rock" was adopted on site. Reasonable methods of raising the horizontal cutter in advance or passively raising the horizontal cutter were adopted to allow the coal machine to cut soft rock as much as possible and cut less hard rock. There was no difficulty in cutting for the coal machine or the need for blasting. The working face quickly passed through the fault area, ensuring on-site safety.
[0053] The present invention realizes construction through the following steps: Step S1, preliminary exploration of fault direction and drop: reasonably select a position near the fault exposed in the two drifts of the working face, use a water exploration drill to conduct preliminary exploration of the fault direction and drop, and understand the development of the fault inside the working face in a macroscopic way; Step S2, find out the specific direction and drop of the fault: when the working face is advanced to about 20m near the fault surface, use a pneumatic drill to conduct precise exploration on the working face, specifically, construct a probe hole every 5-10m along the coal seam inclination, and accurately control the fault direction according to the depth of gangue seen in the probe hole (that is, the position of the fault surface); Step S3, analyze the fault docking layer: use an anchor drill and Simple detection tools such as pneumatic drills are used to detect the rock properties of the top and bottom plates of the coal seams to find out the hardness, integrity, etc. of the rocks in advance; Step S4, formulate a fault crossing plan: According to the above-mentioned comprehensive detection means, the fault direction, inclination, drop and rock layer where the fault surface is connected can be obtained. In order to ensure the rapid advancement of the working face, a "avoid hard and go with soft" method is adopted to formulate a fault crossing construction plan. According to the actual situation, the method of raising the horizontal cutter in advance or passively raising the horizontal cutter can be adopted; in step S1, since the oblique fault is exposed at different positions during the excavation of the two inclined slots of the working face, it is possible to choose an appropriate detection position in the inclined slot to arrange drilling holes, and the drilling holes can be used to determine the fault direction and drop. Conduct detection; Due to the long detection length, the detection at this stage generally requires the use of high-power water or coal drilling rigs. Through detection, the development of the fault inside the working face can be obtained from a macroscopic perspective, so as to prepare for crossing the fault in advance. In step S1, the design of the borehole should take into account the detection of the fault drop and direction at the same time. The design of the drilling detection results should evenly cover the working face to achieve effective control; when the working face is advanced to about 20m near the fault surface, step S2 detection is started. In step S2, when the working face is advanced to about 20m near the fault surface, it is necessary to consider whether to raise the horizontal cutter in advance. Therefore, a pneumatic drill is used in this stage (a pressure relief drill can be used) Precise detection is carried out on the working face; the precise detection is to construct a probe hole along the dip angle of the coal seam every 5-10m, and carry out detection work cyclically as the working face advances, and accurately control the fault direction according to the depth of gangue seen in the probe hole (i.e. the position of the fault surface); in step S3, the rock properties within 5m above and below the top and bottom plates of the coal seam in the working face are detected by using simple detection tools such as anchor drills and pneumatic drills, and the hardness and integrity of the rock are understood in advance, and records are made to draw a rock columnar diagram of the top and bottom plates; in step S4, the fault direction, dip angle, drop and rock layer where the fault surface is connected can be obtained according to the comprehensive detection means in the above three stages;In order to ensure the rapid advancement of the working face, the method of "avoiding hard rock and going for soft rock" is adopted, that is, the method of raising the horizontal cutter in advance or passively raising the horizontal cutter is adopted to let the coal machine cut soft rock as much as possible and cut hard rock less, so as to avoid the phenomenon that the coal machine is difficult to cut or needs blasting. Different types of drilling rigs are used for advanced detection at different positions such as the chute and the working face, so as to determine the direction of the fault, the height difference at different spatial positions and the rock properties of the top and bottom plates in advance. Finally, according to the comprehensive detection results, a reasonable construction method for crossing the fault is formulated, and a reasonable position is selected near the fault exposed in the two chute of the working face, and a water exploration drill is used to drill the fault. The machine conducts preliminary detection of the fault direction and drop; when the working face advances to about 20m near the fault surface, a pneumatic drill is used to conduct precise detection on the working face (one exploration hole is constructed for every 5 supports), and the fault direction is accurately controlled according to the depth of gangue seen by the exploration hole; the rock properties of the top and bottom plates of the coal seam are detected using simple detection tools such as anchor drills and pneumatic drills to find out the hardness and integrity of the rock in advance, while ensuring construction safety and improving the recovery efficiency of the working face, the recovery speed of the working face is increased, and the fire of the coal in the goaf caused by the slow recovery speed is avoided, which has a certain use prospect. ;
[0054] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction method for a fully mechanized mining face passing through an oblique fault, comprising preliminary exploration of the fault direction and fall, finding out the specific direction and fall of the fault, analyzing the fault docking layer and formulating a fault crossing plan, characterized in that: The method for constructing a mining face through an oblique fault comprises the following steps: Step S1, preliminary exploration of fault strike and fall: reasonably select a location near the fault exposed in the two trenches of the working face, use a water exploration drill to conduct preliminary exploration of the fault strike and fall, and gain a macroscopic understanding of the development of the fault inside the working face; Step S2, find out the specific direction and height difference of the fault: when the working face is advanced to 20m on the fault surface, use a pneumatic drill to conduct precise detection on the working face, specifically, drill a probe hole every 5-10m along the coal seam inclination, and accurately control the fault direction according to the depth of gangue seen by the probe hole; Step S3, analyzing the fault docking layer: using an anchor drill and a simple pneumatic drill detection tool to detect the rock properties of the top and bottom plates of the coal seam, and find out the hardness and integrity of the rock in advance; Step S4, formulating a fault crossing plan: According to the above comprehensive detection means, the fault strike, dip, drop and rock layer of the fault plane can be obtained. In order to ensure the rapid advancement of the working face, a "avoiding hard and going for soft" method is adopted to formulate a fault crossing construction plan. According to the actual situation, the method of raising the horizontal cutter in advance or passively raising the horizontal cutter can be adopted; In step S1, since the oblique fault is exposed at different positions during the excavation of the two drifts of the working face, it is possible to select appropriate detection positions in the drift to arrange drilling holes, and the drilling holes can detect the fault strike and fall; In step S1, due to the long detection length, the detection at this stage needs to use a high-power water or coal drilling rig. Through the detection, the development of the fault inside the working face can be obtained from a macroscopic perspective, so as to prepare for crossing the fault in advance; In step S2, when the working face advances to about 20m from the fault surface, it is necessary to consider whether to raise the cutter in advance. Therefore, a pneumatic drill is used to perform precise detection on the working face in this stage.
2. A method for construction of a fully mechanized mining face through an oblique fault according to claim 1, characterized in that: In step S2, precise detection is specifically to construct a probe hole every 5-10m along the inclination of the coal seam, and to carry out detection work cyclically as the working face advances, and to accurately control the direction of the fault according to the depth of gangue seen in the probe hole.
3. A method for construction of a fully mechanized mining face through an oblique fault according to claim 1, characterized in that: In step S3, the rock properties within 5 m above and below the roof and floor of the coal seam in the working face are detected using a bolt drill and a simple pneumatic drill detection tool to find out the hardness and integrity of the rock in advance, keep records, and draw a rock columnar diagram of the roof and floor.
4. A method for construction of a fully mechanized mining face through an oblique fault according to claim 1, characterized in that: In step S4, the fault strike, dip, fall and rock layer where the fault plane abuts can be obtained according to the comprehensive detection means in the above three stages.
5. A method for construction of a fully mechanized mining face through an oblique fault according to claim 1, characterized in that: In step S4, in order to ensure rapid advancement of the working face, the method of "avoiding hard rock and focusing on soft rock" is adopted, that is, the method of raising the horizontal cutter in advance or passively raising the horizontal cutter is adopted to allow the coal machine to cut soft rock as much as possible and cut less hard rock, so as to avoid the phenomenon that the coal machine has difficulty in cutting or needs blasting.
6. A method for construction of a fully mechanized mining face through an oblique fault according to claim 1, characterized in that: In step S1, the design of the borehole should take into account the detection of fault height and direction at the same time, and the design of the borehole detection results should evenly cover the working surface to achieve effective control.
7. A method for construction of a fully mechanized mining face through an oblique fault according to claim 1, characterized in that: When the working face advances to 20m on the fault surface, step S2 detection begins.