A cast-in-place concrete pile head separation device and pile head breaking method

By using a flexible plate laying mechanism to form a physical isolation layer during the construction of highway bridges and culverts, the problems of time-consuming, labor-intensive and dust-producing pile head removal in the existing technology are solved, efficient and safe pile head separation is achieved, and construction efficiency and quality are improved.

CN113250186BActive Publication Date: 2024-10-22MCC CAPITAL ENGINEERING & RESEARCH INC LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110398890.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-04-14
Publication Date
2024-10-22
Estimated Expiration
2041-04-14

AI Technical Summary

Technical Problem

In the existing technology, during the construction of highway bridges and culverts, the process of cutting out the overfilled portion of the cast-in-situ concrete pile heads is time-consuming and labor-intensive, can easily damage the main reinforcement, and generates a large amount of dust, causing harm to the health of workers and the environment.

Method used

A cast-in-place concrete pile head separation device is used, which includes a flexible plate, a flexible plate laying mechanism, a positioning component, and a protective sleeve to separate the invalid pile head from the pile body by forming a physical isolation layer at the pile top elevation. , using a flexible plate laying mechanism to expand the isolation layer in the concrete, and separate the invalid pile head and pile body after the concrete solidifies.

Benefits of technology

There is no need for manual cutting or pneumatic picks to remove concrete, basically no dust is generated, and the main reinforcement will not be damaged. A crane or loader can be used directly to extract the invalid pile head, which reduces labor intensity, improves construction efficiency, and improves the quality of the concrete pile body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113250186B_ABST
    Figure CN113250186B_ABST
Patent Text Reader

Abstract

The present invention proposes a cast-in-place concrete pile head separation device and a pile head breaking method, which relate to the technical field of concrete pouring. The cast-in-place concrete pile head separation device includes a flexible plate, a flexible plate laying mechanism, a positioning component and a plurality of protective sleeves, wherein the flexible plate is accommodated in the flexible plate laying mechanism, the flexible plate laying mechanism is fixedly connected to the positioning component and is preset at the pile top elevation position through the positioning component, the flexible plate laying mechanism can unfold the flexible plate in the cast-in-place concrete to form an isolation layer, and the plurality of protective sleeves can be correspondingly sleeved outside the plurality of main bars of the pile foundation steel cage and isolate the cast-in-place concrete and the main bars. The cast-in-place concrete pile head separation device and the pile head breaking method proposed by the present invention can form a physical separation layer between the invalid pile head and the pile body, so as to facilitate the removal of the invalid pile head.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of concrete pouring, and in particular to a cast-in-place concrete pile head separation device and a pile head breaking method. Background Art

[0002] During the construction of highway bridges and culverts, the pouring of concrete needs to strictly comply with industry standards. The current industry standard JTG / T3650-2020 "Technical Specifications for Highway Bridge and Culvert Construction" stipulates that when the concrete is poured to the top of the pile, measures should be taken to maintain the concrete pressure in the conduit to avoid the excessive density of the mud on the top of the pile, resulting in mud balls or loose concrete on the top of the pile; when the pouring is about to end, the amount of concrete poured should be checked to determine whether the measured concrete pouring height is correct. The top elevation of the bored pile should be no less than 0.5m higher than the design elevation. When there are poor geological conditions, excessive mud density in the hole, and a large pile diameter, the height of the over-pouring should be appropriately increased; the excess over-pouring should be chiseled off before the construction of the foundation or before the pile connection. The pile head after chiseling should be dense and free of loose layers, and the concrete should reach the strength grade specified in the design. In the above construction process, the over-pouring part of the concrete that needs to be chiseled off is the chiseled pile head.

[0003] At present, the over-filled pile heads are mostly removed manually with pneumatic picks or other mechanical cutting equipment, and then the main reinforcement in the reinforcement cage is cleaned and corrected. These methods are not only time-consuming and labor-intensive, but may also damage the main reinforcement, causing quality and safety hazards. In addition, a large amount of dust will be generated during the crushing process, which will cause certain harm to the surrounding environment and the health of the operators.

[0004] The existing patent "A bridge pile foundation pile head breaking device and pile head breaking method" (authorization announcement number CN105297729 B) proposes that before pouring concrete, a circle of rubber hose is arranged at the pile top elevation. After the concrete reaches a certain strength, the rubber hose is manually pulled to form a circle of grooves around the pile body. When chiseling out the over-filled pile head, a pneumatic pick is used to drill horizontal holes along the groove toward the center of the pile body. After the drilling is completed, several steel chisels are driven into the drilled hole and the concrete pile head is pried to form a horizontal fracture surface at the concrete groove, thereby cutting off and separating the effective pile body and the invalid pile body. However, when using a pneumatic pick to drill holes, the operating requirements for the operators are high, and the cross-section cannot be ensured to be horizontal and flat. Vibration and a large amount of dust will also be generated during the drilling process, which will cause certain harm to the health of the operators. In addition, the steel chisel needs to be manually driven in and the concrete pile head needs to be pried. The entire operation process is not only labor-intensive, but also labor-intensive and time-consuming.

[0005] Another existing patent, "A Pile Head Separation Device and Pile Breaking Construction Method" (application publication number CN 111877312A), proposes to use steel plates to prefabricate conical barrier plates and sleeves, and weld the barrier plates and sleeves into a whole. The device is installed on the completed pile main reinforcement through the holes in the pile main reinforcement on the barrier plate, and the pile main reinforcement and the barrier steel plate are welded and fixed by the "one-over-one" welding method. After pouring the concrete, wait for the concrete to solidify, locate the over-filled part of the separation line outside the pile protective layer, use a cutting machine to chisel the pile outer protective layer along the dividing line, and lift the pile head. Use a cutting machine to cut the weld between the barrier plate and part of the main reinforcement, take out the welded body of the barrier plate and the sleeve, break the protruding small part of the conical concrete column and the circular concrete column in the middle, and complete the breaking of the invalid pile head. However, the use of steel plates to prefabricate conical baffles and sleeves, and welding the baffles and sleeves into a whole requires high processing accuracy, and the baffles need to be welded to the main reinforcement. Later, the welding points between the baffles and part of the main reinforcement need to be cut, and the process is cumbersome. It also requires high welding skills of the operators, and the installation and cutting of the baffle kits. The main reinforcement may be damaged, and there are certain quality and safety risks. After the concrete solidifies, a cutting machine is used to chisel the outer protective layer of the pile along the dividing line. Temporary electricity needs to be connected on site, which has high requirements on temporary electricity and the use and management of cutting equipment. A large amount of dust will be generated when using the cutting machine, which will cause certain harm to the health of the operators. If the cutting depth is not properly controlled, the main reinforcement will be damaged.

[0006] In view of this, the inventor has designed a cast-in-place concrete pile head separation device and a pile head breaking method based on many years of production design experience in this field and related fields and through repeated experiments, in order to solve the problems existing in the prior art. Summary of the invention

[0007] The invention provides a cast-in-place concrete pile head separation device and a pile head breaking method, which can form a circle of physical isolation layer in the concrete at the pile top elevation position to separate the invalid pile head from the pile body.

[0008] In order to achieve the above-mentioned purpose, the present invention proposes a cast-in-place concrete pile head separation device, wherein the cast-in-place concrete pile head separation device includes a flexible plate, a flexible plate laying mechanism, a positioning component and a plurality of protective sleeves, the flexible plate is accommodated in the flexible plate laying mechanism, the flexible plate laying mechanism is fixedly connected to the positioning component and is preset at the pile top elevation position through the positioning component, the flexible plate laying mechanism can unfold the flexible plate in the cast-in-place concrete to form an isolation layer, and the plurality of protective sleeves can be correspondingly mounted outside the plurality of main bars of the pile foundation steel cage and isolate the cast-in-place concrete and the main bars.

[0009] The cast-in-place concrete pile head separation device as described above, wherein the cast-in-place concrete pile head separation device further comprises a protective ring for being sleeved outside the pile foundation reinforcement cage, and the protective ring can form an isolation ring layer in the cast-in-place concrete.

[0010] The cast-in-place concrete pile head separation device as described above, wherein the cast-in-place concrete pile head separation device further comprises a hanging ring for pre-embedded in the concrete.

[0011] The cast-in-place concrete pile head separation device as described above, wherein the flexible board laying mechanism includes a fixed rod, a reel rod and a connecting rod, the fixed rod and the reel rod are arranged in parallel and have a gap, the flexible board is pre-rolled on the reel rod, and the end of the flexible board is fixed on the fixed rod, a ring is provided at one end of the fixed rod, the connecting rod is fixedly connected to one end of the reel rod and is arranged perpendicular to the reel rod, the connecting rod passes through the ring and cooperates with the ring for rotation, the connecting rod drives the reel rod to rotate around the ring, and causes the flexible board to unfold with the fixed rod as the starting point to form the isolation layer.

[0012] The cast-in-place concrete pile head separation device as described above, wherein the positioning component includes a center tube and at least one positioning bracket, the center tube is vertically arranged and has a receiving cavity that passes through from top to bottom, the connecting rod is passed through the receiving cavity and is rotatably installed on the inner wall of the center tube, the bottom end of the connecting rod passes through the receiving cavity and is connected to the reel rod, the ring is located between the reel rod and the center tube, and the positioning bracket is fixedly connected to the outer wall of the center tube.

[0013] The present invention further proposes a pile head breaking method, using the cast-in-place concrete pile head separation device as described above, wherein the pile head breaking method comprises:

[0014] Step A, sleeve the plurality of protective sleeves on the plurality of main bars of the pile foundation reinforcement cage correspondingly, and make the bottom end of each protective sleeve flush with the elevation position of the pile top;

[0015] Step B, presetting the flexible plate laying mechanism in the pile foundation steel cage by the positioning component, and making the flexible plate laying mechanism be located at the top elevation position;

[0016] Step C, pouring concrete into the pile foundation steel cage;

[0017] Step D, after the concrete pouring is completed, the flexible board is unfolded in the horizontal direction inside the concrete at the pile top elevation position by the flexible board laying mechanism to form an isolation layer;

[0018] Step E, the concrete solidifies above the flexible plate to form an ineffective pile head, and the concrete solidifies below the flexible plate to form a pile body;

[0019] Step F, after the concrete solidifies to a preset strength, separating the ineffective pile head and the pile body.

[0020] In the pile head breaking method as described above, the cast-in-place concrete pile head separation device further comprises a protective ring. In step A, the protective ring is sleeved outside the pile foundation steel cage and the bottom end of the protective ring is flush with the pile top elevation.

[0021] In the pile head breaking method as described above, the cast-in-place concrete pile head separation device also includes a lifting ring. In step C, the lifting ring is pre-buried in the concrete and the lifting ring portion is made to protrude from the top surface of the concrete. In step F, the invalid pile head is lifted by the lifting ring to achieve separation of the invalid pile head and the pile body.

[0022] The pile head breaking method as described above, wherein, in the step B, concrete release agent is applied to the outside of the flexible board, the flexible board laying mechanism and the positioning component respectively.

[0023] The pile head breaking method as described above, wherein the pile head breaking method further comprises:

[0024] Step G, dismantling the flexible board, the flexible board laying mechanism and the positioning component for turnover use.

[0025] Compared with the prior art, the cast-in-place concrete pile head separation device and pile head breaking method proposed in the present invention have the following characteristics and advantages:

[0026] The cast-in-place concrete pile head separation device proposed in the present invention presets the flexible plate laying mechanism at the pile top elevation position through the positioning component. After the concrete pouring is completed, the flexible plate laying mechanism then unfolds the flexible plate in the cast-in-place concrete at the pile top elevation position and forms an isolation layer, thereby physically isolating the invalid pile head (over-pouring part) from the pile body. When the concrete reaches a certain strength, there is no need for manual cutting or pneumatic picks to remove the concrete, no need to overlap temporary electricity, basically no dust is generated, and the main reinforcement will not be damaged. The pile head can be directly lifted by a crane or loader to remove the invalid pile head. It not only greatly reduces the labor intensity of chiseling the pile head and improves work efficiency, but also avoids damage to the steel bars in the concrete, and improves the construction quality of the concrete pile body. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The accompanying drawings described herein are only for explanation purposes and are not intended to limit the scope of the present invention in any way. In addition, the shapes and proportional dimensions of the various components in the figures are only schematic, used to help understand the present invention, and are not specifically limited to the shapes and proportional dimensions of the various components of the present invention. Those skilled in the art can select various possible shapes and proportional dimensions to implement the present invention according to the teachings of the present invention.

[0028] Figure 1 This is a schematic diagram of the use of the cast-in-place concrete pile head separation device proposed by the present invention;

[0029] Figure 2 It is a schematic diagram of the cast-in-place concrete pile head separation device in the present invention being arranged in concrete;

[0030] Figure 3 It is a schematic diagram of the installation of the flexible board laying mechanism and the fixing components in the present invention;

[0031] Figure 4 It is a structural schematic diagram of the flexible board laying mechanism in the present invention;

[0032] Figure 5 It is a structural schematic diagram of the positioning component in the present invention;

[0033] Figure 6 A schematic diagram of fixing the protective sleeve and the protective ring behind the pile foundation reinforcement cage;

[0034] Figure 7 A schematic diagram of fixing the flexible plate behind the pile foundation reinforcement cage;

[0035] Figure 8 is a schematic diagram of the flexible board in the present invention being unfolded;

[0036] Fig. 9 This is a schematic diagram after pouring concrete into the pile foundation reinforcement cage;

[0037] Fig.10 Schematic diagram of the separation of the invalid pile head and pile body.

[0038] Description of reference numerals:

[0039] 100. Cast-in-place concrete pile head separation device; 10. Flexible board;

[0040] 20. Flexible board laying mechanism; 21. Fixing rod;

[0041] 22. reel rod; 23. connecting rod;

[0042] 24. Ring; 25. Handle;

[0043] 30. Positioning component; 31. Center tube;

[0044] 32. Positioning bracket; 321. Support rod;

[0045] 33. Rotating bearing; 34. Limiting ring;

[0046] 35. Sealing pad. 40. Protective sleeve;

[0047] 50. Protective ring; 60. Lifting ring;

[0048] 200, pile foundation reinforcement cage; 210, main reinforcement;

[0049] 300, elevation position; 400, concrete. DETAILED DESCRIPTION

[0050] The details of the present invention can be more clearly understood with reference to the accompanying drawings and the description of the specific embodiments of the present invention. However, the specific embodiments of the present invention described herein are only used for the purpose of explaining the present invention and cannot be understood as limiting the present invention in any way. Under the guidance of the present invention, technicians can conceive of any possible variations based on the present invention, which should all be considered to belong to the scope of the present invention.

[0051] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be an intermediate element. When an element is referred to as being "connected to" another element, it may be directly connected to the other element or there may be an intermediate element.

[0052] Please refer to Figures 1 to 5 The present invention proposes a cast-in-place concrete pile head separation device 100, which includes a flexible plate 10, a flexible plate laying mechanism 20, a positioning component 30 and a plurality of protective sleeves 40. The flexible plate 10 is accommodated in the flexible plate laying mechanism 20, the flexible plate laying mechanism 20 is connected to the positioning component 30 and is preset at the pile top elevation position through the positioning component 30. The flexible plate laying mechanism 20 can unfold the flexible plate 10 in the cast-in-place concrete and form an isolation layer. The plurality of protective sleeves 40 can be correspondingly sleeved outside the plurality of main bars 210 of the pile foundation steel cage 200 and isolate the cast-in-place concrete and the main bars 210.

[0053] The present invention further provides a pile head breaking method, using the cast-in-place concrete pile head separation device 100 as described above, wherein the pile head breaking method comprises:

[0054] Step A, a plurality of protective sleeves 40 are correspondingly sleeved on a plurality of main bars 210 of the pile foundation reinforcement cage 200, and the bottom end of each protective sleeve 40 is flush with the pile top elevation position 300;

[0055] Step B, presetting the flexible plate laying mechanism 20 in the pile foundation reinforcement cage 200 through the positioning component 30, and the flexible plate laying mechanism 20 is located at the top elevation position 300;

[0056] Step C, pouring concrete 400 into the pile foundation steel cage 200;

[0057] Step D, after the concrete pouring is completed, the flexible board 10 is unfolded horizontally inside the concrete 400 at the pile top elevation by the flexible board laying mechanism 20 to form an isolation layer;

[0058] Step E: the concrete 400 solidifies above the flexible board 10 to form an ineffective pile head, and the concrete 400 solidifies below the flexible board 10 to form a pile body;

[0059] Step F, after the concrete solidifies to a preset strength, separating the invalid pile head and the pile body.

[0060] The cast-in-place concrete pile head separation device 100 and pile head breaking method proposed by the present invention preset the flexible plate laying mechanism 20 at the pile top elevation position through the positioning component 30. After the concrete pouring is completed, the flexible plate laying mechanism 20 then unfolds the flexible plate 10 in the cast-in-place concrete at the pile top elevation position and forms an isolation layer, thereby physically isolating the invalid pile head (over-pouring part) from the pile body; at the same time, the invalid pile head is isolated from the main reinforcement 210 of the pile foundation steel cage 200 by using the protective sleeve 40. When the concrete reaches a certain strength, there is no need for manual cutting or pneumatic chiseling of concrete, no need to overlap temporary electricity, basically no dust is generated, and the main reinforcement will not be damaged. The pile head can be directly lifted by a crane or a loader, so that the invalid pile head can be separated from the pile body and the main reinforcement, thereby conveniently and quickly removing the invalid pile head. Not only does it greatly reduce the labor intensity of chiseling the pile head and improve work efficiency, it also avoids damage to the steel bars in the concrete and improves the construction quality of the concrete pile body.

[0061] The cast-in-place concrete pile head separation device 100 proposed by the present invention has a simple structure and is convenient to construct, which effectively improves the construction efficiency, reduces the project cost, and ensures that the construction work is safe and efficient.

[0062] In an optional embodiment of the present invention, the cast-in-place concrete pile head separation device 100 further includes a protective ring 50. In step A, Figure 6 As shown, the protective ring 50 is sleeved outside the pile foundation reinforcement cage 200 and the bottom end of the protective ring 50 is flush with the pile top elevation position 300. The protective ring 50 can form an isolation ring layer in the concrete outside the pile foundation reinforcement cage 200, further ensuring that the invalid pile head and the pile body can be quickly separated.

[0063] In an optional example of this embodiment, the thickness of the protection ring 50 is the same as the thickness of the pile foundation concrete protection layer outside the pile foundation reinforcement cage 200 .

[0064] In an optional example, the protection ring 50 is a steel wedge ring.

[0065] In an optional embodiment of the present invention, the cast-in-place concrete pile head separation device 100 also includes a lifting ring 60. In step C, the lifting ring 60 is embedded in the concrete 400 and a portion of the lifting ring 60 protrudes from the top surface of the concrete 400. In step F, the invalid pile head is lifted by the lifting ring 60 to achieve separation of the invalid pile head and the pile body.

[0066] In an optional example of this embodiment, a steel strand or a steel wire rope is mounted on the lifting ring 60, and a crane or a loader is used to directly lift out the invalid pile head, and the pile head breaking work can be completed.

[0067] In an optional example, a plurality of hanging rings 60 may be pre-buried in the concrete 400 , each hanging ring 60 being in a "X" shape, with the top of the hanging ring 60 protruding out of the concrete 400 .

[0068] In an optional embodiment of the present invention, in step B, concrete release agent is applied to the outside of the flexible board 10, the flexible board laying mechanism 20 and the positioning component 30 respectively, so that the flexible board 10, the flexible board laying mechanism 20 and the positioning component 30 can be easily removed from the concrete.

[0069] Furthermore, the pile head breaking method also includes: step G, removing the flexible board 10, the flexible board laying mechanism 20 and the positioning component 30 from the concrete for turnover use, thereby saving construction costs.

[0070] In an optional example, a concrete release agent is also applied to the outside of the protection ring 50 to facilitate the turnover of the protection ring 50 .

[0071] In an optional embodiment of the present invention, the flexible board laying mechanism 20 includes a fixed rod 21, a reel rod 22 and a connecting rod 23, one end of the fixed rod 21 is provided with a collar 24, the connecting rod 23 is fixedly connected to one end of the reel rod 22 and is arranged perpendicular to the reel rod 22, the connecting rod 23 passes through the collar 24 and rotates with the collar 24, the fixed rod 21 and the reel rod 22 are arranged in parallel and have a gap, the flexible board 10 is pre-rolled on the reel rod 22, and the end of the flexible board 10 is fixed on the fixed rod 21, the connecting rod 23 drives the reel rod 22 to rotate around the collar 24, and the flexible board 10 on the reel rod 22 is unfolded to form an isolation layer starting from the fixed rod 21. The unfolded flexible board 10 is annular, and the concrete (invalid pile head) located above it and the concrete located below it are separated into two parts that do not contact each other, which is convenient for separation in subsequent construction.

[0072] In an optional example of this embodiment, a protective tube (not shown) is provided on the outer cover of the reel rod 22, an annular space is formed between the protective tube and the inner wall and the reel rod 22, the flexible board 10 is rolled in the annular space, a strip groove is provided on the wall of the protective tube, the strip groove penetrates the wall of the protective tube along the radial direction of the protective tube, and the end of the flexible board 10 penetrates the strip groove and is connected to the fixed rod 21. With the above structure, when the connecting rod 23 drives the reel rod 22 to rotate, the flexible board 10 is easier to unfold.

[0073] In an optional example of this embodiment, the positioning component 30 includes a central tube 31 and at least one positioning bracket 32. The central tube 31 is vertically arranged and has a receiving cavity that passes through from top to bottom. The connecting rod 23 is arranged in the receiving cavity and is rotatably mounted on the inner wall of the central tube 31. The bottom end of the connecting rod 23 passes through the receiving cavity downward and is fixedly connected to the reel rod 22. The collar 24 is located between the reel rod 22 and the central tube 31. The positioning bracket 32 ​​is fixedly connected to the outer wall of the central tube 31. With the above structure, the central tube 31 is fixedly connected to the steel bars of the pile foundation through the positioning bracket 32, so that the connecting rod 23 installed on the central tube 31 is fixed at a predetermined position, and the reel rod 22 and the fixed rod 21 arranged at the bottom end of the connecting rod 23 are also arranged at a predetermined position (the pile top elevation position); and the fixed rod 21 and the reel rod 22 are both arranged horizontally, and the isolation layer formed after the flexible board 10 is unfolded is also arranged horizontally, so that the end surface of the pile head after separation is also flatter, which is conducive to subsequent construction.

[0074] In an optional example, the connecting rod 23 is rotatably mounted on the inner wall of the center tube 31 through a rotating bearing 33. A limiting ring 34 is fixedly provided on the inner wall of the center tube 31 to cooperate with the rotating bearing 33. The bottom end of the outer ring of the rotating bearing 33 is clamped on the top of the limiting ring 34, and the inner ring of the rotating bearing 33 is fixedly connected to the connecting rod 23.

[0075] Preferably, two rotating bearings 33 are provided on the outer sleeve of the connecting rod 23, and the two rotating bearings 33 are arranged at intervals up and down, and two stop rings 34 are fixedly provided on the inner wall of the central tube 31. The outer wall of each stop ring 34 is fixedly connected to the inner wall of the central tube 31, and the two stop rings 34 are arranged at intervals up and down.

[0076] In the present invention, if Figure 7 , Figure 8 As shown, the width of the flexible plate 10 is slightly smaller than the inner diameter of the pile foundation steel cage. Correspondingly, the lengths of the fixed rod 21 and the reel rod 22 are also slightly smaller than the inner diameter of the pile foundation steel cage. The corresponding width of the flexible plate 10 and the lengths of the fixed rod 21 and the reel rod 22 can be adopted according to different pile diameters, thereby being suitable for most concrete pile foundations of different pile diameters, and being reusable and low-cost.

[0077] In an optional example of this embodiment, a sealing pad 35 is provided at the bottom end of the accommodating cavity, and the connecting rod 23 passes through the sealing pad 35. The sealing pad 35 seals the bottom of the accommodating cavity to prevent concrete grout from invading the accommodating cavity.

[0078] In an optional example, the inner edge of the sealing gasket 35 is sealed and fixedly connected to the connecting rod 23 , and the outer edge of the sealing gasket 35 is sealed and rotatably matched with the inner wall of the central tube 31 .

[0079] In another optional example, the inner edge of the sealing gasket 35 is sealingly rotatably matched with the connecting rod 23 , and the outer edge of the sealing gasket 35 is sealingly fixedly connected to the inner wall of the central tube 31 .

[0080] In an optional example of this embodiment, the positioning bracket 32 ​​includes a plurality of support rods 321, one end of each support rod 321 is fixedly connected to the outer wall of the central tube 31, the other end of each support rod 321 extends radially outwardly of the central tube 31, and the plurality of support rods 321 are evenly distributed along the circumference of the central tube 31. With the above structure, the other end of each support rod 321 can be connected to the main reinforcement of the steel cage by binding, so that the central tube 31 can be fixed at a predetermined position.

[0081] Preferably, the positioning bracket 32 ​​includes four support rods 321 , and the four support rods 321 are evenly distributed along the circumference of the central tube 31 .

[0082] In an optional example, two positioning brackets 32 are disposed outside the central tube 31 , and the two positioning brackets 32 are spaced apart up and down to further ensure that the central tube 31 can be fixed at a predetermined position.

[0083] In an optional example of the present invention, the top end of the connecting rod 23 passes through the accommodating cavity upward and is provided with a handle 25. The connecting rod 23 can be driven to rotate by rotating the handle 25, thereby unfolding the flexible board 10.

[0084] In another optional example of the present invention, a motor is further provided on the central tube 31, and the motor is connected to the top end of the connecting rod 23 and drives the connecting rod 23 to rotate around its axis, thereby reducing the workload of the operator.

[0085] In an optional embodiment of the present invention, the flexible board 10 is an aluminum board, a PVC film (plastic board) or a steel board. Preferably, the flexible board 10 is a thin aluminum board or a thin steel board, which can not only ensure that the flexible board 10 can be easily rolled and unfolded, but also ensure that the flexible board 10 has a certain strength, and the damage of the flexible board will affect the isolation effect.

[0086] In an optional embodiment of the present invention, the flexible board 10 is coated with a concrete release agent to form a concrete release agent layer, which further ensures that the ineffective pile head and the pile body can be separated.

[0087] Please refer to Figures 6 to 10 Now, in conjunction with an embodiment, the specific working process of the pile head breaking method proposed by the present invention is described in detail:

[0088] Step A: According to the pile foundation length in the design drawing, measure the pile top elevation, and mark the elevation position 300 on the pile foundation steel cage 200. All main reinforcements 210 are covered with protective sleeves 40. The bottom of the protective sleeves 40 is flush with the elevation position 300 (pile top elevation mark) and is wrapped with tape to prevent the concrete cement slurry from bonding with the main reinforcements 210 in the protective sleeves 40 to increase friction.

[0089] The protective ring 50 is coated with a concrete release agent, and the protective ring 50 is tied and fixed to the outside of the main reinforcement 210 with the hollow protective sleeve 40 (such as Figure 6 As shown), so as to separate the concrete protective layer between the invalid pile head and the pile body, so that when the invalid pile head is subsequently lifted, there is no need to manually cut or chisel off the concrete protective layer;

[0090] Step B: Pre-roll the flexible plate 10 (thin aluminum plate) whose width is slightly smaller than the inner diameter of the pile foundation steel cage 200 on the reel rod 22, and fix the end of the flexible plate 10 on the fixed rod 21. Adjust the two positioning brackets 32 so that the reel rod 22 is set horizontally and consistent with the elevation position 300 (pile top elevation). After the positioning is correct, the two positioning brackets 32 are connected to the main reinforcement 210 wrapped with the protective sleeve 40 by binding; the ring 24 at one end of the fixed rod 21 is connected with the connecting rod 23, and the other end of the fixed rod 21 is tied to the main reinforcement 210 wrapped with the protective sleeve 40 (such as Figure 7 As shown), apply concrete release agent on both the flexible plate 10 and the central tube 31;

[0091] Step C, placing the prepared pile foundation steel cage 200 and the cast-in-place concrete pile head separator into the pile hole, rechecking the elevation and position of the pile foundation steel cage 200, and starting to pour pile foundation concrete into the pile foundation steel cage 200 after confirmation;

[0092] When the concrete is poured to the top, several "X"-shaped lifting rings 60 are embedded in the concrete body;

[0093] Step D: After the final concrete pouring is completed, the crank handle 25 is rotated around the connecting rod 23, the connecting rod 23 drives the reel rod 22 to rotate, and the flexible plate 10 rolled on the reel rod 22 is gradually unfolded starting from the fixed rod 21, forming a circle of physical isolation layer inside the concrete at the pile top elevation position 300;

[0094] Step E: Fig. 9 As shown, the concrete 400 solidifies above the flexible plate 10 to form an ineffective pile head, and the concrete 400 solidifies below the flexible plate 10 to form a pile body;

[0095] Step F: Fig.10 As shown, after the concrete reaches a certain strength (preset strength), the soil of the invalid pile head is excavated, a steel strand or a steel wire rope is mounted on the lifting ring 60, and the invalid pile head is directly lifted out by a crane or a loader, and the pile head breaking work is completed;

[0096] Step G: Remove the protective ring 50, the handle 25, the fixing rod 21, the reel rod 22, the flexible plate 10, and take out the connecting rod 23 and the central tube 31 for subsequent use in the construction.

[0097] The cast-in-place concrete pile head separation device and pile head breaking method proposed in the present invention are simple to operate. After the concrete reaches a certain strength, there is no need for manual cutting or pneumatic pick to remove the concrete, no need to overlap temporary electricity, basically no dust is generated, and the main reinforcement will not be damaged. The invalid pile head can be directly lifted by a crane or a loader, which greatly reduces the labor intensity of chiseling the pile head, improves work efficiency, and saves engineering costs. By adjusting the width of the flexible plate and the length of the fixed rod and the reel rod, it can be applied to most concrete pile foundations with different pile diameters, and it can be reused at a low cost.

[0098] The detailed explanation of the above-mentioned embodiments is only intended to explain the present invention so as to facilitate a better understanding of the present invention. However, these descriptions cannot be interpreted as limitations on the present invention for any reason. In particular, the various features described in different embodiments may also be arbitrarily combined with each other to form other embodiments. Unless there is a clear description to the contrary, these features should be understood to be applicable to any embodiment and are not limited to the described embodiments.

Claims

1. A cast-in-place concrete pile head separation device, characterized in that: The cast-in-place concrete pile head separation device comprises a flexible plate, a flexible plate laying mechanism, a positioning component and a plurality of protective sleeves, wherein the flexible plate is accommodated in the flexible plate laying mechanism, the flexible plate laying mechanism is preset at the pile top elevation position by the positioning component, the flexible plate laying mechanism can unfold the flexible plate in the cast-in-place concrete to form an isolation layer, and the plurality of protective sleeves can be correspondingly sleeved outside the plurality of main bars of the pile foundation steel cage and isolate the cast-in-place concrete and the main bars; The flexible board laying mechanism comprises a fixed rod, a reel rod and a connecting rod, wherein the fixed rod and the reel rod are arranged in parallel and have a gap, the flexible board is pre-rolled on the reel rod, and the end of the flexible board is fixed on the fixed rod, a collar is arranged at one end of the fixed rod, the connecting rod is fixedly connected to one end of the reel rod and is arranged perpendicular to the reel rod, the connecting rod passes through the collar and cooperates with the collar for rotation, the connecting rod drives the reel rod to rotate around the collar, and the flexible board is unfolded with the fixed rod as the starting point to form the isolation layer; The positioning component includes a center tube and at least one positioning bracket. The center tube is vertically arranged and has a receiving cavity that passes through from top to bottom. The connecting rod is passed through the receiving cavity and is rotatably installed on the inner wall of the center tube. The bottom end of the connecting rod passes through the receiving cavity and is connected to the reel rod. The ring is located between the reel rod and the center tube. The positioning bracket is fixedly connected to the outer wall of the center tube.

2. The cast-in-place concrete pile head separation device according to claim 1, characterized in that: The cast-in-place concrete pile head separation device also includes a protective ring for being sleeved outside the pile foundation reinforcement cage, and the protective ring can form an isolation ring layer in the cast-in-place concrete.

3. The cast-in-place concrete pile head separation device according to claim 1, characterized in that: The cast-in-place concrete pile head separation device also includes a lifting ring for pre-embedded in the concrete.

4. A pile head breaking method, using the cast-in-place concrete pile head separation device as claimed in claim 1, characterized in that: The pile head breaking method comprises: Step A, sleeve the plurality of protective sleeves on the plurality of main bars of the pile foundation reinforcement cage correspondingly, and make the bottom end of each protective sleeve flush with the elevation position of the pile top; Step B, presetting the flexible plate laying mechanism in the pile foundation steel cage by the positioning component, and making the flexible plate laying mechanism be located at the top elevation position; Step C, pouring concrete into the pile foundation steel cage; Step D, after the concrete pouring is completed, the flexible board is unfolded in the horizontal direction inside the concrete at the pile top elevation position by the flexible board laying mechanism to form an isolation layer; Step E, the concrete solidifies above the flexible plate to form an ineffective pile head, and the concrete solidifies below the flexible plate to form a pile body; Step F, after the concrete solidifies to a preset strength, separating the ineffective pile head and the pile body.

5. The pile head breaking method according to claim 4, characterized in that: The cast-in-place concrete pile head separation device also includes a protection ring. In step A, the protection ring is sleeved outside the pile foundation reinforcement cage and the bottom end of the protection ring is flush with the pile top elevation.

6. The pile head breaking method according to claim 5, characterized in that: The cast-in-place concrete pile head separation device further comprises a lifting ring, and in the step C, the lifting ring is pre-buried in the concrete and the lifting ring portion protrudes from the top surface of the concrete; In the step F, the invalid pile head is lifted up by the lifting ring to separate the invalid pile head from the pile body.

7. The pile head breaking method according to claim 4, characterized in that: In the step B, concrete release agent is applied to the outside of the flexible board, the flexible board laying mechanism and the positioning component respectively.

8. The pile head breaking method according to claim 7, characterized in that: The pile head breaking method also includes: Step G, dismantling the flexible board, the flexible board laying mechanism and the positioning component for turnover use.