A blast furnace slag descaling energy-saving system and control method
By collecting process parameters in real time in the blast furnace slag dewhitening system, using big data models to calculate flue gas parameters and adjusting the speed of water pumps and fans, the problem of high energy consumption of the traditional system is solved and the energy saving effect of the blast furnace slag dewhitening system is achieved. .
Patent Information
- Application Number
- CN202110585584.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-27
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2041-05-27
AI Technical Summary
The energy consumption of water pumps and fans in traditional blast furnace slag dewhitening systems is too high, resulting in high operating costs. It is difficult to effectively reduce energy consumption with existing technology.
Design an energy-saving blast furnace water slag dewhitening system, including a granulation tower, flange filter, fan and spray cooling system. Process parameters are collected in real time through the control module, and the big data model is used to calculate the flue gas flow and moisture content, and adjust Pump and fan speed to achieve system energy saving.
By optimizing the speed of the water pump and fan, the total energy consumption of the system is reduced and the minimum operating energy consumption is achieved under the condition of meeting the dewhitening efficiency.
Smart Images

Figure CN113350980B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of flue gas treatment and relates to a blast furnace slag descaling energy-saving system and a control method. Background Art
[0002] The technologies for flue gas decolorization in blast furnace slag systems are mainly concentrated in the "direct spray method" and the "cooling and dehumidification + heating and superheating method". The difference between the "direct spray method" technology lies mainly in the different ways of circulating water spraying and circulating flow; the difference between the "cooling and dehumidification + heating and superheating method" technology lies mainly in the different methods and media used for cooling and dehumidification and heating and superheating. Both schemes involve cooling water systems and flue gas systems. Due to the large amount of blast furnace flue gas, the main operating cost of the decolorization system lies in the energy consumption of the water pump of the cooling water system and the fan of the flue gas system. Due to the extremely high energy consumption of blast furnace slag water decolorization, most domestic regions gave up the requirements for decolorization of slag flue gas in 2019. Therefore, reducing energy consumption is the most important aspect of blast furnace slag decolorization technology to be competitive and implementable. Summary of the invention
[0003] In view of this, the object of the present invention is to provide a blast furnace slag descaling energy-saving system and control method to solve the problem of excessive energy consumption of water pumps and fans in traditional descaling systems.
[0004] In order to achieve the above object, the present invention provides the following technical solutions:
[0005] A blast furnace slag descaling energy-saving system comprises a granulation tower, a flange filter, a fan and an exhaust pipe which are sequentially connected by pipelines along the flow direction; a spray cooling system, a cyclone dehydrator and an electric shutter flap valve are sequentially arranged in the granulation tower from bottom to top; the spray cooling system comprises a water pump; the granulation tower, the flange filter, the fan, the water pump of the spray cooling system and the cyclone dehydrator are all connected to the control module signal, and the rotation speed of the water pump and the fan is controlled by the control module.
[0006] Furthermore, two groups of flange filters are arranged in parallel.
[0007] A blast furnace slag descaling energy-saving control method comprises the following steps:
[0008] S1. Real-time acquisition of relevant slag flushing process parameters of blast furnace slag de-whitening energy-saving system through the control module;
[0009] S2. Using the blast furnace slag flushing model, spray cooling model and cyclone dehydration model, calculate the flue gas parameters after the slag flushing process parameters change, the spray water volume of the spray cooling system after the flue gas changes, and the dehydration efficiency of the cyclone dehydrator, and determine the flue gas parameters after spray cooling and cyclone dehydration;
[0010] S3. Analyze the change curve of the flue gas resistance of the granulating tower, adjust the optimal speed of the fan, and realize energy saving of the blast furnace slag descaling system under the constraint of satisfying the descaling efficiency.
[0011] Furthermore, in step S1, the real-time collected slag flushing process parameters include the slag flushing water flow rate Q 冲 , slag flushing water temperature T 冲 , slag flow rate T 熔 , Flue gas temperature difference before and after spraying T 降 , water pump speed w 水 , fan speed w 风 .
[0012] Further, in step S2, the calculated flue gas parameters include the flue gas flow rate Q 烟 , flue gas moisture content M.
[0013] Further, in step S2, the spray water volume of the spray cooling system is:
[0014]
[0015] In the formula, Q 水 is the spray water volume of the spray cooling system, Q 烟 is the flue gas flow rate, T 降 is the flue gas temperature difference before and after spraying, H 热 is the enthalpy of hot flue gas after slag flushing, H 冷 is the enthalpy of cold flue gas after spray cooling.
[0016] Further, in step S2, the resistance of the cyclone dehydrator is:
[0017]
[0018] In the formula, k f is the correction coefficient, ρ t is the smoke density, V t is the flue gas velocity.
[0019] Furthermore, the flue gas after spray cooling is saturated air, so the flue gas density ρ t for:
[0020] ρ t =ρ 饱和
[0021] In the formula, ρ 饱和 It is the saturated air density of flue gas after spray cooling.
[0022] Furthermore, in step S2, other pipe network resistances need to be calculated, and the other pipe network resistances are:
[0023]
[0024] In the formula, A is a constant, ζ d is the equivalent local resistance coefficient, ζ is the local resistance coefficient, η f is the fan efficiency, η b is the inverter efficiency.
[0025] Furthermore, the minimum operating energy consumption P of the blast furnace slag descaling energy-saving system is 系 = Pump energy consumption P 水 + Fan energy consumption P 风 ;in:
[0026] Pump energy consumption P 水 =H*Q 水 / (367.2*η p *η m )
[0027] In the formula, H is the pump head, Q is 水 is the spray water volume, η p is the pump operating efficiency, η m is the efficiency of the water pump motor;
[0028] Fan energy consumption P 风 =ΔP*Q 风 / (3600*1000*η0*η1)
[0029] Where, ΔP is the total wind pressure of the fan, which is also the total flue gas resistance of the blast furnace slag de-whitening energy-saving system, Q 风 is the flue gas flow rate, η0 is the internal efficiency of the fan, and η1 is the mechanical efficiency of the fan; where:
[0030] ΔP=1.05*(P l +P t )
[0031] Where P l is the above-mentioned cyclone dehydrator resistance, P t is the other pipe network resistance mentioned above.
[0032] The beneficial effects of the present invention are:
[0033] The present invention can calculate the key parameters such as flue gas flow rate and flue gas moisture content that meet the requirements of the slag chimney according to the blast furnace slag granulation parameters using the established big data model. According to the flue gas parameters, the amount of condensed water under the de-whitening efficiency condition is calculated through the condensation mathematical model, and the appropriate water pump motor speed is rotated; the resistance of the cyclone dehydrator is calculated according to the flow rate of the pipe network flue gas at this time, and the appropriate fan speed is matched according to the working characteristic curve parameters of the fan stored in the control module, thereby achieving system energy saving. Simply put, it is to minimize the energy consumption of the water pump and fan under the condition of meeting the de-whitening efficiency.
[0034] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:
[0036] Figure 1 This is a flow chart of the arrangement of a blast furnace slag descaling and energy-saving system of the present invention;
[0037] Figure 2 This is a control principle diagram of a blast furnace slag descaling and energy-saving system according to the present invention.
[0038] Reference numerals: granulation tower 1, spray cooling system 2, cyclone dehydrator 3, electric shutter flap valve 4, flange filter 5, fan 6, exhaust pipe 7. DETAILED DESCRIPTION
[0039] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.
[0040] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on the present invention. In order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of actual products. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.
[0041] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "front", "rear", etc. indicate the orientation or position relationship, they are based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as limiting the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0042] See also Figure 1 , which is an energy-saving system for removing white slag from a blast furnace, comprising a granulating tower 1, a flange filter 5, a fan 6 and an exhaust pipe 7 which are connected in sequence through pipelines along the flow direction, a spray cooling system 2, a cyclone dehydrator 3 and an electric shutter flap valve 4 are arranged in sequence from bottom to top in the granulating tower 1, and the spray cooling system 2 comprises a water pump; the granulating tower 1, the flange filter 5, the fan 6, the water pump of the spray cooling system 2, and the cyclone dehydrator 3 are all connected to the control module signal, and the speed of the water pump and the fan 6 is controlled by the control module.
[0043] Among them, two groups of flange filters 5 are arranged in parallel.
[0044] When the process requirements change during the slag flushing process, when the slag flow rate, slag flushing water flow rate and slag flushing water temperature change, the flue gas parameters such as the flue gas flow rate, flue gas moisture content and flue gas temperature in the granulation tower 1 will also change accordingly, so the required amount of spray water needs to be adjusted; in addition, since the flue gas flow causes the resistance of the cyclone dehydrator 3 to change, the resistance of other pipe network systems will also change. Since the specific adjustment value of the motor speed of the fan 6 is mostly estimated based on experience, either the energy consumption is too high or the dehydration does not meet the standard.
[0045] like Figure 2 As shown, the energy-saving control method of the blast furnace slag descaling energy-saving system comprises the following steps:
[0046] S1. Collect relevant slag flushing process parameters of blast furnace slag descaling energy-saving system in real time through control module, including slag flushing water flow rate Q 冲 , slag flushing water temperature T 冲 , slag flow rate T 熔 , Flue gas temperature difference before and after spraying T 降 , water pump speed w 水 , fan speed 6w 风 .
[0047] S2. Use the blast furnace slag flushing model, spray cooling model and cyclone dehydration model to calculate the flue gas parameters after the slag flushing process parameters change, the spray water volume of the spray cooling system 2 after the flue gas changes, and the dehydration efficiency of the cyclone dehydrator 3 (the dehydration efficiency is related to the resistance of the cyclone dehydrator 3. The greater the capacity of the fan 6, the higher the flow rate, the higher the resistance of the dehydrator 3, and the higher the dehydration efficiency), and determine the flue gas parameters after spray cooling and cyclone dehydration.
[0048] Specifically, the calculation formula for the total input power of the blast furnace slag dewhitening energy-saving system is derived, and the minimum value of the total input power of the blast furnace slag dewhitening energy-saving system (that is, the minimum operating energy consumption) is found through the calculation formula. In the process of finding the minimum value of the total input power, the constraint condition of minimum dust removal efficiency must be met.
[0049] The total input power is mainly composed of the water pump energy consumption P of the spray cooling system 2 水 Energy consumption of fan 6P 风 The relationship between them is as follows:
[0050] P 系 =P 水 +P 风
[0051] Spray cooling model:
[0052] In the actual operation process, the spray water volume will change with the change of slag flushing process parameters. When the cooling efficiency is set to a fixed level, the spray water volume of the spray cooling system 2 is:
[0053]
[0054] In the formula, Q 水 is the spray water volume of the spray cooling system 2, Q 烟 is the flue gas flow rate, T 降 is the flue gas temperature difference before and after spraying, H 热 is the enthalpy of hot flue gas after slag flushing, H 冷 is the enthalpy of cold flue gas after spray cooling;
[0055] The enthalpy value of flue gas is needed to determine whether the water vapor in the flue gas is saturated. When the moisture content of the flue gas M> the saturated moisture content of the slag-washing hot flue gas M 饱和 When H 热 =H 饱和 ; When the flue gas moisture content M is less than the saturated moisture content of the hot flue gas, H 热 =H 空 +M*H 水 . Among them, H 饱和 refers to the enthalpy of saturated air, H 水 It refers to the enthalpy of water vapor under the conditions of hot flue gas temperature.
[0056] Cyclone dehydration model:
[0057] In actual engineering, the change of flue gas moisture content M on the resistance of cyclone dehydrator 3 is ignored. The resistance of cyclone dehydrator 3 is set to:
[0058]
[0059] In the formula, k f is the correction coefficient, ρ t is the smoke density, V t It is the flue gas flow rate. Generally, there is a flow meter on site. If there is no flow meter, the flow rate can be reversed by the speed of fan 6. The flue gas flow rate is obtained by dividing the flow rate by the cross-sectional area of the flue.
[0060] Other pipe network resistance models:
[0061] Other pipe network resistances are:
[0062]
[0063] In the formula, A is a constant, which is related to the pipe diameter;
[0064] ζ d is the equivalent local resistance coefficient, which is related to the pipe network structure;
[0065] ζ is the local resistance coefficient, which is related to the pipe network structure;
[0066] η f is the fan efficiency;
[0067] η b is the inverter efficiency.
[0068] The total flue gas resistance of the blast furnace slag de-whitening energy-saving system is ΔP = 1.05*(P l +P t ).
[0069] S3. Analyze the flue gas resistance change curve of the granulating tower 1, adjust the optimal speed of the fan 6, and realize energy saving of the blast furnace slag de-whitening energy-saving system.
[0070] In general, when the slag flushing process parameters of the blast furnace slag de-whitening energy-saving system change, the flue gas flow rate, flue gas moisture content and flue gas temperature generated in the granulation tower 1 all change, and the cooling efficiency of the original spray cooling system 2 also changes. Under the constraint of the total de-whitening efficiency, the spray cooling system 2 and the fan 6 also need to be adjusted accordingly. When the spray water volume of the water pump of the spray cooling system 2 is adjusted, the flow rate of the cooled flue gas will also change; due to the change in flue gas flow rate, the flue gas velocity inside the cyclone dehydrator 3 changes, and the local pressure loss changes; at the same time, due to the change in flue gas flow rate, the cyclone dehydrator 3 and other pipe networks along the way and local resistance losses all change. The resistance of the above-mentioned components changes, and the resistance of the entire dust removal system pipe network changes. According to the characteristic curve of the fan 6 at different speeds, find a suitable working intersection and determine a reasonable fan 6 speed. It should be noted that the determination of the fan 6 speed also needs to refer to the fan 6 efficiency characteristic curve to calculate the inverter efficiency in order to obtain the best energy-saving effect.
[0071] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.
Claims
1. A blast furnace slag de-whitening energy-saving control method, the control method is based on a blast furnace slag de-whitening energy-saving system, the system comprises a granulation tower, a flange filter, a fan and an exhaust pipe connected in sequence through pipelines along the flow direction, a spray cooling system, a cyclone dehydrator and an electric shutter flap valve are arranged in sequence from bottom to top in the granulation tower, the spray cooling system comprises a water pump; the granulation tower, the flange filter, the fan, the water pump of the spray cooling system, and the cyclone dehydrator are all connected to the control module signal, and the speed of the water pump and the fan is controlled by the control module; Features: The following steps are involved: S1. Real-time acquisition of relevant slag flushing process parameters of blast furnace slag de-whitening energy-saving system through the control module; S2. Using the blast furnace slag flushing model, spray cooling model and cyclone dehydration model, calculate the flue gas parameters after the slag flushing process parameters change, the spray water volume of the spray cooling system after the flue gas changes, and the dehydration efficiency of the cyclone dehydrator, and determine the flue gas parameters after spray cooling and cyclone dehydration; S3. Analyze the change curve of the flue gas resistance of the granulating tower, adjust the optimal speed of the fan, and realize the energy saving of the blast furnace slag descaling system under the constraint of satisfying the descaling efficiency; In step S1, the slag flushing process parameters collected in real time include the slag flushing water flow rate Q 冲 , slag flushing water temperature T 冲 , slag flow rate T 熔 , Flue gas temperature difference before and after spraying T 降 , water pump speed w 水 , fan speed w 风 ; In step S2, the calculated flue gas parameters include the flue gas flow rate Q 烟 , smoke moisture content M; The spray water volume of the spray cooling system is: ; In the formula, Q 水 is the spray water volume of the spray cooling system, Q 烟 is the flue gas flow rate, T 降 is the flue gas temperature difference before and after spraying, H 热 is the enthalpy of hot flue gas after slag flushing, H 冷 is the enthalpy of cold flue gas after spray cooling; The resistance of the cyclone dehydrator is: ; In the formula, is the correction factor, is the smoke density, V t is the flue gas velocity; It is also necessary to calculate the resistance of other pipe networks, which are: ; In the formula, A is a constant, is the equivalent local resistance coefficient, is the local resistance coefficient, is the fan efficiency, is the inverter efficiency; Minimum operating energy consumption P of blast furnace slag descaling energy-saving system 系 = Pump energy consumption P 水 + Fan energy consumption P 风 ;in: Pump energy consumption P 水 = H × Q 水 / (367.2×η p ×η m ); In the formula, H is the pump head, Q is 水 is the spray water volume of the spray cooling system, η p is the pump operating efficiency, η m is the efficiency of the water pump motor; Fan energy consumption ; In the formula, is the total wind pressure of the fan, and also the total flue gas resistance of the blast furnace slag descaling energy-saving system, Q 风 is the flue gas flow rate, η0 is the internal efficiency of the fan, and η1 is the mechanical efficiency of the fan; where: ; In the formula, is the resistance of the cyclone dehydrator, is the resistance of other pipe networks.
2. The blast furnace slag descaling and energy-saving control method according to claim 1, characterized in that: The flange filters are arranged in two groups in parallel.