Heating device
By dynamically adjusting the number of heating belts in the tank circuit breaker heating device and controlling the power supply line according to the ambient temperature, the problem of energy waste in the heating device in the prior art in high-temperature environment is solved, and a more efficient heating method is achieved.
Patent Information
- Application Number
- CN202110755961.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-07-05
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2041-07-05
AI Technical Summary
When the ambient temperature of the existing tank circuit breaker heating device is below the preset threshold, the constant power outputs heat, resulting in wasting energy in a high-temperature environment and unable to effectively save energy.
A heating device is designed, including a control module, a first main heating belt and a second main heating belt, and the power supply line is controlled through a temperature sensing and comparison unit, and the number of heating belts is dynamically adjusted according to the ambient temperature, and heating is carried out only when necessary. , to avoid the output of excess heat.
It effectively saves energy consumption when heating tank circuit breakers, ensures that the gas insulating medium is always in the gas state, and improves the energy efficiency of the equipment.
Smart Images

Figure CN113391664B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of power transmission and transformation, and in particular to a heating device. Background Art
[0002] Dead tank circuit breakers (DTs) are important electrical components in high-voltage power transmission and distribution systems. They can close, carry and disconnect currents under normal circuit conditions, and close, carry and disconnect currents under abnormal circuit conditions within a specified time. Dead tank circuit breakers contain gas insulating media, such as sulfur hexafluoride (SF6). In order to prevent the gas insulating media from liquefying due to low temperatures, which may affect the function of the dead tank circuit breaker, a heating device needs to be provided on the dead tank circuit breaker to heat the tank body containing the gas insulating media when the ambient temperature is low, so as to ensure that the gas insulating media is always in a gaseous state.
[0003] At present, the heating device of the tank circuit breaker includes a heating belt. When the ambient temperature is lower than a preset threshold temperature, the power supply line of the heating belt is connected, and the tank body encapsulating the gas insulating medium is heated by the heating belt.
[0004] For the current tank circuit breaker heating device, after the ambient temperature is lower than the preset threshold temperature, the tank body encapsulating the gas insulating medium is heated by the heating belt included in the heating device. After the power supply line of the heating belt is connected, the heating belt outputs heat at a constant power regardless of the ambient temperature. Therefore, when the ambient temperature is high, the heat output by the heating belt is higher than the heat required to maintain the gas insulating medium in a gaseous state, resulting in energy waste. Summary of the invention
[0005] In view of this, the heating device provided by the present application to solve the above-mentioned problem can save the energy required for heating the tank circuit breaker.
[0006] In a first aspect, an embodiment of the present application provides a heating device for heating a tank body encapsulating a gas insulating medium in a tank-type circuit breaker, the heating device comprising: a control module, a first main heating belt and a second main heating belt;
[0007] The control module is connected to the first main heating belt and the second main heating belt respectively;
[0008] The tank body is a cylindrical structure, and the first main heating zone and the second main heating zone are respectively surrounded on the outer side wall of the tank body;
[0009] The control module includes a temperature sensing unit and a temperature comparison unit, wherein the temperature sensing unit senses the air temperature around the end of the tank body where the inflation valve is located, and the temperature sensing unit sends the air temperature to the temperature comparison unit;
[0010] When the temperature comparison unit determines that the air temperature is lower than a preset first threshold temperature and higher than a preset second threshold temperature, the temperature comparison unit sends a first comparison result signal to a first power supply circuit included in the control module for supplying power to the first main heating belt, and the first power supply circuit is connected upon receiving the first comparison result signal, so that the first main heating belt heats the tank body, wherein the first threshold temperature is higher than the second threshold temperature;
[0011] When the temperature comparison unit determines that the air temperature is lower than or equal to the second threshold temperature, the temperature comparison unit sends the first comparison result signal to the first power supply circuit, and sends the second comparison result signal to the second power supply circuit included in the control module for supplying power to the second main heating belt. The first power supply circuit is connected when the first comparison result signal is received, and the second power supply circuit is connected when the second comparison result signal is received, so that the first main heating belt and the second main heating belt heat the tank body.
[0012] In a first possible implementation, in combination with the first aspect, the heating device further includes: a spare heating belt;
[0013] The control module is connected to the standby heating belt;
[0014] The standby heating belt surrounds the outer side wall of the tank body;
[0015] The control module includes a third power supply line for supplying power to the backup heating belt and a fault monitoring unit, wherein the fault monitoring unit monitors whether the first main heating belt and the second main heating belt heat the tank body normally;
[0016] When the temperature comparison unit determines that the air temperature is lower than the first threshold temperature and higher than the second threshold temperature, and the fault monitoring unit detects that the first main heating belt cannot heat the tank body normally, the fault monitoring unit sends a first switching signal to the third power supply line, and the third power supply line is connected upon receiving the first switching signal, so that the backup heating belt heats the tank body;
[0017] When the temperature comparison unit determines that the air temperature is lower than or equal to the second threshold temperature, and the fault monitoring unit detects that the first main heating belt cannot heat the tank body normally, the fault monitoring unit sends the first switching signal to the third power supply line, and the third power supply line is connected upon receiving the first switching signal, so that the second main heating belt and the backup heating belt heat the tank body;
[0018] When the temperature comparison unit determines that the air temperature is lower than or equal to the second threshold temperature, and the fault monitoring unit detects that the second main heating belt cannot heat the tank body normally, the fault monitoring unit sends a second switching signal to the third power supply line, and the third power supply line is connected upon receiving the second switching signal, so that the first main heating belt and the backup heating belt heat the tank body.
[0019] In a second possible implementation, in combination with the above-mentioned first possible implementation, the first main heating belt, the second main heating belt and the backup heating belt are all annular structures; the first main heating belt, the second main heating belt and the backup heating belt are sleeved on the tank body along the axial direction of the tank body, and the backup heating belt is located between the first main heating belt and the second main heating belt.
[0020] In a third possible implementation, in combination with the first possible implementation, the first main heating belt, the second main heating belt and the backup heating belt have the same heating power.
[0021] In a fourth possible implementation, combined with the above first possible implementation,
[0022] The temperature comparison unit includes: a first temperature control switch and a second temperature control switch;
[0023] The first power supply circuit includes: a first relay and a second relay;
[0024] The second power supply circuit includes: a third relay and a fourth relay;
[0025] The first temperature control switch is connected in series with the coil of the first relay, the normally open contact group of the first relay is connected in series with the coil of the second relay, and the normally open contact group of the second relay is connected in series with the first main heating belt;
[0026] The third temperature control switch is connected in series with the coil of the third relay, the normally open contact group of the third relay is connected in series with the coil of the fourth relay, and the normally open contact group of the fourth relay is connected in series with the second main heating belt;
[0027] The first temperature control switch is closed when the air temperature is lower than the first threshold temperature, the first temperature control switch is closed to energize the coil of the first relay, after the coil of the first relay is energized, the normally open contact group is closed, the normally open contact group of the first relay is closed to energize the coil of the second relay, after the coil of the second relay is energized, the normally open contact group is closed, the normally open contact group of the second relay is closed to connect the first power supply line, and the connection of the first power supply line enables the first main heating belt to heat the tank body;
[0028] The second temperature-controlled switch is closed when the air temperature is lower than or equal to the second threshold temperature, and the closing of the second temperature-controlled switch energizes the coil of the third relay. After the coil of the third relay is energized, the normally open contact group is closed, and the normally open contact group of the third relay is closed to energize the coil of the fourth relay. After the coil of the fourth relay is energized, the normally open contact group is closed, and the normally open contact group of the fourth relay is closed to connect the second power supply line, and the connection of the second power supply line enables the second main heating belt to heat the tank body.
[0029] In a fifth possible implementation, in combination with the fourth possible implementation, the first temperature control switch and the second temperature control switch are both arranged at an end of the tank body where the inflation valve is located;
[0030] When the air temperature around the end of the tank where the inflation valve is located is lower than the first threshold temperature, the first temperature control switch is closed;
[0031] When the air temperature around the end of the tank body where the inflation valve is located is lower than or equal to the second threshold temperature, the second temperature control switch is closed.
[0032] In a sixth possible implementation, in combination with the fourth possible implementation,
[0033] The fault monitoring unit comprises: a first current monitoring relay, a second current monitoring relay, a fifth relay and a sixth relay;
[0034] The third power supply circuit includes: a seventh relay;
[0035] The normally open contact group of the first current monitoring relay is connected in series with the coil of the fifth relay, and the normally closed contact group of the fifth relay is connected in series with the coil of the second relay;
[0036] The normally open contact group of the second current monitoring relay is connected in series with the coil of the sixth relay, and the normally closed contact group of the sixth relay is connected in series with the coil of the fourth relay;
[0037] The normally open contact group of the fifth relay is connected in series with the normally open contact group of the first relay to form a first circuit;
[0038] The normally open contact group of the sixth relay is connected in series with the normally open contact group of the third relay to form a second circuit;
[0039] After the first circuit and the second circuit are connected in parallel, they are connected in series with the coil of the seventh relay, and the normally open contact group of the seventh relay is connected in series with the standby heating belt;
[0040] When the first current monitoring relay detects that the current of the first main heating belt is greater than the first preset threshold current, wherein the first main heating belt cannot heat the tank body normally when the current of the first main heating belt is greater than the first preset threshold current, the normally open contact group of the first current monitoring relay is closed, the normally open contact group of the first current monitoring relay is closed to energize the coil of the fifth relay, after the coil of the fifth relay is energized, the normally open contact group is closed and the normally closed contact group is disconnected, the normally closed contact group of the fifth relay is disconnected to disconnect the first power supply line, so that the first power supply line is disconnected to stop the first main heating belt from heating the tank body, the normally open contact group of the fifth relay is closed to energize the coil of the seventh relay, after the coil of the seventh relay is energized, the normally open contact group is closed, the normally open contact group of the seventh relay is closed to connect the third power supply line, and the connection of the third power supply line enables the standby heating belt to heat the tank body;
[0041] When the second current monitoring relay detects that the current of the second main heating belt is greater than the second preset threshold current, wherein the second main heating belt cannot heat the tank body normally when the current of the second main heating belt is greater than the second preset threshold current, the normally open contact group of the second current monitoring relay is closed, and the normally open contact group of the second current monitoring relay is closed to energize the coil of the sixth relay, and after the coil of the sixth relay is energized, the normally open contact group is closed and the normally closed contact group is disconnected, and the normally closed contact group of the sixth relay is disconnected to disconnect the second power supply line, and the disconnection of the second power supply line causes the second main heating belt to stop heating the tank body, and the normally open contact group of the sixth relay is closed to energize the coil of the seventh relay, and after the coil of the seventh relay is energized, the normally open contact group is closed, and the normally open contact group of the seventh relay is closed to connect the third power supply line, and the connection of the third power supply line causes the backup heating belt to heat the tank body.
[0042] In a seventh possible implementation, in combination with the sixth possible implementation,
[0043] The normally open contact group of the fifth relay is connected in parallel with the first current monitoring relay;
[0044] The normally open contact group of the sixth relay is connected in parallel with the second current monitoring relay;
[0045] When the normally closed contact group of the fifth relay is disconnected, the first power supply line is disconnected, the normally open contact group of the first current monitoring relay is disconnected, and the normally open contact group of the fifth relay is closed, so that the coil of the fifth relay is energized, and the normally open contact group of the fifth relay is maintained in a closed state;
[0046] When the normally closed contact group of the sixth relay is disconnected, the second power supply line is disconnected, the normally open contact group of the second current monitoring relay is disconnected, and the normally open contact group of the sixth relay is closed, so that the coil of the sixth relay is energized and the normally open contact group of the sixth relay is maintained in a closed state.
[0047] In an eighth possible implementation, in combination with the seventh possible implementation, the control module further includes: a reset switch;
[0048] The reset switch is connected in series with the normally open contact group of the fifth relay and then connected in parallel with the first current monitoring relay;
[0049] The reset switch is connected in series with the normally open contact group of the sixth relay and then connected in parallel with the second current monitoring relay;
[0050] When the reset switch is disconnected, the coils of the fifth relay and the sixth relay are de-energized, the normally open contact group of the fifth relay and the normally open contact group of the sixth relay are disconnected, so that the coil of the seventh relay is de-energized, and after the coil of the seventh relay is de-energized, the normally open contact group is disconnected, and the normally open contact group of the seventh relay is disconnected, so that the third power supply line is disconnected, and the disconnection of the third power supply line causes the standby heating belt to stop heating the tank body.
[0051] In a ninth possible implementation, in combination with the fourth possible implementation, the control module further includes: a first forced casting switch, a second forced casting switch, and a third forced casting switch;
[0052] The first forced-throw switch is connected in parallel with the normally-open contact group of the second relay and then connected in series with the first power supply line;
[0053] The second forced throw switch is connected in parallel with the normally open contact group of the fourth relay and then connected in series with the second power supply line;
[0054] The third forced throw switch is connected in parallel with the normally open contact group of the seventh relay and then connected in series with the third power supply line;
[0055] When the first forced-throw switch is closed, the first power supply line is connected, and the first power supply line is connected so that the first main heating belt heats the tank body;
[0056] When the second forced-throw switch is closed, the second power supply line is connected, and the second power supply line is connected so that the second main heating belt heats the tank body;
[0057] When the third forced-throw switch is closed, the third power supply line is connected, and the third power supply line is connected so that the standby heating belt heats the tank body.
[0058] In a tenth possible implementation manner, in combination with any one of the first to ninth possible implementation manners,
[0059] When the temperature comparison unit determines that the air temperature is higher than a preset third threshold temperature, the first power supply line, the second power supply line and the third power supply line are disconnected, so that the first main heating belt, the second main heating belt and the backup heating belt stop heating the tank body, wherein the third threshold temperature is higher than the first threshold temperature;
[0060] When the temperature comparison unit determines that the air temperature is higher than the preset fourth threshold temperature and lower than or equal to the third threshold temperature, and the fault monitoring unit detects that the first main heating belt or the second main heating belt cannot heat the tank body normally, the third power supply line is disconnected, so that the backup main heating belt stops heating the tank body, wherein the fourth threshold temperature is lower than the second threshold temperature, and the fourth threshold temperature is higher than the third threshold temperature.
[0061] It can be seen from the above technical solution that the control module controls the first power supply line and the second power supply line based on the air temperature around the end of the tank body where the inflation valve is located. When the air temperature is lower than the first threshold temperature and higher than the second threshold temperature, the tank body is heated only by the first main heating belt. When the air temperature is lower than or equal to the second threshold temperature, the tank body is heated by the first main heating belt and the second main heating belt. That is, the number of heating belts put into use can be determined by the ambient temperature of the tank body. On the premise of ensuring that the gas insulating medium in the tank body will not liquefy, the heating device can avoid outputting excess heat, thereby saving the energy required for heating the tank circuit breaker. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] Figure 1 is a schematic diagram of a heating device provided in Example 1 of the present application;
[0063] Figure 2 is a schematic diagram of a heating device provided in Example 2 of the present application;
[0064] Figure 3 is a schematic diagram of a control module provided in Embodiment 3 of the present application;
[0065] Figure 4 It is a schematic diagram of the connection relationship between a control module and a heating belt provided in the third embodiment of the present application;
[0066] Figure 5 is a schematic diagram of a control module provided in Embodiment 4 of the present application;
[0067] Figure 6 is a schematic diagram of a control module provided in Embodiment 5 of the present application;
[0068] Figure 7 This is a schematic diagram of a control module provided in Example 6 of the present application.
[0069] List of reference numerals:
[0070] 1: Control module 2: First main heating belt 3: Second main heating belt
[0071] 4: Spare heating belt 10: Tank 11: Temperature sensing unit
[0072] 12: Temperature comparison unit 14: First power supply line 15: Second power supply line
[0073] 16: Third power supply line 17: Fault monitoring unit B8: First temperature control switch
[0074] B18: Second temperature control switch K153: First relay K154: Second relay
[0075] K253: Third relay K254: Fourth relay K138: First current monitoring relay
[0076] K238: Second current monitoring relay K133: Fifth relay K233: Sixth relay
[0077] K354: The seventh relay S4: Reset switch F154: The first forced throw switch
[0078] F254: Second forced throw switch DETAILED DESCRIPTION
[0079] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below with reference to the accompanying drawings.
[0080] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0081] As mentioned above, the current heating device of the tank circuit breaker includes a heating belt. When the ambient temperature of the tank circuit breaker is lower than the preset threshold temperature, the power supply line of the heating belt is connected, and the tank body used to encapsulate the gas insulating medium in the tank circuit breaker is heated by the heating belt to prevent the gas insulating medium from liquefying due to the low ambient temperature. When the ambient temperature is lower than the preset threshold temperature, regardless of the difference between the ambient temperature and the threshold temperature, the power supply line of the heating belt will be connected, and the tank body will be heated by the heating belt, that is, as long as the ambient temperature is lower than the threshold temperature, the heating belt will output heat at a constant power regardless of the ambient temperature. Therefore, when the ambient temperature is high, the heat output by the heating belt is higher than the heat required to maintain the gas insulating medium in a gaseous state, which leads to energy waste.
[0082] In the embodiment of the present application, the heating device includes a control module, a first main heating belt and a second main heating belt. When the ambient temperature of the tank body used to encapsulate the gas insulating medium is lower than the first threshold temperature and higher than the second threshold temperature, the first power supply line for supplying power to the first main heating belt is connected, so that the first main heating belt heats the tank body. When the ambient temperature of the tank body is lower than or equal to the second threshold temperature, the second power supply line for supplying power to the second main heating belt is connected, so that the first main heating belt and the second main heating belt heat the tank body. It can be seen that the heating device determines the number of heating belts to be put into use according to the ambient temperature, so as to avoid the heating device from outputting excess heat, thereby saving the energy required for heating the tank circuit breaker.
[0083] It should be noted that the tank type circuit breaker includes a tank body encapsulating a gas insulating medium, and the gas insulating medium encapsulated in the tank body serves as an insulating medium and an arc extinguishing medium of the circuit breaker, for example, the gas insulating medium is sulfur hexafluoride.
[0084] It should also be noted that in the embodiments of the present application, the air temperature around the end of the tank body where the inflation valve is located is sensed as the ambient temperature of the tank body. Since the air temperature around the end of the tank body where the inflation valve is located is less affected by the heating belt, it can more accurately reflect the ambient temperature of the environment in which the tank body is located, and it is more convenient to arrange the temperature sensor at the end of the tank body where the inflation valve is located. Unless otherwise specified, the ambient temperature of the tank body described in each embodiment of the present application refers to the air temperature around the end of the tank body where the inflation valve is located.
[0085] The heating device provided in the embodiment of the present application is described in detail below with reference to the accompanying drawings.
[0086] Embodiment 1
[0087] Figure 1 A schematic diagram of a heating device provided in Example 1 of the present application. The heating device provided in the embodiment of the present application is used to heat a tank body encapsulating a gas insulating medium in a tank-type circuit breaker, see Figure 1 , the heating device comprises: a control module 1, a first main heating belt 2 and a second main heating belt 3;
[0088] The control module 1 is connected to the first main heating belt 2 and the second main heating belt 3 respectively;
[0089] The tank body 10 used to encapsulate the gas insulating medium in the tank type circuit breaker is a cylindrical structure, and the first main heating belt 2 and the second main heating belt 3 are respectively surrounded on the outer side wall of the tank body 10;
[0090] The control module 1 includes a temperature sensing unit 11 and a temperature comparison unit 12. The temperature sensing unit 11 senses the air temperature around the end of the tank body 10 where the inflation valve is located, and the temperature sensing unit 11 sends the sensed air temperature to the temperature comparison unit 12.
[0091] When the temperature comparison unit 12 determines that the received air temperature is lower than a preset first threshold temperature and higher than a preset second threshold temperature, the temperature comparison unit 12 sends a first comparison result signal to a first power supply line 14 included in the control module 1 for supplying power to the first main heating belt 2, and the first power supply line 14 is connected upon receiving the first comparison result signal. The first power supply line 14 is turned on so that the first main heating belt 2 heats the tank body 10, wherein the first threshold temperature is higher than the second threshold temperature;
[0092] When the temperature comparison unit 12 determines that the received air temperature is lower than or equal to the second threshold temperature, the temperature comparison unit 12 sends a first comparison result signal to the first power supply line 14, and sends a second comparison result signal to the second power supply line 15 included in the control module 1 for supplying power to the second main heating belt 3. The first power supply line 14 is connected when the first comparison result signal is received, and the second power supply line 15 is connected when the second comparison result signal is received. When the first power supply line 14 is connected, the first main heating belt 2 heats the tank body 10, and when the second power supply line 15 is connected, the second main heating belt 3 heats the tank body 10.
[0093] In an embodiment of the present application, the control module 1 controls the on and off of the first power supply line 14 and the second power supply line 15 based on the air temperature around the end of the tank body 10 where the inflation valve is located. When the air temperature is lower than the first threshold temperature and higher than the second threshold temperature, the first power supply line 14 is connected, and the tank body 10 is heated only by the first main heating belt 2. When the air temperature is lower than or equal to the second threshold temperature, the first power supply line 14 and the second power supply line 15 are connected, and the tank body 10 is heated by the first main heating belt 2 and the second main heating belt 3. Since the air temperature around the end of the tank body 10 where the inflation valve is located reflects the ambient temperature of the tank body 10, the number of heating belts to be put into use can be determined according to the ambient temperature of the tank body 10. On the premise of ensuring that the gas insulating medium in the tank body 10 will not liquefy, the heating device can be prevented from outputting excess heat, thereby saving the energy required for heating the tank circuit breaker.
[0094] It should be noted that both the first main heating belt 2 and the second main heating belt 3 include electric heating components, such as electric heating wires, electric heating tubes, etc. After the first power supply line 14 is connected, the first main heating belt 2 converts electric energy into heat output, and after the second power supply line 15 is connected, the second main heating belt 3 converts electric energy into heat output, thereby heating the tank body 10 encapsulating the gas insulating medium. When the sensed air temperature is lower than the first threshold temperature and higher than the second threshold temperature, the tank body 10 is heated by the first main heating belt 2 to ensure that the gas insulating medium in the tank body 10 will not liquefy. When the sensed air temperature is lower than the second threshold temperature, the tank body 10 is heated by the first main heating belt 2 and the second main heating belt 3 to ensure that the gas insulating medium in the tank body 10 will not liquefy.
[0095] In one possible implementation, according to the liquefaction temperature of the gas insulating medium in the tank body 10 and the heating power of the first main heating zone 2 and the second main heating zone 3, the first threshold temperature is -25°C and the second threshold temperature is -37°C, that is, when the air temperature around the end of the tank body 10 where the inflation valve is located is lower than -25°C but higher than -37°C, the tank body 10 is heated by the first main heating zone 2; when the air temperature around the end of the tank body 10 where the inflation valve is located is lower than or equal to -37°C, the tank body 10 is heated by the first main heating zone 2 and the second main heating zone 3.
[0096] Embodiment 2
[0097] Figure 2 Schematic diagram of a heating device provided in Example 2 of the present application. Figure 2 ,exist Figure 1 On the basis of the heating device shown, the heating device further comprises: a spare heating belt 4;
[0098] The control module 1 is connected to the spare heating belt 4;
[0099] The standby heating belt 4 surrounds the outer side wall of the tank body 10;
[0100] The control module 1 includes a third power supply line 16 for supplying power to the backup heating belt 4 and a fault monitoring unit 17, and the fault monitoring unit 17 monitors whether the first main heating belt 2 and the second main heating belt 3 heat the tank body 10 normally;
[0101] When the temperature comparison unit 12 determines that the received air temperature is lower than the first threshold temperature and higher than the second threshold temperature, and the fault monitoring unit 17 detects that the first main heating belt 2 cannot heat the tank body 10 normally, the fault monitoring unit 17 sends a first switching signal to the third power supply line 16, and the third power supply line 16 is connected upon receiving the first switching signal, so that the backup heating belt 4 heats the tank body 10;
[0102] When the temperature comparison unit 12 determines that the received air temperature is lower than or equal to the second threshold temperature, and the fault monitoring unit 17 detects that the first main heating belt 2 cannot heat the tank body 10 normally, the fault monitoring unit 17 sends a first switching signal to the third power supply line 16, and the third power supply line 16 is connected upon receiving the first switching signal, so that the second main heating belt 3 and the backup heating belt 4 heat the tank body 10;
[0103] When the temperature comparison unit 12 determines that the received air temperature is lower than or equal to the second threshold temperature, and the fault monitoring unit 17 detects that the second main heating belt 3 cannot heat the tank body 10 normally, the fault monitoring unit 17 sends a second switching signal to the third power supply line 16, and the third power supply line 16 is connected when the second switching signal is received, so that the first main heating belt 2 and the backup heating belt 4 heat the tank body 10.
[0104] In an embodiment of the present application, the heating device includes a first main heating belt 2, a second main heating belt 3 and a backup heating belt 4. The fault monitoring unit 17 included in the control module 1 can monitor whether the first main heating belt 2 and the second main heating belt 3 can normally heat the tank body 10. When the fault monitoring unit 17 detects that the first main heating belt 2 or the second main heating belt 3 cannot normally heat the tank body 10, the third power supply line 16 for supplying power to the backup heating belt 4 is connected, so that the tank body 10 is heated by the backup heating belt 4 instead of the first main heating belt 2 or the second main heating belt 3. When the ambient temperature of the tank body 10 is low, the tank body 10 can be heated normally to ensure that the gas insulating medium in the tank body 10 will not liquefy, thereby ensuring the reliability of the tank circuit breaker.
[0105] By setting a spare heating belt 4 in the heating device, the spare heating belt 4 can replace the first main heating belt 2 or the second main heating belt 3 to heat the tank body 10. Therefore, when the first main heating belt 2 or the second main heating belt 3 cannot heat the tank body 10 normally, there is no need to immediately cut off the power of the tank circuit breaker to repair the heating device. Instead, the spare heating belt 4 can be used to heat the tank body 10 instead of the faulty first main heating belt 2 or the second main heating belt 3, and then the maintenance time of the heating device can be planned, thereby improving the user experience.
[0106] When the sensed air temperature is lower than the first threshold temperature and higher than the second threshold temperature, if the first main heating belt 2 can heat the tank body 10 normally, the first power supply line 14 is connected, so that the first main heating belt 2 heats the tank body 10; if the first main heating belt 2 cannot heat the tank body 10 normally, the third power supply line 16 is connected, so that the backup heating belt 4 heats the tank body 10.
[0107] When the sensed air temperature is lower than or equal to the second threshold temperature, if the first main heating belt 2 and the second main heating belt 3 can both heat the tank body 10 normally, the first power supply line 14 and the second power supply line 15 are connected, so that the first main heating belt 2 and the second main heating belt 3 heat the tank body 10; if the first main heating belt 2 cannot heat the tank body 10 normally, but the second main heating belt 3 can heat the tank body 10 normally, the second power supply line 15 and the third power supply line 16 are connected, so that the second main heating belt 3 and the backup heating belt 4 heat the tank body 10; if the first main heating belt 2 can heat the tank body 10 normally, but the second main heating belt 3 cannot heat the tank body 10 normally, the first power supply line 14 and the third power supply line 16 are connected, so that the first main heating belt 2 and the backup heating belt 4 heat the tank body 10.
[0108] In one possible implementation, see Figure 2 The first main heating belt 2, the second main heating belt 3 and the spare heating belt 4 are all annular structures. The first main heating belt 2, the second main heating belt 3 and the spare heating belt 4 are sleeved on the tank body 10 along the axial direction of the tank body 10, and the spare heating belt 4 is located between the first main heating belt 2 and the second main heating belt 3.
[0109] The tank body 10 for encapsulating the gas insulating medium is a cylindrical structure, and the first main heating belt 2, the second main heating belt 3 and the spare heating belt 4 are all annular structures. The first main heating belt 2, the second main heating belt 3 and the spare heating belt 4 can be put on the tank body 10 along the axial direction of the tank body 10, so that the first main heating belt 2, the second main heating belt 3 and the spare heating belt 4 can be easily installed on the tank body 10, and a large contact area can be ensured between the tank body 10 to ensure the timeliness of heating the tank body 10.
[0110] Along the axial direction of the tank body 10, the backup heating belt 4 is located between the first main heating belt 2 and the second main heating belt 3, that is, the backup heating belt 4 is located in the middle area of the tank body 10. When the backup heating belt 4 replaces the first main heating belt 2 or the second main heating belt 3 to heat the tank body 10, the tank body 10 can be heated more evenly, so that the heating of the tank body 10 is more evenly guaranteed, thereby ensuring that the gas insulating medium in the tank body 10 can be evenly heated, and avoiding the liquefaction of the gas insulating medium in the tank body 10 due to uneven heating.
[0111] In a possible implementation, the first main heating belt 2, the second main heating belt 3 and the backup heating belt 4 have the same heating power. For example, the power of the first main heating belt 2, the second main heating belt 3 and the backup heating belt 4 is 2 kilowatts.
[0112] The first main heating belt 2, the second main heating belt 3 and the backup heating belt 4 have the same heating power, so the first main heating belt 2, the second main heating belt 3 and the backup heating belt 4 can be realized by heating belts of the same specification, reducing the types of components included in the heating device, thereby reducing the cost of the heating device. In addition, the first main heating belt 2, the second main heating belt 3 and the backup heating belt 4 have the same heating power. When the tank body 10 is heated by the first main heating belt 2 and the second main heating belt 3, the first main heating belt 2 and the backup heating belt 4, or the second main heating belt 3 and the backup heating belt 4, the tank body 10 can be heated more evenly, avoiding liquefaction of the gas insulation medium in the tank body 10.
[0113] Embodiment 3
[0114] Figure 3 is a schematic diagram of a control module provided in Embodiment 3 of the present application, Figure 4 Schematic diagram of the connection relationship between a control module and a heating belt provided in the third embodiment of the present application. Figure 3 and Figure 4 , the temperature comparison unit includes a first temperature control switch B8 and a second temperature control switch B18, the first power supply circuit includes a first relay K153 and a second relay K154, and the second power supply circuit includes a third relay K253 and a fourth relay K254;
[0115] The first temperature control switch B8 is connected in series with the coil of the first relay K153, the normally open contact group K153' of the first relay K153 is connected in series with the coil of the second relay K154, and the normally open contact group K154' of the second relay K154 is connected in series with the first main heating belt 2;
[0116] The second temperature control switch B18 is connected in series with the coil of the third relay K253, the normally open contact group K253' of the third relay K253 is connected in series with the coil of the fourth relay K254, and the normally open contact group K254' of the fourth relay K254 is connected in series with the second main heating belt 3;
[0117] The first temperature control switch B8 is closed when the air temperature is lower than the first threshold temperature. The first temperature control switch B8 is closed to energize the coil of the first relay K153. After the coil of the first relay K153 is energized, the normally open contact group K153' is closed. The normally open contact group K153' is closed to energize the coil of the second relay K154. After the coil of the second relay K154 is energized, the normally open contact group K154' is closed. The normally open contact group K154' is closed to connect the first power supply line 14. The first power supply line 14 is connected to enable the first main heating belt 2 to heat the tank body 10.
[0118] The second temperature control switch B18 is closed when the air temperature is lower than or equal to the second threshold temperature. The closing of the second temperature control switch B18 energizes the coil of the third relay K253. After the coil of the third relay K253 is energized, the normally open contact group K253' is closed. The closing of the normally open contact group K253' energizes the coil of the fourth relay K254. After the coil of the fourth relay K254 is energized, the normally open contact group K254' is closed. The closing of the normally open contact group K254' connects the second power supply line 15. When the second power supply line 15 is connected, the second main heating belt 3 heats the tank body 10.
[0119] In the embodiment of the present application, the first temperature control switch B8 is used to control the connection and disconnection of the first power supply line 14, and the second temperature control switch B18 is used to control the connection and disconnection of the second power supply line 15. When the ambient temperature of the tank body 10 is lower than the first threshold temperature but higher than the second threshold temperature, the first temperature control switch B8 is closed and the second temperature control switch B18 is disconnected. At this time, the first power supply line 14 is connected, the second power supply line 15 is disconnected, and the first main heating belt 2 heats the tank body 10. When the ambient temperature of the tank body 10 is lower than or equal to the second threshold temperature, the first temperature control switch B8 and the second temperature control switch B18 are both closed. At this time, the first power supply line 14 and the second power supply line 15 are both connected, and the first main heating belt 2 and the second main heating belt 3 heat the tank body 10.
[0120] The secondary circuit is composed of two temperature control switches and multiple relays. The secondary circuit controls the power supply lines of the two main heating belts based on the ambient temperature of the tank body 10. When the ambient temperature of the tank body 10 is low and may cause the gas insulation medium in the tank body 10 to liquefy, one or all of the two main heating belts are controlled to heat the tank body 10, so that the control of the heating device is accurate. In addition, since the secondary circuit is a low-voltage circuit, the connection and disconnection of the power supply lines of the main heating belts can be controlled by the secondary circuit, which can improve the safety of heating the tank circuit breaker. Figure 3 In the control module shown, two arrows respectively represent the positive pole and the negative pole of the secondary circuit.
[0121] It should be noted that since the second threshold temperature is lower than the first threshold temperature, when the air temperature of the environment in which the tank body 10 is located is lower than or equal to the second threshold temperature, the air temperature of the environment in which the tank body 10 is located must be lower than the first threshold temperature. At this time, the first temperature control switch B8 is closed to connect the first power supply line 14, and at the same time, the second temperature control switch B18 is closed to connect the second power supply line 15.
[0122] It should also be noted that in the embodiments of the present application and the subsequent embodiments, the normally open contact group refers to a group of contacts that are in an open state when the coil of the relay is not energized. When the coil of the relay is not energized, the current cannot be conducted through the normally open contact group. After the coil of the relay is energized, the normally open contact group closes, and the current can be conducted through the normally open contact group. The normally closed contact group refers to a group of contacts that are in a closed state when the coil of the relay is not energized. When the coil of the relay is not energized, the current can be conducted through the normally closed contact group. After the coil of the relay is energized, the normally closed contact group will be disconnected, and the current cannot be conducted through the normally closed contact group.
[0123] In the embodiment of the present application, the first temperature control switch B8 and the second temperature control switch B18 are both arranged at the end of the tank body 10 where the inflation valve is located. When the air temperature around the end of the tank body 10 where the inflation valve is located is lower than the first threshold temperature, the first temperature control switch B8 is closed, so that the first main heating belt 2 heats the tank body 10. When the air temperature around the end of the tank body 10 where the inflation valve is located is lower than or equal to the second threshold temperature, the second temperature control switch B18 is closed, so that the second main heating belt 3 heats the tank body 10.
[0124] Embodiment 4
[0125] Figure 5 Schematic diagram of a control module provided in Embodiment 4 of the present application. Figure 3 Based on the control module shown, see Figure 5, the fault monitoring unit includes a first current monitoring relay K138, a second current monitoring relay K238, a fifth relay K133 and a sixth relay K233, and the third power supply line includes a seventh relay K354;
[0126] The normally open contact group of the first current monitoring relay K138 is connected in series with the coil of the fifth relay K133, and the normally closed contact group K133'' of the fifth relay K133 is connected in series with the coil of the second relay K154;
[0127] The normally open contact group of the second current monitoring relay K238 is connected in series with the coil of the sixth relay K233, and the normally closed contact group K233'' of the sixth relay K233 is connected in series with the coil of the fourth relay K254;
[0128] The normally open contact group K133' of the fifth relay K133 is connected in series with the normally open contact group K153' of the first relay K153 to form a first circuit;
[0129] The normally open contact group K233' of the sixth relay K233 and the normally open contact group K253' of the third relay K253 are connected in series to form a second circuit;
[0130] After the first circuit is connected in parallel with the second circuit, it is connected in series with the coil of the seventh relay K354, and the normally open contact group of the seventh relay K354 is connected in series with the spare heating belt 4;
[0131] When the first current monitoring relay K138 detects that the current of the first main heating belt 2 is greater than the first preset threshold current, wherein the first main heating belt 2 cannot normally heat the tank body 10 when the current of the first main heating belt 2 is greater than the first preset threshold current, the normally open contact group of the first current monitoring relay K138 is closed, and the normally open contact group of the first current monitoring relay K138 is closed to energize the coil of the fifth relay K133. After the coil of the fifth relay K133 is energized, the normally open contact group K133' is closed and the normally closed contact group K133'' is disconnected; the normally closed contact group K133'' of the fifth relay K133 is disconnected to enable the second relay K15 4 is de-energized, and after the coil of the second relay K154 is de-energized, the normally open contact group K154' of the second relay K154 is disconnected, and the normally open contact group K154' is disconnected to disconnect the first power supply line 14, and the disconnection of the first power supply line 14 causes the first main heating belt 2 to stop heating the tank body 10; the normally open contact group K133' of the fifth relay K133 is closed to energize the coil of the seventh relay K354, and after the coil of the seventh relay K354 is energized, the normally open contact group is closed, and the normally open contact group of the seventh relay K354 is closed to connect the third power supply line 16, and the connection of the third power supply line 16 causes the standby heating belt 4 to heat the tank body 10;
[0132] When the second current monitoring relay K238 detects that the current of the second main heating belt 3 is greater than the second preset threshold current, wherein the second main heating belt 3 cannot heat the tank body 10 normally when the current of the second main heating belt 3 is greater than the second preset threshold current, the normally open contact group of the second current monitoring relay K238 is closed, and the normally open contact group of the second current monitoring relay K238 is closed to energize the coil of the sixth relay K233. After the coil of the sixth relay K233 is energized, the normally open contact group K233' is closed and the normally closed contact group K233'' is disconnected; the normally closed contact group K233'' of the sixth relay K233 is disconnected to enable the fourth relay K25 4 is de-energized, and after the coil of the fourth relay K254 is de-energized, the normally open contact group K254' of the fourth relay K254 is disconnected, and the disconnection of the normally open contact group K254' causes the second power supply line 15 to be disconnected, and the disconnection of the second power supply line 15 causes the second main heating belt 3 to stop heating the tank body 10; the normally open contact group K233' of the sixth relay K233 is closed to energize the coil of the seventh relay K354, and after the coil of the seventh relay K354 is energized, the normally open contact group is closed, and the normally open contact group of the seventh relay K354 is closed to connect the third power supply line 16, and the connection of the third power supply line 16 causes the standby heating belt 4 to heat the tank body 10.
[0133] In the embodiment of the present application, when the first temperature control switch B8 is closed to connect the first power supply line 14, the first main heating belt 2 starts to heat the tank body 10. When the first main heating belt 2 has an overcurrent fault, the first current monitoring relay K138 closes the normally open contact group when the first main heating belt 2 has an overcurrent fault. The normally open contact group of the first current monitoring relay K138 is closed to energize the coil of the fifth relay K133. After the coil of the fifth relay K133 is energized, the normally open contact group K133' is closed and the normally closed contact group K133'' is disconnected. The normally closed contact group K133'' is disconnected to disconnect the first power supply line 14, thereby causing the first main heating belt 2 to stop heating the tank body 10. The normally open contact group K133' is closed to connect the third power supply line 16, thereby causing the standby heating belt 4 to heat the tank body 10. It can be seen that the current of the first main heating belt 2 is monitored by the first current monitoring relay K138. When an overcurrent fault occurs in the first main heating belt 2, the first main heating belt 2 stops heating the tank body 10, and the standby heating belt 4 heats the tank body 10, that is, the standby heating belt 4 replaces the faulty first main heating belt 2 to heat the tank body 10. After the first main heating belt 2 fails, it is promptly switched to the standby heating belt 4 to heat the tank body 10. When the ambient temperature of the tank body 10 is low, the tank body 10 can be heated normally to ensure that the gas insulating medium in the tank body 10 will not liquefy, thereby ensuring the reliability of the tank circuit breaker.
[0134] In the embodiment of the present application, when the second temperature control switch B18 is closed to connect the second power supply line 15, the second main heating belt 3 starts to heat the tank body 10. When the second main heating belt 3 has an overcurrent fault, the second current monitoring relay K238 closes the normally open contact group when the second main heating belt 3 has a current abnormality. The normally open contact group of the second current monitoring relay K238 is closed to energize the coil of the sixth relay K233. After the coil of the sixth relay K233 is energized, the normally open contact group K233' is closed and the normally closed contact group K233'' is disconnected. The normally closed contact group K233'' is disconnected to disconnect the second power supply line 15, thereby causing the second main heating belt 3 to stop heating the tank body 10. The normally open contact group K233' is closed to connect the third power supply line 16, thereby causing the standby heating belt 4 to heat the tank body 10. It can be seen that the current of the second main heating belt 3 is monitored by the second current monitoring relay K238. When an overcurrent fault occurs in the second main heating belt 3, the second main heating belt 3 stops heating the tank body 10, and the standby heating belt 4 heats the tank body 10, that is, the standby heating belt 4 replaces the faulty second main heating belt 3 to heat the tank body 10. After the second main heating belt 3 fails, it is promptly switched to heating the tank body 10 by the standby heating belt 4. When the ambient temperature of the tank body 10 is low, the tank body 10 can be heated normally to ensure that the gas insulating medium in the tank body 10 will not liquefy, thereby ensuring the reliability of the tank circuit breaker.
[0135] It should be noted that when the air temperature around the end of the tank body 10 where the inflation valve is located is lower than the first threshold temperature but higher than the second threshold temperature, the first main heating belt 2 heats the tank body 10. At this time, only the first main heating belt 2 may fail, so the backup heating belt 4 can replace the failed first main heating belt 2 to heat the tank body 10. When the air temperature around the end of the tank body 10 where the inflation valve is located is lower than the second threshold temperature, both the first main heating belt 2 and the second main heating belt 3 heat the tank body 10. At this time, both the first main heating belt 2 and the second main heating belt 3 may fail, so the backup heating belt 4 can replace the failed first main heating belt 2 or the second main heating belt 3 to heat the tank body 10. When the air temperature around the end of the tank body 10 where the inflation valve is located is lower than the second threshold temperature, if the first main heating belt 2 and the second main heating belt 3 fail at the same time, the tank body 10 can only be heated by the backup heating belt 4, and the heating device will issue an alarm message to remind relevant personnel to deal with it.
[0136] Embodiment 5
[0137] Figure 6 Schematic diagram of a control module provided in Embodiment 5 of the present application. Figure 5 Based on the control module shown, see Figure 5, the normally open contact group K133' of the fifth relay K133 is connected in parallel with the first current monitoring relay K138, and the normally open contact group K233' of the sixth relay K233 is connected in parallel with the second current monitoring relay K238;
[0138] When the normally closed contact group K133'' of the fifth relay K133 is disconnected, the first power supply line 14 is disconnected, the normally open contact group of the first current monitoring relay K138 is disconnected, and the normally open contact group K133' of the fifth relay K133 is closed, so that the coil of the fifth relay K133 is energized, and the normally open contact group K133' of the fifth relay K133 is maintained in a closed state;
[0139] When the normally closed contact group K233'' of the sixth relay K233 is disconnected, the second power supply line 15 is disconnected, the normally open contact group K233' of the second current monitoring relay K238 is disconnected, and the normally open contact group K233' of the sixth relay K233 is closed, so that the coil of the sixth relay K233 is energized, maintaining the normally open contact group K233' of the sixth relay K233 in a closed state.
[0140] In the embodiment of the present application, when the normally open contact group of the first current monitoring relay K138 is closed, the normally closed contact group K133'' of the fifth relay K133 is disconnected, so that the first power supply line 14 is disconnected. After that, the first current monitoring relay K138 will not detect the current abnormality of the first main heating belt 2, and the normally open contact group of the first current monitoring relay K138 will be disconnected. In order to enable the backup heating belt 4 to replace the first main heating belt 2 to continuously heat the tank body 10, the normally open contact group K133' of the fifth relay K133 is connected in parallel with the first current monitoring relay K138. After the normally open contact group of the first current monitoring relay K138 is closed to close the normally open contact group K133' of the fifth relay K133, the current is transmitted to the coil of the fifth relay K133 through the normally open contact group K133' of the fifth relay K133, so that the fifth relay K133 is continuously in a coil-powered state, thereby maintaining the normally open contact group K133' of the fifth relay K133 in a closed state, and closing the normally open contact group K133' of the seventh relay K354 to connect the third power supply line 16, so that the backup heating belt 4 replaces the first main heating belt 2 to continuously heat the tank body 10.
[0141] In an embodiment of the present application, when the normally open contact group of the second current monitoring relay K238 is closed, the normally closed contact group K233'' of the sixth relay K233 is disconnected, so that the second power supply line 15 is disconnected. After that, the second current monitoring relay K238 will not detect the current abnormality of the second main heating belt 3, and the normally open contact group of the second current monitoring relay K238 will be disconnected. In order to enable the backup heating belt 4 to replace the second main heating belt 3 to continuously heat the tank body 10, the normally open contact group K233' of the sixth relay K233 is connected in parallel with the second current monitoring relay K238. After the normally open contact group of the second current monitoring relay K238 is closed to close the normally open contact group K233' of the sixth relay K233, the current is transmitted to the coil of the sixth relay K233 through the normally open contact group K233' of the sixth relay K233, so that the sixth relay K233 is continuously in the coil energized state, thereby maintaining the normally open contact group K233' of the sixth relay K233 in a closed state, and the normally open contact group K233' of the sixth relay K233 is closed to connect the third power supply line 16, so that the backup heating belt 4 replaces the second main heating belt 3 to continuously heat the tank body 10.
[0142] In the embodiment of the present application, the normally open contact group K133' of the fifth relay K133 is connected in parallel with the first current monitoring relay K138, and the normally open contact group K233' of the sixth relay K233 is connected in parallel with the second current monitoring relay K238. When the normally open contact group of the first current monitoring relay K138 or the second current monitoring relay K238 is closed, the normally open contact group K133' or the normally open contact group K233' is maintained in a closed state, so that the backup heating belt 4 continues to replace the faulty first main heating belt 2 or the second main heating belt 3 to heat the tank body 10, thereby ensuring the stability of the heating device heating the tank body 10.
[0143] Embodiment 6
[0144] Figure 7 Schematic diagram of a control module provided in Example 6 of the present application. Figure 6 Based on the control module shown, see Figure 7 , the control module also includes: a reset switch S4;
[0145] The reset switch S4 is connected in series with the normally open contact group K133' of the fifth relay K133, and then connected in parallel with the first current monitoring relay K138;
[0146] The reset switch S4 is connected in series with the normally open contact group K233' of the sixth relay K233, and then connected in parallel with the second current monitoring relay K238;
[0147] When the reset switch S4 is turned off, the coils of the fifth relay K133 and the sixth relay K233 are de-energized, and the normally open contact group K133' and the normally open contact group K233' are disconnected, so that the coil of the seventh relay K354 is de-energized. After the coil of the seventh relay K354 is de-energized, the normally open contact group of the seventh relay K354 is disconnected. The normally open contact group of the seventh relay K354 is disconnected, and the third power supply line 16 is disconnected. The third power supply line 16 is disconnected, so that the standby heating belt 4 stops heating the tank body 10.
[0148] In the embodiment of the present application, during the process of heating the tank body 10 by the backup heating belt 4, the reset switch S4 is in a closed state. When it is necessary to stop heating the tank body 10 by the backup heating belt 4, the reset switch S4 is disconnected, thereby de-energizing the coil of the seventh relay K354, thereby disconnecting the normally open contact group of the seventh relay K354, disconnecting the third power supply line 16, and stopping the backup heating belt 4 from heating the tank body 10. By providing the reset switch S4 in the heating device, after repairing the first main heating belt 2 or the second main heating belt 3 that has a fault, the backup heating belt 4 can be stopped from heating the tank body 10 by the reset switch S4, and switched to heating the tank body 10 by the first main heating belt 2 or the first main heating belt 2 and the second main heating belt 3, so that the heating belt can be conveniently switched to heat the tank body 10, providing user convenience and usage experience.
[0149] Embodiment 7
[0150] See also Figure 4 , the control module 1 also includes: a first forced throw switch F154, a second forced throw switch F254 and a third forced throw switch;
[0151] The first forced throw switch F154 is connected in parallel with the normally open contact group K154' of the second relay K154, and then connected in series with the first power supply line 14;
[0152] The second forced throw switch F254 is connected in parallel with the normally open contact group K254' of the fourth relay K254, and then connected in series with the second power supply line 15;
[0153] The third forced throw switch is connected in parallel with the normally open contact group of the seventh relay K354 and then connected in series with the third power supply line 16;
[0154] When the first forced switch F154 is closed, the first power supply line 14 is connected, and the first power supply line 14 is connected so that the first main heating belt 2 heats the tank body 10;
[0155] When the second forced switch F254 is closed, the second power supply line 15 is connected, and the second main heating belt 3 heats the tank body 10;
[0156] When the third forced-throw switch is closed, the third power supply line 16 is connected, and the third power supply line 16 is connected to enable the standby heating belt 4 to heat the tank body 10 .
[0157] In an embodiment of the present application, by setting a first forced throw switch F154, a second forced throw switch F254 and a third forced throw switch in the control module 1, regardless of the ambient temperature of the tank body 10, the first forced throw switch F154 can be used to control the first main heating belt 2 to heat the tank body 10, the second forced throw switch F254 can be used to control the second main heating belt 3 to heat the tank body 10, and the third forced throw switch can be used to control the standby heating belt 4 to heat the tank body 10, so that when the circuit of the heating device is verified on site or in an emergency, any one or more of the first main heating belt 2, the second main heating belt 3 and the standby heating belt 4 can be forced to heat the tank body 10 through manual control, thereby facilitating users to inspect the heating device and ensuring the safety and stability of the tank circuit breaker operation in an emergency.
[0158] It should be noted that in Figure 4 In the control module shown, when the three arrows in the upper right corner are used to represent the positive pole of the control module, the line with arrows directly connected to the first current monitoring relay K138 and the second current monitoring relay K238 represents the negative pole of the control module. When the three arrows in the upper right corner are used to represent the negative pole of the control module, the line with arrows directly connected to the first current monitoring relay K138 and the second current monitoring relay K238 represents the positive pole of the control module.
[0159] Embodiment 8
[0160] exist Figure 2 On the basis of the heating device shown, when the temperature comparison unit 12 determines that the received air temperature is higher than the preset third threshold temperature, the first power supply line 14, the second power supply line 15 and the third power supply line 16 are disconnected, so that the first main heating belt 2, the second main heating belt 3 and the backup heating belt 4 stop heating the tank body 10, wherein the third threshold temperature is higher than the first threshold temperature. When the temperature comparison unit 12 determines that the received air temperature is higher than the preset fourth threshold temperature and lower than or equal to the third threshold temperature, and the fault monitoring unit 17 detects that the first main heating belt 2 or the second main heating belt 3 cannot heat the tank body 10 normally, the third power supply line 16 is disconnected, so that the backup main heating belt 4 stops heating the tank body 10, wherein the fourth threshold temperature is lower than the second threshold temperature, and the fourth threshold temperature is higher than the third threshold temperature.
[0161] For example, the first threshold temperature is -25°C, the second threshold temperature is -37°C, the third threshold temperature is -15°C, and the fourth threshold temperature is -25°C. The conditions for the first main heating belt 2, the second main heating belt 3 and the backup heating belt 4 to stop heating the tank body 10 are described below.
[0162] If both the first main heating belt 2 and the second main heating belt 3 can heat the tank body 10 normally, when the ambient temperature of the tank body 10 is lower than -25°C but higher than -37°C, the first main heating belt 2 heats the tank body 10, and when the ambient temperature of the tank body 10 is lower than or equal to -37°C, the first main heating belt 2 and the second main heating belt 3 heat the tank body 10. When the ambient temperature of the tank body 10 rises to above -25°C but lower than -15°C, the second main heating belt 3 stops heating the tank body 10, and only the first main heating belt 2 heats the tank body 10. When the ambient temperature of the tank body 10 rises to above -15°C, both the first main heating belt 2 and the second main heating belt 3 stop heating the tank body 10.
[0163] If the first main heating belt 2 can heat the tank body 10 normally, but the second main heating belt 3 cannot heat the tank body 10 normally, when the ambient temperature of the tank body 10 is lower than -25°C but higher than -37°C, the first main heating belt 2 heats the tank body 10, and when the ambient temperature of the tank body 10 is lower than or equal to -37°C, the first main heating belt 2 and the backup heating belt 4 heat the tank body 10. When the ambient temperature of the tank body 10 rises to above -25°C but lower than -15°C, the backup heating belt 4 stops heating the tank body 10, and only the first main heating belt 2 heats the tank body 10. When the ambient temperature of the tank body 10 rises to above -15°C, both the first main heating belt 2 and the backup heating belt 4 stop heating the tank body 10.
[0164] If the first main heating belt 2 cannot heat the tank body 10 normally, but the second main heating belt 3 can heat the tank body 10 normally, when the ambient temperature of the tank body 10 is lower than -25°C but higher than -37°C, the backup heating belt 4 heats the tank body 10, and when the ambient temperature of the tank body 10 is lower than or equal to -37°C, the second main heating belt 3 and the backup heating belt 4 heat the tank body 10. When the ambient temperature of the tank body 10 rises to above -25°C but lower than -15°C, the second main heating belt 3 stops heating the tank body 10, and only the backup heating belt 4 heats the tank body 10. When the ambient temperature of the tank body 10 rises to above -15°C, both the second main heating belt 3 and the backup heating belt 4 stop heating the tank body 10.
[0165] In the embodiment of the present application, the threshold temperature at which the first main heating belt 2 starts to heat the tank body 10 is different from the threshold temperature at which it stops heating the tank body 10, and the threshold temperature at which the second main heating belt 3 starts to heat the tank body 10 is also different from the threshold temperature at which it stops heating the tank body 10. When the spare heating belt 4 replaces the first main heating belt 2, the starting working temperature and the stopping working temperature of the first main heating belt 2 are consistent. When the spare heating belt 4 replaces the second main heating belt 3, the starting working temperature and the stopping working temperature of the second main heating belt 3 are consistent. When the ambient temperature of the tank body 10 rises to the first threshold temperature Or the second threshold temperature, the first main heating belt 2, the second main heating belt 3 or the spare heating belt 4 is not immediately stopped from heating the tank body 10, but the ambient temperature of the tank body 10 is stopped after it is higher than the third threshold temperature or the fourth threshold temperature, so as to ensure that the first main heating belt 2, the second main heating belt 3 and the spare heating belt 4 have a buffer zone to avoid liquefaction of the gas insulating medium due to errors or the difference between the temperature inside the tank body 10 and the ambient temperature of the tank body 10, thereby ensuring the safety and stability of the tank type circuit breaker.
[0166] It should be noted that, in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprise a ..." do not exclude the existence of other identical factors in the process, method, article or device including the elements.
[0167] Finally, it should be noted that the above are only preferred embodiments of the present invention, which are only used to illustrate the technical solution of the present invention, and are not used to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.
Claims
1. A heating device for heating a tank body (10) encapsulating a gas insulating medium in a tank type circuit breaker, characterized in that: The heating device comprises: a control module (1), a first main heating belt (2) and a second main heating belt (3); The control module (1) is connected to the first main heating belt (2) and the second main heating belt (3) respectively; The tank body (10) is a cylindrical structure, and the first main heating zone (2) and the second main heating zone (3) are respectively surrounded on the outer side wall of the tank body (10); The control module (1) comprises a temperature sensing unit (11) and a temperature comparison unit (12), wherein the temperature sensing unit (11) senses the air temperature around one end of the tank body (10) where the inflation valve is located, and the temperature sensing unit (11) sends the air temperature to the temperature comparison unit (12); When the temperature comparison unit (12) determines that the air temperature is lower than a preset first threshold temperature and higher than a preset second threshold temperature, the temperature comparison unit (12) sends a first comparison result signal to a first power supply line (14) included in the control module (1) for supplying power to the first main heating belt (2), and the first power supply line (14) is connected upon receiving the first comparison result signal, so that the first main heating belt (2) heats the tank body (10), wherein the first threshold temperature is higher than the second threshold temperature; When the temperature comparison unit (12) determines that the air temperature is lower than or equal to the second threshold temperature, the temperature comparison unit (12) sends the first comparison result signal to the first power supply line (14), and sends the second comparison result signal to the second power supply line (15) included in the control module (1) for supplying power to the second main heating belt (3); the first power supply line (14) is connected upon receiving the first comparison result signal, and the second power supply line (15) is connected upon receiving the second comparison result signal, so that the first main heating belt (2) and the second main heating belt (3) heat the tank body (10). The heating device further comprises: a spare heating belt (4); The control module (1) comprises a third power supply line (16) for supplying power to the backup heating belt (4) and a fault monitoring unit (17), The fault monitoring unit (17) comprises: a first current monitoring relay (K138), a second current monitoring relay (K238), a fifth relay (K133) and a sixth relay (K233); The third power supply circuit (16) comprises: a seventh relay (K354); The normally open contact group of the first current monitoring relay (K138) is connected in series with the coil of the fifth relay (K133), and the normally closed contact group (K133'') of the fifth relay (K133) is connected in series with the coil of the second relay (K154); The normally open contact group of the second current monitoring relay (K238) is connected in series with the coil of the sixth relay (K233), and the normally closed contact group (K233'') of the sixth relay (K233) is connected in series with the coil of the fourth relay (K254); The normally open contact group (K133') of the fifth relay (K133) is connected in series with the normally open contact group (K153') of the first relay (K153) to form a first circuit; The normally open contact group (K233') of the sixth relay (K233) and the normally open contact group (K253') of the third relay (K253) are connected in series to form a second circuit; After the first circuit and the second circuit are connected in parallel, they are connected in series with the coil of the seventh relay (K354); the normally open contact group of the seventh relay (K354) is connected in series with the standby heating belt (4); When the first current monitoring relay (K138) detects that the current of the first main heating belt (2) is greater than the first preset threshold current, wherein the first main heating belt (2) cannot normally heat the tank body (10) when the current of the first main heating belt (2) is greater than the first preset threshold current, the normally open contact group of the first current monitoring relay (K138) is closed, and the normally open contact group of the first current monitoring relay (K138) is closed to energize the coil of the fifth relay (K133), and after the coil of the fifth relay (K133) is energized, the normally open contact group (K133') is closed and the normally closed contact group (K133'') is disconnected, and the normally closed contact group (K133'') of the fifth relay (K133) is disconnected to de-energize the coil of the second relay (K154), and the second relay (K154) is disconnected. After the coil of the device (K154) is powered off, the normally open contact group (K154') of the second relay (K154) is disconnected, the normally open contact group (K154') of the second relay (K154) is disconnected to disconnect the first power supply line (14), the first power supply line (14) is disconnected to stop the first main heating belt (2) from heating the tank body (10), the normally open contact group (K133') of the fifth relay (K133) is closed to energize the coil of the seventh relay (K354), after the coil of the seventh relay (K354) is powered on, the normally open contact group is closed, the normally open contact group of the seventh relay (K354) is closed to connect the third power supply line (16), the third power supply line (16) is connected to enable the standby heating belt (4) to heat the tank body (10); When the second current monitoring relay (K238) detects that the current of the second main heating belt (3) is greater than the second preset threshold current, wherein the second main heating belt (3) cannot normally heat the tank body (10) when the current of the second main heating belt (3) is greater than the second preset threshold current, the normally open contact group of the second current monitoring relay (K238) is closed, and the normally open contact group of the second current monitoring relay (K238) is closed to energize the coil of the sixth relay (K233), and the sixth relay (K233) is turned on. After the coil of the first relay (K233) is energized, the normally open contact group (K233') is closed and the normally closed contact group (K233'') is disconnected, the normally closed contact group (K233'') of the sixth relay (K233) is disconnected to disconnect the coil of the fourth relay (K254), after the coil of the fourth relay (K254) is de-energized, the normally open contact group (K254') of the fourth relay (K254) is disconnected, the normally open contact group (K254') of the fourth relay (K254) is disconnected to disconnect the second power supply line (15), and the second power supply line (15) is disconnected. The electric circuit (15) is disconnected so that the second main heating belt (3) stops heating the tank body (10), the normally open contact group (K233') of the sixth relay (K233) is closed so that the coil of the seventh relay (K354) is energized, and after the coil of the seventh relay (K354) is energized, the normally open contact group is closed, and the normally open contact group of the seventh relay (K354) is closed so that the third power supply circuit (16) is connected, and the third power supply circuit (16) is connected so that the standby heating belt (4) heats the tank body (10), The control module (1) is connected to the standby heating belt (4); The standby heating belt (4) surrounds the outer side wall of the tank body (10); The fault monitoring unit (17) monitors whether the first main heating belt (2) and the second main heating belt (3) heat the tank body (10) normally; When the temperature comparison unit (12) determines that the air temperature is lower than the first threshold temperature and higher than the second threshold temperature, and the fault monitoring unit (17) detects that the first main heating belt (2) cannot normally heat the tank body (10), the fault monitoring unit (17) sends a first switching signal to the third power supply line (16), and the third power supply line (16) is connected upon receiving the first switching signal, so that the backup heating belt (4) heats the tank body (10); When the temperature comparison unit (12) determines that the air temperature is lower than or equal to the second threshold temperature, and the fault monitoring unit (17) detects that the first main heating belt (2) cannot normally heat the tank body (10), the fault monitoring unit (17) sends the first switching signal to the third power supply line (16), and the third power supply line (16) is connected upon receiving the first switching signal, so that the second main heating belt (3) and the backup heating belt (4) heat the tank body (10); When the temperature comparison unit (12) determines that the air temperature is lower than or equal to the second threshold temperature, and the fault monitoring unit (17) detects that the second main heating belt (3) cannot heat the tank body (10) normally, the fault monitoring unit (17) sends a second switching signal to the third power supply line (16), and the third power supply line (16) is connected upon receiving the second switching signal, so that the first main heating belt (2) and the backup heating belt (4) heat the tank body (10). The temperature comparison unit (12) comprises: a first temperature control switch (B8) and a second temperature control switch (B18); The first power supply circuit (14) comprises: a first relay (K153) and a second relay (K154); The second power supply circuit (15) comprises: a third relay (K253) and a fourth relay (K254); The first temperature control switch (B8) is connected in series with the coil of the first relay (K153), the normally open contact group (K153') of the first relay (K153) is connected in series with the coil of the second relay (K154), and the normally open contact group (K154') of the second relay (K154) is connected in series with the first main heating belt (2); The second temperature control switch is connected in series with the coil of the third relay (K253), the normally open contact group (K253') of the third relay (K253) is connected in series with the coil of the fourth relay (K254), and the normally open contact group (K254') of the fourth relay (K254) is connected in series with the second main heating belt (3); The first temperature control switch (B8) is closed when the air temperature is lower than the first threshold temperature, the first temperature control switch (B8) is closed so that the coil of the first relay (K153) is energized, after the coil of the first relay (K153) is energized, the normally open contact group (K153') is closed, the normally open contact group (K153') of the first relay (K153) is closed so that the coil of the second relay (K154) is energized, after the coil of the second relay (K154) is energized, the normally open contact group (K154') is closed, the normally open contact group (K154') of the second relay (K154) is closed so that the first power supply line (14) is connected, and the first power supply line (14) is connected so that the first main heating belt (2) heats the tank body (10); The second temperature control switch (B18) is closed when the air temperature is lower than or equal to the second threshold temperature. The closing of the second temperature control switch (B18) causes the coil of the third relay (K253) to be energized. After the coil of the third relay (K253) is energized, the normally open contact group (K253') is closed. The closing of the normally open contact group (K253') of the third relay (K253) causes the coil of the fourth relay (K254) to be energized. After the coil of the fourth relay (K254) is energized, the normally open contact group (K254') is closed. The closing of the normally open contact group (K254') of the fourth relay (K254) causes the second power supply line (15) to be connected. When the second power supply line (15) is connected, the second main heating belt (3) heats the tank body (10).
2. The heating device according to claim 1, characterized in that The first main heating belt (2), the second main heating belt (3) and the backup heating belt (4) are all annular structures; The first main heating belt (2), the second main heating belt (3) and the backup heating belt (4) are sleeved on the tank body (10) along the axial direction of the tank body (10), and the backup heating belt (4) is located between the first main heating belt (2) and the second main heating belt (3).
3. The heating device according to claim 1, characterized in that: The first main heating belt (2), the second main heating belt (3) and the backup heating belt (4) have the same heating power.
4. The heating device according to claim 1, characterized in that The first temperature control switch (B8) and the second temperature control switch (B18) are both arranged at one end of the tank body (10) where the inflation valve is located; When the air temperature around the end of the tank body (10) where the inflation valve is located is lower than the first threshold temperature, the first temperature control switch (B8) is closed; When the air temperature around the end of the tank body (10) where the inflation valve is located is lower than or equal to the second threshold temperature, the second temperature control switch (B18) is closed.
5. The heating device according to claim 1, characterized in that: The normally open contact group (K133') of the fifth relay (K133) is connected in parallel with the first current monitoring relay (K138); The normally open contact group (K233') of the sixth relay (K233) is connected in parallel with the second current monitoring relay (K238); When the normally closed contact group (K133'') of the fifth relay (K133) is disconnected, the first power supply line (14) is disconnected, the normally open contact group of the first current monitoring relay (K138) is disconnected, and the normally open contact group (K133') of the fifth relay (K133) is closed, so that the coil of the fifth relay (K133) is energized, and the normally open contact group (K133') of the fifth relay (K133) is maintained in a closed state; When the normally closed contact group (K233'') of the sixth relay (K233) is disconnected, the second power supply line (15) is disconnected, the normally open contact group of the second current monitoring relay (K238) is disconnected, and the normally open contact group (K233') of the sixth relay (K233) is closed, so that the coil of the sixth relay (K233) is energized, and the normally open contact group (K233') of the sixth relay (K233) is maintained in a closed state.
6. The heating device according to claim 5, characterized in that: The control module (1) further comprises: a reset switch (S4); The reset switch (S4) is connected in series with the normally open contact group (K133') of the fifth relay (K133), and then connected in parallel with the first current monitoring relay (K138); The reset switch (S4) is connected in series with the normally open contact group (K233') of the sixth relay (K233), and then connected in parallel with the second current monitoring relay (K238); When the reset switch (S4) is disconnected, the coils of the fifth relay (K133) and the sixth relay (K233) are de-energized, the normally open contact group (K133') of the fifth relay (K133) and the normally open contact group (K233') of the sixth relay (K233) are disconnected, so that the coil of the seventh relay (K354) is de-energized, and the normally open contact group is disconnected after the coil of the seventh relay (K354) is de-energized, and the normally open contact group of the seventh relay (K354) is disconnected, so that the third power supply line (16) is disconnected, and the third power supply line (16) is disconnected so that the standby heating belt (4) stops heating the tank body (10).
Citation Information
Patent Citations
Automatic heating and aerating device of sulfur hexafluoride cylinder
CN102496869A
Replaceable emergency heating device for tank-type circuit breaker
CN111867155A
Constant temperature control system
CN208737324U
Heating device
CN215932475U