A grid stability control method suitable for abnormal conditions of enterprise grid
By establishing a power grid stability control logic and mathematical model, determining fault types and analyzing power parameters, the problem of economic losses caused by line fault tripping during the process of renewable energy consumption in enterprise power grids was solved, thus achieving stable control of the power grid and improving economic benefits.
Patent Information
- Application Number
- CN202110821239.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-07-20
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2041-07-20
AI Technical Summary
The existing enterprise power grid does not consider deep peak shaving of generating units in the process of absorbing new energy, which leads to challenges in the stable operation of coal-fired generating units, and the economic losses caused by line fault tripping are difficult to control.
By establishing grid stability control logic, determining the tripping type based on component faults, and establishing a mathematical model, power parameter analysis is performed to achieve stable control under abnormal grid conditions, including unit and load disconnection strategies.
While ensuring the stable operation of the power grid, it reduces economic losses caused by fault tripping and improves the operational safety and economic benefits of the enterprise's power grid.
Smart Images

Figure CN113595068B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid stability control, and in particular to a power grid stability control method suitable for use in abnormal power grid situations of an enterprise. Background Art
[0002] In order to meet the local consumption of new energy, the grid-connected enterprise power grid utilizes the peak-shaving capacity of the enterprise coal-fired units to increase the consumption of new energy as much as possible. However, the deep peak-shaving of the units has not been considered in the early construction of the existing coal-fired power generation units in the enterprise power grid. The units involved in deep peak-shaving can only ensure stable power generation conditions through technical methods such as flexibility transformation and operation parameter optimization. In the face of the increase in the consumption of new energy, new challenges will be posed to the stable operation of the enterprise coal-fired power generation units.
[0003] According to the experience of conventional power system operation, the unit transmission lines and load power supply lines in the network are affected by the natural environment and line tripping caused by line grounding faults and short circuit faults may occur. For the unstable factors brought by the participation of the enterprise power grid in the consumption of new energy and the transmission line fault tripping under the normal operation of the enterprise power grid, the enterprise must consider how to reduce the economic losses as much as possible in the event of a fault tripping.
[0004] In view of the above situation, in order to reduce the economic losses caused by unit or unit transmission line fault tripping, load power supply line fault tripping or load loss due to load failure during the normal operation of the enterprise power grid or participation in new energy consumption, it is necessary to consider further optimizing the safety and stability control strategy configured in the enterprise power grid to minimize the amount of load or unit in the network that is safely removed under abnormal circumstances. Summary of the invention
[0005] The present invention aims to reduce the operational risks caused by fault tripping of units and their transmission lines, load faults and their power supply line faults in the enterprise power grid, and reduce the economic losses of the enterprise. It provides a method for realizing grid stability control under abnormal power grid conditions by using a safe and stable control strategy.
[0006] To achieve the above object, the present invention adopts the following technical solutions:
[0007] A grid stability control method applicable to abnormal conditions of an enterprise grid, establishing grid stability control logic according to component fault tripping categories, comprising the following steps:
[0008] S1: component fault tripping determination;
[0009] S2: Component fault tripping category determination;
[0010] S3: According to the fault tripping category determined in S2, determine various power parameters before and after the fault tripping;
[0011] S4: Establish a mathematical model for the power parameters obtained in S3 and perform logic analysis to achieve stable control under abnormal conditions of the power grid.
[0012] Furthermore, the component failure includes a unit failure, a unit output line failure, a load failure, and a load power supply line failure.
[0013] Furthermore, the component fault tripping judgment is based on whether the operating components in the power grid are started, and the two-phase current I when the fault occurs and the set current constant value I s1 , the absolute value of the active power P of the component and the active power P of the component s2 , the three establish the “&” logical relationship for judgment.
[0014] Furthermore, the power parameters in S3 include:
[0015] P 机 : The active power of the unit's transmission line is collected and calculated 20 milliseconds before the unit or unit's transmission line trips due to a fault in each unit in the enterprise power grid within the same calculation cycle;
[0016] P 并 : The active power of the grid-connected interconnection line when a unit trip or load loss failure occurs in the enterprise power grid;
[0017] P 入 : The maximum power limit of incoming power is determined based on the overhead line model of the grid-connected interconnection line connecting the enterprise power grid and the external grid, the ambient temperature, and the maximum power that the external grid can provide to the enterprise power grid;
[0018] P 荷 : The active power value of the load power supply line 20 milliseconds before the load power supply line fault trips or the load itself fails in the enterprise power grid;
[0019] P 出 : The maximum power transmission limit power is determined based on the overhead line model of the grid-connected interconnection line connecting the enterprise power grid and the external grid, the ambient temperature, and the maximum power that the external grid can accept from the enterprise power grid.
[0020] Furthermore, the mathematical model in S4 is:
[0021] |P 并 +P 机 |-P 入 ≥0
[0022] |P 并 -P 荷 |-P 出 ≥0
[0023] When the unit and its output line trip due to fault, if |P并 +P 机 |-P 入 ≥0, the load in the grid is cut off, and the load to be cut is: P 切 =|P 并 +P 机 |-P 入 ; Otherwise, the logic ends;
[0024] When tripping due to load and its power supply line fault, if |P 并 -P 荷 |-P 出 ≥0, then the units in the network are cut off, and the number of units to be cut off is: P 切 =|P 并 -P 荷 |-P 出 ; Otherwise, the logic ends.
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] By establishing the grid stability control logic, it is ensured that when a unit or unit transmission line fault trips, a load power supply line fault trips, or a load failure causes load loss in the enterprise power grid, if the grid-connected interconnection line receives and sends power within the limit range, the logic control output will reliably not operate; and when the grid-connected interconnection line receives and sends power outside the limit range, the logic control output will reliably operate, thereby creating greater economic benefits for the enterprise while ensuring the stable operation of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 Component failure tripping determination logic flow chart. DETAILED DESCRIPTION
[0028] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0029] A grid stability control method applicable to an enterprise grid under abnormal conditions, establishing grid stability control logic according to component failure categories, including the following steps:
[0030] S1: component fault tripping determination;
[0031] like Figure 1 As shown in the figure, by checking whether the components in the power grid are started, and whether the two-phase current I and the set current constant value I s1 , the absolute value of the active power P of the component and the active power P of the component s2 , the three establish the “&” logical relationship for judgment.
[0032] S2: Determine the component fault tripping category;
[0033] Component failures include unit failures, unit output line failures, load failures, and load power supply line failures.
[0034] Specifically, the fault set of the unit or the unit output line tripping includes: unit output line failure, unit booster transformer failure, and unit failure exit.
[0035] Specifically, the load loss fault set caused by load power supply line fault tripping or load self-fault includes: the first series of load power supply lines for electrolytic aluminum are disconnected or the load is lost quickly, the second series of load power supply lines for electrolytic aluminum are disconnected or the load is lost quickly, and the third series of load power supply lines for electrolytic aluminum are disconnected or the load is lost quickly.
[0036] S3: According to the fault type determined in S2, determine the power parameters before and after the fault trip;
[0037] Specifically, the power parameters include:
[0038] P 机 : The active power of the unit's transmission line is collected and calculated 20 milliseconds before the unit or unit's transmission line trips due to a fault in each unit in the enterprise power grid within the same calculation cycle;
[0039] P 并 : The active power of the grid-connected interconnection line when a unit trip or load loss failure occurs in the enterprise power grid;
[0040] P 入 : The maximum power limit of incoming power is determined based on the overhead line model of the grid-connected interconnection line connecting the enterprise power grid and the external grid, the ambient temperature, and the maximum power that the external grid can provide to the enterprise power grid;
[0041] P 荷 : The active power value of the load power supply line 20 milliseconds before the load power supply line fault trips or the load itself fails in the enterprise power grid;
[0042] P 出 : The maximum power transmission limit power is determined based on the overhead line model of the grid-connected interconnection line connecting the enterprise power grid and the external grid, the ambient temperature, and the maximum power that the external grid can accept from the enterprise power grid.
[0043] S4: Establish a mathematical model for the power parameters obtained in S3 and perform logic analysis to achieve stable control under abnormal conditions of the power grid.
[0044] (1) Control means for tripping due to fault of the unit or the unit output line:
[0045] When a unit or transmission line trips due to a fault, the degree to which the grid-connecting line section may receive excessive power is calculated based on the power of the grid-connecting section before the accident, and the load is cut / reduced according to the over-cutting principle.
[0046] The direction of the State Grid supplying the enterprise power grid is positive. If |P 并 +P 机 |-P 入 ≥0, the load in the grid is cut off, and the load to be cut is: P 切 =|P 并 +P 机 |-P 入 ; If |P 并 +P 机 |-P 入 <0, the logic ends.
[0047] (2) Load loss caused by load power supply line fault tripping or load failure itself causing stable control measures:
[0048] When load loss is caused by a fault in the load power supply line or a load failure itself, the load loss fault is used to calculate the degree to which the power sent out by the grid interconnection line section may exceed the limit based on the pre-fault power of the grid interconnection section, and the machine is cut off according to the over-cutting principle.
[0049] If |P 并 -P 荷 |-P 出 ≥0, then the units in the network are cut off, and the number of units to be cut off is: P 切 =|P 并 -P 荷 |-P 出 ; If |P 并 -P 荷 |-P 出 <0, the logic ends.
[0050] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A power grid stability control method suitable for abnormal power grid conditions of an enterprise, characterized in that: Establishing the grid stability control logic according to the component fault tripping category includes the following steps: S1: component fault tripping determination; S2: Component fault tripping category determination; S3: According to the fault tripping category determined in S2, determine various power parameters before and after the fault tripping; The power parameters in S3 include: P 机 : The active power of the unit's transmission line is collected and calculated 20 milliseconds before the unit or unit's transmission line trips due to a fault in each unit in the enterprise power grid within the same calculation cycle; P 并 : The active power of the grid-connected interconnection line when a unit trip or load loss failure occurs in the enterprise power grid; P 入 : The maximum power limit of incoming power is determined based on the overhead line model of the grid-connected interconnection line connecting the enterprise power grid and the external grid, the ambient temperature, and the maximum power that the external grid can provide to the enterprise power grid; P 荷 : The active power value of the load power supply line 20 milliseconds before the load power supply line fault trips or the load itself fails in the enterprise power grid; P 出 : The maximum power transmission limit power is determined based on the overhead line model of the grid-connected interconnection line connecting the enterprise power grid and the external grid, the ambient temperature, and the maximum power that the external grid can accept from the enterprise power grid; S4: Establishing a mathematical model for the power parameters obtained in S3 for logical analysis, thereby achieving stable control under abnormal conditions of the power grid; The mathematical model in S4 is: |P 并 +P 机 |-P 入 ≥0 |P 并 -P 荷 |-P 出 ≥0 When the unit and its output line trip due to fault, if |P 并 +P 机 |-P 入 ≥0, the load in the grid is cut off, and the load to be cut is: P 切 =|P 并 +P 机 |-P 入 ; Otherwise, the logic ends; When tripping due to load and its power supply line fault, if |P 并 -P 荷 |-P 出 ≥0, then the units in the network are cut off, and the number of units to be cut off is: P 切 =|P 并 -P 荷 |-P 出 ; Otherwise, the logic ends.
2. A power grid stability control method applicable to an abnormal power grid of an enterprise according to claim 1, characterized in that: The elements include the unit itself, the unit transmission line, the load itself, and the load power supply line.
3. A power grid stability control method applicable to an abnormal power grid of an enterprise according to claim 1, characterized in that: The component fault tripping judgment is based on whether the operating component in the power grid is started, and the two-phase current I when the fault occurs and the set current constant value I s1 , the absolute value of the active power P of the component and the active power P of the component s2 , the three establish the "&" logical relationship for judgment.
