A method and system for optimizing the configuration of source, load and storage capacity of an island microgrid
Through the dual-layer optimization scheme and the coordinated control of seawater desalination devices and energy storage devices, the source and load storage capacity configuration of the island microgrid is optimized, which solves the problem that the island microgrid does not consider the demand for marine energy power generation and load water, and improves the reliability of power supply and environmental protection level.
Patent Information
- Application Number
- CN202110734625.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-06-30
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-06-30
AI Technical Summary
The existing island microgrid did not consider the form of ocean energy generation such as wave energy and tidal energy when the capacity is optimized, and the impact of important load electricity demand and residential water demand on the operation of the microgrid is not fully taken into account, resulting in power supply reliability and environmental protection. Inadequate level.
A method for optimizing the configuration of source load storage capacity of island microgrids is proposed. Through a double-layer optimization scheme, combining outer capacity optimization and inner operation optimization, considering the water demand for residents and preset lower limits for energy storage, seawater desalination device and energy storage are adopted The coordinated control strategy of the device is optimized to optimize the source and load storage capacity configuration of the island micronet.
The island microgrid has achieved a balance between economy and reliability, improved the penetration rate of renewable energy and green environmental protection level, ensured the reliability of power supply and water demand, and reduced operation and maintenance costs and pollution emissions.
Smart Images

Figure CN113644698B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of island microgrid source-load-storage capacity configuration, and more specifically, to an island microgrid source-load-storage capacity optimization configuration method and system. Background Art
[0002] Island microgrids are an effective way to solve the power supply needs of islands. The reasonable configuration of source, load and storage capacity can not only increase the penetration rate of renewable energy on the island, but also improve the green environmental protection level of the island. At present, factors such as wind and solar complementarity are considered in the capacity optimization configuration, but wave energy, tidal energy and other ocean energy generation forms are not involved. At the same time, the traditional capacity optimization configuration method is still used in the capacity optimization configuration, and the impact of important load power demand and residents' water demand on the operation of the microgrid has not been taken into account.
[0003] Therefore, there is a need for an optimal configuration method for the source, load and storage capacity of an island microgrid containing ocean energy power generation. Summary of the invention
[0004] The present invention proposes a method and system for optimizing the configuration of the source, load and storage capacity of an island microgrid, so as to solve the problem of how to optimize the configuration of the source, load and storage capacity of an island microgrid.
[0005] In order to solve the above problem, according to one aspect of the present invention, a method for optimizing the source-load-storage capacity configuration of an island microgrid is provided, the method comprising:
[0006] Determine the outer capacity optimization objective function and outer constraints with the minimum annual comprehensive cost of the island microgrid;
[0007] Determine the inner operation optimization objective function and inner constraints with the minimum operation cost and waste penalty fee;
[0008] For each configuration scheme, optimization control is performed according to the preset source-load-storage operation coordinated control strategy, and the preset lower limit value and future time period value of energy storage corresponding to each configuration scheme that meet the minimum inner optimization operation objective function and inner constraint conditions are determined;
[0009] According to the preset lower limit value of energy storage, future time period value and external constraints corresponding to each configuration scheme, the power outage rate, renewable energy reduction rate and installed capacity ratio of renewable energy corresponding to each configuration scheme are determined;
[0010] The annual comprehensive cost of the island microgrid corresponding to each configuration scheme is determined according to the power outage rate, renewable energy reduction rate, installed capacity ratio of renewable energy and outer capacity optimization objective function, and the source, load and storage capacity of the island microgrid is configured according to the configuration scheme corresponding to the minimum annual comprehensive cost of the island microgrid.
[0011] Preferably, the method uses the following method to optimize and control any configuration scheme according to a preset source-load-storage operation coordinated control strategy, and determines the preset lower limit value and future time period value of energy storage corresponding to any configuration scheme that satisfies the minimum inner optimization operation objective function and inner constraint conditions, including:
[0012] Step 1, initialization time t=1, energy storage preset lower limit value SoC=0.1, future time period value h=1;
[0013] Step 2: Calculate the water storage capacity S of the seawater desalination device in the current time period des_water (t) and the net power P of the island microgrid net (t);
[0014] Step 3, according to the water storage capacity S of the seawater desalination device des_water (t) and net power P net (t) Execute the preset source-load-storage operation coordination control strategy;
[0015] Step 4, determine whether t satisfies a first preset threshold; if so, calculate the inner optimization operation objective function and proceed to step 5; otherwise, update t=t+1 and return to step 2;
[0016] Step 5, determine whether SoC satisfies a second preset threshold; if so, proceed to step 6; otherwise, update SoC=SoC+a, update t=1, and return to step 2;
[0017] Step 6, determine whether h satisfies and is greater than the third preset threshold; if so, calculate the optimal solution of the inner layer optimization with the minimum operating cost, and determine the preset lower limit value SoC of energy storage and the future time period value h; otherwise, update h=h+b, update t=1, and return to step 2; wherein a is the first preset step length, and b is the second preset step length.
[0018] Preferably, the water storage capacity S of the seawater desalination device des_water (t) and net power P net (t) Execute the preset source-load-storage operation coordination control strategy, including:
[0019] First control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is greater than or equal to the residential water consumption in the next h hours If the state of charge Soc(t-1) at the previous moment is greater than the preset lower limit of energy storage SoC, the maximum regulation power of the seawater desalination device in period t is calculated as: P des-max (t) = N des-max (t)·Pdes ; Among them, N des-max (t) is the maximum number of desalination units in operation at time t; P des is the rated power of the seawater desalination device;
[0020] If the net power P net (t) less than or equal to the maximum regulating power P of the seawater desalination device des-max (t), then determine the adjustable power P consumed by the desalination device during the period t des (t) is:
[0021] If the net power P net (t) is greater than the maximum regulating power P of the seawater desalination device des-max (t), the desalination plant is dispatched at the maximum power, that is, P des (t) = P des-max (t); Residual power P net1 (t) = P net (t)-P des (t) Charge the energy storage device; if the charging power and the remaining power are both within the constraints of the energy storage device, the charging power of the energy storage device during time t is P bat,c (t) = P net (t)-P des (t), there is no remaining energy at this time; if the charging power and the remaining power are not within the constraints of the energy storage device, the energy storage device will charge at the maximum allowable charging power value P of the energy storage device within the time period t. c,max (t) Charging is performed and the remaining energy is discarded;
[0022] Second control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is greater than or equal to the residential water consumption in the next h hours And the state of charge Soc(t-1) at the previous moment is less than or equal to the preset lower limit of energy storage SoC, then the net power P net (t) First, charge the energy storage. If the net power P net (t) is less than the maximum charging power allowable value P that meets the reliability of power supply for important loads. max (t), at this time, the energy storage device can fully absorb the net power but still fail to meet the preset lower limit SoC of energy storage, and the charging power P of energy storage bat,c (t) = P net (t); otherwise the energy storage charging power P bat,c (t)P max (t) Charging, excess power P net1 (t) = P net (t)-P bat,cThe absorption process of (t) is performed according to the first control strategy;
[0023] The maximum charging power allowable value P is calculated using the following method: max (t), including:
[0024]
[0025] Among them, P max,c E is the maximum continuous charging power of the energy storage device; c is the rated capacity of the energy storage device; Soc(t-1) is the remaining power at the end of the t-1 period; η c is the charging efficiency of the energy storage device; Δt is the preset simulation time interval;
[0026] The third control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is less than the residential water consumption in the next h hours The net power P des (t) First, let the desalination device absorb the water consumption, and calculate the maximum regulation power P to meet the residents' water demand in the next h hours according to the following formula des_tj (t) is:
[0027]
[0028]
[0029] If the net power P net (t) greater than or equal to the maximum regulated power P des_tj (t), then the adjustable power P of the desalination device des (t) According to the current maximum adjustment power P des_tj (t) operation; if the net power P net (t) is less than the maximum regulated power P des_tj (t), then recalculate the maximum regulated power as: Adjustable power P of seawater desalination plant des (t) According to the current maximum adjustment power P des_tj (t) operation;
[0030] When there is still excess power, that is, the remaining power P net1 (t) = P net (t)-P des When (t)>0, if Soc(t-1)>SoC, execute the second control strategy; otherwise, execute the second control strategy;
[0031] Among them, S tj(t) is the maximum adjustable water volume of seawater desalination in the period t to meet the water demand of residents in the next h hours; S des_max is the maximum water storage capacity of the seawater desalination device; G des is the water output of a single desalination unit per hour;
[0032] The fourth control strategy: If the net power P net (t) is less than or equal to 0, the energy storage device is discharged first; if the power shortage is met, the discharge power of the energy storage device is the net power P net (t); otherwise, the energy storage is calculated as follows: the maximum discharge power allowable value P of the energy storage device during the period t d,max (t) The remaining power shortage is discharged, and the diesel generator is used to supplement the remaining power shortage; when the remaining power shortage exceeds the rated power of the diesel generator, the diesel generator is discharged at the rated power, and the shortage part is subjected to load shedding operation.
[0033] Preferably, the method further comprises:
[0034] When S des (t-1)-Q water (t)≥S des-min When the water storage in the reservoir meets the water demand of residents on the island, the desalination load P des_water (t) The power consumed is zero, that is, the number of desalination units that need to be started is N des_water (t) = 0; where S des (t-1) is the water storage capacity of the reservoir at the end of the period (t-1); Q water (t) is the water demand of residents on the island during period t; S des-min The minimum water storage capacity of the seawater desalination plant;
[0035] When S des (t-1)-Q water (t)<S des-min When the water storage in the reservoir does not meet the water demand of residents on the island, the number of seawater desalination devices to be started is N des_water (t) is:
[0036]
[0037] Water storage capacity S of seawater desalination device des_water (t) is:
[0038] S des_water (t) = N des_water (t)·G des +S des (t-1)-Q water (t),
[0039] Desalination load Pdes_water (t) is:
[0040] P des_water (t) = N des_water (t)·P des ,
[0041] In addition to meeting the water demand of residents, the desalination load has time-shifting properties and can assist in regulating the power of the microgrid. The current water storage capacity of the desalination device is low, and when all units are turned on, it still cannot exceed the maximum water storage capacity, that is, S des_water (t)+(N des -N des-water (t))·G des ≤S des-max The maximum number of units allowed to be opened is: N des-max (t) = N des -N des-water (t),
[0042] The current water storage capacity of the seawater desalination device is relatively high. When all units are turned on, it will definitely exceed the maximum water storage capacity, that is, S des_water (t)+[N des -N des-water (t)]G des ≥S des-max The maximum number of units allowed to be turned on is:
[0043]
[0044] The maximum regulating power of the seawater desalination device is: P des-max (t) = N des-max (t)·P des ;
[0045] Where Ndes is the number of desalination units configured in the microgrid; G des It is the water output of a single seawater desalination device per hour.
[0046] According to another invention of the present invention, a system for optimizing the configuration of source, load and storage capacity of an island microgrid is provided, the system comprising:
[0047] An outer layer objective function and constraint determination unit is used to determine an outer layer capacity optimization objective function and outer layer constraint conditions with the minimum annual comprehensive cost of the island microgrid;
[0048] An inner layer objective function and constraint determination unit, used for determining an inner layer operation optimization objective function and inner layer constraint conditions with minimum operation cost and waste penalty fee;
[0049] The inner optimization unit is used to optimize and control each configuration scheme according to the preset source-load-storage operation coordinated control strategy, and determine the preset lower limit value and future time period value of energy storage corresponding to each configuration scheme that satisfies the minimum inner optimization operation objective function and the inner constraint conditions;
[0050] The outer optimization unit is used to determine the power failure rate, renewable energy reduction rate and installed capacity ratio of renewable energy corresponding to each configuration scheme according to the preset lower limit value of energy storage, future time period value and outer constraint conditions corresponding to each configuration scheme;
[0051] The configuration scheme determination unit is used to determine the annual comprehensive cost of the island microgrid corresponding to each configuration scheme according to the power outage rate, renewable energy reduction rate, installed capacity ratio of renewable energy and outer capacity optimization objective function corresponding to each configuration scheme, and configure the source, load and storage capacity of the island microgrid according to the configuration scheme corresponding to the minimum annual comprehensive cost of the island microgrid.
[0052] Preferably, the inner optimization unit optimizes and controls any configuration scheme according to a preset source-load-storage operation coordination control strategy in the following manner, and determines the preset lower limit value and future time period value of energy storage corresponding to any configuration scheme that satisfies the minimum inner optimization operation objective function and inner constraint conditions, including:
[0053] Initialization module, used for initialization time t=1, energy storage preset lower limit value SoC=0.1, future time period value h=1;
[0054] The calculation module is used to calculate the water storage capacity S of the seawater desalination device in the current time period. des_water (t) and the net power P of the island microgrid net (t);
[0055] The coordination control module is used to control the water storage capacity S of the seawater desalination device according to the des_water (t) and net power P net (t) Execute the preset source-load-storage operation coordination control strategy;
[0056] The first judgment module is used to judge whether t satisfies a first preset threshold; if so, the inner layer optimization operation objective function is calculated and the second judgment module is entered; otherwise, t=t+1 is updated and the calculation module is entered;
[0057] A second judgment module is used to judge whether SoC satisfies a second preset threshold; if so, the process proceeds to step 6; otherwise, the process updates SoC=SoC+a, updates t=1, and proceeds to the calculation module;
[0058] The third judgment module is used to judge whether h satisfies and is greater than a third preset threshold; if so, the optimal solution of the inner layer optimization is calculated with the minimum operating cost to determine the preset lower limit value SoC of energy storage and the future time period value h; otherwise, h=h+b is updated, t=1 is updated, and the calculation module is entered; wherein a is the first preset step length, and b is the second preset step length.
[0059] Preferably, the coordination control module is configured to control the water storage capacity S of the seawater desalination device according to the water storage capacity S of the seawater desalination device. des_water (t) and net power P net (t) Execute the preset source-load-storage operation coordination control strategy, including:
[0060] First control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is greater than or equal to the residential water consumption in the next h hours If the state of charge Soc(t-1) at the previous moment is greater than the preset lower limit of energy storage SoC, the maximum regulation power of the seawater desalination device in period t is calculated as: P des-max (t) = N des-max (t)·P des ; Among them, N des-max (t) is the maximum number of desalination units in operation at time t; P des is the rated power of the seawater desalination device;
[0061] If the net power P net (t) less than or equal to the maximum regulating power P of the seawater desalination device des-max (t), then determine the adjustable power P consumed by the desalination device during the period t des (t) is:
[0062] If the net power P net (t) is greater than the maximum regulating power P of the seawater desalination device des-max (t), the desalination plant is dispatched at the maximum power, that is, P des (t) = P des-max (t); Residual power P net1 (t) = P net (t)-P des (t) Charge the energy storage device; if the charging power and the remaining power are both within the constraints of the energy storage device, the charging power of the energy storage device during time t is P bat,c (t) = P net (t)-P des (t), there is no remaining energy at this time; if the charging power and the remaining power are not within the constraints of the energy storage device, the energy storage device will charge at the maximum allowable charging power value P of the energy storage device within the time period t.c,max (t) Charging is performed and the remaining energy is discarded;
[0063] Second control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is greater than or equal to the residential water consumption in the next h hours And the state of charge Soc(t-1) at the previous moment is less than or equal to the preset lower limit of energy storage SoC, then the net power P net (t) First, charge the energy storage. If the net power P net (t) is less than the maximum charging power allowable value P that meets the reliability of power supply for important loads. max (t), at this time, the energy storage device can fully absorb the net power but still fail to meet the preset lower limit SoC of energy storage, and the charging power P of energy storage bat,c (t) = P net (t); otherwise the energy storage charging power P bat,c (t)P max (t) Charging, excess power P net1 (t) = P net (t)-P bat,c The absorption process of (t) is performed according to the first control strategy;
[0064] The maximum charging power allowable value P is calculated using the following method: max (t), including:
[0065]
[0066] Among them, P max,c E is the maximum continuous charging power of the energy storage device; c is the rated capacity of the energy storage device; Soc(t-1) is the remaining power at the end of the t-1 period; η c is the charging efficiency of the energy storage device; Δt is the preset simulation time interval;
[0067] The third control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is less than the residential water consumption in the next h hours The net power P des (t) First, let the desalination device absorb the water consumption, and calculate the maximum regulation power P to meet the residents' water demand in the next h hours according to the following formula des_tj (t) is:
[0068]
[0069]
[0070] If the net power P net (t) greater than or equal to the maximum regulated power P des_tj (t), then the adjustable power P of the desalination device des (t) According to the current maximum adjustment power P des_tj (t) operation; if the net power P net (t) is less than the maximum regulated power P des_tj (t), then recalculate the maximum regulated power as: Adjustable power P of seawater desalination plant des (t) According to the current maximum adjustment power P des_tj (t) operation;
[0071] When there is still excess power, that is, the remaining power P net1 (t) = P net (t)-P des When (t)>0, if Soc(t-1)>SoC, execute the second control strategy; otherwise, execute the second control strategy;
[0072] Among them, S tj (t) is the maximum adjustable water volume of seawater desalination in the period t to meet the water demand of residents in the next h hours; S des_max is the maximum water storage capacity of the seawater desalination device; G des is the water output of a single desalination unit per hour;
[0073] The fourth control strategy: If the net power P net (t) is less than or equal to 0, the energy storage device is discharged first; if the power shortage is met, the discharge power of the energy storage device is the net power P net (t); otherwise, the energy storage is calculated as follows: the maximum discharge power allowable value P of the energy storage device during the period t d,max (t) The remaining power shortage is discharged, and the diesel generator is used to supplement the remaining power shortage; when the remaining power shortage exceeds the rated power of the diesel generator, the diesel generator is discharged at the rated power, and the shortage part is subjected to load shedding operation.
[0074] Preferably, the calculation module further includes:
[0075] When S des (t-1)-Q water (t)≥S des-min When the water storage in the reservoir meets the water demand of residents on the island, the desalination load P des_water (t) The power consumed is zero, and the number of desalination units that need to be started is N des_water (t) = 0; where S des (t-1) is the water storage capacity of the reservoir at the end of the period (t-1); Q water(t) is the water demand of residents on the island during period t; S des-min The minimum water storage capacity of the seawater desalination plant;
[0076] When S des (t-1)-Q water (t)<S des-min When the water storage in the reservoir does not meet the water demand of residents on the island, the number of seawater desalination devices to be started is N des_water (t) is:
[0077]
[0078] Water storage capacity S of seawater desalination device des_water (t) is:
[0079] S des_water (t) = N des_water (t)·G des +S des (t-1)-Q water (t),
[0080] Desalination load P des_water (t) is:
[0081] P des_water (t) = N des_water (t)·P des ,
[0082] In addition to meeting the water demand of residents, the desalination load has time-shifting properties and can assist in regulating the power of the microgrid. The current water storage capacity of the desalination device is low, and when all units are turned on, it still cannot exceed the maximum water storage capacity, that is, S des_water (t)+(N des -N des-water (t))·G des ≤S des-max The maximum number of units allowed to be opened is: N des-max (t) = N des -N des-water (t),
[0083] The current water storage capacity of the seawater desalination device is relatively high. When all units are turned on, it will definitely exceed the maximum water storage capacity, that is, S des_water (t)+[N des -N des-water (t)]G des ≥S des-max The maximum number of units allowed to be turned on is:
[0084]
[0085] The maximum regulating power of the seawater desalination device is: P des-max (t) = N des-max (t)·P des ;
[0086] Where Ndes is the number of desalination units configured in the microgrid; G des It is the water output of a single seawater desalination device per hour.
[0087] According to another aspect of the present invention, there is provided a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements any step of a method for optimizing source-load-storage capacity configuration of an island microgrid.
[0088] According to another aspect of the present invention, there is provided an electronic device, comprising:
[0089] The computer-readable storage medium described above; and
[0090] One or more processors are used to execute the program in the computer-readable storage medium.
[0091] The present invention provides a method and system for optimizing the configuration of the source, load and storage capacity of an island microgrid, constructs a double-layer optimization scheme based on outer capacity optimization and inner operation optimization, and realizes the optimization of the inner layer considering the future time period value of residents' water use, the preset lower limit of energy storage and the outer capacity under the source, load and storage coordinated operation control strategy, thereby determining the configuration scheme. The method of the present invention takes into account the impact of power supply reliability and residents' water demand on the operation of the microgrid, so that the island microgrid can find a suitable balance point between economy and reliability, and realize the reasonable configuration of the source, load and storage capacity on the island. BRIEF DESCRIPTION OF THE DRAWINGS
[0092] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:
[0093] Figure 1 A flow chart of a method 100 for optimizing source-load-storage capacity configuration of an island microgrid according to an embodiment of the present invention;
[0094] Figure 2 A flowchart of a double-layer optimization solution according to an embodiment of the present invention;
[0095] Figure 3 A flowchart of the control strategy executed according to an embodiment of the present invention;
[0096] Figure 4 A schematic diagram of the annual wind speed of an island according to an embodiment of the present invention;
[0097] Figure 5 A schematic diagram of the solar radiation intensity of an island throughout the year according to an embodiment of the present invention;
[0098] Figure 6 A schematic diagram of wave height of an island throughout the year according to an embodiment of the present invention;
[0099] Figure 7 A schematic diagram of tidal flow velocity of an island throughout the year according to an embodiment of the present invention;
[0100] Figure 8 A schematic diagram of the annual basic load of an island according to an embodiment of the present invention;
[0101] Fig. 9 Schematic diagram of the structure of a source-load-storage capacity optimization configuration system 900 for an island microgrid according to an embodiment of the present invention. DETAILED DESCRIPTION
[0102] Now, exemplary embodiments of the present invention are described with reference to the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to disclose the present invention in detail and completely and to fully convey the scope of the present invention to those skilled in the art. The terms used in the exemplary embodiments shown in the accompanying drawings are not intended to limit the present invention. In the accompanying drawings, the same units / elements are marked with the same reference numerals.
[0103] Unless otherwise specified, the terms (including technical terms) used herein have the commonly understood meanings to those skilled in the art. In addition, it is understood that the terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.
[0104] Figure 1 Flow chart of a method 100 for optimizing the configuration of source, load and storage capacity of an island microgrid according to an embodiment of the present invention. Figure 1 As shown, the method for optimizing the configuration of the source, load and storage capacity of the island microgrid provided by the embodiment of the present invention constructs a two-layer optimization scheme based on outer capacity optimization and inner operation optimization, and realizes the optimization of the inner layer considering the future time period value of residents' water use, the preset lower limit of energy storage and the outer capacity under the source, load and storage coordinated operation control strategy, so as to determine the configuration scheme. The method of the present invention takes into account the influence of power supply reliability and residents' water demand on the operation of the microgrid, so that the island microgrid can find a suitable balance point in economy and reliability, and realize the reasonable configuration of the source, load and storage capacity on the island. The method 100 for optimizing the configuration of the source, load and storage capacity of the island microgrid provided by the embodiment of the present invention starts from step 101, and in step 101, the outer capacity optimization objective function and outer constraints with the minimum comprehensive cost of the island microgrid equal annual value are determined.
[0105] In step 102, the inner layer operation optimization objective function and inner layer constraint conditions are determined to minimize the operation cost and waste penalty.
[0106] Reasonable configuration of source, load and storage capacity of island microgrids can not only improve the penetration rate of renewable energy on the island, but also improve the green environmental protection level of the island. Although factors such as wind and solar complementarity are currently considered in the capacity optimization configuration, ocean energy generation forms such as wave energy and tidal energy are not involved; at the same time, the configuration method still adopts the traditional capacity optimization configuration method, and the impact of important load electricity demand and residential water demand on the comprehensive operating cost of the microgrid has not been taken into account. Therefore, the present invention adds two types of ocean energy power sources, wave energy and tidal energy, to the traditional island microgrid. In order to ensure the reliability of power supply and water demand, a double-layer capacity optimization model of island microgrid source, load and storage and the corresponding scheduling strategy are proposed, so that the island microgrid can find a suitable balance between economy and reliability.
[0107] In order to find a suitable balance point between economy and reliability for the island microgrid and to more reasonably configure the capacity of source, load and storage on the island, the present invention has created a double-layer optimization method. The double-layer capacity optimization method refers to the double-layer optimization configuration model that realizes the optimization of the inner layer considering the duration of water use of residents h, the preset lower limit of energy storage SoC and the outer layer capacity under the source, load and storage coordinated operation control strategy.
[0108] The present invention comprises a double-layer optimization model of capacity configuration optimization and dynamic optimization of operation cost considering reliability of power supply and water supply.
[0109] ①Outer capacity optimization objective function and constraints
[0110] The capacity optimization objective function of this model is to minimize the comprehensive cost of the microgrid equal annual value, that is:
[0111] min C=C I CRF(r,L)+C R +C Y -C p (1)
[0112] Where C is the annual comprehensive cost of the microgrid; C I is the initial investment cost of the equipment; C R is the annual replacement cost of the equipment; C Y is the annual operating cost of the equipment; C P is the cost subsidized by the state for the development of renewable energy; r is the actual loan interest rate; L is the planning period; CRF(r,L) is the annual capital recovery rate.
[0113]
[0114]
[0115] In the formula, r is the loan interest rate; f is the inflation rate.
[0116] The specific formula is:
[0117]
[0118] Where: N WT 、N PV 、N WV 、N CX 、N bat 、N EN 、N des are the total number of wind turbines, photovoltaic cells, wave energy generators, tidal energy generators, energy storage devices, diesel generators and seawater desalination devices; C WT , C PV , C WV , C CX , C bat , C EN , C des are the purchase price of wind turbines, photovoltaic cells, wave energy generators, tidal energy generators, energy storage devices, diesel generators and seawater desalination devices respectively; C Rbat , C REN are the annual equivalent replacement costs of energy storage devices and diesel generators respectively; P WT (t) Average wind farm output during period t (kW); P PV (t) average photovoltaic output during period t (kW); P WV (t) Average wave energy output during period t (kW); P CX (t) average tidal energy output during period t (kW); C WT,M , C PV,M , C WV,M , C CX,M are the maintenance costs of wind turbines, photovoltaics, wave energy generators, and tidal energy generators; C OM_move is the operating cost to be optimized, including the operation and maintenance costs of the energy storage device, seawater desalination device and diesel generator set, energy waste penalty fees and power outage penalty fees; C WT,P , C PV,P , C WV,P , C CX,P The cost of state subsidies for wind, solar, wave and tidal power generation.
[0119] The constraints for outer capacity optimization are:
[0120]
[0121] Where: LPSP is the power failure rate; f LPSP is the upper limit of power failure rate; P loss(t) is the load shedding amount during period t; P load (t) is the sum of the base load and the desalination load during period t; LORE max is the upper limit of the reduction rate of renewable energy; P dump (t) is the amount of renewable energy abandoned during period t; P energy (t) is the electricity generated by renewable energy in period t; f min The lower limit of the installed capacity ratio of renewable energy; is the installed capacity ratio of renewable energy; P WT , P PV , P WV , P CX are the rated capacities of a single wind turbine, photovoltaic, wave energy generator and tidal energy generator respectively; L max The peak load in a year.
[0122] ②Inner layer operation optimization objective function and constraints
[0123] When the island microgrid system is running, by coordinating reliability and economy, the most suitable operating state of the energy storage device, seawater desalination device, and diesel generator is found to minimize the replacement cost of the energy storage device and the operating cost of the energy storage device, seawater desalination device, and diesel generator, as well as the energy waste cost and power outage penalty cost, that is,
[0124]
[0125] Where: Cc bat, Cd bat, C des , C F , C dump , C pl They are the charging cost, discharging cost, seawater desalination device dispatching cost, diesel generator fuel cost and pollution emission cost, energy waste penalty cost and power outage penalty cost of energy storage; I CL is the dispatching cost of the desalination plant (yuan / kW), P des (t) is the dispatch capacity of the seawater desalination device in period t; μ is the fuel price; γ is the environmental pollution penalty fee; V fuel (t) is the fuel consumption of the diesel generator during period t; P engine (t) is the output of the diesel generator set in the period t (kW); fuel is the diesel engine fuel consumption coefficient (L / kWh); k dump Penalty fee for energy waste; P dump (t) is the renewable energy power abandoned during period t; k loss Power outage penalty fee for load disconnection; P loss (t) is the load shedding amount in period t.
[0126] The inner layer operation constraints are:
[0127]
[0128] Where: P bat,d (t), P bat,c (t) is the charge and discharge power of the energy storage device during period t; P c,max (t) and P d,max (t) are the maximum allowable charging and discharging power of the energy storage device during the period t on the island; P max,c and P max,d are the maximum continuous charging and discharging power of the energy storage device; E c is the rated capacity of the energy storage device; δ is the self-discharge rate of the energy storage device; Soc(t) is the remaining capacity of the energy storage device at the end of period t; Soc(t-1) is the remaining capacity at the end of period t-1; η c , η d are the charging and discharging efficiency of the energy storage device respectively.
[0129] In step 103, each configuration scheme is optimized and controlled according to a preset source-load-storage operation coordinated control strategy to determine a preset lower limit value and a future time period value of energy storage corresponding to each configuration scheme that satisfies the minimum inner optimization operation objective function and inner constraint conditions.
[0130] Preferably, the method uses the following method to optimize and control any configuration scheme according to a preset source-load-storage operation coordinated control strategy, and determines the preset lower limit value and future time period value of energy storage corresponding to any configuration scheme that satisfies the minimum inner optimization operation objective function and inner constraint conditions, including:
[0131] Step 1, initialization time t=1, energy storage preset lower limit value SoC=0.1, future time period value h=1;
[0132] Step 2: Calculate the water storage capacity S of the seawater desalination device in the current time period des_water (t) and the net power P of the island microgrid net (t);
[0133] Step 3, according to the water storage capacity S of the seawater desalination device des_water (t) and net power P net (t) Execute the preset source-load-storage operation coordination control strategy;
[0134] Step 4, determine whether t satisfies a first preset threshold; if so, calculate the inner optimization operation objective function and proceed to step 5; otherwise, update t=t+1 and return to step 2;
[0135] Step 5, determine whether SoC satisfies a second preset threshold; if so, proceed to step 6; otherwise, update SoC=SoC+a, update t=1, and return to step 2;
[0136] Step 6, determine whether h satisfies and is greater than the third preset threshold; if so, calculate the optimal solution of the inner layer optimization with the minimum operating cost, and determine the preset lower limit value SoC of energy storage and the future time period value h; otherwise, update h=h+b, update t=1, and return to step 2; wherein a is the first preset step length, and b is the second preset step length.
[0137] Preferably, the water storage capacity S of the seawater desalination device des_water (t)S des_water (t) and net power P net (t) Execute the preset source-load-storage operation coordination control strategy, including:
[0138] First control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is greater than or equal to the residential water consumption in the next h hours If the state of charge Soc(t-1) at the previous moment is greater than the preset lower limit of energy storage SoC, the maximum regulation power of the seawater desalination device in period t is calculated as: P des-max (t) = N des-max (t)·P des ; Among them, N des-max (t) is the maximum number of desalination units in operation at time t; P des is the rated power of the seawater desalination device;
[0139] If the net power P net (t) less than or equal to the maximum regulating power P of the seawater desalination device des-max (t), then determine the adjustable power P consumed by the desalination device during the period t des (t) is:
[0140] If the net power P net (t) is greater than the maximum regulating power P of the seawater desalination device des-max (t), the desalination plant is dispatched at the maximum power, that is, P des (t) = P des-max (t); Residual power P net1 (t) = P net (t)-P des (t) Charge the energy storage device; if the charging power and the remaining power are both within the constraints of the energy storage device, the charging power of the energy storage device during time t is P bat,c (t) = Pnet (t)-P des (t), there is no remaining energy at this time; if the charging power and the remaining power are not within the constraints of the energy storage device, the energy storage device will charge at the maximum allowable charging power value P of the energy storage device within the time period t. c,max (t) Charging is performed and the remaining energy is discarded;
[0141] Second control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is greater than or equal to the residential water consumption in the next h hours And the state of charge Soc(t-1) at the previous moment is less than or equal to the preset lower limit of energy storage SoC, then the net power P net (t) First, charge the energy storage. If the net power P net (t) is less than the maximum charging power allowable value P that meets the reliability of power supply for important loads. max (t), at this time, the energy storage device can fully absorb the net power but still fail to meet the preset lower limit SoC of energy storage, and the charging power P of energy storage bat,c (t) = P net (t); otherwise the energy storage charging power P bat,c (t)P max (t) Charging, excess power P net1 (t) = P net (t)-P bat,c The absorption process of (t) is performed according to the first control strategy;
[0142] The maximum charging power allowable value P is calculated using the following method: max (t), including:
[0143]
[0144] Among them, P max,c E is the maximum continuous charging power of the energy storage device; c is the rated capacity of the energy storage device; Soc(t-1) is the remaining power at the end of the t-1 period; η c is the charging efficiency of the energy storage device; Δt is the preset simulation time interval;
[0145] The third control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is less than the residential water consumption in the next h hours The net power P des (t) First, let the desalination device absorb the water consumption, and calculate the maximum regulation power P to meet the residents' water demand in the next h hours according to the following formula des_tj (t) is:
[0146]
[0147]
[0148] If the net power P net (t) greater than or equal to the maximum regulated power P des_tj (t), then the adjustable power P of the desalination device des (t) According to the current maximum adjustment power P des_tj (t) operation; if the net power P net (t) is less than the maximum regulated power P des_tj (t), then recalculate the maximum regulated power as: Adjustable power P of seawater desalination plant des (t) According to the current maximum adjustment power P des_tj (t) operation;
[0149] When there is still excess power, that is, the remaining power P net1 (t) = P net (t)-P des When (t)>0, if Soc(t-1)>SoC, execute the second control strategy; otherwise, execute the second control strategy;
[0150] Among them, S tj (t) is the maximum adjustable water volume of seawater desalination in the period t to meet the water demand of residents in the next h hours; S des_max is the maximum water storage capacity of the seawater desalination device; G des is the water output of a single desalination unit per hour;
[0151] The fourth control strategy: If the net power P net (t) is less than or equal to 0, the energy storage device is discharged first; if the power shortage is met, the discharge power of the energy storage device is the net power P net (t); otherwise, the energy storage is calculated as follows: the maximum discharge power allowable value P of the energy storage device during the period t d,max (t) The remaining power shortage is discharged, and the diesel generator is used to supplement the remaining power shortage; when the remaining power shortage exceeds the rated power of the diesel generator, the diesel generator is discharged at the rated power, and the shortage part is subjected to load shedding operation.
[0152] Preferably, the method further comprises:
[0153] When S des (t-1)-Q water (t)≥S des-min When the water storage in the reservoir meets the water demand of residents on the island, the desalination load P des_water(t) The power consumed is zero, that is, the number of desalination units that need to be started is N des_water (t) = 0; where S des (t-1) is the water storage capacity of the reservoir at the end of the period (t-1); Q water (t) is the water demand of residents on the island during period t; S des-min The minimum water storage capacity of the seawater desalination plant;
[0154] When S des (t-1)-Q water (t)<S des-min When the water storage in the reservoir does not meet the water demand of residents on the island, the number of seawater desalination devices to be started is N des_water (t) is:
[0155]
[0156] Water storage capacity S of seawater desalination device des_water (t) is:
[0157] S des_water (t) = N des_water (t)·G des +S des (t-1)-Q water (t),
[0158] Desalination load P des_water (t) is:
[0159] P des_water (t) = N des_water (t)·P des ,
[0160] In addition to meeting the water demand of residents, the desalination load has time-shifting properties and can assist in regulating the power of the microgrid. The current water storage capacity of the desalination device is low, and when all units are turned on, it still cannot exceed the maximum water storage capacity, that is, S des_water (t)+(N des -N des-water (t))·G des ≤S des-max The maximum number of units allowed to be opened is: N des-max (t) = N des -N des-water (t),
[0161] The current water storage capacity of the seawater desalination device is relatively high. When all units are turned on, it will definitely exceed the maximum water storage capacity, that is, S des_water (t)+[N des -N des-water (t)]G des ≥Sdes-max The maximum number of units allowed to be turned on is:
[0162]
[0163] The maximum regulating power of the seawater desalination device is: P des-max (t) = N des-max (t)·P des ;
[0164] Where Ndes is the number of desalination units configured in the microgrid; G des It is the water output of a single seawater desalination device per hour.
[0165] In order to minimize the comprehensive cost of equal annual value, this paper conducts double-layer optimization configuration from two levels: outer capacity configuration and inner coordinated operation. Figure 3 As shown, in the present invention, in the process of capacity optimization configuration, the difficulty lies in calculating the relative objective function when considering the dynamic operation optimization of the reliability of fresh water supply and power supply reliability of important loads on the island for different configuration schemes. The method adopted by the present invention is to simulate the operation status of the island microgrid in one year with an hour as the simulation step length. For different assumed configuration schemes, the objective function value is calculated after 8 760 hours of operation by simulating the dynamic optimization. The specific process is: first, randomly generate individuals x with a population size of 50, each x = [C WT , C PV , C WV , C CX , E b , C EN , C des ], the inner layer operation optimization is based on the capacity value given by each x, and through the execution of the coordinated control strategy, the water supply duration and the preset lower limit of the energy storage SoC are optimized to obtain the minimized inner layer optimization objective function min{C Rbat +C OM_move}, and calculate the capacity optimization objective function value C based on the inner optimization results, and screen the solutions based on the capacity constraints.
[0166] In the present invention, for each configuration scheme, the process of determining the preset lower limit value SoC of energy storage and the future time period value h is as follows:
[0167] Step 1, initialization time t=1, energy storage preset lower limit value SoC=0.1, future time period value h=1;
[0168] Step 2: Calculate the water storage capacity S of the seawater desalination device in the current time period des_water (t) and the net power P of the island microgrid net (t);
[0169] Step 3, according to the water storage capacity S of the seawater desalination device des_water (t) and net power P net (t) Execute the preset source-load-storage operation coordination control strategy;
[0170] Step 4, determine whether t satisfies a first preset threshold; if so, calculate the inner optimization operation objective function and proceed to step 5; otherwise, update t=t+1 and return to step 2;
[0171] Step 5, determine whether SoC satisfies a second preset threshold; if so, proceed to step 6; otherwise, update SoC=SoC+a, update t=1, and return to step 2;
[0172] Step 6, determine whether h satisfies and is greater than the third preset threshold; if so, calculate the optimal solution of the inner layer optimization with the minimum operating cost, and determine the preset lower limit value SoC of energy storage and the future time period value h; otherwise, update h=h+b, update t=1, and return to step 2; wherein a is the first preset step length, and b is the second preset step length.
[0173] In the present invention, the desalination device can be used as both a load and a regulating device during operation. As a load, it is first necessary to determine whether the current water storage capacity in the reservoir can meet the water demand of residents on the island; when the water storage capacity in the reservoir meets the water demand of residents on the island,
[0174] S des (t-1)-Q water (t)≥S des-min (8)
[0175] Where S des (t-1) is the water storage capacity of the reservoir at the end of the previous period; Q water (t) is the water demand of residents on the island during period t; S des-min It is the minimum water storage capacity of the seawater desalination device.
[0176] The desalination load P des_water (t) The power consumed is zero, that is, the number of desalination devices that need to be started is N des_water (t) is:
[0177] N des_water (t)=0 (9)
[0178] When the water storage capacity of the seawater desalination device is insufficient,
[0179] S des (t-1)-Q water (t)<S des-min (10)
[0180] To meet the water demand of residents, the number of desalination plants started is N des_water (t) is:
[0181]
[0182] Where: G des It is the water output of a single seawater desalination device per hour.
[0183] At this time, the water storage capacity S of the seawater desalination device des_water (t)S des_water (t) and desalination load P des_water (t) is:
[0184] S des_water (t) = N des_water (t)·G des +S des (t-1)-Q water (t) (12)
[0185] P des_water (t) = N des_water (t)·P des (13)
[0186] In addition to meeting the water demand of residents, the desalination load has time-shifting properties and can assist in regulating the power of the microgrid. Its maximum regulated power depends on the water storage capacity S of the current desalination device. des_water (t) and maximum water storage capacity.
[0187] The current water storage capacity of the seawater desalination device is low, and even when all units are turned on, it still cannot exceed the maximum water storage capacity, that is,
[0188] S des_water (t)+(N des -N des-water (t))·G des ≤S des-max (14)
[0189] Where: N des It is the number of seawater desalination units configured in the microgrid.
[0190] The maximum number of units that can be opened at this time is:
[0191] N des-max (t) = N des -N des-water (t) (15)
[0192] The current water storage capacity of the seawater desalination device is relatively high. When all units are turned on, the maximum water storage capacity will definitely be exceeded.
[0193] S des_water (t)+[N des -N des-water (t)]G des ≥S des-max (16)
[0194] The maximum number of units that can be opened at this time is:
[0195]
[0196] Furthermore, according to the number of desalination units started, the maximum regulating power is:
[0197] P des-max (t) = N des-max (t)·P des (18)
[0198] When the source-load-storage coordinated control strategy is implemented, the difference between the theoretical output power of the renewable power source and the base load and the desalination load is defined as the net power P net Among them, the basic load includes the basic life load and the inherent load on the island, such as radar stations and lighting loads on military islands. Four implementation strategies are formulated based on the size of the net power and taking into account the reliability of the island's fresh water supply and the reliability of power supply for important loads, such as Figure 2 As shown, including:
[0199] ① Implementation strategy 1: When the net power of the island microgrid P net (t) is greater than 0, and And Soc(t-1)>SoC, that is, the water storage capacity of the seawater desalination device is greater than or equal to the water consumption of residents in the next h hours, and the charge state at the previous moment meets the preset lower limit SoC of energy storage to ensure power supply reliability, the maximum regulation power P of the seawater desalination device is calculated according to formula (18): des-max (t), if the net power P net Less than the maximum regulating power P of seawater desalination des-max (t), then the adjustable power P of the desalination device in the period t is des (t) is:
[0200]
[0201] Otherwise, if the net power P net Greater than or equal to the maximum regulating power P of seawater desalination des_max (t), the desalination plant is dispatched at the maximum power, that is, P des (t) = P des_max (t); the remaining power is:
[0202] P net1 (t) = P net(t)-P des (t) (20)
[0203] The remaining power is used to charge the energy storage device. If the charging power and the remaining power are both within the constraints of the energy storage device, that is, the remaining power is within 0-P c,max (t)(P c,max (t) is the maximum allowable charging power of the energy storage device in period t in formula (7), then the charging power P of the energy storage device in period t is bat,c (t) is:
[0204] P bat,c (t) = P net (t)-P des (t) (21)
[0205] At this time, there is no remaining energy; if the charging power and the remaining power are not within the constraints of the energy storage device, the energy storage is based on the maximum charging power allowable value P of the energy storage device in the t period in formula (7) c,max (t) is charged and the remaining energy is discarded.
[0206] ② Implementation strategy 2: When the net power of the island microgrid is P net is greater than zero, and And Soc(t-1)≤SoC, when the state of charge at the previous moment does not meet the preset lower limit SoC of energy storage, the net power P net (t) First, charge the energy storage. If the net power P net (t) is less than the maximum charging power allowable value P in formula (22) that satisfies the reliability of power supply to important loads max (t), at this time, the energy storage device can fully absorb the net power but still fail to meet the preset lower limit SoC of energy storage, and the charging power P of energy storage bat,c (t) = P net (t); otherwise the energy storage charging power P bat,c (t)P max (t) Charging, excess power P net1 (t) = P net (t)-P bat,c (t) The absorption process executes strategy 1.
[0207]
[0208] Where: SoC is the preset lower limit charge state of the energy storage.
[0209] ③ Implementation strategy three: When the net power of the island microgrid P net (t) is greater than 0, and At this time, the water storage capacity of the seawater desalination device cannot be greater than or equal to the water consumption of residents in the next h hours, and the net power P netFirst, let the desalination device absorb the water consumption, and use formula (24) to calculate the maximum regulation power P of the desalination device to meet the residents' water demand in the next h hours des_tj (t) is:
[0210]
[0211]
[0212]
[0213] Then, P des_tj (t) and net power P net For comparison, if the net power P net (t) greater than or equal to the maximum regulated power P des_tj (t), then the adjustable power P of the desalination device des (t) According to the current maximum adjustment power P des_tj (t) operation; if the net power P net (t) is less than the maximum regulated power P des_tj (t), then recalculate the maximum adjustable power according to formula (25), the adjustable power P of the seawater desalination device des (t) The maximum regulated power P calculated according to formula (25) des_tj (t) operation;
[0214] When there is still excess power, that is, the remaining power P net1 (t) = P net (t)-P des When (t)>0, if Soc(t-1)>SoC, execute strategy 1; otherwise execute strategy 2.
[0215] ④ Implementation strategy 4: When the net power of the island microgrid P net When it is less than zero, the energy storage device is discharged first. If the power shortage is met, the discharge power of the energy storage device is the net power P net Otherwise, the energy storage is based on the maximum discharge power allowable value P of the energy storage device during the t period in formula (7). d,max (t) discharge, and the remaining power shortage is supplemented by the diesel generator. When the remaining power shortage exceeds the rated power of the diesel generator, the diesel generator discharges at the rated power, and the shortage part performs load shedding operation.
[0216] Finally, the energy storage preset lower limit SoC and future time period value h corresponding to each configuration scheme are determined, which are used to bring into the outer constraints to calculate the power outage rate LPSP, renewable energy reduction rate LORE and renewable energy installed capacity ratio F;
[0217] in,
[0218] In step 104, the power outage rate, renewable energy reduction rate and installed capacity ratio of renewable energy corresponding to each configuration scheme are determined according to the preset lower limit value of energy storage, future time period value and outer constraint conditions corresponding to each configuration scheme.
[0219] In step 105, the island microgrid isoannual comprehensive cost corresponding to each configuration scheme is determined according to the power outage rate, renewable energy reduction rate, installed capacity ratio of renewable energy and outer capacity optimization objective function corresponding to each configuration scheme, and the source, load and storage capacity of the island microgrid is configured according to the configuration scheme corresponding to the minimum island microgrid isoannual comprehensive cost.
[0220] Combination Figure 3 As shown, in the present invention, according to the preset lower limit value of energy storage and future time period value and outer constraints corresponding to each configuration scheme, the power outage rate LPSP, renewable energy reduction rate LORE and installed capacity ratio F of renewable energy corresponding to each configuration scheme are determined, and the capacity optimization objective function value C is calculated according to the inner optimization result, and the scheme is screened according to the capacity constraint. Then, according to the power outage rate, renewable energy reduction rate, installed capacity ratio of renewable energy and outer capacity optimization objective function corresponding to each configuration scheme, the island microgrid equal annual value comprehensive cost corresponding to each configuration scheme is determined, and the configuration scheme corresponding to the minimum value of the island microgrid equal annual value comprehensive cost is selected to configure the source-load storage capacity of the island microgrid. According to the final configuration scheme, the new energy penetration rate can also be calculated.
[0221] The method for optimizing the source, load and storage capacity of an island microgrid with ocean energy power generation constructed by the present invention takes into account the wave energy and tidal energy, which are unique forms of power generation on islands, and the influence of power supply reliability and residents' water demand on the operation of the microgrid, so that the island microgrid can find a suitable balance between economy and reliability.
[0222] The following specifically illustrates the embodiments of the present invention.
[0223] Taking an island in the East my country Sea as the research object, the proposed island microgrid source-load-storage capacity optimization configuration method is simulated and verified based on the meteorological data and load data of the island in a certain year. The meteorological data set of the island is referenced from the official website of the National Marine Science Data Center. The annual wind speed of the island, the annual solar radiation intensity of the island, the annual wave height of the island, the annual tidal flow velocity of the island and the annual basic load of the island are as follows: Figure 4 , Figure 5 , Figure 6 , Figure 7 and Figure 8 shown.
[0224] According to the distributed power generation parameters given in Appendix 1, a capacity optimization configuration model is adopted to consider four distributed power generation combination schemes, namely wind-solar-storage, wind-solar-diesel, wind-solar-diesel-storage and wind-solar-wave-diesel-storage. The particle swarm algorithm is used to solve the problem and the optimal configuration results of source-load-storage capacity of each of the four schemes are shown in Appendix 3. The corresponding costs are shown in Appendix 4. The comparison of evaluation index calculation results is shown in Appendix 5.
[0225] As shown in Appendix 3, the installed capacity of renewable energy in the four configuration schemes exceeds the load peak. This is to avoid the unstable climate conditions on the island causing its output power to be unable to meet the maximum load demand. The maximum water consumption of residents on the island is 25t / h. To meet the water needs of residents, at least 3 desalination devices should be equipped with a total power of 75kW. For Scheme 1, due to the large number of wind turbines and photovoltaics, in order to make the annual abandoned power of renewable energy meet the design requirements, the seawater desalination device can only be used to consume the surplus power. Therefore, 7 seawater desalination devices are configured, that is, 175kW, which is higher than the other three schemes.
[0226] Comparing Scheme 1 and Scheme 3 in Appendix 4, it can be found that the annual comprehensive cost of the microgrid of the former is as high as 25.76 million yuan / year, which is 20.8274 million yuan / year higher than the latter. The reason is that there is no diesel generator set in Scheme 1, so the capacity of the energy storage device configured is too large, resulting in higher purchase and replacement costs, and the power failure rate LPSP during operation reaches 0.99%. In Scheme 3, due to the addition of diesel generator sets to ensure the power reliability of important loads on the island, the required energy storage capacity is greatly reduced, which not only reduces the power failure rate, but also significantly reduces the annual comprehensive cost of the microgrid. This shows that it is necessary to configure a certain number of diesel generator sets for the island microgrid.
[0227] Compared with Scheme 2, although the investment cost and replacement cost of Scheme 3 have increased, the operation and maintenance cost has been reduced by 899,811 yuan / year, the pollution control cost has been reduced by 337,993 yuan / year, and the penalty cost has been reduced by 640,038 yuan / year. The equal annual value comprehensive cost of its configuration result is 245,090 yuan / year lower than that of Scheme 2. In addition, it can be seen from Appendix 4 that the renewable energy reduction rate of Scheme 3 is lower than that of Scheme 2, and its new energy penetration rate is higher, which shows that the energy storage device added in Scheme 3 has played a positive role in balancing the system power.
[0228] By comparing the equivalent annual value comprehensive costs of the configuration results, it can be found that Scheme 4 has the lowest cost, followed by Scheme 3. Although Scheme 4 adds ocean energy generation, which increases the investment cost, the wave energy generation output is stable and the tidal energy generation density is high, which enhances the complementarity between renewable energy sources, further improves the penetration rate and power supply capacity of new energy generation, and reduces the operation and maintenance costs, pollution control costs and penalty costs of island microgrids. Therefore, when planning island microgrids, it is necessary to consider incorporating ocean energy generation into the power configuration plan.
[0229] Table 1 Distributed power supply parameters
[0230]
[0231] Table 2 Pollutant emission and control standards
[0232]
[0233] Table 3. Island microgrid power capacity configuration results
[0234]
[0235] Table 4 Configuration plan cost comparison (10,000 yuan / year)
[0236]
[0237] Table 5 Comparison of configuration scheme evaluation indicators
[0238]
[0239] Fig. 9 FIG. 9 is a schematic diagram of a system 900 for optimizing the configuration of source, load and storage capacity of an island microgrid according to an embodiment of the present invention. Fig. 9 As shown, the source-load-storage capacity optimization configuration system 900 of the island microgrid provided by the embodiment of the present invention includes: an outer layer objective function and constraint determination unit 901, an inner layer objective function and constraint determination unit 902, an inner layer optimization unit 903, an outer layer optimization unit 904 and a configuration scheme determination unit 905.
[0240] Preferably, the outer layer objective function and constraint determination unit 901 is used to determine the outer layer capacity optimization objective function and outer layer constraint conditions with the minimum annual comprehensive cost of the island microgrid.
[0241] Preferably, the inner layer objective function and constraint determination unit 902 is used to determine the inner layer operation optimization objective function and inner layer constraint conditions with the minimum operation cost and waste penalty fee.
[0242] Preferably, the inner optimization unit 903 is used to perform optimization control on each configuration scheme according to a preset source-load-storage operation coordination control strategy, and determine the preset lower limit value and future time period value of energy storage corresponding to each configuration scheme that meet the minimum inner optimization operation objective function and inner constraint conditions.
[0243] Preferably, the inner optimization unit 903 optimizes and controls any configuration scheme according to a preset source-load-storage operation coordination control strategy in the following manner, and determines the preset lower limit value and future time period value of energy storage corresponding to any configuration scheme that satisfies the minimum inner optimization operation objective function and inner constraint conditions, including:
[0244] Initialization module, used for initialization time t=1, energy storage preset lower limit value SoC=0.1, future time period value h=1;
[0245] The calculation module is used to calculate the water storage capacity S of the seawater desalination device in the current time period. des_water (t) and the net power P of the island microgrid net (t);
[0246] The coordination control module is used to control the water storage capacity S of the seawater desalination device according to the des_water (t) and net power P net (t) Execute the preset source-load-storage operation coordination control strategy;
[0247] The first judgment module is used to judge whether t satisfies a first preset threshold; if so, the inner layer optimization operation objective function is calculated and the second judgment module is entered; otherwise, t=t+1 is updated and the calculation module is entered;
[0248] A second judgment module is used to judge whether SoC satisfies a second preset threshold; if so, the process proceeds to step 6; otherwise, the process updates SoC=SoC+a, updates t=1, and proceeds to the calculation module;
[0249] The third judgment module is used to judge whether h satisfies and is greater than a third preset threshold; if so, the optimal solution of the inner layer optimization is calculated with the minimum operating cost to determine the preset lower limit value SoC of energy storage and the future time period value h; otherwise, h=h+b is updated, t=1 is updated, and the calculation module is entered; wherein a is the first preset step length, and b is the second preset step length.
[0250] Preferably, the coordination control module is configured to control the water storage capacity S of the seawater desalination device according to the water storage capacity S of the seawater desalination device. des_water (t) and net power P net (t) Execute the preset source-load-storage operation coordination control strategy, including:
[0251] First control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is greater than or equal to the residential water consumption in the next h hours If the state of charge Soc(t-1) at the previous moment is greater than the preset lower limit of energy storage SoC, the maximum regulation power of the seawater desalination device in period t is calculated as: P des-max (t) = N des-max (t)·P des ; Among them, N des-max (t) is the maximum number of desalination units in operation at time t; P des is the rated power of the seawater desalination device;
[0252] If the net power P net (t) less than or equal to the maximum regulating power P of the seawater desalination device des-max (t), then determine the adjustable power P consumed by the desalination device during the period t des (t) is:
[0253] If the net power P net (t) is greater than the maximum regulating power P of the seawater desalination device des-max (t), the desalination plant is dispatched at the maximum power, that is, P des (t) = P des-max (t); Residual power P net1 (t) = P net (t)-P des (t) Charge the energy storage device; if the charging power and the remaining power are both within the constraints of the energy storage device, the charging power of the energy storage device during time t is P bat,c (t) = P net (t)-P des (t), there is no remaining energy at this time; if the charging power and the remaining power are not within the constraints of the energy storage device, the energy storage device will charge at the maximum allowable charging power value P of the energy storage device within the time period t. c,max (t) Charging is performed and the remaining energy is discarded;
[0254] Second control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is greater than or equal to the residential water consumption in the next h hours And the state of charge Soc(t-1) at the previous moment is less than or equal to the preset lower limit of energy storage SoC, then the net power P net (t) First, charge the energy storage. If the net power P net (t) is less than the maximum charging power allowable value P that meets the reliability of power supply for important loads. max(t), at this time, the energy storage device can fully absorb the net power but still fail to meet the preset lower limit SoC of energy storage, and the charging power P of energy storage bat,c (t) = P net (t); otherwise the energy storage charging power P bat,c (t)P max (t) Charging, excess power P net1 (t) = P net (t)-P bat,c The absorption process of (t) is performed according to the first control strategy;
[0255] The maximum charging power allowable value P is calculated using the following method: max (t), including:
[0256]
[0257] Among them, P max,c E is the maximum continuous charging power of the energy storage device; c is the rated capacity of the energy storage device; Soc(t-1) is the remaining power at the end of the t-1 period; η c is the charging efficiency of the energy storage device; Δt is the preset simulation time interval;
[0258] The third control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is less than the residential water consumption in the next h hours The net power P des (t) First, let the desalination device absorb the water consumption, and calculate the maximum regulation power P to meet the residents' water demand in the next h hours according to the following formula des_tj (t) is:
[0259]
[0260]
[0261] If the net power P net (t) greater than or equal to the maximum regulated power P des_tj (t), then the adjustable power P of the desalination device des (t) According to the current maximum adjustment power P des_tj (t) operation; if the net power P net (t) is less than the maximum regulated power P des_tj (t), then recalculate the maximum regulated power as: Adjustable power P of seawater desalination plant des (t) According to the current maximum adjustment power P des_tj (t) operation;
[0262] When there is still excess power, that is, the remaining power P net1 (t) = P net (t)-P des When (t)>0, if Soc(t-1)>SoC, execute the second control strategy; otherwise, execute the second control strategy;
[0263] Among them, S tj (t) is the maximum adjustable water volume of seawater desalination in the period t to meet the water demand of residents in the next h hours; S des_max is the maximum water storage capacity of the seawater desalination device; G des is the water output of a single desalination unit per hour;
[0264] The fourth control strategy: If the net power P net (t) is less than or equal to 0, the energy storage device is discharged first; if the power shortage is met, the discharge power of the energy storage device is the net power P net (t); otherwise, the energy storage is calculated as follows: the maximum discharge power allowable value P of the energy storage device during the period t d,max (t) The remaining power shortage is discharged, and the diesel generator is used to supplement the remaining power shortage; when the remaining power shortage exceeds the rated power of the diesel generator, the diesel generator is discharged at the rated power, and the shortage part is subjected to load shedding operation.
[0265] Preferably, the calculation module further includes:
[0266] When S des (t-1)-Q water (t)≥S des-min When the water storage in the reservoir meets the water demand of residents on the island, the desalination load P des_water (t) The power consumed is zero, and the number of desalination units that need to be started is N des_water (t) = 0; where S des (t-1) is the water storage capacity of the reservoir at the end of the period (t-1); Q water (t) is the water demand of residents on the island during period t; S des-min The minimum water storage capacity of the seawater desalination plant;
[0267] When S des (t-1)-Q water (t)<S des-min When the water storage in the reservoir does not meet the water demand of residents on the island, the number of seawater desalination devices to be started is N des_water (t) is:
[0268]
[0269] Water storage capacity S of seawater desalination device des_water(t) is:
[0270] S des_water (t) = N des_water (t)·G des +S des (t-1)-Q water (t),
[0271] Desalination load P des_water (t) is:
[0272] P des_water (t) = N des_water (t)·P des ,
[0273] In addition to meeting the water demand of residents, the desalination load has time-shifting properties and can assist in regulating the power of the microgrid. The current water storage capacity of the desalination device is low, and when all units are turned on, it still cannot exceed the maximum water storage capacity, that is, S des_water (t)+(N des -N des-water (t))·G des ≤S des-max The maximum number of units allowed to be opened is: N des-max (t) = N des -N des-water (t),
[0274] The current water storage capacity of the seawater desalination device is relatively high. When all units are turned on, it will definitely exceed the maximum water storage capacity, that is, S des_water (t)+[N des -N des-water (t)]G des ≥S des-max The maximum number of units allowed to be turned on is:
[0275]
[0276] The maximum regulating power of the seawater desalination device is: P des-max (t) = N des-max (t)·P des ;
[0277] Where Ndes is the number of desalination units configured in the microgrid; G des It is the water output of a single seawater desalination device per hour.
[0278] Preferably, the outer optimization unit 904 is used to determine the power outage rate, renewable energy reduction rate and installed capacity ratio of renewable energy corresponding to each configuration scheme according to the preset lower limit value of energy storage, future time period value and outer constraint conditions corresponding to each configuration scheme.
[0279] Preferably, the configuration scheme determination unit 905 is used to determine the island microgrid equal annual value comprehensive cost corresponding to each configuration scheme according to the power outage rate, renewable energy reduction rate, installed capacity ratio of renewable energy and outer capacity optimization objective function corresponding to each configuration scheme, and configure the source, load and storage capacity of the island microgrid according to the configuration scheme corresponding to the minimum island microgrid equal annual value comprehensive cost.
[0280] The source-load-storage capacity optimization configuration system 900 of the island microgrid of the embodiment of the present invention corresponds to the source-load-storage capacity optimization configuration method 100 of the island microgrid of another embodiment of the present invention, which will not be repeated here.
[0281] The present invention also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements any step of a method for optimizing source-load-storage capacity configuration of an island microgrid.
[0282] The present invention also provides an electronic device, comprising:
[0283] The computer-readable storage medium described above; and
[0284] One or more processors are used to execute the program in the computer-readable storage medium.
[0285] The invention has been described above with reference to a few embodiments. However, it is readily apparent to a person skilled in the art that other embodiments than the ones disclosed above are equally within the scope of the invention, as defined by the appended patent claims.
[0286] Generally, all terms used in the claims are to be interpreted according to their ordinary meaning in the technical field, unless explicitly defined otherwise herein. All references to "a / said / the [means, components, etc.]" are to be openly interpreted as at least one instance of the means, components, etc., unless explicitly stated otherwise. The steps of any system disclosed herein do not necessarily have to be executed in the exact order disclosed, unless explicitly stated otherwise.
[0287] Those skilled in the art will appreciate that the embodiments of the present application may be provided as systems, systems, or computer program products. Therefore, the present application may adopt the form of complete hardware embodiments, complete software embodiments, or embodiments in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.
[0288] The present application is described with reference to the flowcharts and / or block diagrams of the systems, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0289] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0290] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0291] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A method for optimizing the source, load and storage capacity of an island microgrid, characterized in that: The method comprises: Determine the outer capacity optimization objective function and outer constraints with the minimum annual comprehensive cost of the island microgrid; Determine the inner optimization operation objective function and inner constraints with the minimum operation cost and waste penalty fee; For each configuration scheme, optimization control is performed according to the preset source-load-storage operation coordinated control strategy, and the preset lower limit value and future time period value of energy storage corresponding to each configuration scheme that meet the minimum inner optimization operation objective function and inner constraint conditions are determined; According to the preset lower limit value of energy storage, future time period value and external constraints corresponding to each configuration scheme, the power outage rate, renewable energy reduction rate and installed capacity ratio of renewable energy corresponding to each configuration scheme are determined; Determine the island microgrid equivalent annual comprehensive cost corresponding to each configuration scheme according to the power outage rate, renewable energy reduction rate, renewable energy installed capacity ratio and outer capacity optimization objective function corresponding to each configuration scheme, and configure the source, load and storage capacity of the island microgrid according to the configuration scheme corresponding to the minimum island microgrid equivalent annual comprehensive cost; The method uses the following method to optimize and control any configuration scheme according to the preset source-load-storage operation coordinated control strategy, and determines the preset lower limit value and future time period value of energy storage corresponding to any configuration scheme that satisfies the minimum inner optimization operation objective function and inner constraint conditions, including: Step 1, initialization time t=1, energy storage preset lower limit value SoC=0.1, future time period value h=1; Step 2: Calculate the water storage capacity S of the seawater desalination device in the current time period des_water (t) and the net power P of the island microgrid net (t); Step 3, according to the water storage capacity S of the seawater desalination device des_water (t) and net power P net (t) Execute the preset source-load-storage operation coordination control strategy; Step 4, determine whether t satisfies a first preset threshold; if so, calculate the inner optimization operation objective function and proceed to step 5; otherwise, update t=t+1 and return to step 2; Step 5, determine whether SoC satisfies a second preset threshold; if so, proceed to step 6; otherwise, update SoC=SoC+a, update t=1, and return to step 2; Step 6, determine whether h satisfies a third preset threshold; if so, calculate the optimal solution of the inner optimization with the minimum operating cost, determine the preset lower limit value SoC of energy storage and the future time period value h; otherwise, update h=h+b, update t=1, and return to step 2; wherein a is the first preset step length, and b is the second preset step length; Wherein, the water storage capacity S of the seawater desalination device des_water (t) and net power P net (t) Execute the preset source-load-storage operation coordination control strategy, including: First control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is greater than or equal to the residential water consumption in the next h hours If the state of charge Soc(t-1) at the previous moment is greater than the preset lower limit of energy storage SoC, the maximum regulation power of the seawater desalination device in period t is calculated as: P des-max (t) = N des-max (t)·P des ; Among them, N des-max (t) is the maximum number of desalination units in operation at time t; P des is the rated power of the seawater desalination device; If the net power P net (t) less than or equal to the maximum regulating power P of the seawater desalination device des -max(t), then determine the adjustable power P consumed by the desalination device during the period t des (t) is: If the net power P net (t) is greater than the maximum regulating power P of the seawater desalination device des-max (t), the desalination plant is dispatched at the maximum power, that is, P des (t) = P des-max (t); Residual power P net1 (t) = P net (t)-P des (t) Charge the energy storage device; if the charging power and the remaining power are both within the constraints of the energy storage device, the charging power of the energy storage device during time t is P bat,c (t) = P net (t)-P des (t), there is no remaining energy at this time; if the charging power and the remaining power are not within the constraints of the energy storage device, the energy storage device will charge at the maximum allowable charging power value P of the energy storage device within the time period t. c,max (t) Charging is performed and the remaining energy is discarded; Second control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is greater than or equal to the residential water consumption in the next h hours And the state of charge Soc(t-1) at the previous moment is less than or equal to the preset lower limit of energy storage SoC, then the net power P net (t) First, charge the energy storage. If the net power P net (t) is less than the maximum charging power allowable value P that meets the reliability of power supply for important loads. max (t), at this time, the energy storage device can fully absorb the net power but still fail to meet the preset lower limit SoC of energy storage, and the charging power P of energy storage bat,c (t) = P net (t); otherwise the energy storage charging power P bat,c (t)P max (t) Charging, excess power P net1 (t) = P net (t)-P bat,c The absorption process of (t) is performed according to the first control strategy; The maximum charging power allowable value P is calculated using the following method: max (t), including: Among them, P max,c E is the maximum continuous charging power of the energy storage device; c is the rated capacity of the energy storage device; Soc(t-1) is the remaining power at the end of the t-1 period; η c is the charging efficiency of the energy storage device; Δt is the preset simulation time interval; The third control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is less than the residential water consumption in the next h hours The net power P des (t) First, let the desalination device absorb the water consumption, and calculate the maximum regulation power P to meet the residents' water demand in the next h hours according to the following formula des_tj (t) is: If the net power P net (t) greater than or equal to the maximum regulated power P des_tj (t), then the adjustable power P of the desalination device des (t) According to the current maximum adjustment power P des_tj (t) operation; if the net power P net (t) is less than the maximum regulated power P des_tj (t), then recalculate the maximum regulated power as: Adjustable power P of seawater desalination plant des (t) According to the current maximum adjustment power P des_tj (t) operation; When there is still excess power, that is, the remaining power P net1 (t) = P net (t)-P des When (t)>0, if Soc(t-1)>SoC, execute the second control strategy; otherwise, execute the second control strategy; Among them, S tj (t) is the maximum adjustable water volume of seawater desalination in the period t to meet the water demand of residents in the next h hours; S des_max is the maximum water storage capacity of the seawater desalination device; G des is the water output of a single desalination unit per hour; The fourth control strategy: If the net power P net (t) is less than or equal to 0, the energy storage device is discharged first; if the power shortage is met, the discharge power of the energy storage device is the net power P net (t); otherwise, the energy storage device shall be charged with the maximum discharge power allowed value P of the energy storage device within the period t. d,max (t) discharge, and the remaining power shortage is supplemented by the diesel generator; when the remaining power shortage exceeds the rated power of the diesel generator, the diesel generator generates electricity at the rated power, and the shortage part performs load shedding operation; Q water (t+i) is the water demand of residents on the island during the period t+i; Q water (h) is the water demand of residents on the island during period h; δ is the self-discharge rate of the energy storage device.
2. The method according to claim 1, characterized in that The method further comprises: When S des (t-1)-Q water (t)≥S des-min When the water storage in the reservoir meets the water demand of residents on the island, the desalination load P des_water (t) The power consumed is zero, that is, the number of desalination units that need to be started is N des_water (t) = 0; where S des (t-1) is the water storage capacity of the reservoir at the end of the period (t-1); Q water (t) is the water demand of residents on the island during period t; S des-min The minimum water storage capacity of the seawater desalination plant; When S des (t-1)-Q water (t)<S des-min When the water storage in the reservoir does not meet the water demand of residents on the island, the number of seawater desalination devices to be started is N des_water (t) is: Water storage capacity S of seawater desalination device des_water (t) is: S des_water (t)=N des_water (t)·G des +S des (t-1)-Q water (t), Desalination load P des_water (t) is: P des_water (t)=N des_water (t)·P des , In addition to meeting the water demand of residents, the desalination load has time-shifting properties and can assist in regulating the power of the microgrid. The current water storage capacity of the desalination device is low, and when all units are turned on, it still cannot exceed the maximum water storage capacity, that is, S des_water (t)+(N des -N des-water (t))·G des ≤S des-max The maximum number of units allowed to be opened is: N des-max (t) = N des -N des-water (t), The current water storage capacity of the seawater desalination device is relatively high. When all units are turned on, it will definitely exceed the maximum water storage capacity, that is, S des_water (t)+[N des -N des-water (t)]G des ≥S des-max The maximum number of units allowed to be turned on is: The maximum regulating power of the seawater desalination device is: P des-max (t) = N des-max (t)·P des ; Among them, N des G is the number of seawater desalination units configured in the microgrid; des It is the water output of a single seawater desalination device per hour.
3. A source-load-storage capacity optimization configuration system for an island microgrid, characterized in that: The system comprises: An outer layer objective function and constraint determination unit is used to determine an outer layer capacity optimization objective function and outer layer constraint conditions with the minimum annual comprehensive cost of the island microgrid; An inner layer objective function and constraint determination unit, used for determining an inner layer optimization operation objective function and inner layer constraint conditions with minimum operation cost and waste penalty fee; The inner optimization unit is used to optimize and control each configuration scheme according to the preset source-load-storage operation coordinated control strategy, and determine the preset lower limit value and future time period value of energy storage corresponding to each configuration scheme that satisfies the minimum inner optimization operation objective function and the inner constraint conditions; The outer optimization unit is used to determine the power failure rate, renewable energy reduction rate and installed capacity ratio of renewable energy corresponding to each configuration scheme according to the preset lower limit value of energy storage, future time period value and outer constraint conditions corresponding to each configuration scheme; A configuration scheme determination unit is used to determine the island microgrid equivalent annual value comprehensive cost corresponding to each configuration scheme according to the power outage rate, renewable energy reduction rate, renewable energy installed capacity ratio and outer capacity optimization objective function corresponding to each configuration scheme, and configure the source, load and storage capacity of the island microgrid according to the configuration scheme corresponding to the minimum island microgrid equivalent annual value comprehensive cost; The inner optimization unit optimizes and controls any configuration scheme according to the preset source-load-storage operation coordination control strategy in the following manner, and determines the preset lower limit value and future time period value of energy storage corresponding to any configuration scheme that satisfies the minimum inner optimization operation objective function and the inner constraint conditions, including: Initialization module, used for initialization time t=1, energy storage preset lower limit value SoC=0.1, future time period value h=1; The calculation module is used to calculate the water storage capacity S of the seawater desalination device in the current time period. des_water (t) and the net power P of the island microgrid net (t); The coordination control module is used to control the water storage capacity S of the seawater desalination device according to the des_water (t) and net power P net (t) Execute the preset source-load-storage operation coordination control strategy; The first judgment module is used to judge whether t satisfies a first preset threshold; if so, the inner layer optimization operation objective function is calculated and the second judgment module is entered; otherwise, t=t+1 is updated and the calculation module is entered; A second judgment module is used to judge whether SoC satisfies a second preset threshold; if so, the process proceeds to step 6; otherwise, the process updates SoC=SoC+a, updates t=1, and proceeds to the calculation module; The third judgment module is used to judge whether h satisfies a third preset threshold; if so, the optimal solution of the inner optimization is calculated with the minimum operating cost to determine the preset lower limit value SoC of energy storage and the future time period value h; otherwise, h=h+b is updated, t=1 is updated, and the calculation module is entered; wherein a is the first preset step length, and b is the second preset step length; The coordination control module is configured to control the water storage capacity S of the seawater desalination device according to the water storage capacity S of the seawater desalination device. des_water (t) and net power P net (t) Execute the preset source-load-storage operation coordination control strategy, including: First control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is greater than or equal to the residential water consumption in the next h hours If the state of charge Soc(t-1) at the previous moment is greater than the preset lower limit of energy storage SoC, the maximum regulation power of the seawater desalination device in period t is calculated as: P des-max (t) = N des-max (t)·P des ; Among them, N des-max (t) is the maximum number of desalination units in operation at time t; P des is the rated power of the seawater desalination device; If the net power P net (t) less than or equal to the maximum regulating power P of the seawater desalination device des-max (t), then determine the adjustable power P consumed by the desalination device during the period t des (t) is: If the net power P net (t) is greater than the maximum regulating power P of the seawater desalination device des-max (t), the desalination plant is dispatched at the maximum power, that is, P des (t) = P des-max (t); Residual power P net1 (t) = P net (t)-P des (t) Charge the energy storage device; if the charging power and the remaining power are both within the constraints of the energy storage device, the charging power of the energy storage device during time t is P bat,c (t) = P net (t)-P des (t), there is no remaining energy at this time; if the charging power and the remaining power are not within the constraints of the energy storage device, the energy storage device will charge at the maximum allowable charging power value P of the energy storage device within the time period t. c,max (t) Charging is performed and the remaining energy is discarded; Second control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is greater than or equal to the residential water consumption in the next h hours And the state of charge Soc(t-1) at the previous moment is less than or equal to the preset lower limit of energy storage SoC, then the net power P net (t) First, charge the energy storage. If the net power P net (t) is less than the maximum charging power allowable value P that meets the reliability of power supply for important loads. max (t), at this time, the energy storage device can fully absorb the net power but still fail to meet the preset lower limit SoC of energy storage, and the charging power P of energy storage bat,c (t) = P net (t); otherwise the energy storage charging power P bat,c (t)P max (t) Charging, excess power P net1 (t) = P net (t)-P bat,c The absorption process of (t) is performed according to the first control strategy; The maximum charging power allowable value P is calculated using the following method: max (t), including: Among them, P max,c E is the maximum continuous charging power of the energy storage device; c is the rated capacity of the energy storage device; Soc(t-1) is the remaining power at the end of the t-1 period; η c is the charging efficiency of the energy storage device; Δt is the preset simulation time interval; The third control strategy: If the net power P net (t) is greater than 0, and the water storage capacity S of the seawater desalination device des_water (t) is less than the residential water consumption in the next h hours The net power P des (t) First, let the desalination device absorb the water consumption, and calculate the maximum regulation power P to meet the residents' water demand in the next h hours according to the following formula des_tj (t) is: If the net power P net (t) greater than or equal to the maximum regulated power P des_tj (t), then the adjustable power P of the desalination device des (t) According to the current maximum adjustment power P des_tj (t) operation; if the net power P net (t) is less than the maximum regulated power P des_tj (t), then recalculate the maximum regulated power as: Adjustable power P of seawater desalination plant des (t) According to the current maximum adjustment power P des_tj (t) operation; When there is still excess power, that is, the remaining power P net1 (t) = P net (t)-P des When (t)>0, if Soc(t-1)>SoC, execute the second control strategy; otherwise, execute the second control strategy; Among them, S tj (t) is the maximum adjustable water volume of seawater desalination in the period t to meet the water demand of residents in the next h hours; S des_max is the maximum water storage capacity of the seawater desalination device; G des is the water output of a single desalination unit per hour; The fourth control strategy: If the net power P net (t) is less than or equal to 0, the energy storage device is discharged first; if the power shortage is met, the discharge power of the energy storage device is the net power P net (t); otherwise, the energy storage device shall be charged with the maximum discharge power allowed value P of the energy storage device within the period t. d,max (t) discharge, and the remaining power shortage is supplemented by the diesel generator; when the remaining power shortage exceeds the rated power of the diesel generator, the diesel generator generates electricity at the rated power, and the shortage part performs load shedding operation; Q water (t+i) is the water demand of residents on the island during the period t+i; Q water (h) is the water demand of residents on the island during period h; δ is the self-discharge rate of the energy storage device.
4. The system according to claim 3, characterized in that The computing module further includes: When S des (t-1)-Q water (t)≥S des-min When the water storage in the reservoir meets the water demand of residents on the island, the desalination load P des_water (t) The power consumed is zero, and the number of desalination units that need to be started is N des_water (t) = 0; where S des (t-1) is the water storage capacity of the reservoir at the end of the period (t-1); Q water (t) is the water demand of residents on the island during period t; S des-min The minimum water storage capacity of the seawater desalination plant; When S des (t-1)-Q water (t)<S des-min When the water storage in the reservoir does not meet the water demand of residents on the island, the number of seawater desalination devices to be started is N des_water (t) is: Water storage capacity S of seawater desalination device des_water (t) is: S des_water (t)=N des_water (t)·G des +S des (t-1)-Q water (t), Desalination load P des_water (t) is: P des_water (t)=N des_water (t)·P des , In addition to meeting the water demand of residents, the desalination load has time-shifting properties and can assist in regulating the power of the microgrid. The current water storage capacity of the desalination device is low, and when all units are turned on, it still cannot exceed the maximum water storage capacity, that is, S des_water (t)+(N des -N des-water (t))·G des ≤S des-max The maximum number of units allowed to be opened is: N des-max (t) = N des -N des-water (t), The current water storage capacity of the seawater desalination device is relatively high. When all units are turned on, it will definitely exceed the maximum water storage capacity, that is, S des_water (t)+[N des -N des-water (t)]G des ≥S des-max The maximum number of units allowed to be turned on is: The maximum regulating power of the seawater desalination device is: P des-max (t) = N des-max (t)·P des ; Among them, N des G is the number of seawater desalination units configured in the microgrid; des It is the water output of a single seawater desalination device per hour.
5. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method according to any one of claims 1 to 2 are implemented.