A simulated power transformer for training and modeling method thereof
By designing a simulation power transformer for training that includes an Android host, a simulation transformer body and a shell, the problem of difficulty in high-fidelity simulation of analog power transformers in the existing technology is solved, and a variety of characteristic parameters and fault types are realized at low cost and small footprint. The simulation meets the standard training needs of the power industry and improves the skills of test personnel and the ability to ensure power supply.
Patent Information
- Application Number
- CN202111021593.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-01
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-09-01
AI Technical Summary
Existing technology is difficult to provide high-fidelity simulated power transformers for training and fault analysis in the power sector, and traditional methods require a large amount of equipment and space, resulting in greater economic and site pressure.
A training simulation power transformer is designed that includes an Android host, a simulation transformer body and a simulation transformer shell. It is connected via Bluetooth or wireless. The simulation transformer body contains a dry-type transformer and a compensation module. Combined with a circuit breaker module, it can simulate 110kV and Insulation tests of the above voltages are controlled and simulated through the visualization app.
It realizes the simulation of various characteristic parameters and fault types at low cost and small footprint, meets the standard training needs of the power industry, improves the skills and ability of test personnel to ensure power supply, and ensures the safety of training.
Smart Images

Figure CN113759293B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a simulated power transformer for training and a modeling method thereof, and belongs to the field of power equipment. Background Art
[0002] Power transformers are the main primary equipment in the power grid system and are critical to the stable and reliable operation of the power grid.
[0003] In order to ensure the reliable and trouble-free operation of power transformers and other equipment, the maintenance department of the power company will shut down the power supply to the transformer and conduct routine tests. There are many test items and the power outage time is short. The test personnel need to be able to test the transformer skillfully, professionally and accurately in accordance with the power industry standards and test specifications.
[0004] The requirements for power outages are very strict now, and it is difficult to find faults for the power department's maintenance personnel to analyze and improve their skills, especially for new employees. The power department urgently needs a transformer that can simulate various performance parameters of power transformers with high fidelity, and at the same time simulate the required fault types for personnel training and fault analysis, etc., which has a very positive effect on improving the skills of test personnel and improving the power supply guarantee capability.
[0005] A 110kV power transformer is worth hundreds of thousands of yuan and is very large in size. To simulate dozens of fault types of test items, more than a dozen transformer samples are needed, which also occupies a large area of the work site, bringing huge economic and site pressure to the training unit.
[0006] In view of this, a method and system for modeling a three-phase transformer electromagnetic transient medium and low frequency model is disclosed in the patent document with application number 201711321099.5, and the comparative document is different from the implementation method of this application. Summary of the invention
[0007] The purpose of the present invention is to overcome the above-mentioned deficiencies in the prior art and to provide a training simulated power transformer with a reasonable structural design and a modeling method thereof.
[0008] The technical solution adopted by the present invention to solve the above problems is: the simulated power transformer for training includes an Android host, a simulated transformer body and a simulated transformer body shell, the Android host and the simulated transformer body are connected by Bluetooth or wireless, the simulated transformer body is installed in the simulated transformer body shell, the simulated transformer body includes a controller and a circuit breaker module, and its structural characteristics are: the simulated transformer body also includes a dry-type transformer and a compensation module, the controller is connected to the circuit breaker module, the circuit breaker module is connected to the dry-type transformer, the dry-type transformer is connected to the compensation module, and a transformer bushing is provided on the simulated transformer body shell.
[0009] Furthermore, the transformer bushings include A, B and C bushings with a voltage of 110kV, O, Am, Bm and Cm bushings with a voltage of 35kV, wherein O bushing is a neutral point bushing, and a, b, c, o and core grounding bushings with a voltage of 10kV.
[0010] Furthermore, the dry-type transformer is a customized 10kV three-phase three-winding dry-type transformer with a rated voltage of 10kV / 0.6kV / 0.4kV, and the parameters are the rated voltages of high voltage, medium voltage and low voltage respectively. The high-voltage winding connection group is YN, and the neutral point end has a voltage adjustment tap of ±2×2.5% or ±5%. The 12 terminals of the 0.6kV (medium voltage) winding and the 0.4kV (low voltage) winding are connected to the circuit breaker module to facilitate testing of different transformation ratios and Y or Δ connection groups.
[0011] Furthermore, the compensation module is composed of Figure 4 It is mainly composed of resistors, capacitors and discharge ball gaps. A 15000pF~25000pF high-voltage capacitor, a 150MΩ high-voltage resistor and a 30kV discharge ball gap are connected between the neutral point of the high-voltage winding of the dry-type transformer and the ground to simulate the capacitance of the insulating medium of large and medium-sized transformers, which is convenient for various insulation tests of large and medium-sized transformers of 110kV and above.
[0012] Furthermore, the compensation module is used to compensate for the parameter difference between the 10kV dry-type transformer and the 110kV dry-type transformer, so as to make the parameters of the simulated transformer body closer to reality.
[0013] Furthermore, the simulated transformer body shell can be flexibly designed according to the conditions of the training site, with the shell size of the 110kV dry-type transformer (the reference size of length × width × height is 3.2m × 2.4m × 1.8m), and equipped with corresponding 110kV (high voltage), 35kV (medium voltage), 10kV (low voltage) and core-grounded transformer bushings.
[0014] Furthermore, considering that high voltage is applied in the simulated power transformer test, the internal high-voltage electric field will pose a safety hazard to external training personnel. Therefore, the outer shell of the simulated transformer body needs to be made of metal material, or a layer of conductive cloth or a tighter metal mesh material is installed inside for grounding shielding to ensure the personal safety of instructors and trainers.
[0015] Furthermore, another technical purpose of the present invention is to provide a modeling method for a simulated power transformer for training.
[0016] The above technical objectives of the present invention are achieved through the following technical solutions.
[0017] A modeling method for a simulated power transformer for training, characterized in that: the modeling method is as follows:
[0018] The electrical wiring diagram of the internal modeling of the 110kV simulated transformer in normal state is shown in Figure 2 , after the simulated transformer body shell is in place (the high-voltage side faces outward), move the dry-type transformer into the simulated transformer body shell, fill the bottom of the dry-type transformer with insulating parts, so as to facilitate the grounding of the core grounding point of the dry-type transformer through the core-grounded transformer bushing, install all transformer bushings on the simulated transformer body shell, connect the 10kV winding of the dry-type transformer to the 110kV high-voltage transformer bushing, and connect the neutral point of the dry-type transformer winding to the transformer bushing at the high-voltage neutral point; connect the 0.6kV winding of the dry-type transformer to the 35kV medium-voltage transformer bushing; connect the 0.4kV winding of the dry-type transformer to the 10kV low-voltage transformer bushing, connect the neutral point of the winding to the transformer bushing at the low-voltage neutral point, and connect the grounding of the dry-type transformer to the core-grounded transformer bushing. Finally, connect the compensation module in parallel between the neutral point of the high-voltage winding of the dry-type transformer and the ground.
[0019] Furthermore, another technical purpose of the present invention is to provide a test project based on a modeling method.
[0020] The above technical objectives of the present invention are achieved through the following technical solutions.
[0021] A test project based on a modeling method, characterized in that: the test project is as follows:
[0022] 1. Simulate the insulation resistance and absorption ratio of the transformer winding and the transformer bushing;
[0023] (ii) Measurement of DC leakage current of the winding of the simulated transformer body together with the transformer bushing;
[0024] (III) Measurement of dielectric loss and capacitance of the winding of the simulated transformer body and the transformer bushing;
[0025] (IV) Insulation resistance measurement of core clamps;
[0026] (V) AC withstand voltage test of the windings simulating the transformer body together with the transformer bushing;
[0027] (vi) Measurement of DC resistance of the windings of the simulated transformer body together with the transformer bushing;
[0028] (VII) Transformation ratio test;
[0029] (VIII) Winding deformation test simulating the transformer body;
[0030] (IX) Measurement of dielectric loss and capacitance of non-pure porcelain transformer bushings;
[0031] (10) Measurement of insulation resistance and dielectric loss of non-pure porcelain transformer bushing end screen;
[0032] (XI) High voltage core phase of power system.
[0033] And many other high voltage test trainings, and can perform fault simulation and fault analysis and judgment.
[0034] Furthermore, the measurement and implementation of tests (I), (II) and (III) are all achieved by changing the resistance between the neutral point of the high voltage winding and the ground by the high voltage switch K16. Figure 4 As shown, closing the high-voltage switch K16 will change the insulation resistance, absorption ratio, DC leakage current and dielectric loss of the simulated transformer body. The resistance in the compensation module should be included in the theoretical calculation. Multiple switches and multiple resistors can be used to achieve multi-level settings as required.
[0035] Furthermore, the insulation resistance measurement of the core clamp in test (IV) is achieved by changing the resistance between the core and the ground. Figure 6 As shown, after the Android host sends a command indicating abnormal insulation of the core, K18 is closed, thereby realizing abnormal resistance between the core and the ground.
[0036] Furthermore, test (V) simulates the AC withstand voltage test of the transformer winding and the transformer bushing by connecting the discharge ball gap between the neutral point of the high-voltage winding and the ground to limit the voltage upper limit. Figure 5 As shown, after the Android host issues an abnormal AC withstand voltage command, K20 is closed, and a discharge ball gap with a lower withstand voltage level is connected in parallel next to the compensation module to achieve a lower withstand voltage.
[0037] Furthermore, test (VI) simulates the DC resistance measurement of the transformer winding together with the transformer bushing by disconnecting and short-circuiting one of the medium voltage windings to change the winding resistance. Figure 5 As shown, taking the Am and Cm winding short circuit as an example, K7 is normally open and K4 is normally closed, which is a normal state. After the Android host issues a DC resistance short circuit fault command, K7 is closed. The DC resistance is measured using an instrument, and it is found that the resistances of Am and Cm are greatly reduced, and the resistances between the other two items are slightly reduced;
[0038] Furthermore, in test (VII) the transformation ratio test, the low voltage winding and the medium voltage winding are connected as the normal state, that is, K1 is activated. To prevent the medium voltage winding from being connected incorrectly, the low voltage winding and the medium voltage winding are connected correspondingly in the transformation ratio test, that is, K2 is activated. In the normal state, the transformation ratio is 10:1. The change in the turns ratio is achieved by short-circuiting a certain low voltage winding, such as Figure 5As shown, taking phase A as an example, under normal conditions, the 0.6kV and 0.4kV windings are connected in series and the transformation ratio is 10. After the Android host sends out an abnormal transformation ratio instruction, relay K10 is activated and the transformation ratio is 16.67. The transformation ratios of the other two items remain unchanged.
[0039] Test (VIII) Simulating the winding deformation of the transformer body. In the winding failure test, there are mainly short circuit and open circuit. The normal state and short circuit state are the same as those in the transformation ratio test. Figure 5 Taking phase A as an example, the circuit-breaking state is to disconnect the low-voltage winding, that is, K4 is actuated.
[0040] Furthermore, in tests (IX) and (X), a high-voltage capacitor of 15000pF to 18000pF is connected in parallel to the high-voltage winding of the simulated transformer body to simulate the capacitance of the high-voltage winding of a large or medium-sized transformer to the medium and low-voltage windings and the ground, which is convenient for measuring the dielectric loss and capacitance of non-pure porcelain transformer bushings, as well as the insulation resistance and dielectric loss of the end screen of non-pure porcelain transformer bushings.
[0041] Furthermore, in test (XI) high voltage core phase, the medium voltage winding is a Δ connection group, and the low voltage winding and high voltage winding are both Y connection groups. By leading out the corresponding winding connections, core phase tests of different connection groups can be formed.
[0042] Compared with the prior art, the present invention has the following advantages:
[0043] (1) The present invention designs a simulated power transformer, which is composed of an Android host, a controller, a circuit breaker module, a 10kV dry-type transformer and other components (see the schematic diagram for details). Figure 1 ) simulates various characteristic parameters and fault types of 110kV power transformers to complete eleven routine test items. It provides regular systematic training for junior test trainees on power transformer test items specified by power industry standards and common fault analysis and judgment for higher-level trainees. It has low cost, small footprint, and brings great convenience.
[0044] (2) The developed visualization app is deployed on the Android host, and the control method and modeling process of each test project are pre-made. The controller is connected via BLE Bluetooth (or other wireless methods, such as WiFi) to centrally control the circuit breaker module. The visualization app can simulate the status of the transformer in real time, allowing students to clearly see the current transformer fault status.
[0045] (3) The present invention can complete a number of special test projects; after simulating the installation of a 110kV capacitor bushing on the high-voltage side of the transformer, the dielectric loss test of the non-pure porcelain bushing of the transformer can be performed, which is a training project that general training institutions cannot have; the core is grounded through the grounding bushing, which can simulate the insulation resistance measurement of the core and clamps of large and medium-sized transformers, which is also a training project that general training institutions cannot complete. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 It is a principle design diagram of a simulated power transformer for training according to an embodiment of the present invention.
[0047] Figure 2 The present invention is a schematic diagram of electrical wiring of a simulated power transformer in normal state for training according to an embodiment of the present invention.
[0048] Figure 3 It is a top layout diagram of the simulation transformer body shell according to an embodiment of the present invention.
[0049] Figure 4 Schematic diagram of the structure of the compensation module according to an embodiment of the present invention.
[0050] Figure 5 This is an actual connection diagram of a simulated power transformer for training according to an embodiment of the present invention.
[0051] Figure 6 1 is a related connection circuit diagram of the core clamp of an embodiment of the present invention.
[0052] In the figure: Android host 1, simulated transformer body 2, controller 3, circuit breaker module 4, dry-type transformer 5, compensation module 6, transformer bushing 7, simulated transformer body housing 8, high-voltage resistor 9, high-voltage capacitor 10, discharge ball gap 11. DETAILED DESCRIPTION
[0053] The present invention will be further described in detail below with reference to the accompanying drawings and by way of examples. The following examples are intended to explain the present invention but the present invention is not limited to the following examples.
[0054] Example
[0055] See also Figures 1 to 6 As shown, it should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change in the proportional relationship, or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the effects and purposes that can be achieved by the present invention. At the same time, if there are references to terms such as "upper", "lower", "left", "right", "middle" and "one" in this specification, they are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.
[0056] The simulated power transformer for training in this embodiment includes an Android host 1, a simulated transformer body 2 and a simulated transformer body shell 8. The Android host 1 and the simulated transformer body 2 are connected using Bluetooth or wireless, and the simulated transformer body 2 is installed in the simulated transformer body shell 8.
[0057] The simulated transformer body 2 in this embodiment includes a controller 3, a circuit breaker module 4, a dry-type transformer 5 and a compensation module 6. The controller 3 is connected to the circuit breaker module 4, the circuit breaker module 4 is connected to the dry-type transformer 5, the dry-type transformer 5 is connected to the compensation module 6, and a transformer bushing 7 is provided on the simulated transformer body shell 8; the transformer bushing 7 includes A, B and C bushings with a voltage of 110kV, O, Am, Bm and Cm bushings with a voltage of 35kV, among which O bushing is a neutral point bushing, and a, b, c, o and core grounding bushings with a voltage of 10kV.
[0058] The dry-type transformer 5 in this embodiment is a customized 10kV three-phase three-winding dry-type transformer 5, with rated voltages of 10kV / 0.6kV / 0.4kV, and the parameters are the rated voltages of high voltage, medium voltage and low voltage respectively. The high-voltage winding connection group is YN, and the neutral point end has a voltage adjustment tap of ±2×2.5% or ±5%. 12 terminals of 0.6kV (medium voltage) winding and 0.4kV (low voltage) winding are connected to the circuit breaker module 4, which is convenient for testing different transformation ratios and Y or Δ connection groups.
[0059] The compensation module 6 in this embodiment has a composition diagram as shown in FIG. Figure 4 , mainly composed of a resistor 9, a capacitor 10 and a discharge ball gap 11. A 15000pF~25000pF high-voltage capacitor 10, a 150MΩ high-voltage resistor 9 and a 30kV discharge ball gap 11 are connected between the neutral point of the high-voltage winding of the dry-type transformer 5 and the ground to simulate the capacitance of the insulating medium of large and medium-sized transformers, which is convenient for various insulation tests of large and medium-sized transformers of 110kV and above; a compensation module 6 is used to compensate for the parameter gap between the 10kV dry-type transformer 5 and the 110kV dry-type transformer, so that the parameters of the simulated transformer body 2 are closer to the real ones.
[0060] The simulated transformer body housing 8 in this embodiment can be flexibly designed with the housing size of the 110kV dry-type transformer 5 (the reference size of length×width×height is 3.2m×2.4m×1.8m) according to the conditions of the training venue, and equipped with corresponding 110kV (high voltage), 35kV (medium voltage), 10kV (low voltage) and core-grounded transformer bushings 7.
[0061] In this embodiment, considering that high voltage is applied in the simulated power transformer test, the internal high voltage electric field will pose a safety hazard to external training personnel. Therefore, the simulated transformer body shell 8 needs to be made of metal material, or a layer of conductive cloth or a tighter metal mesh material is installed inside for grounding shielding to ensure the personal safety of instructors and trainers.
[0062] A modeling method of a simulated power transformer for training in this embodiment is as follows: The electrical wiring diagram of the internal modeling of the 110kV simulated transformer in normal state is shown in Figure 2 After the simulated transformer body shell 8 is in place (the high-voltage side faces outward), the dry-type transformer 5 is moved into the simulated transformer body shell 8, and the bottom of the dry-type transformer 5 is filled with insulating parts to facilitate grounding the core grounding point of the dry-type transformer 5 through the core-grounded transformer bushing 7. All transformer bushings 7 are installed on the simulated transformer body shell 8, and the 10kV winding of the dry-type transformer 5 is connected to the 110kV high-voltage transformer bushing 7, and the neutral point of the winding of the dry-type transformer 5 is connected to the transformer bushing 7 at the high-voltage neutral point; the 0.6kV winding of the dry-type transformer 5 is connected to the 35kV medium-voltage transformer bushing 7; the 0.4kV winding of the dry-type transformer 5 is connected to the 10kV low-voltage transformer bushing 7, and the neutral point of the winding is connected to the transformer bushing 7 at the low-voltage neutral point, and the grounding of the dry-type transformer 5 is connected to the core-grounded transformer bushing 7. Finally, the compensation module 6 is connected in parallel between the neutral point of the high-voltage winding of the dry-type transformer 5 and the ground.
[0063] The test items based on the modeling method in this embodiment are as follows:
[0064] (i) Simulate the insulation resistance and absorption ratio of the winding of the transformer body 2 together with the transformer bushing 7;
[0065] (ii) simulating the measurement of the DC leakage current of the winding of the transformer body 2 together with the transformer bushing 7;
[0066] (iii) Measurement of dielectric loss and capacitance of the winding of the simulated transformer body 2 together with the transformer bushing 7;
[0067] (IV) Insulation resistance measurement of core clamps;
[0068] (V) Simulate the AC withstand voltage test of the winding of the transformer body 2 together with the transformer bushing 7;
[0069] (vi) Simulating the measurement of the DC resistance of the winding of the transformer body 2 together with the transformer bushing 7;
[0070] (VII) Transformation ratio test;
[0071] (VIII) Simulating the winding deformation test of the transformer body 2;
[0072] (IX) Dielectric loss and capacitance measurement of non-pure porcelain transformer bushings;
[0073] (10) Measurement of insulation resistance and dielectric loss of non-pure porcelain transformer bushing 7 end screen;
[0074] 11. High voltage core phase of power system.
[0075] And many other high voltage test trainings, and can perform fault simulation and fault analysis and judgment.
[0076] The measurement and implementation of tests (I), (II) and (III) are all achieved by changing the resistance between the neutral point of the high voltage winding and the ground through the high voltage switch K16. Figure 4 As shown, closing the high-voltage switch K16 will change the insulation resistance, absorption ratio, DC leakage current and dielectric loss of the simulated transformer body 2. The resistance in the compensation module 6 should be included in the theoretical calculation. Multiple switches and multiple resistors can be used to achieve multi-level settings as required.
[0077] Among them, the insulation resistance measurement of the core clamp in test (IV) is achieved by changing the resistance between the core and the ground. Figure 6 As shown, after the Android host 1 sends an instruction of core insulation abnormality, K18 is closed, thereby realizing abnormal resistance between the core and the ground.
[0078] Among them, test (V) simulates the AC withstand voltage test of the winding of the transformer body 2 together with the transformer bushing 7. The upper limit of the voltage is limited by connecting the discharge ball gap 11 between the neutral point of the high-voltage winding and the ground. The normal state is as follows Figure 5 As shown, after the Android host 1 issues an abnormal AC withstand voltage command, K20 is closed, and a discharge ball gap 11 with a lower withstand voltage level is connected in parallel next to the compensation module 6 to achieve a lower withstand voltage.
[0079] Among them, test (six) simulates the DC resistance measurement of the winding of the transformer body 2 together with the transformer bushing 7 by breaking and short-circuiting one of the medium voltage windings to change the winding resistance. The normal state is as follows Figure 5 As shown, taking the Am and Cm winding short circuit as an example, K7 is normally open and K4 is normally closed, which is a normal state. After the Android host 1 issues a DC resistance short circuit fault command, K7 is closed, and the DC resistance is measured using an instrument. It is found that the resistances of Am and Cm are greatly reduced, and the resistances between the other two items are slightly reduced.
[0080] Among them, test (VII) transformation ratio test is to connect the low voltage winding and the medium voltage winding as the normal state, that is, K1 is activated. In order to prevent the medium voltage winding from being connected incorrectly, the low voltage winding and the medium voltage winding are connected correspondingly in the transformation ratio test, that is, K2 is activated. In the normal state, the transformation ratio is 10:1. The change of the turns ratio is achieved by short-circuiting a certain low voltage winding, such as Figure 5As shown, taking phase A as an example, under normal conditions, the 0.6kV and 0.4kV windings are connected in series and the transformation ratio is 10. After the Android host 1 issues an abnormal transformation ratio instruction, the relay K10 is actuated and the transformation ratio is 16.67. The transformation ratios of the other two items remain unchanged.
[0081] Among them, in the experiment (eight) simulating the winding deformation experiment of the transformer body 2, the winding faults are mainly divided into short circuit and open circuit. The normal state and short circuit state are the same as the transformation ratio experiment, such as Figure 5 Taking phase A as an example, the circuit-breaking state is to disconnect the low-voltage winding, that is, K4 is actuated.
[0082] Among them, in tests (IX) and (X), a high-voltage capacitor 10 of 15000pF to 18000pF is connected in parallel to the high-voltage winding of the simulated transformer body 2 to simulate the capacitance of the high-voltage winding of a large and medium-sized transformer to the medium and low-voltage windings and the ground, which is convenient for measuring the dielectric loss and capacitance of the non-pure porcelain transformer bushing 7, as well as the insulation resistance and dielectric loss of the end screen of the non-pure porcelain transformer bushing 7.
[0083] Among them, in test (XI) high voltage core phase, the medium voltage winding is a Δ connection group, and the low voltage winding and high voltage winding are both Y connection groups. By leading out the corresponding winding connections, core phase tests of different connection groups can be formed.
[0084] In addition, it should be noted that the shapes and names of the parts and components of the specific embodiments described in this specification may be different, and the above content described in this specification is only an example of the structure of the present invention. All equivalent changes or simple changes made based on the structure, features and principles described in the patent concept of the present invention are included in the protection scope of the patent of the present invention. Technicians in the technical field of the present invention can make various modifications or supplements to the specific embodiments described or replace them in a similar manner, as long as they do not deviate from the structure of the present invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.
Claims
1. A simulated power transformer for training, comprising an Android host (1), a simulated transformer body (2) and a simulated transformer body housing (8), wherein the Android host (1) and the simulated transformer body (2) are connected via Bluetooth or wireless, the simulated transformer body (2) is installed in the simulated transformer body housing (8), and the simulated transformer body (2) comprises a controller (3) and a circuit breaker module (4), characterized in that: The simulated transformer body (2) further comprises a dry-type transformer (5) and a compensation module (6); the controller (3) is connected to the circuit breaker module (4); the circuit breaker module (4) is connected to the dry-type transformer (5); the dry-type transformer (5) is connected to the compensation module (6); and a transformer bushing (7) is provided on the housing (8) of the simulated transformer body; The compensation module (6) is composed of a high-voltage resistor (9), a high-voltage capacitor (10) and a discharge ball gap (11). A 15000pF to 25000pF high-voltage capacitor (10), a 150MΩ high-voltage resistor (9) and a 30kV discharge ball gap (11) are connected between the neutral point of the high-voltage winding of the dry-type transformer (5) and the ground to simulate the capacitance of the insulating medium of large and medium-sized transformers, so as to facilitate various insulation tests of large and medium-sized transformers of 110kV and above. The compensation module (6) is used to compensate for the parameter difference between the 10 kV dry-type transformer and the 110 kV dry-type transformer, so as to make the parameters of the simulated transformer body (2) closer to reality; The training simulated power transformer is provided with high-voltage switches K1-K12, K16, K20, and a high-voltage switch K18 is provided on the core clamp of the training simulated power transformer; One end of the high-voltage switch K16 is connected to the neutral point O of the high-voltage winding, and the other end is connected to the high-voltage resistor; One end of the high-voltage switch K20 is connected to the neutral point O of the high-voltage winding, and the other end is connected to the discharge ball gap; The high voltage switch K7 is connected in parallel at both ends of the medium voltage winding Am; The high voltage switch K8 is connected in parallel at both ends of the medium voltage winding Bm; The high voltage switch K9 is connected in parallel at both ends of the medium voltage winding Cm; One end of the high-voltage switch K4 is connected to the medium-voltage winding Am, and the other end is connected to the common end of the first group of high-voltage switches K1; One end of the high-voltage switch K5 is connected to the medium-voltage winding Bm, and the other end is connected to the common end of the second group of high-voltage switches K1; One end of the high-voltage switch K6 is connected to the Cm medium-voltage winding, and the other end is connected to the common end of the third group of high-voltage switches K1; the high-voltage switch K1 is three groups of single-pole double-throw switches, wherein the common end of the first group of high-voltage switches K1 is connected to the high-voltage switch K4, the normally closed end is connected to the Cm medium-voltage winding, and the normally open end is connected to the first wire; The common end of the second group of high-voltage switches K1 is connected to the high-voltage switch K5, the normally closed end is connected to the medium-voltage winding Am, and the normally open end is connected to the second wire; The common end of the third group of high-voltage switches K1 is connected to the high-voltage switch K6, the normally closed end is connected to the medium-voltage winding Bm, and the normally open end is connected to the third wire; The high-voltage switch K2 is a set of three single-pole double-throw switches, wherein the common end of the first set of high-voltage switches K2 is connected to phase a, the normally closed end is connected to the first conductor, and the normally open end is connected to the high-voltage switch K3; The common end of the second group of high-voltage switches K2 is connected to phase b, the normally closed end is connected to the second wire, and the normally open end is connected to the high-voltage switch K3; The common end of the third group of high-voltage switches K2 is connected to phase c, the normally closed end is connected to the third wire, and the normally open end is connected to the high-voltage switch K3; The high-voltage switch K10 is a single-pole double-throw switch, the common end is connected to the first wire, the normally closed end is connected to one end of the Am low-voltage winding, and the normally open end is connected to the other end of the Am low-voltage winding; The high-voltage switch K11 is a single-pole double-throw switch, with the common end connected to the second wire, the normally closed end connected to one end of the Bm low-voltage winding, and the normally open end connected to the other end of the Bm low-voltage winding; The high-voltage switch K12 is a single-pole double-throw switch, with the common end connected to the third wire, the normally closed end connected to one end of the Cm low-voltage winding, and the normally open end connected to the other end of the Cm low-voltage winding; The transformer bushing (7) comprises A, B and C bushings with a voltage of 110 kV, O, Am, Bm and Cm bushings with a voltage of 35 kV, wherein O bushing is a neutral point bushing, and a, b, c, o and core grounding bushings with a voltage of 10 kV; The dry-type transformer (5) is a customized 10 kV three-phase three-winding dry-type transformer with rated voltages of 10 kV / 0.6 kV / 0.4 kV, the parameters of which are the rated voltages of high voltage, medium voltage and low voltage respectively, the high-voltage winding connection group is YN, the neutral point end is provided with a voltage regulating tap of ±2×2.5% or ±5%, and the 12 terminals of the 0.6 kV winding and the 0.4 kV winding are connected to the circuit breaker module (4) to facilitate testing with different transformation ratios and Y or Δ connection groups; The modeling method of the simulated power transformer for training is as follows: After the simulated transformer body shell (8) is in place, the dry-type transformer (5) is moved into the simulated transformer body shell (8), and the bottom of the dry-type transformer (5) is filled with insulating members to facilitate grounding the core grounding point of the dry-type transformer (5) through the core grounded transformer bushing (7). All transformer bushings (7) are installed on the simulated transformer body shell (8), and the 10kV winding of the dry-type transformer (5) is connected to the 110kV high-voltage transformer bushing (7). The neutral point of the winding of the dry-type transformer (5) is connected to the high voltage. The 0.6 kV winding of the dry-type transformer (5) is connected to the 35 kV medium-voltage transformer bushing (7); the 0.4 kV winding of the dry-type transformer (5) is connected to the 10 kV low-voltage transformer bushing (7), the winding neutral point is connected to the low-voltage neutral point transformer bushing (7), the grounding of the dry-type transformer (5) is connected to the core-grounded transformer bushing (7), and finally, the compensation module (6) is connected in parallel between the neutral point of the high-voltage winding of the dry-type transformer (5) and the ground.
2. The simulated power transformer for training according to claim 1, characterized in that: The shell (8) of the analog transformer body must be made of metal material, or a layer of conductive cloth or a tighter metal mesh material must be installed inside for grounding shielding.
3. A test item based on the simulated power transformer for training according to claim 1, characterized in that: The test items are as follows:
1. Simulating the insulation resistance and absorption ratio measurement of the winding of the transformer body (2) together with the transformer bushing (7); 2. Simulating the measurement of the DC leakage current of the winding of the transformer body (2) together with the transformer bushing (7); 3. Measuring the dielectric loss and capacitance of the winding of the simulated transformer body (2) together with the transformer bushing (7); 4. Insulation resistance measurement of core clamps; 5. An AC withstand voltage test of the winding of the simulated transformer body (2) together with the transformer bushing (7); 6. Simulating the measurement of the DC resistance of the winding of the transformer body (2) together with the transformer bushing (7); 7. Transformation ratio test; 8. Simulate the winding deformation test of the transformer body (2); 9. Non-pure porcelain transformer bushing (7) Dielectric loss and capacitance measurement; 10. Non-pure porcelain transformer bushing (7) End screen insulation resistance and dielectric loss measurement; 11. High voltage core phase of power system.
4. The test item of the simulated power transformer for training according to claim 3 is characterized by: The measurement and implementation of Tests 1, 2 and 3 are all achieved by changing the resistance between the neutral point of the high-voltage winding and the ground through the high-voltage switch K16. Closing the high-voltage switch K16 will change the insulation resistance, absorption ratio, DC leakage current and dielectric loss of the simulated transformer body (2). The resistance in the compensation module (6) should be included in the theoretical calculation. Multiple switches can be used with multiple resistors to achieve multi-level settings as required. The insulation resistance measurement of the test four core clamps is achieved by changing the resistance between the core and the ground. After the Android host (1) sends a command of core insulation abnormality, K18 is closed, thereby achieving abnormal resistance between the core and the ground; Test 5 simulates the AC withstand voltage test of the winding of the transformer body (2) together with the transformer bushing (7). The voltage upper limit is limited by connecting the discharge ball gap (11) between the neutral point of the high-voltage winding and the ground. After the Android host (1) issues an AC withstand voltage abnormality command, K20 is closed, and a discharge ball gap (11) with a lower withstand voltage level is connected in parallel next to the compensation module (6), thereby reducing the withstand voltage. Test 6 simulates the measurement of the DC resistance of the winding of the transformer body (2) together with the transformer bushing (7). By breaking and short-circuiting one of the medium voltage windings to change the winding resistance, taking the short circuit of Am and Cm windings as an example, K7 is normally open and K4 is normally closed, which is a normal state. After the Android host (1) issues a DC resistance short circuit fault command, K7 is closed. The DC resistance is measured using an instrument, and it is found that the resistances of Am and Cm are greatly reduced, and the resistances between the other two items are slightly reduced; Test seven, the transformation ratio test, is to connect the low voltage winding and the medium voltage winding as the normal state, that is, K1 is activated. To prevent the medium voltage winding from being connected incorrectly, the low voltage winding and the medium voltage winding are connected to each other in the transformation ratio test, that is, K2 is activated. Under normal conditions, the transformation ratio is 10:
1. The change of the turns ratio is achieved by short-circuiting a certain low voltage winding. Taking phase A as an example, under normal conditions, the 0.6kV and 0.4kV windings are connected in series, and the transformation ratio is 10. After the Android host (1) issues a transformation ratio abnormality command, relay K10 is activated, and the transformation ratio is 16.
67. The transformation ratios of the other two items remain unchanged. In the winding deformation experiment of the test 8 simulating the transformer body (2), the winding faults are mainly divided into short circuit and open circuit. The normal state and short circuit state are the same as the transformation ratio experiment. Taking phase A as an example, the open circuit state is to disconnect the connection of the low-voltage winding, that is, K4 is actuated; In tests 9 and 10, a high-voltage capacitor (10) of 15000pF to 18000pF is connected in parallel to the high-voltage winding of the simulated transformer body (2) to simulate the capacitance of the high-voltage winding of a large or medium-sized transformer to the medium and low-voltage windings and the ground, so as to facilitate the measurement of the dielectric loss and capacitance of the non-pure porcelain transformer bushing (7), as well as the measurement of the insulation resistance and dielectric loss of the end screen of the non-pure porcelain transformer bushing (7); In test 11, the high voltage core phase and the medium voltage winding are in the Δ connection group, and the low voltage winding and the high voltage winding are both in the Y connection group. By leading out the corresponding winding connections, core phase tests of different connection groups can be formed.
Citation Information
Patent Citations
A Modeling Method and System for Low-Frequency Electromagnetic Transient Models of Three-Phase Transformers
CN107958125B
Dynamic analog method for extra-high voltage transformer
CN101419266A
System for positioning turn-to-turn insulation defect of dry air-core reactor
CN102520310A