DC bus voltage and supercapacitor charge management control method for photovoltaic storage system

Through improved PI control and interactive control strategies, the DC bus voltage and supercapacitor charge state in the photovoltaic grid-connected hybrid energy storage system are optimized, and the problems of DC bus voltage fluctuations and supercapacitor charge state are solved, and the system is realized stability and extension of energy storage components.

CN113809733BActive Publication Date: 2024-11-05NANJING INST OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111078029.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-15
Publication Date
2024-11-05
Estimated Expiration
2041-09-15

AI Technical Summary

Technical Problem

In the existing photovoltaic grid-connected hybrid energy storage system, the DC bus voltage fluctuates greatly, making it difficult to maintain stability, and the supercapacitor state of charge optimization control is insufficient, resulting in system instability and shortening the service life of energy storage components.

Method used

Adopting improved PI control to optimize the common DC bus voltage without static difference control, combined with interactive control and limit management, the secondary power distribution strategy of hybrid energy storage system is optimized by dividing the supercapacitor working mode and introducing virtual correction current. The power distribution between ensures smooth DC bus voltage and stable supercapacitor charge state.

Benefits of technology

Effectively maintain the DC bus voltage near the reference value, extend the service life of the supercapacitor, and improve the reliability of the energy storage device and the stability of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113809733B_ABST
    Figure CN113809733B_ABST
Patent Text Reader

Abstract

The method for managing and controlling the DC bus voltage and supercapacitor charge of a photovoltaic storage system includes a photovoltaic grid-connected hybrid energy storage system, wherein a control coefficient is added to the PI control of the system VSC unit, so that the VSC unit optimizes the common DC bus voltage and the power balance unit controls the common DC bus voltage without static error; the hybrid energy storage system includes supercapacitors and batteries, and the supercapacitor working modes are divided; according to the different modes of the supercapacitor, the power distribution unit performs the initial power distribution of the battery and the supercapacitor, or the hybrid energy storage power secondary distribution control unit optimizes the hybrid energy storage charge and discharge pulse trigger control unit, so that the hybrid energy storage charge and discharge pulse trigger control unit controls the charging or discharging of the supercapacitor and the battery, thereby performing secondary distribution of the supercapacitor power and the battery power. The above improvements make the DC bus voltage more stable, enhance the reliability of the energy storage device, and extend the life of the supercapacitor.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of photovoltaic energy storage, and in particular to a method for managing and controlling a DC bus voltage and a supercapacitor charge in a photovoltaic energy storage system. Background Art

[0002] In recent years, with the rapid rise of renewable energy such as wind / solar power generation, the significant improvement of power converter performance and the continuous progress of new materials, energy storage technology is showing unprecedented development prospects with its flexible power regulation capability and good controllability. Hybrid energy storage systems have attracted much attention due to their dual properties of high energy density and high power density. Due to volatility and randomness, the large-scale grid connection of wind and solar renewable energy has a great impact on the power grid, and the use of hybrid energy storage can improve the absorption of renewable energy and system stability. Some literatures have proposed a maximum power tracking operating point control of photovoltaics (PV) and a hybrid energy storage system (HESS) to coordinate and smooth the power fluctuation of photovoltaic grid-connected power. Through the close cooperation between PV and HESS, the power fluctuation of PV grid-connected power can be effectively suppressed within the acceptable range of the power grid. The stability of the grid-connected voltage source converter (VSC) system is one of the most concerned and most important issues with practical application significance in the current research on the stability of power electronic power systems. Some literatures coordinate and integrate the constant power control of the power converter in the photovoltaic-energy storage microgrid system and the zero-static tracking control strategy of the DC bus voltage, ensuring that the photovoltaic-energy storage microgrid system provides the required active and reactive power to the large power grid while effectively maintaining the stable operation of the microgrid system. The classical proportional-integral (PI) control parameter setting is relatively difficult, the anti-interference ability is weak, and it is difficult to maintain good control performance under complex working conditions; some literatures use an improved PI control model to improve the steady-state accuracy and response speed of the DC bus voltage; some literatures propose a DC voltage control method based on deep reinforcement learning, which integrates the deep learning neural network with the determination of the strategy gradient to achieve continuous action search and adaptively adjust the voltage control strategy. Compared with the traditional proportional-integral (PI) control method, the proposed method has better dynamic and static performance, effectively improves the control accuracy of the DC voltage, reduces the DC voltage fluctuation and power overshoot under disturbance, and shortens the recovery and stabilization time of the DC voltage and power; some literatures propose a variable domain fuzzy PI adaptive control strategy, which adjusts the fuzzy domain in real time according to the size of the input error to obtain better control effect. Considering the characteristics of energy-type and power-type hybrid energy storage, each of which bears a power component, some literature has proposed a hybrid energy storage double-layer optimization configuration method based on a meta-model optimization algorithm for the configuration problem of hybrid energy storage in wind power suppression. The inner layer of this method is the hybrid energy storage power optimization allocation strategy; the outer layer takes the minimum capacity and minimum power as constraints, and the minimum annual average cost of the hybrid energy storage over its entire life cycle as the objective function. The proposed optimization configuration method can effectively avoid frequent charging and discharging of batteries while maintaining the optimal economic performance of hybrid energy storage, thereby increasing its service life.Some literature decomposes the second-order high-frequency filter link into a response filter link and a compensation filter link, and analyzes its frequency characteristics, clarifies the selection principle of the handover frequency, and performs hybrid energy storage power distribution, so as to more efficiently smooth out wind power fluctuations while taking into account the state of charge of power-type energy storage equipment. Some literature proposes a hierarchical control strategy for load power distribution of distributed energy storage systems based on a discrete consistency algorithm. The lower layer performs a primary power distribution, and the upper layer uses a consistency algorithm to generate a current correction amount for power control again. Some literature adaptively performs variational mode decomposition on the original photovoltaic power to achieve primary power distribution; secondly, within the energy storage system, the state of charge of the supercapacitor is monitored, and the primary power of the energy storage element is corrected secondary by fuzzy control. The results show that the primary power optimization correction based on fuzzy control enables the energy storage element to work within the safe range of the state of charge (SOC), greatly extending the economic life of the energy storage element. In the power fluctuation smoothing mode, wavelet packet decomposition is used to distribute the internal power of the energy storage system, and the primary power is corrected in combination with the state of charge information of the energy storage device to achieve secondary power distribution. Some literatures adopt a supercapacitor state of charge limit management strategy for photovoltaic DC microgrid hybrid energy storage system to limit supercapacitor overcharge and over-discharge; however, the DC bus voltage fluctuates greatly during operation, and the control effect is not ideal. Some literatures propose a variational mode decomposition-fuzzy control strategy to smooth wind power fluctuations. The results show that this control strategy can not only meet the maximum output power change rate limit requirements of wind farms, but also keep SOC within a reasonable range to avoid overcharge and over-discharge. Some literatures discuss the feasibility and implementation methods of soft switching technology for non-isolated photovoltaic grid-connected inverters, laying the foundation for the next generation of high-power density non-isolated photovoltaic grid-connected inverters. Based on spectrum analysis, the power outside the target domain is decomposed into high-frequency and low-frequency components to achieve the purpose of power allocation. The charging / discharging battery group state is switched according to the charging / discharging reference power, and the primary control of compensating prediction errors for different working conditions and the secondary control of smoothing fluctuations are realized to complete the hybrid energy storage charging / discharging priority control.

[0003] In summary, based on the existing technology, the DC bus voltage stability can be further improved to make the entire photovoltaic grid-connected power generation system more stable. In addition, the supercapacitor SOC can be optimized and controlled to optimize the supercapacitor working state and extend its service life. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a method for managing and controlling the DC bus voltage and supercapacitor charge of a photovoltaic storage system. For the grid-connected voltage converter (VSC) of a photovoltaic grid-connected hybrid energy storage system, an improved PI control is proposed to optimize the common DC bus voltage zero-static control, and maintain the common DC bus voltage stable at a reference value after grid connection. For photovoltaic grid-connected power generation systems, a secondary power distribution control strategy for hybrid energy storage systems based on interactive control and limit management is proposed to enhance the reliability of energy storage devices and extend the service life of supercapacitors.

[0005] To achieve the above object, the present invention adopts the following technical solutions:

[0006] A method for managing and controlling a DC bus voltage and a supercapacitor charge in a photovoltaic storage system includes:

[0007] Photovoltaic grid-connected hybrid energy storage system; the photovoltaic grid-connected hybrid energy storage system includes a VSC unit, a hybrid energy storage charge and discharge pulse trigger control unit, a hybrid energy storage system, a common DC bus voltage power balancing unit, a power distribution unit, and a hybrid energy storage power secondary distribution control unit;

[0008] Adding multiple control coefficients in the outer loop PI control of the VSC unit, so that the voltage outer loop control in the VSC unit is optimized, thereby controlling the current inner loop, and finally indirectly achieving better zero-static error control of the common DC bus voltage;

[0009] The hybrid energy storage system includes a supercapacitor and a battery, and the working mode of the supercapacitor is divided;

[0010] According to the different working modes of the supercapacitor, the power distribution unit performs the initial power distribution to the battery and the supercapacitor, or the hybrid energy storage power secondary distribution control unit optimizes the control of the hybrid energy storage charge and discharge pulse trigger control unit, so that the hybrid energy storage charge and discharge pulse trigger control unit controls the charging or discharging of the supercapacitor and the battery, thereby performing the secondary distribution of the supercapacitor power and the battery power.

[0011] Furthermore, the multiple control coefficients include: control coefficient c1, control coefficient c2, control coefficient p3; after the PI control is optimized through multiple control coefficients, the output VSC unit inner loop control input reference current I d_ref , and through the inner loop current control of the VSC unit, the common DC bus voltage is indirectly better controlled without static error;

[0012] The control coefficient c1 is:

[0013] In the formula, maxU represents U dc_ref -U dc The maximum difference between dc_ref-U dc The minimum difference between dc_ref Indicates the common DC bus voltage reference value, U dc Indicates the actual measured value of the common DC bus voltage;

[0014] The control coefficient c2 is:

[0015] In the formula, |maxU'| represents U dc_ref -U dc The maximum value of the first-order derivative of the difference and the amplitude result are taken. |minU'| represents U dc_ref -U dc The minimum value of the first derivative of the difference and the amplitude result;

[0016] The control coefficient p3 is:

[0017] Where U dcmax Indicates the maximum value of the common DC bus voltage;

[0018] I d_ref The current is:

[0019] In the formula, K p0 , K i0 represents the initial parameter value of the PI controller, U e Indicates U dc_ref -U dc The difference, dU e / dt represents U dc_ref -U dc The first derivative of the difference.

[0020] Furthermore, the specific contents of the classification of the working modes of supercapacitors are as follows:

[0021] The state of charge SOCsc of the supercapacitor sets a limit management warning value a1 and a critical discharge warning value a during the 0-50% state, and a1 < a; the state of charge SOCsc of the supercapacitor sets a limit management warning value b1 and a critical charge warning value b during the 50%-100% state, and b < b1;

[0022] Normal operating state range: a<=SOCsc<=b;

[0023] Critical charge and discharge state intervals, including a critical charge interval: b<SOCsc<b1, and a critical discharge interval: a1<SOCsc<a;

[0024] The limit management limit charge and discharge state interval includes a limit management limit discharge interval: 0<SOCsc<=a1, and a limit management limit charge interval: b1<=SOCsc<100%.

[0025] Further, when the supercapacitor charge state SOCsc is in a normal operating state, that is, a<=SOCsc<=b;

[0026] The low-pass filter LPF in the power distribution unit is used to perform initial power distribution to the battery and supercapacitor, so that the photovoltaic grid-connected hybrid energy storage system (model) remains stable.

[0027] Further, when the supercapacitor state of charge SOCsc is in the critical charging interval: b<SOCsc<b1, the critical discharging interval: a1<SOCsc<a, the limit management limit discharging interval: 0<SOCsc<=a1, the limit management limit charging interval: b1<=SOCsc<100%;

[0028] According to different intervals, the supercapacitor SOC control module inside the hybrid energy storage power secondary distribution control unit processes and calculates some parameters in the photovoltaic grid-connected hybrid energy storage system to obtain the virtual correction current I in the corresponding interval. vir ; The hybrid energy storage power secondary distribution control unit is based on the virtual correction current I in the corresponding interval vir The hybrid energy storage charging and discharging pulse trigger control unit is optimized to obtain the virtual correction current I in the corresponding interval. vir The power P of the supercapacitor after control sc_ref_1 , and then get the battery power P in the corresponding interval b_ref_1 , P b_ref_1 and P sc_ref_1 The closed-loop feedback is transmitted to the supercapacitor SOC control module, and the supercapacitor SOC control module combines with P b_ref_1 , P sc_ref_1 And some parameters are processed and calculated to obtain the supercapacitor reference current I in the corresponding range sc_ref_1 And the battery reference current I in the corresponding range b_ref_1 ;

[0029] The hybrid energy storage power secondary distribution control unit converts the supercapacitor reference current I in the corresponding interval sc_ref_1 and battery reference current I b_ref_1 The input is to the hybrid energy storage charge and discharge pulse trigger control unit, which controls the battery and supercapacitor to adaptively charge or discharge, thereby realizing power distribution between the battery and the supercapacitor, and making the charge state of the supercapacitor change in a stable direction.

[0030] Furthermore, the partial parameters include a supercapacitor state of charge reference value SOC ref , Supercapacitor real-time state of charge value SOC (t) , Battery reference power P b_ref , supercapacitor reference power P sc_ref , limit management warning value a1, critical discharge warning value a, limit management warning value b1, critical charge warning value b, and one or more of the interaction rate factor k.

[0031] Furthermore, when the supercapacitor state of charge SOCsc is in the critical discharge interval, that is, a1<SOCsc<a, and is in the continuous discharge state, that is, P sc_ref >=0, I vir =-|K*(SOC (t) -SOC ref )|、P sc_ref_1 =P sc_ref , P b_ref_1 =P b_ref ;

[0032] When the supercapacitor state of charge SOCsc is in the critical discharge interval, that is, a1<SOCsc<a, and is in the continuous charging state, that is, P sc_ref <0,I vir =0, P sc_ref_1 =P sc_ref , P b_ref_1 =P b_ref ;

[0033] When the supercapacitor state of charge SOCsc is in the critical charging interval b<SOCsc<b1, and is in the continuous charging state P sc_ref <0,I vir =|K*(SOC (t) -SOC ref )|、P sc_ref_1 =P sc_ref , P b_ref_1 =P b_ref ;

[0034] When the supercapacitor state of charge SOCsc is in the critical charging interval b<SOCsc<b1, and is in the continuous discharge state P sc_ref >=0,I vir =0, P sc_ref_1 =P sc_ref , P b_ref_1 =P b_ref .

[0035] Furthermore, when the supercapacitor state of charge SOCsc is in the limit management limit discharge interval, that is, 0<SOCsc<=a1, and is in the continuous discharge state, that is, Psc_ref >=0; I vir =0, P sc_ref_1 =0, P b_ref_1 =P b_ref +P sc_ref ;

[0036] When the supercapacitor state of charge SOCsc is in the limit management limit discharge interval, that is, 0<SOCsc<=a1, and is in the continuous charging state, that is, P sc_ref <0 hours; I vir =0, P sc_ref_1 =P sc_ref , P b_ref_1 =P b_ref ;

[0037] When the supercapacitor state of charge SOCsc is in the limit management limit charging range, that is, b1<=SOCsc<100%, and is in the continuous discharge state, that is, P sc_ref >=0; I vir =0, P sc_ref_1 =P sc_ref , P b_ref_1 =P b_ref ;

[0038] When the supercapacitor state of charge SOCsc is in the limit management limit charging range, that is, b1<=SOCsc<100%, and is in the continuous charging state, that is, P sc_ref <0 hours; I vir =0, P sc_ref_1 =0, P b_ref_1 =P b_ref +P sc_ref .

[0039] Furthermore, I b_ref_1 =P b_ref_1 / U bat ;

[0040] I sc_ref_1 =P sc_ref_1 / U sc ;

[0041] Where U bat Indicates the battery voltage, U sc Indicates the supercapacitor voltage.

[0042] The beneficial effects of the present invention are:

[0043] 1. For the grid-connected voltage converter (VSC) in the photovoltaic grid-connected hybrid energy storage system, an improved PI control is proposed to optimize the common DC bus voltage zero-static error control. Compared with the traditional PI control, the common DC bus voltage can be better maintained near the reference voltage.

[0044] 2. For the critical charge and discharge interval of supercapacitors, the concept of virtual correction current is introduced. The size of virtual correction current is determined according to the positive and negative power distribution of supercapacitors and the interaction rate factor, so that the charge state of supercapacitors changes in a stable direction. The working state of supercapacitors is optimized and their service life is extended.

[0045] 3. Based on the existing research, this application proposes an improved PI control for the VSC system in the photovoltaic grid-connected system; considering the power distribution problem of the hybrid energy storage system, a secondary power distribution control strategy based on interactive control and limit management is proposed. This control strategy maintains the DC bus voltage stable at the reference value by optimizing the static error control of the common DC bus voltage; the secondary power distribution of the hybrid energy storage system can achieve a stable change in the SOC of the supercapacitor. Based on the SOC of the supercapacitor, the system working state is divided into three working modes. When the SOC is in the normal operating range working mode, low-pass filtering is used for primary power distribution; in the critical charge and discharge mode, the concept of virtual correction current is introduced. When the control conditions are met, the power alternation between the energy storage elements is controlled by the virtual correction current, and the SOC of the supercapacitor is controlled to tend to the normal operating range; in the extreme charge and discharge mode, the supercapacitor is managed by limit value to avoid overcharging and over-discharging. This control strategy can achieve the stability of the photovoltaic grid-connected DC bus voltage and the reasonable operation of the supercapacitor SOC. By building a photovoltaic grid-connected hybrid energy storage system (model), a simulation comparative analysis is carried out on the VSC system under traditional PI control and improved PI control. At the same time, simulations are carried out in three operating ranges: normal operation, critical charge and discharge, and extreme charge and discharge to verify the correctness and effectiveness of the proposed control strategy. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 It is a structural schematic diagram of the photovoltaic grid-connected hybrid energy storage system or model of the present invention.

[0047] Figure 2 The invention is a block diagram of the DC bus voltage zero-static-error tracking control in the prior art.

[0048] Figure 3 It is a schematic diagram of a block diagram of a DC bus voltage zero-static-error tracking control of the improved PI control of the present invention.

[0049] Figure 4 It is a schematic diagram of SOC division of supercapacitors of the present invention.

[0050] Figure 5 It is the battery reference power P in the prior art of the present invention. b_ref With supercapacitor reference power P sc_ref Get the schematic.

[0051] Figure 6 It is a schematic diagram of a hybrid energy storage charge and discharge pulse trigger control unit controlling a battery charge and discharge trigger pulse in the prior art of the present invention.

[0052] Figure 7 It is a schematic diagram of a hybrid energy storage charge and discharge pulse trigger control unit controlling a supercapacitor charge and discharge trigger pulse in the prior art of the present invention.

[0053] Figure 8 It is a schematic diagram of the processing calculation of the supercapacitor SOC control module of the present invention.

[0054] Fig. 9 The present invention introduces a virtual correction current I vir and supercapacitor reference current I sc_ref_1 , schematic diagram of the trigger pulse for controlling the charging and discharging of the supercapacitor through the hybrid energy storage charging and discharging pulse triggering control unit.

[0055] Fig.10 The present invention is based on the battery reference current I b_ref_1 , schematic diagram of controlling the battery charge and discharge trigger pulses through the hybrid energy storage charge and discharge pulse trigger control unit.

[0056] Fig.11 It is a schematic diagram of the secondary power distribution and interactive control process of the hybrid energy storage of the present invention.

[0057] Fig.12 It is a comparison diagram of the DC bus voltage curve of the present invention.

[0058] Fig.13 It is a comparison diagram of the charge state change curve (critical charge) of the supercapacitor of the present invention.

[0059] Fig.14 It is a comparison diagram of the charge and discharge current curves of the battery of the present invention.

[0060] Fig.15 It is a comparison diagram of the charge state change curve (critical discharge) of the supercapacitor of the present invention.

[0061] Fig.16 It is a comparison diagram of the charge and discharge current curves of the battery of the present invention.

[0062] Fig.17 It is a comparison diagram of the supercapacitor charge state change curve (extreme charging limit management) of the present invention.

[0063] Fig.18 It is a schematic diagram of the critical charging power of the supercapacitor under the control method of the present invention.

[0064] Fig.19 It is a schematic diagram of the power borne by the supercapacitor when the present invention does not adopt control conditions.

[0065] Fig. 20 It is a schematic diagram of critical discharge supercapacitor power under the control method of the present invention.

[0066] Fig.21 It is the power borne by the supercapacitor when the control method is not adopted in the present invention. DETAILED DESCRIPTION

[0067] The present invention will now be described in further detail with reference to the accompanying drawings.

[0068] The present invention discloses a method for managing and controlling the DC bus voltage and supercapacitor charge of a photovoltaic storage system. For a grid-connected voltage converter (VSC) of a photovoltaic grid-connected hybrid energy storage system, an improved PI control is proposed to optimize the common DC bus voltage zero-error control to maintain the DC bus voltage stable at a reference value. For the power distribution problem of energy storage devices in a microgrid containing random and intermittent renewable energy, a secondary power distribution control strategy for a hybrid energy storage system based on interactive control and limit management is proposed. The system operating mode is divided according to the charge state of the supercapacitor, and the coordinated control method under each operating mode is analyzed. In the normal charge and discharge mode, low-pass filtering is used to distribute power, and each hybrid energy storage bears the corresponding power component; in the critical charge and discharge mode, the concept of virtual correction current is introduced, and the size of the virtual correction current is determined according to the positive and negative power distribution of the supercapacitor and the interactive rate factor, so that the charge state of the supercapacitor changes in a stable direction; when the system reaches the limit charge and discharge mode, the charge state of the supercapacitor is limited and managed to avoid overcharging and over-discharging. Finally, the proposed control strategy was verified in the constructed photovoltaic grid-connected simulation model. The results showed that the proposed control strategy can stabilize the DC bus voltage, enhance the reliability of the energy storage device, and extend the service life of the supercapacitor.

[0069] 1. The present invention is implemented by adopting the following technical solutions.

[0070] 1. Research on secondary power distribution and control strategy of photovoltaic grid-connected hybrid energy storage system:

[0071] Step 1: Build a photovoltaic grid-connected hybrid energy storage system (model) according to the invention requirements;

[0072] Step 2, designing and improving PI control to optimize the common DC bus voltage zero-static error control according to the invention requirements;

[0073] Step 3, dividing the supercapacitor working mode according to the invention requirements;

[0074] Step 4, according to the invention requirements, the supercapacitor charge state is controlled in different working modes, and a virtual current is introduced to control the supercapacitor charge and discharge;

[0075] Step 5: Run and debug in the photovoltaic grid-connected model according to the requirements of the invention, and perform simulation verification and analysis.

[0076] 2. In step 1, build the existing photovoltaic grid-connected hybrid energy storage system model according to the invention requirements and improve some units. Figure 1 shown.

[0077] Specifically including: photovoltaic power generation unit, large power grid unit, VSC unit, AC / DC load unit, hybrid energy storage (charging and discharging) pulse triggering control unit, hybrid energy storage system, common DC bus voltage power balancing unit, power distribution unit, hybrid energy storage power secondary distribution control unit.

[0078] Photovoltaic power generation unit: including photovoltaic maximum power tracking and BOOST boost control, providing photovoltaic power for the system;

[0079] Large grid unit: provides grid power to the system;

[0080] VSC unit: a grid-connected voltage converter that connects photovoltaic power generation to the grid system;

[0081] AC / DC load unit: consumes system power;

[0082] The hybrid energy storage charge and discharge pulse trigger control unit includes: a battery pulse trigger control unit, a battery charge and discharge unit, a supercapacitor charge and discharge control unit, and a supercapacitor pulse trigger control unit; according to the hybrid energy storage current index parameter, through PWM control, the corresponding charge and discharge trigger pulse is generated to control the hybrid energy storage charge and discharge control switch power MOSFET to turn on and off, so as to realize the hybrid energy storage charge and discharge function;

[0083] Hybrid energy storage system: including batteries and supercapacitors;

[0084] Public DC bus voltage power balancing unit: maintains the common DC bus voltage stable;

[0085] Power distribution unit: initially distributes hybrid energy storage power;

[0086] The hybrid energy storage power secondary distribution control unit includes: combining the supercapacitor charge state change and related index parameters, introducing a virtual correction current and an interaction rate factor, so that the supercapacitor charge state changes in a stable direction, and realizing the supercapacitor charge state optimization control.

[0087] 3. In step 2, an improved PI control is designed to optimize the common DC bus voltage zero-static error control according to the invention requirements.

[0088] VSC is the core component of the photovoltaic power generation unit, which realizes the conversion of DC to AC. In order to improve the active and reactive control performance, the controller usually adopts a dual-loop control structure in the dq0 coordinate system; the outer loop controller realizes DC voltage, reactive power or AC voltage control, and the output is the target current value of the inner loop current decoupling controller. The inner loop adopts direct current vector control, and the outer loop control of the VSC of the present invention adopts simplified constant power control and constant DC bus voltage constant reactive power control. Figure 2 This is the block diagram of the traditional DC bus voltage zero-static error tracking control. Figure 2 Middle U dc is the actual measured value of the common DC bus voltage, U dc_ref is the DC bus voltage reference value. In order to better stabilize the common DC bus voltage, based on the fuzzy PI control related theory, the traditional control method is improved and the traditional PI control is optimized; an improved PI method is proposed for control, and its block diagram is as follows Figure 3 shown.

[0089] in, Figure 3 The meaning of du / dt is: dc_ref -U dc ) The first-order derivative of the difference is taken; Function F1 generates a control coefficient c1, which is related to the error; Function F2 generates a control coefficient c2, which is related to the error change rate; Function F3 generates a proportional coefficient p3, which is related to U dc Related; the specific calculation formula is as follows:

[0090]

[0091] In the formula, maxU represents U dc_ref -U dc The maximum difference between dc_ref -U dc The minimum difference between dc_ref Indicates the common DC bus voltage reference value, U dc Indicates the actual measured value of the common DC bus voltage;

[0092]

[0093] In the formula, |maxU'| represents U dc_ref -U dc The maximum value of the first-order derivative of the difference and the absolute value of the result, |minU'| represents U dc_ref -U dc The minimum of the first derivatives of the difference and the absolute value of the result;

[0094]

[0095] Where U dcmaxIndicates the maximum value of the common DC bus voltage.

[0096] 4. In step 3, the supercapacitor working modes are divided according to the requirements of the invention.

[0097] Considering that the charge state of supercapacitor energy storage changes quickly, it is easy to overcharge and over-discharge. In order to enable the energy storage unit to operate effectively, it is necessary to set its charge state to a normal working range. The charge state of supercapacitor is divided into Figure 4 shown. Figure 4 In the figure, a1 and b1 are the warning values ​​of the limit management mode; a and b are the critical charge and discharge warning values. The four warning values ​​divide the charge state of the supercapacitor into three states, namely normal operation state, critical charge and discharge state and limit management limit charge and discharge state.

[0098] 5. In step 4, the supercapacitor charge state is controlled in different working modes according to the invention requirements, and a virtual current is introduced to control the supercapacitor charge and discharge;

[0099] in accordance with Figure 4 The control of the hybrid energy storage system can be divided into the following three working states, where SOCsc represents the supercapacitor charge state:

[0100] (1) Normal operating range: a<=SOCsc<=b

[0101] In this range, the charge state of the supercapacitor is in normal operation, and the hybrid energy storage performs preliminary power distribution through low-pass filtering to maintain the stability of the system.

[0102] (2) Critical charge and discharge interval: b<SOCsc<b1 (critical charge interval) or a1<SOCsc<a (critical discharge interval).

[0103] The control method for the critical charge and discharge interval is as follows: Figure 5 , 8 -10. Figure 5 , 8 -10, I b_ref ,I sc_ref The current of the battery and supercapacitor for the initial power distribution, I b_ref_1 ,I sc_ref_1 Represents the current of the secondary power distribution hybrid energy storage; I sc_refn It indicates that in the critical charge and discharge interval, the current of the supercapacitor is increased after the virtual correction current is secondary distributed; I vir is the virtual correction current, I sc_refn =I sc_ref +I vir , thereby changing the power exchange amount of the supercapacitor, achieving the purpose of power redistribution and optimizing the supercapacitor charge state. The specific contents compared with the traditional ones are:

[0104] For the existing hybrid energy storage charging and discharging pulse signal generation method, such as Figure 5-7 As shown. First, the remaining power P hess After low-pass filtering (LPF), the remaining power includes P LD (DC load power), P LS (AC load power), P dc (maintaining DC bus voltage stable power), P pv (photovoltaic power), P sys (large grid power)), and obtain the battery reference power P b_ref With supercapacitor reference power P sc_ref . Then P b_ref With battery voltage U bat Calculate and find the quotient to get the battery reference current I b_ref , and the battery current I bat Then the difference is processed through PI control, amplitude limiting, PWM and judgment comparison (switch) to generate battery charge and discharge trigger pulse control signals G1 and G2. sc_ref and supercapacitor voltage U sc Calculate and find the quotient to get the supercapacitor reference current I sc_ref and the current I flowing through the supercapacitor sc Then the difference is controlled by PI, limited, PWM and judgment comparison (switch) to generate supercapacitor charge and discharge trigger pulse control signals G3 and G4.

[0105] The present invention improves the above-mentioned traditional contents, and the same parameters are not repeated here. Figure 5 , 8 As shown in Figure 10, a virtual current is formed based on the supercapacitor SOC, and the limit management control is used to perform secondary distribution of the hybrid energy storage power. Figure 8 In the supercapacitor SOC control module part, the left dashed box is the main input parameter, which is passed through the supercapacitor SOC control module and then outputs the corresponding control parameters. The main functions of this part are: generating a virtual current (I vir ), slowing down the SOC variation trend of supercapacitor, I vir Acts on I sc_ref , and then control the supercapacitor charge and discharge trigger pulse signals G3 and G4 to achieve the purpose of power redistribution. Considering the closed-loop control of the entire system, the power of the supercapacitor and the battery will no longer be P sc_ref , P b_ref and becomes P sc_ref_1 , P b_ref_1 , and then quotient them with their respective voltages to obtain their respective reference currents Isc_ref_1 , I b_ref_1 Take control.

[0106] In the third case, when 0<SOCsc<=a1, and in the continuous discharge state, that is, P sc_ref >=0, P sc_ref_1 =0,P b_ref_1 =P b_ref +P sc_ref ; or when b1<=SOCsc<100%, and in the state of continuing charging, that is, P sc_ref <0, P sc_ref_1 =0,P b_ref_1 =P b_ref +P sc_ref (That is, the supercapacitor bears all the remaining power, which still belongs to the secondary power distribution, and the indicator is still P sc_ref_1 , P b_ref_1 , I sc_ref_1 , I b_ref_1 It means that during this period I vir No effect occurs).

[0107] Where: Virtual correction current I vir The calculation formula is as follows:

[0108]

[0109] Where: K is the interaction rate factor, K>0; SOC ref SOC is the reference value of the supercapacitor state of charge; (t) Indicates the real-time state of charge value of the supercapacitor; the virtual current correction value depends on the supercapacitor state of charge offset (SOC (t) -SOC ref ) and the interaction rate factor K. From the above formula, we can see that when the supercapacitor charge state is within the critical discharge range and still needs to be discharged, I vir Taking a negative value reduces the supercapacitor discharge current (discharge current is positive), and the battery current changes accordingly, and the discharge current increases; within this range, P sc_ref <0, it indicates that charging is about to begin, the state of charge increases, and the discharge critical region is left, and the virtual current is 0. When the supercapacitor state of charge is within the critical charging range and still needs to be charged, I vir Take a positive value to reduce the supercapacitor charging current (charging current is negative), I vir The size (positive or negative) determines the change amplitude (trend) of SOC under the control method proposed in the present invention. At this time, the battery current changes accordingly and the charging current increases. In this range, P sc_ref When >=0, it indicates that discharge is about to occur, the state of charge decreases, and the critical charging area is left, and the virtual current is 0.

[0110] In the hybrid energy storage control unit, the interaction rate factor K has an influence on the interaction correction current I vir The influence of K is also crucial. The larger the K is, the greater the interaction current and power are, and the faster the interaction speed is. A smaller K will result in a smaller virtual correction current and a longer conversion time. The K value is limited by the current of the supercapacitor. Selecting a suitable K value makes I vir Maintain at about 0.3-0.6 times the supercapacitor current amplitude.

[0111] (3) Limit management range: 0<SOCsc<=a1 or b1<=SOCsc<100%

[0112] When the supercapacitor needs to be discharged after being discharged to the limit or needs to be charged after being charged to the limit, in order to avoid overcharging or over-discharging of the supercapacitor, a limit management control strategy is adopted for the supercapacitor charge state in this situation, so that the battery bears the residual power change in this situation. When a charging or discharging situation opposite to the limit situation occurs, the SOCsc returns to mode (2) to continue operation.

[0113] Secondary power distribution and interactive control process of hybrid energy storage system Fig.11 As shown. Fig.11 It can be seen that the required operating index parameters of the microgrid system are first collected to determine the mode of the system at this time, and then the power is redistributed according to different control methods to obtain the control current of the energy storage unit to generate a PWM signal to control the charging and discharging of the energy storage element. At the same time, it can also be combined with charts to more intuitively see the results of power distribution in different intervals and states, as shown in Table 1:

[0114] Table 1 Secondary power distribution of interactive control and limit management hybrid energy storage system

[0115]

[0116] 6: In step 5, the design is run and debugged in the photovoltaic grid-connected model according to the invention requirements, and simulation verification and analysis are performed;

[0117] In order to verify the effectiveness of the improved PI control and the secondary power distribution control strategy of the hybrid energy storage system based on interactive control and limit management proposed in this paper, a simulation platform is built on the Matlab / Simulink platform as follows: Figure 1The photovoltaic grid-connected model is shown. At an ambient temperature of 25°C, the light intensity is 1000W / m2, and the DC load changes in 0.8 seconds, 1.5 seconds, and the AC load changes in 1.4 seconds. The rated voltage of the battery is 120V and the rated capacity is 50A·h. In order to accelerate the change of the supercapacitor SOC, the supercapacitor capacity is set to a smaller value during the simulation verification, assuming that the battery is in a reasonable operating state during the simulation process. Set the SOC ref =0.5, a1=0.25, a=0.3, b=0.7, b1=0.8. That is, the supercapacitor SOC range in normal operation is: [0.3, 0.7]; the critical discharge and charge interval range is: [0.25, 0.3] and [0.7, 0.8]; the limit discharge and charge interval range is: [0, 0.25] and [0.8, 1]; the K value range is [800, 1100].

[0118] The innovation of the present invention is that, in step 2, for the grid-connected voltage converter (VSC) in the photovoltaic grid-connected hybrid energy storage system, an improved PI control is proposed to optimize the common DC bus voltage zero-static error control. Compared with the traditional PI control, the common DC bus voltage can be better maintained near the reference voltage.

[0119] The innovation of the present invention is that in step 4, the concept of virtual correction current is introduced for the critical charge and discharge interval of the supercapacitor, and the magnitude of the virtual correction current is determined according to the positive and negative power distribution of the supercapacitor and the interaction rate factor, so that the charge state of the supercapacitor changes in a stable direction, optimizes the working state of the supercapacitor, and prolongs its service life.

[0120] Second: Next, we will analyze and explain the experimental simulation results. According to the content of the present invention, we use matlab / simulink to perform modeling analysis. The details are as follows.

[0121] 1. Traditional PI control and improved PI control Common DC bus voltage control

[0122] Under the same simulation model and conditions, the corresponding control parameters are shown in Table 2. A comparative simulation is performed on the common DC bus voltage zero-static error control in VSC control. The voltage results are compared. Fig.12 As shown in the figure, it can be seen that the system voltage reference value is 700V (U dcref ), the system voltage under traditional PI control (U dc ) is basically maintained at around 680V, ​​and the common DC bus voltage stability effect is poor; improving PI control makes the voltage (improving U dc ) is well maintained near the reference voltage value, indicating the effectiveness of the improved method.

[0123] Table 2 Control parameters

[0124]

[0125] 2. Control of supercapacitor operation in normal operating range and critical charging range

[0126] When the supercapacitor operates within the normal operating range, the remaining power is low-pass filtered for power distribution. Fig.13 , 14 As shown, before region a (region 1) is the normal operation period, the supercapacitor SOC curve and battery current curve of the traditional low-pass filtering initial power control method (without considering the SOCsc control case) and the method proposed in the present invention are consistent; in region a, when the supercapacitor is about to charge to the critical interval, I vir The action starts, reducing the supercapacitor charging current, making the battery charging current larger (area 1), increasing the battery charging capacity, and relieving the supercapacitor charging state; at 0.8 seconds, the supercapacitor turns to the discharge state, and the two methods of charging state and battery current curves begin to change in the same trend. In area b (area 2), when the supercapacitor continues to charge and the remaining power is still maintained so that the supercapacitor will be charged for a long time, the SOCsc of the traditional method continues to rise and approaches the limit charging state, while the SOC controlled by the method of the present invention is affected by I after reaching the critical charging interval. vir The effect begins to decrease (I vir The larger the value, the stronger the effect trend), the supercapacitor charging capacity decreases, the battery charging current increases, and the supercapacitor charging state is relieved so that SOCsc moves to the normal operating area. bat It indicates the simulation curve without other control conditions, new control SOC, new control I bat It represents the curve under the control method of the present invention. Figure 18-19 The power variation curve of super capacitor is given. Figure 18-19 It can be seen that when the supercapacitor SOC is in the critical charging state, the charging power component borne by the supercapacitor is reduced, reducing the supercapacitor's continued charging energy to meet the control requirements.

[0127] 3. Supercapacitors work in critical discharge and limit discharge range control

[0128] from Figure 15-16 It can be seen that without other control methods, SOCsc is lower than the critical discharge lower limit, that is, the supercapacitor continues to discharge even when it is discharged to the limit value management area, and the supercapacitor is over-discharged; when the method described in the present invention is adopted, it can be seen from area c that when it is close to the critical discharge area, I virThe action starts, reducing the supercapacitor discharge current, making SOCsc change to the normal range, so that the battery discharge current becomes larger (as shown in area 3), increasing the battery discharge capacity, and relieving the supercapacitor discharge state; when SOCsc reaches the limit management warning value, it remains unchanged (25%) through the limit management curve. bat It indicates the simulation curve without other control conditions, new control SOC, new control I bat It represents the curve under the control method of the present invention. Figure 20-21 The power variation curve of super capacitor is given. Figure 20-21 It can be seen that between 0.1-0.2s, the discharge power component borne by the supercapacitor is reduced, reducing the supercapacitor's continued discharge energy to meet the control requirements.

[0129] 4. Supercapacitors work within the limit management range control

[0130] When the critical charge and discharge control method cannot control SOCsc well, the limit charge and discharge state will be reached. In this state, the supercapacitor SOC is constrained by limiting management, limiting the supercapacitor charge and discharge, and the battery bears all the remaining power. In order to verify the feasibility of the method, the present invention conducts limit management analysis on the limit charge state, such as Fig.17 As shown in area 4, a schematic diagram of the extreme charging limit management is given. It can be seen that after the limit management, the supercapacitor SOC remains unchanged at 90% during the continued charging state, avoiding overcharging that damages the supercapacitor's service life; at the same time, Fig.15 Region c shows the effect of limit management in the extreme discharge state. The limit management curve remains unchanged (25%) to avoid over-discharge. The original SOC represents the state of charge curve without other control, and the limit SOC represents the state of charge curve after the limit management in the present invention.

[0131] After simulation verification, the following conclusions can be drawn:

[0132] 1. The proposed improved PI control optimizes the common DC bus voltage zero-error control under the photovoltaic grid-connected model to maintain the DC bus voltage stable.

[0133] 2. Considering the fast charging and discharging speed of supercapacitors, a control method based on interactive control and limit management is proposed to correct the charge state of supercapacitors to keep them in a good working range. Under the critical charging and discharging state of the hybrid energy storage system, the concept of virtual correction current is introduced to control the power redistribution between energy storage elements and optimize the working state of supercapacitors. Under the extreme charging and discharging state of the hybrid energy storage system, limit management is used to limit the charging and discharging of supercapacitors to avoid overcharging and over-discharging.

[0134] It should be noted that the terms such as "upper", "lower", "left", "right", "front", "back", etc. cited in the invention are only for the convenience of description and are not used to limit the scope of implementation of the present invention. Changes or adjustments in their relative relationships should be regarded as the scope of implementation of the present invention without substantially changing the technical content.

[0135] The above are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should be regarded as the protection scope of the present invention.

Claims

1. A method for managing and controlling the DC bus voltage and supercapacitor charge of a photovoltaic storage system, characterized in that: include: Photovoltaic grid-connected hybrid energy storage system; the photovoltaic grid-connected hybrid energy storage system includes a VSC unit, a hybrid energy storage charge and discharge pulse trigger control unit, a hybrid energy storage system, a common DC bus voltage power balancing unit, a power distribution unit, and a hybrid energy storage power secondary distribution control unit; In the PI control of the VSC unit, multiple control coefficients are added to enable the VSC unit to optimize the common DC bus voltage. The power balancing unit controls the common DC bus voltage without static error. The multiple control coefficients include: control coefficient c1, control coefficient c2, and control coefficient p3. After the PI control is optimized by multiple control coefficients, the VSC unit inner loop control input reference current I is output. d_ref , and after being processed inside the VSC unit, it is transmitted to the common DC bus voltage power balance unit, thereby optimizing the common DC bus voltage zero-static error control; The control coefficient c1 is: In the formula, maxU represents U dc_ref -U dc The maximum difference between dc_ref -U dc The minimum difference between dc_ref Indicates the common DC bus voltage reference value, U dc Indicates the actual measured value of the common DC bus voltage; The control coefficient c2 is: In the formula, |maxU'| represents U dc_ref -U dc The maximum value of the first-order derivative of the difference and the amplitude result are taken. |minU'| represents U dc_ref -U dc The minimum value of the first-order derivative of the difference and the amplitude result; The control coefficient p3 is: Where U dcmax Indicates the maximum value of the common DC bus voltage; I d_ref The current is: In the formula, K p0 , K i0 represents the initial parameter value of the PI controller, U e Indicates U dc_ref -U dc The difference, Indicates U dc_ref -U dc The first derivative of the difference; The hybrid energy storage system includes a supercapacitor and a battery, and the working modes of the supercapacitor are divided; the specific contents of the division of the working modes of the supercapacitor are: The state of charge SOCsc of the supercapacitor sets a limit management warning value a1 and a critical discharge warning value a during the 0-50% state, and a1 < a; the state of charge SOCsc of the supercapacitor sets a limit management warning value b1 and a critical charge warning value b during the 50%-100% state, and b < b1; Normal operating state range: a<=SOCsc<=b; Critical charge and discharge state intervals, including a critical charge interval: b<SOCsc<b1, and a critical discharge interval: a1<SOCsc<a; A limit value management limit charge and discharge state interval, including a limit value management limit discharge interval: 0<SOCsc<=a1, a limit value management limit charge interval: b1<=SOCsc<100%; According to the different working modes of the supercapacitor, the power distribution unit performs the initial power distribution to the battery and the supercapacitor, or the hybrid energy storage power secondary distribution control unit optimizes the control of the hybrid energy storage charge and discharge pulse trigger control unit, so that the hybrid energy storage charge and discharge pulse trigger control unit controls the charging or discharging of the supercapacitor and the battery, thereby performing secondary distribution of the supercapacitor power and the battery power; When the supercapacitor state of charge SOCsc is in the critical charging interval: b<SOCsc<b1, the critical discharging interval: a1<SOCsc<a, the limit management limit discharging interval: 0<SOCsc<=a1, the limit management limit charging interval: b1<=SOCsc<100%; According to different intervals, the supercapacitor SOC control module inside the hybrid energy storage power secondary distribution control unit processes and calculates some parameters in the photovoltaic grid-connected hybrid energy storage system to obtain the virtual correction current I in the corresponding interval. vir ; The hybrid energy storage power secondary distribution control unit is based on the virtual correction current I in the corresponding interval vir The hybrid energy storage charging and discharging pulse trigger control unit is optimized to obtain the virtual correction current I in the corresponding interval. vir The power P of the supercapacitor after control sc_ref_1 , and then get the battery power P in the corresponding interval b_ref_1 , P b_ref_1 and P sc_ref_1 The closed-loop feedback is transmitted to the supercapacitor SOC control module, and the supercapacitor SOC control module combines with P b_ref_1 , P sc_ref_1 And some parameters are processed and calculated to obtain the supercapacitor reference current I in the corresponding range sc_ref_1 And the battery reference current I in the corresponding range b_ref_1 ; The hybrid energy storage power secondary distribution control unit converts the supercapacitor reference current I in the corresponding interval sc_ref_1 and battery reference current I b_ref_1 The input is sent to the hybrid energy storage charge and discharge pulse trigger control unit, which controls the battery and the supercapacitor to adaptively charge or discharge, thereby realizing power distribution between the battery and the supercapacitor, and making the charge state of the supercapacitor change in a stable direction; The parameters include the supercapacitor state of charge reference value SOC ref , Supercapacitor real-time state of charge value SOC (t) , Battery reference power P b_ref , supercapacitor reference power P sc_ref , one or more of a limit management warning value a1, a critical discharge warning value a, a limit management warning value b1, a critical charge warning value b, and an interaction rate factor K; When the supercapacitor state of charge SOCsc is in the critical discharge interval, that is, a1<SOCsc<a, and is in the continuous discharge state, that is, P sc_ref >=0, I vir =-|K*(SOC (t) -SOC ref )|、P sc_ref_1 =P sc_ref , P b_ref_1 =P b_ref ; When the supercapacitor state of charge SOCsc is in the critical discharge interval, that is, a1<SOCsc<a, and is in the continuous charging state, that is, P sc_ref <0,I vir =0, P sc_ref_1 =P sc_ref , P b_ref_1 =P b_ref ; When the supercapacitor state of charge SOCsc is in the critical charging range, that is, b<SOCsc<b1, and is in the continuous charging state, that is, P sc_ref <0,I vir =|K*(SOC (t) -SOC ref )|、P sc_ref_1 =P sc_ref , P b_ref_1 =P b_ref ; When the supercapacitor state of charge SOCsc is in the critical charging range, that is, b<SOCsc<b1, and is in the continuous discharge state, that is, P sc_ref >=0,I vir =0, P sc_ref_1 =P sc_ref , P b_ref_1 =P b_ref ; When the supercapacitor state of charge SOCsc is in the limit management limit discharge interval, that is, 0<SOCsc<=a1, and is in the continuous discharge state, that is, P sc_ref >=0; I vir =0, P sc_ref_1 =0, P b_ref_1 =P b_ref +P sc_ref ; When the supercapacitor state of charge SOCsc is in the limit management limit discharge interval, that is, 0<SOCsc<=a1, and is in the continuous charging state, that is, P sc_ref <0 hours; I vir =0, P sc_ref_1 =P sc_ref , P b_ref_1 =P b_ref ; When the supercapacitor state of charge SOCsc is in the limit management limit charging range, that is, b1<=SOCsc<100%, and is in the continuous discharge state, that is, P sc_ref >=0; I vir =0, P sc_ref_1 =P sc_ref , P b_ref_1 =P b_ref ; When the supercapacitor state of charge SOCsc is in the limit management limit charging range, that is, b1<=SOCsc<100%, and is in the continuous charging state, that is, P sc_ref <0 hours; I vir =0, P sc_ref_1 =0, P b_ref_1 =P b_ref +P sc_ref ; AND b_ref_1 =P b_ref_1 / IN bat ; AND sc_ref_1 =P sc_ref_1 / IN sc ; Where U bat Indicates the battery voltage, U sc Indicates the supercapacitor voltage.

2. The method for managing and controlling the DC bus voltage and supercapacitor charge of a photovoltaic storage system according to claim 1, characterized in that: When the supercapacitor charge state SOCsc is in normal operation, that is, a<=SOCsc<=b; The low-pass filter LPF in the power distribution unit performs initial power distribution to the battery and supercapacitor to maintain the stability of the photovoltaic grid-connected hybrid energy storage system.