An operation optimization method for virtual power plants to participate in the construction of rural energy Internet

By constructing a virtual power plant operation optimization method, utilizing cost-benefit and operation evaluation models, and conducting sensitivity analysis, the problems of resource depletion and environmental pollution in the rural energy internet were solved, thereby improving economic efficiency and energy utilization.

CN113837448BActive Publication Date: 2024-11-05ECONOMIC TECH RES INST OF STATE GRID HENAN ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111006653.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-30
Publication Date
2024-11-05
Estimated Expiration
2041-08-30

AI Technical Summary

Technical Problem

How can we optimize the operation of the rural energy internet through virtual power plants, reduce resource consumption and environmental pollution, and improve economic efficiency?

Method used

This study constructs an operation optimization method for virtual power plants participating in the rural energy internet, including a cost-benefit model and an operation evaluation model. Sensitivity analysis is conducted to determine key indicators such as net present value, internal rate of return, and dynamic payback period, and the impact of uncertain factors is analyzed.

Benefits of technology

It improved the system's economic efficiency, increased energy utilization, reduced environmental pollution, and optimized resource allocation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113837448B_ABST
    Figure CN113837448B_ABST
Patent Text Reader

Abstract

The present invention relates to an operation optimization method for a virtual power plant to participate in the construction of a rural energy internet, comprising the following steps: analyzing typical application scenarios of a virtual power plant participating in the construction of a rural energy internet; based on typical application scenarios, from the perspective of the full life cycle cost of a virtual power plant participating in a project, constructing an operation model for a virtual power plant to participate in a rural energy internet, including a cost-benefit model and an operation evaluation model; and constructing a sensitivity analysis model for a virtual power plant to participate in the operation of a rural energy internet. The present invention can improve the economy of the system, while improving the utilization rate of energy, reducing resource loss, and reducing environmental pollution.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of virtual power plants, and specifically relates to an operation optimization method for a virtual power plant participating in the construction of a rural energy Internet. Background Art

[0002] As my country's resource and environmental constraints continue to strengthen, the traditional centralized energy development model is unsustainable. Rural areas, relying on their renewable energy development potential and spatial resource advantages, have become new entities for developing energy Internet and promoting energy structure transformation. How to accelerate the energyization of rural resources through new technology application innovation has become an urgent problem to be solved in the current construction of rural energy Internet. Virtual power plants provide forward-looking technical solutions for optimizing the operation of rural energy Internet by aggregating distributed energy. However, based on the application scenarios of rural energy Internet construction and operation of virtual power plants, how to reduce resource loss and environmental pollution, and at the same time improve the economic efficiency of virtual power plants participating in the construction of rural energy Internet are problems that need to be solved at present. Summary of the invention

[0003] The purpose of the present invention is to overcome the shortcomings of the prior art and to provide an operation optimization method for a virtual power plant to participate in the construction of a rural energy Internet, which can improve the economy of the system while improving energy utilization, reducing resource loss and reducing environmental pollution.

[0004] The technical solution adopted by the present invention is: an operation optimization method for a virtual power plant to participate in the construction of a rural energy Internet, comprising the following steps:

[0005] A: Analyze the typical application scenarios of virtual power plants participating in the construction of rural energy internet;

[0006] B: Based on typical application scenarios, from the perspective of the full life cycle cost of virtual power plant participation projects, a model for the operation of virtual power plants participating in rural energy Internet is constructed, including a cost-benefit model and an operation evaluation model.

[0007] The cost-benefit model includes the initial investment, annual operation and maintenance costs and annual revenue of the project.

[0008] The operation evaluation model includes economic performance, environmental protection and energy. The indicators used in the economic performance include net present value (NPV), internal rate of return (IPR) and dynamic investment payback period (T). The indicators used in the environmental protection and energy performance include energy utilization rate and pollutant emissions.

[0009] C: Construct a sensitivity analysis model for the operation of virtual power plants in rural energy internet. The steps of the sensitivity analysis are as follows:

[0010] a: Determine the indicators for sensitivity analysis, including the net present value NPV, internal rate of return IPR and dynamic investment payback period T.

[0011] b: Select uncertain factors and calculate the values ​​of sensitivity analysis indicators before and after the uncertain factors change.

[0012] c: Calculate the influence of changes in uncertain factors on sensitivity analysis indicators. The calculation formula is:

[0013]

[0014] In the formula, F is the uncertainty factor, ΔF is the rate of change of the uncertainty factor, and E NPV 、E IRR and E T They are the sensitivity coefficients of net present value NPV, internal rate of return IPR and dynamic investment payback period T to uncertain factors, NPV before and NPV after They are the values ​​of the net present value NPV and IRR before and after the uncertain factors change. before and IRR after are the values ​​of the internal rate of return IPR before and after the changes in uncertain factors, and are the values ​​of the dynamic investment payback period T before and after the changes in uncertain factors.

[0015] Specifically, the initial investment of the project is the total investment cost of each equipment, specifically:

[0016]

[0017] In the formula, C0 is the initial investment of the project, I i is the unit investment of the ith equipment, V i is the equipment capacity of the i-th equipment, and m is the number of equipment types;

[0018] Discounting the initial investment of the project to each year, the annual investment cost is:

[0019]

[0020] In the formula, is the investment cost in the jth year, (A / P,r,n) is the capital investment coefficient, where r is the discount rate and n is the life of the project.

[0021] Specifically, the annual operation and maintenance cost is the total operation and maintenance cost of each device, specifically:

[0022]

[0023] In the formula, is the operation and maintenance cost in the jth year, is the unit maintenance cost of the i-th equipment at time t in the j-th year, is the equipment capacity of the ith equipment in the jth year, and 8760 is the total number of hours in the jth year.

[0024] Specifically, the annual income is:

[0025]

[0026] In the formula, is the energy supply income of the virtual power plant in the jth year, is the total energy supply in the jth year, is the unit price of energy supply in the jth year.

[0027] Specifically, the calculation formula of the net present value NPV is:

[0028]

[0029] The internal rate of return (IPR) refers to the discount rate when the total present value of capital inflows is equal to the total present value of capital outflows and the net present value is zero.

[0030]

[0031] The dynamic investment payback period T refers to the time required for the cumulative economic benefits to equal the initial investment cost, specifically:

[0032]

[0033] Specifically, the energy utilization rate refers to the ratio of energy output to input, specifically:

[0034]

[0035] Where η j is the system energy utilization rate in the jth year, is the energy output in the jth year, is the energy input in the jth year;

[0036] The pollutant emissions refer to the total amount of pollutants generated by the system, specifically:

[0037]

[0038] In the formula, is the total amount of pollutants produced in year j, They are CO2, SO2 and NO produced per unit of energy supply. x .

[0039] Specifically, the uncertain factors include the equipment unit investment and equipment capacity in the initial investment of the project.

[0040] Beneficial effects of the present invention: The present invention determines the typical application scenarios of virtual power plants participating in the construction of rural energy Internet, provides typical application scenarios, and uses algorithms to analyze the operation models of virtual power plants participating in rural energy Internet. It can derive operation plans that improve the economy of the system, improve energy utilization efficiency, and reduce environmental pollution. At the same time, it can construct a sensitivity analysis model to facilitate the analysis of the economy of the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION

[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention, and are specifically described in combination with the embodiments below.

[0043] like Figure 1 As shown, the present invention comprises the following steps:

[0044] A: Analyze the typical application scenarios of virtual power plants participating in the construction of rural energy internet;

[0045] B: Based on typical application scenarios, from the perspective of the full life cycle cost of virtual power plant participation projects, a model for the operation of virtual power plants participating in rural energy Internet is constructed, including a cost-benefit model and an operation evaluation model.

[0046] The cost-benefit model includes the initial investment, annual operation and maintenance costs and annual revenue of the project.

[0047] The initial investment of the project is the total investment cost of each equipment, specifically:

[0048]

[0049] In the formula, C0 is the initial investment of the project, I i is the unit investment of the ith equipment, V i is the equipment capacity of the i-th equipment, and m is the number of equipment types;

[0050] Discounting the initial investment of the project to each year, the annual investment cost is:

[0051]

[0052] In the formula, is the investment cost in the jth year, (A / P,r,n) is the capital investment coefficient, where r is the discount rate and n is the life of the project.

[0053] The annual operation and maintenance cost is the total operation and maintenance cost of each device, specifically:

[0054]

[0055] In the formula, is the operation and maintenance cost in the jth year, is the unit maintenance cost of the i-th equipment at time t in the j-th year, is the equipment capacity of the ith equipment in the jth year, and 8760 is the total number of hours in the jth year (365 days).

[0056] The annual income is specifically:

[0057]

[0058] In the formula, is the energy supply income of the virtual power plant in the jth year, is the total energy supply in the jth year, is the unit price of energy supply in the jth year.

[0059] The operation evaluation model includes economic performance, environmental protection and energy. The indicators used in the economic performance include net present value (NPV), internal rate of return (IPR) and dynamic investment payback period (T). The indicators used in the environmental protection and energy performance include energy utilization rate and pollutant emissions.

[0060] The calculation formula of the net present value NPV is:

[0061]

[0062] The internal rate of return (IPR) refers to the discount rate when the total present value of capital inflows is equal to the total present value of capital outflows and the net present value is zero.

[0063]

[0064] The dynamic investment payback period T refers to the time required for the cumulative economic benefits to equal the initial investment cost, specifically:

[0065]

[0066] The energy utilization rate refers to the ratio of energy output to input, specifically:

[0067]

[0068] Where η j is the system energy utilization rate in the jth year, is the energy output in the jth year, is the energy input in the jth year;

[0069] The pollutant emissions refer to the total amount of pollutants generated by the system, specifically:

[0070]

[0071] In the formula, is the total amount of pollutants produced in year j, They are CO2, SO2 and NO produced per unit of energy supply. x .

[0072] C: Construct a sensitivity analysis model for the operation of virtual power plants in rural energy internet. The steps of the sensitivity analysis are as follows:

[0073] a: Determine the indicators for sensitivity analysis, including the net present value NPV, internal rate of return IPR and dynamic investment payback period T.

[0074] b: Select uncertain factors, including the equipment unit investment and equipment capacity in the initial investment of the project, and calculate the values ​​of sensitivity analysis indicators before and after the changes in uncertain factors.

[0075] c: Calculate the influence of changes in uncertain factors on sensitivity analysis indicators. The calculation formula is:

[0076]

[0077] In the formula, F is the uncertainty factor, ΔF is the rate of change of the uncertainty factor, and E NPV 、E IRR and E T They are the sensitivity coefficients of net present value NPV, internal rate of return IPR and dynamic investment payback period T to uncertain factors, NPV before and NPV after They are the values ​​of the net present value NPV and IRR before and after the uncertain factors change. before and IRR after are the values ​​of the internal rate of return IPR before and after the changes in uncertain factors, and are the values ​​of the dynamic investment payback period T before and after the changes in uncertain factors.

[0078] An empirical analysis is conducted on the participation of Henan virtual power plant in the construction of rural energy internet. The four typical application scenarios are rural centralized energy consumption, rural family life, rural agricultural breeding and rural industrial industry. "Rural centralized energy consumption" is mainly reflected in new rural centralized communities, where villagers live in centralized areas and use energy in centralized areas. The load types usually include: electricity, heat and cold loads, and the total load is large. The energy demand is uniformly dispatched by multi-energy complementary operators or power grids, which is suitable for large distributed units to supply load demand. "Rural family life" is mainly reflected in the existing decentralized individual households in rural areas, where energy consumption is decentralized. The load types usually include: electricity, heat and cold loads, but the total load is small, mostly self-sufficient, and can be designed by family users themselves, which is suitable for small distributed units to supply load demand. "Rural agricultural breeding" is mainly reflected in rural (centralized or individual) agricultural production, such as the use of clean energy for irrigation, light greenhouses, and recycling of biogas sludge. The main load types usually include: electricity load and heat load, and the size of the distributed unit is determined by the scale of production. "Rural industrial industries" are mainly reflected in new rural industrial parks, which are similar to urban industrial parks, with concentrated energy consumption and obvious peak and valley periods. The main load types usually include electricity, heat, cold, gas and other loads, and the energy consumption is generally large, which is suitable for large-scale distributed units to supply load demand and suitable for unified dispatching and supply of energy demand by multi-energy complementary operators or power grids.

[0079] The parameter settings of various devices are shown in Table 1:

[0080] Table 1 Equipment parameters and cost settings

[0081]

[0082] Based on the equipment parameters in Table 1 and the calculation formulas for net present value, internal rate of return, payback period, energy utilization rate, and pollutant emissions, the operation evaluation index values ​​under four scenarios are obtained as shown in Table 2:

[0083] Table 2 Operation evaluation index values ​​under four typical scenarios

[0084]

[0085] In order to verify the effect of the rural energy Internet operation optimization method proposed in this paper, the traditional rural energy supply method is evaluated using net present value, internal rate of return, investment payback period, energy utilization rate, and pollutant emissions indicators. The evaluation results are shown in Table 3:

[0086] Table 3 Operation evaluation index values ​​in traditional mode for four typical scenarios

[0087]

[0088] By comparing Table 3 with Table 2, it can be seen that the traditional energy supply scheme has a slow investment recovery period, a small net present value, low energy utilization efficiency, and a large amount of pollutant emissions. This shows that the operation optimization method proposed in the present invention can improve the economy of the system, while improving energy utilization efficiency, reducing resource loss, and reducing environmental pollution.

[0089] Finally, the virtual power plant + rural industrial energy consumption model with relatively low investment return rate is selected for sensitivity analysis. The project net present value, internal rate of return and investment payback period are selected as sensitivity analysis indicators. The construction scale is selected as the uncertainty factor, including equipment unit investment and equipment capacity. According to the sensitivity analysis formula, the sensitivity analysis results are shown in Table 4:

[0090] Table 4 Sensitivity analysis results

[0091]

[0092] It can be seen from Table 4 that with the expansion of construction scale (increase in load), the economy of the system shows a gradually improving trend. Therefore, in the process of constructing a multi-energy complementary system, it is necessary to pay attention to the load that the system can meet, and build a multi-energy complementary system based on the load to achieve better economic benefits.

[0093] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered in all respects as exemplary and non-limiting, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations within the meaning and scope of the elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

Claims

1. An operation optimization method for virtual power plants to participate in the construction of rural energy Internet, It is characterized in that The steps include: A: Analyze the typical application scenarios of virtual power plants participating in the construction of rural energy internet; B: Based on typical application scenarios, from the perspective of the full life cycle cost of virtual power plant participation projects, a model for the operation of virtual power plants participating in rural energy Internet is constructed, including a cost-benefit model and an operation evaluation model. The cost-benefit model includes the initial investment, annual operation and maintenance costs and annual revenue of the project. The operation evaluation model includes economic performance, environmental protection and energy. The indicators used in the economic performance include net present value (NPV), internal rate of return (IPR) and dynamic investment payback period (T). The indicators used in the environmental protection and energy performance include energy utilization rate and pollutant emissions. C: Construct a sensitivity analysis model for the operation of virtual power plants in rural energy internet. The steps of the sensitivity analysis are as follows: a: Determine the indicators for sensitivity analysis, including the net present value NPV, internal rate of return IPR and dynamic investment payback period T. b: Select uncertain factors and calculate the values ​​of sensitivity analysis indicators before and after the uncertain factors change. c: Calculate the influence of changes in uncertain factors on sensitivity analysis indicators. The calculation formula is: In the formula, F is the uncertainty factor, ΔF is the rate of change of the uncertainty factor, and E NPV 、E IRR and E T They are the sensitivity coefficients of net present value NPV, internal rate of return IPR and dynamic investment payback period T to uncertain factors, NPV before and NPV after They are the values ​​of the net present value NPV and IRR before and after the uncertain factors change. before and IRR after are the values ​​of the internal rate of return IPR before and after the uncertain factors change, T before and T after They are the values ​​of the dynamic investment payback period T before and after the uncertain factors change; The initial investment of the project is the total investment cost of each equipment, specifically: In the formula, C 0 is the initial investment of the project, I i is the unit investment of the ith equipment, V i is the equipment capacity of the i-th equipment, and m is the number of equipment types; Discounting the initial investment of the project to each year, the annual investment cost is: In the formula, is the investment cost in the jth year, (A / P,r,n) is the capital investment coefficient, where r is the discount rate and n is the life of the project; The annual operation and maintenance cost is the total operation and maintenance cost of each device, specifically: In the formula, is the operation and maintenance cost in the jth year, is the unit maintenance cost of the i-th equipment at time t in the j-th year, is the equipment capacity of the i-th equipment in the j-th year, and 8760 is the total hours in the j-th year; The annual income is specifically: In the formula, is the energy supply income of the virtual power plant in the jth year, is the total energy supply in the jth year, is the unit price of energy supply in the jth year; The calculation formula of the net present value NPV is: The internal rate of return (IPR) refers to the discount rate when the total present value of capital inflows is equal to the total present value of capital outflows and the net present value is zero. The dynamic investment payback period T refers to the time required for the cumulative economic benefits to equal the initial investment cost, specifically: The energy utilization rate refers to the ratio of energy output to input, specifically: Where η j is the system energy utilization rate in the jth year, is the energy output in year j, is the energy input in the jth year; The pollutant emissions refer to the total amount of pollutants generated by the system, specifically: In the formula, is the total amount of pollutants produced in year j, The CO generated per unit of energy supply is 2 、SO 2 、NO x ; The uncertain factors include the equipment unit investment and equipment capacity in the initial investment of the project.