A coal quantity compensation control method based on the start and stop of direct-blowing pulverizing system

By setting the appropriate delay time and feedback loop in the thermal power set, calculating and compensating the fuel volume during start and stop of the powder making system, the main steam pressure and temperature fluctuations are solved, the stability and safety of AGC are improved, and the More stable generator set operation.

CN113864811BActive Publication Date: 2024-11-05HUANENG SHANTOU HAIMEN POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111094215.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-17
Publication Date
2024-11-05
Estimated Expiration
2041-09-17

AI Technical Summary

Technical Problem

During the long-term continuous and stable operation of AGC, the thermal power unit has caused frequent start and stop of the direct blowing powder making system, which has caused fluctuations in the main steam pressure and temperature, which has damaged the coordinated control conditions. The existing coal volume control system cannot effectively reduce disturbances, affecting the AGC assessment.

Method used

By obtaining the operating signals of the coal feeder and coal mill of the generator set, setting the appropriate delay time, analyzing historical data to calculate the amount of fuel required for the start and stop of the powdering system, and setting a feedforward loop in the boiler main control logic to compensate The coal quantity is superimposed to determine the appropriate compensation data and coal addition rate to ensure the stability of the main steam pressure and temperature.

Benefits of technology

It effectively reduces the disturbances of the start and stop of the powdering system to the unit, improves the stability and safety of AGC operation, reduces the risk of malfunction, and enhances the stability and reliability of the control system of the generator set.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113864811B_ABST
    Figure CN113864811B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of coordinated control of thermal power units, and in particular to a method for controlling the amount of coal compensation based on the start and stop of a direct-blowing pulverizing system, comprising the following steps: S1: obtaining operation signals of a coal feeder and a coal mill of a generator set; S2: obtaining shutdown signals of a coal feeder and a coal mill of a generator set; S3: calculating the amount of fuel required to be compensated for the start and stop of each pulverizing system by analyzing the historical operation data of the generator set; S4: setting a feedforward loop in the main control logic of the boiler of the unit, and superimposing the amount of fuel required to be compensated for the start and stop of each pulverizing system on the boiler main control through the feedforward loop of the boiler main control; S5: determining appropriate compensation data through a method for online start and stop pulverizing system test during the normal operation of the unit. The present invention provides a method for controlling the logic of coal compensation for the start and stop of a pulverizing system, which solves the problem of fluctuations in the main steam pressure and the main steam temperature of the current generator set when the pulverizing system is started and stopped, and effectively improves the main operating parameters of the generator set and the safe and stable operation capability of the AGC system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of coordinated control of thermal power units, and more specifically, to a coal quantity compensation control method based on start-stop of a direct-blowing pulverizing system. Background Art

[0002] In order to give full play to the advantages of power grid operation and meet the requirements of bidding for access to the grid, achieving and ensuring the long-term continuous and stable operation of AGC has become an important indicator in the control and assessment of large thermal power units on the power generation side. However, due to the constraints of the operation mode of the pulverizing system, even if the unit is in normal operation, the pulverizing system needs to be rotated for maintenance, especially when the AGC command is frequently activated, the start and stop operation of the pulverizing system will also become frequent. At present, the most commonly used pulverizing system in thermal power units is the direct-blowing coal mill. During the start and stop process of the coal mill, due to the certain amount of coal stored in the coal mill, a part of the coal will enter the boiler for combustion, so the start and stop of the coal mill will cause a large disturbance to the main steam pressure and main steam temperature of the unit. When the main steam pressure and main steam temperature fluctuate too much, it is even necessary to exit the coordinated operation mode of the unit and switch to manual control, which destroys the input conditions of AGC and makes it impossible for the unit AGC to achieve long-term continuous and stable operation. Therefore, how to ensure the stability of the main steam pressure and main steam temperature of the pulverizing system during the start and stop process is a problem that needs to be solved in production practice.

[0003] The coal quantity control system in the existing unit coordinated control system does not measure the amount of coal stored in the coal mill entering the boiler for combustion during the start and stop of the pulverizing system. It can only adjust the coal quantity through closed-loop control through the change of the main steam pressure. There is a large hysteresis, which cannot effectively reduce the disturbance of the start and stop of the pulverizing system to the boiler combustion, and reduce the fluctuations in the steam temperature, steam pressure and power of the unit. The present invention can solve such problems well, so that the generator set can have a more stable and safer AGC operation effect, and reduce the AGC assessment caused by unstable coordinated control of power generation enterprises.

[0004] The invention patent with application number 201510855202.9 and titled "A method for starting and stopping a medium-speed coal mill based on online compensation of coal quantity" discloses a method of using coal mill start-stop test, and uses Matlab curve fitting toolbox CFtool to fit the calculation formula of coal quantity in the coal mill: M = f (I, ΔP, Gf). The coal quantity compensation method for the start-stop of the pulverizing system in this patent is to obtain the coal quantity function of the coal mill through the test and calculation fitting method, so as to make accurate compensation on the total coal quantity. However, this method is not very practical for the production practice of power generation enterprises, because the boiler combustion efficiency of the generator set is different under different powers, and the layout of the powder pipe for compensating the coal quantity entering the boiler will also have a great influence on the main steam pressure and main steam temperature. These two problems have not yet been solved in the existing method for compensating the start-stop coal quantity of the pulverizing system. Summary of the invention

[0005] The present invention provides a coal quantity compensation control method based on the start and stop of a direct-blowing pulverizing system. The method is easy to implement in the coordinated control logic of a generator set, and the design idea is simple and clear, which is easy for production personnel of power generation enterprises to master. The present invention is simple and easy to implement, and can be implemented in any control system. The control principle of the present invention is easy to understand, and parameter correction is relatively convenient, which is easy for personnel of power generation enterprises to master. The present invention sets a reasonable logic condition trigger loop, so it will not affect the normal coordinated control system of the generator set.

[0006] In order to achieve the above technical purpose, the technical solution of the present invention is:

[0007] A coal quantity compensation control method based on the start and stop of a direct-blowing pulverizing system, characterized in that it comprises the following steps:

[0008] S1: Obtain the operation signals of the coal feeder and coal mill of the generator set;

[0009] S2: Obtain shutdown signals of coal feeder and coal mill of the generator set;

[0010] S3: By analyzing the historical operation data of the generator set, the amount of fuel required to compensate for the start and stop of each pulverizing system is calculated;

[0011] S4: A feedforward loop is set in the unit boiler master control logic, and the amount of fuel required to compensate for the start and stop of each pulverizing system is superimposed on the boiler master control through the boiler master control feedforward loop;

[0012] S5: Determine the appropriate compensation data by conducting online start-stop test of the powder making system during normal operation of the unit.

[0013] Preferably, after S1 obtains the operating signals of the coal feeder and coal mill of the generator set, a suitable delay time is set to avoid malfunction of the logic caused by abnormal changes in the operating signals of the coal feeder and coal mill.

[0014] Preferably, the S2 sets a suitable delay time after acquiring the shutdown signal of the coal feeder and coal mill of the generator set, so as to avoid malfunction of the logic caused by abnormal changes in the operation signals of the coal feeder and coal mill.

[0015] Preferably, the appropriate delay time is 1-3 seconds, which is the accurate time to avoid malfunction of the logic due to abnormal changes in the operating signals of the coal feeder and the coal mill.

[0016] Preferably, the method for calculating the amount of fuel that needs to be compensated for the start and stop of each pulverizing system in S3 is: by analyzing the historical operation data of the generator set, the disturbance amount of the start and stop of each pulverizing system on the main steam pressure and main steam temperature of the generator set is calculated, thereby calculating the amount of fuel that needs to be compensated for the start and stop of each pulverizing system.

[0017] Preferably, the appropriate compensation data in S5 are the amount of coal to be compensated for starting and stopping each pulverizing system, the duration of the compensation coal, and the rate at which the coal enters the furnace.

[0018] Preferably, a coal quantity compensation control method based on the start and stop of a direct-blowing pulverizing system is characterized by comprising the following steps:

[0019] S1: Obtain the operation signals of the coal feeder and coal mill of the generator set and set the appropriate delay time;

[0020] S2: Obtain the shutdown signal of the coal feeder and coal mill of the generator set and set a suitable delay time;

[0021] S3: By analyzing the historical operation data of the generator set, the disturbance amount of the start and stop of each pulverizing system on the main steam pressure and main steam temperature of the generator set is calculated, so as to calculate the amount of fuel that needs to be compensated for the start and stop of each pulverizing system;

[0022] S4: A feedforward loop is set in the unit boiler master control logic, and the amount of fuel required to compensate for the start and stop of each pulverizing system is superimposed on the boiler master control through the boiler master control feedforward loop;

[0023] S5: Obtain the unit power signal, perform coefficient correction on the start-stop compensation coal quantity of the pulverizing system, and set the rate at which the compensation coal quantity enters the furnace according to the layout of the pulverized coal inlet pipe of each pulverizing system in the boiler;

[0024] S6: Through the online test method during the normal operation of the unit, determine the amount of compensation coal for each pulverizing system to be started and stopped, the time for compensation coal, and the rate at which the compensation coal enters the furnace.

[0025] Preferably, a coal quantity compensation control method based on the start and stop of a direct-blowing pulverizing system is characterized by comprising the following steps:

[0026] S1: Obtain the operation signals of the coal feeder and coal mill of the generator set and set the appropriate delay time;

[0027] S2: Obtain the shutdown signal of the coal feeder and coal mill of the generator set and set a suitable delay time;

[0028] S3: Obtain the set value and measured value of the main steam pressure of the generator set, and set reasonable upper and lower limits for the deviation between the set value and the measured value to lock the action of the logic loop;

[0029] S4: By analyzing the historical operation data of the generator set, the disturbance amount of the start and stop of each pulverizing system on the main steam pressure and main steam temperature of the generator set is calculated, so as to calculate the amount of fuel that needs to be compensated for the start and stop of each pulverizing system;

[0030] S5: A feedforward loop is set in the unit boiler master control logic, and the amount of fuel required to compensate for the start and stop of each pulverizing system is superimposed on the boiler master control through the boiler master control feedforward loop;

[0031] S6: Obtain the unit power signal, perform coefficient correction on the start-stop compensation coal quantity of the pulverizing system, and set the rate at which the compensation coal quantity enters the furnace according to the layout of the pulverized coal inlet pipe of each pulverizing system in the boiler;

[0032] S7: Through the online test method during the normal operation of the unit, determine the amount of compensation coal for each pulverizing system to be started and stopped, the time for compensation coal, and the rate at which the compensation coal enters the furnace.

[0033] Compared with the prior art, the gain effect of the present invention is:

[0034] The method of the present invention is used to compensate the amount of coal for starting and stopping the pulverizing system of the generator set, which has the following advantages:

[0035] 1) Set a suitable (1-3 seconds) delay time for the start and stop signals of the coal feeder and coal mill to prevent the logic from malfunctioning;

[0036] 2) Analyze the historical operation data of the unit to determine the amount of compensation coal required for the start-up and shutdown process of each pulverizing system (because the pulverized coal inlet pipe of each pulverizing system is arranged at a different height in the boiler, the impact of its start-up and shutdown process on boiler combustion is also different), and obtain relatively accurate compensation coal amount data, which is highly consistent with the boiler combustion characteristics of the generator set;

[0037] 3) The coal quantity compensation logic control method acts on the feedforward loop of the boiler main control, so that the compensation coal quantity can be sent to the furnace for combustion in time, and will not be affected by the main steam pressure closed-loop regulation of the boiler main control part, thereby improving the stability of the control system;

[0038] 4) The coal quantity compensation logic control method is set with appropriate action time and appropriate coal adding rate, which will not cause disturbance to boiler combustion and improve the safety and reliability of the unit. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] In order to more clearly illustrate the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0040] Figure 1 It is a schematic diagram of the principle of the present invention;

[0041] Figure 2 A first control principle diagram of an embodiment provided for an embodiment of the present invention;

[0042] Figure 3 A control principle diagram of a second embodiment provided for an embodiment of the present invention. DETAILED DESCRIPTION

[0043] The present invention provides a coal quantity compensation logic control method based on the start and stop of a direct-blowing pulverizing system, which keeps the main steam pressure and main steam temperature of the unit stable during the start and stop process of the pulverizing system of a generator set.

[0044] See also Figure 1 A coal quantity compensation control method based on the start and stop of a direct-blowing pulverizing system is characterized by comprising the following steps:

[0045] S1: Obtain the operation signals of the coal feeder and coal mill of the generator set;

[0046] S2: Obtain shutdown signals of coal feeder and coal mill of the generator set;

[0047] S3: By analyzing the historical operation data of the generator set, the amount of fuel required to compensate for the start and stop of each pulverizing system is calculated;

[0048] S4: A feedforward loop is set in the unit boiler master control logic, and the amount of fuel required to compensate for the start and stop of each pulverizing system is superimposed on the boiler master control through the boiler master control feedforward loop;

[0049] S5: Determine the appropriate compensation data by conducting online start-stop test of the powder making system during normal operation of the unit.

[0050] Preferably, after S1 obtains the operating signals of the coal feeder and coal mill of the generator set, a suitable delay time is set to avoid malfunction of the logic caused by abnormal changes in the operating signals of the coal feeder and coal mill.

[0051] Preferably, the S2 sets a suitable delay time after acquiring the shutdown signal of the coal feeder and coal mill of the generator set, so as to avoid malfunction of the logic caused by abnormal changes in the operation signals of the coal feeder and coal mill.

[0052] Preferably, the appropriate delay time is 1-3 seconds, which is the accurate time to avoid malfunction of the logic due to abnormal changes in the operating signals of the coal feeder and the coal mill.

[0053] Preferably, the method for calculating the amount of fuel that needs to be compensated for the start and stop of each pulverizing system in S3 is: by analyzing the historical operation data of the generator set, the disturbance amount of the start and stop of each pulverizing system on the main steam pressure and main steam temperature of the generator set is calculated, thereby calculating the amount of fuel that needs to be compensated for the start and stop of each pulverizing system.

[0054] Preferably, the appropriate compensation data in S5 are the amount of coal to be compensated for starting and stopping each pulverizing system, the duration of the compensation coal, and the rate at which the coal enters the furnace.

[0055] Preferably, a coal quantity compensation control method based on the start and stop of a direct-blowing pulverizing system is characterized by comprising the following steps:

[0056] S1: Obtain the operation signals of the coal feeder and coal mill of the generator set and set the appropriate delay time;

[0057] S2: Obtain the shutdown signal of the coal feeder and coal mill of the generator set and set a suitable delay time;

[0058] S3: By analyzing the historical operation data of the generator set, the disturbance amount of the start and stop of each pulverizing system on the main steam pressure and main steam temperature of the generator set is calculated, so as to calculate the amount of fuel that needs to be compensated for the start and stop of each pulverizing system;

[0059] S4: A feedforward loop is set in the unit boiler master control logic, and the amount of fuel required to compensate for the start and stop of each pulverizing system is superimposed on the boiler master control through the boiler master control feedforward loop;

[0060] S5: Obtain the unit power signal, perform coefficient correction on the start-stop compensation coal quantity of the pulverizing system, and set the rate at which the compensation coal quantity enters the furnace according to the layout of the pulverized coal inlet pipe of each pulverizing system in the boiler;

[0061] S6: Through the online test method during the normal operation of the unit, determine the amount of compensation coal for each pulverizing system to be started and stopped, the time for compensation coal, and the rate at which the compensation coal enters the furnace.

[0062] Preferably, a coal quantity compensation control method based on the start and stop of a direct-blowing pulverizing system is characterized by comprising the following steps:

[0063] S1: Obtain the operation signals of the coal feeder and coal mill of the generator set and set the appropriate delay time;

[0064] S2: Obtain the shutdown signal of the coal feeder and coal mill of the generator set and set a suitable delay time;

[0065] S3: Obtain the set value and measured value of the main steam pressure of the generator set, and set reasonable upper and lower limits for the deviation between the set value and the measured value to lock the action of the logic loop;

[0066] S4: By analyzing the historical operation data of the generator set, the disturbance amount of the start and stop of each pulverizing system on the main steam pressure and main steam temperature of the generator set is calculated, so as to calculate the amount of fuel that needs to be compensated for the start and stop of each pulverizing system;

[0067] S5: A feedforward loop is set in the unit boiler master control logic, and the amount of fuel required to compensate for the start and stop of each pulverizing system is superimposed on the boiler master control through the boiler master control feedforward loop;

[0068] S6: Obtain the unit power signal, perform coefficient correction on the start-stop compensation coal quantity of the pulverizing system, and set the rate at which the compensation coal quantity enters the furnace according to the layout of the pulverized coal inlet pipe of each pulverizing system in the boiler;

[0069] S7: Through the online test method during the normal operation of the unit, determine the amount of compensation coal for each pulverizing system to be started and stopped, the time for compensation coal, and the rate at which the compensation coal enters the furnace.

[0070] It can be seen from the above technical solutions that the present invention has the following advantages:

[0071] 1) Set a suitable (1-3 seconds) delay time for the start and stop signals of the coal feeder and coal mill to prevent the logic from malfunctioning;

[0072] 2) Analyze the historical operation data of the unit to determine the amount of compensation coal required for the start-up and shutdown process of each pulverizing system (because the pulverized coal inlet pipe of each pulverizing system is arranged at a different height in the boiler, the impact of its start-up and shutdown process on boiler combustion is also different), and obtain relatively accurate compensation coal amount data, which is highly consistent with the boiler combustion characteristics of the generator set;

[0073] 3) The coal quantity compensation logic control method acts on the feedforward loop of the boiler main control, so that the compensation coal quantity can be sent to the furnace for combustion in time, and will not be affected by the main steam pressure closed-loop regulation of the boiler main control part, thereby improving the stability of the control system;

[0074] 4) The coal quantity compensation logic control method is set with appropriate action time and appropriate coal adding rate, which will not cause disturbance to boiler combustion and improve the safety and reliability of the unit.

[0075] The embodiment of the present invention provides a method for logical control of coal quantity compensation for starting and stopping a pulverizing system, which solves the problem of fluctuations in main steam pressure and main steam temperature of the current generator set when the pulverizing system is started and stopped, and effectively improves the main operating parameters of the generator set and the safe and stable operation capability of the AGC system.

[0076] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0077] Example 1

[0078] See also Figure 2 The present invention provides a method for controlling the start and stop coal quantity compensation logic of a pulverizing system. The first embodiment is applicable to supercritical and ultra-supercritical 1000MW units. The control function of the main steam pressure of the unit is a full-load section sliding pressure curve. Taking the start and stop compensation coal quantity control logic of the Nth set of pulverizing system of the unit as an example, it includes:

[0079] Step S1: Obtain the operating signals of the coal feeder and coal mill of the generator set (generally, the generator set will be equipped with six pulverizing systems, each of which includes a coal feeder and a coal mill), set an appropriate delay time (1-3 seconds) to avoid malfunction of the logic due to abnormal changes in the operating signals of the coal feeder and coal mill.

[0080] Step S2: Obtain the shutdown signal of the coal feeder and coal mill of the generator set (generally, the generator set will be equipped with six pulverizing systems, each of which includes a coal feeder and a coal mill), set an appropriate delay time (1-3 seconds) to avoid malfunction of the logic due to abnormal changes in the operating signals of the coal feeder and coal mill.

[0081] Step S3: By analyzing the historical operation data of the generator set, the disturbance amount of each pulverizing system start-up and stop on the main steam pressure and main steam temperature of the generator set is calculated, thereby calculating the amount of fuel required to compensate for the start-up and stop of each pulverizing system.

[0082] Step S4: a feedforward loop is set in the unit boiler master control logic, and the amount of fuel required to compensate for the start and stop of each pulverizing system is superimposed on the boiler master control through the boiler master control feedforward loop.

[0083] Step S5: Obtain the unit power signal, and perform coefficient correction on the start-stop compensation coal quantity of the pulverizing system (the boiler combustion efficiency of the generator set is different under different power conditions). At the same time, according to the layout position of the pulverized coal inlet pipe of each pulverizing system in the boiler, set the rate at which the compensation coal quantity enters the furnace.

[0084] Step S6: Determine the amount of compensation coal for each pulverizing system start and stop, the time for compensation coal, and the rate at which the compensation coal enters the furnace through an online test method during the normal operation of the unit.

[0085] The above is an embodiment of a method for starting and stopping coal quantity compensation logic control in a pulverizing system provided by an embodiment of the present invention.

[0086] Example 2

[0087] See also Figure 3 , which is a second embodiment of a coal quantity compensation logic control method for starting and stopping a pulverizing system provided by an embodiment of the present invention, and is applicable to a 600MW unit with a main steam pressure function having a constant pressure curve setting. It includes:

[0088] Step S1: Obtain the operating signals of the coal feeder and coal mill of the generator set (generally, the generator set will be equipped with six pulverizing systems, each of which includes a coal feeder and a coal mill), set an appropriate delay time (1-3 seconds) to avoid malfunction of the logic due to abnormal changes in the operating signals of the coal feeder and coal mill.

[0089] Step S2: Obtain the shutdown signal of the coal feeder and coal mill of the generator set (generally, the generator set will be equipped with six pulverizing systems, each of which includes a coal feeder and a coal mill), set an appropriate delay time (1-3 seconds) to avoid malfunction of the logic due to abnormal changes in the operating signals of the coal feeder and coal mill.

[0090] Step S3: Obtain the set value and measured value of the main steam pressure of the generator set, and set reasonable upper and lower limits for the deviation between the set value and the measured value (reasonable upper and lower limits are determined according to the actual operating conditions of the unit, mainly considering the impact of the main steam pressure deviation on the safety and power of the unit) to lock the action of the logic loop.

[0091] Step S4: By analyzing the historical operation data of the generator set, the disturbance amount of each pulverizing system start-up and stop on the main steam pressure and main steam temperature of the generator set is calculated, thereby calculating the amount of fuel required to compensate for the start-up and stop of each pulverizing system.

[0092] Step S5: a feedforward loop is set in the unit boiler master control logic, and the amount of fuel required to compensate for the start and stop of each pulverizing system is superimposed on the boiler master control through the boiler master control feedforward loop.

[0093] Step S6: Obtain the unit power signal, and perform coefficient correction on the start-stop compensation coal quantity of the pulverizing system (the boiler combustion efficiency of the generator set is different under different power conditions). At the same time, according to the layout position of the pulverized coal inlet pipe of each pulverizing system in the boiler, set the rate at which the compensation coal enters the furnace.

[0094] Step S7: Determine the amount of compensation coal for each pulverizing system start and stop, the time for compensation coal, and the rate at which the compensation coal enters the furnace through an online test method during the normal operation of the unit.

[0095] In the several embodiments provided in this application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the control logic embodiments described above are only illustrative and can be locally optimized and modified according to the actual operation of the unit. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interface, device or unit, which can be electrical, mechanical or other forms.

[0096] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0097] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0098] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0099] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A coal quantity compensation control method based on the start and stop of a direct-blowing pulverizing system, characterized in that: The steps include: S1: Obtain the operation signals of the coal feeder and coal mill of the generator set and set the appropriate delay time; S2: Obtain the shutdown signal of the coal feeder and coal mill of the generator set and set a suitable delay time; S3: Obtain the set value and measured value of the main steam pressure of the generator set, and set reasonable upper and lower limits for the deviation between the set value and the measured value to lock the action of the logic loop; S4: By analyzing the historical operation data of the generator set, the disturbance amount of the start and stop of each pulverizing system on the main steam pressure and main steam temperature of the generator set is calculated, so as to calculate the amount of fuel that needs to be compensated for the start and stop of each pulverizing system; S5: A feedforward loop is set in the unit boiler master control logic, and the amount of fuel required to compensate for the start and stop of each pulverizing system is superimposed on the boiler master control through the boiler master control feedforward loop; S6: Obtain the unit power signal, perform coefficient correction on the start-stop compensation coal quantity of the pulverizing system, and set the rate at which the compensation coal quantity enters the furnace according to the layout of the pulverized coal inlet pipe of each pulverizing system in the boiler; S7: Through the online test method during the normal operation of the unit, determine the amount of compensation coal for each pulverizing system to be started and stopped, the time for compensation coal, and the rate at which the compensation coal enters the furnace.

2. A coal quantity compensation control method based on the start and stop of a direct-blowing pulverizing system according to claim 1, characterized in that: After obtaining the operating signals of the coal feeder and coal mill of the generator set, S1 sets a suitable delay time.

3. A coal quantity compensation control method based on the start and stop of a direct-blowing pulverizing system according to claim 1, characterized in that: The S2 sets a suitable delay time after obtaining the shutdown signal of the coal feeder and coal mill of the generator set.

4. A coal quantity compensation control method based on start and stop of a direct-blowing pulverizing system according to claim 2 or 3, characterized in that: The appropriate delay time is 1-3 seconds.

5. The method for controlling the amount of coal compensation based on the start and stop of a direct-blowing pulverizing system according to claim 1 is characterized in that: The method for calculating the amount of fuel that needs to be compensated for the start and stop of each pulverizing system in S3 is: by analyzing the historical operation data of the generator set, the disturbance amount of the start and stop of each pulverizing system on the main steam pressure and main steam temperature of the generator set is calculated, thereby calculating the amount of fuel that needs to be compensated for the start and stop of each pulverizing system.

6. A coal quantity compensation control method based on start and stop of a direct-blowing pulverizing system according to claim 1, characterized in that: The appropriate compensation data in S5 are the amount of coal to be compensated for starting and stopping each pulverizing system, the duration of the compensation coal, and the rate at which the coal enters the furnace.