A method for estimating the peak value of maximum water inflow during rainstorm period in a tunnel under a karst tiankeng

By combining actual measurement and statistical data, the calculation steps include micro-terrain mapping and multiple parameters calculation, the problem of low accuracy and error in the calculation of water inflow in traditional tunnels under the karst sinkhole is solved, and the karst sinkhole tunnel is realized Accurate prediction of maximum water influx ensures safety of tunnel construction and operation.

CN113962475BActive Publication Date: 2024-11-22CCCC FIRST HIGHWAY XIAMEN ENGINEERING CO LTD +2
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202111319014.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-09
Publication Date
2024-11-22
Estimated Expiration
2041-11-09

AI Technical Summary

Technical Problem

The traditional tunnel water inrush calculation method is too conceptual when passing through the karst sinkhole, with few factors to consider, the calculation results have low accuracy and large errors, and it is impossible to accurately predict the maximum tunnel water inrush caused by runoff replenishment of karst sinkholes during heavy rainstorm periods.

Method used

Using a method combining actual measured data and statistical data, through micro-terrain surveying, basin characteristic parameters determination, rainfall statistical parameters acquisition, rain force calculation, loss parameters and flow time calculation, convergence parameter calculation, groundwater convergence parameter solution, and actual measured inrush flow Analysis and deduce the calculation steps for the maximum water inflow in the tunnel.

Benefits of technology

Accurate prediction of the maximum water influx of karst sinkhole runoff supply tunnel during heavy rainstorm periods, reasonably design the drainage capacity and water pressure load of the lining structure to ensure the safety of tunnel construction and operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure BDA0003344805040000011
    Figure BDA0003344805040000011
  • Figure BDA0003344805040000021
    Figure BDA0003344805040000021
  • Figure BDA0003344805040000046
    Figure BDA0003344805040000046
Patent Text Reader

Abstract

The present invention is a method for estimating the peak value of the maximum water inflow during a rainstorm period for a tunnel under a karst tiankeng. The specific steps include: (1) mapping the micro-topography of the karst tiankeng; (2) determining the characteristic parameters of the watershed; (3) obtaining rainfall statistical parameters; (4) calculating the design rainfall; (5) calculating the rain force; (6) calculating the loss parameters and the duration of runoff generation; (7) calculating the confluence parameters; (8) calculating the duration of watershed confluence and the design peak flow; (9) calculating the groundwater confluence parameters; (10) calculating the maximum water inflow of the tunnel. The present invention can accurately predict the maximum water inflow of the karst tiankeng runoff to replenish the tunnel during the rainstorm period, thereby rationally designing the drainage capacity and the water pressure load of the lining structure during the tunnel construction and operation periods, and ensuring the safety of tunnel construction and operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a method for estimating the maximum water inflow of a tunnel under a karst tiankeng during a rainstorm period. The invention belongs to the field of design and construction of tunnels under a karst tiankeng, and in particular to a method for estimating the water inflow of a tunnel caused by tiankeng water collection under rainstorm conditions. The method is suitable for accurately predicting the maximum water inflow of a karst tiankeng runoff supply tunnel during a rainstorm period, so as to reasonably design the drainage capacity and water pressure load of the lining structure during the tunnel construction and operation periods. Background Art

[0002] In the design and construction of highway and railway tunnels in karst areas, karst underground river systems are often encountered. Karst underground river systems are usually dominated by various karst cavities such as karst caves. Their flow is not only affected by the recharge of their own groundwater system, but also has a close correlation with surface runoff. During heavy rains, their flow will increase rapidly, the flow rate will accelerate, and a flood peak will form in a short time.

[0003] Tunnel construction has seized the original flow path of the underground river. Whether in the tunnel construction period or the operation period, it is necessary to effectively deal with the impact of the karst underground river on the tunnel. During the tunnel construction, it is necessary to carry out flood forecasts for the underground river, set a reasonable embankment height to ensure flood prevention and disaster reduction, and in terms of tunnel operation safety, reasonably design the water flow capacity of the aqueduct and culvert that cross the underground river into the tunnel.

[0004] At present, the methods for predicting tunnel water inflow include atmospheric rainfall infiltration method, groundwater runoff modulus method, groundwater drainage static water volume method, spring flow summary method, groundwater dynamics method, numerical analysis method, data mining method, etc.

[0005] Subsurface runoff modulus method:

[0006] Q = 86.4M·A, where M is the runoff modulus; A is the catchment area;

[0007] Atmospheric rainfall infiltration method:

[0008] Calculate the rainfall infiltration coefficient η based on the water balance principle

[0009]

[0010] Where: ΔQ+Q out is the rainfall infiltration recharge; Q out is the average flow rate monitored at the discharge point of the groundwater system; ΔQ can be solved according to the spring flow attenuation equation; A is the catchment area; P is the rainfall;

[0011] Q i =2.74η i ·h·A i Q=∑Q i

[0012] Where: Q is the total water inflow of the tunnel; Q i is the water inflow of each geological section of the tunnel; i is the infiltration coefficient of each geological segment of the tunnel; h is the maximum annual rainfall in the region; A i is the catchment area of ​​each geological segment;

[0013] Groundwater dynamics method:

[0014] The principle formula is:

[0015]

[0016] Where: B is the length through the aquifer; K is the permeability coefficient; H is the thickness of the aquifer; R is the influence radius;

[0017] Many scholars have proposed hydrodynamic formulas under their own assumptions, as follows:

[0018] Qiu Buyi theory formula:

[0019] Kuniaki Sato formula: Q s =Q max -0.584ε·K·r

[0020] Ochiai Toshiro formula:

[0021] Kosyakov formula:

[0022] Goodman's empirical formula:

[0023] Oshima Hiroshi formula:

[0024] Gilinsky formula: y=26.89K0.5709

[0025] Railway survey specification empirical formula: Q max =(0.0255+1.9224KH)L;Q s =KLH(0.676-0.06K)

[0026] Where: Q max - Predict the maximum possible water inflow when the tunnel passes through the water-bearing body (m3 / d); Q s-Prediction of stable water inflow through the tunnel through the water-bearing body (m3 / d); K-permeability coefficient of the rock mass (m / d); H-vertical distance from the original static water level in the aquifer to the tunnel floor (m); H0-distance from the original static water level to the center of the equivalent circle of the tunnel cross section (m); S-groundwater level drop (m); h-assumed water depth of the drainage ditch in the tunnel, based on experience, 1m; h c -thickness of water body (m); h0-distance from tunnel bottom to underlying aquiclude (m); L-length of tunnel through aquifer (m); R-radius of water inrush in tunnel (m); r-radius of equivalent circle of tunnel cross section (m), (empirical value of single tunnel is 3.5m, empirical value of double tunnel is 7m); d-diameter of equivalent circle of tunnel cross section (m), d=2r; ε-test coefficient, generally 12.8; m-conversion coefficient, generally 0.86; i-empirical coefficient (d / m), 0.0105.

[0027] Numerical analysis method:

[0028] Mainly includes finite element method (FEFLOW, FEMWATER), finite difference method (MODFLOW, GMS), etc.;

[0029] Data Mining Method:

[0030] Mainly includes nonlinear theoretical methods (neural network, system identification method), random mathematical methods (fuzzy mathematical method, multivariate statistical method, time series analysis method);

[0031] Among them, although the atmospheric rainfall infiltration method takes into account the factor of rainfall recharge, it is only a rough estimate of the total amount of rainfall reduction, and cannot calculate the surface runoff caused by rainfall, which in turn recharges the underground river and forms a flood peak in the underground river. Other methods do not take into account the recharge effect of rainfall. At the same time, the above-mentioned methods are all based on the concepts of groundwater seepage or groundwater pumping and recharge, and do not involve the principle of flood peak formation caused by the time effect in runoff convergence.

[0032] Patent CN 107730151 B provides a method for calculating basin design flood based on a conceptual hydrological model. This method is mainly suitable for the formation of river flood peaks and does not involve the relationship between the formation of surface runoff flood peaks and tunnel water inrush.

[0033] Patent CN 102289570 B provides a flood forecasting method based on rainfall-runoff-flood evolution calculation. This method is mainly based on the deduction and regression of measured rainfall and water conditions data, and cannot be estimated based on historical data or actual terrain data, and does not involve the relationship between surface flood peaks and tunnel water inrush.

[0034] Patent CN 102930357 B provides a method for predicting the peak value and peak time of karst underground river flooding during rainstorms. This method is based on a conceptual formula and lacks corrections based on actual measurements and empirical data. The accuracy of the calculation results is questionable. At the same time, the flood peak calculation is simply the addition of surface runoff and underground runoff, without fully considering the relationship between surface runoff and underground river recharge, as well as the flood discharge capacity of underground rivers. At the same time, this patent itself only involves the estimation of tunnel water inflow, and there is no underground river problem.

[0035] Therefore, when using the traditional hydrogeological tunnel water inflow prediction method to realize the peak value and peak time of karst tunnel water inflow, there is still a problem that the calculation process is too rough and does not involve the special karst geological conditions such as passing under the karst tiankeng. The traditional tunnel water inflow prediction is either based on conventional groundwater conditions or, although it takes surface recharge into consideration, the calculation process is mainly based on conceptual calculation, with low accuracy and large errors. Summary of the invention

[0036] Technical problem: The purpose of the present invention is to provide a method for estimating the peak value of the maximum water inflow during heavy rain in a tunnel under a karst tiankeng. It is mainly aimed at the special karst geological conditions of underpasses such as karst tiankengs, and solves the problem that the traditional tunnel water inflow calculation method is too conceptual, takes fewer factors into consideration, and the calculation results are low in precision and have large errors. Based on the combination of measured data and statistical data, the present invention deduces the formation of karst tiankeng water peaks and the mechanism of tunnel water inflow and discharge based on the heavy rain data of small watersheds. The present invention can accurately predict the maximum water inflow of karst tiankeng runoff to replenish the tunnel during heavy rain, so as to reasonably design the tunnel construction and operation period waterproofing and drainage capacity and lining structure water pressure load, and ensure the safety of tunnel construction and operation.

[0037] Technical solution: The present invention is a method for estimating the peak value of the maximum water inflow during a rainstorm period when passing through a karst tiankeng tunnel. The method comprises the following steps:

[0038] Step 1: Karst tiankeng microtopography mapping:

[0039] Conduct micro-topographic UAV photogrammetry and topographic mapping of karst tiankengs to obtain high-precision digital elevation model (DEM) topographic data of tiankeng areas;

[0040] Step 2: Determine the watershed characteristic parameters:

[0041] Based on the high-precision digital elevation model terrain data of the karst tiankeng area, the digital terrain analysis method is used to calculate the karst tiankeng basin area F, the flow length L at the farthest point in the basin, and the average longitudinal gradient J of the farthest flow;

[0042] Step 3, obtain rainfall statistical parameters:

[0043] The annual maximum 24-hour rainfall can be obtained from the Hydrological Manual of the basin where the karst tiankeng is located. And the corresponding coefficient of variation C 24,v , skewness coefficient C 24,s ; The rainstorm reduction index n when the rainfall frequency is 0.2%;

[0044] Step 4, calculate the design rainfall;

[0045] According to the Pearson III frequency curve, the rainstorm frequency curve is determined by the mean value of rainfall, coefficient of variation, and coefficient of skewness. According to the rainstorm frequency P value, the deviation coefficient Φ is determined. 24 ; Modulus ratio coefficient K 24,P =Φ 24 ·C 24,v +1, so the design rainfall of the 24-hour design rainstorm frequency P

[0046] Step 5, calculate the rain force:

[0047] Rain Power A P The calculation formula is: P =H 24,P ·twenty four n-1 ,

[0048] Step 6: Calculate the loss parameter μ and the flow duration t c :

[0049] Determine H based on the regional rainstorm runoff correlation map 24,P The corresponding net rainfall And make a preliminary judgment on t c <24h, then Will Substitute μ into the calculation formula to obtain μ; replace μ and A P 、Substitute n into t c Calculate the formula to find t c , and judge t c <24h is true, if not, use the formula Recalculate μ and t c ,

[0050] When t c ≤24h,

[0051]

[0052]

[0053]

[0054] When t c >24h,

[0055]

[0056] α is the runoff coefficient when the rainfall duration is 24 h, which can be obtained by consulting the local hydrological manual;

[0057] Step 7, calculate the confluence parameters:

[0058] The basin characteristic factor θ is selected to establish an empirical relationship with the confluence parameter m to deduce the value of m. The calculation formula of the basin characteristic factor θ is: Then, according to the value of θ, consult the regional hydrological manual to obtain the value of the runoff parameter m;

[0059] Step 8: Calculate the duration of watershed confluence and the design peak flow:

[0060] The design peak flow Q is obtained by using the basin confluence duration τ and the inference formula m,P Calculate according to the following formula:

[0061] t c ≥τ

[0062] t c <τ Where m is the confluence parameter, J is the average longitudinal gradient of the farthest flow path, L is the flow length at the farthest point, and the flow generation duration t is c ;

[0063] Step 9, calculating groundwater confluence parameters;

[0064] Step 10: Calculate the maximum water inflow in the tunnel.

[0065] in,

[0066] The basin confluence duration τ is solved according to the trial algorithm:

[0067] Step a, calculate t according to step 6 c value;

[0068] Step b, assume a Q′ m,P Value, using the formula Calculate the corresponding T value, if t c ≥τ, then use R τ,P =n·A P ·τ 1-n Calculate R τ,P , τ and R τ,P Substitute into the formula Calculate the corresponding Q m,P Value, if t c <τ, then use Calculate R τ,P , τ and R τ,P Substitute into the formula Calculate the corresponding Q m,P value;

[0069] Step c, compare the assumed Q′ m,P and calculate Q m,P If the two are exactly the same, then assume that Q′ m,P and calculate Q m,P This is what we want, otherwise we assume a new Q′ m,P , repeat the above calculation until the difference between the two is very small.

[0070] The step 9 is specifically as follows:

[0071] Carry out actual measurement of tunnel water inflow during the rainy season and record the daily water inflow Q without rainfall. n,0 , peak water flow during rainfall period Q n,1 , stable water flow Q after the rain stops during the rainy period n,2 , and Q n,1 With Q n,2 The duration between n The groundwater flow parameter K is calculated using the following formula: n :

[0072]

[0073] The rainfall measured should be in the tunnel site area where the rainfall should exceed the average monthly rainfall in the region during the rainy season over the years.

[0074] The step 10 is specifically as follows:

[0075] According to the flood peak of the outlet section at the bottom of the karst tiankeng, Q m,P , the water inflow of the tiankeng runoff supply tunnel Q n,P Calculate according to the following formula:

[0076]

[0077] Peak water inflow Q of the tiankeng runoff recharge tunnel n,P The daily water flow Q n,0 The sum is the maximum water inflow of the tunnel Q n,P,Max , which is Q n,P,Max =Q n,P +Q n,0 .

[0078] Beneficial effects: Based on the combination of measured data and statistical data, the present invention deduces the formation of karst tiankeng water peaks and the mechanism of tunnel water inrush and discharge based on the rainstorm data of small watersheds, and proposes a method for estimating the maximum water inrush during the rainstorm period of the tunnel under the karst tiankeng that combines measured and statistical data. The present invention solves the problem that in the special karst geological conditions of underpasses such as karst tiankengs, the traditional tunnel water inrush calculation method is too conceptual, takes fewer factors into consideration, and the calculation results are low in precision and have large errors. The present invention can accurately predict the maximum water inrush of the karst tiankeng runoff to replenish the tunnel during the rainstorm period, thereby rationally designing the tunnel's drainage capacity and lining structure water pressure load during the construction and operation periods, and ensuring the safety of tunnel construction and operation. DETAILED DESCRIPTION

[0079] The technical solution of the present invention is described in detail with examples below:

[0080] The present invention is a method for estimating the peak value of the maximum water inflow during the rainstorm period of a tunnel under a karst tiankeng. The specific steps include: (1) mapping the micro-topography of the karst tiankeng; (2) determining the characteristic parameters of the watershed; (3) obtaining rainfall statistical parameters; (4) calculating the design rainfall; (5) calculating the rain force; (6) calculating the loss parameters and the duration of runoff generation; (7) calculating the confluence parameters; (8) calculating the duration of the confluence of the watershed and the design peak flow; (9) calculating the groundwater confluence parameters; and (10) calculating the maximum water inflow of the tunnel.

[0081] Step 1: Karst tiankeng microtopography mapping

[0082] Carry out micro-topography drone photogrammetry and topographic mapping of karst tiankengs to obtain high-precision DEM topographic data of tiankeng areas.

[0083] Step 2: Determine the watershed characteristic parameters

[0084] Based on the high-precision DEM terrain data of the karst tiankeng area, the DEM digital terrain analysis method was used to calculate the karst tiankeng basin area F = 0.3937 km 2 The flow length of the farthest point in the basin is L = 0.47 km, and the average longitudinal gradient of the farthest flow is J = 3.235‰.

[0085] Step 3: Obtain rainfall statistical parameters

[0086] The annual maximum 24-hour rainfall can be obtained from the Hydrological Manual of the basin where the karst tiankeng is located. And the corresponding coefficient of variation C 24,v =0.426, skewness coefficient C 24,s =1.491; rainstorm reduction index n(n1, n2) = (0.414, 0.533).

[0087] Step 4: Calculate the design rainfall H 24,P

[0088] According to the Pearson III frequency curve, the rainstorm frequency curve can be determined by the mean value of rainfall, coefficient of variation, and coefficient of skewness. According to the rainstorm frequency P = 0.2%, the deviation coefficient Φ is determined. 24 =2.375. Modulus ratio coefficient K 24,P =Φ 24 ·C 24,v +1=2.375×0.426+1=2.012, so the design rainfall of the 24-hour design rainstorm frequency P

[0089] Table 1: Deviation coefficients of Pearson III frequency curves

[0090]

[0091] Step 5: Calculate the rain force A P

[0092] Rain Power A P The calculation formula is: P =H 24,P ·twenty four n-1 =215.284×24 0.533-1 =48.804mm.

[0093] Step 6: Calculate the loss parameter μ and the flow duration t c

[0094] Determine H based on the regional rainstorm runoff correlation map 24,P The corresponding net rainfall And make a preliminary judgment on t c <24h, then Will Substitute μ into the calculation formula to get μ. P 、Substitute n into t c Calculate the formula to find t c , and judge t c <24h is true, if not, use the formula Recalculate μ and t c

[0095] When t c ≤24h,

[0096]

[0097]

[0098]

[0099] When t c>24h,

[0100]

[0101] α is the runoff coefficient when the rainfall lasts for 24 hours, which can be obtained by consulting the local hydrological manual.

[0102] Step 7: Calculate the confluence parameter m

[0103] Generally, the basin characteristic factor θ is used to establish an empirical relationship with the confluence parameter m to deduce the value of m. The calculation formula of the basin characteristic factor θ is: Then, based on the value of θ, the regional hydrological manual was consulted and the runoff parameter m = 0.62 was obtained.

[0104] Table 2: Small watershed m value calculation table

[0105]

[0106]

[0107] Step 8: Calculate the basin runoff duration τ and design peak flow Q m,P

[0108] The design peak flow Q is obtained by using the basin confluence duration τ and the inference formula m,P It can be calculated as follows:

[0109] t c ≥τ

[0110] t c <τ

[0111] Where m is the confluence parameter, J is the average longitudinal gradient of the farthest flow path, L is the flow length at the farthest point, and the flow generation duration t is c .

[0112] According to the trial algorithm, the basin confluence duration τ is solved:

[0113] (1) Calculate t according to step 6 c value;

[0114] (2) Assume a Q′ m,P Value, using the formula Calculate the corresponding τ value, if t c ≥τ, then use R τ,P =n·A P ·τ 1-n Calculate R τ,P , τ and R τ,P Substitute into the formula Calculate the corresponding Q m,P Value, if t c<τ, then use Calculate R τ,P , τ and R τ,P Substitute into the formula Calculate the corresponding Q m,P value;

[0115] (3) Compare the assumed Q′ m,P and calculate Q m,P If the two are exactly the same, then assume that Q′ m,P and calculate Q m,P This is what we want, otherwise we assume a new Q′ m,P , repeat the above calculation until the difference between the two is very small.

[0116] See Table 3 for specific results.

[0117] Table 3: Design peak flow calculation table

[0118] <![CDATA[Assume Q' m,P value]]> t <![CDATA[R τ,P ]]> <![CDATA[Q m,P ]]> 55611 9.195 56.893 67720 63180 8.906 56.893 69918 71456 8.636 56.893 72104 72330 8.610 56.893 72329 72360 8.609 56.893 72335

[0119] Step 9: Calculate the groundwater flow parameter K n

[0120] Carry out actual measurement of tunnel water inflow during the rainy season and record the daily water inflow Q without rainfall. n,0 =38915m 3 / d, peak water flow during rainfall period Q n,1 =155660m 3 / d, stable water flow after raining period Q n,2 =58373m 3 / d, and Q n,1 With Q n,2 The duration between n The groundwater confluence parameter K is calculated using the following formula: n :

[0121]

[0122]

[0123] K n =1.266

[0124] The rainfall measured should be in the tunnel site area where the rainfall should exceed the average monthly rainfall in the region during the rainy season over the years.

[0125] Step 10: Calculation of maximum water inflow in the tunnel

[0126] According to the flood peak of the outlet section at the bottom of the karst tiankeng, Q m,P , the water inflow from the tiankeng runoff to the tunnel is Q n,PIt can be calculated as follows:

[0127]

[0128]

[0129] Peak water inflow Q of the tiankeng runoff recharge tunnel n,P The daily water flow Q n,0 The sum is the maximum water inflow of the tunnel Q n,P,Max , which is Q n,P,Max =Q n,P +Q n,0 =25528+38915=64443m 3 / d.

Claims

1. A method for estimating the maximum water inflow peak value during rainstorm period in a karst tiankeng tunnel, characterized in that The method comprises the following steps: Step 1: Karst tiankeng microtopography mapping: Conduct micro-topographic UAV photogrammetry and topographic mapping of karst tiankengs to obtain high-precision digital elevation model (DEM) topographic data of tiankeng areas; Step 2: Determine the watershed characteristic parameters: Based on the high-precision digital elevation model terrain data of the karst tiankeng area, the digital terrain analysis method is used to calculate the karst tiankeng basin area F, the flow length L at the farthest point in the basin, and the average longitudinal gradient J of the farthest flow; Step 3, obtain rainfall statistical parameters: Get the annual maximum 24-hour rainfall And the corresponding coefficient of variation C 24,v , skewness coefficient C 24,s ; The rainstorm reduction index n for a rainfall frequency of 0.2%; Step 4, calculate the design rainfall; According to the Pearson III frequency curve, the rainstorm frequency curve is determined by the mean value of rainfall, coefficient of variation, and coefficient of skewness. According to the rainstorm frequency P value, the deviation coefficient Φ is determined. 24 ; Modulus ratio coefficient K 24,P =Φ 24 ·C 24,v +1, so the design rainfall of the 24-hour design rainstorm frequency P Step 5, calculate the rain force: Rain Power A P The calculation formula is: P =H 24, P.24 n-1 , Step 6: Calculate the loss parameter μ and the flow duration t c : Determine H based on the regional rainstorm runoff correlation map 24,P The corresponding net rainfall And make a preliminary judgment on t c <24h, then Will Substitute μ into the calculation formula to obtain μ; replace μ and A P 、Substitute n into t c Calculate the formula to find t c , and judge t c <24h is true, if not, use the formula Recalculate μ and t c , When t c ≤24h, When t c >24h α is the runoff coefficient when the rainfall duration is 24 hours, Step 7, calculate the confluence parameters: The basin characteristic factor θ is selected to establish an empirical relationship with the confluence parameter m to deduce the value of m. The calculation formula of the basin characteristic factor θ is: Then, according to the value of θ, consult the regional hydrological manual to obtain the value of the runoff parameter m; Step 8: Calculate the duration of watershed confluence and the design peak flow: The design peak flow Q is obtained by using the basin confluence duration τ and the inference formula m,P Calculate according to the following formula: t c ≥τ t c <at time τ Where m is the confluence parameter, J is the average longitudinal gradient of the farthest flow path, L is the flow length at the farthest point, and the flow generation duration t is c ; Step 9, calculating groundwater confluence parameters; Step 10: Calculate the maximum water inflow in the tunnel.

2. The method for estimating the maximum water inflow peak value during rainstorm period of a tunnel under a karst tiankeng as claimed in claim 1, characterized in that: The basin confluence duration τ is solved according to the trial algorithm: Step a, calculate t according to step 6 c value; Step b, assume a Q' m,P Value, using the formula Calculate the corresponding τ value, if t c ≥τ, then use R τ,P =n·A P ·τ 1-n Calculate R τ,P , τ and R τ,P Substitute into the formula Calculate the corresponding Q m,P Value, if t c <τ, then use Calculate R τ,P , τ and R τ,P Substitute into the formula Calculate the corresponding Q m,P value; Step c, compare the assumed Q' m,P and calculate Q m,P If the two are exactly the same, then assume that Q' m,P and calculate Q m,P This is what we want, otherwise we assume a new Q' m,P , repeat the above calculation until the difference between the two is minimized.

3. The method for estimating the maximum water inflow peak value during rainstorm period of a tunnel under a karst tiankeng as claimed in claim 1, characterized in that: The step 9 is specifically as follows: Carry out actual measurement of tunnel water inflow during the rainy season and record the daily water inflow Q without rainfall. n,0 , peak water flow during rainfall period Q n,1 , stable water flow Q after the rain stops during the rainy period n,2 , and Q n,1 With Q n,2 The duration between n The groundwater flow parameter K is calculated using the following formula: n : The rainfall measured in the corresponding tunnel site should exceed the average monthly rainfall in the rainy season over the years in the tunnel site.

4. The method for estimating the maximum water inflow peak value during rainstorm period of a tunnel under a karst tiankeng as claimed in claim 1, characterized in that: The step 10 is specifically as follows: According to the flood peak of the outlet section at the bottom of the karst tiankeng, Q m,P , the water inflow from the tiankeng runoff to the tunnel is Q n,P Calculate according to the following formula: Peak water inflow Q of the tiankeng runoff recharge tunnel n,P The daily water flow Q n,0 The sum is the maximum water inflow of the tunnel Q n,P,Max , which is Q n,P,Max =Q n,P +Q n,0 .

Citation Information

Patent Citations

  • Flood forecast method based on rainfall-runoff-flood routing calculation

    CN102289570B

  • Prediction method of flood peak value and peak time of storm water inrush from underground river in karst tunnel

    CN102930357B

  • A Method for Estimating Design Floods in Watersheds Based on a Conceptual Hydrological Model

    CN107730151B

  • Method for forecasting water burst flood peak and peak time for karst tunnel underground river