New energy station energy storage configuration method and device

By analyzing the historical output sequence data of new energy stations and optimizing the energy storage configuration, the problems of wind and light abandonment in new energy generation have been solved, and the utilization rate of transmission channels and the level of new energy consumption have been improved.

CN114048954BActive Publication Date: 2024-11-26ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111202321.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-15
Publication Date
2024-11-26
Estimated Expiration
2041-10-15

AI Technical Summary

Technical Problem

The intermittent, randomness and uncertainty of new energy power generation have led to the inability to absorb new energy power generation in some areas in time, resulting in the problems of wind and light abandonment, and traditional energy storage configuration methods cannot effectively improve the utilization efficiency of transmission channels.

Method used

By determining the optimal energy storage ratio of new energy stations, analyzing historical output sequence data, counting the charge and discharge time and electricity, calculating the energy storage configuration power, and optimizing the energy storage configuration to improve the new energy consumption rate and transmission channel utilization rate .

Benefits of technology

Effectively reduce power abandonment in new energy stations, improve the level of new energy consumption, improve the utilization efficiency of transmission channels, and promote the grid-connected consumption of new energy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114048954B_ABST
    Figure CN114048954B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and device for configuring energy storage at a new energy station. The method analyzes historical output sequence data of the new energy station, combines the utilization of the transmission channel of the new energy station, and determines the energy storage configuration of the new energy station from two dimensions: charging and discharging time and power, so as to achieve the goal of improving the consumption of new energy. The present invention reduces the abandoned power of new energy stations while improving the utilization rate of the transmission channel, which helps to promote the consumption of new energy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of new energy technologies, and in particular to a new energy station energy storage configuration method and device. Background Art

[0002] Renewable energy generation is characterized by intermittency, randomness, and uncertainty, which brings new challenges to the operation of the power grid. Restricted by the traditional grid structure and transmission channels, some areas cannot absorb renewable energy generation in a timely manner, resulting in wind and solar power abandonment.

[0003] Energy storage systems are flexible to install and have two-way interactive charging / discharging capabilities. Configuring energy storage at new energy stations can not only improve the utilization efficiency of transmission channels and increase the level of new energy consumption, but also smooth out new energy power fluctuations and promote new energy grid connection and consumption. At the same time, the energy storage ratio of new energy stations should follow scientific and reasonable basic principles, while maximizing the benefits of energy storage and reducing unnecessary redundancy. Therefore, it is necessary to propose a reasonable energy storage configuration calculation method based on the characteristics of new energy stations, maximize the role of energy storage, improve the utilization efficiency of the transmission channel of new energy stations, and reduce the system's abandoned wind and abandoned light. Summary of the invention

[0004] The embodiments of the present invention provide a method and device for configuring energy storage in a new energy station, which can determine the optimal energy storage ratio of the new energy station, thereby improving the utilization efficiency of the power transmission channel of the new energy station and reducing the system's wind and solar power abandonment.

[0005] The embodiment of the present invention provides a method for configuring energy storage in a new energy station, including:

[0006] Determine the initial power consumption rate of new energy, and determine the target power consumption rate of new energy based on the historical output sequence of the new energy station and the initial power consumption rate of new energy;

[0007] According to the initial power consumption rate of the new energy, the power transmission channel capacity of the new energy station is determined based on the historical output sequence;

[0008] The duration of the output that is greater than the capacity of the transmission channel in history is counted to obtain the charging and discharging time required for configuring the energy storage;

[0009] The continuous power output of the historical power output greater than the capacity of the power transmission channel is counted, and the charging and discharging energy required for configuring the energy storage is determined according to the statistical results of the initial power consumption rate of the new energy, the target power consumption rate of the new energy and the continuous power output;

[0010] The configuration power of the energy storage is determined according to the required charging and discharging time and the required charging and discharging energy, and the energy storage is configured for the new energy station according to the configuration power of the energy storage.

[0011] As an improvement of the above solution, the method of determining the transmission channel capacity of the new energy station based on the historical output sequence according to the new energy initial power consumption rate specifically includes:

[0012] The function of renewable energy power consumption under a given transmission channel capacity is established as follows:

[0013]

[0014] In the formula, F P (t) is the power that can be absorbed, P is the capacity of the given transmission channel, p is the output of new energy, and t is time; for the function of the power that can be absorbed by new energy, F P (t) is integrated to obtain the function of the amount of electricity that can be absorbed by new energy:

[0015]

[0016] In the formula, Q(P) is the amount of electricity that can be absorbed under a given transmission channel capacity;

[0017] The absorption rate of new energy is calculated based on the function of the amount of electricity that can be absorbed by new energy:

[0018] α(P)=Q(P) / Q(P max )

[0019] Where P max is the maximum transmission channel capacity, which is also the installed capacity of the new energy station, and α(P) is the new energy consumption rate under the transmission channel capacity;

[0020] According to the initial power consumption rate of new energy and the following formula, the transmission channel capacity of the new energy station is determined:

[0021] P 0 =α -1 (α 1 )

[0022] Where P 0 It is the transmission channel capacity of new energy stations.

[0023] As an improvement to the above solution, the duration of the output when the historical output is greater than the capacity of the transmission channel is counted to obtain the charging and discharging time required for configuring the energy storage, which specifically includes:

[0024] The duration of the output when the historical output is greater than the capacity of the transmission channel is counted to obtain a probability distribution function of the duration;

[0025] The cumulative distribution function of the probability distribution function of the duration is calculated to obtain the cumulative distribution function of the duration of the output when the historical output exceeds the capacity of the transmission channel:

[0026] k=G T (t≤T)

[0027] Where T is the duration of the historical output exceeding the transmission channel, k is the cumulative probability corresponding to the duration T, and G is the cumulative distribution function of the duration of the historical output exceeding the capacity of the transmission channel;

[0028] According to the actual situation of the new energy station, let K = k 0 , and determine the charging and discharging time required for energy storage configuration in new energy stations according to the following formula:

[0029]

[0030] Among them, T 0 Configure the charging and discharging time required for energy storage for new energy stations.

[0031] As an improvement to the above scheme, the continuous power output of the historical output greater than the capacity of the transmission channel is counted, and the charging and discharging energy required for configuring the energy storage is determined according to the statistical results of the initial power consumption rate of the new energy, the target power consumption rate of the new energy and the continuous power output, which specifically includes:

[0032] The continuous power output whose historical output is greater than the capacity of the transmission channel is counted to obtain a probability distribution function of the continuous power output;

[0033] The cumulative distribution function of the probability distribution function of the continuous power is calculated to obtain the cumulative distribution function of the continuous power output when the historical output exceeds the capacity of the transmission channel:

[0034] m=H q (x≤q)

[0035] Among them, q is the continuous power output of the new energy station exceeding the capacity of the transmission channel, m is the cumulative probability corresponding to the continuous power output q, and H is the cumulative distribution function of the continuous power output of the historical output exceeding the capacity of the transmission channel;

[0036] According to the target power consumption rate of new energy and the initial power consumption rate of new energy, the charging and discharging energy required for configuring energy storage is determined:

[0037]

[0038] Among them, α 1 is the initial power consumption rate of new energy, α 2 is the target electricity consumption rate of new energy, q 0 Configure the charging and discharging energy required for energy storage for new energy stations.

[0039] As an improvement of the above scheme, the configuration power of energy storage is determined according to the required charging and discharging time and the required charging and discharging energy, and energy storage configuration is performed on the new energy station according to the configuration power of energy storage, specifically including:

[0040] Determine the configuration power of energy storage according to the following formula:

[0041] P 1 =q 0 / T 0

[0042] Among them, P 1 is the configuration power of energy storage, T 0 The charging and discharging time required to configure energy storage for new energy stations, q 0 Configure the charging and discharging energy required for energy storage at new energy stations;

[0043] According to the configured power of the energy storage, energy storage is configured for the new energy station.

[0044] The embodiment of the present invention also provides a new energy station energy storage configuration device, including:

[0045] The power consumption rate determination module is used to determine the initial power consumption rate of new energy, and determine the target power consumption rate of new energy according to the historical output sequence of the acquired new energy station and the initial power consumption rate of new energy;

[0046] A transmission channel capacity determination module, configured to determine the transmission channel capacity of a new energy station based on the historical output sequence according to the new energy initial power consumption rate;

[0047] A charging and discharging time acquisition module is used to collect statistics on the duration of the output that is greater than the capacity of the transmission channel in history, and obtain the charging and discharging time required for configuring the energy storage;

[0048] A charging and discharging energy determination module is used to collect statistics on the continuous power output of the power transmission channel whose historical output is greater than the capacity of the power transmission channel, and determine the charging and discharging energy required for configuring the energy storage according to the statistical results of the initial power consumption rate of the new energy, the target power consumption rate of the new energy and the continuous power output;

[0049] The energy storage configuration module is used to determine the configuration power of the energy storage according to the required charging and discharging time and the required charging and discharging energy, and to perform energy storage configuration for the new energy station according to the configuration power of the energy storage.

[0050] As an improvement of the above solution, the power transmission channel capacity determination module is specifically used for:

[0051] The function of renewable energy power consumption under a given transmission channel capacity is established as follows:

[0052]

[0053] In the formula, F P (t) is the power that can be absorbed, P is the capacity of the given transmission channel, p is the output of new energy, and t is the time;

[0054] The function of renewable energy power consumption F P (t) is integrated to obtain the function of the amount of electricity that can be absorbed by new energy:

[0055]

[0056] In the formula, Q(P) is the amount of electricity that can be absorbed under a given transmission channel capacity;

[0057] The absorption rate of new energy is calculated based on the function of the amount of electricity that can be absorbed by new energy:

[0058] α(P)=Q(P) / Q(P max )

[0059] Where P max is the maximum transmission channel capacity, which is also the installed capacity of the new energy station, and α(P) is the new energy consumption rate under the transmission channel capacity;

[0060] According to the initial power consumption rate of new energy and the following formula, the transmission channel capacity of the new energy station is determined:

[0061] P 0 =α -1 (α 1 )

[0062] Where P 0 It is the transmission channel capacity of new energy stations.

[0063] As an improvement of the above solution, the charging and discharging time acquisition module is specifically used for:

[0064] The duration of the output when the historical output is greater than the capacity of the transmission channel is counted to obtain a probability distribution function of the duration;

[0065] The cumulative distribution function of the probability distribution function of the duration is calculated to obtain the cumulative distribution function of the duration of the output when the historical output exceeds the capacity of the transmission channel:

[0066] k=G T (t≤T)

[0067] Where T is the duration of the historical output exceeding the transmission channel, k is the cumulative probability corresponding to the duration T, and G is the cumulative distribution function of the duration of the historical output exceeding the capacity of the transmission channel;

[0068] According to the actual situation of the new energy station, let k = k 0 , and determine the charging and discharging time required for energy storage configuration in new energy stations according to the following formula:

[0069]

[0070] Among them, T 0 Configure the charging and discharging time required for energy storage for new energy stations.

[0071] As an improvement of the above solution, the charging and discharging energy determination module is specifically used for:

[0072] The continuous power output whose historical output is greater than the capacity of the transmission channel is counted to obtain a probability distribution function of the continuous power output;

[0073] The cumulative distribution function of the probability distribution function of the continuous power is calculated to obtain the cumulative distribution function of the continuous power output when the historical output exceeds the capacity of the transmission channel:

[0074] m=H q (x≤q)

[0075] Among them, q is the continuous power output of the new energy station exceeding the capacity of the transmission channel, m is the cumulative probability corresponding to the continuous power output q, and H is the cumulative distribution function of the continuous power output of the historical output exceeding the capacity of the transmission channel;

[0076] According to the target power consumption rate of new energy and the initial power consumption rate of new energy, the charging and discharging energy required for configuring energy storage is determined:

[0077]

[0078] Among them, α 1 is the initial power consumption rate of new energy, α 2 is the target electricity consumption rate of new energy, q 0 Configure the charging and discharging energy required for energy storage for new energy stations.

[0079] As an improvement of the above solution, the energy storage configuration module is specifically used for:

[0080] Determine the configuration power of energy storage according to the following formula:

[0081] P 1 =q 0 / T 0

[0082] Among them, P 1 is the configuration power of energy storage, T 0 The charging and discharging time required to configure energy storage for new energy stations, q 0 Configure the charging and discharging energy required for energy storage at new energy stations;

[0083] According to the configured power of the energy storage, energy storage is configured for the new energy station.

[0084] Compared with the prior art, the new energy station energy storage configuration method and device provided by the embodiment of the present invention has the following beneficial effects:

[0085] The energy storage configuration method for a new energy station provided by the present invention comprises determining an initial power consumption rate of new energy, and determining a target power consumption rate of new energy according to an acquired historical output sequence of the new energy station and the initial power consumption rate of new energy; determining a transmission channel capacity of the new energy station based on the historical output sequence according to the initial power consumption rate of new energy; calculating a continuous time when the historical output exceeds the capacity of the transmission channel to obtain a charging and discharging time required for configuring energy storage; calculating a continuous power when the historical output exceeds the capacity of the transmission channel, and calculating a charging and discharging time required for configuring energy storage according to the initial power consumption rate of new energy, the target power consumption rate of new energy, and the initial power consumption rate of new energy. The statistical results of the energy consumption rate and the continuous power output are used to determine the charging and discharging energy required for configuring the energy storage; the configuration power of the energy storage is determined according to the required charging and discharging time and the required charging and discharging energy, so as to configure the energy storage for the new energy station according to the configuration power of the energy storage. By analyzing the historical output sequence data of the new energy station and combining the utilization of the transmission channel of the new energy station, the energy storage configuration of the new energy station is determined from the two dimensions of charging and discharging time and power, so as to achieve the goal of improving the consumption of new energy, which can reduce the power abandonment of the new energy station while improving the utilization rate of the transmission channel, and help promote the consumption of new energy. BRIEF DESCRIPTION OF THE DRAWINGS

[0086] Figure 1 It is a flow chart of a method for configuring energy storage in a new energy station provided by an embodiment of the present invention;

[0087] Figure 2 It is a curve diagram showing the relationship between the capacity of the power transmission channel to the new energy station and the power abandonment rate provided by the present invention;

[0088] Figure 3 It is a probability distribution statistical diagram of the duration of the renewable energy output exceeding the capacity of the transmission channel provided by the present invention;

[0089] Figure 4 It is a probability distribution statistical diagram of the continuous amount of electricity output of the new energy provided by the present invention exceeding the capacity of the transmission channel;

[0090] Figure 5 It is a structural block diagram of a new energy station energy storage configuration device provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0091] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0092] See also Figure 1 , Figure 1 It is a flow chart of a new energy station energy storage configuration method provided in an embodiment of the present invention.

[0093] The energy storage configuration method of a new energy station provided in an embodiment of the present invention includes steps S11 to S15:

[0094] Step S11, determining the initial power consumption rate of new energy, and determining the target power consumption rate of new energy according to the historical output sequence of the acquired new energy station and the initial power consumption rate of new energy;

[0095] Step S12, determining the transmission channel capacity of the new energy station based on the historical output sequence according to the new energy initial power consumption rate;

[0096] Step S13, counting the duration of the output that is greater than the capacity of the transmission channel in history, and obtaining the charging and discharging time required for configuring the energy storage;

[0097] Step S14, counting the continuous power output of the historical power output greater than the capacity of the power transmission channel, and determining the charging and discharging energy required for configuring the energy storage according to the statistical results of the initial power consumption rate of the new energy, the target power consumption rate of the new energy and the continuous power output;

[0098] Step S15, determining the configuration power of energy storage according to the required charging and discharging time and the required charging and discharging energy, and configuring energy storage for the new energy station according to the configuration power of energy storage.

[0099] Specifically, the initial consumption rate of new energy can be understood as the minimum amount of electricity that can be consumed (sent out) by new energy. The minimum consumption rate of new energy can be determined according to the requirements of management departments, dispatching agencies, etc., and the transmission channel capacity of new energy stations can be determined based on this minimum consumption rate. The target consumption rate of new energy is formed by appropriately increasing the initial consumption rate based on the initial consumption rate and the historical output of new energy stations. This consumption rate serves as a prerequisite for the calculation of the energy storage ratio of subsequent new energy stations.

[0100] Exemplarily, in step S13, the statistics of the duration of the output when the historical output is greater than the capacity of the transmission channel should be understood as follows: Assuming that in the historical output, the output of new energy is greater than the capacity of the transmission channel from 9:00 to 10:00, and the output of new energy is less than the capacity of the transmission channel from 10:00 to 15:30, and the output of new energy is greater than the capacity of the transmission channel from 15:30 to 21:30, then the final duration statistics result is the sum of the duration from 9:00 to 10:00 and the duration from 15:30 to 21:30, that is, the duration statistics result is 1+6=7. In specific implementation, the historical output sequence data of the new energy station can be traversed to select at least one time period in which the output of new energy is greater than the capacity of the transmission channel, and the duration corresponding to at least one time period is accumulated to obtain the total duration of the output of new energy exceeding the capacity of the transmission channel. It can be understood that when the new energy station is not equipped with an energy storage device, the total duration of the output of new energy exceeding the capacity of the transmission channel is the duration of the abandonment of new energy. Therefore, the charging and discharging duration of energy storage required for new energy stations can be determined based on the distribution of duration, so as to achieve the goal of reducing new energy power abandonment.

[0101] Exemplarily, in step S14, statistics on the continuous power output whose historical output is greater than the capacity of the transmission channel should be understood as: assuming that when the power continues for a period of time, the output of new energy is greater than the capacity of the transmission channel, and at the same time, when the power continues for another period of time, b, the output of new energy is greater than the capacity of the transmission channel, then the statistical result of the continuous power output is a+b.

[0102] The energy storage configuration method for a new energy station provided by the present invention comprises determining an initial power consumption rate of new energy, and determining a target power consumption rate of new energy according to an acquired historical output sequence of the new energy station and the initial power consumption rate of new energy; determining a transmission channel capacity of the new energy station based on the historical output sequence according to the initial power consumption rate of new energy; counting the continuous output time when the historical output exceeds the capacity of the transmission channel to obtain the charging and discharging time required for configuring energy storage; counting the continuous power of the historical output exceeding the capacity of the transmission channel, and determining a target power consumption rate of new energy according to the initial power consumption rate of the new energy station; determining a target power consumption rate of new energy according to the initial power consumption rate of new energy; determining a transmission channel capacity of the new energy station based on the historical output sequence according to the initial power consumption rate of new energy; obtaining a charging and discharging time required for configuring energy storage according to the historical power consumption; obtaining a target power consumption rate of new energy according to the initial power consumption rate of new energy The statistical results of the standard power consumption rate and the continuous power output are used to determine the charging and discharging energy required for configuring the energy storage; the configuration power of the energy storage is determined according to the required charging and discharging time and the required charging and discharging energy, so as to configure the energy storage for the new energy station according to the configuration power of the energy storage. It analyzes the historical output sequence data of the new energy station, combines the utilization of the transmission channel of the new energy station, and determines the energy storage configuration of the new energy station from the two dimensions of charging and discharging time and power, so as to achieve the goal of improving the consumption of new energy, which can reduce the power abandonment of new energy stations while improving the utilization rate of the transmission channel, and help promote the consumption of new energy.

[0103] In one embodiment, the step S12 "determining the transmission channel capacity of the new energy station based on the historical output sequence according to the initial power consumption rate of the new energy" specifically includes:

[0104] The function of renewable energy power consumption under a given transmission channel capacity is established as follows:

[0105]

[0106] In the formula, F P (t) is the power that can be absorbed, P is the capacity of the given transmission channel, p is the output of new energy, and t is the time;

[0107] The function of renewable energy power consumption F P (t) is integrated to obtain the function of the amount of electricity that can be absorbed by new energy:

[0108]

[0109] In the formula, Q(P) is the amount of electricity that can be absorbed under a given transmission channel capacity;

[0110] The absorption rate of new energy is calculated based on the function of the amount of electricity that can be absorbed by new energy:

[0111] α(P)=Q(P) / Q(P max )

[0112] Where P max is the maximum transmission channel capacity, which is also the installed capacity of the new energy station, and α(P) is the new energy consumption rate under the transmission channel capacity;

[0113] According to the initial power consumption rate of new energy and the following formula, the transmission channel capacity of the new energy station is determined:

[0114] P 0 =α -1 (α 1 )

[0115] Where P 0 It is the transmission channel capacity of new energy stations.

[0116] In specific implementation, the absorbable power function under a given transmission channel can be established in advance. In specific application, the absorbable power function can be obtained and integrated to calculate the absorbable power under a given transmission channel, that is, the relationship function between the transmission channel capacity of the new energy station and the absorbable power can be obtained. At the same time, the power abandonment rate of the new energy station can be calculated according to the power absorption rate, and the relationship curve between the transmission channel capacity of the new energy station and the power abandonment rate can be obtained, such as Figure 2 In practical applications, this curve can be used as a basis for determining the capacity of the transmission channel for new energy stations.

[0117] In one embodiment, the step S13 of "taking statistics on the duration of the output that is greater than the capacity of the transmission channel in history to obtain the charging and discharging duration required for configuring the energy storage" specifically includes:

[0118] The duration of the output when the historical output is greater than the capacity of the transmission channel is counted to obtain a probability distribution function of the duration;

[0119] The cumulative distribution function of the probability distribution function of the duration is calculated to obtain the cumulative distribution function of the duration of the output when the historical output exceeds the capacity of the transmission channel:

[0120] k=G T (t≤T)

[0121] Where T is the duration of the historical output exceeding the transmission channel, k is the cumulative probability corresponding to the duration T, and G is the cumulative distribution function of the duration of the historical output exceeding the capacity of the transmission channel;

[0122] According to the actual situation of the new energy station, let K = k 0 , and determine the charging and discharging time required for energy storage configuration in new energy stations according to the following formula:

[0123]

[0124] Among them, T 0 Configure the charging and discharging time required for energy storage for new energy stations.

[0125] See also Figure 3 , Figure 3 It is a probability distribution statistical graph of the duration obtained by statistically analyzing the probability distribution of the duration that the output of new energy exceeds the capacity of the transmission channel. In specific implementation, the cumulative probability distribution of the duration can be calculated based on this probability distribution, and a certain confidence level, such as 90% or 95%, can be taken as the charging and discharging duration indicator of the energy storage. Under this charging and discharging duration indicator, the energy storage device will be able to absorb the output of new energy that exceeds the capacity of the transmission channel covered by the confidence level, and reduce the abandoned electricity of new energy. In one embodiment, the step S14 "counts the continuous power output of the historical output that is greater than the capacity of the transmission channel, and determines the charging and discharging energy required to configure the energy storage based on the statistical results of the initial power consumption rate of the new energy, the target power consumption rate of the new energy, and the continuous power output", specifically includes:

[0126] The continuous power output whose historical output is greater than the capacity of the transmission channel is counted to obtain a probability distribution function of the continuous power output;

[0127] The cumulative distribution function of the probability distribution function of the continuous power is calculated to obtain the cumulative distribution function of the continuous power output when the historical output exceeds the capacity of the transmission channel:

[0128] m=H q (x≤q)

[0129] Among them, q is the continuous power output of the new energy station exceeding the capacity of the transmission channel, m is the cumulative probability corresponding to the continuous power output q, and H is the cumulative distribution function of the continuous power output of the historical output exceeding the capacity of the transmission channel;

[0130] According to the target power consumption rate of new energy and the initial power consumption rate of new energy, the charging and discharging energy required for configuring energy storage is determined:

[0131]

[0132] Among them, α 1 is the initial power consumption rate of new energy, α 2 is the target electricity consumption rate of new energy, q 0 Configure the charging and discharging energy required for energy storage for new energy stations.

[0133] See also Figure 4 , Figure 4 It is a probability distribution statistical chart of continuous electricity obtained by statistically analyzing the probability distribution of continuous electricity output when the output of new energy exceeds the capacity of the transmission channel. In specific implementation, the cumulative probability distribution of continuous electricity can be calculated based on this probability distribution. At the same time, based on the initial electricity consumption rate and the target electricity consumption rate, the improvement effect of energy storage on the consumption of new energy electricity is determined. This improvement effect can also be expressed as the proportion of the amount of energy storage to the part of the new energy output that exceeds the capacity of the transmission channel to the total electricity that exceeds the channel. This proportion is used as the confidence level, and the charging and discharging energy required by the energy storage device is determined through the cumulative probability distribution function of the continuous electricity output when the output of new energy exceeds the capacity of the transmission channel.

[0134] In one embodiment, the step S15 of "determining the configuration power of energy storage according to the required charging and discharging time and the required charging and discharging energy, and configuring energy storage for the new energy station according to the configuration power of the energy storage" specifically includes:

[0135] Determine the configuration power of energy storage according to the following formula:

[0136] P 1 =q 0 / T 0

[0137] Among them, P 1 is the configuration power of energy storage, T 0 The charging and discharging time required to configure energy storage for new energy stations, q0 Configure the charging and discharging energy required for energy storage at new energy stations;

[0138] According to the configured power of the energy storage, energy storage is configured for the new energy station.

[0139] In an embodiment of the present invention, based on the charging and discharging time required for configuring the energy storage determined in step S13 and the charging and discharging energy required for configuring the energy storage determined in step S14, the power of the energy storage device can be calculated, thereby obtaining various parameters for the optimal energy storage ratio required by the new energy station.

[0140] Accordingly, see Figure 5 , Figure 5 1 is a structural block diagram of a new energy station energy storage configuration device provided in an embodiment of the present invention. The new energy station energy storage configuration device 10 provided in an embodiment of the present invention includes:

[0141] The power consumption rate determination module 11 is used to determine the initial power consumption rate of new energy, and determine the target power consumption rate of new energy according to the historical output sequence of the acquired new energy station and the initial power consumption rate of new energy;

[0142] A transmission channel capacity determination module 12, configured to determine the transmission channel capacity of a new energy station based on the historical output sequence according to the new energy initial power consumption rate;

[0143] The charging and discharging time acquisition module 13 is used to collect statistics on the duration of the output that is greater than the capacity of the transmission channel in history, and obtain the charging and discharging time required for configuring the energy storage;

[0144] The charging and discharging energy determination module 14 is used to collect statistics on the continuous power output of the historical output that is greater than the capacity of the transmission channel, and determine the charging and discharging energy required for configuring the energy storage according to the statistical results of the initial power consumption rate of the new energy, the target power consumption rate of the new energy and the continuous power output;

[0145] The energy storage configuration module 15 is used to determine the configuration power of the energy storage according to the required charging and discharging time and the required charging and discharging energy, and to perform energy storage configuration for the new energy station according to the configuration power of the energy storage.

[0146] In one implementation, the power transmission channel capacity determination module 12 is specifically configured to:

[0147] The function of renewable energy power consumption under a given transmission channel capacity is established as follows:

[0148]

[0149] In the formula, F P(t) is the power that can be absorbed, P is the capacity of the given transmission channel, p is the output of new energy, and t is the time;

[0150] The function of renewable energy power consumption F P (t) is integrated to obtain the function of the amount of electricity that can be absorbed by new energy:

[0151]

[0152] In the formula, Q(P) is the amount of electricity that can be absorbed under a given transmission channel capacity;

[0153] The absorption rate of new energy is calculated based on the function of the amount of electricity that can be absorbed by new energy:

[0154] α(P)=Q(P) / Q(P max )

[0155] Where P max is the maximum transmission channel capacity, which is also the installed capacity of the new energy station, and α(P) is the new energy consumption rate under the transmission channel capacity;

[0156] According to the initial power consumption rate of new energy and the following formula, the transmission channel capacity of the new energy station is determined:

[0157] P 0 =α -1 (α 1 )

[0158] Where P 0 It is the transmission channel capacity of new energy stations.

[0159] In one embodiment, the charging and discharging time acquisition module 13 is specifically used for:

[0160] The duration of the output when the historical output is greater than the capacity of the transmission channel is counted to obtain a probability distribution function of the duration;

[0161] The cumulative distribution function of the probability distribution function of the duration is calculated to obtain the cumulative distribution function of the duration of the output when the historical output exceeds the capacity of the transmission channel:

[0162] k=G T (t≤T)

[0163] Where T is the duration of the historical output exceeding the transmission channel, k is the cumulative probability corresponding to the duration T, and G is the cumulative distribution function of the duration of the historical output exceeding the capacity of the transmission channel;

[0164] According to the actual situation of the new energy station, let k = k 0 , and determine the charging and discharging time required for energy storage configuration in new energy stations according to the following formula:

[0165]

[0166] Among them, T 0 Configure the charging and discharging time required for energy storage for new energy stations.

[0167] In one implementation, the charge and discharge energy determination module 14 is specifically used to:

[0168] The continuous power output whose historical output is greater than the capacity of the transmission channel is counted to obtain a probability distribution function of the continuous power output;

[0169] The cumulative distribution function of the probability distribution function of the continuous power is calculated to obtain the cumulative distribution function of the continuous power output when the historical output exceeds the capacity of the transmission channel:

[0170] m=H q (x≤q)

[0171] Among them, q is the continuous power output of the new energy station exceeding the capacity of the transmission channel, m is the cumulative probability corresponding to the continuous power output q, and H is the cumulative distribution function of the continuous power output of the historical output exceeding the capacity of the transmission channel;

[0172] According to the target power consumption rate of new energy and the initial power consumption rate of new energy, the charging and discharging energy required for configuring energy storage is determined:

[0173]

[0174] Among them, α 1 is the initial power consumption rate of new energy, α 2 is the target electricity consumption rate of new energy, q 0 Configure the charging and discharging energy required for energy storage for new energy stations.

[0175] In one embodiment, the energy storage configuration module 15 is specifically used for:

[0176] Determine the configuration power of energy storage according to the following formula:

[0177] P 1 =q 0 / T 0

[0178] Among them, P 1 is the configuration power of energy storage, T 0 The charging and discharging time required to configure energy storage for new energy stations, q 0 Configure the charging and discharging energy required for energy storage at new energy stations;

[0179] According to the configured power of the energy storage, energy storage is configured for the new energy station.

[0180] It should be noted that the new energy station energy storage configuration device provided in the embodiment of the present invention is used to execute all the steps and processes of the new energy station energy storage configuration method provided in the above embodiment. The working principles and effects of the two correspond one to one, and no further details will be given here.

[0181] In addition, the device embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the accompanying drawings of the device embodiments provided by the present invention, the connection relationship between the modules indicates that there is a communication connection between them, which may be specifically implemented as one or more communication buses or signal lines. A person of ordinary skill in the art may understand and implement it without paying any creative effort.

[0182] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.

Claims

1. A method for configuring energy storage in a new energy station, characterized in that: include: Determine the initial power consumption rate of new energy, and determine the target power consumption rate of new energy based on the historical output sequence of the new energy station and the initial power consumption rate of new energy; According to the initial power consumption rate of the new energy, the power transmission channel capacity of the new energy station is determined based on the historical output sequence; The duration of the output that is greater than the capacity of the transmission channel in history is counted to obtain the charging and discharging time required for configuring the energy storage; The continuous power output of the historical power output greater than the capacity of the power transmission channel is counted, and the charging and discharging energy required for configuring the energy storage is determined according to the statistical results of the initial power consumption rate of the new energy, the target power consumption rate of the new energy and the continuous power output; Determine the configuration power of energy storage according to the required charging and discharging time and the required charging and discharging energy, and perform energy storage configuration on the new energy station according to the configuration power of energy storage; in, The determining of the transmission channel capacity of the new energy station based on the historical output sequence according to the new energy initial power consumption rate specifically includes: The function of renewable energy power consumption under a given transmission channel capacity is established as follows: In the formula, F P (t) is the power that can be absorbed, P is the capacity of the given transmission channel, p is the output of new energy, and t is the time; The function of renewable energy power consumption F P (t) is integrated to obtain the function of the amount of electricity that can be absorbed by new energy: In the formula, Q(P) is the amount of electricity that can be absorbed under a given transmission channel capacity; The absorption rate of new energy is calculated based on the function of the amount of electricity that can be absorbed by new energy: α(P)=Q(P) / Q(P max ) Where P max is the maximum transmission channel capacity, which is also the installed capacity of the new energy station, and α(P) is the new energy consumption rate under the transmission channel capacity; According to the initial power consumption rate of new energy and the following formula, the transmission channel capacity of the new energy station is determined: P0=α -1 (α1) In the formula, P0 is the transmission channel capacity of the new energy station; The statistical analysis of the duration of the output when the historical output is greater than the capacity of the transmission channel to obtain the charging and discharging time required for configuring the energy storage specifically includes: The duration of the output when the historical output is greater than the capacity of the transmission channel is counted to obtain a probability distribution function of the duration; The cumulative distribution function of the probability distribution function of the duration is calculated to obtain the cumulative distribution function of the duration of the output when the historical output exceeds the capacity of the transmission channel: k=G T (t≤T) Where T is the duration of the historical output exceeding the transmission channel, k is the cumulative probability corresponding to the duration T, and G is the cumulative distribution function of the duration of the historical output exceeding the capacity of the transmission channel; According to the actual situation of the new energy station, let k = k0, and determine the charging and discharging time required for the energy storage configuration of the new energy station according to the following formula: Among them, T0 is the charging and discharging time required for the energy storage configured at the new energy station; The continuous power output of the historical power output greater than the capacity of the power transmission channel is counted, and the charging and discharging energy required for configuring the energy storage is determined according to the statistical results of the initial power consumption rate of the new energy, the target power consumption rate of the new energy and the continuous power output, specifically including: The continuous power output whose historical output is greater than the capacity of the transmission channel is counted to obtain a probability distribution function of the continuous power output; The cumulative distribution function of the probability distribution function of the continuous power is calculated to obtain the cumulative distribution function of the continuous power output when the historical output exceeds the capacity of the transmission channel: m=H q (x≤q) Among them, q is the continuous power output of the new energy station exceeding the capacity of the transmission channel, m is the cumulative probability corresponding to the continuous power output q, and H is the cumulative distribution function of the continuous power output of the historical output exceeding the capacity of the transmission channel; According to the target power consumption rate of new energy and the initial power consumption rate of new energy, the charging and discharging energy required for configuring energy storage is determined: Among them, α1 is the initial power consumption rate of new energy, α2 is the target power consumption rate of new energy, and q0 is the charging and discharging energy required for the energy storage configured at the new energy station.

2. The method for configuring energy storage at a new energy station according to claim 1, characterized in that: The step of determining the configuration power of energy storage according to the required charging and discharging time and the required charging and discharging energy, and configuring energy storage for the new energy station according to the configuration power of energy storage, specifically includes: Determine the configuration power of energy storage according to the following formula: P1=q0 / T0 Among them, P1 is the configured power of energy storage, T0 is the charging and discharging time required for the energy storage configured by the new energy station, and q0 is the charging and discharging energy required for the energy storage configured by the new energy station; According to the configured power of the energy storage, energy storage is configured for the new energy station.

3. A new energy station energy storage configuration device, characterized in that: include: The power consumption rate determination module is used to determine the initial power consumption rate of new energy, and determine the target power consumption rate of new energy according to the historical output sequence of the acquired new energy station and the initial power consumption rate of new energy; A transmission channel capacity determination module, configured to determine the transmission channel capacity of a new energy station based on the historical output sequence according to the new energy initial power consumption rate; A charging and discharging time acquisition module is used to collect statistics on the duration of the output that is greater than the capacity of the transmission channel in history, and obtain the charging and discharging time required for configuring the energy storage; A charging and discharging energy determination module is used to collect statistics on the continuous power output of the power transmission channel whose historical output is greater than the capacity of the power transmission channel, and determine the charging and discharging energy required for configuring the energy storage according to the statistical results of the initial power consumption rate of the new energy, the target power consumption rate of the new energy and the continuous power output; An energy storage configuration module, used to determine the configuration power of energy storage according to the required charging and discharging time and the required charging and discharging energy, and perform energy storage configuration for the new energy station according to the configuration power of energy storage; in, The power transmission channel capacity determination module is specifically used for: The function of renewable energy power consumption under a given transmission channel capacity is established as follows: In the formula, F P (t) is the power that can be absorbed, P is the capacity of the given transmission channel, p is the output of new energy, and t is the time; The function of renewable energy power consumption F P (t) is integrated to obtain the function of the amount of electricity that can be absorbed by new energy: In the formula, Q(P) is the amount of electricity that can be absorbed under a given transmission channel capacity; The absorption rate of new energy is calculated based on the function of the amount of electricity that can be absorbed by new energy: α(P)=Q(P) / Q(P max ) Where P max is the maximum transmission channel capacity, which is also the installed capacity of the new energy station. α(P) is the new energy consumption rate under the transmission channel capacity. According to the initial power consumption rate of new energy and the following formula, the transmission channel capacity of the new energy station is determined: P0=α -1 (α1) In the formula, P0 is the transmission channel capacity of the new energy station; The charging and discharging time acquisition module is specifically used for: The duration of the output when the historical output is greater than the capacity of the transmission channel is counted to obtain a probability distribution function of the duration; The cumulative distribution function of the probability distribution function of the duration is calculated to obtain the cumulative distribution function of the duration of the output when the historical output exceeds the capacity of the transmission channel: k=G T (t≤T) Where T is the duration of the historical output exceeding the transmission channel, k is the cumulative probability corresponding to the duration T, and G is the cumulative distribution function of the duration of the historical output exceeding the capacity of the transmission channel; According to the actual situation of the new energy station, let k = k0, and determine the charging and discharging time required for the energy storage configuration of the new energy station according to the following formula: Among them, T0 is the charging and discharging time required for the energy storage configured at the new energy station; The charging and discharging energy determination module is specifically used for: The continuous power output whose historical output is greater than the capacity of the transmission channel is counted to obtain a probability distribution function of the continuous power output; The cumulative distribution function of the probability distribution function of the continuous power is calculated to obtain the cumulative distribution function of the continuous power output when the historical output exceeds the capacity of the transmission channel: m=H q (x≤q) Among them, q is the continuous power output of the new energy station exceeding the capacity of the transmission channel, m is the cumulative probability corresponding to the continuous power output q, and H is the cumulative distribution function of the continuous power output of the historical output exceeding the capacity of the transmission channel; According to the target power consumption rate of new energy and the initial power consumption rate of new energy, the charging and discharging energy required for configuring energy storage is determined: Among them, α1 is the initial power consumption rate of new energy, α2 is the target power consumption rate of new energy, and q0 is the charging and discharging energy required for the energy storage configured at the new energy station.

4. The new energy station energy storage configuration device according to claim 3, characterized in that: The energy storage configuration module is specifically used for: Determine the configuration power of energy storage according to the following formula: P1=q0 / T0 Among them, P1 is the configured power of energy storage, T0 is the charging and discharging time required for the energy storage configured by the new energy station, and q0 is the charging and discharging energy required for the energy storage configured by the new energy station; According to the configured power of the energy storage, energy storage is configured for the new energy station.