A test method for simulating the movement of submarine pipelines

Through the test method of simulating the motion of submarine pipelines and using the model box and monitoring system to record the motion data of submarine pipelines, the problem of simulation of submarine pipeline motions in the existing technology is solved, the research efficiency is improved and a teaching tool for the damage effects of submarine landslides is provided.

CN114088339BActive Publication Date: 2024-10-25GUANGZHOU HUANTOU NANSHA ENVIRONMENTAL ENERGY CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111335998.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-12
Publication Date
2024-10-25
Estimated Expiration
2041-11-12

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively simulate and evaluate the movement of submarine pipelines due to thermal expansion and contraction during operation and its impact on the seabed topography, and the scale of the model box is difficult to determine, resulting in research difficulties and high costs.

Method used

Provides a test method for simulating the motion of submarine pipelines, including a model box, a displacement device and a monitoring system. The hydraulic loader is used to simulate the motion of the pipeline. It is combined with high-definition cameras, infrared rangefinders, pore pressure sensors and other equipment to record data to achieve the purpose of monitoring the seabed. Realistic simulation of pipe movement.

Benefits of technology

This method is easy to operate, automatically records data, improves efficiency, can simulate the motion of different types of submarine pipelines, provides a teaching test tool for the damage effects of submarine landslides on pile foundations, and effectively evaluates hidden dangers in submarine pipeline operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114088339B_ABST
    Figure CN114088339B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of marine engineering research, and in particular to a test method for simulating the movement of submarine pipelines. The method comprises the steps of: preparing soil samples; arranging the seabed; installing a hydraulic loader and injecting water; arranging a monitoring system; starting the hydraulic loader to make the pipeline cyclically reciprocate, and the data acquisition system records each experimental data. After the experiment is over, the model box and the experimental soil are recovered, and the obtained experimental data are used for later processing. The device provided by the present invention can simulate different types of submarine pipeline movements by changing conditions such as pipeline size, movement speed, and movement cycle. The present invention is easy to operate and can automatically record data, which not only improves scientific research efficiency, but also provides a teaching test instrument for studying the damage effect of submarine landslides on pile foundations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of marine engineering research, and in particular to a test method for simulating the movement of a submarine pipeline. Background Art

[0002] Submarine pipelines are pipelines that continuously transport large amounts of oil (gas) through closed pipelines on the seabed. They are the main component of the offshore oil (gas) field development and production system, and are currently the fastest, safest, most economical and reliable way to transport offshore oil and gas. The advantage of submarine pipelines is that they can be transported continuously, are almost unaffected by environmental conditions, and will not force oil fields to reduce or stop production due to capacity limitations of offshore oil storage facilities or untimely shuttle tankers. Therefore, the oil transportation efficiency is high and the oil transportation capacity is large. In addition, the submarine pipeline laying period is short, the production is fast, the management is convenient and the operating cost is low.

[0003] The main function of submarine pipelines is to transport oil (gas). During the oil transportation period, the temperature of the oil is higher than the seabed environment. Therefore, the pipeline will expand due to thermal expansion and contraction, resulting in displacement. During the interval between oil transportation, it will shrink again, and this cycle will repeat, changing the seabed topography. Due to the uncertainty of pipeline movement and the complexity of the seabed environment, the experiment on the movement of submarine pipelines faces a lot of difficulties. At the same time, the long distance and small diameter of the submarine pipeline also make it difficult to determine the scale of the model box. Therefore, most previous studies use in-situ observations, numerical simulations and other methods for analysis, but they all have corresponding disadvantages: in-situ observations require a lot of costs, and underwater equipment requires regular maintenance and inspection, which is relatively difficult; numerical simulations lack verification.

[0004] Therefore, there is an urgent need for a model test method that can truly simulate the entire movement process of the submarine pipeline in order to evaluate the hidden dangers and impacts in the operation of the submarine pipeline. Summary of the invention

[0005] The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide a test method for simulating the movement of a submarine pipeline.

[0006] To solve the technical problem, the solution of the present invention is:

[0007] Provided is a test method for simulating the movement of a submarine pipeline. The test method is implemented based on a test device for simulating the movement of a submarine pipeline. The test device includes a model box, a displacement action device and a monitoring system.

[0008] The model box is a box-shaped structure with an open top, and its side walls are made of organic glass plates, and drainage ports are provided at two end faces; a model pipe is horizontally erected in the model box, and its two ends are closed with baffles, and a water injection pipe and a drainage pipe are provided on the pipe wall; the space between the model box and the model pipe is filled with simulated soil;

[0009] The displacement device comprises hydraulic loaders arranged at both ends of the model pipeline, the two hydraulic loaders are arranged facing each other and coaxial with the model pipeline;

[0010] The monitoring system includes strain gauges, force gauges, displacement gauges, high-definition cameras, infrared rangefinders, pore pressure sensors and data acquisition systems; wherein, there are multiple strain gauges, which are pasted on the inner wall of the model pipeline at intervals, and the wires thereof pass through the pipeline; there are two force gauges, which are installed between the end of the model pipeline and the hydraulic loader; there are two displacement gauges, which are installed at both ends of the model pipeline; the high-definition camera is arranged on the side of the model box and is kept roughly horizontal with the model pipeline; the infrared rangefinder is arranged above the model box and is kept roughly vertical with the model pipeline; multiple pore pressure sensors are buried in the simulated soil on the side or below the model pipeline; the strain gauges, force gauges, displacement gauges, high-definition cameras, infrared rangefinders and pore pressure sensors are respectively connected to the data acquisition system through wires;

[0011] The test method for simulating the movement of a submarine pipeline specifically comprises the following steps:

[0012] (1) Soil sample preparation: First, kaolin and sand were mixed in the required proportions to simulate the seabed soil and ensure uniform mixing;

[0013] (2) Arrange the seabed: fill the simulated seabed soil in layers, and level each layer; bury the pore pressure sensor according to the preset depth during the filling process;

[0014] (3) Installing the hydraulic loader and injecting water: A strain gauge is attached to the inner wall surface of the model pipe and placed horizontally in the model box. Then, a dynamometer, displacement meter and hydraulic loader are installed. The soil is filled and leveled until the landfill depth is set. Then, water is injected into the model box to make it penetrate into the soil of the simulated seabed to reach saturation. When the water level reaches the required height for the experiment, water injection is stopped and the soil is left to stand for 24 hours to allow the soil to consolidate.

[0015] (4) Arrange the monitoring system: Arrange high-definition cameras and infrared rangefinders at corresponding positions outside the model box, and connect each measuring device or component to the data acquisition system;

[0016] (5) Start the hydraulic loader to make the simulated pipeline reciprocate and record the experimental data for each time; during the experiment, water is injected or drained into the simulated pipeline according to the preset plan; after the experiment, the experimental soil in the model box is recovered and the obtained experimental data is used for later processing.

[0017] As a preferred solution of the present invention, the model box has four drainage outlets, which are respectively arranged in the middle and bottom of the end surface.

[0018] As a preferred solution of the present invention, the model pipe is a hollow metal pipe with a through hole on the pipe wall; a rubber plug is installed in the through hole, and the wire connecting the strain gauge passes through the rubber plug and is connected to the data acquisition system.

[0019] As a preferred solution of the present invention, a scale or scale markings are provided on the side wall of the model box.

[0020] As a preferred solution of the present invention, the model box is provided with iron bars surrounding the box body to strengthen the fixing effect.

[0021] As a preferred solution of the present invention, two brackets are provided on the bottom plate of the model box, and the model pipes are installed on the brackets.

[0022] As a preferred solution of the present invention, the data acquisition system is a computer or a single chip microcomputer.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] 1. Based on the provided test device, the present invention can simulate different types of submarine pipeline movements by changing pipeline size, movement speed, movement cycle and other conditions;

[0025] 2. The test device of the present invention is easy to operate and can automatically record data, which not only improves efficiency but also provides a teaching test instrument for studying the damage effect of submarine landslides on pile foundations. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a perspective view of the test device in the present invention.

[0027] Figure 2 It is a top view of the test device in the present invention.

[0028] Figure 3 It is a left view of the model pipeline in the present invention.

[0029] The reference numerals in the figure are: 1 model box; 2 infrared rangefinder; 3 hydraulic loader; 4 bracket; 5 simulation pipeline; 6 displacement meter; 7 water injection pipe; 8 force gauge; 9 drainage pipe; 10 pore pressure sensor; 11 data acquisition system; 12 strain gauge. DETAILED DESCRIPTION

[0030] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments:

[0031] The test device for submarine pipeline movement in the present invention comprises a model box 1, a displacement action device and a monitoring system; wherein:

[0032] The model box 1 is a rectangular box-shaped structure with an open top. The two side walls are made of organic glass with iron bars on the outside. The iron bars are used to strengthen the fixing effect. Two drainage ports are respectively arranged on the two end faces of the model box 1, which are arranged in the middle and bottom of the end faces respectively. Two brackets 4 are arranged on the bottom plate of the model box 1, and the model pipe 5 is horizontally installed on the brackets 4. The two ends of the model pipe 5 are closed with baffles, and a water injection pipe 7 and a drainage pipe 9 are arranged on the pipe wall; the space between the model box 1 and the model pipe 5 is filled with simulated soil.

[0033] A scale or scale mark is provided on the side wall of the model box 1 for calculating the thickness of the mud when it flows. For example, a grid is marked on one side plate of the model box 1, and each grid is a 1 cm×1 cm square.

[0034] The displacement device includes hydraulic loaders 3 disposed at both ends of the model pipeline 5, and the two hydraulic loaders 3 are arranged opposite to each other and coaxial with the model pipeline 5. The hydraulic loaders 3 cause the model pipeline 5 to produce reciprocating horizontal motion by pressurizing, so as to simulate the process of the pipeline moving in the seabed due to thermal expansion and contraction in reality.

[0035] The monitoring system includes a strain gauge 12, a high-definition camera (not shown in the figure), a pore pressure sensor 10, an infrared rangefinder 2, a displacement meter 6, and a dynamometer 8, which are connected to a data acquisition system 11 through wires. The high-definition camera can be a commercially available product that meets the experimental recording requirements, and the present invention does not make special requirements.

[0036] The model pipe 5 is a hollow metal pipe (such as an iron pipe, a steel pipe or an aluminum pipe), and a strain gauge 12 is pasted on the inner wall. A through hole is provided on the pipe wall, and a rubber plug is installed in the through hole. The wire connected to the strain gauge 12 passes through the rubber plug and is connected to the data acquisition system 11, and the strain data is automatically recorded at regular intervals to reflect the movement process of the pipe. The high-definition camera is arranged on the side of the model box 1, and is kept roughly horizontal with the model pipe 5, and is used to test and record the vertical displacement of the pipe and the change process of the soil in the box; a plurality of pore pressure sensors 10 are buried in the simulated soil on the side or below the model pipe 5, and are used to record the pore pressure changes of the soil below the pipe during the movement process; the infrared rangefinder 2 is arranged above the model box, and is kept roughly vertical to the model pipe 5, and is used to record the lateral displacement changes during the operation of the pipe; the displacement meter 6 is arranged at both ends of the pipe 5, and is connected to the data acquisition system 11, and is used to record the horizontal displacement of the pipe 5; the dynamometer 8 is arranged at the connection between the hydraulic loader 3 and the model pipe 5, and is used to record the pulling force required by the model pipe 5 during the movement process.

[0037] The data acquisition system 11 can be implemented by existing hardware, such as a computer or a single chip microcomputer. Those skilled in the art can use existing technical means to implement related functions according to the functions of the present invention. Since these contents are not the focus of the present invention, they will not be repeated.

[0038] Based on the above submarine pipeline model test device, the experimental research method of submarine pipeline displacement effect is described in detail below. For the convenience of explanation, the schematic diagram showing the device structure will not be partially enlarged according to the general proportion, and this should not be used as a limitation of the present invention. In addition, in actual production, the three-dimensional space dimensions of length, width and height should be included.

[0039] Using the above device, the test method of simulating the movement of a submarine pipeline of the present invention comprises the following steps:

[0040] (1) Soil sample preparation: First, kaolin and sand were mixed according to the experimental requirements to ensure uniform mixing ratio to simulate seabed soil;

[0041] (2) Arrangement of the seabed: First, spread the soil to 20 cm to 25 cm from the bottom and level it, then spread it to 30 cm to 35 cm from the bottom and level it, and finally spread it to 35 cm to 40 cm from the bottom and level it. Place the pore pressure sensor 10 in the model soil layer 10 cm to 25 cm below the surface.

[0042] (3) Install the hydraulic loader 3 and inject water: A strain gauge 12 is attached to the inner wall surface of the model pipe 5, and then placed horizontally on the soil surface in the model box 1. The hydraulic loader 3, dynamometer 8 and displacement meter 6 are installed at both ends of the pipe 5, and then a layer of soil is laid to the required burial depth of the experiment. Water is slowly injected into the model box 1 to make it penetrate into the soil of the simulated seabed to reach saturation. When the water surface reaches the required height for the experiment, stop injecting water and let it stand for 24 hours to allow the soil to consolidate.

[0043] (4) Arrange the monitoring system: Arrange a high-definition camera and an infrared rangefinder 2 at corresponding positions outside the model box 1, and connect them to the data acquisition system 11, and at the same time connect each measuring device or component to the data acquisition system 11;

[0044] (5) Start the hydraulic loader 3 to make the pipeline 5 reciprocate, and the data acquisition system 11 records each experimental data. During the experiment, water is injected or drained into the simulated pipeline according to the preset plan; after the experiment, the model box 1 and the experimental soil are recovered, and the obtained experimental data are used for later processing.

[0045] Example:

[0046] An experiment of simulating the movement of a submarine pipeline using the device of the present invention is carried out, and the specific steps are as follows:

[0047] (1) Prepare the required experimental soil. First, spread the soil 25 cm from the bottom and level it. Then spread it 35 cm from the bottom and level it. Finally, spread the soil 40 cm from the bottom and level it. Place the pore pressure sensor 10 at the position described in Table 1.

[0048] (2) Inside the model pipeline 5, Figure 3 Strain gauges 12 are attached at the positions shown. After the arrangement is completed, the model pipe 5 is placed on the leveled soil, and after the remaining measuring equipment or components are installed, a layer of soil is laid to the required burial depth of the experiment. Water is slowly injected into the model box 1 to infiltrate the soil simulating the seabed to saturate it. When the liquid level rises to 0.3m above the soil surface, water injection is accelerated; when the water level reaches the required height for the experiment, water injection is stopped and the soil is left to stand for 24 hours to consolidate.

[0049] (3) Use a displacement meter to record the initial position (vertical direction) of the horizontal conduit; inject water into the model pipe 5, and start the hydraulic pressurizer 3 at one end after it is filled, and pull the pipe to perform axial uniform reciprocating motion. Run for 10 hours, and after the operation is completed, record the changes in the values ​​of each instrument (for details of pipe diameter, buried depth and uniform motion speed, see Appendix 1);

[0050] (4) After the operation is completed, leave it for 24 hours and record the changes in the values ​​of each instrument;

[0051] (5) After completing step 4, drain the water injected into the model pipe 5, and start the hydraulic pressure booster 3 at the other end to pull the pipe to perform a uniform reciprocating motion, the speed of which is the same as that in step 3. Run for 10 hours, and record the changes in the values ​​of each instrument after the operation is completed;

[0052] (6) After the operation is completed, leave it for 24 hours and record the changes in the values ​​of each instrument;

[0053] (7) Repeat steps 3-6 5 times.

[0054] Table 1

[0055]

[0056]

[0057] The above content is only a description of the experimental research on simulating the movement of submarine pipelines. For the sake of convenience, the schematic diagram showing the device structure will not be partially enlarged according to the general ratio, but this should not be used as a limitation of the present invention. In addition, in actual production, the three-dimensional spatial dimensions of length, width and height should be included.

[0058] Finally, it should be noted that the above examples are only specific embodiments of the present invention. Obviously, the present invention is not limited to the above examples, and many variations are possible. All variations that can be directly derived or associated with the content disclosed by a person skilled in the art should be considered as the protection scope of the present invention.

Claims

1. A test method for simulating the movement of submarine pipelines. It is characterized in that The test method is implemented based on a test device that simulates the movement of a submarine pipeline, and the test device includes a model box, a displacement action device and a monitoring system; The model box is a box-shaped structure with an open top, and its side wall is a plexiglass plate, and drainage holes are arranged on two end faces; a model pipe is horizontally erected in the model box, and its two ends are closed with baffles, and a water injection pipe and a drainage pipe are arranged on the pipe wall; the space between the model box and the model pipe is filled with simulated soil; the model box has four drainage holes, which are arranged in the middle and bottom of the end face respectively; The displacement device comprises hydraulic loaders arranged at both ends of the model pipeline, the two hydraulic loaders are arranged facing each other and coaxial with the model pipeline; The monitoring system includes strain gauges, force gauges, displacement gauges, high-definition cameras, infrared rangefinders, pore pressure sensors and data acquisition systems; wherein, there are multiple strain gauges, which are pasted on the inner wall of the model pipe at intervals, and the wires thereof pass through the model pipe; there are two force gauges, which are installed between the end of the model pipe and the hydraulic loader; there are two displacement gauges, which are installed at both ends of the model pipe; the high-definition camera is arranged on the side of the model box and is kept roughly horizontal with the model pipe; the infrared rangefinder is arranged above the model box and is kept roughly vertical with the model pipe; multiple pore pressure sensors are buried in the simulated soil on the side or below the model pipe; the strain gauges, force gauges, displacement gauges, high-definition cameras, infrared rangefinders and pore pressure sensors are respectively connected to the data acquisition system through wires; the model pipe is a hollow metal pipe with a through hole on the pipe wall; a rubber plug is installed in the through hole, and the wire connected to the strain gauge passes through the rubber plug and is connected to the data acquisition system; The test method for simulating the movement of a submarine pipeline specifically comprises the following steps: (1) Soil sample preparation: First, kaolin and sand were mixed in the required proportions to simulate the seabed soil and ensure uniform mixing; (2) Arrange the seabed: fill the simulated seabed soil in layers, and level each layer. During the filling process, pore pressure sensors are buried according to the preset depth. (3) Install the hydraulic loader and inject water: A strain gauge is attached to the inner wall surface of the model pipe and placed horizontally in the model box. Then, a dynamometer, displacement meter and hydraulic loader are installed. The soil is filled and leveled until the landfill depth is set. Then, water is injected into the model box to make it penetrate into the soil of the simulated seabed to reach saturation. When the water level reaches the required height for the experiment, the injection is stopped and the soil is left to stand for 24 hours to allow the soil to consolidate. (4) Arrange the monitoring system: Arrange high-definition cameras and infrared rangefinders at corresponding positions outside the model box, and connect each measuring device or component to the data acquisition system; (5) Start the hydraulic loader to make the model pipe reciprocate and record the experimental data for each time; during the experiment, water is injected or drained into the model pipe according to the preset plan; after the experiment, the experimental soil in the model box is recovered and the obtained experimental data is used for later processing.

2. The test method according to claim 1, It is characterized in that A scale or scale markings are provided on the side wall of the model box.

3. The test method according to claim 1, It is characterized in that The model box is provided with iron bars surrounding the box body to strengthen the fixing effect.

4. The test method according to claim 1, It is characterized in that Two brackets are arranged on the bottom plate of the model box, and the model pipeline is installed on the brackets.

5. The test method according to claim 1, It is characterized in that The data acquisition system is a computer or a single chip microcomputer.