Energy storage configuration method and system for smoothing power fluctuations of new energy station groups
By calculating the comprehensive indicators of node power fluctuations and optimizing the energy storage configuration, the problem of lack of system-level considerations for energy storage configuration in the new energy station group is solved, effectively suppressing the power fluctuations of the new energy station group, and improving the local power grid stability.
Patent Information
- Application Number
- CN202111398085.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-23
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-11-23
AI Technical Summary
The existing technology lacks system-level considerations in the energy storage configuration of new energy stations, and cannot effectively curb power fluctuations in new energy station groups, affecting the stability of the power system.
By calculating the comprehensive indicators of node power fluctuations, the energy storage distribution sequence is formed, and the energy storage configuration is optimized. Combined with the basic data of the new energy station group and the local power grid, the optimal configuration of energy storage on the new energy station side and the power grid side is realized. Calculate until the boundary conditions of energy storage configuration are met.
Effectively suppress the power fluctuations of the new energy station group, improve the comprehensive performance of the local power grid, optimize the distribution, configuration and operation of energy storage, and reduce the maximum volatility.
Smart Images

Figure CN114123262B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of new energy and electricity, and specifically relates to an energy storage configuration method and system for smoothing power fluctuations of a new energy station group. Background Art
[0002] As a device for converting electric energy in time and space, energy storage devices do not generate electricity themselves. In new power systems, energy storage costs and technical application performance are crucial in their large-scale applications. Energy storage technology can effectively mitigate the negative impact of the power of new energy stations on the power system. Configuration technology is a key issue in the joint application of new energy stations and energy storage. In the past, energy storage configuration issues at new energy stations were mostly based on station level, lacking system-level considerations. Summary of the invention
[0003] In order to improve the comprehensive performance of energy storage in smoothing the power fluctuation of new energy station groups in local power grids, the present invention proposes an energy storage configuration method and system for smoothing the power fluctuation of new energy station groups. Based on the distribution and fluctuation characteristics of new energy station groups and combined with the structural characteristics of the power system, the energy storage is optimized in the system. The configuration and operation. The present invention takes into account the new energy station group and the local power grid, based on the power fluctuation characteristics and distribution characteristics of the new energy station, by calculating the comprehensive index of node power fluctuation, an energy storage point sequence is formed, and through the processes of judgment, point configuration and optimization, cyclic calculation, etc., the optimal configuration of energy storage on the new energy station side and the power grid side is realized.
[0004] The technical solution of the present invention is: a method for configuring energy storage for smoothing power fluctuations of a new energy station group, comprising:
[0005] Step 1: Set the energy storage information and the energy storage configuration boundary conditions for smoothing the power fluctuation of the new energy station group, and load the basic data of the new energy station group and the local power grid;
[0006] Step 2: Calculate the comprehensive index of node power fluctuation to form the energy storage point sequence s1;
[0007] Step 3: determine whether the energy storage point sequence s1 meets the energy storage configuration boundary conditions, optimize the energy storage E1 point distribution, configuration and operation to smooth the power fluctuation of the new energy station group, correct the energy storage point sequence, and perform cyclic calculation until the energy storage configuration boundary conditions are met;
[0008] Step 4: Statistically analyze the energy storage configuration results of each node, and output the nodes of energy storage configuration and the energy storage scale and maximum fluctuation rate of each node.
[0009] Another aspect of the present invention further provides an energy storage configuration system for smoothing power fluctuations of a new energy station group, comprising:
[0010] The loading unit is used to set energy storage information and energy storage configuration boundary conditions for smoothing power fluctuations of the new energy station group, and load basic data of the new energy station group and the local power grid;
[0011] A calculation unit, used to calculate the comprehensive index of node power fluctuation according to the loaded data and generate an energy storage point sequence;
[0012] A comparison and judgment unit is used to judge whether the boundary conditions of energy storage configuration are met. If not, the energy storage E1 layout, configuration and operation for smoothing the power fluctuation of the new energy station group are optimized, and the energy storage layout sequence is corrected. After the correction, the judgment is continued until the boundary conditions of energy storage configuration are met;
[0013] Output unit, used for statistical analysis and output of configuration results.
[0014] Beneficial effects:
[0015] The present invention is based on the basic data of new energy station clusters and local power grids, takes into account the power fluctuation characteristics and distribution characteristics of new energy stations, forms an energy storage point sequence by calculating the comprehensive index of node power fluctuation, and realizes the optimal configuration of energy storage on the new energy station side and the power grid side through processes such as judgment, point configuration and optimization, and cyclic calculation. First, set the energy storage information and the energy storage configuration boundary conditions for smoothing the power fluctuation of the new energy station cluster, and load the basic data of the new energy station cluster and the local power grid; secondly, calculate the comprehensive index of node power fluctuation to form the energy storage point sequence s1; then, determine whether the energy storage configuration boundary conditions are met, optimize the energy storage E1 point, configuration and operation that smoothes the power fluctuation of the new energy station cluster, correct the energy storage point sequence, and perform cyclic calculation until the energy storage configuration boundary conditions are met; finally, statistical analysis and device output. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 is a flow chart of the method of the present invention;
[0017] Figure 2 It is a system block diagram of the present invention. DETAILED DESCRIPTION
[0018] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the protection scope of the present invention.
[0019] According to one embodiment of the present invention, Figure 1 As shown, a method for configuring energy storage for smoothing power fluctuations of a new energy station group includes:
[0020] Step 1: Set the energy storage information and the energy storage configuration boundary conditions for smoothing the power fluctuation of the new energy station group, and load the basic data of the new energy station group and the local power grid;
[0021] Step 2: Calculate the comprehensive index of node power fluctuation to form the energy storage point sequence s1;
[0022] Step 3: determine whether the energy storage point sequence s1 meets the energy storage configuration boundary conditions, optimize the energy storage E1 point distribution, configuration and operation to smooth the power fluctuation of the new energy station group, correct the energy storage point sequence, and perform cyclic calculation until the energy storage configuration boundary conditions are met;
[0023] Step 4: Statistically analyze the energy storage configuration results of each node, and output the nodes of energy storage configuration and the energy storage scale and maximum fluctuation rate of each node.
[0024] The energy storage information in step 1 includes: the lower limit of the state of charge of the energy storage technology, the upper limit of the state of charge, the energy conversion efficiency, the power and capacity of the unit module; the energy storage configuration boundary conditions for smoothing the power fluctuation of the new energy station group include:
[0025] The comprehensive index value of node power fluctuation is given by weighting the maximum power fluctuation and the fluctuation mean. i,1 , α i,2 , where α i,1 +α i,2 =1, and α i,1 ∈[0,1],α i,2 ∈[0,1], and the comprehensive index of node power fluctuation is obtained by weighted summation.
[0026] The basic data of the new energy station group includes: the grid-connected nodes of the new energy station, the new energy installed capacity of each grid-connected node, the new energy historical output time series, and the actual output and predicted output corresponding to each time point;
[0027] The local power grid basic data includes: physical bus, generator, load, AC line, parallel capacitor reactance, two-winding transformer, three-winding transformer, PV node, node type.
[0028] In step 2, the steps for forming the energy storage point sequence s1 are:
[0029] Preprocess the data of the new energy station group, calculate the power fluctuation time series of each new energy station at different sampling time intervals, calculate the comprehensive index of node power fluctuation, and sort the energy storage point nodes from high to low according to the comprehensive index value of power fluctuation to form the energy storage point sequence s1.
[0030] The pre-processing of the new energy station group data is specifically as follows: for the historical output time series of each new energy station and the actual output and predicted output corresponding to each time point, filling in missing data and deleting duplicate data; setting a sampling time interval, and extracting the time series of each new energy station and its actual output and predicted output at different sampling time intervals according to the set sampling time interval.
[0031] The calculation of the power fluctuation time series of each new energy station at different sampling time intervals is specifically: based on the actual output and predicted output of each new energy station at the same sampling time point, the power error between the actual output and the predicted output is calculated to obtain the power fluctuation time series of each new energy station.
[0032] The computing node power fluctuation comprehensive index is specifically:
[0033] Construct local power grid simulation system data, calculate the power transfer distribution between each node power and each branch power based on power flow analysis, and start from the power fluctuation data of new energy sites. Based on the power transfer distribution, establish the power fluctuation of each branch power flow, and then combine the relationship between branches and nodes. Based on the branch power flow fluctuation flowing into the node, calculate the equivalent power fluctuation time series of non-new energy site nodes; calculate the comprehensive index value of node power fluctuation.
[0034] In step 3, the energy storage E1 layout, configuration and operation optimization for smoothing the power fluctuation of the new energy station group specifically include:
[0035] Determine the relationship between the peak volatility at the energy storage point sequence s1=1 and the energy storage configuration boundary condition. If the peak volatility at the energy storage point sequence s1=1 is less than the energy storage configuration boundary condition, there is no need to configure energy storage, and the system and equipment will exit operation.
[0036] Otherwise, add a unit module energy storage device at the node where the energy storage point sequence s1 is 1, optimize the operation of the energy storage device with the minimum volatility as the goal, and obtain the energy storage E1 operation curve under the minimum volatility and the maximum volatility after the introduction of energy storage.
[0037] The energy storage E1 is the energy storage of the node corresponding to the sequence number 1 in the access sequence S1.
[0038] In step 3, the energy storage point arrangement sequence correction specifically includes:
[0039] Considering the unit module energy storage device and its operation curve introduced at point 1 of the energy storage point sequence s1, the comprehensive index of node power fluctuation is corrected to form the energy storage point sequence s2.
[0040] The cyclic calculation to meet the energy storage configuration boundary conditions specifically includes:
[0041] Determine the relationship between the peak volatility at the energy storage point sequence s2 = 1 and the boundary conditions of the energy storage configuration. If the peak volatility at the energy storage point sequence s2 = 1 is less than the boundary conditions of the energy storage configuration, there is no need to configure energy storage, and the system and equipment exit operation. Otherwise, return to the calculation to add a unit module energy storage device at the node where the energy storage point sequence s2 is 1, optimize the operation of the energy storage device with the minimum volatility as the goal, and obtain the energy storage E2 operation curve under the minimum volatility and the maximum volatility after the introduction of energy storage. Repeat the execution of point distribution, configuration and operation optimization and energy storage point distribution sequence correction until the system and equipment exit conditions are met. The exit condition is: the peak volatility at the energy storage point sequence s2 = 1 is less than the boundary conditions of the energy storage configuration, where the energy storage E2 is the energy storage corresponding to the node with sequence number 1 in the access sequence S2.
[0042] According to another embodiment of the present invention, Figure 2 As shown, it is a block diagram of an energy storage configuration system for smoothing power fluctuations of a new energy station group provided by the present invention, including a loading unit, a calculation unit, a comparison and judgment unit, and an output unit;
[0043] The loading unit is used to set energy storage information and energy storage configuration boundary conditions for smoothing power fluctuations of the new energy station group, and load basic data of the new energy station group and the local power grid;
[0044] The calculation unit is used to calculate the comprehensive index of node power fluctuation according to the loaded data and generate the energy storage point sequence; the comparison and judgment unit is used to judge whether the boundary conditions of energy storage configuration are met. If not, the energy storage E1 point, configuration and operation that smoothes the power fluctuation of the new energy station group are optimized, and the energy storage point sequence is corrected. After the correction, the judgment is continued until the boundary conditions of energy storage configuration are met;
[0045] The output unit is used to perform statistical analysis and output configuration results.
[0046] Although the above describes the illustrative specific embodiments of the present invention to facilitate those skilled in the art to understand the present invention, and it should be clear that the present invention is not limited to the scope of the specific embodiments, for those of ordinary skill in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all inventions and creations using the concept of the present invention are protected.
Claims
1. A method for configuring energy storage to smooth power fluctuations of a new energy station group, characterized in that: include: Step 1: Set the energy storage information and the energy storage configuration boundary conditions for smoothing the power fluctuation of the new energy station group, and load the basic data of the new energy station group and the local power grid; Step 2: Calculate the comprehensive index of node power fluctuation to form the energy storage point sequence s1; The comprehensive index value of node power fluctuation is given weights to the maximum power fluctuation and the fluctuation mean. , ,in ,The comprehensive index of node power fluctuation is obtained through weighted summation; Pre-process the data of the new energy station group, calculate the power fluctuation time series of each new energy station at different sampling time intervals, calculate the comprehensive index of node power fluctuation, and sort the energy storage point nodes from high to low according to the comprehensive index value of power fluctuation to form the energy storage point sequence s1; Step 3: determine whether the energy storage point sequence s1 meets the energy storage configuration boundary conditions, optimize the energy storage E1 point distribution, configuration and operation to smooth the power fluctuation of the new energy station group, correct the energy storage point sequence, and perform cyclic calculation until the energy storage configuration boundary conditions are met; In step 3, the energy storage E1 layout, configuration and operation optimization for smoothing the power fluctuation of the new energy station group specifically include: Determine the relationship between the peak volatility at the energy storage point sequence s1=1 and the energy storage configuration boundary condition. If the peak volatility at the energy storage point sequence s1=1 is less than the energy storage configuration boundary condition, there is no need to configure energy storage, and the system and equipment will exit operation. Otherwise, add a unit module energy storage device at the node where the energy storage point sequence s1 is 1, optimize the operation of the energy storage device with the minimum volatility as the goal, and obtain the energy storage E1 operation curve with the minimum volatility and the maximum volatility after the introduction of energy storage. Among them, the energy storage E1 is the energy storage of the node corresponding to the sequence number 1 in the access sequence S1; The energy storage point sequence correction specifically includes: Considering the unit module energy storage device and its operation curve introduced at the energy storage point sequence s1 1, the comprehensive index of node power fluctuation is corrected to form the energy storage point sequence s2; The cyclic calculation to meet the energy storage configuration boundary conditions specifically includes: Determine the relationship between the peak volatility at the energy storage point sequence s2 = 1 and the boundary conditions of the energy storage configuration. If the peak volatility at the energy storage point sequence s2 = 1 is less than the boundary conditions of the energy storage configuration, there is no need to configure energy storage, and the system and equipment exit operation; otherwise, return to the calculation to add a unit module energy storage device at the node where the energy storage point sequence s2 is 1, optimize the operation of the energy storage device with the minimum volatility as the goal, and obtain the energy storage E2 operation curve under the minimum volatility and the maximum volatility after the introduction of energy storage; repeat the execution of point distribution, configuration and operation optimization and energy storage point distribution sequence correction until the system and equipment exit conditions are met. The exit condition is: the peak volatility at the energy storage point sequence s2 = 1 is less than the boundary conditions of the energy storage configuration, where the energy storage E2 is the energy storage corresponding to the node with sequence number 1 in the access sequence S2; Step 4: Statistically analyze the energy storage configuration results of each node, and output the nodes of energy storage configuration and the energy storage scale and maximum fluctuation rate of each node.
2. According to claim 1, a method for configuring energy storage for smoothing power fluctuations of a new energy station group is characterized in that: The energy storage information of step 1 includes: the lower limit of the state of charge of the energy storage technology, the upper limit of the state of charge, the energy conversion efficiency, the power and capacity of the unit module; the energy storage configuration boundary conditions for smoothing the power fluctuations of the new energy station group include: the comprehensive index value of the node power fluctuations.
3. The energy storage configuration method for smoothing power fluctuations of a new energy station group according to claim 1 is characterized in that: The basic data of the new energy station group includes: the grid-connected nodes of the new energy station, the new energy installed capacity of each grid-connected node, the new energy historical output time series, and the actual output and predicted output corresponding to each time point; The local power grid basic data includes: physical bus, generator, load, AC line, parallel capacitor reactance, two-winding transformer, three-winding transformer, PV node, node type.
4. The energy storage configuration method for smoothing power fluctuations of a new energy station group according to claim 1 is characterized in that: The pre-processing of the new energy station group data is specifically as follows: for the historical output time series of each new energy station and the actual output and predicted output corresponding to each time point, filling in missing data and deleting duplicate data; setting a sampling time interval, and extracting the time series of each new energy station and its actual output and predicted output at different sampling time intervals according to the set sampling time interval.
5. The energy storage configuration method for smoothing power fluctuations of a new energy station group according to claim 1 is characterized in that: The calculation of the power fluctuation time series of each new energy station at different sampling time intervals is specifically: based on the actual output and predicted output of each new energy station at the same sampling time point, the power error between the actual output and the predicted output is calculated to obtain the power fluctuation time series of each new energy station.
6. The energy storage configuration method for smoothing power fluctuations of a new energy station group according to claim 1 is characterized in that: The computing node power fluctuation comprehensive index is specifically: Construct local power grid simulation system data, calculate the power transfer distribution between each node power and each branch power based on power flow analysis, and start from the power fluctuation data of new energy sites. Based on the power transfer distribution, establish the power fluctuation of each branch power flow, and then combine the relationship between branches and nodes. Based on the branch power flow fluctuation flowing into the node, calculate the equivalent power fluctuation time series of non-new energy site nodes; calculate the comprehensive index value of node power fluctuation.
7. An energy storage configuration system for smoothing power fluctuations of a new energy station group, characterized in that: include: The loading unit is used to set the energy storage information and the energy storage configuration boundary conditions to smooth the power fluctuation of the new energy station group, and load the basic data of the new energy station group and the local power grid; A calculation unit, used to calculate the comprehensive index of node power fluctuation according to the loaded data and generate an energy storage point sequence; The comprehensive index value of node power fluctuation is given weights to the maximum power fluctuation and the fluctuation mean. , ,in ,The comprehensive index of node power fluctuation is obtained through weighted summation; Pre-process the data of the new energy station group, calculate the power fluctuation time series of each new energy station at different sampling time intervals, calculate the comprehensive index of node power fluctuation, and sort the energy storage point nodes from high to low according to the comprehensive index value of power fluctuation to form the energy storage point sequence s1; A comparison and judgment unit is used to judge whether the boundary conditions of energy storage configuration are met. If not, the energy storage E1 layout, configuration and operation for smoothing the power fluctuation of the new energy station group are optimized, and the energy storage layout sequence is corrected. After the correction, the judgment is continued until the boundary conditions of energy storage configuration are met; The energy storage E1 layout, configuration and operation optimization to smooth out the power fluctuations of the new energy station group specifically include: Determine the relationship between the peak volatility at the energy storage point sequence s1=1 and the energy storage configuration boundary condition. If the peak volatility at the energy storage point sequence s1=1 is less than the energy storage configuration boundary condition, there is no need to configure energy storage, and the system and equipment will exit operation. Otherwise, add a unit module energy storage device at the node where the energy storage point sequence s1 is 1, optimize the operation of the energy storage device with the minimum volatility as the goal, and obtain the energy storage E1 operation curve with the minimum volatility and the maximum volatility after the introduction of energy storage. Among them, the energy storage E1 is the energy storage of the node corresponding to the sequence number 1 in the access sequence S1; The energy storage point sequence correction specifically includes: Considering the unit module energy storage device and its operation curve introduced at the energy storage point sequence s1 1, the comprehensive index of node power fluctuation is corrected to form the energy storage point sequence s2; The further determination after correction until the energy storage configuration boundary condition is met specifically includes: Determine the relationship between the peak volatility at the energy storage point sequence s2 = 1 and the boundary conditions of the energy storage configuration. If the peak volatility at the energy storage point sequence s2 = 1 is less than the boundary conditions of the energy storage configuration, there is no need to configure energy storage, and the system and equipment exit operation; otherwise, return to the calculation to add a unit module energy storage device at the node where the energy storage point sequence s2 is 1, optimize the operation of the energy storage device with the minimum volatility as the goal, and obtain the energy storage E2 operation curve under the minimum volatility and the maximum volatility after the introduction of energy storage; repeat the execution of point distribution, configuration and operation optimization and energy storage point distribution sequence correction until the system and equipment exit conditions are met. The exit condition is: the peak volatility at the energy storage point sequence s2 = 1 is less than the boundary conditions of the energy storage configuration, where the energy storage E2 is the energy storage corresponding to the node with sequence number 1 in the access sequence S2; Output unit, used for statistical analysis and output of configuration results.