A superconducting magnet comprehensive function service tower

By designing the comprehensive functional service tower of superconducting magnets, the problems of welding quality and sealing connection difficulties in the prior art are solved, and a simpler and more compact structure and lower heat leakage value are achieved, ensuring the safety and efficiency of the equipment.

CN114156039BActive Publication Date: 2024-12-03JIANGSU JACK ZHONGKE SUPERCONDUCTING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111616462.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-28
Publication Date
2024-12-03
Estimated Expiration
2041-12-28

AI Technical Summary

Technical Problem

In the assembly process of existing superconducting magnets, due to space limitations, the welding quality of the transition connector and the side wall of the corrugated tube is difficult to guarantee, and the moving space after the copper lead passes through the transition connector is limited, resulting in difficulty in vacuum sealing connection.

Method used

A superconducting magnet comprehensive functional service tower was designed, including room temperature flange, upper corrugated tube, lower corrugated tube, air box, room temperature electrode and high temperature superconducting current lead, forming an internal space through welding, and using the refrigerator cooling head room temperature The jack enables sealed connections, eliminating unnecessary corrugated pipes and transition connection pipes, increasing the area of ​​the holes for easy operation and gas circulation.

Benefits of technology

It realizes a simpler and more compact structure, improves welding quality and assembly accuracy, ensures the operating space and air flow smoothness when installing the helium container, reduces the heat leakage value of the superconducting magnet, and the actual effect is consistent with the theoretical value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114156039B_ABST
    Figure CN114156039B_ABST
Patent Text Reader

Abstract

The invention discloses a superconducting magnet comprehensive function service tower, including a room temperature flange, a primary flange, a secondary flange, an upper bellows, a lower bellows, a gas box, two room temperature electrodes, a refrigerant injection port, a connection structure, and two high-temperature superconducting current leads; a refrigerator cold head assembly is inserted into the service tower through the room temperature flange; the gas box is arranged on the top surface of the room temperature flange, two room temperature electrodes and the refrigerant injection port are arranged on the gas box, and the two room temperature electrodes are respectively connected to two high-temperature superconducting current leads electrically connected to the superconducting coil at the other end through the connection structure. The service tower of the invention integrates all external interfaces of the superconducting magnet, and the diameter is reduced to a greater extent; the overall structure becomes more concise, the assembly process is easier to ensure dimensional accuracy, and welding is more convenient; in the process of assembling the service tower to the helium container, the room temperature jack of the refrigerator cold head with a larger diameter can be fully utilized as an operating space.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of superconducting magnets, and in particular relates to a superconducting magnet comprehensive function service tower integrating mechanical interfaces and electrical interfaces. Background Art

[0002] The superconducting magnets currently used in the industrial and medical imaging fields are still mainly cooled by liquid helium. The patent of this invention is a key component of this type of superconducting magnet. Except for the interface, the overall sealing is welded. The general structure of the above-mentioned type of superconducting magnet can be described as follows: the superconducting coil or coil group is encapsulated in a helium container and cooled by liquid helium; the helium container is surrounded by a cold screen, and the cold screen is surrounded by a vacuum container. The function of the cold screen is to eliminate most of the radiation leakage heat on the helium container; the enclosed space between the helium container and the vacuum container is called an interlayer vacuum, which is used to improve the thermal insulation performance of the magnet. The superconducting coil current in the helium container needs to be introduced from the outside of the vacuum container, and the monitoring signal needs to be led to the outside of the vacuum container. Initially, liquid helium needs to be injected from the outside of the vacuum container into the inside of the helium container. When the magnet works normally, a helium refrigerator is required to produce liquid helium in the helium container. The extraction port of the interlayer vacuum needs to be set on the surface of the vacuum container, and the monitoring signal needs to be led to the outside of the vacuum container. The general practice is to integrate all the interfaces connecting the helium container and the interlayer with the outside world on the upper surface with a cylindrical appearance. The main body of the superconducting magnet used in the above fields is a hollow cylinder, and the integrated component is usually placed vertically at the axial center of the outer surface of the main body. The natural name formed in history is the neck tube or neck tube combination, while the "service tower" corresponds to the English direct translation and is often used in more formal occasions. Due to its significant advantages in low-temperature heat leakage, the single service tower structure is the most popular.

[0003] The main designer of this invention patent applied to the China Patent Office for an invention patent for "a compact neck tube combination structure" in 2018, and obtained the invention patent right (patent number CN108806916B) in 2020. The following problems were found in the implementation of this patented component:

[0004] 1. Due to space limitations, the welding quality between the transition piece and the upper bellows side wall and room temperature flange is difficult to guarantee;

[0005] 2. The copper lead has limited space for movement after passing through the transition connector, which makes it difficult to establish a vacuum-tight connection between the room-temperature electrode and the copper lead and the room-temperature flange. Summary of the invention

[0006] The purpose of the present invention is to provide a superconducting magnet comprehensive function service tower with a more reasonable assembly process for liquid helium cooled superconducting magnets, so as to solve the above problems existing in the original patented product.

[0007] On the superconducting magnets of the helium container outer cylinder 203, the cold shield outer cylinder 202, and the vacuum container outer cylinder 201,

[0008] The present invention is achieved through the following technical solutions:

[0009] A superconducting magnet comprehensive function service tower 101 is used to be installed on a superconducting magnet whose exterior is a helium container 203, a cold shield 202, and a vacuum container 201 from the inside to the outside. The service tower 101 comprises a room temperature flange 1, a primary flange 2, a secondary flange 3, an upper bellows 4, a lower bellows 5, a gas box 6, two room temperature electrodes 7, a refrigerant injection port 8, a connection structure, and two high-temperature superconducting current leads 17; the room temperature flange 1, the upper bellows 4, the primary flange 2, the lower bellows 5 and the secondary flange 3 are welded together in sequence, and the interiors are connected to each other to form the internal space of the service tower 101; the secondary flange 3 is welded together with the opening of the helium container 203, so that the internal space of the service tower 101 is connected to the internal space of the helium container 203; the room temperature flange is provided with a refrigerator cold head room temperature jack K1, a refrigerator cold head assembly 102 is inserted into the service tower 101 through the refrigerator cold head room temperature jack K1, and is inserted into the refrigerator in the refrigerator A sealed connection is formed at the orifice of the cold head room temperature jack K1, and an interlayer vacuum is formed between the helium container and the vacuum container; a service tower outer cylinder 205 is also provided on the outside of the service tower 101, which wraps the room temperature flange 1, the primary flange 2, the secondary flange 3, the upper bellows 4, and the lower bellows 5. The room temperature flange 1 is welded to the opening of the vacuum container 201 through the service tower outer cylinder 205, so that the internal space surrounded by the service tower outer cylinder 205 is connected to the interlayer vacuum; the gas box 6 is arranged on the top surface of the room temperature flange 1, the two room temperature electrodes 7 and the refrigerant injection port 8 are both arranged on the gas box 6, and a refrigerant injection pipe is inserted into the refrigerant injection port 8. The two room temperature electrodes 7 are respectively connected to two high-temperature superconducting current leads 17 whose other ends are electrically connected to the superconducting coil of the superconducting magnet through a connecting structure; the connecting structure, the two high-temperature superconducting current leads 17 and the refrigerant injection pipe are all contained in the internal space of the service tower 101.

[0010] Preferably, the refrigerator cold head assembly 102 is inserted into the service tower 101 through the refrigerator cold head room temperature plug hole K1, and a sealing connection is formed at the opening of the refrigerator cold head room temperature plug hole K1 through an O-ring.

[0011] Preferably, the connection structure includes two leads 15 and a primary flange electrical connector 16, the primary flange electrical connector 16 is arranged on the primary flange 2, the two room temperature electrodes 7 are respectively connected to the two leads 15, the other ends of the two leads 15 are respectively connected to two high temperature superconducting current leads 17 through the two primary flange electrical connectors 16, and the other ends of the two high temperature superconducting current leads 17 are respectively connected to the two leads of the superconducting coil to realize the electrical connection between the superconducting coil and the outside world. More preferably, the leads 15 are copper leads.

[0012] More preferably, the lead wire 15 is bent in a serpentine shape, with horizontal sections spaced more than 15 mm apart and upper and lower ends vertical, so that connection with the room temperature electrode 7 and the primary flange electrical connector 16 becomes convenient and easy.

[0013] Preferably, two feed-through electrodes, i.e., room temperature electrodes 7, and an injection port, i.e., refrigerant injection port 8, are located on the upper surface of the gas box, and the two room temperature electrodes 7 are arranged on both sides of the refrigerant injection port 8 so as to provide maximum operating space for the two operations of connecting external cables and plugging and unplugging the injection tube.

[0014] Preferably, the gas box 6 is welded to the top end surface of the room temperature flange 1. More preferably, the gas box is an arc-shaped gas box.

[0015] Preferably, the lower part of the refrigerator cold head assembly 102 also passes through the refrigerator cold head primary flange jack k11 arranged on the primary flange, and the refrigerator cold head room temperature jack K1 and the refrigerator cold head primary flange jack k11 are eccentrically arranged on the room temperature flange and the primary flange.

[0016] Preferably, the secondary flange 3 is a circular ring structure.

[0017] Preferably, the room temperature flange 1 is also provided with a sandwich vacuum port connection hole K5 and a sandwich vacuum instrument signal socket connection hole k6; a vacuum port 12 is welded to the sandwich vacuum port connection hole K5, which is used to evacuate the space where the sandwich vacuum is located; and a sandwich vacuum port plug 13 is also provided in coordination with the vacuum port 12. More preferably, the vacuum port plug 13 and the vacuum port 12 are sealed by an O-shaped rubber ring to form a sealing structure, which is used to seal the sandwich vacuum after the vacuum is completed. A sandwich vacuum instrument signal socket 14 is welded to the sandwich vacuum instrument signal socket connection hole k6 to form a continuous channel, which is used to lead the signal line of the monitoring probe inside the sandwich vacuum to the external air side of the sandwich vacuum.

[0018] Preferably, the primary flange 2 is connected to the opening of the cold shield 202 through a plurality of circumferentially distributed flexible metal strips 204 to form a heat conduction channel.

[0019] Preferably, the room temperature flange 1 is further provided with a liquid injection pipe jack k2, a lead wire through hole k3, and an air guide hole k4, wherein the liquid injection pipe jack k2, the lead wire through hole k3, and the air guide hole k4 are all surrounded by the inside of the gas box 6, and the hole surrounded by the gas box 6 is also surrounded by the bellows under the room temperature flange to be located in the internal space of the service tower 101; the liquid injection pipe jack k2 is used for the refrigerant liquid injection pipe inserted from the refrigerant liquid injection port 8 to pass through; the lead wire through hole k3 is used for the connection structure to pass through; the air guide hole k4 is used to increase the gas flow area from the helium container to the outside; more preferably, the gas box 6 is as close as possible to the room temperature jack k1 of the refrigerator cold head so that the service tower 101 obtains a smaller maximum diameter.

[0020] In coordination with the through hole on the room temperature flange, the primary flange 2 is also provided with a primary flange jack k12 for a liquid injection pipe, a primary flange electrical connector through hole k13, a primary flange air guide hole k14 and a primary flange signal line through hole k15; the primary flange jack k12 for a liquid injection pipe, the primary flange electrical connector through hole k13, the primary flange air guide hole k14 and the primary flange signal line through hole k15 are also located in the internal space of the service tower 101; the primary flange electrical connector through hole k13 is used to set a primary flange electrical connector 16, and the primary flange air guide hole k14 cooperates with the air guide hole k4 on the room temperature flange 1 to increase the flow area from the helium container to the gas box. More preferably, the primary flange air guide hole k14 and the air guide hole k4 on the room temperature flange 1 are at least 2, and most preferably, 4. The primary flange signal line through hole k15 is used to cooperate with any one of the air guide holes k4 on the room temperature flange 1 to form a continuous channel to lead the signal line of the monitoring probe inside the helium container to the air side outside the helium container.

[0021] Preferably, a small hole, namely a thin rod fixing hole k16, is provided next to the first-level flange signal line through hole k15 on the first-level flange for fixing a thin rod between the first-level flange and the second-level flange to fix the signal line from inside the helium container.

[0022] More preferably, the injection pipe socket k2 on the room temperature flange 1 and the injection pipe primary flange socket k12 on the primary flange 2 are coaxially arranged.

[0023] Preferably, the room temperature flange 1 and the primary flange 2 are fixedly connected by screws.

[0024] Preferably, the gas box 6 is also provided with a KF40 quick-connect flange 9, a gas supply valve connecting pipe 10, and a helium container internal instrument signal socket 11.

[0025] Preferably, the refrigerator cold head assembly 102 comprises a refrigerator cold head 21 , a primary cold head heat conducting connector 22 and a secondary cold head condenser 23 which are connected in sequence.

[0026] Preferably, the refrigerator cold head 21 is thermally connected to the primary flange 2 through the primary cold head thermal connector 22; under normal operating conditions, the secondary cold head condenser 23 functions to condense the surrounding cold helium to form liquid helium.

[0027] The beneficial effects of the present invention are:

[0028] A superconducting magnet comprehensive function service tower of the present invention has an ingenious structure, integrates all external interfaces of the superconducting magnet, and the diameter is reduced to a greater extent; the overall structure also becomes more concise, the dimensional accuracy is easier to ensure during the assembly process, and welding is more convenient; and in the process of assembling the service tower to the helium container, the room temperature plug hole of the refrigerator cold head with a larger diameter can be fully utilized as an operating space; in addition, the total area of ​​the holes on the room temperature flange and the primary flange ensures the smooth flow of air from the helium container to the outside, thereby ensuring the safety of the superconducting magnet equipment in the case of coil quenching; and including the high-temperature superconducting current lead, the theoretical value of heat leakage of the service tower to the helium container is less than 0.38W, and the use results on the superconducting magnet product show that the actual heat leakage is consistent with the theoretical value, the effect is good, and the practicability is strong. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] For ease of explanation, the present invention is described in detail with reference to the following specific embodiments and accompanying drawings.

[0030] Figure 1 A perspective structural view of an embodiment of a service tower as an independent component;

[0031] Figure 2 for Figure 1 A longitudinal section view of

[0032] Figure 3 It is a top view of the room temperature flange of the service tower;

[0033] Figure 4 This is a top view of the first level flange of the service tower;

[0034] Figure 5a It is the front view of the lead;

[0035] Figure 5b It is the top view of the lead;

[0036] Figure 6 A partial cross-sectional view of the service tower after it has been installed into the superconducting magnet;

[0037] Figure 7 It is a schematic diagram of the three-dimensional structure of the cold head assembly of the refrigerator. DETAILED DESCRIPTION

[0038] like Figure 1-7As shown, a superconducting magnet comprehensive function service tower 101 is used to be installed on a superconducting magnet whose exterior is a helium container 203, a cold shield 202, and a vacuum container 201 from the inside to the outside. The service tower 101 includes a room temperature flange 1, a primary flange 2, a secondary flange 3, an upper bellows 4, a lower bellows 5, a gas box 6, two room temperature electrodes 7, a refrigerant injection port 8, a connection structure, and two high-temperature superconducting current leads 17; the room temperature flange 1, the upper bellows 4, the primary flange 2, the lower bellows 5 and the secondary flange 3 are welded together in sequence, and the interiors are connected to each other to form the internal space of the service tower 101; the secondary flange 3 is welded to the opening of the helium container 203 so that the internal space of the service tower 101 is connected to the internal space of the helium container 203; the room temperature flange is provided with a refrigerator cold head room temperature jack K1, and a refrigerator cold head assembly 102 is inserted into the service tower 101 through the refrigerator cold head room temperature jack K1, and is made A sealed connection is formed at the orifice of the room temperature jack K1 of the cold head of the refrigerator, and an interlayer vacuum is formed between the helium container and the vacuum container; a service tower outer cylinder 205 is also provided on the outside of the service tower 101, which wraps the room temperature flange 1, the first-level flange 2, the second-level flange 3, the upper bellows 4, and the lower bellows 5. The room temperature flange 1 is welded to the opening of the vacuum container 201 through the service tower outer cylinder 205, so that the internal space surrounded by the service tower outer cylinder 205 is connected to the interlayer vacuum; the gas box 6 is arranged on the top surface of the room temperature flange 1, the two room temperature electrodes 7 and the refrigerant injection port 8 are both arranged on the gas box 6, and a refrigerant injection pipe is inserted into the refrigerant injection port 8. The two room temperature electrodes 7 are respectively connected to two high-temperature superconducting current leads 17 whose other ends are electrically connected to the superconducting coil of the superconducting magnet through a connecting structure; the connecting structure, the two high-temperature superconducting current leads 17 and the refrigerant injection pipe are all contained in the internal space of the service tower 101.

[0039] The refrigerator cold head assembly 102 is inserted into the service tower 101 through the refrigerator cold head room temperature plug hole K1, and a sealing connection is formed at the opening of the refrigerator cold head room temperature plug hole K1 through an O-shaped rubber ring.

[0040] The connection structure includes two leads 15 and a primary flange electrical connector 16, wherein the primary flange electrical connector 16 is disposed on the primary flange 2, and the two room temperature electrodes 7 are respectively connected to the two leads 15, and the other ends of the two leads 15 are respectively connected to two high temperature superconducting current leads 17 through the two primary flange electrical connectors 16, and the other ends of the two high temperature superconducting current leads 17 are respectively connected to the two leads of the superconducting coil to realize the electrical connection between the superconducting coil and the outside world. Preferably, the leads 15 are copper leads.

[0041] The lead wire 15 is bent in a serpentine shape, with horizontal sections spaced more than 15 mm apart and upper and lower ends vertical, making it convenient and easy to connect with the room temperature electrode 7 and the primary flange electrical connector 16.

[0042] Two feed-through electrodes, namely the room temperature electrodes 7, and the injection port, namely the refrigerant injection port 8, are located on the upper surface of the gas box, and the two room temperature electrodes 7 are arranged on both sides of the refrigerant injection port 8 to provide maximum operating space for the two operations of connecting external cables and plugging and unplugging the injection tube.

[0043] The gas box 6 is welded to the top end surface of the room temperature flange 1. Preferably, the gas box is an arc-shaped gas box.

[0044] The lower part of the refrigerator cold head assembly 102 also passes through the refrigerator cold head primary flange jack k11 arranged on the primary flange, and the refrigerator cold head room temperature jack K1 and the refrigerator cold head primary flange jack k11 are both eccentrically arranged on the room temperature flange and the primary flange.

[0045] The room temperature flange 1 is also provided with a sandwich vacuum port connection hole K5 and a sandwich vacuum instrument signal socket connection hole k6; a vacuum port 12 is welded to the sandwich vacuum port connection hole K5, which is used to evacuate the space where the sandwich vacuum is located; and a sandwich vacuum port plug 13 is also provided in coordination with the vacuum port 12. The vacuum port plug 13 and the vacuum port 12 are sealed by an O-shaped rubber ring to form a sealing structure, which is used to seal the sandwich vacuum after the vacuum is completed. A sandwich vacuum instrument signal socket 14 is welded to the sandwich vacuum instrument signal socket connection hole k6 to form a continuous channel, which is used to lead the signal line of the monitoring probe inside the sandwich vacuum to the external air side of the sandwich vacuum.

[0046] The primary flange 2 is connected to the opening of the cold shield 202 through a plurality of circumferentially distributed flexible metal strips 204 to form a heat conduction channel.

[0047] The room temperature flange 1 is also provided with a liquid injection pipe jack k2, a lead wire through hole k3, and an air guide hole k4. The liquid injection pipe jack k2, the lead wire through hole k3, and the air guide hole k4 are all surrounded by the inside of the gas box 6, and the hole surrounded by the gas box 6 is also surrounded by the bellows under the room temperature flange to be located in the internal space of the service tower 101; the liquid injection pipe jack k2 is used for the refrigerant liquid injection pipe inserted from the refrigerant liquid injection port 8 to pass through; the lead wire through hole k3 is used for the connection structure to pass through; the air guide hole k4 is used to increase the gas flow area from the helium container to the outside; more preferably, the gas box 6 is as close as possible to the room temperature jack k1 of the refrigerator cold head so that the service tower 101 obtains a smaller maximum diameter.

[0048] In cooperation with the through hole on the room temperature flange, the first-level flange 2 is also provided with a first-level flange jack k12 for a liquid injection pipe, a first-level flange electrical connector perforation k13, a first-level flange air guide hole k14 and a first-level flange signal line perforation k15; the first-level flange jack k12 for a liquid injection pipe, the first-level flange electrical connector perforation k13, the first-level flange air guide hole k14 and the first-level flange signal line perforation k15 are also located in the internal space of the service tower 101; the first-level flange electrical connector perforation k13 is used to set the first-level flange electrical connector 16, and the first-level flange air guide hole k14 cooperates with the air guide hole k4 on the room temperature flange 1 to increase the flow area from the helium container to the gas box. The first-level flange air guide hole k14 and the air guide hole k4 on the room temperature flange 1 are both at least 2, and in this embodiment, 4. The first-level flange signal line perforation k15 is used to cooperate with any one of the air guide holes k4 on the room temperature flange 1 to form a continuous channel to lead the signal line of the monitoring probe inside the helium container to the air side outside the helium container.

[0049] A small hole, namely a thin rod fixing hole k16, is provided next to the first-level flange signal line through hole k15 on the first-level flange for fixing a thin rod between the first-level flange and the second-level flange to fix the signal line from inside the helium container.

[0050] The injection pipe insertion hole k2 on the room temperature flange 1 and the injection pipe primary flange insertion hole k12 on the primary flange 2 are coaxially arranged.

[0051] The room temperature flange 1 and the primary flange 2 are fixedly connected by screws.

[0052] The gas box 6 is also provided with a KF40 quick-connect flange 9, a gas supply valve connecting pipe 10, and a helium container internal instrument signal socket 11.

[0053] The refrigerator cold head assembly 102 includes a refrigerator cold head 21 , a primary cold head heat conducting connector 22 and a secondary cold head condenser 23 which are connected in sequence.

[0054] The refrigerator cold head 21 is thermally connected to the primary flange 2 through the primary cold head thermal connector 22; under normal operating conditions, the secondary cold head condenser 23 condenses the surrounding cold helium to form liquid helium.

[0055] The specific embodiments are as follows:

[0056] See attached Figure 1 , Attachment Figure 2 , Attachment Figure 6A superconducting magnet integrated function service tower 101 includes: a room temperature flange 1, a primary flange 2, a secondary flange 3, an upper bellows 4, a lower bellows 5, a gas box 6, two room temperature electrodes 7, a refrigerant injection port 8, a KF40 quick-connect flange 9, a gas supply valve connecting pipe 10, an instrument signal socket 11 in a helium container, a sandwich vacuum extraction port 12, a sandwich vacuum extraction port plug 13, a sandwich vacuum instrument signal socket 14, two leads 15, two primary flange electrical connectors 16, and two high-temperature superconducting current leads 17. The room temperature flange 1, the primary flange 2, the upper bellows 4, the lower bellows 5, and the secondary flange 3 are welded together in sequence, and the internal spaces are connected to each other. The gas box 6 is welded to the top surface of the room temperature flange 1. The two room temperature electrodes 7 are respectively connected to two leads 15, the other ends of the two leads 15 are respectively connected to two high-temperature superconducting current leads 17 through two first-level flange electrical connectors 16 arranged on the first-level flange, and the other ends of the two high-temperature superconducting current leads 17 are respectively connected to the two leads of the superconducting coil, thereby realizing the electrical connection between the superconducting coil and the outside world.

[0057] See attached Figure 3 , a top view of the room temperature flange 1, the through holes processed thereon include: the room temperature jack k1 of the refrigerator cold head, the jack k2 of the liquid injection pipe, the lead through hole k3, the air guide hole k4, the sandwich vacuum extraction port connection hole k5, and the sandwich vacuum instrument signal socket connection hole k6. The through holes k2, k3, and k4 are surrounded by the inside of the gas box 6, and the holes surrounded by the gas box 6 are also surrounded by the bellows under the room temperature flange. The gas box is an arc-shaped gas box, which is as close as possible to the refrigerator cold head jack in the middle of the room temperature flange, so that the holes surrounded by the gas box are also surrounded by the bellows under the room temperature flange.

[0058] See attached Figure 4 , a top view of the primary flange 2, the through holes processed thereon include: the primary flange socket k11 of the refrigerator cold head, the primary flange socket k12 of the liquid injection pipe, the primary flange electrical connector through hole k13, the primary flange air guide hole k14, the primary flange signal line through hole k15, and the thin rod fixing hole k16.

[0059] See attached Figure 5a and attached Figure 5b , are respectively a front view and a top view of one of the two leads 15. The shape of the other lead 15 is similar to Figure 5a and Figure 5b The shape shown in Figure 4 The horizontal center line of the lead wire 15 is mirror-symmetrical. The horizontal sections are bent in a serpentine shape. The horizontal sections are spaced more than 15 mm apart, and the upper and lower ends are vertical, so that the connection with the room temperature electrode 7 and the primary flange electrical connector 16 becomes convenient and easy.

[0060] See attached Figure 6 and attached Figure 2, a partial cross-sectional view of the service tower after being installed in the superconducting magnet. The figure shows the three components of the superconducting magnet, which are the helium container 203, the cold shield 202, and the vacuum container 201 from the inside to the outside. The secondary flange 3 of the service tower 101 is welded to the opening of the helium container 203, forming a closed space inside; the primary flange 2 is connected to the opening of the cold shield outer tube 202 through multiple circumferentially distributed flexible metal strips 204 to form a heat conduction channel; the room temperature flange 1 is welded to the vacuum container through the service tower outer tube 205, forming a closed space inside. The interlayer between the vacuum container and the helium container is evacuated, and the space surrounded by the interlayer is also customarily called the interlayer vacuum.

[0061] See attached Figure 6 , Attachment Figure 7 , Attachment Figure 3 and attached Figure 4 , the refrigerator cold head 21, the first cold head heat conductive connector 22, and the second cold head condenser 23 together form the refrigerator cold head assembly 102, which is then inserted into the service tower 101. The room temperature contact part between the refrigerator cold head 21 and the service tower 101 is sealed by an O-ring; the first cold head is thermally connected to the first flange through the first cold head heat conductive connector 22; under normal operating conditions, the second cold head condenser 23 condenses the surrounding cold helium to form liquid helium.

[0062] Therefore, the difference between this patent and the original patent is:

[0063] 1. In the original patent, there are three sets of bellows connecting the room temperature flange and the 4K helium container, including the bellows where the refrigerator is located, the liquid injection bellows and the signal line bellows. This patent cancels the latter two bellows, and the secondary flange degenerates into a ring, thereby simplifying the manufacturing process of the service tower.

[0064] 2. The diameter of the bellows where the refrigerator is located is slightly increased, and the eccentric structure of the refrigerator cold head socket is retained on the room temperature flange and the first-level flange, so as to allow more holes to be added to the area surrounded by the bellows on the first-level flange, two of which are used to install the electrical connector connecting the high-temperature superconducting current lead and the lead, one of which is used to insert the injection pipe, one of which is used to pass the signal line, and the remaining holes are used as channels for gas flow. The gas box on the room temperature flange is as close as possible to the refrigerator cold head socket, so that the holes surrounded by the gas box are also surrounded by the bellows under the room temperature flange. In particular, the hole for inserting the injection pipe is coaxial with the hole of the same purpose on the first-level flange; two of the holes are used to pass the lead; and the remaining holes are used as channels for gas flow. Compared with the original invention patent, the side wall opening of the bellows and the transition connecting pipe are cancelled, thereby eliminating the difficulty of the lead passing through the pipe, and making the overall structure more simple and compact.

[0065] 3. The two feedthrough electrodes and the injection port must be located on the upper surface of the gas box, and the two feedthrough electrodes must be arranged on both sides of the injection port to provide the maximum operating space for connecting external cables and plugging and unplugging the injection tube. Other various interfaces, such as the gas supply pipe, instrument electrical feedthrough socket, etc., are located on the outer arc surface of the gas box, and these interfaces are arranged according to the principle of convenient connection operation. The two feedthrough electrodes are respectively connected to two leads, and the other ends of the two leads are respectively connected to two high-temperature superconducting current leads through electrical connectors on the primary flange. The other ends of the two high-temperature superconducting current leads are respectively connected to the two leads of the superconducting coil, thereby realizing the electrical connection between the superconducting coil and the outside world.

[0066] 4. Add a small hole next to the hole in the primary flange for passing the signal line, which is used to fix a thin rod between the primary flange and the secondary flange. The thin rod is used to fix the signal line from the inside of the helium container.

[0067] A superconducting magnet comprehensive function service tower of the present invention has an ingenious structure, integrates all external interfaces of the superconducting magnet, and the diameter is reduced to a greater extent; the overall structure becomes more concise, the dimensional accuracy is easier to ensure during the assembly process, and welding is more convenient; and in the process of assembling the service tower to the helium container, the cold head socket of the refrigerator with a larger diameter can be fully utilized as an operating space; in addition, the total area of ​​the holes on the room temperature flange and the first-level flange ensures smooth airflow from the helium container to the gas box, thereby ensuring the safety of the superconducting magnet equipment in the case of coil quenching; and including the high-temperature superconducting current lead, the theoretical heat leakage value of the service tower to the helium container is less than 0.38W, and the use results on the superconducting magnet product show that the actual heat leakage is consistent with the theoretical value, the effect is good, and the practicability is strong.

[0068] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that are not conceived through creative work should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope defined in the claims.

Claims

1. A superconducting magnet comprehensive function service tower, used to be installed on a superconducting magnet which includes a helium container (203), a cold shield (202), and a vacuum container (201) from the inside to the outside, characterized in that: The service tower (101) comprises a room temperature flange (1), a primary flange (2), a secondary flange (3), an upper bellows (4), a lower bellows (5), a gas box (6), two room temperature electrodes (7), a refrigerant injection port (8), a connection structure, and two high-temperature superconducting current leads (17); the room temperature flange (1), the upper bellows (4), the primary flange (2), the lower bellows (5), and the secondary flange (3) are welded together in sequence, and the interiors thereof are interconnected to form an internal space of the service tower (101); the secondary flange (3) is welded together with an opening of the helium container (203) so that the internal space of the service tower (101) is connected to the internal space of the helium container (203); a refrigerator cold head room temperature plug hole (K1) is provided on the room temperature flange, a refrigerator cold head assembly (102) is inserted into the service tower (101) through the refrigerator cold head room temperature plug hole (K1), and a sealed connection is formed at the opening of the refrigerator cold head room temperature plug hole (K1), and the helium container is connected to the service tower (101). An interlayer vacuum is formed between the vacuum containers; the room temperature flange (1), the first-level flange (2), the second-level flange (3), the upper bellows (4), and the lower bellows (5) are wrapped around the service tower (101); a service tower outer cylinder (205) is further provided on the outside of the service tower (101); the room temperature flange (1) is welded to the opening of the vacuum container (201) through the service tower outer cylinder (205), so that the internal space surrounded by the service tower outer cylinder (205) is connected to the interlayer vacuum; the gas box (6) is provided with The two room temperature electrodes (7) and the refrigerant injection port (8) are arranged on the top surface of the room temperature flange (1), and the two room temperature electrodes (7) and the refrigerant injection port (8) are both arranged on the gas box (6). A refrigerant injection pipe is inserted into the refrigerant injection port (8). The two room temperature electrodes (7) are respectively connected to two high-temperature superconducting current leads (17) whose other ends are electrically connected to the superconducting coil of the superconducting magnet through a connecting structure; the connecting structure, the two high-temperature superconducting current leads (17) and the refrigerant injection pipe are all contained in the internal space of the service tower (101); The connection structure comprises two leads (15) and a primary flange electrical connector (16), wherein the primary flange electrical connector (16) is arranged on the primary flange (2), the two room temperature electrodes (7) are respectively connected to the two leads (15), the other ends of the two leads (15) are respectively connected to two high-temperature superconducting current leads (17) via the two primary flange electrical connectors (16), and the other ends of the two high-temperature superconducting current leads (17) are respectively connected to two leads of a superconducting coil of a superconducting magnet to achieve electrical connection between the superconducting coil and the outside world; The room temperature flange (1) is also provided with a liquid injection pipe insertion hole (k2), a lead wire through hole (k3), and an air guide hole (k4); the liquid injection pipe insertion hole (k2), the lead wire through hole (k3), and the air guide hole (k4) are all surrounded by the inside of the gas box (6), and the hole surrounded by the gas box (6) is also surrounded by the bellows below the room temperature flange so as to be located in the internal space of the service tower (101); the liquid injection pipe insertion hole (k2) is used for the refrigerant liquid injection pipe inserted from the refrigerant liquid injection port (8) to pass through; the lead wire through hole (k3) is used for the connection structure to pass through; and the air guide hole (k4) is used to increase the gas flow area from the helium container to the outside.

2. The service tower according to claim 1, characterized in that The lead wire (15) is bent in a serpentine shape, with horizontal sections spaced more than 15 mm apart, and upper and lower ends being vertical.

3. The service tower according to claim 1, characterized in that The two room temperature electrodes (7) and the refrigerant injection port (8) are both located on the upper surface of the gas box, and the two room temperature electrodes (7) are arranged on both sides of the refrigerant injection port (8).

4. The service tower according to claim 1, characterized in that The gas box (6) is welded to the top end surface of the room temperature flange (1), and the gas box (6) is an arc-shaped gas box.

5. The service tower according to claim 1, characterized in that The room temperature flange (1) is also provided with a sandwich vacuum extraction port connection hole (K5) and a sandwich vacuum instrument signal socket connection hole (k6); a vacuum extraction port (12) is welded to the sandwich vacuum extraction port connection hole (K5) for evacuating the space where the sandwich vacuum is located; a sandwich vacuum extraction port plug (13) is also provided in coordination with the vacuum extraction port (12); a sandwich vacuum instrument signal socket (14) is welded to the sandwich vacuum instrument signal socket connection hole (k6) to form a continuous channel for leading the signal line of the monitoring probe inside the sandwich vacuum to the external air side of the sandwich vacuum.

6. The service tower according to claim 1, characterized in that The primary flange (2) is connected to the opening of the outer cylinder of the cold shield (202) via a plurality of circumferentially distributed flexible metal strips (204), thereby forming a heat conduction channel.

7. The service tower according to claim 1, characterized in that In cooperation with the through hole on the room temperature flange (1), the first-level flange (2) is further provided with a first-level flange insertion hole (k12) for a liquid injection pipe, a first-level flange electrical connector through hole (k13), a first-level flange air guide hole (k14) and a first-level flange signal line through hole (k15); the first-level flange insertion hole (k12) for a liquid injection pipe, the first-level flange electrical connector through hole (k13), the first-level flange air guide hole (k14) and the first-level flange signal line through hole (k15) are also located in the internal space of the service tower (101); the first-level flange electrical connector through hole (k13) is used to set a first-level flange electrical connector (16); the first-level flange air guide hole (k14) cooperates with the air guide hole (k4) on the room temperature flange (1) to increase the flow area from the helium container to the gas box; the first-level flange signal line through hole (k15) is used to cooperate with the air guide hole (k4) on the room temperature flange (1) to form a continuous channel to lead the signal line of the monitoring probe inside the helium container to the air side outside the helium container.

8. The service tower according to claim 1, characterized in that The refrigerator cold head assembly (102) comprises a refrigerator cold head (21), a first-stage cold head heat-conducting connector (22), and a second-stage cold head condenser (23) which are connected in sequence; between the refrigerator cold head (21) and the service tower (101), a portion in contact with the room temperature flange (1) is sealed via an O-ring; the refrigerator cold head (21) is heat-conductingly connected to the first-stage flange (2) via the first-stage cold head heat-conducting connector (22); and the second-stage cold head condenser (23) is used to condense surrounding cold helium gas to form liquid helium under normal operating conditions.