A fuel cell frame glue injection mold device with cooling structure
By setting a hollow area and a heat dissipation fan in the fuel cell frame injection mold, the complex and damage problems of sealant line molding in the prior art are solved, and efficient assembly and mass production are achieved.
Patent Information
- Application Number
- CN202111509902.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-10
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2041-12-10
AI Technical Summary
The existing fuel cell sealant line forming method is complex in operation, low assembly efficiency and production capacity, lack of cooling structure, difficult to mass production, and easy to cause damage to core components such as membrane electrodes and bipolar plates.
A fuel cell frame glue injection mold device with a cooling structure is designed, including a top-down panel, a water outlet panel, an upper formwork, a lower formwork, a bearing plate, a square iron and a bottom plate, and a hollow area is set to form a connected air channel. , and a cooling fan is installed in the panel and bearing plate, and the temperature and humidity are adjusted through the air-conditioning input pipe to ensure that the temperature in the mold is less than 75℃.
It improves assembly efficiency and production capacity, reduces the damage risk to membrane electrodes and bipolar plates, and achieves a sealing effect suitable for large-scale mass production.
Smart Images

Figure CN114211702B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of fuel cell sealing, and in particular to a fuel cell frame glue injection mold device with a cooling structure. Background Art
[0002] Fuel cells are online power generation devices that convert chemical energy into electrical energy. Fuel cell stacks are gradually moving towards lightweight. Graphite bipolar plates have been thinned from 1.8mm to 1.6mm, and even molded graphite bipolar plates have proposed the concept of ultra-thin bipolar plates of 1.2mm. In order to ensure the strength and service life of the bipolar plates, the depth of the sealing grooves of the bipolar plates has also been required to be shallower, making it difficult for the dispensing process currently used in the industry to match it. Affected by the type of glue, the accuracy of the dispensing valve, and the flatness of the dispensing platform, the dispensing height of the dispensing machine must be guaranteed to be above 0.45mm to ensure that the dispensing strip meets the design accuracy requirements. A dispensing height lower than this will result in the risk of substandard appearance inspection of the sealing strip or airtightness due to insufficient accuracy.
[0003] At present, the common membrane electrode MEA is a seven-layer structure with a double frame, including a membrane assembly with a proton exchange membrane and a double-sided catalyst layer, a double-layer frame, and two porous conductive materials such as carbon paper. Since the membrane electrode assembly needs to participate in the injection process, higher requirements are placed on the heat dissipation of the injection mold. In the prior art, the sealing of fuel cell stacks can be achieved by directly injecting a sealing strip assembly with a specific cross-sectional shape on the monopolar plate, bipolar plate, or even on the membrane electrode frame, or by injecting a sealing strip into an integrated manner on the membrane electrode frame.
[0004] The commonly used process paths for forming the sealing strip on the membrane electrode frame are screen printing technology, dispensing technology or injection technology. At present, most membrane electrode suppliers in the industry use a seven-layer membrane electrode structure with double frames glued together. Therefore, the injection samples in the injection molding process generally include frames and membrane electrode assemblies, and the heat resistance of CCM cannot exceed 120℃ / 3min, which brings huge challenges to the development of the injection process. Due to the limitations of frame material selection, frame thickness shaping, membrane electrode assembly packaging process, injection molding mold accuracy, injection process parameters, and the inability to predict whether it will cause internal performance damage, the current membrane electrode injection solution has always been in the small-batch experimental stage and has not yet entered the stage of mass production. Summary of the invention
[0005] Based on this, the present invention provides a fuel cell frame glue injection mold device with a cooling structure, which aims to solve the problems of the existing sealant line forming method being complicated to operate, inconvenient for the assembly of the fuel cell stack, low assembly efficiency and production capacity, lacking a cooling structure, easily causing damage to core components such as membrane electrodes and bipolar plates, and being unable to carry out mass production.
[0006] To achieve the above object, the present invention proposes the following technical solutions:
[0007] The present application proposes a fuel cell frame glue injection mold device with a cooling structure, which is used for sealing the membrane electrode, and includes a panel, a nozzle plate, an upper mold plate, a lower mold plate, a support plate, a square iron and a bottom plate arranged from top to bottom;
[0008] A first groove is provided on the side of the upper mold plate close to the lower mold plate, and an upper mold core is provided in the first groove; a second groove is provided on the side of the lower mold plate close to the upper mold plate, and a lower mold core is provided in the second groove;
[0009] The panel, the nozzle plate, the upper mold plate, the upper mold core, the lower mold core, the lower mold plate and the carrier plate are all provided with hollow areas, and the hollow areas are abutted from top to bottom to form a connected air channel;
[0010] A first heat dissipation fan is arranged in the hollow area of the panel; and a second heat dissipation fan is arranged in the hollow area of the carrier plate.
[0011] Preferably, a first cold air inlet pipe is provided on the side of the upper mold plate, one end of the first cold air inlet pipe passes through the upper mold plate and the upper mold core in sequence and is connected to the hollow area of the upper mold core, and the other end is connected to the cold air source;
[0012] A second cold air inlet pipe is arranged on the side of the lower mold plate, one end of the second cold air inlet pipe passes through the lower mold plate and the lower mold core in sequence and is connected to the hollow area of the lower mold core, and the other end is connected to the cold air source.
[0013] Preferably, the square iron includes a first square iron and a second square iron symmetrically arranged, a pin panel and a pin bottom plate are arranged between the first square iron and the second square iron, the pin panel is arranged on the pin bottom plate, and a first gap is arranged between the pin panel and the square iron, between the pin panel and the support plate, between the pin bottom plate and the square iron, and between the pin bottom plate and the bottom plate.
[0014] Preferably, the geometric centers of the panel and the nozzle plate are both provided with glue injection through holes, and the glue injection through holes are used to seal the membrane electrode through glue injection flow channel system.
[0015] Preferably, the glue injection channel system includes a glue injection main pipe, a first shunt pipe, a second shunt pipe, a third shunt pipe and a fourth shunt pipe;
[0016] One end of the glue injection main pipe is connected to the first shunt pipe, and the other end passes through the glue injection through hole and is connected to the glue source;
[0017] One end of the second shunt pipe is connected to one end of the first shunt pipe, and the other end is connected to the third shunt pipe;
[0018] The third shunt pipe is connected to the fourth shunt pipe;
[0019] The fourth shunt pipe is provided with a plurality of glue injection branch pipes, and the glue injection branch pipes are communicated with the glue injection ports of the membrane electrode.
[0020] Preferably, two of the second shunt tube, the third shunt tube and the fourth shunt tube are each provided; the two second shunt tubes are symmetrically arranged; the two third shunt tubes are symmetrically arranged; and the two fourth shunt tubes are symmetrically arranged.
[0021] Preferably, one end of the glue injection main pipe is connected to the geometric center of the first diversion pipe.
[0022] Preferably, the first shunt pipe is fixed to the upper mold plate by screws, the second shunt pipe is arranged in the upper mold plate; and the third shunt pipe is arranged in the upper mold core.
[0023] Preferably, a first slot for accommodating the fourth diverter tube is provided on the side of the upper mold core close to the lower mold core, and a second slot for accommodating the fourth diverter tube is provided on the side of the lower mold core close to the upper mold core, and the fourth diverter tube is engaged in the first slot and the second slot.
[0024] Preferably, the plurality of injection branch pipes are respectively fixed on the ejector base plate through ejectors.
[0025] Preferably, one end of the ejector pin is in contact with the injection branch pipe, and the other end passes through the lower mold core, the lower mold plate, the support plate and the ejector panel in sequence and is then fixed to the ejector bottom plate.
[0026] Preferably, the inner side of the hollow area is provided with an insulation frame adapted to the hollow area. Since the injection mold needs to preheat the molding area of the mold during production to achieve the requirement of rapid curing of the silicone, the cavity of the hollow area needs to maintain temperature and humidity to meet the conditions of room temperature working conditions. By setting a fixed layer of insulation frame with low thermal conductivity and easy processing around it, it can be well ensured that the cavity of the hollow area can maintain appropriate temperature and humidity to meet production needs.
[0027] Preferably, the thickness of the thermal insulation frame is preferably 1-30 mm. The thickness of the thermal insulation frame is mainly determined by the specific structure of the membrane electrode assembly.
[0028] Preferably, the insulation frame is preferably an insulation frame made of glass fiber material, foam plastic, ultra-fine glass wool, vacuum insulation panel or aerogel felt.
[0029] Preferably, a first grid support plate is provided on the side of the upper mold core close to the lower mold core, and a second grid support plate is provided on the side of the lower mold core close to the upper mold core; a second gap is provided between the first grid support plate and the insulation frame of the upper mold core, and between the second grid support plate and the insulation frame of the lower mold core.
[0030] The second gap is preferably a gap of 1-10 mm. The size of the second gap is mainly determined by the specific size of the membrane electrode assembly. The grid support plate mainly provides protection and support for the carbon paper of the membrane electrode assembly during the glue injection process. The size of the grid support plate is generally slightly smaller than the size of the insulation frame of the upper and lower mold cores, so that the existence of the second gap can be ensured, which is beneficial to the heat dissipation of the membrane electrode assembly during the glue injection process.
[0031] Preferably, the first cold air inlet pipe and the second cold air inlet pipe are arranged on the same side.
[0032] Preferably, the first cooling fan and the second cooling fan are both suction fans. Through the first cooling fan and the second cooling fan, the hot air in the fuel cell frame injection mold device can be quickly sucked out, effectively ensuring that the cavity temperature in the fuel cell frame injection mold device is less than 75°C, ensuring that the core components such as the membrane electrode and the bipolar plate will not be damaged during the injection process, effectively improving the assembly efficiency and production capacity, and can be suitable for large-scale mass production. The size and specification parameters of the cooling fan can be calculated and designed through the hot air exchange efficiency.
[0033] In an embodiment of the present application, the first cooling fan and the second cooling fan can be set to be linked control with the mold closing signal of the fuel cell frame injection mold; that is, when the fuel cell frame injection mold is closed, the first cooling fan and the second cooling fan are started; when the fuel cell frame injection mold is opened and opened to the extreme position, the first cooling fan and the second cooling fan are turned off.
[0034] Preferably, the first groove is matched with the upper mold core, and the second groove is matched with the lower mold core.
[0035] Preferably, the ejector panel is provided with a plurality of ejector fixing holes for fixing ejectors.
[0036] Preferably, the input ends of the first cold air input pipe and the second cold air input pipe are provided with gas filters. Through the cold air input pipe, air with suitable humidity and temperature can be delivered to the active area cavity of the membrane electrode assembly to ensure that the membrane electrode assembly will not be damaged due to the high temperature generated by the glue injection sealing process; through the gas filter, it can be effectively ensured that the CCM of the membrane electrode assembly will not be contaminated by impurity gases.
[0037] Preferably, the lower mold core is provided with a plurality of vacuum adsorption holes, which can ensure the accurate positioning of the membrane electrode frame and also ensure that the membrane electrode assembly will not be displaced due to gas suction during the injection molding process.
[0038] Preferably, the hollow areas of the upper mold core and the lower mold core are both provided with temperature sensors and humidity sensors. Through the humidity sensors and temperature sensors, the working environment in the mold during the molding process can be monitored in real time to take corresponding countermeasures.
[0039] In the embodiment of the present application, the upper mold core and the lower mold core can be processed into a whole hollow structure, and its size is determined according to the size of the membrane electrode assembly. Generally, the single-side distance between the edge of the carbon paper and the glue line on the sealing frame of the membrane electrode assembly is 5mm-25mm. The diameter of the glue injection port of the membrane electrode is preferably 0.1-100mm.
[0040] Compared with the prior art, this application has the following technical effects:
[0041] In the present invention, a connected air channel is formed by setting a hollow area and making the hollow areas abut each other from top to bottom. At the same time, a first cooling fan is set in the hollow area of the panel and a second cooling fan is set in the hollow area of the support plate. The heat generated during the glue injection process can be quickly sucked out through the air channel by the first cooling fan and the second cooling fan, thereby greatly reducing the risk of damage to core components such as membrane electrodes and bipolar plates caused by the glue injection process.
[0042] In addition, by setting a cold air inlet pipe, air with suitable humidity and temperature can be delivered to the active area cavity of the membrane electrode assembly, effectively ensuring that the cavity temperature in the fuel cell frame injection mold device is less than 75°C, so as to ensure that the membrane electrode assembly will not be damaged due to the high temperature generated by the injection and sealing process. Through the device of the present application, during the injection and sealing process of the membrane electrode assembly, the heat generated by the injection can be quickly sucked out, and the working temperature and humidity in the mold can be effectively adjusted as needed, ensuring that the core components such as the membrane electrode and bipolar plate will not be damaged during the injection process, and the sealing effect is good, the practicability is strong, and the assembly efficiency and production capacity can be effectively improved, which is suitable for large-scale mass production. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0044] Figure 1 It is a structural schematic diagram of a fuel cell frame glue injection mold device with a cooling structure according to an embodiment of the present invention;
[0045] Figure 2 for Figure 1 Schematic diagram of the longitudinal section structure of the middle structure;
[0046] Figure 3 for Figure 1 Schematic diagram of the structure of the injection runner system in the middle structure.
[0047] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0049] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, top, bottom...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0050] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0051] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be an intermediate element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be an intermediate element at the same time.
[0052] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0053] At present, the commonly used process paths for integrally forming sealing strips on the membrane electrode frame are screen printing technology, dispensing technology or injection technology. At present, most membrane electrode suppliers in the industry use a seven-layer membrane electrode structure with double frames glued together. Therefore, the injection samples in the injection molding process generally include frames and membrane electrode assemblies, and the heat resistance of CCM cannot exceed 120℃ / 3min, which brings huge challenges to the development of the injection process. Limited by the selection of frame materials, frame thickness shaping, membrane electrode assembly packaging process, injection molding mold accuracy, injection process parameters, and the inability to predict whether it will cause internal performance damage, the current membrane electrode injection scheme has always been in the small-batch experimental stage and has not yet entered the stage of mass production. In order to solve the above problems, an embodiment of the present invention provides a fuel cell frame injection mold device with a cooling structure.
[0054] The device of the present invention has an air cooling structure designed in the area where the injection mold is in direct contact with the membrane electrode to cool the area so that the temperature of the local area is not higher than 75°C, thereby ensuring that the CCM will not suffer irreversible damage during the injection process.
[0055] like Figures 1 to 3 As shown, a fuel cell frame glue injection mold device with a cooling structure proposed in an embodiment of the present application is used for sealing a membrane electrode (not shown in the figure), including a panel 10, a nozzle plate 20, an upper mold plate 30, a lower mold plate 40, a support plate 50, a square iron 60 and a bottom plate 70 arranged from top to bottom;
[0056] A first groove (not marked in the figure) is provided on the side of the upper mold plate 30 close to the lower mold plate 40, and an upper mold core 31 is provided in the first groove; a second groove (not marked in the figure) is provided on the side of the lower mold plate 40 close to the upper mold plate 30, and a lower mold core 41 is provided in the second groove;
[0057] The panel 10, the nozzle plate 20, the upper mold plate 30, the upper mold core 31, the lower mold core 41, the lower mold plate 40 and the carrier plate 50 are all provided with hollow areas 100, and the hollow areas 100 are abutted from top to bottom to form a connected air channel;
[0058] A first heat dissipation fan 11 is disposed in the hollow area of the panel 10 ; and a second heat dissipation fan 51 is disposed in the hollow area of the carrier plate 50 .
[0059] In the embodiment of the present application, the number of hollow areas 100 can be set according to actual needs. Specifically, in the present embodiment, two hollow areas 100 are provided, and the two hollow areas 100 are symmetrically arranged. It is understood that in other embodiments, the hollow areas 100 can also be set into a mesh structure of 4, 6, 8 or more blocks according to actual heat dissipation requirements.
[0060] Preferably, a first cold air inlet pipe 32 is provided on the side of the upper mold plate 30, one end of the first cold air inlet pipe 32 passes through the upper mold plate 30 and the upper mold core 31 in sequence and is connected to the hollow area of the upper mold core 31, and the other end is connected to a cold air source (not marked in the figure);
[0061] A second cold air inlet pipe 42 is provided on the side of the lower mold plate 40, one end of the second cold air inlet pipe 42 passes through the lower mold plate 40 and the lower mold core 41 in sequence and is connected to the hollow area of the lower mold core 41, and the other end is connected to the cold air source.
[0062] In the embodiment of the present application, the number of the first cold air input pipe 32 and the second cold air input pipe 42 can be set according to actual needs. Specifically, in the present embodiment, two first cold air input pipes 32 and two second cold air input pipes 42 are provided. It is understandable that in other embodiments, the number of the first cold air input pipe 32 and the second cold air input pipe 42 can be set to 3, 4, 5, 6, etc. according to actual needs.
[0063] Preferably, the square iron 60 includes a first square iron 61 and a second square iron 62 that are symmetrically arranged, an ejector panel 80 and an ejector bottom plate 90 are arranged between the first square iron 61 and the second square iron 62, the ejector panel 80 is arranged on the ejector bottom plate 90, and a first gap (not marked in the figure) is arranged between the ejector panel 80 and the square iron 60, between the ejector panel 80 and the carrier plate 50, between the ejector bottom plate 90 and the square iron 60, and between the ejector bottom plate 90 and the bottom plate 70. Through the first gap, the heat sucked by the second cooling fan 51 can be quickly dissipated outward.
[0064] Preferably, a glue injection through hole 12 is provided at the geometric center of the panel 10 and the nozzle plate 20 , and the glue injection through hole 12 is used to inject glue and seal the membrane electrode through a glue injection channel system 200 .
[0065] Preferably, the glue injection channel system 200 includes a glue injection main pipe 210, a first shunt pipe 220, a second shunt pipe 230, a third shunt pipe 240 and a fourth shunt pipe 250;
[0066] One end of the glue injection main pipe 210 is connected to the first shunt pipe 220, and the other end passes through the glue injection through hole 12 and is connected to a glue source (not marked in the figure);
[0067] One end of the second shunt pipe 230 is connected to one end of the first shunt pipe 220, and the other end is connected to the third shunt pipe 240;
[0068] The third shunt pipe 240 is in communication with the fourth shunt pipe 250;
[0069] The fourth branch pipe 250 is provided with a plurality of glue injection branch pipes 251 , and the glue injection branch pipes 251 are connected to the glue injection ports (not marked in the figure) of the membrane electrode.
[0070] Preferably, two of the second shunt tube 230, the third shunt tube 240 and the fourth shunt tube 250 are each provided; the two second shunt tubes 230 are symmetrically arranged; the two third shunt tubes 240 are symmetrically arranged; and the two fourth shunt tubes 250 are symmetrically arranged.
[0071] Preferably, one end of the glue injection main pipe 210 is connected to the geometric center of the first diversion pipe 220 .
[0072] Preferably, the first shunt pipe 220 is fixed to the upper mold plate 30 by screws (not marked in the figure), the second shunt pipe 230 is arranged in the upper mold plate 30; and the third shunt pipe 240 is arranged in the upper mold core 31.
[0073] Preferably, a first card slot (not marked in the figure) for accommodating the fourth diversion tube 250 is provided on the side of the upper mold core 31 close to the lower mold core 41, and a second card slot (not marked in the figure) for accommodating the fourth diversion tube 250 is provided on the side of the lower mold core 41 close to the upper mold core 31, and the fourth diversion tube 250 is engaged in the first card slot and the second card slot.
[0074] Preferably, the plurality of injection branch pipes 251 are fixed to the ejector base plate 90 via ejector pins 252 , respectively.
[0075] Preferably, one end of the ejector pin 252 abuts against the injection branch pipe 251 , and the other end sequentially passes through the lower mold core 41 , the lower mold plate 40 , the support plate 50 and the ejector panel 80 and is fixed on the ejector bottom plate 90 .
[0076] Preferably, the inner side surface of the hollow area 100 is provided with an insulation frame 110 adapted to the hollow area 100. Since the injection mold needs to preheat the molding area of the mold during production to achieve the requirement of rapid curing of the silicone, the cavity of the hollow area needs to maintain temperature and humidity to meet the conditions of room temperature working conditions. By setting a fixed layer of insulation frame with low thermal conductivity and easy processing around it, it can be well ensured that the cavity of the hollow area can maintain appropriate temperature and humidity to meet production needs.
[0077] Preferably, the thickness of the heat insulation frame 110 is preferably 1-30 mm. The thickness of the heat insulation frame 110 is mainly determined according to the specific structure of the membrane electrode assembly.
[0078] Preferably, the insulation frame 110 is preferably an insulation frame made of glass fiber material, foam plastic, ultra-fine glass wool, vacuum insulation panel or aerogel felt.
[0079] Preferably, a first grid support plate 311 is provided on the side of the upper mold core 31 close to the lower mold core 41, and a second grid support plate 411 is provided on the side of the lower mold core 41 close to the upper mold core 31; a second gap (not marked in the figure) is provided between the first grid support plate 311 and the insulation frame of the upper mold core 31, and between the second grid support plate 411 and the insulation frame of the lower mold core 41.
[0080] The second gap is preferably a gap of 1-10 mm. The size of the second gap is mainly determined by the specific size of the membrane electrode assembly. The grid support plate mainly provides protection and support for the carbon paper of the membrane electrode assembly during the glue injection process. The size of the grid support plate is generally slightly smaller than the size of the insulation frame of the upper and lower mold cores, so that the existence of the second gap can be ensured, which is beneficial to the heat dissipation of the membrane electrode assembly during the glue injection process.
[0081] Preferably, the first cold air inlet pipe 32 and the second cold air inlet pipe 42 are arranged on the same side, which is conducive to improving space utilization and saving space.
[0082] Preferably, the first cooling fan 11 and the second cooling fan 51 are both suction fans. Through the first cooling fan 11 and the second cooling fan 51, the hot air in the fuel cell frame injection mold device can be quickly sucked out, effectively ensuring that the cavity temperature in the fuel cell frame injection mold device is less than 75°C, ensuring that the core components such as the membrane electrode and the bipolar plate will not be damaged during the injection process, effectively improving the assembly efficiency and production capacity, and can be suitable for large-scale mass production. The size and specification parameters of the cooling fan can be calculated and designed through the hot air exchange efficiency.
[0083] In an embodiment of the present application, the first cooling fan 11 and the second cooling fan 51 can be set to be linked control with the mold closing signal of the fuel cell frame injection mold; that is, when the fuel cell frame injection mold is closed, the first cooling fan 11 and the second cooling fan 51 are started; when the fuel cell frame injection mold is opened and opened to the extreme position, the first cooling fan 11 and the second cooling fan 51 are turned off.
[0084] Preferably, the first groove is matched with the upper mold core 31 , and the second groove is matched with the lower mold core 41 .
[0085] Preferably, the ejector panel 80 is provided with a plurality of ejector fixing holes (not marked in the figure) for fixing ejectors.
[0086] Preferably, a gas filter (not shown) is provided at the input end of the first cold air input pipe 32 and the second cold air input pipe 42. Through the cold air input pipe, air with suitable humidity and temperature can be delivered to the active area cavity of the membrane electrode assembly to ensure that the membrane electrode assembly will not be damaged due to the high temperature generated by the glue injection sealing process; through the gas filter, it can be effectively ensured that the CCM of the membrane electrode assembly will not be contaminated by impurity gases.
[0087] Preferably, a plurality of vacuum adsorption holes (not shown) are provided on the lower mold core 41. The vacuum adsorption holes can ensure accurate positioning of the membrane electrode frame and also ensure that the membrane electrode assembly will not be displaced due to gas suction during the injection molding process.
[0088] Preferably, a temperature sensor (not marked in the figure) and a humidity sensor (not marked in the figure) are provided in the hollow areas of the upper mold core 31 and the lower mold core 41. In the embodiment of the present application, a controller is provided on the panel, and the controller is respectively connected to the first cooling fan, the second cooling fan, the humidity sensor and the temperature sensor; through the humidity sensor and the temperature sensor, the working environment in the mold during the molding process can be monitored in real time to take corresponding measures to deal with the conditions.
[0089] In the embodiment of the present application, the upper mold core 31 and the lower mold core 41 can be processed into a whole hollow structure, and its size is determined according to the size of the membrane electrode assembly. Generally, the single-side distance between the edge of the carbon paper and the glue line on the sealing frame of the membrane electrode assembly is 5mm-25mm. The diameter of the glue injection port of the membrane electrode is preferably 0.1-100mm.
[0090] Specifically, in one of the embodiments, in the fuel cell frame glue injection mold device with a cooling structure, the glue selected for injection molding is a two-component liquid silicone, the temperature for molding the sealing strip is 110°C ± 5°C, and the molding time is 2min. It should be particularly pointed out in this embodiment that adjusting the power of the cooling fan can cool the cavity of the fuel cell frame glue injection mold device, read data through the temperature sensor and the humidity sensor, adjust the working conditions and control the temperature below 75°C and the humidity at about 60% RH. In the fuel cell frame glue injection mold device, the thickness of the insulation frame is 10mm, the thickness of the first grid support plate and the second grid support plate are both 10mm, and the inner diameters of the first cold air input pipe and the second cold air input pipe are both 12mm. After the glue injection and sealing molding, the height of the sealing strip of the membrane electrode is 0.6±0.05mm and the width is 2.0±0.1mm, and the sealing strip has no defects such as bubbles, white spots, and glue shortage; the membrane electrode assembly has no obvious expansion or wrinkling, and the performance difference of the membrane electrode before and after the glue injection is within ±10mV.
[0091] When in use, the proton exchange membrane (CCM) is stacked and fixed in sequence with other components to obtain a membrane electrode assembly, and then the membrane electrode assembly is placed between the first grid support plate and the second grid support plate of the device of the present application for glue injection and sealing. As the glue injection and sealing process proceeds, the first cooling fan and the second cooling fan are started; the heat generated is sucked out from bottom to top in the air channel formed in the hollow area through the first cooling fan and the second cooling fan; when the operating temperature in the fuel cell frame glue injection mold device is higher than 75°C (or the humidity is not suitable), the cold air input is started, and the inner cavity in the fuel cell frame glue injection mold device is cooled and the humidity is adjusted through the first cold air input pipe and the second cold air input pipe, so that the operating temperature of the fuel cell frame glue injection mold device is maintained below 75°C and the humidity is controlled at about 60%RH.
[0092] In the present invention, a hollow area is provided and the hollow areas are abutted from top to bottom to form a connected air channel, and a first cooling fan is provided in the hollow area of the panel and a second cooling fan is provided in the hollow area of the carrier plate. The heat generated during the glue injection process can be quickly sucked out through the air channel by the first cooling fan and the second cooling fan, which greatly reduces the risk of damage to core components such as membrane electrode and bipolar plate caused by the glue injection process. In addition, by providing a cold air inlet pipe, air with suitable humidity and temperature can be delivered to the active area cavity of the membrane electrode assembly, effectively ensuring that the cavity temperature in the fuel cell frame glue injection mold device is less than 75°C, so as to ensure that the membrane electrode assembly will not be damaged due to the high temperature generated by the glue injection sealing process. Through the device of the present application, in the process of glue injection and sealing of the membrane electrode assembly, the heat generated by the glue injection can be quickly sucked out, and the working temperature and humidity in the mold can be effectively adjusted as needed, ensuring that the core components such as membrane electrode and bipolar plate will not be damaged during the glue injection process, and the sealing effect is good, the cost is low, the practicability is strong, and the assembly efficiency and production capacity can be effectively improved. The process of the invention is simple to manufacture and easy to assemble, and is suitable for large-scale batch production.
[0093] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.
Claims
1. A fuel cell frame glue injection mold device with a cooling structure, used for sealing membrane electrodes, characterized in that: It includes the panel, nozzle plate, upper template, lower template, support plate, square iron and bottom plate arranged from top to bottom; A first groove is provided on the side of the upper mold plate close to the lower mold plate, and an upper mold core is provided in the first groove; a second groove is provided on the side of the lower mold plate close to the upper mold plate, and a lower mold core is provided in the second groove; The panel, the nozzle plate, the upper mold plate, the upper mold core, the lower mold core, the lower mold plate and the carrier plate are all provided with hollow areas, and the hollow areas are abutted from top to bottom to form a connected air channel; A first cooling fan is arranged in the hollow area of the panel; a second cooling fan is arranged in the hollow area of the carrier plate; A first cold air inlet pipe is provided on the side of the upper mold plate, one end of the first cold air inlet pipe passes through the upper mold plate and the upper mold core in sequence and is connected to the hollow area of the upper mold core, and the other end of the first cold air inlet pipe is connected to a cold air source; A second cold air inlet pipe is provided on the side of the lower mold plate, one end of the second cold air inlet pipe passes through the lower mold plate and the lower mold core in sequence and is connected to the hollow area of the lower mold core, and the other end of the second cold air inlet pipe is connected to the cold air source; The inner side surfaces of the hollow areas are provided with heat insulation frames matched with the hollow areas.
2. The fuel cell frame glue injection mold device with a cooling structure according to claim 1 is characterized in that: The square iron includes a first square iron and a second square iron that are symmetrically arranged, an ejector panel and an ejector bottom plate are arranged between the first square iron and the second square iron, the ejector panel is arranged on the ejector bottom plate, and a first gap is arranged between the ejector panel and the square iron, between the ejector panel and the support plate, between the ejector bottom plate and the square iron, and between the ejector bottom plate and the bottom plate.
3. The fuel cell frame glue injection mold device with a cooling structure according to claim 2, characterized in that: The geometric centers of the panel and the nozzle plate are both provided with glue injection holes, and the glue injection holes are used to seal the membrane electrode through the glue injection channel system; The glue injection flow channel system comprises a glue injection main pipe, a first shunt pipe, a second shunt pipe, a third shunt pipe and a fourth shunt pipe; One end of the glue injection main pipe is connected to the first shunt pipe, and the other end passes through the glue injection through hole and is connected to the glue source; One end of the second shunt pipe is connected to one end of the first shunt pipe, and the other end is connected to the third shunt pipe; The third shunt pipe is connected to the fourth shunt pipe; The fourth shunt pipe is provided with a plurality of glue injection branch pipes, and the glue injection branch pipes are communicated with the glue injection ports of the membrane electrode.
4. The fuel cell frame glue injection mold device with a cooling structure according to claim 3 is characterized in that: Two of the second shunt tubes, the third shunt tubes and the fourth shunt tubes are each provided; the two second shunt tubes are symmetrically provided; the two third shunt tubes are symmetrically provided; and the two fourth shunt tubes are symmetrically provided.
5. The fuel cell frame glue injection mold device with cooling structure according to claim 4, characterized in that: The first shunt pipe is fixed to the upper mold plate by screws, the second shunt pipe is arranged in the upper mold plate; the third shunt pipe is arranged in the upper mold core; A first clamping groove for accommodating the fourth manifold is provided on the side of the upper mold core close to the lower mold core, and a second clamping groove for accommodating the fourth manifold is provided on the side of the lower mold core close to the upper mold core, and the fourth manifold is engaged in the first clamping groove and the second clamping groove; The plurality of glue injection branch pipes are respectively fixed on the ejector bottom plate through ejectors.
6. The fuel cell frame glue injection mold device with a cooling structure according to claim 5, characterized in that: One end of the ejector pin is in contact with the injection branch pipe, and the other end is successively passed through the lower mold core, the lower mold plate, the support plate and the ejector pin panel and then fixed on the ejector pin bottom plate.
7. The fuel cell frame glue injection mold device with a cooling structure according to claim 1, characterized in that: A first grid support plate is provided on the side of the upper mold core close to the lower mold core, and a second grid support plate is provided on the side of the lower mold core close to the upper mold core; a second gap is provided between the first grid support plate and the insulation frame of the upper mold core, and between the second grid support plate and the insulation frame of the lower mold core.
8. The fuel cell frame glue injection mold device with a cooling structure according to claim 2, characterized in that: The first cold air input pipe and the second cold air input pipe are arranged on the same side; the input ends of the first cold air input pipe and the second cold air input pipe are both provided with gas filters; The first cooling fan and the second cooling fan are both suction fans; The first groove is matched with the upper mold core, and the second groove is matched with the lower mold core; The ejector panel is provided with a plurality of ejector fixing holes for fixing ejectors; The lower mold core is provided with a plurality of vacuum adsorption holes; Temperature sensors and humidity sensors are provided in the hollow areas of the upper mold core and the lower mold core.
Citation Information
Patent Citations
Temperature-adjustable injection mold
CN212472227U
Circulating cooling device based on injection mold
CN213500661U
Die capable of being rapidly cooled
CN213704335U
Plastic rapid cooling device
CN214294313U
Fuel cell frame glue injection mold device with cooling structure
CN217144687U