Micro-seismic exploration construction method, system, computer equipment and storage medium
Through the coordinated work of computer equipment and seismometers, the construction parameters and layout maps are determined, the efficiency and accuracy of micro-movement exploration are improved, the problems of low efficiency and high environmental requirements of traditional methods are solved, and the efficient micro-movement exploration effect is achieved.
Patent Information
- Application Number
- CN202111411781.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-25
- Publication Date
- 2025-01-14
- Estimated Expiration
- 2041-11-25
AI Technical Summary
Traditional micro-movement exploration methods are low in efficiency, high construction environment requirements, and the accuracy is difficult to ensure in an environment with rich noise sources.
Obtain construction conditions and layout diagrams through computer equipment, determine the initial and target construction parameters, and generate on-site construction work diagrams. Engineers arrange seismometers at the construction site according to the image, collect micro-movement data, and import the data into the computer equipment for processing to extract the frequency dispersion. Curve and Generative Exploration Profile.
It improves the efficiency and accuracy of micro-movement exploration, reduces the cost of each measurement point, enhances the competitiveness of micro-movement exploration in other geophysical exploration methods, and is suitable for the production environment.
Smart Images

Figure CN114240073B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of geological prospecting technology, and in particular to a micro-motion prospecting construction method, system, computer equipment and storage medium. Background Art
[0002] Micromotion refers to the tiny vibrations caused by non-earthquakes that exist on the earth at all times. The micromotion detection method is based on the theory of stationary random processes and extracts the surface wave dispersion curve from the vertical component of the micromotion signal. It is a geophysical exploration method that obtains the shear wave velocity structure of the underground medium by inverting the dispersion curve to achieve the purpose of detection. The commonly used methods at present are the spatial autocorrelation method (SPAC) and the extended spatial autocorrelation method (ESPAC). The spatial autocorrelation method (SPAC) requires less equipment and has the highest detection accuracy, but the construction efficiency is low and the construction environment requirements are high. The extended spatial autocorrelation method (ESPAC) is an extension of the spatial autocorrelation method (SPAC). Because the SPAC method has high requirements for the construction environment, in the operating environment where it is not convenient to deploy the SPAC array, L-type, T-type, cross-type, linear array and other types can be used; this method effectively solves the situation of construction environment restrictions, especially the linear array, which is extremely convenient to deploy. In cities with rich noise sources, the accuracy is basically the same as SPAC.
[0003] However, the traditional micro-seismic exploration method has the problem of low exploration efficiency. Summary of the invention
[0004] Based on this, in order to solve the above technical problems, a micro-motion exploration construction method, system, computer equipment and storage medium are provided to improve the efficiency of micro-motion exploration.
[0005] A micro-seismic exploration construction method, the method comprising:
[0006] The computer equipment obtains the construction conditions and the construction layout drawing, and determines the initial construction parameters according to the construction conditions;
[0007] The computer device collects construction site data, determines target construction parameters according to the construction site data and the construction conditions, modifies the construction layout drawing according to the target construction parameters, and generates a site construction operation drawing;
[0008] The engineer deploys seismographs at the construction site according to the on-site construction work map, and collects exploration micro-seismic data from each measuring point in a rolling manner through the seismographs;
[0009] The seismograph imports the exploration micro-motion data into the computer device, and the computer device processes the exploration micro-motion data to extract a dispersion curve, and generates a micro-motion exploration profile according to the exploration micro-motion data and the dispersion curve.
[0010] In one embodiment, determining the initial construction parameters according to the construction conditions includes:
[0011] The computer device determines the exploration depth and the distance between measuring points according to the construction conditions, and obtains a preset relationship formula between parameters;
[0012] The computer device calculates and determines the initial construction parameters according to the exploration depth, the distance between the measuring points, and the relationship formula between the parameters.
[0013] In one embodiment, before the computer device collects the construction site data, the method further includes:
[0014] Engineers conduct consistency tests on various seismometers at the construction site, obtain test results of various seismometers, and determine the operable seismometers and the number of seismometers according to the test results;
[0015] The engineer collects rough data through the operable seismograph at the construction site, and determines the number of each array group according to the rough data.
[0016] In one embodiment, the computer device collects construction site data, and determines target construction parameters according to the construction site data and the construction conditions, including:
[0017] The engineer inputs the number of seismographs and the number of each array group as the construction site data into the computer device;
[0018] The computer device calculates the number of measuring points each time and the number of rolling seismometers each time according to the number of seismographs and the number of each array group, and uses the number of seismographs, the number of each array group, the number of measuring points each time and the number of rolling seismographs each time as target construction parameters.
[0019] In one embodiment, the step of modifying the construction layout drawing according to the target construction parameters to generate a site construction operation drawing includes:
[0020] The computer device searches for the location of each measuring point in the construction layout diagram, and marks each measuring point in turn according to the target construction parameters to generate an on-site construction operation diagram;
[0021] The method further comprises:
[0022] The computer device determines the coordinates of each measuring point according to the position of each measuring point, and generates a micro-motion survey team report according to the coordinates of each measuring point, the marked position of each measuring point, and the on-site construction work map.
[0023] In one embodiment, the engineer deploys seismographs at the construction site according to the on-site construction work map, including:
[0024] The engineer determines the measuring points and the direction of the measuring line at the construction site according to the positions of the measuring points in the on-site construction operation map;
[0025] The engineer arranges the seismographs according to the measuring points and the measuring line directions and the positions of the measuring points marked in the on-site construction work map;
[0026] The engineer uploads the layout data of the seismograph to the computer device, and the computer device verifies the layout data according to a verification formula;
[0027] The engineer fills in the micro-movement survey team report based on the verified layout data.
[0028] In one embodiment, the computer device processes the exploration micro-motion data to extract a dispersion curve, and generates a micro-motion exploration profile according to the exploration micro-motion data and the dispersion curve, including:
[0029] The computer device slices the data recorded in the micro-motion exploration class report, arranges and sorts the sliced data according to the station array corresponding to each measuring point, and extracts dispersion curves from the sorted data and the exploration micro-motion data;
[0030] The computer device inverts the velocity value below each of the measuring points according to the dispersion curve and generates the micro-seismic exploration profile.
[0031] A micro-motion exploration and construction system, the system comprising:
[0032] Computer equipment, used to obtain construction conditions and construction layout drawings, and determine initial construction parameters based on the construction conditions;
[0033] The computer device is further used to collect construction site data, determine target construction parameters according to the construction site data and the construction conditions, and modify the construction layout drawing according to the target construction parameters to generate a site construction operation drawing;
[0034] The engineer deploys the seismograph at the construction site according to the site construction operation drawing;
[0035] The seismograph is used to collect exploration micro-seismic data at each measuring point in a rolling manner; and to import the exploration micro-seismic data into the computer device;
[0036] The computer device is also used to extract a dispersion curve after processing the exploration micro-motion data, and generate a micro-motion exploration profile according to the exploration micro-motion data and the dispersion curve.
[0037] The above-mentioned micro-seismic exploration construction method, system, computer equipment and storage medium obtain construction conditions and construction layout drawings through computer equipment, and determine initial construction parameters according to the construction conditions; the computer equipment collects construction site data, determines target construction parameters according to the construction site data and the construction conditions, and modifies the construction layout drawings according to the target construction parameters to generate a site construction operation drawing; engineers deploy seismometers at the construction site according to the site construction operation drawing, and use the seismometers to roll-collect exploration micro-seismic data for each measuring point; the seismometers import the exploration micro-seismic data into the computer equipment, the computer equipment extracts dispersion curves after data processing of the exploration micro-seismic data, and generates a micro-seismic exploration profile according to the exploration micro-seismic data and the dispersion curve. The construction is completed by rationally deploying seismographs according to the construction conditions and construction site data. Multiple measuring points can be explored at the same time and rolling operations can be carried out in one construction, which improves the efficiency of micro-seismic exploration. The efficient micro-seismic exploration construction greatly reduces the cost of each micro-seismic measuring point, improves the competitiveness of micro-seismic exploration among other geophysical exploration methods, and makes micro-seismic exploration more suitable for production. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 A diagram showing an application environment of a micro-motion exploration construction method in one embodiment;
[0039] Figure 2 A schematic diagram of a micro-motion exploration construction method in one embodiment;
[0040] Figure 3 A diagram of a construction site in one embodiment;
[0041] Figure 4 A structural block diagram of a micro-motion exploration and construction system in one embodiment;
[0042] Figure 5 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0043] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0044] The micro-motion exploration construction method provided in the embodiment of the present application can be applied to Figure 1 In the application environment shown. Figure 1 As shown, the application environment includes a computer device 110 and a seismograph 120, wherein the computer device 110 and the seismograph 120 can communicate through a wireless network, a wired connection, etc. The computer device 110 can obtain construction conditions and construction layout drawings, and determine initial construction parameters according to the construction conditions; the computer device 110 can collect construction site data, determine target construction parameters according to the construction site data and construction conditions, and modify the construction layout drawings according to the target construction parameters to generate a site construction operation drawing; the engineer deploys the seismograph 120 at the construction site according to the site construction operation drawing, and collects exploration micro-seismic data for each measuring point through the seismograph 120; the seismograph 120 imports the exploration micro-seismic data into the computer device 110, and the computer device 110 can extract dispersion curves after data processing of the exploration micro-seismic data, and generate micro-seismic exploration profiles according to the exploration micro-seismic data and the dispersion curves. Among them, the computer device 110 can be, but not limited to, various personal computers, laptops, smart phones, robots, tablet computers and other devices.
[0045] In one embodiment, Figure 2 As shown, a micro-seismic exploration construction method is provided, comprising the following steps:
[0046] Step 202: The computer device obtains construction conditions and a construction layout diagram, and determines initial construction parameters according to the construction conditions.
[0047] Among them, a micro-seismic exploration construction method provided in this embodiment can be applied to locations with abundant noise sources. If the energy of natural source surface waves is equivalent in all directions, this application can be applied in downtown areas; if the energy of natural source surface waves mainly comes from one direction, this application can be applied next to railways or highways.
[0048] The construction conditions may be the exploration depth, exploration effect, measurement point data and other conditions that the construction project needs to meet. The construction layout drawing may be a rough drawing designed according to the construction project. Engineers can select the construction conditions from the construction project and input them into the computer equipment. Engineers can also input the construction layout drawing into the computer equipment by scanning.
[0049] After obtaining the construction conditions, the computer equipment can determine the initial construction parameters according to the construction conditions. The initial construction parameters can be used to indicate the total number of available seismographs owned by the construction unit, the detection depth, the distance between measuring points, the number of each array group, the distance between geophones, the number of measuring points each time, and the number of rolling seismographs each time.
[0050] Step 204, the computer equipment collects the construction site data, determines the target construction parameters according to the construction site data and the construction conditions, modifies the construction layout drawing according to the target construction parameters, and generates the on-site construction operation drawing.
[0051] The construction site data may be data obtained after engineers place seismographs at the construction site for experiments. The engineers may input the collected construction site data into a computer device. The computer device may adjust the initial construction parameters according to the construction site data and construction conditions, thereby determining the target construction parameters. In this embodiment, the determined target construction parameters may include the total number of available seismograph channels, the detection depth, the spacing between measuring points, the number of each array group, the spacing between geophones, the number of measuring points each time, and the number of rolling seismographs each time.
[0052] Computer equipment can adjust the construction layout drawing according to the target construction parameters to obtain the on-site construction operation drawing.
[0053] In step 206, the engineer deploys seismographs at the construction site according to the on-site construction work map, and uses the seismographs to collect exploration micro-seismic data at each measuring point in a rolling manner.
[0054] After the computer equipment generates the on-site construction work drawing, it can display the on-site construction work drawing in the display interface for engineers to view.
[0055] Engineers can deploy seismographs at the construction site according to the on-site construction work drawing. For example, when the on-site construction work drawing shows that N = 20 seismographs and n = 9 seismographs per array can meet the exploration depth requirements, then the number of micro-motion measurement points each time is M = 12, and the number of rolling channels each time is 12. Engineers can deploy seismographs at the construction site according to the on-site construction work drawing according to N = 20 seismographs and n = 9 seismographs per array.
[0056] In this embodiment, engineers can deploy seismometers in a rolling manner to collect exploration micro-seismic data at each measuring point, thereby collecting each exploration micro-seismic data at each measuring point.
[0057] In step 208, the seismograph imports the exploration micro-seismic data into the computer device, and the computer device processes the exploration micro-seismic data to extract the dispersion curve, and generates a micro-seismic exploration profile according to the exploration micro-seismic data and the dispersion curve.
[0058] After each seismograph collects each exploration micro-motion data of each measuring point, the collected exploration micro-motion data can be uniformly imported into a computer device.
[0059] In this embodiment, the construction conditions and construction layout drawings are obtained by computer equipment, and the initial construction parameters are determined according to the construction conditions; the computer equipment collects construction site data, determines the target construction parameters according to the construction site data and construction conditions, and modifies the construction layout drawings according to the target construction parameters to generate the on-site construction operation drawings; the engineer deploys the seismograph at the construction site according to the on-site construction operation drawings, and collects the exploration micro-seismic data of each measuring point in a rolling manner through the seismograph; the seismograph imports the exploration micro-seismic data into the computer equipment, and the computer equipment extracts the dispersion curve after data processing of the exploration micro-seismic data, and generates the micro-seismic exploration profile according to the exploration micro-seismic data and the dispersion curve. The seismograph is reasonably deployed according to the construction conditions and the construction site data to complete the construction, and multiple measuring points can be explored and rolled at one time, which improves the efficiency of micro-seismic exploration; and the efficient micro-seismic exploration construction greatly reduces the cost of each micro-seismic measuring point, improves the competitiveness of micro-seismic exploration in other geophysical exploration methods, and makes micro-seismic exploration more suitable for production.
[0060] In one embodiment, a micro-seismic exploration construction method provided may also include a process of determining initial construction parameters, the specific process including: the computer equipment determines the exploration depth and the measurement point spacing according to the construction conditions, and obtains a pre-set parameter relationship formula; the computer equipment calculates and determines the initial construction parameters according to the exploration depth, the measurement point spacing, and the parameter relationship formula.
[0061] The construction conditions include various parameters involved in the construction project, and the computer equipment can determine the exploration depth H and the measurement point spacing D from the various parameters involved in the construction conditions. The relationship formula between parameters can be preset, and there can be 5 relationship formulas between parameters, namely: d = D; n = [H / (1.5 ~ 2.5) d] + 1; n is a cardinality ≥ 7; M = N-n + 1; m = M. Among them, d represents the distance between seismographs, D represents the distance between measurement points, n represents the number of each array, H represents the exploration depth, M represents the number of measurement points each time, and m represents the number of rolling seismographs each time.
[0062] The computer equipment can calculate the initial construction parameters based on the parameters that have been obtained and the relationship formula between the parameters. For example, taking the exploration depth H = 100m and the measurement point spacing D = 5m as an example: the formula calculates that the seismograph spacing d = 5m, n = 9, 11, 13, 15.
[0063] In one embodiment, a micro-seismic exploration construction method provided may also include a process of testing seismographs, and the specific process includes: engineers perform consistency tests on each seismograph at the construction site to obtain test results of each seismograph, and determine the operable seismographs and the number of seismographs based on the test results; engineers collect rough data through the operable seismographs at the construction site, and determine the number of each array group based on the rough data.
[0064] Engineers can conduct consistency tests on each seismograph at the construction site, where the consistency test can determine the number of available seismograph channels N. Specifically, engineers can take all seismographs to the construction site for consistency testing. If the coherence of all seismographs reaches above 0.9 in the effective frequency band, the next step of construction can be carried out. Otherwise, the seismographs need to be replaced or adjusted. If there are individual seismographs with poor consistency, they need to be removed or repaired, and the number of available seismographs N can be determined through consistency testing.
[0065] In this embodiment, engineers can also collect rough data through working seismographs at the construction site, for example, perform a detection depth test to determine the number n of each array group, take the maximum value of n according to the initial construction parameters, and arrange 15 seismographs in a row at a track spacing of 5 m on the survey line to be constructed, collect data for 20 minutes, select 1 to 9 channels as a group of arrays to extract surface wave dispersion curves, and perform inversion. If the detection depth can reach the expected requirement of 100 m, then n=9 is directly determined. If the detection depth of 100 m cannot be reached, then further repeat the previous operation, extract 1 to 11 channels as a group, extract dispersion curve data, and perform inversion... 1 to 13 channels are inverted as a group... until the detection depth of 100 m is reached, and finally determine the value of n.
[0066] In one embodiment, a micro-seismic exploration construction method is provided that may further include a process of determining target construction parameters, the specific process including: an engineer inputs the number of seismometers and the number of each array group as construction site data into a computer device; the computer device calculates the number of measuring points each time and the number of seismometers rolled each time based on the number of seismometers and the number of each array group, and uses the number of seismometers, the number of each array group, the number of measuring points each time and the number of seismometers rolled each time as target construction parameters.
[0067] After determining the number of seismographs and the number of each array, the engineer can input the number of seismographs and the number of each array into the computer device, and the computer device can calculate the number of measuring points each time and the number of rolling seismographs each time according to the pre-set parameter relationship formula. Specifically, the computer device can calculate the number of measuring points M each time according to M=N-n+1, and then calculate the number of rolling seismographs m each time according to m=M. For example, in this embodiment, the total number of seismograph channels N=20 is determined, and the number of each array n=9, then the computer device can calculate the number of measuring points M=12 each time according to M=N-n+1, and then calculate the number of rolling seismographs m=12 each time according to m=M. If n=11 is determined, then M=10, m=10.
[0068] In one embodiment, a micro-motion exploration construction method is provided that may further include a process of generating an on-site construction operation diagram and a shift report, the specific process including: the computer device searches for the position of each measuring point in the construction layout diagram, and marks each measuring point position in turn according to the target construction parameters to generate an on-site construction operation diagram; the computer device determines the coordinates of each measuring point according to the position of each measuring point, and generates a micro-motion exploration shift report according to the coordinates of each measuring point, the marked positions of each measuring point, and the on-site construction operation diagram.
[0069] The computer device may store a construction layout diagram, and the computer device may search for the location of each measuring point in the construction layout diagram, and mark the location of each measuring point according to the determined target construction parameters. Specifically, the computer device may also mark the station number and the measuring line number of the seismograph according to the target construction parameters, thereby generating a site construction operation diagram.
[0070] Taking the detection depth H = 100m and the micro-motion measuring point distance D = 5m as an example, the distance between seismographs is d = 5m. Assuming that the experiment confirms that the total number of seismograph channels N = 20 and the number of channels of each array seismograph n = 9 can meet the exploration depth requirements, then the number of micro-motion measuring points each time is M = 12, and the number of rolling channels each time is 12. The computer equipment can use this parameter to mark the construction layout diagram and obtain the on-site construction operation diagram. Figure 3 As shown, Z1, Z2... represent the station number of the seismograph, W1, W2... represent the micro-seismic measurement point number, the survey line number is line 1, the direction is due east -90°, "1 line 1 measurement" represents the first arrangement of the seismograph on line 1, "1 line 2 measurement" represents the second arrangement of the seismograph on line 1, and so on. In this embodiment, 1 line 2 measurement demonstrates the process of how the seismograph is rolled for construction.
[0071] like Figure 3As shown, in this embodiment, since the distances between each measuring point and the seismograph are equal and arranged in a straight line, the center point of the Z1-Z9 measuring stations is the Z5 measuring station, and the position of the Z5 measuring station coincides with the position of the W1 measuring point. The Z1-Z9 seismographs are selected as a group of ESPAC linear arrays, and the dispersion curve measured by them is the dispersion curve below the W1 measuring point. By extracting the dispersion curve, the phase velocity value and the apparent shear wave value below the W1 point can be obtained, and the lithology below it can be further inverted to achieve the exploration purpose; similarly, the W2 measuring point is located at the center of the Z2-Z10 measuring stations, and the Z2-Z10 seismographs are selected as a group of linear arrays to extract the dispersion curve below. The phase velocity value and apparent shear wave value below point W2 can be obtained by using the linear array, and the lithology below it can be further inverted..., W12 selects Z12-Z20 as a group of linear arrays, and the phase velocity value and apparent shear wave value below point W12 can be obtained by extracting the dispersion curve below, and the lithology below it can be further inverted; therefore, the first linear array of 20 seismic instruments arranged on survey line 1 can complete the micro-seismic exploration points of 12 points at a time, and 12 dispersion curves can be obtained, and the lithology below the 12 points can be inverted, which is recorded as 1 line 1 survey, and the spacing between each survey point of 1 line 1 survey is 5m, the survey depth is 100m, and the length of one survey line is 40m.
[0072] When the first survey is completed, the 12 seismometers behind are moved to the front survey point in the order of the seismometer numbers from small to large: Z1 is moved to the position of survey point W13, Z2 is moved to the position of survey point W14, and ... Z12 is moved to the position of survey point W24. After the rolling is completed, a new linear array consisting of 20 seismometers is formed to start the second micro-motion detection, which is recorded as 1 line 2 surveys. Then, repeat the station selection combination of 1 line 1 survey: Z13-Z1 measures W13 point, Z14-Z2 measures W14 point, Z15-Z3 measures W15 point, ... Z4-Z12 measures W24 point. The linear array of 20 seismic instruments on 1 line 2 survey can also complete the micro-seismic exploration of 12 points in one arrangement, and 12 dispersion curves can be obtained, and the lithology below the 12 points can be inverted. The spacing between each measuring point of 1 line 1 survey is 5m, and the measuring depth is 100m. The final measuring point of 1 line 1 survey is W12, and the starting point of 1 line 2 survey is W13. The spacing between the two measuring points is 5m, so after rolling again, the effective measuring points of the two micro-seismic detections are seamlessly connected, without duplication and omission. The same principle can be used to complete the exploration of long micro-seismic survey lines.
[0073] In this embodiment, the computer equipment can generate a micro-seismic exploration team report according to the target construction parameters and the on-site construction operation diagram. Among them, in the micro-seismic exploration team report, the header is written in order as the survey line number, survey times, point number, design coordinates (X, Y, H), array seismograph number, acquisition start time, and acquisition duration (seconds). Among them, the survey line number, survey times, point number, and design coordinates correspond to each other in the design diagram, and are filled in sequentially to ensure that the diagrams are consistent and checked with each other. The acquisition start time and acquisition duration are recorded on-site by engineers during construction and filled in on-site.
[0074] In one embodiment, a provided micro-seismic exploration construction method may also include a process in which engineers deploy seismographs at a construction site, and the specific process includes: engineers determine the measurement points and measurement line directions at the construction site according to the positions of each measurement point in the on-site construction work map; engineers deploy seismographs according to the measurement points and measurement line directions and the positions of each measurement point marked in the on-site construction work map; engineers upload the deployment data of the seismographs to a computer device, and the computer device verifies the deployment data according to a verification formula; engineers fill in a micro-seismic exploration class report based on the verified deployment data.
[0075] Engineers can use RTK to place points according to the on-site construction drawings, and use tape measure and compass to assist in the construction of the collection station. For example, if the starting point is W1, the RTK is used to find points, locate and mark on-site according to the coordinates corresponding to W1 in the micro-survey team report. The compass is used to determine the direction of the survey line in the on-site construction drawings, and the two-person forward and reverse measurement method is used to determine the direction of the survey line on-site. With W1 as the starting point, use a tape measure to measure B meters in the opposite direction of the survey line as the starting point 0m of the tape measure, where B = (n-1) / 2m.
[0076] Next, engineers can deploy seismometers, starting from the tape measure 0m, in the order of the seismometer numbers on the site construction work map, with a designed interval of d meters between seismometer tracks. On land, the seismometer needs to be connected to a large spur and inserted deep into the soil to ensure stability and be perpendicular to the ground; on hard roads, the seismometer needs to be removed from the large spur, and the bottom of the seismometer needs to be firmly attached to the hard roadside with plaster and be perpendicular to the ground.
[0077] After all the seismographs are deployed, engineers can check the arrangement of the seismographs to confirm that the arrangement is correct. Engineers can verify the corresponding positions and arrangement combinations of the measuring points and stations for each roll based on the verification formula. In this embodiment, the starting point is Wx, and the Wx point is arranged from Z1. The total number of measuring stations is N, and the number of autocorrelation measuring stations at each point is n. The Wx points are arranged in order from Z1, and each measuring point M=each rolling measuring station m. Then the autocorrelation measuring station numbers of the n channels corresponding to the Wy point are: if yx≤N, the starting measuring station number at point y is Z(y-x+1), and the ending station number is Z(y-x+n); if (y-x+n)>N, the ending station number is Z(y-x+nN); if yx>N, the starting measuring station number at point y is Z(y-x+1)mod N, and the ending station number is Z[(yx)mod N]+n; if [(yx)mod N]+n>N, the ending station number is Z[(yx)mod N]+nN. Among them, x~y are arranged in order from small to large.
[0078] Next, data collection can begin. After a group of N seismographs are deployed, data collection begins. The start time of data collection is recorded on the record sheet. Each data collection takes 20 to 30 minutes. During this period, RTK can be used to measure the point of each seismograph, and the actual coordinates of the point number corresponding to the seismograph are recorded. During the collection, in addition to the surveyors, try to ensure that there are no other pedestrians near the seismograph to interfere. The surveyors should also try to walk lightly and not touch the station. After the collection is completed, record the collection time.
[0079] After the first survey is completed, the second survey can be carried out, that is, the second deployment and data collection can be carried out. According to the on-site construction work map, the m seismometers behind are moved to the front measurement point in the order of the seismometer numbers from small to large and with a track spacing of d meters. After the second survey is completed, the engineer can carry out the third survey, and the method of the third survey is the same as that of the first and second surveys. Engineers can fill in the micro-seismic exploration class report based on the verified deployment data.
[0080] In one embodiment, a micro-seismic exploration construction method provided may also include a process of data processing and generating a profile diagram, and the specific process includes: a computer device slices the data recorded in the micro-seismic exploration class report, and arranges and organizes the sliced data according to the measuring station array corresponding to each measuring point, and extracts a dispersion curve from the organized data and the exploration micro-seismic data; the computer device inverts the velocity value below each measuring point according to the dispersion curve, and generates a micro-seismic exploration profile diagram.
[0081] Computer equipment can export data from the seismograph, slice the data uniformly according to the upper acquisition start time and acquisition duration of each measurement record in the microseismic exploration team report, and arrange and organize the sliced data according to the station array corresponding to each measuring point. Verification will be performed during the sorting process. After each measuring point is arranged correctly, the data processing software in the computer equipment can be used to extract the dispersion curve and invert the velocity value below each measuring point to generate a microseismic exploration profile.
[0082] It should be understood that, although the various steps in the above-mentioned flow chart are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the above-mentioned flow chart may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these sub-steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the sub-steps or stages of other steps.
[0083] In one embodiment, Figure 4 As shown, a micro-seismic exploration construction system is provided, including: a computer device 110 and a seismograph 120, wherein:
[0084] Computer device 110, used to obtain construction conditions and construction layout drawings, and determine initial construction parameters according to the construction conditions;
[0085] The computer device 110 is also used to collect construction site data, determine target construction parameters according to the construction site data and construction conditions, and modify the construction layout drawing according to the target construction parameters to generate a site construction operation drawing;
[0086] Engineers deployed seismographs 120 at the construction site according to the on-site construction work map;
[0087] The seismograph 120 is used to collect the exploration micro-seismic data at each measuring point in a rolling manner and import the exploration micro-seismic data into the computer device 110;
[0088] The computer device 110 is also used to extract dispersion curves after performing data processing on the exploration micro-seismic data, and generate micro-seismic exploration profiles according to the exploration micro-seismic data and the dispersion curves.
[0089] In one embodiment, the computer device 110 is also used to determine the exploration depth and the distance between measuring points according to the construction conditions, and obtain a preset relationship formula between parameters; calculate and determine the initial construction parameters according to the exploration depth, the distance between measuring points, and the relationship formula between parameters.
[0090] In one embodiment, the computer device 110 is also used to calculate the number of measuring points each time and the number of seismic instruments rolled each time according to the number of seismic instruments and the number of each array group, and use the number of seismic instruments, the number of each array group, the number of measuring points each time and the number of seismic instruments rolled each time as target construction parameters.
[0091] In one embodiment, engineers can perform consistency tests on each seismograph 120 at the construction site, obtain test results of each seismograph 120, and determine the operable seismographs 120 and the number of seismographs based on the test results; engineers collect rough data through the operable seismographs 120 at the construction site, and determine the number of each array group based on the rough data.
[0092] In one embodiment, engineers can input the number of seismographs and the number of each array group as construction site data into the computer device 110; the computer device 110 is also used to find the location of each measuring point in the construction layout diagram, and mark the location of each measuring point in turn according to the target construction parameters to generate an on-site construction operation diagram; determine the coordinates of each measuring point according to the location of each measuring point, and generate a micro-seismic exploration team report based on the coordinates of each measuring point, the marked locations of each measuring point, and the on-site construction operation diagram.
[0093] In one embodiment, the engineer can determine the measurement points and the direction of the measurement line at the construction site according to the positions of each measurement point in the on-site construction work map; the engineer deploys the seismograph 120 according to the measurement points and the direction of the measurement line according to the positions of each measurement point marked in the on-site construction work map; the engineer uploads the deployment data of the seismograph 120 to the computer device 110, and the computer device 110 verifies the deployment data according to the verification formula; the engineer fills in the micro-seismic exploration class report according to the verified deployment data.
[0094] In one embodiment, the computer device 110 is also used to slice the data recorded in the micro-seismic exploration class report, and arrange the sliced data according to the station array corresponding to each measuring point, extract the dispersion curve of the arranged data and the exploration micro-seismic data; invert the velocity value under each measuring point according to the dispersion curve, and generate a micro-seismic exploration profile.
[0095] In one embodiment, a computer device is provided. The computer device may be a terminal, and its internal structure diagram may be as follows: Figure 5As shown. The computer device includes a processor, a memory, a network interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a micro-exploration construction method is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covering the display screen, or a key, trackball or touchpad set on the computer device housing, or an external keyboard, touchpad or mouse, etc.
[0096] Those skilled in the art will understand that Figure 5 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0097] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the following steps are implemented:
[0098] Obtain construction conditions and construction layout drawings, and determine initial construction parameters based on the construction conditions;
[0099] Collect construction site data, determine target construction parameters based on the construction site data and construction conditions, modify the construction layout diagram according to the target construction parameters, and generate a site construction operation diagram;
[0100] After data processing of the exploration micro-seismic data, the dispersion curve is extracted, and the micro-seismic exploration profile is generated according to the exploration micro-seismic data and the dispersion curve.
[0101] In one embodiment, when the processor executes the computer program, the following steps are also implemented: determining the exploration depth and the distance between measuring points according to the construction conditions, and obtaining a preset formula for the relationship between parameters; calculating and determining the initial construction parameters according to the exploration depth, the distance between measuring points, and the formula for the relationship between parameters.
[0102] In one embodiment, when the processor executes the computer program, the following steps are also implemented: according to the number of seismographs and the number of each array group, the number of measuring points each time and the number of seismographs rolled each time are calculated, and the number of seismographs, the number of each array group, the number of measuring points each time and the number of seismographs rolled each time are used as target construction parameters.
[0103] In one embodiment, when the processor executes the computer program, the following steps are also implemented: searching for the location of each measuring point in the construction layout diagram, and marking each measuring point location in turn according to the target construction parameters to generate an on-site construction operation diagram; determining the coordinates of each measuring point according to the location of each measuring point, and generating a micro-survey class report based on the coordinates of each measuring point, the marked locations of each measuring point, and the on-site construction operation diagram.
[0104] In one embodiment, when the processor executes the computer program, the following steps are also implemented: slicing the data recorded in the micro-seismic exploration class report, arranging and sorting the sliced data according to the station array corresponding to each measuring point, extracting dispersion curves from the sorted data and the exploration micro-seismic data; inverting the velocity value below each measuring point according to the dispersion curve, and generating a micro-seismic exploration profile.
[0105] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:
[0106] Obtain construction conditions and construction layout drawings, and determine initial construction parameters based on the construction conditions;
[0107] Collect construction site data, determine target construction parameters based on the construction site data and construction conditions, modify the construction layout diagram according to the target construction parameters, and generate a site construction operation diagram;
[0108] After data processing of the exploration micro-seismic data, the dispersion curve is extracted, and the micro-seismic exploration profile is generated according to the exploration micro-seismic data and the dispersion curve.
[0109] In one embodiment, when the computer program is executed by the processor, the following steps are also implemented: determining the exploration depth and the distance between measuring points according to the construction conditions, and obtaining a preset formula for the relationship between parameters; calculating and determining the initial construction parameters according to the exploration depth, the distance between measuring points, and the formula for the relationship between parameters.
[0110] In one embodiment, when the computer program is executed by the processor, the following steps are also implemented: according to the number of seismographs and the number of each array group, the number of measuring points each time and the number of seismographs rolled each time are calculated, and the number of seismographs, the number of each array group, the number of measuring points each time and the number of seismographs rolled each time are used as target construction parameters.
[0111] In one embodiment, when the computer program is executed by the processor, the following steps are also implemented: searching for the location of each measuring point in the construction layout diagram, and marking each measuring point location in turn according to the target construction parameters to generate an on-site construction operation diagram; determining the coordinates of each measuring point according to the location of each measuring point, and generating a micro-survey class report based on the coordinates of each measuring point, the marked locations of each measuring point, and the on-site construction operation diagram.
[0112] In one embodiment, when the computer program is executed by the processor, the following steps are also implemented: slicing the data recorded in the micro-seismic exploration class report, arranging and sorting the sliced data according to the station array corresponding to each measuring point, extracting dispersion curves from the sorted data and the exploration micro-seismic data; inverting the velocity value below each measuring point according to the dispersion curve, and generating a micro-seismic exploration profile.
[0113] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0114] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0115] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.
Claims
1. A micro-motion exploration construction method, characterized in that: The method comprises: The computer equipment obtains the construction conditions and the construction layout diagram, and determines the initial construction parameters according to the construction conditions, including: the computer equipment determines the exploration depth and the distance between measuring points according to the construction conditions, and obtains the preset relationship formula between parameters; the computer equipment calculates and determines the initial construction parameters according to the exploration depth, the distance between measuring points, and the relationship formula between parameters; the computer equipment determines the exploration depth H and the distance between measuring points D from various parameters of the construction conditions, and the relationship formula between parameters is preset, and the relationship formula between parameters includes: d=D; n=[H / (1.5~2.5)d]+1; n is a cardinality ≥7; M=N-n+1; m=M; wherein d represents the distance between seismographs, D represents the distance between measuring points, n represents the number of each array group, H represents the exploration depth, M represents the number of measuring points each time, and m represents the number of rolling seismographs each time; The engineer conducts consistency tests on each seismograph at the construction site, obtains the test results of each seismograph, and determines the operable seismographs and the number of seismographs according to the test results; the engineer collects rough data through the operable seismographs at the construction site, and determines the number of each array according to the rough data; if the coherence of all seismographs reaches above 0.9 in the effective frequency band, the next step of construction is carried out, otherwise the seismographs are replaced or adjusted; if there are individual seismographs with poor consistency, the seismographs are removed or repaired, and the number of seismographs to be used N is determined through consistency tests; The computer device collects construction site data, and determines target construction parameters according to the construction site data and the construction conditions, including: the engineer inputs the number of seismographs and the number of each array group as the construction site data into the computer device; the computer device calculates the number of measuring points each time and the number of rolling seismographs each time according to the number of seismographs and the number of each array group, and uses the number of seismographs, the number of each array group, the number of measuring points each time, and the number of rolling seismographs each time as target construction parameters; the computer device calculates the number of measuring points M each time according to M=N-n+1, and then calculates the number m of rolling seismographs each time according to m=M, and modifies the construction layout diagram according to the target construction parameters to generate a site construction operation diagram, including: the computer device searches for the location of each measuring point in the construction layout diagram, and marks the location of each measuring point in turn according to the target construction parameters to generate a site construction operation diagram; The engineer deploys seismographs at the construction site according to the on-site construction work map, and uses the seismographs to roll-collect exploration micro-seismic data at each measuring point; The seismograph imports the exploration micro-motion data into the computer device, and the computer device processes the exploration micro-motion data to extract a dispersion curve, and generates a micro-motion exploration profile according to the exploration micro-motion data and the dispersion curve.
2. The micro-motion exploration construction method according to claim 1 is characterized in that: The method further comprises: The computer device determines the coordinates of each measuring point according to the position of each measuring point, and generates a micro-motion survey team report according to the coordinates of each measuring point, the marked position of each measuring point, and the on-site construction work map.
3. The micro-motion exploration construction method according to claim 2 is characterized in that: The engineer deploys seismographs at the construction site according to the on-site construction work map, including: The engineer determines the measuring points and the direction of the measuring line at the construction site according to the positions of the measuring points in the on-site construction operation map; The engineer arranges the seismographs according to the measuring points and the measuring line directions and the positions of the measuring points marked in the on-site construction work map; The engineer uploads the layout data of the seismograph to the computer device, and the computer device verifies the layout data according to a verification formula; The engineer fills in the micro-movement survey team report based on the verified layout data.
4. The micro-motion exploration construction method according to claim 3 is characterized in that: The computer device processes the exploration micro-motion data to extract a dispersion curve, and generates a micro-motion exploration profile according to the exploration micro-motion data and the dispersion curve, including: The computer device slices the data recorded in the micro-motion exploration class report, arranges and sorts the sliced data according to the station array corresponding to each measuring point, and extracts dispersion curves from the sorted data and the exploration micro-motion data; The computer device inverts the velocity value below each of the measuring points according to the dispersion curve and generates the micro-seismic exploration profile.
5. A micro-motion exploration and construction system, characterized in that: The system comprises: A computer device, used for obtaining construction conditions and construction layout drawings, and determining initial construction parameters according to the construction conditions, including: the computer device determines the exploration depth and the distance between measuring points according to the construction conditions, and obtains a preset parameter relationship formula; the computer device calculates and determines the initial construction parameters according to the exploration depth, the distance between measuring points, and the parameter relationship formula; the computer device determines the exploration depth H and the distance between measuring points D from various parameters of the construction conditions, and the parameter relationship formula is preset, and the parameter relationship formula includes: d=D; n=[H / (1.5~2.5)d]+1; n is a cardinality ≥7; M=N-n+1; m=M; wherein d represents the distance between seismographs, D represents the distance between measuring points, n represents the number of each array group, H represents the exploration depth, M represents the number of measuring points each time, and m represents the number of rolling seismographs each time; The engineer conducts consistency tests on each seismograph at the construction site, obtains the test results of each seismograph, and determines the operable seismographs and the number of seismographs according to the test results; the engineer collects rough data through the operable seismographs at the construction site, and determines the number of each array according to the rough data; if the coherence of all seismographs reaches above 0.9 in the effective frequency band, the next step of construction is carried out, otherwise the seismographs are replaced or adjusted; if there are individual seismographs with poor consistency, the seismographs are removed or repaired, and the number of seismographs to be used N is determined through consistency tests; The computer device is also used to collect construction site data and determine target construction parameters according to the construction site data and the construction conditions, including: the engineer inputs the number of seismographs and the number of each array group as the construction site data into the computer device; the computer device calculates the number of measuring points each time and the number of rolling seismographs each time according to the number of seismographs and the number of each array group, and uses the number of seismographs, the number of each array group, the number of measuring points each time, and the number of rolling seismographs each time as target construction parameters; the computer device calculates the number of measuring points M each time according to M=N-n+1, and then calculates the number m of rolling seismographs each time according to m=M, and modifies the construction layout diagram according to the target construction parameters to generate a site construction operation diagram, including: the computer device searches for the location of each measuring point in the construction layout diagram, and marks the location of each measuring point in turn according to the target construction parameters to generate a site construction operation diagram; The engineer deploys the seismograph at the construction site according to the site construction operation drawing; The seismograph is used to collect exploration micro-seismic data at each measuring point in a rolling manner; and to import the exploration micro-seismic data into the computer device; The computer device is also used to extract a dispersion curve after processing the exploration micro-motion data, and generate a micro-motion exploration profile according to the exploration micro-motion data and the dispersion curve.
6. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 4 are implemented.
7. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 4 are implemented.
Citation Information
Patent Citations
Micro-motion data acquisition method based on multi-time coverage of linear array
CN112505749A
Micro-motion exploration method and device and electronic equipment
CN113466930A