A thermal composite throughput efficiency enhancement system and operation method for offshore low-yield heavy oil cold production wells

By injecting hot water, compound synergists and nitrogen into offshore low-yield heavy oil cold recovery wells, combined with the well stew reaction, the oil layer plugging problem was solved, the flow capacity and recovery rate of heavy oil reservoirs were improved, and low-yield cold recovery was realized Improvement of well efficiency.

CN114370259BActive Publication Date: 2024-10-01CHINA NAT OFFSHORE OIL CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210100542.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-27
Publication Date
2024-10-01
Estimated Expiration
2042-01-27

AI Technical Summary

Technical Problem

During the cold production development process of offshore heavy oil fields, due to the extraction of light components, the heavy components cause the formation fluid pores to shrink or block, and the oil well production is greatly reduced. It is difficult to effectively improve the low-yield cold production wells with existing technology. mining effect.

Method used

The thermal compound stimulation system of offshore low-yield heavy oil cold production wells is used to inject hot water, compound potentiation agent and nitrogen through the wellhead Christmas tree and electric pump production string, combined with the well stew reaction, to improve the flow capacity of the oil layer.

Benefits of technology

It can effectively remove the blockage of oil layer colloid and asphaltene, improve the flow capacity of heavy oil reservoirs, improve the mining effect and recovery rate of low-yield cold recovery heavy oil wells, and increase the production of platform oil wells.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114370259B_ABST
    Figure CN114370259B_ABST
Patent Text Reader

Abstract

The invention discloses a thermal composite throughput enhancement system for low-yield heavy oil cold production wells at sea, comprising a wellhead Christmas tree, an electric pump production string, a hot water injection pipeline, a mud tank, a reagent tank and a nitrogen generator, one end of the hot water injection pipeline is connected to the oil pipe wing valve, and the other end is connected to the hot water on the platform; the mud tank stores a composite enhancement agent A, and the mud tank is connected to the hot water injection pipeline through the reagent injection pipeline A; the reagent tank stores a composite enhancement agent B, and the reagent tank is connected to the hot water injection pipeline through the reagent injection pipeline B; the nitrogen generator is connected to the casing wing valve through the nitrogen injection pipeline. The invention also discloses an operating method of the above system: hot water, composite enhancement agent A, composite enhancement agent B and nitrogen are injected into the oil reservoir through the crude oil cold production string, and after the injection is completed, the well is shut down for a period of time and the pump is started for production. The invention can give full play to the synergistic enhancement effect of heat, gas and chemical agents, improve the utilization degree of low-yield heavy oil reservoirs, and thus greatly improve the recovery rate of heavy oil.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a thermal recovery and oil production process for an offshore heavy oil field, and in particular to a thermal composite throughput efficiency enhancement system for an offshore low-yield heavy oil cold production well and an operation method thereof. Background Art

[0002] Heavy oil steam huff and puff thermal recovery refers to the continuous injection of a certain amount of high-temperature and high-pressure steam into a heavy oil well in a short period of time, and then shutting the well for 5-7 days to allow the steam heat to diffuse into the reservoir. After that, the pump is started to start production. When the instantaneous oil production or bottom hole flow temperature drops to a certain level, the next round of steam injection, well shutting and oil production begins. By repeatedly injecting high-temperature and high-pressure steam and repeating multiple cycles, the purpose of steam huff and puff to increase the recovery rate of heavy oil reservoirs is achieved.

[0003] Ordinary offshore heavy oil fields generally adopt a cold production development model. As the production continues, the light components are gradually produced, and the heavy components retained in the oil layer will cause the formation fluid pores to shrink or become blocked, and the oil well output will be greatly reduced. However, the offshore oil field production platform has a limited area and small space. It is very difficult to place boilers, water treatment and other facilities similar to those used in the development of terrestrial heavy oil fields on the platform. In addition, heavy oil cold production development wells generally adopt a conventional completion model, and the wellhead oil tree, tubing and sand control system have limited temperature resistance, which is not suitable for high-temperature and high-pressure steam throughput to enhance oil recovery operations.

[0004] The flow and production of heavy oil fluids under formation conditions have certain variability. Various single heavy oil cold production well production increase technologies have a short validity period and certain limitations. Therefore, how to innovate and develop a low-cost and high-efficiency production technology to improve the development effect of low-yield heavy oil cold production oil fields and increase production benefits during the period of low oil prices is a key problem that offshore oil development and production engineers need to solve. Summary of the invention

[0005] The purpose of the present invention is to solve the limitation of the existing offshore heavy oil production technology that the technology is relatively single, and to provide an offshore low-yield heavy oil cold production well thermal composite throughput efficiency enhancement system and an operation method thereof, which can implement the thermal composite efficiency enhancement technology according to the temperature resistance characteristics of the cold production well wellhead and the pipe string to improve the production effect of the low-yield cold production heavy oil well. The present invention integrates the different characteristics of heat-gas-agent, can lay a technical application foundation for the development of offshore low-yield heavy oil cold production wells, and has very important practical significance for improving the development effect of offshore low-yield heavy oil cold production development wells.

[0006] The technical solution adopted by the present invention is: a thermal composite throughput efficiency enhancement system for cold production wells of low-yield heavy oil at sea, the system comprising a wellhead Christmas tree and an electric pump production string, the system also comprising:

[0007] A hot water injection pipeline, one end of which is connected to the tubing wing valve of the wellhead Christmas tree, and the other end is connected to the platform hot water, and the platform hot water can be injected into the tubing of the electric pump production string through the hot water injection pipeline;

[0008] A mud tank, wherein a composite synergistic agent A is stored in the mud tank, and the mud tank is connected to the hot water injection pipeline via an agent injection pipeline A, so that the composite synergistic agent A can be injected into the oil pipe of the electric pump production string through the oil pipe wing valve;

[0009] A reagent tank, wherein a composite synergistic agent B is stored in the reagent tank, and the reagent tank is connected to the hot water injection pipeline through a reagent injection pipeline B, so that the composite synergistic agent B can be mixed with the platform hot water in the hot water injection pipeline and injected into the oil pipe of the electric pump production string through the oil pipe wing valve; and

[0010] A nitrogen generator is connected to the casing wing valve of the wellhead Christmas tree through a nitrogen injection pipeline, so that the nitrogen produced by the nitrogen generator can be injected into the oil casing annulus of the electric pump production string through the casing wing valve.

[0011] Furthermore, an injection pump is provided on the hot water injection pipeline at one end close to the hot water on the platform.

[0012] Furthermore, the drug injection pipeline A is provided with a platform mud pump.

[0013] Furthermore, the drug injection pipeline B is provided with a drug pump.

[0014] Furthermore, the temperature of the platform hot water is 100°C to 115°C.

[0015] Furthermore, the composite synergistic agent A includes one or more of petroleum ether, unsaturated acid lipid copolymer, and high molecular surfactant; the treatment radius of the composite synergistic agent A is 0.2m to 0.5m.

[0016] Furthermore, the composite synergist B comprises one or more of an alkylbenzene sulfonic acid surfactant, an alkyl glycoside surfactant, and an OP surfactant, and the concentration of the composite synergist B after mixing with the platform hot water (3) is 0.8% to 1.2%.

[0017] Another technical solution adopted by the present invention is: the operation method of the above-mentioned offshore low-yield heavy oil cold production well thermal composite throughput efficiency enhancement system comprises the following steps:

[0018] Step 1, fishing out the Y plug in the electric pump production string;

[0019] Step 2, injecting the composite synergistic agent A into the oil pipe of the electric pump production string, and after injecting the composite synergistic agent A, injecting the platform hot water into the oil pipe to displace it, so that the composite synergistic agent A in the oil pipe is injected into the heavy oil layer through the liquid outlet holes and the horizontal section screen pipe on the oil pipe in sequence under the action of the platform hot water, and after the composite synergistic agent A is injected into the heavy oil layer, a well soaking reaction is performed;

[0020] Step 3, the composite synergistic agent B is mixed with the platform hot water in the hot water injection pipeline to form a hot water synergistic slug solution, and the hot water synergistic slug solution is injected into the oil pipe. The hot water synergistic slug solution in the oil pipe is sequentially injected into the heavy oil layer through the liquid outlet holes on the oil pipe and the screen pipe;

[0021] Step 4, injecting nitrogen into the oil casing annulus of the electric pump production string through the nitrogen generating device, and the nitrogen in the oil casing annulus is injected into the heavy oil layer through the screen pipe;

[0022] Step 5, after the nitrogen injection is completed, the well is shut down;

[0023] Step 6, putting Y plug into the production string and the electric pump into production operation.

[0024] Furthermore, in step 2, the soaking reaction time is 12 hours to 24 hours.

[0025] Furthermore, in step 5, the stewing time is 24 to 48 hours.

[0026] The beneficial effects of the present invention are as follows: the present invention provides a new process for improving the production effect of low-yield cold-production heavy oil wells, which can effectively solve the problem of colloid and asphaltene blockage in the near-wellbore area of ​​the oil layer, can give full play to the synergistic effect of heat, gas and chemical agents, effectively improve the flow capacity of heavy oil reservoirs, greatly improve the utilization level of heavy oil reservoirs and the production effect of low-yield cold-production heavy oil wells, and increase the production of platform oil wells. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 : Schematic diagram of the structure of the thermal composite throughput efficiency enhancement system for offshore low-yield heavy oil cold production wells of the present invention.

[0028] Figure annotation:

[0029] 1——mud tank; 2——platform mud pump;

[0030] 3——Platform hot water; 4——Injection pump;

[0031] 5——medicine tank; 6——medicine pump;

[0032] 7——Nitrogen generator; 8——Oil pipe wing valve;

[0033] 9——Casing wing valve; 10——Oil pipe;

[0034] 11——hot water enhanced slug solution; 12——casing annulus;

[0035] 13——Nitrogen; 14——Y plugging;

[0036] 15——casing; 16——heavy oil layer;

[0037] 17——Electric submersible pump; 18——Hot water injection pipeline;

[0038] 19——Pharmaceutical injection pipeline A; 20——Pharmaceutical injection pipeline B;

[0039] 21——nitrogen injection pipeline; 22——screen tube;

[0040] 23——Liquid outlet. DETAILED DESCRIPTION

[0041] In order to further understand the content, features and effects of the present invention, the following embodiments are given as examples and described in detail with reference to the accompanying drawings:

[0042] As attached Figure 1 As shown, a thermal composite throughput efficiency enhancement system for cold production wells of low-yield heavy oil at sea, the system comprises a wellhead Christmas tree and an electric pump production string, a tubing wing valve 8 and a casing wing valve 9 are installed on the wellhead Christmas tree, the electric pump production string comprises a tubing 10, a casing 15, a screen pipe 22, a Y plug 14 and an electric submersible pump 17, etc., an oil-casing annulus 12 is formed between the tubing 10 and the casing 15 and between the tubing 10 and the screen pipe 22, and a plurality of liquid outlet holes 23 are arranged at intervals on the horizontal section of the tubing 10.

[0043] The system further includes a hot water injection pipeline 18 , a mud tank 1 , a chemical injection pipeline A 19 , a chemical injection pipeline B 20 , a nitrogen generator 7 and a nitrogen injection pipeline 21 .

[0044] One end of the hot water injection pipeline 18 is connected to the tubing wing valve 8, and the other end is connected to the platform hot water 3. An injection pump 4 is provided on the hot water injection pipeline 18, at one end close to the platform hot water 3. The platform hot water 3 can be injected into the tubing 10 of the electric pump production string through the hot water injection pipeline 18. The temperature of the platform hot water 3 is 100°C to 115°C, so that the temperature of the hot water enhancement slug solution 11 injected into the tubing 10 is 100°C to 115°C.

[0045] The mud tank 1 stores a composite synergist A, which is connected to the hot water injection pipeline 18 through the injection pipeline A19, and the platform mud pump 2 is arranged on the injection pipeline A19. The composite synergist A can be injected into the oil pipe 10 of the electric pump production string located in the heavy oil layer 16 through the oil pipe wing valve 8. Among them, the main function of the composite synergist A is to eliminate the organic blockage problem such as colloid asphaltene that may exist near the well of the oil reservoir. The main components of the composite synergist A are composed of one or more of petroleum ether, unsaturated acid copolymer, and high molecular surfactant. The treatment radius of the composite synergist A is 0.2m to 0.5m.

[0046] The compound synergistic agent B is stored in the agent tank 5, and the agent tank 5 is connected to the hot water injection pipeline 18 through the agent injection pipeline B20, and the agent injection pipeline B20 is provided with a agent pump 6. The compound synergistic agent B can be mixed with the platform hot water 3 in the hot water injection pipeline 18 and injected into the oil pipe 10 of the electric pump production string located in the heavy oil layer 16 through the oil pipe wing valve 8. Among them, the main function of the compound synergistic agent B is to reduce the viscosity of the heavy oil, reduce the oil-water interfacial tension, and improve the oil-water mobility ratio. The main components of the compound synergistic agent B are composed of one or more of alkylbenzene sulfonic acid surfactants, alkyl glycoside surfactants, and OP surfactants. After the compound synergistic agent B is mixed with the platform hot water 3, the concentration of the compound synergistic agent B is 0.8% to 1.2%.

[0047] The nitrogen generator 7 is used to produce high-purity nitrogen 13, and the nitrogen generator 7 is connected to the casing wing valve 9 of the wellhead Christmas tree through the nitrogen injection pipeline 21. The nitrogen 13 produced by the nitrogen generator 7 can be injected into the oil casing annulus 12 of the electric pump production string through the casing wing valve 9. The nitrogen 13 is used to suppress the intrusion of edge and bottom water and to insulate the oil casing annulus.

[0048] The operation method of the above-mentioned offshore low-yield heavy oil cold production well thermal composite huff-and-puff efficiency enhancement system is as follows:

[0049] Step 1: Use wireline operation to fish out the Y plug 14 in the electric pump production string.

[0050] Step 2, injecting the composite synergistic agent A into the oil pipe 10 of the electric pump production string through the platform mud pump 2, and after injecting the composite synergistic agent A, injecting the platform hot water 3 into the oil pipe 10, so that the composite synergistic agent A in the oil pipe 10 is injected into the heavy oil layer 16 through the liquid outlet 23 and the horizontal section screen pipe 22 on the oil pipe 10 in sequence under the action of the platform hot water 3, and after the composite synergistic agent A is injected into the heavy oil layer 16, a well soaking reaction is carried out, wherein the well soaking reaction time is 12 hours to 24 hours.

[0051] Step 3, the chemical pump 6 injects the composite synergistic agent B in the chemical tank 5 into the hot water injection pipeline 18, so that the composite synergistic agent B and the platform hot water 3 are mixed in the hot water injection pipeline 18 to form a hot water synergistic slug solution 11, and the hot water synergistic slug solution 11 is injected into the oil pipe 10. The hot water synergistic slug solution 11 in the oil pipe 10 is sequentially injected into the heavy oil layer 16 through the liquid outlet 23 and the screen pipe 22 on the oil pipe 10.

[0052] Step 4, injecting nitrogen 13 into the casing annulus 12 of the electric pump production string through the nitrogen generator 7, and the nitrogen 13 in the casing annulus 12 is injected into the heavy oil layer 16 through the screen tube 22.

[0053] Step 5, after the injection of nitrogen 13 is completed, the well is soaked, wherein the soaking time is 24 hours to 48 hours.

[0054] Step 6, put the Y plug 14 into operation, start the electric submersible pump 17, and pump the production string to carry out production operations.

[0055] In the first embodiment of the present invention, the composite synergist A adopts a polymer surfactant, and its treatment radius is 0.2m; the temperature of the platform hot water 3 is 115°C; the composite synergist B is an alkylbenzene sulfonic acid surfactant, and the composite synergist B is mixed with the platform hot water 3 and used at a concentration of 0.8%; the soaking time after the injection is completed is 24 hours.

[0056] In the second embodiment of the present invention, the composite synergist A is specifically petroleum ether, and its treatment radius is 0.4m; the temperature of the platform hot water 3 is 110°C; the composite synergist B is composed of an alkyl glycoside surfactant and an OP surfactant. After the composite synergist B is mixed with the platform hot water 3, the concentration of the alkyl glycoside surfactant is 0.5%, and the concentration of the OP surfactant is 0.5%; the well soaking time after the injection is completed is 48 hours.

[0057] In the third embodiment of the present invention, the composite synergist A is composed of a polymer surfactant and an unsaturated acid copolymer, and its treatment radius is 0.5m; the temperature of the platform hot water 3 is 115°C; the composite synergist B is an OP surfactant, and the composite synergist B is mixed with the platform hot water 3 and used at a concentration of 1.2%; the soaking time after the injection is completed is 30 hours.

[0058] The effect of the present invention is verified by the following field test examples:

[0059] A certain offshore heavy oil cold production well was selected. The reservoir was buried at a depth of about 1,800 meters and the horizontal section was about 300 meters long. High-quality screen pipe + gravel filling completion and sand control were adopted. The maximum temperature resistance of the wellhead Christmas tree and pipe string was 121°C. The viscosity of the dehydrated crude oil at 50°C was 4230mPa.s. During the stable production period, the gas-oil ratio was 3-5m3 / m 3 , Y-column production, daily liquid production 19m 3 , daily oil production 4.7m 3 , which is a low-yield heavy oil cold production well.

[0060] In view of the geological characteristics of the reservoir, the properties of the ground crude oil and development contradictions, in 2021, based on the previous cold production trials in the heavy oil block, a thermal composite throughput efficiency enhancement process test was carried out for heavy oil cold production wells.

[0061] According to the actual geological conditions of the reservoir and the results of CMG numerical simulation, the dosage of composite enhancer A is designed to be 20m 3 , dosage of compound synergist B: 36m 3 , nitrogen 13 injection volume 10x10 4 Nm 3 , the specific parameters are as follows:

[0062] 1) Composite synergist A usage parameters

[0063] Treatment radius 0.2m, use concentration 100%, total 20m 3 .

[0064] 2) Nitrogen 13 water pressure cone parameters

[0065] Injection of nitrogen 13 into the casing annulus 12, purity of nitrogen 13 is 99.9%, injection volume is 10x10 4 Nm 3 .

[0066] 3) Main slug parameters

[0067] Platform hot water 3 injection volume 3000m 3 The injection temperature is 108℃, the composite synergist B and platform hot water 3 are continuously injected, and the amount of composite synergist B is 36m 3 , using a concentration of 1.2%, and simultaneously continuously injecting high purity nitrogen 13 into the casing annulus 12.

[0068] After the implementation of the present invention, the daily oil production of the offshore heavy oil cold production well reached 50m 3 / d, to achieve the goal of increasing efficiency, increasing production and effective mobilization.

[0069] In summary, the present invention is a synergistic process method that injects hot water of a certain temperature, a composite synergistic agent (including composite synergistic agent A and composite synergistic agent B) and nitrogen 13 into a low-yield heavy oil cold production well, keeps the well shut for a certain period of time after the injection, and then starts the pump for production. The process can give full play to the viscosity reduction and blockage removal effects of heat-gas-agent, effectively improve the oil-water mobility ratio of the heavy oil reservoir, and increase the utilization degree of the heavy oil reservoir, thereby greatly improving the heavy oil recovery rate of the low-yield cold production heavy oil well. It is a new technology that has broad application prospects on offshore platforms under the current technical background and can greatly improve the production effect and recovery rate of low-yield heavy oil cold production wells.

[0070] Although the preferred embodiments of the present invention have been described above in conjunction with the accompanying drawings, the present invention is not limited to the above-mentioned specific embodiments. The above-mentioned specific embodiments are merely illustrative and not restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the present invention and the claims, all of which belong to the scope of protection of the present invention.

Claims

1. An operating method based on a thermal composite throughput efficiency enhancement system for offshore low-yield heavy oil cold production wells, the system include: Wellhead Christmas tree; Electric pump production string; A hot water injection pipeline (18), one end of which is connected to the oil pipe wing valve (8) of the wellhead Christmas tree, and the other end is connected to the platform hot water (3), and the platform hot water (3) can be injected into the oil pipe (10) of the electric pump production string through the hot water injection pipeline (18); A mud tank (1), wherein the composite synergistic agent A is stored in the mud tank (1), and the mud tank (1) is connected to the hot water injection pipeline (18) via a drug injection pipeline A (19), so that the composite synergistic agent A can be injected into the oil pipe (10) of the electric pump production string through the oil pipe wing valve (8); A reagent tank (5), wherein the reagent tank (5) stores a composite synergistic agent B, and the reagent tank (5) is connected to the hot water injection pipeline (18) via a reagent injection pipeline B (20), so that the composite synergistic agent B can be mixed with the platform hot water (3) in the hot water injection pipeline (18) and injected into the oil pipe (10) of the electric pump production string through the oil pipe wing valve (8); and A nitrogen generator (7), the nitrogen generator (7) being connected to the casing wing valve (9) of the wellhead Christmas tree via a nitrogen injection pipeline (21), so that the nitrogen (13) produced by the nitrogen generator (7) can be injected into the casing annulus (12) of the electric pump production string through the casing wing valve (9); It is characterized in that the operation method comprises the following steps: Step 1, fishing out the Y plug (14) in the electric pump production string; Step 2, injecting the composite synergistic agent A into the oil pipe (10) of the electric pump production string, and after injecting the composite synergistic agent A, injecting the platform hot water (3) into the oil pipe (10) to displace it, so that the composite synergistic agent A in the oil pipe (10) is injected into the heavy oil layer (16) through the liquid outlet hole (23) and the horizontal section screen pipe (22) on the oil pipe (10) under the action of the platform hot water (3), and after the composite synergistic agent A is injected into the heavy oil layer (16), a well soaking reaction is performed; Step 3, the composite synergistic agent B is mixed with the platform hot water (3) in the hot water injection pipeline (18) to form a hot water synergistic slug solution (11), and the hot water synergistic slug solution (11) is injected into the oil pipe (10). The hot water synergistic slug solution (11) in the oil pipe (10) is sequentially injected into the heavy oil layer (16) through the liquid outlet (23) on the oil pipe (10) and the screen pipe (22); Step 4, injecting nitrogen (13) into the oil casing annulus (12) of the electric pump production string through the nitrogen generating device (7), and the nitrogen (13) in the oil casing annulus (12) is injected into the heavy oil layer (16) through the screen pipe (22); Step 5, after the nitrogen (13) injection is completed, the well is shut down; Step 6, putting in Y plug (14), the electric pump production string to carry out production operation; The composite synergistic agent A includes one or more of petroleum ether, unsaturated acid copolymer, and high molecular surfactant; the treatment radius of the composite synergistic agent A is 0.2m to 0.5m; The composite synergist B comprises one or more of an alkylbenzene sulfonic acid surfactant, an alkyl glycoside surfactant, and an OP surfactant. The concentration of the composite synergist B after mixing with the platform hot water (3) is 0.8% to 1.2%.

2. The operation method according to claim 1, It is characterized in that In step 2, the time of the soaking reaction is 12 to 24 hours.

3. The operation method according to claim 1, It is characterized in that In step 5, the stewing time is 24 to 48 hours.

4. The operation method according to claim 1, It is characterized in that An injection pump (4) is provided on the hot water injection pipeline (18) at one end close to the platform hot water (3).

5. The operation method according to claim 1, It is characterized in that The drug injection pipeline A (19) is provided with a platform mud pump (2).

6. The operation method according to claim 1, It is characterized in that The drug injection pipeline B (20) is provided with a drug pump (6).

7. The operation method according to claim 1, It is characterized in that The temperature of the platform hot water (3) is 100°C to 115°C.