A kind of retaining pile and its construction method and steel cage structure manufacturing method
The use of a steel cage structure with U-shaped tubes and prestressed steel strands addresses the deformation and steel consumption issues in retaining piles, enhancing rigidity and stability while allowing for steel reuse.
Patent Information
- Application Number
- CN202111495440.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-08
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2041-12-08
AI Technical Summary
Existing retaining piles deform under soil pressure during deep foundation pit excavations, leading to issues like ground cracking and settlement, and require excessive steel usage due to their low rigidity.
A retaining pile design incorporating a steel cage structure with U-shaped tubes and prestressed steel strands, which are tensioned and anchored after concrete pouring, enhancing rigidity and stability while reducing steel consumption.
The prestressed steel strand technology increases the rigidity of retaining piles, reduces deformation and settlement, and conserves steel by allowing reuse of non-stressed strands, improving overall stability and construction efficiency.
Smart Images

Figure CN114382085B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction engineering, and in particular to a retaining pile and a construction method thereof and a method for manufacturing a steel cage structure. Background Art
[0002] When excavating foundation pits during construction, temporary support is required to ensure the safety of the environment around the foundation pits. When the excavation depth of the foundation pit is large, the support method often adopts the method of retaining piles plus supports, among which the retaining piles mainly include bored cast-in-place piles, SMW method piles, underground continuous walls, etc. When using common bored cast-in-place piles, if the excavation depth of the foundation pit is deep, the retaining piles will be subjected to greater force. In order to ensure safety, more steel bars need to be configured, and a large amount of steel is used. When the foundation pit is excavated, the retaining piles will deform under the action of soil pressure, and the surrounding area of the foundation pit will also deform with the deformation of the retaining piles. In severe cases, problems such as ground cracking and settlement may occur.
[0003] Steel strands are often used in prestressed structural components due to their high strength and lightness, and are widely used in large-span structures, bridges and other fields. Prestressing technology is also commonly used in prefabricated components, such as prefabricated panels and prefabricated piles. In underground projects, steel strands are mainly used in slope projects and prefabricated piles. Due to the complex process, steel strands are rarely used in retaining pile projects.
[0004] Therefore, it is urgent to develop a retaining pile and a construction method thereof and a reinforcement cage structure manufacturing method to solve the problems in the prior art. Summary of the invention
[0005] The purpose of the present invention is to provide a retaining pile and a construction method thereof and a method for manufacturing a steel cage structure to solve the problems raised in the above-mentioned background technology. The main purpose of the present invention is to use the prestressed steel strand technology for retaining piles to save steel. At the same time, the prestressed technology is used to increase the rigidity of the retaining piles, improve the overall stability of the soil, and reduce the deformation and settlement around the foundation pit.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A retaining pile comprises a steel cage structure, wherein the steel cage structure comprises a steel cage frame and a plurality of U-shaped tubes arranged on the steel cage frame, and steel strands passing through the U-shaped tubes; the steel cage frame comprises longitudinal bars and stirrups, the U-shaped tubes are arranged at equal intervals along the inner side of the steel cage frame, and the steel strands passing through the U-shaped tubes serve as carriers for applying prestress.
[0008] As a further solution of the present invention: the U-shaped tube is fixed on the inner side of the steel cage frame and is bent into a U shape at a certain distance from the bottom of the steel cage frame.
[0009] As a further solution of the present invention: a plurality of U-shaped tubes are arranged at equal intervals in the horizontal direction, and are staggered in the vertical direction toward the bottom end of the steel cage frame, and are fixed on the steel cage frame.
[0010] As a further solution of the present invention: a crown beam is provided at the top of the steel cage structure, and the crown beam is connected with a plurality of steel cage structures by concrete pouring to form a foundation pit support structure, wherein the steel strands of the steel cage structure are tensioned and anchored after passing through the crown beam, and then grouting is injected into the U-shaped tube to fill it.
[0011] A method for manufacturing a steel cage structure of a retaining pile, comprising:
[0012] S1: Several longitudinal bars and stirrups are evenly distributed at a certain interval and assembled into a steel cage skeleton;
[0013] S2: insert several steel strands into the U-shaped tube;
[0014] S3: The straight section of the U-shaped tube is fixed on the steel cage frame at uniform intervals;
[0015] S4: The U-shaped part of the U-shaped tube is fixed near the bottom of the steel cage frame and arranged staggered;
[0016] S5: The overall fabrication of the steel cage structure is completed.
[0017] A construction method for retaining piles, comprising:
[0018] S1: The steel cage structure is assembled by a steel cage frame, a U-shaped tube and steel strands inserted into the U-shaped tube;
[0019] S2: The steel cage structure is lowered into the pile hole, the U-shaped tube is filled with clean water, and the top of the U-shaped tube is sealed; S3: The pile body concrete is poured, and the ends of the steel strands extend out of the concrete surface;
[0020] S4: Recover the steel strands in the non-stress direction;
[0021] S5: After the concrete strength of the pile body and crown beam meets the requirements, the steel strands are tensioned and anchored, and the U-shaped tube is filled with grouting; S6: Post-tensioned bonded prestressed retaining piles are put into use in the project.
[0022] As a further solution of the present invention: the steel cage structure in S2 is lowered into the pile hole, the U-shaped tube is filled with clean water and the top of the U-shaped tube is sealed, protective measures are taken, and then the pile body is poured with concrete.
[0023] Compared with the prior art, the invention has the following beneficial effects: the prestressed steel strand technology is used for retaining piles, the steel bars in the stress direction can be replaced by steel strands with three times the strength and one-third the weight, and the steel strands in the non-stress direction are recycled to save steel. At the same time, a new method for implementing prestressed technology in retaining piles is proposed, which simplifies the construction process, improves the rigidity of retaining piles, improves the overall stability of soil, and reduces deformation around the foundation pit.
[0024] Other features and advantages of the present invention will be disclosed in detail in the following specific embodiments and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of an overall structure of a retaining pile in an embodiment of the present invention;
[0026] Figure 2 is a schematic top view of a retaining pile in an embodiment of the present invention;
[0027] Figure 3 is a cross-sectional schematic diagram of a U-shaped tube in an embodiment of the present invention;
[0028] Figure 4 is a schematic diagram of a position of a pile top connection in an embodiment of the present invention;
[0029] Figure 5 It is a schematic flow chart of the construction method of prestressed retaining piles in an embodiment of the present invention.
[0030] The reference numerals in the figures are: steel cage structure 1, steel cage skeleton 11, stirrups 111, longitudinal bars 112, U-shaped tubes 12, steel strands 13, pile holes 2, stress-bearing areas 3, pressure-bearing steel plates 4, and cap beams 5. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] In an embodiment of the present invention, a retaining pile, see Figure 1-4 As shown, it includes a steel cage structure 1, wherein the steel cage structure 1 includes a steel cage skeleton 11 and a plurality of U-shaped tubes 12 arranged on the steel cage skeleton 11, and steel strands 13 passing through the U-shaped tubes 12; the steel cage skeleton 11 includes longitudinal bars 112 and stirrups 111, the U-shaped tubes 12 are arranged at equal intervals along the inner side of the steel cage skeleton 11, and the steel strands 13 passing through the U-shaped tubes 12 are carriers for applying prestress.
[0033] Among them, since the tensile strength design value of HRB400 steel bar is 360MPa, the tensile strength design value of the commonly used steel strand 13 is 1320MPa, and the tensile strength design value of the steel strand 13 is about 3.67 times the strength design value of HRB400 steel bar. Under the same strength conditions, the steel consumption of the steel strand 13 is less than one-third of that of the HRB400 steel bar. Compared with the use of steel bars in the traditional method, in the embodiment of the present invention, the steel strand 13 in the stress direction is used to replace the steel bar, and the steel strand in the non-stress direction can be pulled out and put into the next pile for use, which can save more than half of the steel consumption.
[0034] The retaining pile provided in this embodiment has a pile head above the ground, which is convenient for tensioning. The prestressed steel strand 13 is used as the main reinforcement. The strength of the steel strand 13 can fully play its role, improve the quality of the pile body, reduce pile cracks, increase the rigidity of the pile body, and reduce the deformation around the foundation pit. During construction, there is no requirement for the placement direction of the steel cage structure 1. It can be placed at will according to the convenience of construction. After the concrete pouring of the pile body is completed and has a certain strength, the steel strand in the non-stress direction is recycled and put into the next pile for use, which is reused and environmentally friendly.
[0035] In this embodiment, see Figure 1-3 As shown, the U-shaped tube 12 is fixed on the inner side of the steel cage frame 11 and is bent into a U shape at a certain distance from the bottom of the steel cage frame 11. The U-shaped tube 12 extends from one side of the top of the steel cage frame 11 to the bottom, is bent into a U shape at a certain distance (e.g., about 2m) from the bottom of the steel cage frame 11, and returns to the top of the steel cage frame 11 along the other side of the steel cage frame 11. Since the U-shaped tube 12 does not need to be provided with an anchor at the bottom, it avoids the problem of difficulty in grouting and unreliable grouting quality when the bottom end of the tube is closed, and the problem of difficulty in removing soil and debris that fall into the tube due to the bottom end of the tube being closed, thereby affecting the grouting quality.
[0036] In this embodiment, see Figure 1-3 As shown, a plurality of U-shaped tubes 12 are arranged at equal intervals in the horizontal direction, and are staggered in the vertical direction near the bottom end of the steel cage skeleton 11, and are fixed on the steel cage skeleton 11. A plurality of U-shaped tubes 12 are arranged at equal intervals in the horizontal direction and staggered in the vertical direction near the lower end of the steel cage skeleton 11, and are fixed on the steel cage skeleton 11. In the vertical direction, if the first U-shaped tube 12 passes from the top of the pile to near the bottom of the pile and then turns back, the second U-shaped tube 12 passes to about 1 meter above the bottom of the first U-shaped tube 12 and turns back. In the plane direction, each U-shaped tube 12 is staggered at equal intervals. Through the orderly staggering of the U-shaped tubes 12 in the horizontal and vertical directions, they do not interfere with each other and each exerts a prestressing effect.
[0037] In this embodiment, see Figure 1-4As shown, a crown beam 5 is provided at the top of the steel cage structure 1, and the crown beam 5 is connected with several steel cage structures 1 by pouring concrete to form a foundation pit support structure, wherein the steel strands 13 of the steel cage structure 1 are tensioned and anchored after passing through the crown beam 5, and then the U-shaped tube 12 is filled with grout. After the crown beam 5 at the top of the retaining pile is poured and meets a certain strength, the steel strands 13 are tensioned and anchored, and the U-shaped tube 12 is filled with cement slurry. The symmetrical tensioning method can prevent the concrete from overstressing, the steel cage from twisting and bending, etc. The post-tensioning method does not require pedestal equipment to apply prestress, and has great flexibility. This construction method integrates the prestressed tendons with the concrete structure, improving the anchoring reliability and durability of the prestressed tendons.
[0038] A method for manufacturing a steel cage structure of a retaining pile, comprising:
[0039] S1: a plurality of longitudinal bars 112 and stirrups 111 are evenly distributed at a certain interval and assembled into a steel cage skeleton 11; S2: a plurality of steel strands 13 are inserted into the U-shaped tube 12;
[0040] S3: The straight section of the U-shaped tube 12 is fixed on the steel cage frame 11 at a uniform spacing;
[0041] S4: The U-shaped part of the U-shaped tube 12 is fixed near the bottom of the steel cage frame 11 and arranged in a staggered manner;
[0042] S5: The overall fabrication of the steel cage structure 1 is completed.
[0043] A construction method for retaining piles, see Figure 5 As shown, including:
[0044] S1: The steel cage structure 1 is assembled by a steel cage skeleton 11, a U-shaped tube 12 and a steel strand 13 inserted into the U-shaped tube 12;
[0045] S2: The steel cage structure 1 is lowered into the pile hole, the U-shaped tube 12 is filled with clean water, and the top of the U-shaped tube 12 is sealed;
[0046] S3: pouring pile concrete, the end of the steel strand 13 extends out of the concrete surface;
[0047] S4: Recover the steel strand 13 in the non-stress direction;
[0048] S5: After the concrete strength of the pile body and the cap beam 5 meets the requirements, the steel strands are tensioned and anchored, and the U-shaped tube 12 is filled with grout;
[0049] S6: Post-tensioned bonded prestressed retaining piles are put into use in the project.
[0050] The construction method of the retaining pile in this embodiment is to assemble a steel cage structure 1 through stirrups 111, longitudinal bars 112, U-shaped tubes 12, and steel strands 13, and design the matched steel strands 13, and put them into the U-shaped tube 12. The steel cage structure 1 of the steel strands 13 is inserted into the U-shaped tube 12 and lowered into the pile hole 2, and concrete is poured into the pile hole 3, and the crown beam 5 is poured on the top of the pile. After the concrete strength of the pile body and the crown beam 5 meets the requirements, the steel strands 13 are tensioned and anchored on the top of the pile, and the U-shaped tube 12 is filled with cement slurry, and the retaining pile is put into use in the project, thereby reducing the amount of steel used, reducing the weight of the steel cage structure 1, and increasing the rigidity of the retaining pile, reducing the deformation of the foundation pit. At the same time, the non-stressed part of the steel strands 13 are recovered and put into the next pile for use, which is economical.
[0051] See also Figures 4 to 5 The steel cage structure 1 is lowered to the pile hole 2, and clean water is injected into the U-shaped tube 12, and the top of the U-shaped tube 12 is blocked to prevent concrete from entering the U-shaped tube 12 during the pouring of the pile body concrete, and to protect the U-shaped tube from damage during the pouring of the pile body concrete. A pressure-bearing steel plate 4 is provided between the pile body and the crown beam 5 to disperse the pressure, so as to prevent the pile body and the crown beam from being damaged due to stress concentration. Then, the non-stress-bearing direction steel strands that are not in the stress-bearing area 3 are recovered according to the stress requirements.
[0052] The present invention provides a retaining pile and a construction method thereof and a method for manufacturing a steel cage structure, which can apply the prestressed steel strand technology to the retaining pile and save steel. At the same time, the prestressed technology is used to increase the rigidity of the retaining pile, improve the overall stability of the soil, and reduce deformation and settlement around the foundation pit. The structure is simple, the use is convenient, and the reliability is high.
[0053] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0054] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A construction method for retaining piles, It is characterized in that It comprises a steel cage structure, wherein the steel cage structure comprises a steel cage frame and a plurality of U-shaped tubes arranged on the steel cage frame, and steel strands passing through the U-shaped tubes; the steel cage frame comprises longitudinal bars and stirrups, the U-shaped tubes are arranged at equal intervals along the inner side of the steel cage frame, and the steel strands passing through the U-shaped tubes are carriers for applying prestress; A cap beam is provided at the top of the steel cage structure, and the cap beam is connected with a plurality of steel cage structures by pouring concrete to form a foundation pit support structure, wherein the steel strands of the steel cage structure are tensioned and anchored after passing through the cap beam, and then grouting is filled into the U-shaped tube; the construction method of the retaining pile comprises: S1: The steel cage structure is assembled by a steel cage frame, a U-shaped tube and steel strands inserted into the U-shaped tube; S2: The steel cage structure is lowered into the pile hole, the U-shaped tube is filled with clean water, and the top of the U-shaped tube is sealed; S3: pouring pile concrete, with the ends of the steel strands extending out of the concrete surface; S4: Recover the steel strands in the non-stress direction; S5: After the concrete strength of the pile body and cap beam meets the requirements, the steel strands are tensioned and anchored, and the U-shaped tube is filled with grouting; S6: Post-tensioned bonded prestressed retaining piles are put into use in the project.
2. The construction method of the retaining pile according to claim 1, It is characterized in that The U-shaped tube is fixed on the inner side of the steel cage frame and is bent into a U shape at a certain distance from the bottom of the steel cage frame.
3. The construction method of the retaining pile according to claim 1 or 2, It is characterized in that A plurality of U-shaped tubes are arranged at equal intervals in the horizontal direction, are arranged in a staggered manner toward the bottom end of the steel cage frame in the vertical direction, and are fixed on the steel cage frame.
4. The construction method of the retaining pile according to claim 1, It is characterized in that The steel cage structure in S2 is lowered into the pile hole, the U-shaped tube is filled with clean water and the top of the U-shaped tube is sealed. After protective measures are taken, concrete is poured into the pile body.
5. A method for manufacturing a steel cage structure of a retaining pile, It is characterized in that The invention comprises a steel cage structure, wherein the steel cage structure comprises a steel cage frame and a plurality of U-shaped tubes arranged on the steel cage frame, and steel strands passing through the U-shaped tubes; the steel cage frame comprises longitudinal bars and stirrups, the U-shaped tubes are arranged at equal intervals along the inner side of the steel cage frame, and the steel strands passing through the U-shaped tubes are carriers for applying prestress; The production method includes: S1: Several longitudinal bars and stirrups are evenly distributed at a certain interval and assembled into a steel cage skeleton; S2: insert several steel strands into the U-shaped tube; S3: The straight section of the U-shaped tube is fixed on the steel cage frame at uniform intervals; S4: The U-shaped part of the U-shaped tube is fixed near the bottom of the steel cage frame and arranged staggered; S5: The overall fabrication of the steel cage structure is completed.
Citation Information
Patent Citations
Concrete -steel stranded conductor cage of a deep basal pit prestressing force cantilever fender pile
CN208701693U
Post-tensioning bonded prestressed fender post
CN216920296U