Transmission system planning method, device and storage medium considering wind-solar correlation

The hybrid vine Copula model based on Mini Batch K-Means clustering and AD distance evaluation solves the problem that the correlation between wind power and photovoltaic output and load is not accurately considered in transmission system planning, improves the accuracy and efficiency of planning, and achieves More reliable grid expansion planning.

CN114386700BActive Publication Date: 2024-10-29GUANGDONG POWER GRID CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210039670.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-13
Publication Date
2024-10-29
Estimated Expiration
2042-01-13

AI Technical Summary

Technical Problem

The existing technology fails to accurately consider the complex correlation between wind power, photovoltaic output and load in transmission system expansion planning, resulting in inaccurate and unreliable planning results, and the hybrid vine Copula model has low computational efficiency in large-scale data processing. affect modeling accuracy.

Method used

The Mini Batch K-Means clustering method is used to divide historical data into scenes, determine the Copula function parameters and types, use the vine structure to generate samples, and judge the optimal vine structure through AD distance, establish a mixed vine Copula model, and generate a scenery load sample set , inputting the transmission system planning model to output grid planning results.

Benefits of technology

It improves the accuracy and efficiency of transmission system expansion planning, reduces calculation time through Mini Batch K-Means, and AD distance evaluation improves modeling accuracy and enhances the credibility of planning results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114386700B_ABST
    Figure CN114386700B_ABST
Patent Text Reader

Abstract

The present application discloses a transmission system planning method, device and storage medium that considers the correlation between wind and solar power, wherein the method includes: obtaining a historical data set of power system parameters and random variables; dividing the historical data set into scenarios according to the Mini Batch K‑Means clustering method; determining the parameters and type of the Copula function according to each scenario data, and using the AD distance to judge the optimal vine structure in each scenario; establishing a hybrid vine Copula model according to the optimal vine structure in each scenario, and generating a wind-solar load sample set; inputting the wind-solar load sample set and power system parameters into the transmission system planning model, and outputting the power grid planning results. The present application uses the Mini Batch K‑Means algorithm to divide scenarios, reducing the calculation time; using the AD distance as the vine structure judgment standard, the modeling accuracy of the hybrid vine Copula is improved, and the credibility of the transmission system expansion planning method is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power transmission systems, and in particular to a power transmission system planning method, device, equipment and storage medium that takes into account the correlation between wind and solar power. Background Art

[0002] In recent years, with the increasing demand for energy and the increasingly severe environmental problems, the installed capacity of renewable energy has increased year by year. As we all know, wind power and photovoltaic output are extremely random and intermittent, which will bring severe challenges to the expansion planning of the power system. At the same time, the widespread loads in the power system are affected by the differences and irregularities of power users' behaviors, and there is also a strong uncertainty. On the other hand, the randomness between wind power, photovoltaic output and load is not completely independent, but there is a complex correlation between them. In order to deeply reveal the impact of the correlation between wind power, photovoltaic output and load (referred to as "wind, photovoltaic and load") on power grid planning, it is necessary to study the transmission system expansion planning method that considers the complex correlation of "wind, photovoltaic and load".

[0003] "Large-Scale Wind-PV Complementary Grid Expansion Planning Considering Correlation" [J]. Power System Technology, 2018, 42(07): 2120-2127. Considering the correlation between the output of wind farms and photovoltaic power stations, a wind-PV complementary output Copula model is established, and on this basis, a wind-PV complementary multi-objective grid expansion planning model is proposed. However, this paper has two shortcomings: 1) Only the correlation between wind speed and light intensity is considered. In actual power systems, there is a certain correlation between wind speed, light intensity and load. Considering only the correlation between wind speed and light intensity will lead to inaccurate planning results. 2) Only a single Copula function is used, namely the Frank Copula function. The correlation between "wind, light and load" is different, and the dependency structure (correlation type) between random variables described by each Copula function is different. Therefore, using only a single Copula function cannot accurately describe the correlation between different variables.

[0004] "Relevance Modeling of Wind-Solar Combined Power Generation Based on Hybrid Vine Copula Model and Its Application in Reactive Power Optimization [J]. Power System Technology, 2017, 41(03):791-798." proposes to establish a hybrid vine Copula model by combining K-means clustering and vine structure principles, and uses the hybrid vine Copula model to focus on analyzing the correlation between wind speed, light, and load combined output. However, this paper has three shortcomings:

[0005] 1) The hybrid vine Copula model is applied in the field of reactive power optimization of power grids and has never been used in the field of transmission network expansion planning. Moreover, the technical difficulty of combining the two technologies is still unknown.

[0006] 2) The K-means clustering algorithm is used to cluster the input random variable data. This method has a faster calculation speed in scenarios with small sample sizes. However, when the historical data of random variables is huge, its calculation is time-consuming and inefficient, which seriously affects the modeling accuracy based on the hybrid vine Copula and further affects the efficiency of the transmission system expansion planning.

[0007] 3) The vine structure evaluation index CvM distance measures the integral of the square distance between the empirical cumulative distribution function and the target cumulative distribution function. If most of the data falls in the tail positions on the left and right sides, more emphasis should be placed on the difference in the tails. The total distribution deviation obtained by the CvM distance, although considering all the difference points, does not consider the differences caused by the distribution position of large-scale data. Summary of the invention

[0008] The present application provides a transmission system planning method, device, equipment and storage medium that take into account the correlation between wind and solar power, so as to solve the problem of unreliable and inaccurate transmission system expansion planning results in the prior art.

[0009] In order to solve the above technical problems, the present application proposes a transmission system planning method that considers the correlation between wind and solar power, including: obtaining historical data sets of power system parameters and random variables; clustering and classifying the historical data sets and dividing the scenarios according to the Mini Batch K-Means clustering method; determining the parameters and type of the Copula function according to each scene data after the scenario division, using the vine structure to generate samples corresponding to each scene data, and using the AD distance to determine the optimal vine structure for each scene; establishing a hybrid vine Copula model according to the optimal vine structure for each scene, and generating a wind-solar load sample set according to the proportion of each scene data in the hybrid vine Copula model; inputting the wind-solar load sample set and the power system parameters into the transmission system planning model, and finally outputting the power grid planning results.

[0010] Optionally, the random variables include wind speed, light and load, and the historical data set is clustered and classified and the scene is divided according to the Mini Batch K-Means clustering method, including: inputting the historical data set D of continuous random variables about wind speed, light and load of the power system, clustering parameter K and sampling data N, using the Mini Batch K-Means clustering method to output 9 clustering schemes; calculating the DBI index value corresponding to each K value, and outputting the optimal cluster number K best and its corresponding scene partition set C=(C 1 ,C 2 ,…,C K ).

[0011] Optionally, it also includes: inputting a scene partition set C=(C 1,C 2 ,…,C K ), respectively use the nonparametric kernel density estimation method to fit the probability density function of the multidimensional variables of each scene, and obtain the marginal distribution function F(x i ); According to the marginal distribution function F(x i ), use the Copulafit function provided by MATLAB to select the optimal parameters of each candidate Copula function and calculate the candidate Copula function C p and the empirical Copula function C n The Euclidean distance between the cumulative distribution functions of each scenario is calculated. The optimal three Copula functions and their parameters are output for each scenario. The total number of samples is set to O, and the LHS method is used to generate the independent variable set L for each scenario. i , where i = 1, 2, ..., K; the independent variable set L i , input the vine Copula model built for each scene and sample them respectively, and output the sampled samples Z; according to the sampled samples Z, calculate the AD distance under each scene, and select the vine Copula model with the smallest AD distance as the mixed vine Copula model of the scene.

[0012] Optionally, it also includes: obtaining a sample data set U according to a mixed vine Copula model, obtaining a marginal distribution function by a non-parametric kernel density method, and converting the sample data set U into a required wind-solar load sample set X according to an estimated inverse function of the marginal distribution.

[0013] Optionally, the set of independent variables L i , input the vine Copula model built for each scene and sample them respectively, and output the sampled samples Z, including: i Randomly generate an n-dimensional sample set that obeys independent uniform distribution; write equations according to the structure of C vine and D vine respectively, the sample points of the first dimension are uniformly distributed sampling points, and use the properties of conditional distribution to obtain the sampling points corresponding to the second dimension. The sample points of this dimension are obtained one by one according to the sample points of the previous dimension until all the sample points of n dimensions are obtained, and finally generate sampling samples Z.

[0014] Optionally, before inputting the wind and solar load sample set and the power system parameters into the transmission system planning model, it also includes: establishing a transmission system planning model according to the objective function and constraints; wherein the objective function includes the grid construction cost value, the economic loss value of wind and solar abandonment, and the pollution discharge of conventional grid units, and the constraints include power balance constraints, load node new energy power generation penetration power constraints, branch flow constraints, conventional generator set output upper and lower limit constraints, wind turbine unit operating condition constraints, photovoltaic unit operating condition constraints and equipment commissioning status 0-1 constraints.

[0015] Optionally, the wind and solar load sample set and power system parameters are input into the transmission system planning model, and finally the power grid planning result is output, including: under the constraint conditions, when the three objective functions are minimized, the optimal power grid planning result is output.

[0016] In order to solve the above technical problems, the present application proposes a transmission system planning device that takes into account the correlation between wind and solar power, including: a data acquisition module, used to obtain historical data sets of power system parameters and random variables; a clustering module, used to cluster and classify the historical data sets and divide the scenarios according to the Mini Batch K-Means clustering method; a hybrid vine Copula model module, used to determine the parameters and type of the Copula function according to each scene data after the scene division, use the vine structure to generate samples corresponding to each scene data, and use AD distance to judge the optimal vine structure in each scene; establish a hybrid vine Copula model according to the optimal vine structure in each scene, and generate a wind-solar load sample set according to the proportion of each scene data in the hybrid vine Copula model; a planning result module, used to input the wind-solar load sample set and power system parameters into the transmission system planning model, and finally output the power grid planning results.

[0017] In order to solve the above technical problems, the present application proposes an electronic device, including a memory and a processor, wherein the memory is connected to the processor, and the memory stores a computer program. When the computer program is executed by the processor, the above-mentioned transmission system planning method considering the correlation between wind and solar power is implemented.

[0018] In order to solve the above technical problems, the present application proposes a computer-readable storage medium storing a computer program, which, when executed, implements the above-mentioned transmission system planning method considering the correlation between wind and solar power.

[0019] The present application proposes a transmission system planning method, device, equipment and storage medium that considers the correlation between wind and solar, wherein the method includes: obtaining a historical data set of power system parameters and random variables; clustering and classifying the historical data set and dividing the scene according to the Mini Batch K-Means clustering method; determining the parameters and type of the Copula function according to each scene data after the scene division, using the vine structure to generate samples corresponding to each scene data, and using the AD distance to determine the optimal vine structure in each scene; establishing a hybrid vine Copula model according to the optimal vine structure in each scene, and generating a wind-solar load sample set according to the proportion of each scene data in the hybrid vine Copula model; inputting the wind-solar load sample set and the power system parameters into the transmission system planning model, and finally outputting the power grid planning results. In the above manner, the present application uses the MiniBatch K-Means algorithm to divide the multidimensional data into scenes, greatly reducing the calculation time; using the AD distance as the vine structure judgment standard, the modeling accuracy of the hybrid vine Copula is improved, and the credibility of the transmission system expansion planning method is further improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solution of the present application, the drawings required for use in the implementation manner will be briefly introduced below. Obviously, the drawings described below are only some implementation manners of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0021] Figure 1 It is a flowchart of an embodiment of a method for planning a power transmission system considering the correlation between wind and solar power in the present application;

[0022] Figure 2 It is a logical schematic diagram of the C-vine structure of this application;

[0023] Figure 3 It is a logical schematic diagram of the D vine structure of this application;

[0024] Figure 4 It is a structural diagram of an embodiment of an improved IEEE-6 node system of the present application;

[0025] Figure 5 It is a structural schematic diagram of an embodiment of a power transmission system planning device considering wind-solar correlation of the present application;

[0026] Figure 6 It is a structural schematic diagram of an embodiment of the electronic device of the present application;

[0027] Figure 7 It is a structural diagram of an embodiment of a computer-readable storage medium of the present application. DETAILED DESCRIPTION

[0028] In order to enable technicians in this field to better understand the technical solution of the present application, the transmission system planning method, device, equipment and storage medium considering the wind-solar correlation provided by the present application are further described in detail below in combination with the accompanying drawings and specific implementation methods.

[0029] This application proposes a transmission system planning method that takes into account the correlation between wind and solar power. Figure 1 , Figure 1 1 is a flow chart of an embodiment of a power transmission system planning method considering wind-solar correlation in the present application. In this embodiment, the power transmission system planning method considering wind-solar correlation may include steps S110 to S140, and each step is specifically as follows:

[0030] S110: Acquire historical data sets of power system parameters and random variables.

[0031] Collect power system parameters and random variables D = (x 1 ,x 2 ,...,x n ), where the random variables may include continuous random variables such as wind speed, light and load.

[0032] S120: Cluster and classify historical data sets and divide scenarios based on the Mini Batch K-Means clustering method.

[0033] When considering the correlation of "wind and solar load", due to the large amount of historical data, detailed analysis of the data can make the analysis structure more accurate. From this perspective, this embodiment uses a clustering partitioning method to first subdivide the historical data set to be analyzed into several categories, and then perform correlation analysis on each type of data to be analyzed. Among them, the partitioning method selected is the Mini Batch K-Means clustering method.

[0034] In the traditional K-Means algorithm, the distances from all sample points to all centroids are calculated. If the sample size is very large, such as more than 100,000, and there are more than 100 features, the traditional K-Means algorithm is very time-consuming.

[0035] The main idea of ​​Mini Batch K-Means is to select some representative samples from a large number of sample points for K-Means clustering, which can effectively reduce the algorithm convergence time, thereby greatly improving the efficiency of clustering calculation. Especially when considering the correlation between "wind and solar load", historical data is a multi-dimensional random variable. In such a scenario, using Mini Batch K-Means will greatly reduce the calculation time.

[0036] Compared with the traditional K-Means algorithm, the accuracy of the Mini Batch K-Means algorithm is reduced to a certain extent, but this reduction is within an acceptable range. Preferably, in order to improve the accuracy based on the Mini Batch K-Means algorithm, the present embodiment can also repeat the sampling multiple times and then calculate the mean of the obtained class coordinates until the class center tends to be stable.

[0037] The number of division scenarios will affect the separation of different correlations of multidimensional variables. Therefore, when clustering historical data of random variables such as "wind and solar load" in the transmission system, it is necessary to analyze the impact of changes in the number of clusters on the data similarity classification, so as to select the most appropriate number of classifications.

[0038] In this embodiment, the optimal number of clusters can be determined by a density based index (DBI). The DBI index can solve the problem that the number of clusters needs to be specified based on empirical values, and it is difficult to obtain the optimal number of clusters that best matches the clustering characteristics of the data itself. The largest value is the optimal number of clusters. 1 ,x 2 ,...,x n}, if each sample point is P-dimensional and the number of clusters initially set is K, the steps for calculating the DBI index are as follows:

[0039] 1) Find the class radius R i , R i Represented as each data set C i All data in the cluster are transferred to the cluster center c i The average value of the distance:

[0040] d(x,c i )=|xc i |……(1)

[0041]

[0042] In the formula, C i represents the cluster set output by the Mini Batch K-Means algorithm, where i = (1, 2, ..., K), c i For class C i The center point, N(C i ) represents class C i The number of historical data contained in d(x,c i ) represents the distance between samples.

[0043] 2) Find the median point c between classes ij , c ij Represented as two class centers c iand c j A point on the line connecting the two is the class radius R i and R j The ratio divides the center line equally:

[0044]

[0045] In the formula, and Respectively represent c i and c j n-dimensional coordinates, where n = (1, 2, ..., P), λ = R i / R j .

[0046] 3) Find the cluster center density D inside (), D inside () represents class C i All to the cluster center point c i The distance is less than the class radius R i Number of data:

[0047]

[0048] 4) Find the class edge density D edge (), D edge () represents class C i and any class C in the dataset j All the points between the two types c ij The distance is less than r=(R i +R j ) / 2 is the mean of the number of data samples:

[0049] d(x,c ij )=|xc ij |……(5)

[0050]

[0051] In the formula, K is the number of clusters.

[0052] 5) Calculate the DBI index value V DBI (i), V DBI (i) Expressed as cluster center density D inside (i) The sum of the class edge density D edge The ratio of the sum of (), its definition is:

[0053]

[0054] Where V DBI (i), i=(1,2,...,K).

[0055] K best = argmax{V DBI (i),i=1,2…,K}……(8)

[0056] Considering the best clustering effect, the closer the data within a class is, the better, and the more dispersed the data between classes is, the better. Therefore, the optimal number of clusters for MiniBatch K-means is the maximum value of the DBI index V. DBI (i) The corresponding K value K best .

[0057] In some embodiments, the scene division method of the “wind-solar-load” correlation model is determined as follows:

[0058] Step 1: Given a sample set D = (x 1 ,x 2 ,...,x n ), n is the sample size. The clustering parameter K is set to 2 to 10 categories, i.e. 2 categories, 3 categories, ... 10 categories, for a total of 9 schemes;

[0059] It should be noted that the clustering parameter K can be selected in a more appropriate range according to actual conditions. In other embodiments, it can also be set to 2-15, 4-12, etc.

[0060] Step 2: Select K data objects in D as the initial clustering centers c i , i=(1,2,...,K);

[0061] Step 3: Randomly extract a sample subset S with a capacity of b from D = (s 1 ,…,s j ,…,s b ), form a Batch;

[0062] Step 4: For each sample point s in S j , calculate its similarity with K cluster centers, and convert the sample point s j Assign to the class with the greatest similarity;

[0063] Step 5: After all samples in S have gone through step 4, the cluster centers are recalculated according to the class labels of each sample;

[0064] Step 6: Determine whether the conditions for clustering end are met (such as reaching the number of iterations t). If not, return to step 3; otherwise, proceed to step 7.

[0065] Step 7: For each sample point in D, according to its similarity with the K cluster centers, it is divided into the class with the greatest similarity, and 9 clustering schemes are obtained;

[0066] Step 8: Compare the DBI indicators corresponding to the results of each clustering scheme to determine the optimal clustering number K for multidimensional data best , and output the corresponding scene division results.

[0067] Among them, the main computational effort of the Mini Batch K-Means algorithm is concentrated in step 4, which is to calculate the similarity of each sample point and determine its attribution. According to the Mini Batch K-Means clustering analysis results, the proportion function Q(i) is defined in each scene, as shown in formula (9):

[0068]

[0069] In the formula, N(C i ) represents class C i The number of data contained in , N is the total number of data.

[0070] S130: Determine the parameters and type of the Copula function according to each scene data after scene division, generate samples corresponding to each scene data using the vine structure, and use the AD distance to determine the optimal vine structure in each scene.

[0071] S140: A hybrid vine Copula model is established according to the optimal vine structure in each scene, and a wind-solar load sample set is generated according to the proportion of each scene data in the hybrid vine Copula model.

[0072] As for the analysis method of random variable correlation, the main technical means at present are spatial variation method and Copula function method. Among them, the spatial transformation method can only study a certain feature of correlation, and its usage is relatively limited. Therefore, when modeling the correlation of historical data of wind speed, light and load, this embodiment uses the Copula function method. Copula comes from the Sklar theorem proposed by Sklar in 1959. The definition of the theorem is as follows: Let H be a joint distribution function, and the marginal cumulative distribution function F 1 and F 2 , then there exists a Copula such that:

[0073] H(x 1 ,x 2 )=C(F 1 (x 1 ),F 2 (x 2 ))……(10)

[0074] If F 1 and F 2 is continuous, then the Copula function C is uniquely determined; otherwise, in F 1 and F 2Conversely, if C is a Copula function, F 1 and F 2 is the marginal cumulative distribution function, then the function H calculated by formula (9) is the joint distribution function, and its marginal cumulative distribution function is F 1 and F 2 The Copula function defines the connection function of the joint distribution function of multidimensional random variables and their respective marginal distribution functions, that is, it "couples" the joint distribution function and their respective marginal distribution functions.

[0075] Copula functions can be divided into elliptic copula and Archimedean copula. Elliptic copula includes Gaussian copula, t-copula, etc. Archimedean copula includes Gumbel copula, Frank copula and Clayton copula, etc. Different copula functions can characterize different dependency structures and have different advantages.

[0076] The five Copula functions, Gaussian Copula, t-Copula, Gumbel Copula, Clayton Copula, and Frank Copula, are selected as candidate functions, and their probability distribution functions are shown in Table 1:

[0077] Table 1 Alternative Copula functions

[0078]

[0079] Each Copula function has corresponding parameters that describe the degree of correlation of random variables. Therefore, analyzing the correlation of "wind and solar load" requires finding the optimal parameters of the Copula function. Prior to this, it is necessary to first obtain the marginal distribution functions of the multidimensional variables. This embodiment uses non-parametric kernel density estimation. This method does not require the prediction of the distribution characteristics of the data to be analyzed. The marginal distribution function can be solved based on the characteristics of the data itself, eliminating the impact of the parameter estimation method due to improper selection of the distribution function.

[0080] If the theoretical probability density of variable X is set to f h (x), then the kernel density estimate is calculated as follows:

[0081]

[0082] Among them, n is the number of samples, h is the kernel window width, and K(.) is the selected kernel function.

[0083] In this embodiment, a Gaussian kernel is used, and its optimal window width is selected by referring to empirical parameters. The specific selection method is as shown in formula (12):

[0084]

[0085] Follow the above steps to obtain the marginal distribution function F(x i ), then the corresponding optimal parameters of each candidate Copula function can be selected according to the maximum likelihood method. The specific implementation method of this step can be completed using the Copulafit function provided by MATLAB.

[0086] Since the properties of the random variables described by each candidate Copula function are different, when analyzing the correlation between "wind and solar load", it is necessary to select the three most suitable Copula functions for each scenario in the Copula function library (refer to Table 1) for fitting.

[0087] This embodiment uses the Euclidean distance as an indicator to calculate the Euclidean distance between each candidate Copula function type and the cumulative distribution function curve of the empirical Copula function. The Copula function with the smallest calculation result is the optimal Copula function type. n The calculation method is as follows:

[0088]

[0089] Where: u, v∈[0,1]; I takes the value of 0,1; F(x i ) is the joint cumulative distribution function, when F(x i )≤u, otherwise

[0090] The Euclidean distance between the cumulative distribution functions of different Copula functions and the cumulative distribution functions of the empirical Copula function is calculated as shown in formula (14):

[0091]

[0092] Among them C n and C p They represent the cumulative distribution function values ​​of the empirical Copula function and each alternative Copula function respectively.

[0093] When performing correlation analysis on multidimensional variables, connecting Copula functions with the help of vine structure models can better simulate the interdependence of the original data structure. At the same time, the vine Copula model can be used to transform the complex correlation between "wind, light and load" into a relatively simple correlation between two variables for analysis. In practical applications, the more commonly used vine structures are C vine and D vine structure models, which are introduced as follows:

[0094] 1) C-vine structure

[0095] The logic diagram of C vine structure is as follows Figure 2 As shown in the figure, it can be seen that each dimensional random variable represented by the vine structure is connected to one of the dimensional random variables, which means that the C-vine structure is suitable for the situation where one dimensional variable has a strong correlation with the remaining variables, while the remaining variables have a weak correlation with each other.

[0096] When using the C-vine structure to analyze the correlation of multi-dimensional related variables, its joint probability density distribution is expressed as formula (15):

[0097]

[0098] In the formula, f i (x i ) and F i (x i ) represent X i The probability density function and cumulative distribution function of .

[0099] 2) D-vine structure

[0100] The D-vine model has an obvious parallel structure and has good accuracy when the correlation between multiple variables is close. Its logic diagram is as follows: Figure 3 shown.

[0101] When using the D-vine structure to analyze the correlation of multi-dimensional related variables, its joint probability density distribution is expressed as formula (16):

[0102]

[0103] In the formula, f i (x i ) and F i (x i ) represent X i The probability density function and cumulative distribution function of .

[0104] In addition, the steps of establishing the mixed vine copula model also include:

[0105] i) Optimal vine structure selection

[0106] 1) Principle Introduction

[0107] For a variable X, if its cumulative distribution function is represented by U=F(X), U∈[0,1], and if the cumulative distribution function is reversible within the domain, then the cumulative distribution function can be transformed as shown in formula (17):

[0108] P(U <u)=P(F(X)<u)=P(X<F -1 (u))=F(F -1 (u))=u……(17)

[0109] In the formula, F -1 (u) is the inverse function of the cumulative distribution function. From the above formula, we can see that the cumulative distribution function of variable X is a uniform distribution function in the range [0,1]. 1 =F 1 (x 1 ), 2 =F 2 (x 2 ), then for the joint cumulative distribution function of the two, its acquisition method is as follows:

[0110]

[0111] It can be seen from the above formula that the Copula function can be approximately regarded as a joint cumulative distribution function of a uniform distribution function in the range of [0,1].

[0112] According to the properties of the Copula function, the joint cumulative distribution function of multidimensional variables can be decomposed using the properties of conditional distribution, and the variables corresponding to the cumulative distribution function obtained are independent of each other. The method of obtaining it is as shown in formula (19):

[0113]

[0114] Where v j represents a vector v, v -j Indicates removing v from v j The remaining vector.

[0115] Based on this theoretical foundation, for multidimensional variables X 1 ,X 2 ,…,X n The cumulative distribution function of can be assumed as follows:

[0116]

[0117] Where Z n represents uniformly distributed data in the range [0,1], F(X n |X 1 ,X2 ,...,X n-1 ) is the inverse function of formula (20).

[0118] C vine and D vine have different choices for j. For C vine:

[0119]

[0120] For D-vine:

[0121]

[0122] 2) Steps for obtaining multidimensional variable sampling points

[0123] Combined with the vine structure, the mutual constraints between the dimensions of the sampled samples can be obtained. Therefore, the sampling point acquisition method based on the vine structure model is to first randomly generate an n-dimensional sample set that obeys an independent uniform distribution, and write equations according to the structures of C vine and D vine respectively. The sample points of the first dimension are uniformly distributed sampling points. The properties of conditional distribution can be used to obtain the sampling points corresponding to the second dimension, and the sample points of this dimension are obtained one by one according to the sample points of the previous dimension, until the sample points of all dimensions are obtained. The specific process can be summarized as follows:

[0124] Step 1: Use MATLAB's own unifrnd function to simulate and generate a set of num×N (number of data x dimension) uniform variables z;

[0125] Step 2: Let the first set of variables to be determined be equal to the first column in step 1, i.e. u 1 =z 1 ;

[0126] Step 3: Using equation (19), the second dimension variable u 2 Can be used To calculate, calculate the time z 2 Generated in step 1, C(u 1 ,u 2 )express u 1 ,u 2 The function value at the corresponding Copula function is calculated by the Copulacdf function. To solve the right side, add a while loop and use the binary search method to solve u 2 , until the difference between the data calculated on the right side of the equation and the data on the left side is very small, then the random u 2 This is the desired simulation data;

[0127] Step 4: Exploitation Iterate to solve the simulation data of subsequent dimensions.

[0128] Through the above steps, we can complete the acquisition of multidimensional variable sampling points. It should be noted that because the generated Z=(z 1 ,z 2 ,…,z n ) is still in the interval [0,1], so it is necessary to convert these data into the required samples based on the inverse function of the estimated marginal distribution function.

[0129] ii) Optimal vine structure index

[0130] 1) Introduction to Anderson-Darling (AD) distance

[0131] By selecting the best vine structure in each scenario to connect each Copula function, the correlation analysis of "wind, light and load" can be made more accurate. From this perspective, this embodiment selects the Anderson-Darling (AD) distance index to judge the simulation effect of different vine structure models, which effectively improves the modeling accuracy of the mixed vine Copula model.

[0132] The main descriptive indicators for the accuracy of correlation modeling results are Cramer Von Mise (CvM) distance, Kolmogorov-Smirnov (KS) distance, and Anderson-Darling (AD) distance. CvM distance measures the integral of the square distance between the empirical cumulative distribution function and the target cumulative distribution function. If most of the data falls in the tail positions on the left and right sides, more emphasis should be placed on the differences in the tails. The total distribution deviation obtained by CvM distance, although taking into account all the difference points, does not take into account the differences caused by the distribution position of large-scale data.

[0133] AD distance is actually an improvement on CvM distance. By adding a weight function as shown in formula (23), this weight function is mainly used to limit the weight of the data position. It is equivalent to giving a higher weight when calculating the square distance of the tail data; when calculating the square distance of the middle data, giving it a smaller weight, which can more effectively test the modeling accuracy of the vine structure model.

[0134]

[0135] 2) Optimal vine structure selection based on AD distance

[0136] In the process of combining traditional methods with vine structure models, the vine Copula model only involves a certain type of vine structure. This has a disadvantage because for a certain vine structure, the type of dependent structure that can be analyzed is also fixed. When faced with the historical data of "wind, light and load", because it is too complex and changeable, this single vine structure connection method may not be able to describe the correlation of all "wind, light and load" data in detail and comprehensively.

[0137] To address this problem, in this embodiment, the AD distance is selected to test the quality of each scene simulated by the C vine structure and the D vine structure, and the optimal vine structure in each scene is selected to improve the accuracy of the correlation modeling results.

[0138] Based on the empirical distribution function expression mentioned above, the AD distance d between the established model and the original data AD As shown in formula (24):

[0139]

[0140] Where d represents the random variable dimension, C n and C p Respectively represent the cumulative distribution function values ​​of the empirical Copula function and each alternative Copula function.

[0141] When solving the AD distance between different vine structure modeling and original sample data, the Copula function form is relatively complex, the corresponding multi-dimensional variable vine structure expression is relatively large, and after modeling each scene, the original sample overall model has no specific function form. Therefore, when calculating the AD distance, the model established for each scene is sampled with the same number of samples to obtain the same number of sampling points as the original sample points, and the empirical distribution function of the newly sampled sample points is calculated, and the corresponding AD distance is solved. AD The smaller the distance, the higher the modeling accuracy.

[0142] S150: Input the wind and solar load sample set and power system parameters into the transmission system planning model, and finally output the power grid planning results.

[0143] Optionally, before inputting the wind / solar load sample set and the power system parameters into the power transmission system planning model, the method further includes: establishing the power transmission system planning model according to the objective function and the constraint conditions.

[0144] Among them, the objective function includes the cost of grid construction, the economic loss value of wind and solar power abandonment, and the pollution discharge of conventional grid units. The constraints include power balance constraints, load node new energy power penetration constraints, branch flow constraints, conventional generator output upper and lower limits, wind turbine operating conditions, photovoltaic unit operating conditions, and equipment commissioning status 0-1 constraints. Under the constraints, when the three objective functions are minimized, the transmission system planning model outputs the optimal grid planning results.

[0145] The following is a further introduction to the transmission system planning model from two aspects: objective function and constraint conditions:

[0146] i) Objective function

[0147] 1) Grid construction costs

[0148] Taking into account the economic efficiency of grid investment, this embodiment takes the grid construction cost as one of the objective functions of grid planning, including the grid investment cost, grid loss cost and power generation cost.

[0149] f 1 =C Ⅰ +C NL +C G ……(25)

[0150] C Ⅰ For investment cost.

[0151]

[0152] Where: x m ,y n 、z o is a 0-1 decision variable, which represents the operation status of conventional generator sets, wind farm grid-connected lines, and photovoltaic power station grid-connected lines, 0 means shutdown, 1 means operation; C IG , C IWTG , C IPVG is the corresponding annual value of investment cost; i, j, k are the total number of conventional generating units to be added, the total number of wind farm grid-connected lines to be added, and the total number of photovoltaic power station grid-connected lines to be added, respectively.

[0153] is the annual value of the investment cost of the mth conventional generator set to be added, I IG,m is the initial investment cost of a conventional generator set, q is the annual discount rate of investment, N i It is the service life of conventional generator sets.

[0154] C IWTG,n , C IPVG,o= is the annual value of the investment cost of the wind farm grid-connected line to be added in the nth item and the annual value of the investment cost of the photovoltaic power station grid-connected line to be added in the oth item. The calculation formula is the same as C IG,m .

[0155] C NL The network loss cost.

[0156]

[0157] Where: δ is the unit grid loss price, 10,000 yuan / (kW·h); l is the total number of original transmission lines in the system; I u ,I n ,I o is the current flowing through the line in the corresponding period t; R u , R n , R o is the resistance of the corresponding line; T is the total number of time periods throughout the year.

[0158] C G For the cost of power generation.

[0159]

[0160] Where: G is the unit power generation cost of conventional generator sets; ρ H is the unit power generation cost of the wind-solar hybrid power unit; P G,t is the active power output of the conventional generator set in the corresponding period t; P H,t is the active output of the wind-solar hybrid power generating unit in the corresponding period t.

[0161] 2) Economic losses from wind and solar power abandonment

[0162] The phenomenon of wind and solar power abandonment caused by the grid connection of new energy cannot be ignored. In this embodiment, the economic losses caused by wind and solar power abandonment are taken as one of the objective functions of grid planning.

[0163]

[0164] Where: c WTG 、c PVG are the economic losses caused by the unit wind abandonment and unit solar abandonment respectively; P WTG0 , P PVG0 are the planned active power outputs of wind turbines and photovoltaic units respectively; P WTG , P PVG They are the actual active outputs of wind turbines and photovoltaic units respectively.

[0165] 3) System discharge volume

[0166] The pollution discharged by conventional units will have many adverse effects on the environment. In this embodiment, the pollution discharge of conventional units in the power grid is taken as one of the objective functions of the power grid planning, and efforts are made to reduce the pollution discharge to the minimum.

[0167]

[0168] Where: N E is the number of pollutant types, r=1 is NO 2 、r=2 is CO 2 , r=3 is SO 2 β 0 , β 1 , β 2 , μ, and ε are all emission coefficients of conventional generator sets.

[0169] ii) Constraints

[0170] 1) Power balance constraints.

[0171] P t =B t θ t ……(31)

[0172]

[0173] Where: P t Inject power vector into the node in time period t; B t is the node admittance matrix of time period t; θ t is the node voltage phase angle vector of time period t; P L,t is the system active power load in period t.

[0174] 2) New energy power generation penetrates power constraints at load nodes.

[0175]

[0176] Where: P WTGn,max is the maximum output power of the nth wind turbine; N WTG is the wind turbine set; P PVGo,max is the maximum output power of the oth photovoltaic unit; N PVG is the photovoltaic unit collection; P Lf,max is the maximum penetration power of load node f.

[0177] 3) Branch flow constraints.

[0178] |P u,t |≤P u,max ……(34)

[0179] Where: P u,t is the active power flow of the uth branch in period t; Pu,max is the upper limit of the transmission power of the u-th branch.

[0180] 4) Upper and lower limits on output of conventional generator sets.

[0181] P G,min ≤P G,t ≤P G,max ……(35)

[0182] Where: P G,max , P G,min It is the upper and lower limits of active output of conventional generator sets.

[0183] 5) Constraints on wind turbine operating conditions.

[0184] 0≤P WTG,t ≤P WTG,max ……(36)

[0185] Where P WTG,max It is the maximum output of the wind turbine.

[0186] 6) Constraints on operating conditions of photovoltaic units.

[0187] 0≤P PVG,t ≤P PVG,max ……(37)

[0188] Where P PVG,max It is the maximum output of the photovoltaic unit.

[0189] This embodiment takes into account the investment cost, economic and environmental benefits of the power grid, and combines the actual situation of the objective function, constraint conditions and wind and solar output correlation to minimize the three objective functions in order to achieve the optimal planning effect. The constructed multi-objective power grid expansion planning model is as follows:

[0190]

[0191] The optimization software package is used to solve the problem in Matlab R2016 environment and output the power grid planning results.

[0192] Furthermore, the probabilistic programming model can be summarized as:

[0193] Y_planning=f_planning(X,T,PLAN).

[0194] Among them, Y_planning is the grid construction cost, economic losses of wind and solar power abandonment, and pollution discharge of different plans. 1 ,x 2 ,…,x n), which are wind speed, light intensity and load data; T is the system status parameter, including the operation status of conventional generator sets, wind farm grid-connected lines, photovoltaic power station grid-connected lines and other parameters; PLAN is the expansion of different transmission lines.

[0195] In some other embodiments, Latin hypercube sampling may also be used. Latin hypercube sampling (LHS) is an extension of stratified sampling in multiple dimensions, first proposed by McKay et al. in 1979, and its accuracy is affected by the correlation between input random variables.

[0196] LHS consists of two parts: sampling and sorting. The purpose of sampling is to make the sampling points completely cover the variable distribution area, and the purpose of sorting is to control the correlation between input random variables. In this way, the calculation results with high enough accuracy can be obtained with fewer sampling points.

[0197] When used in the sampling of multidimensional random variables in this embodiment, compared with simple random sampling (SRS), the LHS method ensures that the sampling points can completely cover the distribution interval and will not be repeated, so it has higher sampling efficiency and better robustness.

[0198] Let the cumulative distribution function of random variable X be F(X), and I = F(X), then U is a random variable and is uniformly distributed in the interval [0,1]. In order to obtain N sampling points, the interval [0,1] is divided into N parts, and N non-overlapping sub-intervals are obtained, each of which is 1 / N in length. A sample value is randomly selected from each sub-interval, and the inverse function F of the cumulative distribution function F(X) is used to calculate the value. -1 (X) Calculate the sampling value. If the midpoint of the subinterval is selected, the sampling point can be calculated as follows:

[0199]

[0200] In the formula, x i is the sampling value, where i=1,2,…,N.

[0201] Based on the above introduction to the hybrid vine copula model, the transmission system planning model and the LHS method, the transmission system expansion planning method based on the hybrid vine copula can be summarized as follows:

[0202] Based on the above introduction to the hybrid vine copula model, the transmission system planning model and the LHS method, the transmission system expansion planning method based on the hybrid vine copula can be summarized as follows:

[0203] Step 1: Input the historical data set D of power system random variables (mainly including continuous random variables such as wind speed, light and load), clustering parameter K (set to 2 to 10 categories), sampling number N, etc., and use Mini Batch K-Means algorithm to output 9 clustering schemes;

[0204] Step 2: Based on the clustering scheme obtained in step 1), use formulas (1) to (8) to obtain the DBI index value corresponding to each K value and output the optimal clustering number K. best And its corresponding scene division scheme C=(C 1 ,C 2 ,…,C K );

[0205] Step 3: Input partition set C = (C 1 ,C 2 ,…,C K ), respectively, the probability density function of the multidimensional variable of each scene is fitted by nonparametric kernel density estimation method, and the marginal distribution function F(x i ).

[0206] Step 4: According to the marginal distribution function F(x) obtained in step 1) i ). Use the Copulafit function provided by MATLAB to select the optimal parameters of each candidate Copula function, and use formulas (13) and (14) to calculate the candidate Copula function C p and the empirical Copula function C n The Euclidean distance between the cumulative distribution functions of , and the optimal three Copula functions and their parameters are output for each scenario;

[0207] Step 5: Set the total number of samples O, and use formula (9) to generate the independent variable set L for each scenario using the LHS method. i , where i = 1, 2, ..., K;

[0208] Step 6: According to the independent variable set L obtained in step 5) i , input it into the vine Copula model built for each scene and sample it respectively (please refer to the multidimensional variable sampling point acquisition step in Section 4.2 2) above), and output the sampled sample Z;

[0209] Step 7: Based on the sample Z obtained in step 6), use formulas (23) and (24) to calculate the AD distance in each scene, select the vine copula model with the smallest AD distance as the model of the scene, and output the sample data set U;

[0210] Step 8: Based on the sample data set U obtained in step 7), use formulas (11) and (12) to obtain the marginal distribution function through the non-parametric kernel density method, and convert these sample data into the required "wind-solar load" sample set X according to the estimated inverse function of the marginal distribution;

[0211] Step 8: Input the “wind-solar-load” sample set X, power system parameters T and other data into the transmission system planning model and output the power grid planning results.

[0212] In this regard, this application also provides examples for verification, specifically:

[0213] Firstly, the rationality and effectiveness of the model are verified by using the improved IEEE-6 node system. On the basis of the IEEE-6 node system in reference [1], a wind farm and a photovoltaic power station are added to conduct a correlation analysis of wind and solar output. Figure 4 shown.

[0214] The three busbars 1, 3, and 6 of the system are connected to the power supply, among which the power supply G1=50MW, G2=165MW, G3=545MW, the scale of the wind farm is 120MW, and the scale of the photovoltaic power station is 120MW; the cost per unit length of a single-circuit line is 800,000 yuan / km.

[0215] First, the wind and solar grid connection planning is considered, and the wind farm is connected to node 2 and the photovoltaic power station is connected to node 5, without involving the grid expansion planning. In the scheme without considering the correlation between wind and solar output, the system standard data is used, and the wind and solar outputs are independent of each other; in the scheme considering the correlation between wind and solar output, the wind and solar output correlation model analysis established in this paper (referred to as "this method considering correlation") and the method of "Large-scale wind and solar complementary grid expansion planning considering correlation [J]" are used to construct the wind and solar output correlation model (referred to as "comparison method considering correlation"). Table 2 lists the calculation results of the objective function in the three cases.

[0216] Table 2 Results comparison

[0217]

[0218] As can be seen from Table 2, considering the correlation of wind and solar output in the system can alleviate the volatility and uncertainty of the output of wind farms and photovoltaic power stations, improve the new energy absorption capacity, significantly reduce the economic losses of wind and solar abandonment, and significantly reduce the system pollution. At the same time, it reduces the construction cost of the power grid and brings certain economic benefits. The method of this embodiment has higher modeling accuracy and a better objective function than the correlation comparison method, which is more conducive to accurately simulating the correlation of wind and solar joint distribution, and further increases the accuracy of the transmission network expansion plan.

[0219] Based on the above-mentioned transmission system planning method considering the correlation between wind and solar, this application proposes a transmission system planning device considering the correlation between wind and solar, please refer to Figure 5 , Figure 5 It is a structural diagram of an embodiment of a planning device for power transmission system expansion of the present application. In this embodiment, the planning device for power transmission system expansion may include a data acquisition module 210, a clustering module 220, a hybrid vine Copula model module 230 and a planning result module 240.

[0220] A data acquisition module 210 is used to acquire historical data sets of power system parameters and random variables;

[0221] A clustering module 220, for clustering and classifying the historical data set and dividing the scenes according to the Mini Batch K-Means clustering method;

[0222] The hybrid vine Copula model module 230 is used to determine the parameters and types of the Copula function according to each scene data after scene division, generate samples corresponding to each scene data using the vine structure, and use the AD distance to determine the optimal vine structure in each scene; establish a hybrid vine Copula model according to the optimal vine structure in each scene, and generate a wind-solar load sample set according to the proportion of each scene data in the hybrid vine Copula model;

[0223] The planning result module 240 is used to input the wind and solar load sample set and power system parameters into the transmission system planning model, and finally output the power grid planning results.

[0224] Based on the above-mentioned transmission system planning method considering the correlation between wind and solar, the present application also proposes an electronic device, such as Figure 6 As shown, Figure 6 3 is a schematic diagram of the structure of an embodiment of an electronic device of the present application. The electronic device 300 may include a memory 31 and a processor 32, the memory 31 is connected to the processor 32, the memory 31 stores a computer program, and when the computer program is executed by the processor 32, the method of any of the above embodiments is implemented. The steps and principles have been described in detail in the above method, and will not be repeated here.

[0225] In this embodiment, the processor 32 may also be referred to as a CPU (central processing unit). The processor 32 may be an integrated circuit chip having signal processing capabilities. The processor 32 may also be a general-purpose processor, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.

[0226] Based on the above-mentioned transmission system planning method considering the correlation between wind and solar, the present application also proposes a computer-readable storage medium. Figure 7 , Figure 7 4 is a schematic diagram of a computer readable storage medium of the present application. A computer program 41 is stored on the computer readable storage medium 400. When the computer program 41 is executed by the processor, the method of any of the above embodiments is implemented. The steps and principles have been described in detail in the above method and will not be repeated here.

[0227] Furthermore, the computer-readable storage medium 400 may be any medium that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic tape, or an optical disk.

[0228] In summary, the present application proposes a transmission system planning method, device, equipment and storage medium that considers the correlation between wind and solar, wherein the method includes: obtaining historical data sets of power system parameters and random variables; clustering and classifying the historical data sets and dividing the scenarios according to the Mini Batch K-Means clustering method; determining the Copula function parameters and function type, using the AD distance as the criterion for judging the vine structure, and establishing a hybrid vine Copula model; inputting the data after the scenario division into the hybrid vine Copula model, and performing the optimal vine structure judgment to obtain the wind and solar load sample set; inputting the wind and solar load sample set and the power system parameters into the transmission system planning model, and finally outputting the power grid planning results. Through the above methods, the present application uses the Mini Batch K-Means algorithm to divide the scenarios of multidimensional data, greatly reducing the calculation time; using the AD distance as the criterion for judging the vine structure, the modeling accuracy of the hybrid vine Copula is improved, and the credibility of the transmission system expansion planning method is further improved.

[0229] It is to be understood that the specific embodiments described herein are only used to explain the present application, rather than to limit the present application. In addition, for ease of description, only some structures related to the present application are shown in the accompanying drawings, rather than all structures. The step numbers used in the text are also only for the convenience of description and are not used as a limitation on the order in which the steps are executed. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.

[0230] The terms "first", "second", etc. in this application are used to distinguish different objects, rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices.

[0231] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0232] The above description is only an implementation method of the present application, and does not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly used in other related technical fields, are also included in the patent protection scope of the present application.

Claims

1. A transmission system planning method considering wind-solar correlation, characterized in that: include: Obtain historical data sets of power system parameters and random variables; The historical data set is clustered and classified and the scene is divided according to the Mini Batch K-Means clustering method; specifically, the historical data set D of continuous random variables of wind speed, light and load of the power system, the clustering parameter K and the sampling data N are input, and 9 clustering schemes are output using the Mini Batch K-Means clustering method; the DBI index value corresponding to each K value is calculated, and the optimal cluster number K is output best and its corresponding scene partition set C=(C1,C2,…,C K ); According to each scene data after scene division, the parameters and type of the Copula function are determined respectively, the samples corresponding to each scene data are generated by using the vine structure, and the AD distance is used to determine the optimal vine structure in each scene; specifically, the scene division set C = (C1, C2, ..., C K ), respectively use the nonparametric kernel density estimation method to fit the probability density function of the multidimensional variables of each scene, and obtain the marginal distribution function F(x i ); According to the marginal distribution function F(x i ), use the Copulafit function provided by MATLAB to select the optimal parameters of each candidate Copula function and calculate the candidate Copula function C p and the empirical Copula function C n The Euclidean distance between the cumulative distribution functions of each scenario is calculated. The optimal three Copula functions and their parameters are output for each scenario. The total number of samples is set to O, and the LHS method is used to generate the independent variable set L for each scenario. i , where i = 1, 2, ..., K; the independent variable set L i , input the vine Copula model built for each scene and sample them respectively, and output the sampled samples Z; according to the sampled samples Z, calculate the AD distance in each scene, and select the vine Copula model with the smallest AD distance as the mixed vine Copula model of the scene; wherein, the expression of the AD distance is: Where d represents the random variable dimension, C n and C p They represent the cumulative distribution function values ​​of the empirical Copula function and each candidate Copula function respectively; W(x) is the weight function, A mixed vine Copula model is established according to the optimal vine structure in each scene, and a wind-solar load sample set is generated according to the proportion of each scene data in the mixed vine Copula model; The wind and solar load sample set and the power system parameters are input into the power transmission system planning model, and finally the power grid planning result is output.

2. The power transmission system planning method considering wind-solar correlation according to claim 1 is characterized in that: Also includes: A sample data set U is obtained according to the mixed vine Copula model, a marginal distribution function is obtained by a non-parametric kernel density method, and the sample data set U is converted into the required wind-solar load sample set X according to the inverse function of the estimated marginal distribution.

3. The power transmission system planning method considering wind-solar correlation according to claim 1 is characterized in that: The independent variable set L i , input the vine Copula model built for each scene and sample them respectively, and output the sampled samples Z, including: The independent variable set L i Randomly generate n-dimensional sample sets that obey independent uniform distribution; The equations are written according to the structures of C vine and D vine respectively. The sample points of the first dimension are uniformly distributed sampling points. The sampling points corresponding to the second dimension are obtained by using the properties of conditional distribution. The sample points of this dimension are obtained one by one according to the sample points of the previous dimension, until the sample points of all n dimensions are obtained, and finally the sampling sample Z is generated.

4. The power transmission system planning method considering wind-solar correlation according to claim 1 is characterized in that: Before inputting the wind-solar load sample set and the power system parameters into the power transmission system planning model, the method further includes: Establish a transmission system planning model based on objective functions and constraints; Among them, the objective function includes the cost value of grid construction, the economic loss value of wind and solar power abandonment, and the pollution discharge of conventional units in the grid; the constraints include power balance constraints, new energy power generation penetration power constraints at load nodes, branch flow constraints, upper and lower limit constraints on the output of conventional generator sets, wind turbine unit operating condition constraints, photovoltaic unit operating condition constraints and equipment operation status 0-1 constraints.

5. The power transmission system planning method considering wind-solar correlation according to claim 4 is characterized in that: The step of inputting the wind / solar load sample set and the power system parameters into a power transmission system planning model and finally outputting a power grid planning result comprises: Under the constraints, when the three objective functions are minimized, the optimal power grid planning result is output.

6. A transmission system planning device considering wind and solar correlation, characterized in that: include: A data acquisition module is used to obtain historical data sets of power system parameters and random variables; The clustering module is used to cluster and classify the historical data set according to the Mini Batch K-Means clustering method and divide the scenarios. Specifically, the historical data set D of continuous random variables of wind speed, light and load in the power system, the clustering parameter K and the sampling data N are input, and 9 clustering schemes are output using the Mini Batch K-Means clustering method. The DBI index value corresponding to each K value is calculated, and the optimal cluster number K is output. best and its corresponding scene partition set C=(C1,C2,…,C K ); The hybrid vine Copula model module is used to determine the parameters and types of the Copula function according to each scene data after scene division, generate samples corresponding to each scene data by using the vine structure, and use the AD distance to determine the optimal vine structure in each scene; establish a hybrid vine Copula model according to the optimal vine structure in each scene, and generate a wind-solar load sample set according to the proportion of each scene data in the hybrid vine Copula model; specifically, input the scene division set C = (C1, C2, ..., C K ), respectively use the nonparametric kernel density estimation method to fit the probability density function of the multidimensional variables of each scene, and obtain the marginal distribution function F(x i ); According to the marginal distribution function F(x i ), use the Copulafit function provided by MATLAB to select the optimal parameters of each candidate Copula function and calculate the candidate Copula function C p and the empirical Copula function C n The Euclidean distance between the cumulative distribution functions of each scenario is calculated. The optimal three Copula functions and their parameters are output for each scenario. The total number of samples is set to O, and the LHS method is used to generate the independent variable set L for each scenario. i , where i = 1, 2, ..., K; the independent variable set L i , input the vine Copula model built for each scene and sample them respectively, and output the sampled samples Z; according to the sampled samples Z, calculate the AD distance in each scene, and select the vine Copula model with the smallest AD distance as the mixed vine Copula model of the scene; wherein, The expression of the AD distance is: Where d represents the random variable dimension, C n and C p They represent the cumulative distribution function values ​​of the empirical Copula function and each candidate Copula function respectively; W(x) is the weight function, The planning result module is used to input the wind and solar load sample set and the power system parameters into the transmission system planning model, and finally output the power grid planning results.

7. An electronic device, characterized in that: It includes a memory and a processor, the memory is connected to the processor, the memory stores a computer program, and when the computer program is executed by the processor, the transmission system planning method considering wind-solar correlation described in any one of claims 1-5 is implemented.

8. A computer-readable storage medium, characterized in that: A computer program is stored, and when the computer program is executed, the method for planning a power transmission system taking into account the correlation between wind and solar power as described in any one of claims 1 to 5 is implemented.

Citation Information

Patent Citations

  • A power distribution network renewable energy power generation cluster access planning method

    CN109829560A

  • Power transmission network planning scheme generation system and method considering maintenance under new energy access

    CN110705808A