A cylinder liner blank production line and production process thereof
By designing a four-power head cyclic eight-station cylinder liner blank production line, a fully automated production process is realized, which solves the problems of low automation degree and low production efficiency in the existing technology, improves production efficiency and safety, and saves occupation Area of the ground.
Patent Information
- Application Number
- CN202210087563.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-01-25
AI Technical Summary
The existing cylinder liner blank production line has low degree of automation, low production efficiency, unreasonable equipment layout, large area of land and high labor intensity.
Design a cylinder liner blank production line with cyclic eight-station, using four power heads to fully automatic flow, including casting machine, mold, baffle, fly hammer, cooling, air-cooling, brush cleaning device and multi-joint robot to achieve full automation Production process.
It improves production efficiency, reduces labor intensity, saves land area, improves production safety, and achieves the compactness and high automation of the production line.
Smart Images

Figure CN114393205B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of cylinder liner production, and particularly relates to a cylinder liner blank production line and a production process thereof. Background Art
[0002] Cylinder liners, also known as cylinder liners, are the core component of an internal combustion engine. They are embedded in the cylinder block and, together with the piston and cylinder head, form the combustion chamber. Their quality directly affects the engine's usability, reliability, economy, and service life. The production process for cylinder liners generally includes multiple steps, including casting the blank, rough turning, rough boring, fine boring, fine turning, rough honing, and fine honing. Currently, cylinder liner blanks are mostly manufactured using centrifugal casting, which involves multiple steps, including mold preparation, pouring molten iron, cooling and shaping, blank extraction, blank cooling, and blank paint removal. Existing large-diameter blank casting lines are generally dual-station with only two power heads, resulting in low production efficiency. Furthermore, the entire production process is often manually operated or semi-automated, resulting in a low degree of automation, an unreasonable equipment layout, elongated production lines, a large footprint, and high labor intensity. Summary of the Invention
[0003] In response to the above situation, the present invention provides a cylinder liner blank production line, which adopts a four-power head and eight-station casting design. The entire production process is fully automated and does not require manual operation, which greatly reduces labor intensity and effectively improves production efficiency.
[0004] In order to achieve the above objectives, the present invention adopts the following technical solutions:
[0005] A cylinder liner blank production line includes a casting machine, which is a circulating eight-station casting machine with a rotating base in the middle of the casting machine. Four power heads are arranged in a cross shape above the rotating base, and eight stations are arranged in a regular octagon around the casting machine. Each power head can rotate cyclically or dock at any station under the driving action of the rotating base. Four molds for centrifugal casting of cylinder liner blanks are correspondingly installed on the four power heads. The inner end of each mold is connected to the power head, and the outer end is matched with a baffle and a fly hammer for fastening the baffle. A pouring port is provided at the center of the baffle. In a counterclockwise direction, a quenching device for pouring molten iron into the mold through the pouring port is provided on the outer side of the station 1 of the casting machine. Stations 2, 3 and 4 are water-stimulating stations for cooling the mold and shaping the molten iron. A blank plucking device for taking the shaped blank out of the mold is provided on the outer side of station 5. An air cooling device for further cooling the blank is provided downstream of the blank device, and a blank cleaning device for cleaning residual paint on the surface of the blank is connected to the downstream of the air cooling device. A blank basket for placing cylinder liner blanks is provided on the side of the blank cleaning device. A fly hammer device for pushing away the fly hammer to install the baffle and a mold cleaning device for cleaning the inner wall of the mold are provided on the outside of station six. A baffle cleaning and spraying device for completing the cleaning of residual paint on the baffle and spraying paint on the baffle is also provided on the side of the fly hammer device. A mold spraying device for spraying paint on the inner wall of the mold is provided on the outside of station seven. A multi-joint manipulator for grabbing the blank and the baffle is provided between the blank cleaning device and the fly hammer device. Station eight is an idle operation station before pouring. A paint control device is provided on the outside of the mold spraying device, and a main control cabinet for the entire cylinder liner blank production line is provided on the outside of the pouring machine.
[0006] Furthermore, the outer side of the pouring machine is provided with a regular octagonal guardrail corresponding to the eight workstations, and a window is provided at the position where each workstation needs to be opened.
[0007] Furthermore, spray heads for spraying cooling water onto the mold are installed on the guardrails corresponding to the workstations 2, 3 and 4.
[0008] Furthermore, a baffle outer end surface cleaning device for cleaning residual paint on the baffle outer end surface is also provided on the outer side of the work station four.
[0009] Furthermore, a blank transfer slide for transferring the blanks and transporting them to the air cooling device and an air cooling loading truss for grabbing and placing the blanks onto the air cooling device are provided between the air cooling device and the blank pulling device.
[0010] Furthermore, a blank cleaning and brushing loading turntable for transferring the blanks to the blank cleaning device and a blank cleaning and brushing loading truss for grabbing and placing the blanks onto the blank cleaning device are provided between the blank cleaning device and the air cooling device.
[0011] Furthermore, the paint control device includes a paint tank for storing refractory paint and a circulating water tank for providing water for preparing paint spray, as well as a spray control cabinet that controls the preparation of paint spray and quantitatively supplies paint spray to the mold spray device and the baffle cleaning spray device.
[0012] A cylinder liner blank production process comprises the following steps:
[0013] S1, Station 1: The pouring device pours the molten iron transferred from the electric furnace into the prepared mold. The pouring device adopts automatic control and does not require manual operation;
[0014] S2. After the pouring is completed, the mold rotates counterclockwise and enters stations 2, 3, and 4 in turn to receive spray water cooling. At the same time, the outer end surface cleaning device of the baffle at each station completes the cleaning of the residual paint on the outer end surface of the mold baffle, so as to facilitate the subsequent multi-joint manipulator to reliably grasp the baffle and prevent it from slipping;
[0015] S3. After water cooling, the mold rotates to station five. The multi-joint robot removes the baffle and places it on the baffle cleaning and spraying device. Then, the blank pulling device pulls out the cylinder liner blank and places it on the blank transfer slide.
[0016] S4, the blank transfer slide transports the blank to the air-cooling loading truss and rotates 90 degrees. The gripper mechanism on the air-cooling loading truss grabs the blank and places it on the air-cooling device. The conveyor belt of the air-cooling device transports the cylinder liner blank through each blower air-cooling position in turn, and then the blank falls onto the blank cleaning and loading turntable;
[0017] S5. The blank cleaning and brushing feeding turntable is equipped with a rotating disk and a pushing device, which can rotate the blank 90 degrees and push it to the designated position. Then the blank cleaning and brushing feeding truss grabs the blank and places it on the blank paint cleaning device;
[0018] S6. The blank paint cleaning device is equipped with a supporting wheel to drive the blank to rotate, and a steel brush is installed on the top to clean the paint on the blank surface. After the cleaning is completed, the multi-joint robot grabs the blank and puts it into the blank basket;
[0019] S7. After the multi-joint manipulator places the baffle on the loading position of the baffle cleaning and spraying device, the claw on the baffle cleaning and spraying device grabs the baffle and places it on the baffle cleaning and spraying station, cleans the paint on the inner surface and side of the baffle, and re-sprays the refractory paint;
[0020] S8. After the baffle is removed, the mold rotates to station six. The steel brush of the mold cleaning device starts to clean the paint on the inner wall of the mold. After the mold inner wall is cleaned, the multi-joint robot installs the sprayed baffle on the mold. When installing the baffle, the fly hammer device pushes the fly hammer away to facilitate the multi-joint robot to install the baffle;
[0021] S9. After the baffle is installed, the mold rotates to station seven, where the mold spraying device sprays refractory coating into the mold cavity again. After the spraying is completed, the mold is ready. After the idle operation at station eight, it enters the next cycle and returns to station one to pour molten iron again.
[0022] The present invention also includes other components that enable it to be used normally, which are all conventional means in the field. In addition, the devices or components not limited in the present invention, such as: ignition device, blank pulling device, fly hammer device, mold cleaning device, mold spraying device, baffle cleaning and spraying device, blank cleaning device, multi-joint manipulator, blank transfer slide, air-cooled loading truss, air-cooling device, blank cleaning and loading turntable, blank cleaning and loading truss, etc., all adopt the existing technology in this field.
[0023] The beneficial effects of the present invention are as follows:
[0024] The cylinder liner blank production line and production process provided by the present invention rationally design and arrange the equipment required for each step of cylinder liner blank casting, so that the entire blank casting production line is highly centralized. By improving the degree of automation of the production line, the production line structure is made compact and independent of each other, effectively saving floor space, reducing labor intensity, improving production efficiency, and enhancing production safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a three-dimensional schematic diagram of the cylinder liner blank production line in the embodiment.
[0026] Figure 2 for Figure 1 Schematic diagram of the equipment layout of the cylinder liner blank production line.
[0027] Figure 3 for Figure 1 Schematic diagram of the three-dimensional structure of the power head.
[0028] Figure 4 for Figure 1 Schematic diagram of the three-dimensional structure of the cleaning device for the outer end surface of the middle baffle.
[0029] Figure 5 Figure 1 Schematic diagram of the three-dimensional structure of the blank drawing device.
[0030] Figure 6 for Figure 1 Schematic diagram of the three-dimensional structure of the middle blank transfer slide.
[0031] Figure 7 for Figure 1 Schematic diagram of the three-dimensional structure of the air-cooled loading truss.
[0032] Figure 8 for Figure 1 Schematic diagram of the three-dimensional structure of the medium blank cleaning and loading turntable.
[0033] Figure 9 for Figure 1 Schematic diagram of the three-dimensional structure of the medium blank cleaning and loading truss.
[0034] Figure 10 for Figure 1 Schematic diagram of the three-dimensional structure of the middle-stroke fly hammer device.
[0035] Figure 11 for Figure 1 Schematic diagram of the three-dimensional structure of the middle mold cleaning device.
[0036] Figure 12 for Figure 1 Schematic diagram of the three-dimensional structure of the central fire pouring device.
[0037] Figure 13 for Figure 1 Schematic diagram of the three-dimensional structure of the air cooling device.
[0038] Figure 14 for Figure 1 Schematic diagram of the three-dimensional structure of the middle baffle cleaning and spraying device.
[0039] Figure 15 for Figure 1 Schematic diagram of the three-dimensional structure of the medium blank cleaning device.
[0040] Figure 16 for Figure 1 Schematic diagram of the three-dimensional structure of the middle mold spraying device.
[0041] Figure 17 for Figure 1 Schematic diagram of the three-dimensional structure of the multi-joint robot. DETAILED DESCRIPTION
[0042] The technical solutions of the present invention will be clearly and completely described below in conjunction with specific embodiments. Obviously, the described embodiments are only some embodiments of the present invention, rather than all embodiments.
[0043] Example
[0044] like Figure 1-17 As shown, a cylinder liner blank production line includes a casting machine 1, which is a circulating eight-station casting machine. A rotating base 2 is provided in the middle of the casting machine. Four power heads 3 are arranged in a cross shape above the rotating base. Eight stations are arranged in a regular octagon around the casting machine. Each power head can rotate cyclically or dock at any station under the drive of the rotating base.
[0045] Four molds 4 for centrifugal casting of cylinder liner blanks are correspondingly installed on the four power heads. The inner end of each mold is connected to the power head, and the outer end is equipped with a baffle 5 and a hammer 6 for fastening the baffle. A pouring gate 27 is provided at the center of the baffle.
[0046] In the counterclockwise direction, the outer side of station one of the pouring machine is provided with a quenching device 7 for pouring molten iron into the mold through the pouring port, stations two, three and four are water-stimulating stations for cooling the mold and shaping the molten iron, and the outer side of station five is provided with a blank pulling device 8 for taking the shaped blank out of the mold, and an air cooling device 9 for further cooling the blank is provided downstream of the blank pulling device, and a blank cleaning device 10 for cleaning residual paint on the surface of the blank is connected downstream of the air cooling device, and a blank basket 11 for placing cylinder liner blanks is provided on the side of the blank cleaning device.
[0047] The outside of station six is provided with a fly hammer device 12 for pushing away the fly hammers to install the baffle and a mold cleaning device 13 for cleaning the inner wall of the mold. The side of the fly hammer device is also provided with a baffle cleaning and spraying device 14 for completing the cleaning of residual paint on the baffle and spraying paint on the baffle. The outside of station seven is provided with a mold spraying device 15 for spraying paint on the inner wall of the mold. A multi-joint manipulator 16 for grabbing the blank and the baffle is provided between the blank cleaning device and the fly hammer device. Station eight is an idle operation station before preparing for pouring.
[0048] A coating control device is provided on the outside of the mold spraying device, and a main control cabinet 17 of the entire cylinder liner blank production line is provided on the outside of the pouring machine.
[0049] The outer side of the pouring machine is surrounded by a regular octagonal guardrail 18 corresponding to the eight workstations, and a window is provided at the position where each workstation needs to be opened.
[0050] The guardrails corresponding to the workstations 2, 3 and 4 are equipped with spray heads for spraying cooling water onto the mold.
[0051] The outer side of the station 4 is also provided with a baffle outer end surface cleaning device 19 for cleaning residual paint on the outer end surface of the baffle.
[0052] A blank transfer slide 20 for transferring blanks and transporting them to the air cooling device and an air cooling loading truss 21 for grabbing and placing blanks onto the air cooling device are provided between the air cooling device and the blank pulling device.
[0053] A blank cleaning and brushing feed turntable 22 for transferring the blanks to the blank cleaning and brushing device and a blank cleaning and brushing feed truss 23 for grabbing and placing the blanks onto the blank cleaning and brushing device are provided between the blank cleaning and brushing device and the air cooling device.
[0054] The coating control device includes a coating tank 24 for storing refractory coating and a circulating water tank 25 for providing water for preparing coating spray, as well as a spray control cabinet 26 for controlling the preparation of coating spray and quantitatively supplying coating spray to the mold spray device and the baffle cleaning spray device.
[0055] A cylinder liner blank production process comprises the following steps:
[0056] S1, Station 1: The pouring device pours the molten iron transferred from the electric furnace into the prepared mold. The pouring device adopts automatic control and does not require manual operation;
[0057] S2. After the pouring is completed, the mold rotates counterclockwise and enters stations 2, 3, and 4 in turn to receive spray water cooling. At the same time, the outer end surface cleaning device of the baffle at each station completes the cleaning of the residual paint on the outer end surface of the mold baffle, so as to facilitate the subsequent multi-joint manipulator to reliably grasp the baffle and prevent it from slipping;
[0058] S3. After water cooling, the mold rotates to station five. The multi-joint robot removes the baffle and places it on the baffle cleaning and spraying device. Then, the blank pulling device pulls out the cylinder liner blank and places it on the blank transfer slide.
[0059] S4, the blank transfer slide transports the blank to the air-cooling loading truss and rotates 90 degrees. The gripper mechanism on the air-cooling loading truss grabs the blank and places it on the air-cooling device. The conveyor belt of the air-cooling device transports the cylinder liner blank through each blower air-cooling position in turn, and then the blank falls onto the blank cleaning and loading turntable;
[0060] S5. The blank cleaning and brushing feeding turntable is equipped with a rotating disk and a pushing device, which can rotate the blank 90 degrees and push it to the designated position. Then the blank cleaning and brushing feeding truss grabs the blank and places it on the blank paint cleaning device;
[0061] S6. The blank paint cleaning device is equipped with a supporting wheel to drive the blank to rotate, and a steel brush is installed on the top to clean the paint on the blank surface. After the cleaning is completed, the multi-joint robot grabs the blank and puts it into the blank basket;
[0062] S7. After the multi-joint manipulator places the baffle on the loading position of the baffle cleaning and spraying device, the claw on the baffle cleaning and spraying device grabs the baffle and places it on the baffle cleaning and spraying station, cleans the paint on the inner surface and side of the baffle, and re-sprays the refractory paint;
[0063] S8. After the baffle is removed, the mold rotates to station six. The steel brush of the mold cleaning device starts to clean the paint on the inner wall of the mold. After the mold inner wall is cleaned, the multi-joint robot installs the sprayed baffle on the mold. When installing the baffle, the fly hammer device pushes the fly hammer away to facilitate the multi-joint robot to install the baffle;
[0064] S9. After the baffle is installed, the mold rotates to station seven, where the mold spraying device sprays refractory coating into the mold cavity again. After the spraying is completed, the mold is ready. After the idle operation at station eight, it enters the next cycle and returns to station one to pour molten iron again.
[0065] The technical solution of the present invention is not limited to the above-mentioned specific embodiments. Without departing from the scope and spirit of the described embodiments, many modifications and changes are obvious to ordinary technicians in this technical field. Any technical deformation made within the spirit and principles of the present invention falls within the scope of protection of the present invention.
Claims
1. A cylinder liner blank production line, comprising a pouring machine, characterized in that: The pouring machine is a circulating eight-station pouring machine, with a rotating base in the middle, four power heads arranged in a cross shape above the rotating base, and eight stations arranged in a regular octagon around the pouring machine. Each of the power heads can rotate cyclically or stop at any station under the driving action of the rotating base. Four molds for centrifugal casting of cylinder liner blanks are correspondingly installed on the four power heads. The inner end of each mold is connected to the power head, and the outer end is matched with a baffle and a fly hammer for fastening the baffle. A pouring port is arranged at the center of the baffle. In the counterclockwise direction, a pouring port passing through the pouring port is arranged on the outer side of station one of the pouring machine. A pouring device for pouring molten iron into the mold, stations two, three and four are water-spraying stations for cooling the mold and shaping the molten iron, a blank-pulling device for taking the shaped blank out of the mold is arranged on the outside of station five, an air-cooling device for further cooling the blank is arranged downstream of the blank-pulling device, a blank-cleaning device for cleaning residual paint on the surface of the blank is connected downstream of the air-cooling device, a blank-cleaning basket for placing cylinder liner blanks is arranged on the side of the blank-cleaning device, a fly-pushing hammer device for pushing away the fly-hammer for installing the baffle and a mold-cleaning device for cleaning the inner wall of the mold are arranged on the outside of station six, the fly-pushing hammer device A baffle cleaning and spraying device for cleaning residual paint on the baffle and spraying paint on the baffle is also provided on the side. A mold spraying device for spraying paint on the inner wall of the mold is provided on the outside of station seven. A multi-joint manipulator for grabbing the blank and the baffle is provided between the blank cleaning device and the fly hammer device. Station eight is an idle operation station before pouring. A paint regulating device is provided on the outside of the mold spraying device. The main control cabinet of the entire cylinder liner blank production line is provided on the outside of the pouring machine; a baffle outer end surface cleaning device for cleaning residual paint on the outer end surface of the baffle is also provided on the outside of station four; the air cooling device and the blank pulling device are A blank transfer slide for transferring the blanks and transporting them to the air cooling device and an air cooling loading truss for grabbing and placing the blanks on the air cooling device are arranged between the devices; a blank cleaning loading turntable for transferring the blanks to the blank cleaning device and a blank cleaning loading truss for grabbing and placing the blanks on the blank cleaning device are arranged between the blank cleaning device and the air cooling device; the paint control device includes a paint tank for storing refractory paint and a circulating water tank for providing water for preparing paint spray, as well as a spray control cabinet for controlling the preparation of paint spray and quantitatively supplying paint spray to the mold spray device and the baffle cleaning spray device.
2. The cylinder liner blank production line according to claim 1, characterized in that: The outer side of the pouring machine is surrounded by a regular octagonal guardrail corresponding to the eight workstations.
3. The cylinder liner blank production line according to claim 2, characterized in that: The guardrails corresponding to the workstations 2, 3 and 4 are provided with spray heads for spraying cooling water onto the mold.
4. A production process using the cylinder liner blank production line according to any one of claims 1 to 3, characterized in that: The steps include: S1, Station 1: The pouring device pours the molten iron transferred from the electric furnace into the prepared mold. The pouring device is automatically controlled and does not require manual operation; S2. After the pouring is completed, the mold rotates counterclockwise and enters the second, third and fourth stations in turn to be sprayed with water for cooling. The outer end surface cleaning device of the baffle at the four stations completes the cleaning of the residual paint on the outer end surface of the mold baffle, so as to facilitate the subsequent multi-joint manipulator to reliably grasp the baffle and prevent it from slipping; S3. After water cooling, the mold rotates to station five, and the multi-joint manipulator removes the baffle and puts it on the baffle cleaning and spraying device. Then the blank pulling device pulls out the cylinder liner blank and puts it on the blank transfer slide. S4, the blank transfer slide transports the blank to the air-cooled loading truss and rotates 90 degrees. The gripper mechanism on the air-cooled loading truss grabs the blank and puts it on the air-cooling device. The conveyor belt of the air-cooling device transports the cylinder liner blank through each blower air-cooling position in turn, and then the blank falls to the blank cleaning and loading turntable; S5. The blank cleaning and brushing feeding turntable is equipped with a rotating disk and a pushing device, which can rotate the blank by 90 degrees and push it to the specified position. Then the blank cleaning and brushing feeding truss grabs the blank and puts it on the blank paint cleaning and brushing device; S6. The blank paint cleaning device is provided with a supporting wheel to drive the blank to rotate, and a steel brush is provided on the top to clean the paint on the surface of the blank. After the cleaning is completed, the multi-joint manipulator grabs the blank and puts it into the blank basket; S7. After the multi-joint manipulator places the baffle plate on the loading position of the baffle plate cleaning and spraying device, the claw on the baffle plate cleaning and spraying device grabs the baffle plate and places it on the baffle plate cleaning and spraying station, cleans the paint on the inner surface and side of the baffle plate, and re-sprays the refractory paint; S8, after the baffle is removed, the mold rotates to station six, and the steel brush of the mold cleaning device starts to clean the paint on the inner wall of the mold. After the inner wall of the mold is cleaned, the multi-joint manipulator installs the sprayed baffle on the mold. When installing the baffle, the fly hammer device pushes the fly hammer away to facilitate the multi-joint manipulator to install the baffle; S9. After the baffle is installed, the mold rotates to station seven, where the mold spraying device sprays refractory coating to the inner cavity of the mold again. After the spraying is completed, the mold is ready. After the idle operation at station eight, it enters the next cycle and comes to station one again to pour molten iron.