A method for treating air preheater blockage and reducing flue pressure

By introducing flue gas heat exchanger into the coal-fired boiler and adjusting the flue gas and air volume, the problems of air preloader blockage and flue pressure exceeding the limit are solved, the load capacity and efficiency of the boiler are improved, and the flue deformation is avoided. The fan power consumption increases.

CN114413275BActive Publication Date: 2024-11-01HUANENG CHAOHU POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111598454.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-24
Publication Date
2024-11-01
Estimated Expiration
2041-12-24

AI Technical Summary

Technical Problem

The hollow preloader of coal-fired boiler is prone to blockage and flue pressure exceeds the limit, resulting in low boiler efficiency, fan stall and flue deformation.

Method used

By adding a flue gas heat exchanger, high-temperature flue gas and cold secondary air are extracted for heat exchange, and the flue gas and air volume are adjusted to reduce air pre-communication and flue pressure. The flue pressure adjustment barrier and secondary air temperature adjustment barrier are used. The board is controlled.

Benefits of technology

It effectively solves the problems of air preloader differential pressure and flue pressure exceeding the limit, improves the load capacity of the boiler, avoids flue deformation and increase fan power consumption, and improves the boiler efficiency and the stability of the smoke system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114413275B_ABST
    Figure CN114413275B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of flue gas transportation technology, and discloses a method for treating air preheater blockage and reducing flue pressure, comprising the following steps: extracting high-temperature flue gas from the outlet side of the denitration reactor at the tail of the boiler to the flue gas cavity of the flue gas heat exchanger, and extracting cold secondary air from behind the outlet electric baffle of the blower to the air cavity of the flue gas heat exchanger; high-temperature flue gas and cold secondary air are heat exchanged in the flue gas heat exchanger to obtain low-temperature flue gas and hot secondary air respectively, and the low-temperature flue gas is transported to the electrostatic precipitator, and the hot secondary air is transported to the hot secondary air box. The method of the present invention realizes the connection of the air duct and flue on both sides of the boiler, improves the load-carrying capacity of a single blower of the boiler when it is running, and the flue gas temperature at the outlet of the flue gas heat exchanger is easy to control, and problems such as ammonium bisulfate blockage will not occur.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of flue gas transportation, and more particularly to a method for treating air preheater blockage and reducing flue pressure. Background Art

[0002] At present, in order to enable the fuel to burn normally in the furnace, the air supply system of the wind and smoke system of coal-fired boilers must supply the air required for fuel combustion into the furnace, use the blower to overcome the flow resistance generated by the air duct, air preheater and burner, and provide the oxygen required for fuel combustion. The secondary air process is as follows: the air passes through the filter and silencer, enters the two axial flow blowers vertically to increase the pressure, enters the air preheater through the secondary air electric damper at the inlet of the air preheater, and then enters the secondary air bin of the two Junkers three-compartment air preheaters through the secondary air duct to be preheated into hot secondary air, and then is sent to the boiler hot secondary air box through the hot secondary air electric damper at the outlet of the air preheater to enter the furnace to assist combustion. In the flue gas system of the boiler, the high-temperature flue gas in the flue at the tail end of the furnace is extracted after the NOx is removed by the denitrification reactor, and then enters the flue gas chamber of two Ljungberg-type three-compartment air preheaters through the electric damper of the flue gas at the inlet of the air preheater to heat the primary air and the secondary air, and then enters the electrostatic precipitator to remove the dust in the flue gas, and then enters the desulfurization device to remove the SO2 in the flue gas after being pressurized by the induced draft fan, and then is discharged to the atmosphere through the chimney.

[0003] The flue gas discharged by coal-fired boilers must all pass through denitrification, desulfurization and dust removal equipment before it can be discharged into the atmosphere. During the boiler flue gas denitrification process, excessive ammonia escape causes a large amount of ammonium bisulfate to accumulate at the cold end of the air preheater, which can easily cause blockage of the air preheater. The air preheater heat exchange efficiency is low, the exhaust gas temperature is high, the furnace negative pressure fluctuates greatly, the induced draft fan current is large, there is a risk of fan stall and boiler fire extinguishing, and the boiler efficiency is low. In addition, it will also cause the flue pressure at the induced draft fan inlet to exceed the low limit when under high load, causing the boiler flue to deform or rupture, and the boiler load has to be reduced.

[0004] At present, the following methods are mainly used to reduce the differential pressure of air preheaters: first, strengthen steam soot blowing, that is, increase the soot blowing steam pressure and increase the frequency of steam soot blowing, but the problem of large differential pressure of air preheaters is still not improved; second, since the air and smoke systems of medium and large coal-fired boilers basically adopt a double-row arrangement and balanced ventilation method, the outlet temperature of the single-side air preheater is increased to above 160°C to melt ammonium bisulfate (melting point of ammonium bisulfate is 147°C) to reduce the differential pressure of the air preheater. Specifically, taking the increase of the outlet temperature of air preheater A as an example, the output of induced draft fan A is increased, and the output of forced draft fan A is reduced. force, so that a large amount of flue gas heats a small amount of cold air to increase the flue gas temperature at the air preheater outlet. However, this method has drawbacks in the actual application of thermal power plants, that is, when adjusting the air supply and flue gas volume on the A side of the boiler to increase the outlet temperature of the air preheater on the A side to melt ammonium bisulfate, the outlet temperature of the air preheater on the B side is reduced to below 80°C due to the large air supply and small flue gas volume of the boiler, which in turn aggravates the accumulation and blockage of ammonium bisulfate in the air preheater on the B side, further increasing the differential pressure of the air preheater. Therefore, this method is not ideal for reducing the differential pressure of the air preheater. Third, the air preheater is flushed with high-pressure water online to clean the blockage of the air preheater. The high-pressure water damages the heat exchange elements of the air preheater, and the cold shock causes the deformation of the air preheater rotor to produce wear and jamming. In addition, the injected water increases the dew point of the flue gas. Summary of the invention

[0005] The invention aims to solve the problem that the air preheater is blocked by ammonium bisulfate and the flue pressure exceeds the limit and cannot carry the rated load.

[0006] One object of the present invention is to provide a method for treating air preheater blockage and reducing flue pressure by adding a flue gas heat exchanger, comprising the following steps:

[0007] (1) High-temperature flue gas is extracted from the outlet side of the denitration reactor at the tail of the boiler to the flue gas cavity of the flue gas heat exchanger, and cold secondary air is extracted from behind the outlet electric damper of the blower to the air cavity of the flue gas heat exchanger;

[0008] (2) After the high-temperature flue gas and the cold secondary air are heat exchanged in the flue gas heat exchanger, low-temperature flue gas and hot secondary air are obtained respectively. The low-temperature flue gas is transported to the electrostatic precipitator, and the hot secondary air is transported to the hot secondary air box;

[0009] By adjusting the cold secondary air volume from the blower outlet to the air cavity of the flue gas heat exchanger and the flue gas volume from the high-temperature flue gas denitrification reactor outlet to the flue gas cavity of the flue gas heat exchanger, the blockage of the air preheater and the flue pressure can be reduced.

[0010] Preferably, the amount of cold secondary air from the blower outlet to the air cavity of the flue gas heat exchanger is adjusted by a secondary air temperature regulating damper;

[0011] The amount of flue gas from the outlet of the high-temperature flue gas denitrification reactor to the flue gas cavity of the flue gas heat exchanger is adjusted by a flue pressure regulating damper.

[0012] Preferably, the method for treating air preheater blockage and reducing flue pressure specifically comprises the following steps:

[0013] (1) The flue gas from the flue ducts on the A and B sides of the boiler tail section passes through the denitration reactors on both sides to remove NOx. The flue gas treated with denitration extracts high-temperature flue gas through the pneumatic regulating baffle, and then passes through the flue pressure regulating baffle to be sent to the flue gas cavity of the flue gas heat exchanger for heat exchange. The low-temperature flue gas after heat exchange passes through the pneumatic regulating baffle and is respectively introduced into the electrostatic precipitators on both sides;

[0014] (2) Cold secondary air is extracted from behind the electric dampers at the outlets of the blowers on both sides, and is sent into the air cavity of the flue gas heat exchanger for heat exchange after passing through the pneumatic adjustment dampers on both sides. The heated secondary air passes through the secondary air temperature adjustment damper and the secondary air pneumatic adjustment damper and returns to the hot secondary air box.

[0015] Another object of the present invention is to provide a system for treating air preheater blockage and reducing flue pressure, comprising:

[0016] A flue gas heat exchanger, comprising a flue gas chamber and an air chamber;

[0017] The inlet of the flue gas heat exchanger's flue gas cavity is connected to the denitration reactor, and the outlet is connected to the electrostatic precipitator; the inlet of the air cavity of the flue gas heat exchanger is connected to the blower, and the outlet is connected to the hot secondary air box;

[0018] A flue pressure regulating baffle for controlling flue gas flow rate is arranged between the denitration reactor and the flue gas cavity of the flue gas heat exchanger; a secondary air temperature regulating baffle for controlling air volume is arranged between the hot secondary air box and the air cavity of the flue gas heat exchanger.

[0019] Preferably, the blower is provided with an electric baffle near the outlet, and a pneumatic adjustment baffle is provided between the electric baffle of the blower and the air cavity of the flue gas heat exchanger, for adjusting the air volume of the air cavity of the flue gas heat exchanger;

[0020] An electric baffle is provided at the outlet of the electrostatic precipitator, and a pneumatic adjustment baffle is provided between the electrostatic precipitator and the flue gas heat exchanger for adjusting the flow rate of flue gas at the outlet of the boiler tail flue.

[0021] Preferably, the flue gas heat exchanger is a shell and tube flue gas heat exchanger.

[0022] Preferably, at least two of the denitration reactor, the electrostatic precipitator, and the blower are provided to cooperate in conveying the flue gas generated by the multiple flue outlets at the rear of the boiler.

[0023] Preferably, the denitration reactor comprises a first denitration reactor and a second denitration reactor;

[0024] The inlet of the first denitration reactor is connected to the flue outlet on the A side of the boiler tail, and the inlet of the second denitration reactor is connected to the flue outlet on the B side of the boiler tail;

[0025] The outlet pipes of the first denitration reactor and the second denitration reactor are connected to the same pipe and then connected to the flue gas cavity of the flue gas heat exchanger.

[0026] Preferably, the electrostatic precipitator comprises a first electrostatic precipitator and a second electrostatic precipitator;

[0027] The inlet of the first electrostatic precipitator is connected to the outlet of the flue gas cavity of the flue gas heat exchanger, and is used to transport the flue gas at the flue outlet on the A side of the boiler tail; the inlet of the second electrostatic precipitator is connected to the outlet of the flue gas cavity of the flue gas heat exchanger, and is used to transport the flue gas at the flue outlet on the B side of the boiler tail.

[0028] Preferably, the flue gas passing through the flue gas chamber of the flue gas heat exchanger is output from the same pipeline and then diverted to the first electrostatic precipitator and the second electrostatic precipitator through different pipelines.

[0029] Preferably, the blower includes a first blower and a second blower; generally, the air from the blower in the boiler system is called secondary air;

[0030] The air supply ducts of the first air supply fan and the second air supply fan are all collected into the same duct and then connected to the air cavity of the flue gas heat exchanger.

[0031] Preferably, the system further comprises:

[0032] The first air preheater is provided with a secondary air bin and a flue gas bin, the flue gas bin inlet of the first air preheater is connected to the first denitration reactor, the outlet is connected to the first electrostatic precipitator, the secondary air bin inlet of the first air preheater is connected to the first blower, and the outlet is connected to the hot secondary air box;

[0033] The second air preheater is provided with a secondary air bin and a flue gas bin; the inlet of the flue gas bin of the second air preheater is connected to the second denitration reactor, and the outlet is connected to the second electrostatic precipitator; the inlet of the secondary air bin of the second air preheater is connected to the second blower, and the outlet is connected to the hot secondary air box.

[0034] Preferably, the system further comprises:

[0035] a first induced draft fan, connected to the outlet of the first electrostatic precipitator, for conveying flue gas from the flue outlet on the A side of the boiler tail;

[0036] The second induced draft fan is connected to the outlet of the second electrostatic precipitator and is used for conveying the flue gas from the flue outlet on the B side of the boiler tail.

[0037] Preferably, the first blower and the second blower are both provided with electric baffles near the outlet; a pneumatic adjustment baffle is provided between the electric baffle of the first blower and the air cavity of the flue gas heat exchanger, for adjusting the air volume of the first blower entering the air cavity of the flue gas heat exchanger; a pneumatic adjustment baffle is provided between the electric baffle of the second blower and the air cavity of the flue gas heat exchanger, for adjusting the air volume of the second blower entering the air cavity of the flue gas heat exchanger.

[0038] Preferably, electric baffles are provided at the outlets of the first electrostatic precipitator and the second electrostatic precipitator; a pneumatic adjustment baffle is provided between the first electrostatic precipitator and the flue gas heat exchanger to adjust the flow rate of flue gas at the flue outlet on side A of the rear part of the boiler; a pneumatic adjustment baffle is provided between the second electrostatic precipitator and the flue gas heat exchanger to adjust the flow rate of flue gas at the flue outlet on side B of the rear part of the boiler.

[0039] Preferably, a pneumatic regulating baffle is provided between the first denitration reactor, the second denitration reactor and the flue pressure regulating baffle, for extracting high-temperature flue gas into the flue gas heat exchanger.

[0040] Preferably, a pressure gauge is provided near the inlet side of the first electrostatic precipitator for measuring the flue pressure on the A side of the boiler tail, and a pressure gauge is provided near the inlet side of the second electrostatic precipitator for measuring the flue pressure on the B side of the boiler tail.

[0041] Preferably, a temperature measuring device is provided near the outlet side of the air cavity of the flue gas heat exchanger for measuring the secondary air temperature at the outlet of the flue gas heat exchanger.

[0042] Preferably, an electric baffle is provided between the first denitrification reactor and the flue gas bin of the first air preheater to isolate the flue gas at the flue outlet on the A side of the boiler tail from entering the flue gas bin of the first air preheater; an electric baffle is provided between the hot secondary air box and the secondary air bin of the first air preheater to isolate the hot secondary air from flowing back into the secondary air bin of the first air preheater.

[0043] An electric baffle is arranged between the second denitrification reactor and the flue gas bin of the second air preheater, which is used to isolate the flue gas at the flue outlet on the B side of the boiler tail from entering the flue gas bin of the second air preheater; an electric baffle is arranged between the hot secondary air box and the secondary air bin of the second air preheater, which is used to isolate the hot secondary air from flowing back into the secondary air bin of the second air preheater.

[0044] The present invention provides a method for treating air preheater blockage and reducing flue pressure. Compared with the prior art, the method has the following beneficial effects:

[0045] The present invention solves the problem that the outlet temperature of the air preheater on one side is too low when the unit online increases the outlet temperature of the air preheater on the other side to reduce the differential pressure, and can reduce the amount of flue gas flowing through the air preheater to reduce the negative force of the tail flue, thereby solving the problem that the unit cannot carry the rated load due to excessive flue pressure caused by high differential pressure of the air preheater or ash accumulation and blockage of the flue.

[0046] The system of the present invention realizes the connection of the air ducts and the flue on both sides of the boiler, improves the load-carrying capacity of a single fan of the boiler during operation, and the flue gas temperature at the flue gas heat exchanger outlet is easy to control, and problems such as ammonium bisulfate blockage will not occur. The system has a good application prospect for coal-fired boilers. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 It is a schematic diagram of the process of the system of the present invention. DETAILED DESCRIPTION

[0048] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] A system for treating air preheater blockage and reducing flue pressure, comprising:

[0050] A flue gas heat exchanger, comprising a flue gas chamber and an air chamber;

[0051] The inlet of the flue gas heat exchanger's flue gas cavity is connected to the denitration reactor, and the outlet is connected to the electrostatic precipitator; the inlet of the air cavity of the flue gas heat exchanger is connected to the blower, and the outlet is connected to the hot secondary air box;

[0052] A flue pressure regulating baffle for controlling flue gas flow rate is arranged between the denitration reactor and the flue gas cavity of the flue gas heat exchanger; a secondary air temperature regulating baffle for controlling air volume is arranged between the hot secondary air box and the air cavity of the flue gas heat exchanger.

[0053] Preferably, the blower is provided with an electric baffle near the outlet, and a pneumatic adjustment baffle is provided between the electric baffle of the blower and the air cavity of the flue gas heat exchanger, for adjusting the air volume of the air cavity of the flue gas heat exchanger;

[0054] An electric baffle is provided at the outlet of the electrostatic precipitator, and a pneumatic adjustment baffle is provided between the electrostatic precipitator and the flue gas heat exchanger for adjusting the flow rate of flue gas at the outlet of the boiler tail flue.

[0055] In order to further optimize the above technical solution, the flue gas heat exchanger is a shell and tube flue gas heat exchanger.

[0056] like Figure 1 As shown, in some embodiments of the present invention, two of the denitration reactor, the electrostatic precipitator, and the blower are provided to cooperate in conveying the flue gas generated by multiple flue outlets at the rear of the boiler.

[0057] Wherein, the denitration reactor comprises a first denitration reactor and a second denitration reactor;

[0058] The inlet of the first denitration reactor is connected to the flue outlet on the A side of the boiler tail, and the inlet of the second denitration reactor is connected to the flue outlet on the B side of the boiler tail;

[0059] The outlet pipes of the first denitration reactor and the second denitration reactor are connected to the same pipe and then connected to the flue gas cavity of the flue gas heat exchanger.

[0060] In some embodiments of the present invention, the electrostatic precipitator comprises a first electrostatic precipitator and a second electrostatic precipitator;

[0061] The inlet of the first electrostatic precipitator is connected to the outlet of the flue gas cavity of the flue gas heat exchanger, and is used to transport the flue gas at the flue outlet on the A side of the boiler tail; the inlet of the second electrostatic precipitator is connected to the outlet of the flue gas cavity of the flue gas heat exchanger, and is used to transport the flue gas at the flue outlet on the B side of the boiler tail.

[0062] In some embodiments of the present invention, the flue gas passing through the flue gas chamber of the flue gas heat exchanger is output from the same pipeline and then diverted to the first electrostatic precipitator and the second electrostatic precipitator through different pipelines.

[0063] In some embodiments of the present invention, the blower includes a first blower and a second blower;

[0064] The air supply ducts of the first air supply fan and the second air supply fan are all collected into the same duct and then connected to the air cavity of the flue gas heat exchanger.

[0065] In some embodiments of the present invention, the system further comprises:

[0066] The first air preheater is provided with a secondary air bin and a flue gas bin, the flue gas bin inlet of the first air preheater is connected to the first denitration reactor, the outlet is connected to the first electrostatic precipitator, the secondary air bin inlet of the first air preheater is connected to the first blower, and the outlet is connected to the hot secondary air box;

[0067] The second air preheater is provided with a secondary air bin and a flue gas bin; the inlet of the flue gas bin of the second air preheater is connected to the second denitration reactor, and the outlet is connected to the second electrostatic precipitator; the inlet of the secondary air bin of the second air preheater is connected to the second blower, and the outlet is connected to the hot secondary air box.

[0068] In some embodiments of the present invention, the system further comprises:

[0069] a first induced draft fan, connected to the outlet of the first electrostatic precipitator, for conveying flue gas from the flue outlet on the A side of the boiler tail;

[0070] The second induced draft fan is connected to the outlet of the second electrostatic precipitator and is used for conveying the flue gas from the flue outlet on the B side of the boiler tail.

[0071] In some embodiments of the present invention, the first blower and the second blower are both provided with electric baffles 1 and 3 near the outlet for isolating the blowers; a pneumatic adjustment baffle 9 is provided between the electric baffle 1 of the first blower and the air cavity of the flue gas heat exchanger for adjusting the air volume of the first blower entering the air cavity of the flue gas heat exchanger; a pneumatic adjustment baffle 12 is provided between the electric baffle 3 of the second blower and the air cavity of the flue gas heat exchanger for adjusting the air volume of the second blower entering the air cavity of the flue gas heat exchanger.

[0072] In some embodiments of the present invention, electric baffles 6 and 8 are provided at the outlets of the first electrostatic precipitator and the second electrostatic precipitator; a pneumatic adjustment baffle 14 is provided between the first electrostatic precipitator and the flue gas heat exchanger to adjust the flow rate of flue gas at the flue outlet on the A side of the boiler tail; a pneumatic adjustment baffle 16 is provided between the second electrostatic precipitator and the flue gas heat exchanger to adjust the flow rate of flue gas at the flue outlet on the B side of the boiler tail.

[0073] In some embodiments of the present invention, pneumatic regulating baffles 13 and 15 are provided between the first denitration reactor, the second denitration reactor and the flue pressure regulating baffle 17 for extracting high-temperature flue gas into the flue gas heat exchanger.

[0074] In some embodiments of the present invention, a pressure gauge is provided near the inlet side of the first electrostatic precipitator for measuring the flue pressure on the A side of the boiler tail, and a pressure gauge is provided near the inlet side of the second electrostatic precipitator for measuring the flue pressure on the B side of the boiler tail.

[0075] In some embodiments of the present invention, a temperature measuring device is provided near the outlet side of the air cavity of the flue gas heat exchanger to measure the secondary air temperature at the outlet of the flue gas heat exchanger.

[0076] In some embodiments of the present invention, an electric baffle 5 is provided between the first denitrification reactor and the flue gas bin of the first air preheater to isolate the flue gas at the flue outlet on the A side of the boiler tail from entering the flue gas bin of the first air preheater; an electric baffle 2 is provided between the hot secondary air box and the secondary air bin of the first air preheater to isolate the hot secondary air from flowing back into the secondary air bin of the first air preheater.

[0077] An electric baffle 7 is arranged between the second denitrification reactor and the flue gas bin of the second air preheater to isolate the flue gas at the flue outlet on the B side of the boiler tail from entering the flue gas bin of the second air preheater; an electric baffle 4 is arranged between the hot secondary air box and the secondary air bin of the second air preheater to isolate the hot secondary air from flowing back into the secondary air bin of the second air preheater.

[0078] Based on the system for processing air preheater blockage and reducing flue pressure provided by the above embodiment of the present invention, the method for processing air preheater blockage and reducing flue pressure includes the following steps:

[0079] (1) The flue gas from the flue ducts on the A and B sides of the boiler tail section passes through the denitration reactors on both sides to remove NOx. The flue gas treated with denitration extracts high-temperature flue gas through the pneumatic regulating baffle, and then passes through the flue pressure regulating baffle to be sent to the flue gas cavity of the flue gas heat exchanger for heat exchange. The low-temperature flue gas after heat exchange passes through the pneumatic regulating baffle and is respectively introduced into the electrostatic precipitators on both sides;

[0080] (2) Cold secondary air is extracted from behind the electric dampers at the outlets of the blowers on both sides, and is sent into the air cavity of the flue gas heat exchanger for heat exchange after passing through the pneumatic adjustment dampers on both sides. The heated secondary air passes through the secondary air temperature adjustment damper and the secondary air pneumatic adjustment damper and returns to the hot secondary air box.

[0081] Specifically, the application of the system for treating air preheater blockage and reducing flue pressure of the present invention will be described in detail below in combination with specific operating conditions.

[0082] First, the present invention solves the problem that the outlet temperature of the air preheater on one side is too low when the unit online increases the outlet temperature of the air preheater on the other side to reduce the differential pressure.

[0083] Taking the example of reducing the differential pressure of the first air preheater by heating up the single-side air preheater to melt the ammonium bisulfate, the output of the first blower is appropriately reduced, the output of the first induced draft fan is increased, the flue gas temperature at the outlet of the first air preheater is increased, and the output of the second blower is increased, and the output of the second induced draft fan is reduced. The flue gas temperature at the outlet of the second air preheater decreases. During the adjustment process, the flue gas temperature at the outlet of the second air preheater is controlled not to be lower than the flue gas dew point. At this time, the pneumatic adjustment damper 15 from the second denitrification reactor to the flue gas cavity of the flue gas heat exchanger and the flue gas heat exchanger are opened. The pneumatic regulating dampers 14 and 16 on both sides of the inlet of the electrostatic precipitator are opened, and then the pneumatic regulating damper 9 between the outlet of the first blower and the air cavity of the flue gas heat exchanger and the pneumatic regulating damper 10 from the air cavity of the flue gas heat exchanger to the hot secondary wind box are opened, and the flue pressure regulating damper 17 is adjusted to control the flue gas temperature at the outlet of the second air preheater to be not lower than the flue gas dew point, and the secondary air temperature regulating damper 11 is adjusted to continue to increase the cold end temperature of the first air preheater, and the melted ammonium bisulfate is washed by the flue gas and carried to the flue behind.

[0084] After the differential pressure of the first air preheater returns to normal, adjust the output balance of the fans on both sides, open the pneumatic regulating damper 13 from the first denitrification reactor of the boiler to the flue gas heat exchanger and the pneumatic regulating damper 12 from the outlet of the second blower to the flue gas heat exchanger, adjust the flue pressure regulating damper 17 and the secondary air temperature regulating damper 11 to control the outlet flue gas temperature of the flue gas heat exchanger to be greater than 160°C to melt the ammonium bisulfate and be carried away by the flue gas, and after the differential pressure of the flue gas heat exchanger returns to normal, close the above-mentioned opened valves to exit the flue gas heat exchanger operation.

[0085] Second, the present invention can reduce the amount of flue gas flowing through the air preheater to reduce the negative pressure of the tail flue, thereby solving the problem that the unit cannot carry the rated load due to excessive flue pressure caused by high air preheater differential pressure or flue ash blockage.

[0086] When the flue pressure exceeds the lower limit under high load, the pneumatic regulating dampers 13 and 15 between the first denitrification reactor and the second denitrification reactor to the flue gas cavity of the flue gas heat exchanger and the pneumatic regulating dampers 14 and 16 on both sides of the flue gas heat exchanger to the inlet of the electrostatic precipitator are opened, and then the pneumatic regulating dampers 9 and 12 between the outlet of the first blower and the second blower to the air cavity of the flue gas heat exchanger and the pneumatic regulating damper 10 between the flue gas heat exchanger and the hot secondary wind box are opened, and the flue pressure regulating damper 17 and the secondary air temperature regulating damper 11 are adjusted to control the flue gas temperature at the flue gas heat exchanger outlet, and the advantage of the good flue gas flow performance of the flue gas heat exchanger is utilized to reduce the flue gas volume of the first air preheater and the second air preheater, reduce the resistance of the air preheater, improve the negative pressure of the flue at the inlet of the induced draft fan, avoid deformation and tearing of the flue, reduce the power consumption of the primary fan, the blower and the induced draft fan, improve the boiler efficiency, and at the same time improve the load capacity of the unit.

[0087] Thirdly, the system of the present invention realizes the interconnection of the air ducts and the smoke ducts on both sides of the boiler, thereby improving the load-carrying capacity of the unit when a single fan fails.

[0088] If the first induced draft fan fails and stops operating, the electric flue gas damper 6 at the inlet of the first induced draft fan is closed. The load capacity of the single-side air and smoke system is less than 50% due to the differential pressure of the air preheater. The air and smoke duct of the flue gas heat exchanger can realize the double-sided operation of the air and smoke system. The pneumatic adjustment dampers 14 and 16 of the flue gas from the flue gas cavity of the flue gas heat exchanger to the inlet of the electrostatic precipitator are opened. The high-temperature flue gas from the flue gas on the A side of the boiler tail passes through the electric flue gas damper 5 at the inlet of the first air preheater, the pneumatic adjustment dampers 14 and 16 of the flue gas on both sides of the first air preheater and the electrostatic precipitator inlet to the inlet duct of the second electrostatic precipitator. Since the flue gas outlet diameter of the flue gas heat exchanger is small, the output of the first blower and the primary fan on the A side is appropriately reduced. The load capacity of the boiler air and smoke system is only limited by the output of the second induced draft fan. Since the first air preheater diversion reduces the flue gas flow of the second air preheater, the load capacity of a single fan is correspondingly improved.

[0089] Similarly, after the first blower stops operating due to a fault, the cold secondary air at the outlet of the second blower passes through the pneumatic adjustment dampers 12 and 9 and is heated by the first air preheater, while heating the cold primary air on the A side. The load capacity of the air and smoke system is only limited by the output of the second blower, and the load capacity of the boiler is improved.

[0090] In addition, if the first supply fan and the first induced draft fan are simultaneously faulty and undergoing maintenance, the load-carrying capacity of the fans will be limited due to the influence of the air preheater differential pressure. The operation mode of the primary fan is adjusted. The primary fan on the A side supplies cold primary air, and the primary fan on the B side supplies hot primary air. The cold secondary air at the outlet of the second blower passes through the pneumatic adjustment damper 12 and enters the air cavity of the flue gas heat exchanger for heating, and then passes through the secondary air temperature adjustment damper 11 and the pneumatic adjustment damper 10 at the outlet of the flue gas heat exchanger to enter the hot secondary wind box. At the same time, the outlet of the first denitrification reactor is opened to extract high-temperature flue gas through the flue gas pneumatic adjustment damper 13, and then sent into the flue gas cavity of the flue gas heat exchanger through the tail flue pressure adjustment damper 17. The low-temperature flue gas passes through the pneumatic adjustment damper 16 to the inlet flue of the second electrostatic precipitator device and is put into operation of the flue gas heat exchanger to divert the secondary air on the B side. The load capacity of the boiler is improved, which depends on the output of the second blower and the second induced draft fan. At the same time, the flue gas on the flue A side at the tail of the boiler is circulated, avoiding the flue collapse accident caused by the inability of the flue gas to circulate after the failure of the first induced draft fan.

[0091] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the scheme disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0092] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for treating air preheater blockage and reducing flue pressure, characterized in that: The air preheater blockage and flue pressure reduction can be solved by adding a flue gas heat exchanger, including the following steps: (1) High-temperature flue gas is extracted from the outlet side of the denitration reactor at the tail of the boiler to the flue gas cavity of the flue gas heat exchanger, and cold secondary air is extracted from behind the electric damper at the outlet of the blower to the air cavity of the flue gas heat exchanger; (2) After the high-temperature flue gas and the cold secondary air are heat exchanged in the flue gas heat exchanger, low-temperature flue gas and hot secondary air are obtained respectively. The low-temperature flue gas is transported to the electrostatic precipitator, and the hot secondary air is transported to the hot secondary air box; By adjusting the cold secondary air volume from the blower outlet to the air cavity of the flue gas heat exchanger and the flue gas volume from the high-temperature flue gas denitration reactor outlet to the flue gas cavity of the flue gas heat exchanger, the blockage of the air preheater and the flue pressure can be reduced; The cold secondary air volume from the blower outlet to the air cavity of the flue gas heat exchanger is adjusted by the secondary air temperature regulating damper; The flue gas volume from the outlet of the high-temperature flue gas denitration reactor to the flue gas cavity of the flue gas heat exchanger is adjusted by the flue pressure regulating damper; The specific steps include: (1) The flue gas from the flue ducts on the A and B sides of the boiler tail section passes through the denitration reactors on both sides to remove NOx. The flue gas treated with denitration extracts high-temperature flue gas through the pneumatic regulating baffle, and then passes through the flue pressure regulating baffle to be sent to the flue gas cavity of the flue gas heat exchanger for heat exchange. The low-temperature flue gas after heat exchange passes through the pneumatic regulating baffle and is respectively introduced into the electrostatic precipitators on both sides; (2) Cold secondary air is extracted from behind the electric dampers at the outlets of the blowers on both sides, and is sent into the air cavity of the flue gas heat exchanger for heat exchange after passing through the pneumatic adjustment dampers on both sides. The heated secondary air passes through the secondary air temperature adjustment damper and the secondary air pneumatic adjustment damper and returns to the hot secondary air box.

2. A system for treating air preheater blockage and reducing flue pressure, characterized in that: include: A flue gas heat exchanger, comprising a flue gas chamber and an air chamber; The flue gas chamber inlet of the flue gas heat exchanger is connected to the denitration reactor, and the outlet is connected to the electrostatic precipitator; The air cavity inlet of the flue gas heat exchanger is connected to the blower, and the outlet is connected to the hot secondary air box; A flue pressure regulating baffle for controlling the flue gas flow rate is provided between the denitration reactor and the flue gas cavity of the flue gas heat exchanger; a secondary air temperature regulating baffle for controlling the air volume is provided between the hot secondary air box and the air cavity of the flue gas heat exchanger; The blower is provided with an electric baffle near the outlet, and a pneumatic adjustment baffle is provided between the electric baffle of the blower and the air cavity of the flue gas heat exchanger, for adjusting the air volume of the air cavity of the flue gas heat exchanger; An electric baffle is provided at the outlet of the electrostatic precipitator, and a pneumatic adjustment baffle is provided between the electrostatic precipitator and the flue gas heat exchanger, for adjusting the flow rate of flue gas at the outlet of the tail flue of the boiler; At least two of the denitration reactor, the electrostatic precipitator, and the blower are provided to cooperate in conveying the flue gas generated by the multiple flue outlets at the rear of the boiler; The denitration reactor comprises a first denitration reactor and a second denitration reactor; The inlet of the first denitration reactor is connected to the flue outlet on the A side of the boiler tail, and the inlet of the second denitration reactor is connected to the flue outlet on the B side of the boiler tail; The outlet pipes of the first denitration reactor and the second denitration reactor are connected to the same pipe and then connected to the flue gas cavity of the flue gas heat exchanger.

3. A system for treating air preheater blockage and reducing flue pressure according to claim 2, characterized in that: The electric precipitator comprises a first electric precipitator and a second electric precipitator; The inlet of the first electrostatic precipitator is connected to the outlet of the flue gas cavity of the flue gas heat exchanger, and is used to transport the flue gas at the flue outlet on the A side of the tail of the boiler; the inlet of the second electrostatic precipitator is connected to the outlet of the flue gas cavity of the flue gas heat exchanger, and is used to transport the flue gas at the outlet of the flue on the B side of the tail of the boiler; The flue gas passing through the flue gas chamber of the flue gas heat exchanger is output from the same pipeline and then diverted to the first electrostatic precipitator and the second electrostatic precipitator through different pipelines.

4. A system for treating air preheater blockage and reducing flue pressure according to claim 2, characterized in that: The air blower comprises a first air blower and a second air blower; The air supply ducts of the first air supply fan and the second air supply fan are all collected into the same duct and then connected to the air cavity of the flue gas heat exchanger.

5. A system for treating air preheater blockage and reducing flue pressure according to claim 4, characterized in that: The system further comprises: The first air preheater is provided with a secondary air bin and a flue gas bin, the flue gas bin inlet of the first air preheater is connected to the first denitration reactor, and the outlet is connected to the first electrostatic precipitator, the secondary air bin inlet of the first air preheater is connected to the first blower, and the outlet is connected to the hot secondary air box; The second air preheater is provided with a secondary air bin and a flue gas bin; the inlet of the flue gas bin of the second air preheater is connected to the second denitration reactor, and the outlet is connected to the second electrostatic precipitator; the inlet of the secondary air bin of the second air preheater is connected to the second blower, and the outlet is connected to the hot secondary air box; a first induced draft fan, connected to the outlet of the first electrostatic precipitator, for conveying flue gas from the flue outlet on the A side of the boiler tail; The second induced draft fan is connected to the outlet of the second electrostatic precipitator and is used for conveying the flue gas from the flue outlet on the B side of the boiler tail.