Optimization method and device for new oilfield project evaluation scheme
By obtaining the basic parameters and historical data of new oilfield projects and establishing and optimizing the production planning scheme prediction model, the problem that the evaluation scheme of new oilfield projects in the existing technology cannot accurately determine the production planning scheme, and efficient and accurate determination of production planning schemes is achieved , improving the scientificity and efficiency of oil and gas exploration and development.
Patent Information
- Application Number
- CN202011202653.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-02
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2040-11-02
AI Technical Summary
The evaluation plan for new oilfield projects cannot efficiently and accurately determine the appropriate production planning plan, which affects the scientificity and efficiency of oil and gas exploration and development.
By obtaining the basic parameters of the new oil field project to be optimized, and establishing and optimizing production planning predictions based on the pre-established optimal production planning scheme prediction model, including historical oil production data, water production data, water injection data and well number data, we will establish and optimize production planning scheme predictions based on the pre-established optimal production planning scheme prediction model, including historical oil production data, water injection data and well number data. model, and then determine the optimal production planning scheme.
It has achieved efficient and accurate determination of the optimal production planning scheme, improved the efficiency and accuracy of new oilfield projects, and provided scientific guidance for oil and gas exploration and development.
Smart Images

Figure CN114439472B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of oil and gas exploration and development, and in particular to a method and device for optimizing an evaluation scheme for a new oilfield project. Background Art
[0002] This section is intended to provide a background or context to the embodiments of the invention recited in the claims. No admission is made that the description herein is prior art by inclusion in this section.
[0003] At present, in the process of oil and gas exploration and development, how to accurately evaluate whether the production planning scheme of new oilfield projects is appropriate is particularly important for later oil and gas exploration and development. However, the existing evaluation scheme for new oilfield projects cannot efficiently and accurately determine the appropriate production planning scheme. Summary of the invention
[0004] The embodiment of the present invention provides a method for optimizing an oilfield new project evaluation scheme, which is used to efficiently and accurately determine an optimal production planning scheme. The method includes:
[0005] Obtain basic parameters for the evaluation plan of new oilfield projects to be optimized;
[0006] The optimal production planning scheme is obtained according to the basic parameters of the new oil field project evaluation scheme to be optimized and the pre-established optimal production planning scheme prediction model; the optimal production planning scheme prediction model is pre-established according to the historical oil production data, water production data, water injection data and well number data.
[0007] The embodiment of the present invention also provides an oilfield new project evaluation scheme optimization device for efficiently and accurately determining the optimal production planning scheme, the device comprising:
[0008] An acquisition unit, used to acquire basic parameters of the evaluation plan for the new oilfield project to be optimized;
[0009] The optimization unit is used to obtain the optimal production planning scheme based on the basic parameters of the new oil field project evaluation scheme to be optimized and the pre-established optimal production planning scheme prediction model; the optimal production planning scheme prediction model is pre-established based on historical oil production data, water production data, water injection data and well number data.
[0010] An embodiment of the present invention also provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned method for optimizing the evaluation scheme for new oilfield projects when executing the computer program.
[0011] An embodiment of the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program for executing the above-mentioned method for optimizing the new oilfield project evaluation scheme.
[0012] In the embodiment of the present invention, the new oilfield project evaluation scheme optimization scheme, compared with the technical scheme in the prior art that the existing new oilfield project evaluation scheme cannot efficiently and accurately determine the appropriate production planning scheme, obtains the optimal production planning scheme according to the basic parameters of the new oilfield project evaluation scheme to be optimized and a pre-established optimal production planning scheme prediction model; the optimal production planning scheme prediction model is pre-established according to historical oil production data, water production data, water injection data and well number data, and can efficiently and accurately determine the optimal production planning scheme, which plays a scientific guiding role in oil and gas exploration and development. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:
[0014] Figure 1 A schematic diagram of a flow chart of a method for optimizing a new oilfield project evaluation scheme in an embodiment of the present invention;
[0015] Figure 2 This is a curve chart showing the number of wells put into production in the optimization scheme in the embodiment of the present invention;
[0016] Figure 3 This is a curve diagram of the output change of the optimization scheme in the embodiment of the present invention;
[0017] Figure 4 It is a curve diagram of economic net present value change of the optimization scheme in the embodiment of the present invention;
[0018] Figure 5 It is a schematic diagram of the structure of an oilfield new project evaluation scheme optimization device in an embodiment of the present invention. DETAILED DESCRIPTION
[0019] To make the purpose, technical solution and advantages of the embodiments of the present invention more clear, the embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings. Here, the exemplary embodiments of the present invention and their descriptions are used to explain the present invention, but are not intended to limit the present invention.
[0020] Figure 1 FIG. 1 is a flow chart of a method for optimizing a new oilfield project evaluation scheme in an embodiment of the present invention. Figure 1 As shown, the method comprises the following steps:
[0021] Step 101: Obtain basic parameters of the new oilfield project evaluation plan to be optimized;
[0022] Step 102: Obtain an optimal production planning scheme based on the basic parameters of the new oil field project evaluation scheme to be optimized and a pre-established optimal production planning scheme prediction model; the optimal production planning scheme prediction model is pre-established based on historical oil production data, water production data, water injection data and well number data.
[0023] In one embodiment, the above-mentioned oilfield new project evaluation scheme optimization method may also include: deploying the oilfield new project according to the optimal production planning scheme.
[0024] During the specific implementation, new oilfield projects are deployed according to the optimal production planning scheme, which improves the efficiency and accuracy of new oilfield project deployment and plays a scientific guiding role in oil and gas exploration and development.
[0025] In one embodiment, the optimal production planning solution prediction model can be established according to the following method:
[0026] According to the historical oil production data, water production data, water injection data and well number data, the production planning scheme optimization objective function is established;
[0027] The oil well production variation law is processed in sections, so that the production planning optimization objective function is transformed into a production planning optimization linear equation;
[0028] The characteristics of the production increase stage, stable production stage and decline stage are converted into constraint conditions, and the constraint conditions are used to simplify the production planning scheme optimization linear equation to obtain the optimal production planning scheme prediction model.
[0029] In specific implementation, the above-mentioned implementation method of establishing the optimal production planning scheme prediction model obtains the optimal production planning scheme prediction model with high prediction accuracy, and then the optimal production planning scheme can be determined more efficiently and accurately by using this model.
[0030] In one embodiment, based on historical oil production data, water production data, water injection data and well number data, establishing a production planning optimization objective function may include:
[0031] The oil production in each time period is divided into the oil production of new wells put into production and the oil production of old wells in previous years, and the oil production of new wells put into production and the oil production of old wells in previous years are used to improve the optimization objective function of the production planning scheme to obtain an improved optimization objective function of the production planning scheme;
[0032] The oil well production variation law is processed in sections and equivalently, so that the production planning scheme optimization objective function is converted into the production planning scheme optimization linear equation, including: the oil well production variation law is processed in sections and equivalently, so that the improved production planning scheme optimization objective function is converted into the production planning scheme optimization linear equation.
[0033] In specific implementation, the above-mentioned implementation method of establishing the production planning scheme optimization objective function further improves the prediction accuracy of establishing the optimal production planning scheme prediction model, and then the model can be used to further efficiently and accurately determine the optimal production planning scheme.
[0034] In one embodiment, obtaining basic parameters of the evaluation scheme for the new oilfield project to be optimized may include: obtaining reservoir characteristic parameters and oil reservoir production characteristic parameters of the evaluation scheme for the new oilfield project to be optimized.
[0035] In specific implementation, the basic parameters may be reservoir characteristic parameters and oil reservoir production characteristic parameters, which further improve the accuracy of optimization of new oilfield project evaluation schemes.
[0036] In order to facilitate understanding of how the present invention is implemented, the following Figures 2 to 4 , give an example to illustrate the detailed implementation steps of the present invention.
[0037] The present invention is further described below with respect to the optimization of a new oil field project evaluation program.
[0038] The data in this embodiment are basic parameters for evaluating a new project in a certain oil field, mainly including reservoir characteristics, oil reservoir production characteristics and economic parameters.
[0039] 1) Closed fault block oil and gas field, consisting of 3 fault blocks
[0040] 2) Sandstone reservoirs, with gas cap and bottom water, and weak water energy
[0041] 3) Oil-bearing area: 259km 2 , reserves 2.4X 10 8 t
[0042] 4) Average thickness of oil layer is 10 meters, gas cap is 12 meters
[0043] 5) Porosity 0.17, permeability 380mD, initial oil saturation 0.84
[0044] 6) Crude oil volume coefficient 1.12, crude oil viscosity 8.8mPa.s, crude oil density 0.867g / cm 3
[0045] 7) Formation pressure 14MPa, bubble point pressure 11MPa
[0046] 8) Reservoir fluid production index 1.3m3 / d.Mpa.m, decline rate 14%
[0047] 9) Deploy horizontal wells with a horizontal section length of 600m and a wellbore radius of 0.1m
[0048] 10) New well cost 1300X 10 4 $ / well, oil price 50$ / bbl, operating expenses in the first year are $ / bbl, and then increase by 2.5% each year.
[0049] 11) Forecast period is 28 years, internal rate of return is 10%
[0050] Combining the oilfield production rules and economic benefits, a scheme optimization model is established with the goal of maximizing the economic net present value of the evaluation scheme. The model is converted into a standard optimization problem through equivalent processing, and the optimization method is used to solve it, realize automatic optimization, and determine the best scheme.
[0051] 1. Based on the overall benefits of the project, and according to the changes in oil production, water production, water injection volume, and number of wells, establish an optimization objective function for the economic net present value (production planning optimization objective function). The oil production in each time period is subdivided into the oil production of new wells put into production and the oil production of old wells over the years, and their corresponding costs and expenses are calculated separately to improve the optimization objective function.
[0052]
[0053] Among them, Q ot represents oil production, Q wt Represents water production, Q it Represents the water injection volume, N wt represents the number of new wells, P t represents other costs, P ot Represents crude oil price data, C mt Represents crude oil operating cost data, C wt Represents the sewage treatment cost data, C it represents the water injection cost data, P wt represents the new well cost data, t t represents the time interval, t represents the prediction time point, i c Represents the benchmark yield data, and T represents the forecast period.
[0054] 2. Carry out segmented equivalent processing on the complex law of oil well production changes, so that the continuous optimization objective function is transformed into a linear equation (the linear equation for production planning optimization, the correlation coefficients involved in the equation are shown in Table 1 below).
[0055]
[0056] Among them, A tA represents the coefficient of the linear equation at time t, and B represents the coefficient of the linear equation B.
[0057] Table 1 Main coefficients of linear equations
[0058] Coefficient name coefficient Coefficient name coefficient Coefficient name coefficient Coefficient name coefficient A1 1.10E+06 A8 368117 A15 6939.76 A22 -281720 A2 961221 A9 301738 A16 -32496.2 A23 -333606 A3 832846 A10 241726 A17 -71192.2 A24 -391274 A4 718164 A11 187171 A18 -109915 A25 -456050 A5 615665 A12 137213 A19 -149461 A26 -529435 A6 523977 A13 91039.1 A20 -190667 A27 -613130 A7 441844 A14 47868.1 A21 -234429 A28 -709080
[0059] 3. Convert the characteristics of the production increase stage, stable production stage, and decline stage and other restrictions into constraints and simplify them into linear equations. The annual production in the rising stage must be higher than the production in the previous year; the annual production in the stable stage must be the same as the production in the previous year; and the annual production in the decline stage must be lower than the production in the previous year. After substituting the oil field data, the constraint inequality for each year can be formed (Table 2 to Table 4).
[0060] Table 2 Constraint inequality parameter table (1)
[0061]
[0062]
[0063] Table 3 Constraint inequality parameter table (2)
[0064]
[0065]
[0066] Table 4 Constraint inequality parameter table (3)
[0067]
[0068] 4. Using the integer programming method to solve, the maximum economic net present value is calculated to be US$440 million, and the corresponding number of wells put into production in each time period is obtained (Table 5, Figure 2 to Figure 4 ) to form the optimal planning scheme for new projects.
[0069] Table 5 Optimization results
[0070]
[0071]
[0072] After the optimization is completed, the optimized number of wells put into production can be used as a parameter for production planning for subsequent evaluation, and the optimized total economic net present value can also be analyzed to quickly evaluate the feasibility of the optimization plan. If the feasibility is high, a subsequent evaluation can be carried out; if the feasibility is poor, the constraints are checked and confirmed, and repeated optimization is performed. After the constraints are determined, the optimization process is carried out automatically, reducing the influence of human factors; the calculation efficiency is high, reducing the workload; with the goal of maximizing the economic net present value, the work of the two segments of production planning and economic analysis is integrated, avoiding the problem of inconsistency between the optimal solution and the maximum parameter when screening the optimization plan during segmented evaluation.
[0073] The present invention also provides an oilfield new project evaluation scheme optimization device, as described in the following embodiments. Since the principle of the device to solve the problem is similar to the oilfield new project evaluation scheme optimization method, the implementation of the device can refer to the implementation of the oilfield new project evaluation scheme optimization method, and the repeated parts will not be repeated.
[0074] Figure 5 FIG. 1 is a schematic diagram of the structure of the device for optimizing the new oilfield project evaluation scheme according to an embodiment of the present invention. Figure 5 As shown, the device comprises:
[0075] Acquisition unit 01, used to obtain basic parameters of the evaluation plan for the new oilfield project to be optimized;
[0076] Optimization unit 02 is used to obtain the optimal production planning scheme based on the basic parameters of the new oil field project evaluation scheme to be optimized and the pre-established optimal production planning scheme prediction model; the optimal production planning scheme prediction model is pre-established based on historical oil production data, water production data, water injection data and well number data.
[0077] In one embodiment, the above-mentioned oilfield new project evaluation scheme optimization device may further include: an establishment unit for establishing an optimal production planning scheme prediction model according to the following method:
[0078] According to the historical oil production data, water production data, water injection data and well number data, the production planning scheme optimization objective function is established;
[0079] The oil well production variation law is processed in sections, so that the production planning optimization objective function is transformed into a production planning optimization linear equation;
[0080] The characteristics of the production increase stage, stable production stage and decline stage are converted into constraint conditions, and the constraint conditions are used to simplify the production planning scheme optimization linear equation to obtain the optimal production planning scheme prediction model.
[0081] In one embodiment, the establishing unit may be specifically used to:
[0082] The oil production in each time period is divided into the oil production of new wells put into production and the oil production of old wells in previous years, and the oil production of new wells put into production and the oil production of old wells in previous years are used to improve the optimization objective function of the production planning scheme to obtain an improved optimization objective function of the production planning scheme;
[0083] The oil well production variation law is processed in sections, so that the improved production planning optimization objective function is transformed into a production planning optimization linear equation.
[0084] In one embodiment, the acquisition unit may be specifically used to acquire reservoir characteristic parameters and oil reservoir production characteristic parameters of the new oil field project evaluation plan to be optimized.
[0085] An embodiment of the present invention also provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned method for optimizing the evaluation scheme for new oilfield projects when executing the computer program.
[0086] An embodiment of the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program for executing the above-mentioned method for optimizing the new oilfield project evaluation scheme.
[0087] In the embodiment of the present invention, the new oilfield project evaluation scheme optimization scheme, compared with the technical scheme in the prior art that the existing new oilfield project evaluation scheme cannot efficiently and accurately determine the appropriate production planning scheme, obtains the optimal production planning scheme according to the basic parameters of the new oilfield project evaluation scheme to be optimized and a pre-established optimal production planning scheme prediction model; the optimal production planning scheme prediction model is pre-established according to historical oil production data, water production data, water injection data and well number data, and can efficiently and accurately determine the optimal production planning scheme, which plays a scientific guiding role in oil and gas exploration and development.
[0088] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0089] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0090] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0091] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0092] The specific embodiments described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for optimizing an oilfield new project evaluation scheme, characterized in that: include: Obtain basic parameters for the evaluation plan of new oilfield projects to be optimized; The optimal production planning scheme is obtained according to the basic parameters of the new project evaluation scheme of the oil field to be optimized and the pre-established optimal production planning scheme prediction model; the optimal production planning scheme prediction model is pre-established according to the historical oil production data, water production data, water injection data and well number data; The optimal production planning scheme prediction model is established according to the following method: according to the historical oil production data, water production data, water injection data and well number data, the production planning scheme optimization objective function is established; the oil well production change law is processed in sections, so that the production planning scheme optimization objective function is converted into the production planning scheme optimization linear equation; the characteristics of the production rising stage, the stable production stage and the decline stage are converted into constraint conditions, and the production planning scheme optimization linear equation is simplified by using the constraint conditions to obtain the optimal production planning scheme prediction model; Among them, according to the historical oil production data, water production data, water injection data and well number data, a production planning scheme optimization objective function is established, including: dividing the oil production in each time period into the oil production of new wells put into production and the oil production of old wells in previous years, using the oil production of new wells put into production and the oil production of old wells in previous years to improve the production planning scheme optimization objective function to obtain an improved production planning scheme optimization objective function; performing segmented equivalent processing on the oil well production change law, so that the production planning scheme optimization objective function is converted into a production planning scheme optimization linear equation, including: performing segmented equivalent processing on the oil well production change law, so that the improved production planning scheme optimization objective function is converted into a production planning scheme optimization linear equation.
2. The method for optimizing the evaluation scheme of a new oilfield project according to claim 1, characterized in that: Obtaining basic parameters of the new project evaluation plan for the oil field to be optimized, including: obtaining reservoir characteristic parameters and oil reservoir production characteristic parameters of the new project evaluation plan for the oil field to be optimized.
3. An oilfield new project evaluation scheme optimization device, characterized in that: include: An acquisition unit, used to acquire basic parameters of the evaluation plan for the new oilfield project to be optimized; The optimization unit is used to obtain the optimal production planning scheme according to the basic parameters of the new project evaluation scheme of the oil field to be optimized and the pre-established optimal production planning scheme prediction model; the optimal production planning scheme prediction model is pre-established according to the historical oil production data, water production data, water injection data and well number data; It also includes an establishment unit for establishing an optimal production planning scheme prediction model according to the following method: establishing a production planning scheme optimization objective function based on historical oil production data, water production data, water injection data and well number data; performing segmented equivalent processing on the oil well production change law, so that the production planning scheme optimization objective function is converted into a production planning scheme optimization linear equation; converting the characteristics of the production rising stage, stable production stage and decline stage into constraint conditions, and using the constraint conditions to simplify the production planning scheme optimization linear equation to obtain the optimal production planning scheme prediction model; The establishment unit is specifically used to: divide the oil production in each time period into the oil production of new wells put into production and the oil production of old wells over the years, and improve the production planning scheme optimization objective function by using the oil production of new wells put into production and the oil production of old wells over the years to obtain an improved production planning scheme optimization objective function; The oil well production variation law is processed in sections, so that the improved production planning optimization objective function is transformed into a production planning optimization linear equation.
4. The oilfield new project evaluation scheme optimization device according to claim 3, characterized in that: The acquisition unit is specifically used to acquire reservoir characteristic parameters and oil reservoir production characteristic parameters of the new oil field project evaluation plan to be optimized.
5. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method according to claim 1 or 2 is implemented.