A shield tunnel prefabricated box culvert parts splicing automatic sorting system and method

Through the automatic sorting system, point cloud and image data acquisition technology are used to optimize the splicing sequence of shield tunnel prefabricated box culverts, solving the problems of low installation accuracy and measurement efficiency during construction, and improving splicing quality and efficiency.

CN114458338BActive Publication Date: 2024-11-12CHINA RAILWAY 14TH BUREAU GRP LARGE SHIELD ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210184430.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-28
Publication Date
2024-11-12
Estimated Expiration
2042-02-28

AI Technical Summary

Technical Problem

In shield tunnel construction, the traditional prefabricated box culvert splicing process has high installation accuracy requirements due to size differences and turning settlement, resulting in the splicing quality not meeting the standards, and manual measurement is time-consuming and labor-intensive, affecting construction efficiency.

Method used

A shield tunnel prefabricated box culvert splicing automatic sorting system is designed, including tunnel data acquisition module, box culvert data acquisition module and box culvert sorting industrial control machine, using point cloud data and image data to collect tunnel axis and box culvert Size, automatically calculate and optimize splicing sequences to reduce installation accuracy requirements.

Benefits of technology

Automatic measurement of the center line of the shield tunnel is realized, the measurement work is simplified, the splicing efficiency and quality are improved, the difficulty of splicing adjustment is reduced, the detection process is simplified, and the splicing efficiency of prefabricated box culverts is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114458338B_ABST
    Figure CN114458338B_ABST
Patent Text Reader

Abstract

The present invention provides a shield tunnel prefabricated box culvert parts automatic splicing sorting system and method, which is composed of a tunnel data acquisition module, a box culvert parts data acquisition module and a box culvert parts sorting industrial control computer. The specific method is as follows: the tunnel data acquisition module collects tunnel information and sends point cloud data to the box culvert parts sorting industrial control computer; the box culvert parts data acquisition module collects box culvert parts information and sends image data to the box culvert parts sorting industrial control computer; the box culvert parts sorting industrial control computer processes the point cloud and image data to obtain the tunnel axis and the precise size of the box culvert parts respectively, and then obtains the splicing sequence of the box culvert parts in the tunnel. The present invention effectively reduces the adjustment difficulty when splicing prefabricated box culvert parts, and greatly improves the splicing quality of prefabricated box culvert parts; in addition, it can also provide the relative positions between prefabricated box culvert parts, guide the installation device to splice the prefabricated box culvert parts, simplify the splicing detection process, and improve the splicing efficiency of prefabricated box culvert parts.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of splicing of prefabricated box culvert parts in shield tunnels, and in particular to an automatic sorting system and method for splicing prefabricated box culvert parts in shield tunnels. Background Art

[0002] During the shield tunnel construction process, the construction steps of the box culvert are relatively cumbersome. The traditional construction plan uses ordinary formwork to cast in-situ concrete construction, which is slow. The new construction plan uses prefabricated box culvert parts for on-site splicing construction, which significantly improves construction efficiency. When splicing the box culvert parts, the box culvert parts need to be fine-tuned to meet the installation quality requirements of the box culvert parts. Due to the turns and settlements of the shield tunnel and the differences in the sizes of the prefabricated box culvert parts, the installation accuracy requirements of the prefabricated box culvert parts on the installation device are increased, and even the installation quality of the prefabricated box culvert parts does not meet the standards.

[0003] By reasonably sorting the prefabricated box culvert parts, the size difference of the box culvert parts can be complemented with the turning and settlement of the shield tunnel, which can effectively improve the installation quality of the prefabricated box culvert parts. The measurement of the shield tunnel axis and the size of the prefabricated box culvert parts is the basis for the sorting of prefabricated box culvert parts. During construction, the shield tunnel axis is measured by total station and prism, but during the measurement process, the prism needs to be manually placed on the tunnel segment, which is time-consuming and laborious. Summary of the invention

[0004] The present invention aims to solve the above-mentioned technical problems to a certain extent, and provides an automatic sorting method for splicing prefabricated box culvert parts in a shield tunnel, so as to obtain the current optimal splicing sequence of prefabricated box culvert parts, increase the adjustable tolerance range when splicing prefabricated box culvert parts, reduce the installation accuracy requirements of the installation device, and ensure the installation quality of prefabricated box culvert parts.

[0005] The technical solution adopted by the present invention to solve its technical problem is:

[0006] A shield tunnel prefabricated box culvert piece splicing automatic sorting system, composed of a tunnel data acquisition module, a box culvert piece data acquisition module and a box culvert piece sorting industrial control computer, wherein the tunnel data acquisition module is installed on the shield machine frame behind the segment splicing device, the box culvert piece data acquisition module is installed in the box culvert piece size measuring device, and the box culvert piece sorting industrial control computer is connected to the tunnel data acquisition module and the box culvert piece data acquisition module respectively;

[0007] The tunnel data acquisition module is composed of a point cloud data transmission module, a point cloud data acquisition control module and a pan-tilt laser scanner. The point cloud data acquisition control module is connected to the point cloud data transmission module and the pan-tilt laser scanner respectively. The pan-tilt laser scanner is composed of a pan-tilt and a laser scanner. The laser scanner is installed on the pan-tilt.

[0008] The box culvert data acquisition module consists of an image data transmission module, an image data acquisition control module, a horizontal CCD camera and a vertical CCD camera. The image data transmission module is connected to the image data acquisition control module, and the image data acquisition control module is respectively connected to the horizontal CCD camera and the vertical CCD camera.

[0009] A shield tunnel prefabricated box culvert parts splicing automatic sorting method, comprising the following steps:

[0010] S1. The tunnel data acquisition module collects tunnel information and sends the point cloud data to the box culvert sorting industrial computer; the specific steps are as follows:

[0011] S101. The point cloud data acquisition control module controls the PTZ laser scanner to collect tunnel data;

[0012] S102. The point cloud data acquisition control module sends the collected point cloud data to the box culvert sorting industrial computer through the point cloud data transmission module;

[0013] S2. The box culvert data acquisition module collects box culvert information and sends the image data to the box culvert sorting industrial computer; the specific steps are as follows:

[0014] S201. The image data acquisition control module controls the horizontal CCD camera and the vertical CCD camera to collect box culvert data;

[0015] S202. The image data acquisition control module sends the collected image data to the box culvert sorting industrial computer through the image data transmission module;

[0016] S3. The box culvert parts sorting industrial computer processes the point cloud and image data to obtain the precise dimensions of the tunnel axis and the box culvert parts, and then obtains the splicing sequence of the box culvert parts in the tunnel.

[0017] Preferably, the specific steps of S3 are as follows:

[0018] S301. splicing each segment of point cloud data according to the overlapping parts between the point cloud data segments, and unifying the coordinate system of each segment of point cloud data;

[0019] S302. intercepting the tunnel cross-section data points, removing interference from the cross-section data, and leaving the segment surface data points;

[0020] S303. Randomly select three data points from the cross-section data points after interference removal, and the intersection of three straight lines passing through the three points is the center of the tunnel cross section;

[0021] S304. Determine whether the point cloud data has been intercepted and obtain the center of all cross-sections of the tunnel. If so, execute S305. Otherwise, execute S302 to intercept the next cross-section of the tunnel and process it.

[0022] S305. Fitting the tunnel axis using the obtained center points of each cross section;

[0023] S306. Identify the edges of the box culvert in the image and calculate the number of pixels on the edges;

[0024] S307. Calculate the ratio between the camera pixel points and the actual size, place the calibration object at the position of the box culvert to be calculated, obtain the ratio between the camera pixel points and the actual size by the ratio of the calibration object image obtained by the camera and the actual size of the calibration object, and obtain the edge length of the box culvert by dividing the calibrated camera pixel points by the actual size ratio;

[0025] S308. Set the relative position of the edges to obtain the outer contour dimensions of the upper surface and side surfaces of a single box culvert;

[0026] S309. Determine whether the image data has been processed and obtain the sizes of all box culvert pieces. If so, execute S310. Otherwise, execute S306 to process the image data of the next box culvert piece.

[0027] S310. Establish a simplified model library of box culverts according to the outer contour dimensions of the upper surface and side of the box culverts;

[0028] S311. Splice the simplified model of the box culvert member along the tunnel axis of S305 with the midpoints of the two long sides of the upper surface of the box culvert member as the reference in the horizontal direction and with the long sides of the bottom surface of the box culvert member as the reference in the vertical direction, and obtain the coordinates of the midpoints of the two long sides of the upper surface of the simplified model of the spliced ​​box culvert member;

[0029] S312. According to the midpoint spacing of the long sides of the upper surfaces of adjacent box culvert pieces, which is the gap between adjacent box culvert pieces, the average and variance of the gaps between the box culvert pieces in the current splicing sequence are obtained;

[0030] S313. Determine whether all the splicing sequences of the box culvert have been processed. If so, execute S314. Otherwise, execute S311 to process the next splicing sequence.

[0031] S314. Select the splicing sequence with the smallest splicing error as the layout of the tunnel box culvert.

[0032]

[0033] in, is the stitching error, The average and variance The weight of .

[0034] The beneficial effects of the present invention are:

[0035] The present invention realizes automatic measurement of the center line of the shield tunnel through the tunnel data acquisition module, simplifies the measurement work and improves the efficiency of tunnel center line measurement; the automatic sorting method for splicing prefabricated box culvert parts in the shield tunnel can obtain the optimal splicing sequence of the current tunnel segments, effectively reduces the adjustment difficulty when splicing prefabricated box culvert parts, and greatly improves the splicing quality of prefabricated box culvert parts; in addition, the relative positions between prefabricated box culvert parts can be provided to guide the installation device to splice the prefabricated box culvert parts, simplify the splicing detection process, and improve the splicing efficiency of prefabricated box culvert parts. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 The present invention is a flow chart of the automatic sorting method for splicing prefabricated box culvert parts in a shield tunnel.

[0037] Figure 2 This is a principle block diagram of the automatic sorting system for splicing prefabricated box culvert parts in shield tunnels of the present invention.

[0038] Figure 3 This is a flow chart of tunnel data collection according to the present invention.

[0039] Figure 4 This is a flow chart of data collection for box culvert parts of the present invention.

[0040] Figure 5 This is a data processing flow chart of an industrial computer for sorting box culvert parts according to the present invention. DETAILED DESCRIPTION

[0041] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific embodiments of the present invention are now described in detail with reference to the accompanying drawings. In the following description, it should be understood that the directions or positional relationships indicated by "front", "back", "up", "down", "left", "right", "longitudinal", "horizontal", "vertical", "horizontal", "top", "bottom", "inside", "outside", "head", "tail", etc. are based on the directions or positional relationships shown in the accompanying drawings, are constructed and operated in a specific direction, and are only for the convenience of describing the present technical solution, rather than indicating that the device or element referred to must have a specific direction, and therefore cannot be understood as a limitation to the present invention.

[0042] It should also be noted that, unless otherwise clearly specified and limited, the terms such as "installed", "connected", "connected", "fixed", "set" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. When an element is referred to as being "on" or "under" another element, the element can be "directly" or "indirectly" located on the other element, or there may be one or more intermediate elements. The terms "first", "second", "third", etc. are only for the convenience of describing the present technical solution, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first", "second", "third", etc. can explicitly or implicitly include one or more of the features. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0043] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.

[0044] like Figure 2 The figure shows an automatic sorting system for splicing prefabricated box culvert parts in a shield tunnel described in this embodiment, including a tunnel data acquisition module, a box culvert part data acquisition module and a box culvert part sorting industrial control computer 4. The tunnel data acquisition module is installed on the shield machine frame behind the pipe segment splicing device, the box culvert part data acquisition module is installed in the box culvert part size measuring device, and the box culvert part sorting industrial control computer 4 is respectively connected to the tunnel data acquisition module and the box culvert part data acquisition module.

[0045] like Figure 2 As shown, the tunnel data acquisition module in this embodiment is composed of a point cloud data transmission module 1, a point cloud data acquisition control module 2 and a pan-tilt laser scanner 3. The point cloud data acquisition control module 2 is connected to the point cloud data transmission module 1 and the pan-tilt laser scanner 3 respectively. The pan-tilt laser scanner is composed of a pan-tilt and a laser scanner, and the laser scanner is installed on the pan-tilt.

[0046] like Figure 2As shown, the box culvert data acquisition module in this embodiment is composed of an image data transmission module 5, an image data acquisition control module 6, a horizontal CCD camera 7 and a vertical CCD camera 8. The image data transmission module 5 is connected to the image data acquisition control module 6, and the image data acquisition control module 6 is respectively connected to the horizontal CCD camera 7 and the vertical CCD camera 8.

[0047] Among them, the point cloud data acquisition control module 2 and the image data acquisition control module 6 adopt lower computers such as PLC and single-chip microcomputer, and the point cloud data transmission module 2 and the image data transmission module 5 adopt wired communication or wireless communication technology.

[0048] On the other hand, a method for automatically sorting the splicing of prefabricated box culvert parts in shield tunnels is provided. Figure 1 As shown, the automatic sorting system for splicing prefabricated box culvert parts of shield tunnels is used, which specifically includes the following steps:

[0049] S1. The tunnel data acquisition module collects tunnel information and sends the point cloud data to the box culvert sorting industrial computer;

[0050] S2. The box culvert data acquisition module collects box culvert information and sends the image data to the box culvert sorting industrial computer;

[0051] S3. Sorting of box culvert parts The industrial computer 4 processes the point cloud and image data to obtain the precise dimensions of the tunnel axis and the box culvert parts, and further obtain the splicing sequence of the box culvert parts in the tunnel.

[0052] like Figure 3 As shown, the specific steps of S1 are as follows:

[0053] S101. The shield machine drives the tunnel data acquisition module to move forward, and the point cloud data acquisition control module 2 controls the PTZ laser scanner to collect tunnel data at a certain frequency. The PTZ laser scanner samples each time to obtain data from a small section of the tunnel;

[0054] S102. The point cloud data acquisition control module 2 sends the collected tunnel point cloud data to the box culvert part sorting industrial computer 4 through the point cloud data transmission module 1.

[0055] like Figure 4 As shown, the specific steps of S2 are as follows:

[0056] S201 box culvert size measuring device for each box culvert piece, the image data acquisition control module 6 controls the lateral CCD camera 7 and the longitudinal CCD camera 8 to collect a set of box culvert piece data;

[0057] S202 . The image data acquisition control module 6 sends the acquired box culvert image data to the box culvert sorting industrial computer 4 through the image data transmission module 5 .

[0058] like Figure 5 As shown, the specific steps of S3 are as follows:

[0059] S301. Using the coordinate system of the first segment of the tunnel point cloud data as the calibration coordinate system, splicing each segment of the point cloud data according to the overlapping parts between the point cloud data segments, converting the coordinate system of each segment of the point cloud into the calibration coordinate system, and obtaining the point cloud data including the direction of the tunnel;

[0060] S302. Extract tunnel cross-section data from the point cloud data containing the tunnel direction, remove interference from the cross-section data, and leave segment surface data points;

[0061] S303. Randomly select three data points from the cross-section data points after interference removal, and the intersection of three straight lines passing through the three points is the center of the tunnel cross section;

[0062] S304. Determine whether the point cloud data has been intercepted and whether the centers of all the tunnel sections have been obtained. If so, execute S305. Otherwise, execute S302 to intercept the next tunnel section and process it.

[0063] S305. Fitting the tunnel axis using the obtained center points of each cross section;

[0064] S306. Process a single group of box culvert images, identify the edges of the box culverts in the images, and calculate the number of pixels on the edges;

[0065] S307. Obtain the edge length of the box culvert by the ratio between the calibrated pixel points and the actual size;

[0066] S308. Set the relative position of the edges to obtain the outer contour dimensions of the upper surface and side surfaces of a single box culvert;

[0067] S309. Determine whether the image data has been processed and whether the sizes of all box culvert pieces have been obtained. If so, execute S310. Otherwise, execute S306 to process the image data of the next box culvert piece.

[0068] S310. Establish a simplified model library of box culverts according to the outer contour dimensions of the upper surface and side of the box culverts;

[0069] S311. Splice the simplified model of the box culvert member along the tunnel axis of S305 with the midpoints of the two long sides of the upper surface of the box culvert member as the reference in the horizontal direction and with the long sides of the bottom surface of the box culvert member as the reference in the vertical direction, and obtain the coordinates of the midpoints of the two long sides of the upper surface of the simplified model of the spliced ​​box culvert member;

[0070] S312. According to the midpoint spacing of the long sides of the upper surfaces of adjacent box culvert pieces, which is the gap between adjacent box culvert pieces, the average and variance of the gaps between the box culvert pieces in the current splicing sequence are obtained;

[0071] S313. Determine whether all the splicing sequences of the box culvert have been processed. If so, execute S314. Otherwise, execute S311 to process the next splicing sequence.

[0072] S314. Select the splicing sequence with the smallest splicing error as the layout of the tunnel box culvert.

[0073]

[0074] in, is the stitching error, The average and variance The weight of .

[0075] The present invention realizes automatic measurement of the center line of the shield tunnel through the tunnel data acquisition module, simplifies the measurement work and improves the efficiency of tunnel center line measurement; the automatic sorting method for splicing prefabricated box culvert parts in the shield tunnel can obtain the optimal splicing sequence of the current tunnel segments, effectively reduces the adjustment difficulty when splicing prefabricated box culvert parts, and greatly improves the splicing quality of prefabricated box culvert parts; in addition, the relative positions between prefabricated box culvert parts can be provided to guide the installation device to splice the prefabricated box culvert parts, simplify the splicing detection process, and improve the splicing efficiency of prefabricated box culvert parts.

[0076] It can be understood that the above embodiments only express the preferred implementation modes of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the patent scope of the present invention. It should be pointed out that, for ordinary technicians in this field, the above technical features can be freely combined without departing from the concept of the present invention, and several deformations and improvements can be made, which all belong to the protection scope of the present invention. Therefore, all equivalent changes and modifications made to the scope of the claims of the present invention should belong to the coverage of the claims of the present invention.

Claims

1. A method for automatically sorting the splicing of prefabricated box culvert parts in a shield tunnel, characterized in that: It comprises an automatic sorting system for splicing prefabricated box culvert parts of a shield tunnel, which is composed of a tunnel data acquisition module, a box culvert part data acquisition module and a box culvert part sorting industrial control computer. The tunnel data acquisition module is installed on the shield machine frame behind the pipe segment splicing device, the box culvert part data acquisition module is installed in the box culvert part size measuring device, and the box culvert part sorting industrial control computer is connected to the tunnel data acquisition module and the box culvert part data acquisition module respectively; the tunnel data acquisition module is composed of a point cloud data transmission module, a point cloud data acquisition control module and a pan-tilt laser scanner, the point cloud data acquisition control module is connected to the point cloud data transmission module and the pan-tilt laser scanner respectively, the pan-tilt laser scanner is composed of a pan-tilt and a laser scanner, and the laser scanner is installed on the pan-tilt; the box culvert part data acquisition module is composed of an image data transmission module, an image data acquisition control module, a horizontal CCD camera and a vertical CCD camera, the image data transmission module is connected to the image data acquisition control module, and the image data acquisition control module is connected to the horizontal CCD camera and the vertical CCD camera respectively; The method is specifically as follows: S1. The tunnel data acquisition module collects tunnel information and sends the point cloud data to the box culvert sorting industrial computer; the specific steps are as follows: S101. The point cloud data acquisition control module controls the PTZ laser scanner to collect tunnel data; S102. The point cloud data acquisition control module sends the collected point cloud data to the box culvert sorting industrial computer through the point cloud data transmission module; S2. The box culvert data acquisition module collects box culvert information and sends the image data to the box culvert sorting industrial computer; the specific steps are as follows: S201. The image data acquisition control module controls the horizontal CCD camera and the vertical CCD camera to collect box culvert data; S202. The image data acquisition control module sends the collected image data to the box culvert sorting industrial computer through the image data transmission module; S3. The box culvert parts sorting industrial computer processes the point cloud and image data to obtain the precise dimensions of the tunnel axis and the box culvert parts, and then obtains the splicing sequence of the box culvert parts in the tunnel.

2. The automatic sorting method for splicing prefabricated box culvert parts of a shield tunnel according to claim 1 is characterized in that: The specific steps of S3 are as follows: S301. splicing each segment of point cloud data according to the overlapping parts between the point cloud data segments, and unifying the coordinate system of each segment of point cloud data; S302. intercepting the tunnel cross-section data points, removing interference from the cross-section data, and leaving the segment surface data points; S303. Randomly select three data points from the cross-section data points after interference removal, and the intersection of three straight lines passing through the three points is the center of the tunnel cross section; S304. Determine whether the point cloud data has been intercepted and obtain the center of all cross-sections of the tunnel. If so, execute S305. Otherwise, execute S302 to intercept the next cross-section of the tunnel and process it. S305. Fitting the tunnel axis using the obtained center points of each cross section; S306. Identify the edges of the box culvert in the image and calculate the number of pixels on the edges; S307. Calculate the ratio between the camera pixel points and the actual size, place the calibration object at the position of the box culvert to be calculated, obtain the ratio between the camera pixel points and the actual size by the ratio of the calibration object image obtained by the camera and the actual size of the calibration object, and obtain the edge length of the box culvert by dividing the calibrated camera pixel points by the actual size ratio; S308. Set the relative position of the edges to obtain the outer contour dimensions of the upper surface and side surfaces of a single box culvert; S309. Determine whether the image data has been processed and obtain the sizes of all box culvert pieces. If so, execute S310. Otherwise, execute S306 to process the image data of the next box culvert piece. S310. Establish a simplified model library of box culverts according to the outer contour dimensions of the upper surface and side of the box culverts; S311. Splice the simplified model of the box culvert member along the tunnel axis of S305 with the midpoints of the two long sides of the upper surface of the box culvert member as the reference in the horizontal direction and with the long sides of the bottom surface of the box culvert member as the reference in the vertical direction, and obtain the coordinates of the midpoints of the two long sides of the upper surface of the simplified model of the spliced ​​box culvert member; S312. According to the midpoint spacing of the long sides of the upper surfaces of adjacent box culvert pieces, which is the gap between adjacent box culvert pieces, the average and variance of the gaps between the box culvert pieces in the current splicing sequence are obtained; S313. Determine whether all the splicing sequences of the box culvert have been processed. If so, execute S314. Otherwise, execute S311 to process the next splicing sequence. S314. Select the splicing sequence with the smallest splicing error as the layout of the tunnel box culvert. in, is the stitching error, and The average and variance The weight of .