Integrated construction method for main structure slab, wall and column of subway open-cut station
By using the wall-column integrated pouring mixing system and symmetrical support mechanism in the open-cut station, the center column and side wall formwork are simultaneously built, realizing the integrated pouring of the middle plate, side walls and center columns, and solving the construction period of the traditional open-cut station. The problem of long, high cost and longitudinal construction joints improves the waterproof performance and construction stability of concrete.
Patent Information
- Application Number
- CN202210185680.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-28
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-02-28
AI Technical Summary
The construction period of traditional open-cut station structures is long and the cost is high, and the middle plate construction cannot be carried out immediately after the construction of the side walls, resulting in the formation of longitudinal construction joints and affecting the waterproof performance of the concrete.
The wall-column integrated pouring hybrid system is used to set up the full-floor brackets and symmetrical support formwork of the symmetrical support mechanism. The center column and side wall formwork are simultaneously built. The side wall bracing steel pipes are adjusted to resist the support formwork to realize the middle plate, side wall and middle panel. The columns are cast in one piece to reduce construction joints and improve the waterproof performance of the concrete.
It shortens the construction period, reduces costs, reduces longitudinal construction joints, improves the self-waterproofing performance and construction stability of concrete, and ensures construction safety.
Smart Images

Figure CN114482127B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of open-cut tunnel station structure construction, and in particular to a method for integrated slab, wall and column construction of a main structure of an open-cut subway station. Background Art
[0002] In the traditional open-cut station structure construction, after the bottom slab is poured, the center column, side wall, and middle slab (beam) are constructed in sequence. The side wall is constructed first and then the middle slab is constructed using a combined triangular support system. Each process includes the installation and removal of the support, the installation and removal of the formwork, and the batch pouring of concrete. Each process of the structural layer must be completed in sequence. In this process, there are the following disadvantages: 1) The construction period of each structural layer is long, each construction process is greatly affected by the cycle sequence, the investment of resources is large, and the construction cost is high; 2) After the side wall construction is completed, due to the influence of conditions such as concrete strength, maintenance, and removal of the triangular support system, the full-floor support system of the middle slab cannot be constructed immediately; 3) After the middle slab is poured, four longitudinal construction joints are formed in each structural layer, which is not conducive to the waterproofing of the structural concrete. Summary of the invention
[0003] The present invention aims to provide an integrated construction method for main structural slabs, walls and columns of subway open-cut stations, which has a short construction period and low construction cost, and solves the problems of long construction period, high construction cost and generation of longitudinal construction joints of each structural layer slab, wall and column of traditional open-cut stations.
[0004] To this end, the technical solution adopted by the present invention is: a method for integrated construction of main structure panels, walls and columns for subway open-cut stations, comprising the following steps:
[0005] Step A, constructing a wall-column integrated casting hybrid system for the main structural slab of the open-cut subway station; the wall-column integrated casting hybrid system comprises a full-span bracket with a symmetrical support mechanism, the full-span bracket comprises an inclined rod, a horizontal rod, a vertical rod and a full-span bracket bottom mold located at the top and equipped with a steel beam, the symmetrical support mechanism comprises a symmetrical support template located on the left and right sides and equipped with a steel beam and a plurality of side wall supporting steel pipes arranged in an array on the main structure of the full-span bracket, the symmetrical support template is placed on the side of the side wall of the station to be constructed through the steel beam, the side wall supporting steel pipes are horizontally arranged in parallel between adjacent transverse horizontal rods of the full-span bracket and the left and right ends extend outside the full-span bracket, the side wall supporting steel pipes are fastened to the vertical rods with fasteners arranged at intervals on the pipe body, and the side wall supporting steel pipes are provided with horizontally movable free ends at the left and right ends;
[0006] Step B, using the wall-column integrated casting mixed system being constructed, synchronously construct the station center column steel template, and using the wall-column integrated casting mixed system being constructed, synchronously construct the station side wall waterproofing and steel template;
[0007] Step C: Use the full-floor bracket bottom formwork in the built wall-column integrated casting mixed system and the middle column formwork to build the station middle plate steel bar formwork;
[0008] Step D: The full-floor bracket in the wall-column integrated casting mixed system supports the station middle plate formwork, and the free ends of the side wall bracing steel pipes are adjusted to press against the symmetrical supporting formwork, thereby pressing against the station side wall steel formwork, and then the constructed station middle column steel formwork, station side wall steel formwork, and station middle plate steel formwork are cast in one piece.
[0009] As a preferred embodiment of the above scheme, in step A, the left and right ends of the side wall supporting steel pipe are provided with screw top supports which are threadedly connected to the two ends of the steel pipe. By adjusting the depth of the screw at the tail of the top support screwed into the steel pipe, the head of the screw top support can be moved horizontally to press against the symmetrical supporting formwork, which is convenient and fast to operate and has strong flexibility.
[0010] It is further preferred that in step A, the diagonal rods, horizontal rods and vertical rods are overlapped by disc-type steel pipe brackets to form the main structure of the full-height bracket, so that the structure of the full-height bracket has strong stability, the top of the vertical rod is provided with a supporting top support, the bottom end is provided with a supporting bottom support, the bottom mold of the full-height bracket is placed on the top support through a steel beam, the supporting top support and the supporting bottom support are both Φ60×5.0×600mm type, with suitable material selection and good supporting performance, the cantilever length of the supporting top support is not more than 600mm, and the exposed length of the supporting bottom support is not more than 300mm.
[0011] It is further preferred that in step A, the dimensions of the vertical poles and horizontal poles are Φ60×3.2mm, the vertical pole spacing is 1500mm horizontally×1200mm vertically, the spacing is moderate, the steel beams equipped with the full-floor bracket bottom formwork and the symmetrical supporting formwork are composed of main beams and small beams, the main beams are I10 I-beams, the small beams are 100mm×50mm rectangular steel pipes, the full-floor bracket bottom formwork is made of 20mm thick wood plywood, and the symmetrical supporting formwork is made of 20mm thick veneer wood plywood, the material selection is reasonable and the application is suitable.
[0012] It is further preferred that in step B, the station side wall formwork adopts a whole formwork to reduce the gap between the assembled formworks, so that the side wall concrete surface is smoother and has no misaligned seams, and can be flexibly constructed.
[0013] Beneficial effects of the present invention:
[0014] (1) A wall-column integrated casting system is adopted, and a symmetrical support mechanism is set up on the full-span support, which cleverly combines the two support systems together, thereby changing the time-sequential construction steps of the middle plate, side wall and middle column (collectively referred to as "plate-wall-column") of each structural layer of the traditional open-cut station; the station middle plate steel bar template is constructed by combining the full-span support bottom formwork in the wall-column integrated casting system with the middle column template, which is convenient for construction. The free end of the side wall bracing steel pipe is adjusted to press against the symmetrical support template, thereby pressing against the station side wall steel bar template, and then the constructed station middle column steel bar template, station side wall steel bar template, and station middle plate steel bar template are cast in one piece, which greatly saves the structural construction period, reduces the construction joints of each structural layer, and improves the self-waterproof performance of concrete.
[0015] (2) The symmetrical support mechanism includes symmetrical support formworks located on the left and right sides and equipped with steel beams, and a number of side wall bracing steel pipes arranged in an array on the main structure of the full-height bracket. The symmetrical support formworks can effectively ensure that the concrete does not explode when pouring the side walls of the station. The full-height bracket supports the middle plate formwork, and the symmetrical support mechanism supports the side walls, ensuring that the structure of the station's main structure slab wall columns is stable before integral pouring, thereby improving the personal safety of construction workers and eliminating safety hazards.
[0016] (3) The side wall supporting steel pipes are horizontally arranged in parallel between the adjacent horizontal bars of the full-span support and the left and right ends extend outside the full-span support to ensure that each layer of the full-span support has horizontally parallel symmetrical side wall steel pipes, so that the structure of the entire mixed support system is stable; the side wall supporting steel pipes are fastened to the vertical poles with fasteners arranged at intervals on the pipe body, which are tightly connected and easy to install and disassemble; the left and right ends of the side wall supporting steel pipes are provided with horizontally movable free ends, and the overall length of the side wall supporting steel pipes can be adjusted according to needs, which has strong flexibility and wide applicability.
[0017] To sum up, it is safe and reliable, easy to operate and implement, with high construction quality and fast construction progress. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a front view of the present invention.
[0019] Figure 2 for Figure 1 A partial enlarged view of point A.
[0020] Figure 3 This is a cross-sectional diagram of the full-hall support construction.
[0021] Figure 4 for Figure 3 Longitudinal section view (partial). DETAILED DESCRIPTION
[0022] The present invention will be further described below by way of embodiments and in conjunction with the accompanying drawings:
[0023] Combination Figure 1 — Figure 4 As shown, a method for integrated construction of main structure panels, walls and columns for open-cut subway stations is described, and the specific implementation steps are as follows:
[0024] Step A, constructing a wall-column integrated casting mixed system for the main structural slab of the open-cut subway station; the wall-column integrated casting mixed system mainly consists of a full-height bracket 1 with a symmetrical supporting mechanism 2.
[0025] The full-height support 1 is composed of an oblique rod 11, a horizontal rod 12, a vertical rod 13 and a full-height support bottom mold located at the top and equipped with a steel beam.
[0026] The symmetrical support mechanism 2 consists of a symmetrical support formwork 22 located on the left and right sides and equipped with steel beams, and a number of side wall support steel pipes 21 arranged in an array on the main structure of the full-hall support 1. The symmetrical support formwork 22 is placed on the side of the side wall 4 of the station to be constructed through the steel beam. The side wall support steel pipes 21 are horizontally arranged in parallel between adjacent transverse horizontal bars 12 of the full-hall support 1, and the left and right ends extend outside the full-hall support 1. The side wall support steel pipes 21 are fastened to the vertical bars 13 with fasteners arranged at intervals on the pipe body, and horizontally movable free ends are arranged on the left and right ends of the side wall support steel pipes 21.
[0027] In step A, the left and right ends of the side wall supporting steel pipe 21 are provided with screw top supports 211 threadedly connected to the two ends of the steel pipe. By adjusting the depth of the screw at the tail of the top support screwed into the steel pipe, the head of the screw top support 211 is moved horizontally to press against the symmetrical supporting template 22.
[0028] In step A, the diagonal rods 11, the horizontal rods 12 and the vertical rods 13 are overlapped by disc-type steel pipe brackets to form the main structure of the full-height bracket 1. The top of the vertical rod 13 is provided with a supporting top bracket, and the bottom of the vertical rod 13 is provided with a supporting bottom bracket. The bottom mold of the full-height bracket is placed on the top bracket through a steel beam. The supporting top bracket and the supporting bottom bracket are both Φ60×5.0×600mm type. The cantilever length of the supporting top bracket is not more than 600mm, and the exposed length of the supporting bottom bracket is not more than 300mm.
[0029] In step A, the dimensions of the vertical poles 13 and the horizontal poles 12 are Φ60×3.2mm, the spacing between the vertical poles 13 is 1500mm horizontally×1200mm vertically, the steel beams equipped with the full-height bracket bottom formwork and the symmetrical supporting formwork 22 are composed of a main beam 6 and a small beam, the main beam 6 is made of I10 I-beam, the small beam is made of 100mm×50mm rectangular steel pipe, the full-height bracket bottom formwork is made of 20mm thick wood plywood, and the symmetrical supporting formwork 22 is made of 20mm thick veneer wood plywood.
[0030] Step B: synchronously build the steel formwork for the center column 3 of the station with the aid of the integrated casting mixed system of the wall and column being constructed, and synchronously build the waterproof and steel formwork for the side wall 4 of the station with the aid of the integrated casting mixed system of the wall and column being constructed.
[0031] In step B, the station side wall 4 template adopts a whole template.
[0032] Step C: Use the full-height bracket bottom formwork in the built wall-column integrated casting mixed system and the middle column formwork to build the station middle plate 5 steel bar formwork. The station middle plate serves as a partition between the floors of the subway station. Each floor of the station is equipped with a full-height bracket, and the wall columns of each floor are cast in one piece. The bottom of each floor of the station middle plate is spaced apart with a longitudinally extending station middle column.
[0033] Step D, the full-floor bracket 1 in the wall-column integrated casting mixed system supports the station middle plate 5 formwork, and adjusts the free end of the side wall supporting steel pipe 21 to press against the symmetrical supporting formwork 22, thereby pressing against the station side wall 4 steel formwork, and then the built station middle column 3 steel formwork, station side wall 4 steel formwork, and station middle plate 5 steel formwork are cast in one piece without any construction joints, and the station waterproofing construction quality is improved through the self-waterproofing ability of concrete.
Claims
1. A method for integrated construction of main structure panels, walls and columns for subway open-cut stations. It is characterized in that The following steps are involved: Step A, constructing a wall-column integrated casting hybrid system for the main structural slab of an open-cut subway station; the wall-column integrated casting hybrid system comprises a full-height bracket (1) equipped with a symmetrical support mechanism (2), the full-height bracket (1) comprising an inclined rod (11), a horizontal rod (12), a vertical rod (13) and a full-height bracket bottom mold located at the top and equipped with a steel beam, the symmetrical support mechanism (2) comprising a symmetrical support template (22) located at the left and right sides and equipped with a steel beam and a plurality of arrays arranged on the The side wall supporting steel pipe (21) on the main structure of the full-concrete support (1) and the symmetrical supporting formwork (22) are arranged on the side of the side wall (4) of the station to be constructed through steel beams. The side wall supporting steel pipe (21) is horizontally and parallelly erected between adjacent transverse horizontal bars (12) of the full-concrete support (1) and the left and right ends extend outside the full-concrete support (1). The side wall supporting steel pipe (21) is fastened to the vertical bars (13) with the fasteners arranged at intervals on the pipe body. The left and right ends of the side wall supporting steel pipe (21) are provided with horizontally movable free ends. Step B, using the wall-column integrated casting mixed system being constructed, synchronously constructing the station center column (3) steel template, and using the wall-column integrated casting mixed system being constructed, synchronously constructing the station side wall (4) waterproof and steel template; Step C, using the full-floor support bottom formwork in the built wall-column integrated casting mixed system and the center column formwork to build the station middle plate (5) steel bar formwork; Step D: The full-floor support (1) in the wall-column integrated casting mixed system supports the station middle plate (5) template, and the free end of the side wall supporting steel pipe (21) is adjusted to be in close contact with the symmetrical supporting template (22), thereby in close contact with the station side wall (4) steel template, and then the built station middle column (3) steel template, station side wall (4) steel template, and station middle plate (5) steel template are cast in one piece; In the step A, the dimensions of the vertical poles (13) and the horizontal poles (12) are Φ60×3.2mm, the spacing between the vertical poles (13) is 1500mm horizontally and 1200mm vertically, the steel beams equipped with the full-floor support bottom formwork and the symmetrical support formwork (22) are composed of a main beam (6) and a small beam, the main beam (6) is made of I10 I-beam, the small beam is made of 100mm×50mm rectangular steel pipe, the full-floor support bottom formwork is made of 20mm thick wood plywood, and the symmetrical support formwork (22) is made of 20mm thick cladding wood plywood; in the step B, the station side wall (4) formwork is a whole formwork.
2. A method for integrated construction of main structure panels, walls and columns for open-cut subway stations according to claim 1, Features: In step A, the left and right ends of the side wall supporting steel pipe (21) are provided with screw top supports (211) threadedly connected to the two ends of the steel pipe, and the depth of the screw at the tail of the top support screwed into the steel pipe is adjusted to make the head of the screw top support (211) move horizontally to press against the symmetrical supporting template (22).
3. The method for integrated construction of main structure panels, walls and columns for open-cut subway stations according to claim 1, Features: In step A, the diagonal rods (11), the horizontal rods (12) and the vertical rods (13) are overlapped by means of disc-type steel pipe brackets to form the main structure of the full-height bracket (1). The top of the vertical rods (13) is provided with a top support, and the bottom of the vertical rods (13) is provided with a bottom support. The bottom mold of the full-height bracket is placed on the top support through a steel beam. The top support and the bottom support are both Φ60×5.0×600mm. The cantilever length of the top support is not more than 600mm, and the exposed length of the bottom support is not more than 300mm.