A shear-resistant steel bar for longitudinal construction joint of secondary lining side wall of tunnel and construction method

By using inverted V-shaped steel bars and V-shaped steel bars in the longitudinal construction joints of the second lining side wall of the subway tunnel, combined with the binding method of galvanized steel plate water stops, the problem of reducing shear bearing capacity caused by the buried water stops is solved. The shear bearing capacity of the construction joints has been significantly improved.

CN114483111BActive Publication Date: 2024-11-01CHINA RAILWAY LIUYUAN GRP CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202210227328.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-08
Publication Date
2024-11-01
Estimated Expiration
2042-03-08

AI Technical Summary

Technical Problem

When the longitudinal construction joints of the second lining side wall of the subway tunnel are subjected to large soil and water pressure, the buried water stop belt makes it impossible to install tension ribs on the side wall, which significantly reduces the inclined cross-section shear bearing capacity of the construction joints.

Method used

Inverted V-shaped steel bars and V-shaped steel bars are used, combined with galvanized steel plate water stops, and the shear bearing capacity of the construction joints is improved by binding and vertical steel bars on the outer and inner sides of the side walls, and a galvanized steel plate water stop is installed at the construction joints. To enhance bonding effect.

Benefits of technology

The shear bearing capacity of the inclined section of the longitudinal construction joint of the second lining side wall of the tunnel is significantly improved, and the bending bearing capacity reduction and shear bearing capacity caused by the middle buried water stop are avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114483111B_ABST
    Figure CN114483111B_ABST
Patent Text Reader

Abstract

The invention provides a tunnel secondary lining side wall longitudinal construction joint shear steel bar and a construction method, comprising an inverted V-shaped steel bar and a V-shaped steel bar; the oblique branch one of the inverted V-shaped steel bar is arranged in the upper concrete of the construction joint, the vertical section one of the inverted V-shaped steel bar is arranged in the lower concrete of the construction joint, and the two vertical sections one of the inverted V-shaped steel bar are respectively tied with the outer vertical steel bar of the side wall and the inner vertical steel bar of the side wall; the oblique branch two of the V-shaped steel bar is arranged in the lower concrete of the construction joint, the vertical section two of the V-shaped steel bar is arranged in the upper concrete of the construction joint, and the two vertical sections two of the V-shaped steel bar are respectively tied with the outer vertical steel bar of the side wall and the inner vertical steel bar of the side wall. By arranging the tunnel secondary lining side wall longitudinal construction joint shear steel bar, the invention significantly improves the shear bearing capacity of the oblique section of the tunnel secondary lining side wall longitudinal construction joint compared with the current tunnel secondary lining side wall construction joint oblique section shear bearing capacity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and particularly relates to a shear-resistant steel bar for a longitudinal construction joint of a secondary lining side wall of a tunnel and a construction method thereof. Background Art

[0002] In order to ensure the safety, durability and normal use of underground structures, the secondary lining reinforced concrete needs to be poured for the mining tunnel. The secondary lining of the mining tunnel needs to construct the invert first, and then the side wall and the vault. There is a longitudinal construction joint between the invert and the side wall. The lower concrete and upper concrete of the longitudinal construction joint of the side wall are poured twice, which is easy to leak water, and waterproofing measures need to be taken. The "Railway Tunnel Design Code" (TB10003-2016) stipulates that when the tunnel lining waterproof level is level one or level two, the tunnel lining construction joint should use a buried waterstop. Railway tunnels generally adopt drainage technology solutions, and the tunnel secondary lining is not subject to much horizontal pressure. The construction joint mainly considers the waterproof function requirements. At present, the longitudinal construction joint of the secondary lining side wall of the subway section mining tunnel refers to the "Railway Tunnel Design Code", and the longitudinal construction joint of the secondary lining side wall adopts a buried waterstop. Subway section tunnels are generally located in the underground soil and rock layers of the city. Generally, drainage technology solutions are not considered, but a full waterproofing solution is adopted. The side wall of the tunnel secondary lining needs to withstand greater water and soil pressure. For example, in the section between Yong'anli Station and Dongdaqiao Station of Beijing Metro Line 17, the cover thickness is 26.6m to 27.7m, the clear span is 5.38m, the clear height is 5.52m, the secondary lining side wall thickness is 300mm, the side wall vertical reinforcement is ¢20@150, the tension reinforcement is ¢8@300X300, and the side wall construction joint adopts embedded waterstop; in the section between Wusi Square Station and Nanjing Road Station of Qingdao Metro Line 2, the section cover thickness is 10.8m to 12.0m, the secondary lining section clear height is 5.58m, the clear width is 5.2m, the secondary lining side wall thickness is 300mm, the VI type lining section side wall vertical reinforcement is ¢20@150, the tension reinforcement is ¢8@300X300, and the construction joint adopts embedded waterstop.

[0003] The deeper the tunnel secondary lining is, the greater the water pressure and soil pressure acting on the tunnel secondary lining, and the greater the force (bending moment, shear force) on the tunnel secondary lining side wall. The buried waterstop includes galvanized steel plate waterstop and steel edge rubber waterstop, and the height of the buried waterstop is about 350mm. If the buried waterstop is set at the construction joint of the secondary lining side wall, the side wall cannot be equipped with reinforcement within the height range of the waterstop; the side wall has no reinforcement within the height range of the waterstop, which will greatly reduce the shear bearing capacity of the oblique section of the side wall construction joint. Therefore, how to improve the shear bearing capacity of the oblique section of the construction joint of the secondary lining side wall of the subway tunnel is of practical significance. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a tunnel secondary lining side wall longitudinal construction joint shear steel bar and a construction method, which significantly improves the shear bearing capacity of the inclined section of the construction joint.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is as follows:

[0006] In a first aspect, the present invention provides a shear-resistant steel bar for a longitudinal construction joint of a secondary lining side wall of a tunnel, comprising an inverted V-shaped steel bar and a V-shaped steel bar; the inverted V-shaped steel bar comprises two oblique branches one and two vertical segments one, the top ends of the two oblique branches one are connected to form a V-shape with an opening downward, and the end of each oblique branch one is connected to a vertical segment one in a vertical direction; the V-shaped steel bar comprises two oblique branches two and two vertical segments two, the bottom ends of the two oblique branches two are connected to form a V-shape with an opening upward, and the end of each oblique branch two is connected to a vertical segment two in a vertical direction;

[0007] The upper concrete of the construction joint is located above the construction joint, and the lower concrete of the construction joint is located below the construction joint. The oblique branch one of the inverted V-shaped steel bar is set in the upper concrete of the construction joint, and the vertical section one of the inverted V-shaped steel bar is set in the lower concrete of the construction joint. The two vertical sections one of the inverted V-shaped steel bar are respectively tied to the outer vertical steel bars of the side wall and the inner vertical steel bars of the side wall; the oblique branch two of the V-shaped steel bar is set in the lower concrete of the construction joint, and the vertical section two of the V-shaped steel bar is set in the upper concrete of the construction joint. The two vertical sections two of the V-shaped steel bar are respectively tied to the outer vertical steel bars of the side wall and the inner vertical steel bars of the side wall.

[0008] Preferably, the inverted V-shaped steel bars and the V-shaped steel bars are respectively formed by bending steel bars of the same length.

[0009] Preferably, the angle between the two oblique branches 1 and the angle between the two oblique branches 2 are both in the range of 65 degrees to 140 degrees.

[0010] In a second aspect, the present invention further provides a method for constructing shear reinforcement of a longitudinal construction joint of a secondary lining side wall of a tunnel, the method comprising the following steps:

[0011] Step S1, processing an inverted V-shaped steel bar and a V-shaped steel bar, wherein the inverted V-shaped steel bar and the V-shaped steel bar are respectively formed by bending steel bars of the same length;

[0012] Step S2, tying the tunnel secondary lining invert reinforcement and tying the inner vertical reinforcement of the side wall, the outer vertical reinforcement of the side wall, the horizontal distribution reinforcement and the tension reinforcement;

[0013] Step S3, V-shaped steel bars are installed at intervals along the longitudinal direction of the tunnel at the construction joint, the oblique branch 2 of the V-shaped steel bar is located below the construction joint, the vertical section 2 of the V-shaped steel bar is located above the construction joint, and the vertical section 2 of the V-shaped steel bar is respectively tied to the vertical steel bars on the outer side of the side wall and the vertical steel bars on the inner side of the side wall;

[0014] Step S4, installing the galvanized steel plate water stop strip in the middle of the V-shaped steel bar, and the V-shaped steel bar is symmetrically located on both sides of the galvanized steel plate water stop strip;

[0015] Step S5, installing the inverted V-shaped steel bars at intervals along the longitudinal direction of the tunnel on the top of the galvanized steel plate water stop, wherein the oblique branch one of the inverted V-shaped steel bar is located above the construction joint, the vertical section one of the inverted V-shaped steel bar is located below the construction joint, and the vertical section one of the inverted V-shaped steel bar is respectively tied to the vertical steel bars on the outside of the side wall and the vertical steel bars on the inside of the side wall;

[0016] Step S6, pouring concrete at the bottom of the invert arch and the side wall construction joint;

[0017] Step S7, installing the side wall formwork, and then pouring concrete on the upper part of the side wall construction joint.

[0018] Preferably, the galvanized steel plate waterstop is arranged at the center of the thickness of the side wall, with half of the galvanized steel plate waterstop being located below the construction joint and the other half being located above the construction joint.

[0019] The present invention has the following beneficial effects:

[0020] The invention provides a tunnel secondary lining side wall longitudinal construction joint shear steel bar and a construction method. By setting the tunnel secondary lining side wall longitudinal construction joint shear steel bar, the shear bearing capacity of the inclined section of the tunnel secondary lining side wall longitudinal construction joint is significantly improved compared with the current tunnel secondary lining side wall construction joint inclined section shear bearing capacity.

[0021] The present invention adopts galvanized steel waterstop in the longitudinal construction joint of the secondary lining side wall of the tunnel. The galvanized steel waterstop has a bonding effect with the concrete. The elastic modulus of the steel plate material is larger than that of the concrete material. The concrete on both sides of the galvanized steel waterstop can be regarded as an integral concrete component, which avoids the situation that the bending bearing capacity of the cross section at the construction joint and the shear bearing capacity of the inclined cross section will be significantly reduced due to the use of steel-edge rubber waterstop. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the embodiments of the present invention.

[0023] Figure 1 It is a schematic diagram of the longitudinal construction joint structure of the secondary lining side wall of the tunnel in the comparative example;

[0024] Figure 2 Schematic diagram of the longitudinal construction joint structure of the secondary lining side wall of a tunnel in an embodiment of the present invention;

[0025] Figure 3 Schematic diagram of a V-shaped steel bar and an inverted V-shaped steel bar in an embodiment of the present invention;

[0026] Figure 4 It is a schematic diagram of the oblique cross section of the longitudinal construction joint of the secondary lining side wall of the tunnel in the comparative example;

[0027] Figure 5It is a schematic diagram of the oblique cross-section of the longitudinal construction joint of the secondary lining side wall of the tunnel in an embodiment of the present invention.

[0028] Description of reference numerals:

[0029] 1. Construction joint; 2. Galvanized steel waterstop; 3. Inverted V-shaped steel bar; 31. Oblique branch one; 32. Vertical section one; 4. V-shaped steel bar; 41. Oblique branch two; 42. Vertical section two; 5. Vertical steel bar inside the side wall; 6. Vertical steel bar outside the side wall; 7. Concrete below the construction joint; 8. Concrete above the construction joint; 9. Tie bars; 10. Horizontal distribution bars; 11. Oblique section. DETAILED DESCRIPTION

[0030] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0031] Example 1

[0032] The soil cover of a tunnel vault is 26.90m thick and the bottom plate is buried 33.75m deep. The groundwater level is 2.0m below the ground. The clear span of the tunnel secondary lining structure is 5.3m, the clear height is 5.35m, the side wall thickness is 450mm, the vertical reinforcement inside the side wall is ¢22@150, the vertical reinforcement outside the side wall bottom is ¢22@150, the side wall reinforcement is ¢10, the vertical spacing of the reinforcement is 150mm, the horizontal spacing is 300mm, the side wall longitudinal construction joint is 300mm from the inverted arch, and the shear force of the construction joint section is 650kN.

[0033] This embodiment provides a tunnel secondary lining side wall longitudinal construction joint shear reinforcement, such as Figure 2 and Figure 3 As shown, it includes an inverted V-shaped steel bar 3 and a V-shaped steel bar 4; the inverted V-shaped steel bar 3 includes two oblique branches 31 and two vertical sections 32, the top ends of the two oblique branches 31 are connected to form a V-shape opening downward, and the end of each oblique branch 31 is connected to a vertical section 32 in the vertical direction; the V-shaped steel bar 4 includes two oblique branches 41 and two vertical sections 42, the bottom ends of the two oblique branches 41 are connected to form a V-shape opening upward, and the end of each oblique branch 41 is connected to a vertical section 42 in the vertical direction.

[0034] The upper concrete 8 of the construction joint is located above the construction joint 1, and the lower concrete 7 of the construction joint is located below the construction joint 1. The oblique branch 31 of the inverted V-shaped steel bar 3 is arranged in the upper concrete 8 of the construction joint, and the vertical section 32 of the inverted V-shaped steel bar 3 is arranged in the lower concrete 7 of the construction joint. The two vertical sections 32 of the inverted V-shaped steel bar 3 are respectively tied to the outer vertical steel bars 6 of the side wall and the inner vertical steel bars 5 of the side wall; the oblique branch 41 of the V-shaped steel bar 4 is arranged in the lower concrete 7 of the construction joint, and the vertical section 42 of the V-shaped steel bar 4 is arranged in the upper concrete 8 of the construction joint. The two vertical sections 42 of the V-shaped steel bar 4 are respectively tied to the outer vertical steel bars 6 of the side wall and the inner vertical steel bars 5 of the side wall.

[0035] The inverted V-shaped steel bar 3 and the V-shaped steel bar 4 are respectively formed by bending steel bars of the same length. The angle between the two oblique branches 1 31 and the angle between the two oblique branches 2 41 are both in the range of 65 degrees to 140 degrees.

[0036] In this embodiment, the diameter of the V-shaped steel bar 4 and the inverted V-shaped steel bar 3 is Ф12mm, and the V-shaped steel bar 4 and the inverted V-shaped steel bar 3 are arranged at a spacing of 150mm along the longitudinal direction of the tunnel; the vertical section 242 of the V-shaped steel bar 4 is 250mm long, the oblique branch section 241 on one side of the V-shaped steel bar 4 is 258mm long, and the angle between the two oblique branches 241 of the V-shaped steel bar 4 is 94°; the vertical section 132 of the inverted V-shaped steel bar 3 is 250mm long, the oblique branch section 131 on one side of the inverted V-shaped steel bar 3 is 258mm long, and the angle between the two oblique branches 131 of the inverted V-shaped steel bar 3 is 94°.

[0037] The galvanized steel plate waterstop 2 is 350 mm high and is arranged at the center of the side wall thickness. Half of the galvanized steel plate waterstop 2 is located below the construction joint 1 and the other half is located above the construction joint 1.

[0038] At present, the buried waterstop includes galvanized steel waterstop and steel-edge rubber waterstop, both of which are used in subway tunnel projects. For railway mountain tunnels, drainage design is adopted, the tunnel secondary lining has no water pressure, and the cross-sectional stress (bending moment, shear force) of the tunnel secondary lining is not large, so both waterstops can be used. The galvanized steel waterstop has a bonding effect with the concrete, and the elastic modulus of the steel plate material is larger than that of the concrete material. The concrete on both sides of the galvanized steel waterstop can be regarded as an integral concrete component; however, the elastic modulus of the rubber material is about 0.0078GPa, and the elastic modulus of the C35 concrete material is about 32.5GPa. The elastic modulus of the concrete material is more than 4000 times larger than that of the rubber material, so the rubber plate in the waterstop is equivalent to a cavity (the cavity width is the thickness of the rubber plate, the cavity width is about 10mm, and the cavity height is about 200mm), and the concrete on both sides of the rubber plate cannot be regarded as an integral component. According to the Manual of Construction of Reinforced Concrete Structures, the bending resistance and shear resistance of the inclined section of the component at the cavity are significantly reduced. The Manual of Construction of Reinforced Concrete Structures requires that the cavity should be located in a position with smaller shear force and reinforcing bars should be installed around the cavity.

[0039] Therefore, in this embodiment, galvanized steel waterstop should be used in the longitudinal construction joint of the tunnel secondary lining side wall; otherwise, the bending bearing capacity of the section at the construction joint and the shear bearing capacity of the inclined section will be significantly reduced.

[0040] This embodiment also provides a method for constructing shear reinforcement of the longitudinal construction joint of the secondary lining side wall of a tunnel, the method comprising the following steps:

[0041] Step S1, processing an inverted V-shaped steel bar 3 and a V-shaped steel bar 4, wherein the inverted V-shaped steel bar 3 and the V-shaped steel bar 4 are respectively formed by bending steel bars of the same length;

[0042] Step S2, tying the tunnel secondary lining invert reinforcement and tying the inner side vertical reinforcement 5 of the side wall, the outer side vertical reinforcement 6 of the side wall, the horizontal distribution reinforcement 10 and the tension reinforcement 9;

[0043] Step S3, V-shaped steel bars 4 are installed at the construction joint 1 at intervals of 150 mm along the longitudinal direction of the tunnel, the oblique branches 2 41 of the V-shaped steel bars 4 are located below the construction joint 1, the vertical sections 2 42 of the V-shaped steel bars 4 are located above the construction joint 1, and the vertical sections 2 42 of the V-shaped steel bars 4 are respectively tied to the vertical steel bars 6 on the outside of the side wall and the vertical steel bars 5 on the inside of the side wall;

[0044] Step S4, installing the galvanized steel plate water stop 2 in the middle of the V-shaped steel bar 4, and the V-shaped steel bar 4 is symmetrically located on both sides of the galvanized steel plate water stop 2;

[0045] Step S5, the inverted V-shaped steel bars are installed on the top of the galvanized steel plate water stop strip 2 at intervals of 150 mm along the longitudinal direction of the tunnel, the oblique branch 31 of the inverted V-shaped steel bar 3 is located above the construction joint 1, the vertical section 32 of the inverted V-shaped steel bar 3 is located below the construction joint 1, and the vertical section 32 of the inverted V-shaped steel bar 3 is respectively tied to the vertical steel bar 6 on the outside of the side wall and the vertical steel bar 5 on the inside of the side wall;

[0046] Step S6, pouring concrete 7 at the lower part of the invert and the construction joint;

[0047] Step S7, install the side wall formwork, and then pour the upper concrete 8 of the construction joint.

[0048] Furthermore, the angle between the two oblique branches 1 31 of the inverted V-shaped steel bar 3 and the angle between the two oblique branches 2 41 of the V-shaped steel bar 4 are both 94°; the lengths of the oblique branches 1 31 and 2 41 are both 258 mm; the inverted V-shaped steel bar 3 and the V-shaped steel bar 4 are respectively formed by bending a steel bar with a length of 966 mm.

[0049] The inclined section of the construction joint of the tunnel secondary lining side wall designed in this embodiment is as follows: Figure 5 As shown, the inclined section 11 intersects with an inclined branch of the inverted V-shaped steel bar 3 and the V-shaped steel bar 4 respectively, and the inclined branch is equivalent to the bent steel bar. The shear bearing capacity V of the inclined section of the side wall is calculated according to the following formula according to the "Concrete Structure Design Code":

[0050]

[0051] The first term of formula (1) is provided by the concrete for shear bearing capacity, and the second term is provided by the shear reinforcement for shear bearing capacity, where λ is the shear span ratio of the calculated section of the eccentrically compressed member, and f yv A is the design value of tensile strength of shear reinforcement; sb is the sum of the shear reinforcement areas intersecting the inclined section within the calculated width of the side wall, f t is the design value of concrete axial tensile strength, h0 is the effective height of the side wall section, b is the calculated width of the side wall, α s It is the angle between the shear reinforcement and the center line of the side wall.

[0052] The thickness of the tunnel side wall is 450mm, the strength grade of the side wall concrete is C40, λ=1.5, h0=400mm, f t =1.71N / mm 2 , b=1000mm, f yv =270N / mm 2 , shear steel bar diameter 12mm, shear steel bar longitudinal spacing 150mm (b = 1000mm, 6.67 bars), A sb =2×6.67×113.0=1508.0mm 2 , α s=47.2°,

[0053] The shear bearing capacity of the inclined section is equal to 714.7 kN, which is greater than the shear bearing capacity of the construction joint section of 650 kN. The shear bearing capacity provided by the shear reinforcement is equal to 238.7 kN, accounting for 33.4% of the shear bearing capacity of the inclined section of the side wall construction joint.

[0054] Comparative Example 1

[0055] The construction joint of the secondary lining side wall of a tunnel is equipped with an embedded waterstop. The side wall cannot be equipped with reinforcement within the height range of the waterstop. Figure 1 If there is no reinforcement in the water stop height range of the side wall, the shear bearing capacity of the inclined section at the construction joint of the side wall will be greatly reduced. Figure 4 shown.

[0056] The tunnel vault cover is 26.90m thick, and the bottom plate is buried 33.75m deep. The groundwater level is 2.0m below the ground. The clear span of the tunnel secondary lining structure is 5.3m and the clear height is 5.35m. The cross section adopts a straight wall vault structure, the side wall thickness is 450mm, the vertical reinforcement on the inside of the side wall is ¢22@150, the vertical reinforcement on the outside of the side wall bottom is ¢22@75, the side wall reinforcement is ¢10, the horizontal spacing of the reinforcement is 300mm, the vertical spacing is 150mm, the longitudinal construction joint of the side wall is 300mm from the inverted arch, and the side wall concrete strength grade is C40. Referring to the "Concrete Structure Design Code", the shear bearing capacity V of the inclined section of the tunnel secondary lining side wall is calculated according to the following formula (excluding the influence of axial force),

[0057]

[0058] Where λ is the shear span ratio of the calculated section of the eccentrically compressed member, which is taken as 1.5; f yv A is the design value of tensile strength of the reinforcement; sv is the sum of the reinforcement areas within the calculated width of the side wall, s is the reinforcement spacing along the vertical direction of the side wall, and f t is the design value of concrete axial tensile strength, h0 is the effective height of the side wall section, and b is the calculated width of the side wall. h0=400mm, f t =1.71N / mm 2 , b=1000mm, f yv =270N / mm 2 , s = 150 mm, A sv =3.33×78.5=261.4mm 2 ,

[0059] Among them, the shear bearing capacity provided by the reinforcement is equal to 188.2kN, accounting for 28.3% of the shear bearing capacity of the inclined section of the side wall. However, in this comparative example 1, the longitudinal construction joint of the secondary lining side wall of the tunnel adopts a buried waterstop, and the reinforcement cannot be arranged within the height range of the waterstop. Figure 4 (If the reinforcement is arranged, it is necessary to drill holes in the waterstop, and the reinforcement passes through the holes of the waterstop, but the waterproof effect of the waterstop is greatly reduced). Therefore, the shear bearing capacity of the oblique section within the height range of the side wall waterstop in this comparative example 1 is only 476kN, which is less than the shear force of the construction joint section 650.0kN. Therefore, the shear bearing capacity of the oblique section at the construction joint is significantly reduced.

[0060] It can be seen from the above technical scheme that the shear-resistant steel bars and construction method of the longitudinal construction joint of the secondary lining side wall of a tunnel provided in this embodiment 1, by setting the shear-resistant steel bars of the longitudinal construction joint of the secondary lining side wall of the tunnel, the shear bearing capacity of the inclined section of the longitudinal construction joint of the secondary lining side wall of the tunnel is significantly improved than the shear bearing capacity of the inclined section of the current construction joint of the secondary lining side wall of the tunnel.

[0061] The above embodiments of the present invention are described in detail through examples, but the contents described are only exemplary embodiments of the embodiments of the present invention and cannot be considered to limit the scope of implementation of the embodiments of the present invention. The protection scope of the embodiments of the present invention is defined by the claims. Anyone who utilizes the technical solutions described in the embodiments of the present invention, or who, inspired by the technical solutions of the embodiments of the present invention, designs similar technical solutions within the essence and protection scope of the embodiments of the present invention to achieve the above technical effects, or who makes equal changes and improvements to the scope of application, shall still fall within the scope of protection covered by the patent of the embodiments of the present invention.

Claims

1. A method for constructing shear reinforcement for the longitudinal construction joint of the secondary lining side wall of a tunnel, characterized in that: The method is applied to a shear-resistant steel bar for a longitudinal construction joint of a secondary lining side wall of a tunnel, comprising an inverted V-shaped steel bar (3) and a V-shaped steel bar (4); the inverted V-shaped steel bar (3) comprises two inclined branches (31) and two vertical segments (32); the top ends of the two inclined branches (31) are connected to form a V-shape with an opening downward, and the end of each inclined branch (31) is connected to a vertical segment (32) in a vertical direction; the V-shaped steel bar (4) comprises two inclined branches (41) and two vertical segments (42); the bottom ends of the two inclined branches (41) are connected to form a V-shape with an opening upward, and the end of each inclined branch (41) is connected to a vertical segment (42) in a vertical direction; the angle between the two inclined branches (31) and the angle between the two inclined branches (41) are both in the range of 65 degrees to 140 degrees; The upper concrete (8) of the construction joint is located above the construction joint (1), the lower concrete (7) of the construction joint is located below the construction joint (1), the first oblique branch (31) of the inverted V-shaped steel bar (3) is arranged in the upper concrete (8) of the construction joint, and the first vertical section (32) of the inverted V-shaped steel bar (3) is arranged in the lower concrete (7) of the construction joint; the second oblique branch (41) of the V-shaped steel bar (4) is arranged in the lower concrete (7) of the construction joint, and the second vertical section (42) of the V-shaped steel bar (4) is arranged in the upper concrete (8) of the construction joint; The method comprises the following steps: Step S1, processing an inverted V-shaped steel bar (3) and a V-shaped steel bar (4), wherein the inverted V-shaped steel bar (3) and the V-shaped steel bar (4) are respectively formed by bending steel bars of the same length; Step S2, tying the tunnel secondary lining invert reinforcement and tying the inner side vertical reinforcement (5) of the side wall, the outer side vertical reinforcement (6) of the side wall, the horizontal distribution reinforcement (10) and the tension reinforcement (9); Step S3, V-shaped steel bars (4) are installed at intervals along the longitudinal direction of the tunnel at the construction joint (1), the second oblique branch (41) of the V-shaped steel bar (4) is located below the construction joint (1), the second vertical section (42) of the V-shaped steel bar (4) is located above the construction joint (1), and the second vertical section (42) of the V-shaped steel bar (4) is respectively tied to the vertical steel bars (6) on the outer side of the side wall and the vertical steel bars (5) on the inner side of the side wall; Step S4, installing the galvanized steel plate water stop strip (2) in the middle of the V-shaped steel bar (4), and the V-shaped steel bar (4) is symmetrically located on both sides of the galvanized steel plate water stop strip (2); Step S5, installing the inverted V-shaped steel bars (3) at intervals along the longitudinal direction of the tunnel on the top of the galvanized steel plate water stop (2), wherein the oblique branch one (31) of the inverted V-shaped steel bar (3) is located above the construction joint (1), and the vertical section one (32) of the inverted V-shaped steel bar (3) is located below the construction joint (1), and the vertical section one (32) of the inverted V-shaped steel bar (3) is respectively tied to the vertical steel bars (6) on the outer side of the side wall and the vertical steel bars (5) on the inner side of the side wall; Step S6, pouring concrete (7) at the bottom of the invert and construction joint; Step S7, installing the side wall formwork, and then pouring concrete (8) on the upper part of the construction joint.

2. The method for constructing shear-resistant steel bars in the longitudinal construction joint of the secondary lining side wall of a tunnel according to claim 1, characterized in that: The inverted V-shaped steel bars (3) and the V-shaped steel bars (4) are respectively formed by bending steel bars of the same length.

3. The method for constructing shear-resistant steel bars in the longitudinal construction joint of the secondary lining side wall of a tunnel according to claim 1, characterized in that: The galvanized steel plate water stop (2) is arranged at the center of the thickness of the side wall, with half of the galvanized steel plate water stop (2) being located below the construction joint (1) and the other half being located above the construction joint (1).

Citation Information

Patent Citations

  • Double-bending tunnel

    CN101429869A

  • Tunnel

    CN108547631A

  • Connection joint structure of subway station bottom plates on sealing wall

    CN201326185Y

  • Steel bar binding construction structure for cast-in-place shear wall part of fabricated residence

    CN213806180U

  • Tunnel side wall concrete structure with locally reinforced construction joints

    CN214090004U