A method for emergency shutdown and joint tripping of steam turbines in a two-repile-one-unit reactor

Through the combined steam condition judgment logic and emergency shutdown interlock tripping logic, the problem of emergency shutdown judgment of a single reactor in a two-reactor one-machine reactor is solved, accurate interlock tripping in emergency situations is achieved, and the operation of the nuclear power plant is improved. Security.

CN114512253BActive Publication Date: 2024-10-18STATE NUCLEAR ELECTRIC POWER PLANNING DESIGN & RES INST CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202111619423.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-27
Publication Date
2024-10-18
Estimated Expiration
2041-12-27

AI Technical Summary

Technical Problem

In the reactor configuration of two reactors and one machine, it is difficult for existing technology to effectively identify the emergency shutdown situation of a single reactor and its impact on the steam turbine generator unit, which makes it difficult to accurately interlock and trip the steam turbine under emergency conditions, affecting the operational safety of the nuclear power plant. .

Method used

Through the combined steam condition judgment logic and emergency shutdown interlock tripping logic, the SUM algorithm and the high-limit monitoring algorithm are used to obtain the power difference between the reactor and the turbine generator unit, determine the power operating status of the two reactors, and control it through the human-machine interface Interlock tripping of turbine generator sets to ensure correct interlocking tripping in emergency situations.

Benefits of technology

It is possible to accurately determine the reactor operating status and steam supply ratio under the configuration of two reactors and one machine, ensuring that the steam turbine can be correctly interlocked and tripped in the event of an emergency shutdown, thus improving the operational safety and flexibility of the nuclear power plant.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114512253B_ABST
    Figure CN114512253B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for emergency shutdown of two reactors and one unit and interlocking tripping of a steam turbine. The technical scheme thereof includes a No. 1 reactor, a No. 2 reactor and a steam turbine generator set, wherein the No. 1 reactor and the No. 2 reactor control the interlocking tripping of the steam turbine generator set according to the judgment logic of the steam parallel working condition. The present invention designs a nuclear power unit suitable for the operation of two reactors with one steam turbine generator set, which is used for the emergency shutdown interlocking tripping steam turbine generator set of the reactor under emergency working conditions. The method judges the steam supply status of the two reactors to the steam turbine generator set through the deviation between the current power of the steam turbine generator set and the power of the reactor, thereby ensuring the safe operation of the unit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of industrial control, and in particular to a method for emergency shutdown and joint tripping of a steam turbine of a two-repile one-machine reactor. Background Art

[0002] For conventional units with a "two boilers and one unit" configuration, the two boilers operate with one unit. Generally, the operating condition of the two boilers' simultaneous boiler main fuel trip (BMFT) interlocking and tripping the turbine is not considered. Only the operating mode of one boiler's main fuel trip (BMFT) failure and the two boilers entering the shutdown procedure normally is considered.

[0003] Conventional units adopt the configuration of "two furnaces and one machine", but two furnaces run one machine. Since conventional units generally adopt sliding pressure start and constant pressure operation, conventional units do not need to be equipped with a dedicated start-stop system. In addition, due to the characteristics of the boiler, two furnaces and one machine must be equipped with intermediate reheating, while the demonstration project does not have intermediate secondary reheating. Due to the differences in the thermal capacity characteristics and start-stop methods of boilers and reactors, the corresponding protection schemes are also quite different.

[0004] The high-temperature gas-cooled reactor adopts a constant-pressure startup and operation mode. The outlet pressure of the steam generator (steam generator) must be kept stable at 13.9MPa at all times, including transient and certain accident conditions. The turbine run-in pressure is 4.75MPa, and the constant-pressure run-in. After the basic load is brought in, the bypass system is gradually closed in conjunction with the reactor power increase, the turbine power is increased, and the pressure parameters in front of the machine are gradually increased to 13.24MPa for stable operation. After the bypass system is completely closed, the steam at the steam generator outlet is switched to the main line operation, the start-stop system is shut down, and the bypass system is in overpressure protection mode.

[0005] Nuclear power plants take safety as their top priority and must consider various emergency shutdown interlocking and turbine tripping conditions to ensure the safety of personnel and equipment operation. Summary of the invention

[0006] The object of the present invention is to provide a method for emergency shutdown and joint tripping of a steam turbine of a two-repile one-unit reactor to solve the problems raised in the above-mentioned background technology.

[0007] To achieve the above-mentioned purpose, the present invention provides the following technical scheme: a method for emergency shutdown and joint tripping of a two-reactor-one-unit reactor, comprising a No. 1 reactor, a No. 2 reactor and a steam turbine generator set, characterized in that: the No. 1 reactor and the No. 2 reactor control the interlocking tripping of the steam turbine generator set according to the steam parallel operating condition judgment logic.

[0008] Preferably, the steam parallel working condition judgment logic includes:

[0009] Get the power of reactor 1;

[0010] Get the power of Reactor 2;

[0011] Get the generator power;

[0012] The power difference between the generator power and the No. 1 reactor power is calculated by the SUM algorithm, and the obtained power difference is output to the high limit monitoring algorithm. If the difference between the generator power and the No. 1 reactor power is ≥5%, it indicates that the No. 2 reactor has been completed.

[0013] The power difference between the generator power and the No. 2 reactor power is calculated by the SUM algorithm, and the obtained power difference is output to the high limit monitoring algorithm. If the difference between the generator power and the No. 2 reactor power is ≥5%, it indicates that the No. 1 reactor has been completed.

[0014] If any of the conditions for the completion of the steam connection of Reactor No. 1 or Reactor No. 2 is met, it means that Reactor No. 1 and Reactor No. 2 are already operating at full capacity.

[0015] Preferably, the SUM algorithm includes:

[0016] Get the generator power A;

[0017] Get the power B of reactor No. 1 or reactor No. 2;

[0018] Calculate the difference Y between the generator power and the stack power, where Y = AB.

[0019] Preferably, the high limit monitoring algorithm includes:

[0020] If the input value exceeds a fixed set value, the digital output flag is set to TRUE.

[0021] Preferably, the interlocked tripping of the generator sets is controlled by the emergency shutdown interlock tripping turbine logic.

[0022] Preferably, the emergency shutdown interlock tripping steam turbine logic includes:

[0023] By clicking the "PK1: Select Reactor 1 Power Operation" button through the human-machine interface, the pulse instruction passes through the subsequent RS trigger link to maintain the signal as the long level signal A1. Under the condition that only Reactor 1 is operating at power, if the "Reactor 1 Emergency Shutdown" condition occurs at this time, the long level signal A1 and the Reactor 1 Emergency Shutdown generate an emergency shutdown and turbine trip signal through the AND gate.

[0024] Preferably, the emergency shutdown interlock tripping steam turbine logic further includes:

[0025] By clicking the "PK2: Select Reactor No. 2 Power Operation" button through the human-machine interface, the pulse instruction will maintain the signal as the long level signal A2 through the subsequent RS trigger link. Under the condition that only Reactor No. 2 is operating at power, if the "Reactor No. 2 Emergency Shutdown" condition occurs at this time, the long level signal A2 and the Reactor No. 2 Emergency Shutdown will generate an emergency shutdown and turbine tripping signal through the AND gate.

[0026] Preferably, the emergency shutdown interlock tripping steam turbine logic includes:

[0027] When the "PK3: Two-reactor power operation" button is clicked through the human-machine interface, the two-reactor power operation signals will pass through the RS trigger to reset the A1 and A2 signals, and the A1 and A2 signals will be set to "0". At this time, a single "reactor emergency shutdown" signal will not trigger the turbine tripping. Only when the "No. 1 reactor emergency shutdown" and "No. 2 reactor emergency shutdown" are valid at the same time, will the emergency shutdown and turbine tripping signal be generated.

[0028] Preferably, the emergency shutdown interlock tripping steam turbine logic includes:

[0029] During the power operation of the steam turbine, "PK3: two-pile power operation" was not operated in time, and the A3 signal and the PK3 signal were introduced into the OR gate together. The two have the same function and are used to reset the A1 and A2 signals, and set the steam turbine protection mode to the "two-pile power operation" mode.

[0030] Preferably, the emergency shutdown interlock tripping steam turbine logic includes:

[0031] No matter "PK1: Select reactor power operation of No. 1" or "PK2: Select reactor power operation of No. 2" mode is selected, the selected mode will be reset only by clicking the "PK4: Reset" button.

[0032] Technical effects and advantages of the present invention:

[0033] The present invention proposes a method for interlocking and tripping a steam turbine generator set in an emergency shutdown of a nuclear power unit generally applicable to a unit in which two reactors are operated with one steam turbine generator set. The method determines the steam supply status of the two reactors to the steam turbine generator set based on the deviation between the current power of the steam turbine generator set and the reactor power, and is used for interlocking and tripping the steam turbine generator set in an emergency condition to ensure the safe operation of the unit.

[0034] The present invention will solve the technical problem of how to judge the operating status of another reactor and the steam share supplied to the steam turbine generator set during the power operation of a single reactor, so as to judge whether the emergency shutdown of the single reactor will interlock and trip the turbine. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1It is a logic diagram for distinguishing the steam-coupling working condition of the present invention;

[0036] Figure 2 A logic diagram of an emergency shutdown interlock tripping steam turbine according to the present invention;

[0037] Figure 3 It is a schematic flow chart of the main steam and start-stop system of the present invention;

[0038] Figure 4 This is the operating condition 1A: cold start curve of the NSSS system and steam turbine of the No. 1 reactor;

[0039] Figure 5 This is the cold start-up curve of the NSSS system of the No. 2 reactor under condition 2A;

[0040] Figure 6 This is operating condition 10B: the two reactors are running at low load without stopping, and the steam turbine is hot starting curve. DETAILED DESCRIPTION

[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] The invention provides a method for emergency shutdown and joint tripping of a two-reacter-one-machine reactor, comprising a No. 1 reactor, a No. 2 reactor and a steam turbine generator set, wherein the No. 1 reactor and the No. 2 reactor control the interlocking tripping of the steam turbine generator set according to a logic of steam parallel working condition judgment.

[0043] The generator set adopts the machine-following reactor operation mode in normal operation mode, and generally operates in the eye pressure control mode to keep the pressure in front of the machine stable. The reactor adjusts the reactor power according to the grid dispatching instructions.

[0044] In steady-state operation, the steam turbine power matches the reactor power, and the load control fluctuation range is 0.5%. In pressure control mode, the pressure fluctuation range before the main steam valve is 1.5%. In steady-state operation, the steam turbine power will not exceed the reactor power, otherwise the generator will trip due to reverse power.

[0045] like Figure 1 It shows that the working condition judgment logic includes:

[0046] Get the power of reactor No. 1, get the power of reactor No. 2, get the power of generator;

[0047] The generator power is respectively combined with the power of reactor No. 1 and the power of reactor No. 2 by the SUM algorithm to obtain the power difference between the generator power and the power of reactor No. 1, and the power difference between the generator power and the power of reactor No. 2. The SUM algorithm converts the sum operation into a subtraction operation to obtain the power difference by setting the input sign. Among them, the input of the SUM adder algorithm is an analog quantity, which is up to 16 channels. Each input is corrected and calculated using its own gain and offset, and then the corrected input values ​​are summed.

[0048] Among them, the SUM algorithm includes:

[0049] Get the generator power A;

[0050] Get the power B of reactor No. 1 or reactor No. 2;

[0051] Calculate the difference Y between the generator power and the stack power, where Y = AB.

[0052] The specific SUM algorithm is: IN1GB = (IN "1" x IN "1" GAIN) + IN "1" BIAS

[0053] IN2GB=(IN“2”x IN“2”GAIN)+IN“2”BIAS

[0054] OUT=IN"1"GB+IN"2"GB+IN"16"GB

[0055] IF OUT ≥ TPSC THEN

[0056] OUT=TPSC

[0057] ELSE

[0058] IF OUT≤BTSC THEN

[0059] OUT = BTSC),

[0060] Among them, "1" is the power of reactor No. 1, "2" is the power of reactor No. 2, "16" is the power of the generator, and the output OUT is the power difference.

[0061] The calculated deviation power is output to the high limit monitoring algorithm. The high limit monitoring algorithm is a high signal monitor with reset deadband and fixed / variable limits. In the HIGHMON algorithm, if the input value (IN) exceeds a fixed set value, the digital output flag (OUT) is set to TRUE.

[0062] If the difference between the generator power and the No. 1 reactor power is ≥5%, it means that the No. 2 reactor has been connected to the steam turbine and its power contribution to the steam turbine generator set exceeds the generator basic load by 5% (this value is adjustable, generally the steam turbine basic load is 3-5%. When it is less than this value, the steam turbine is prone to reverse power).

[0063] Similarly, if the difference between the generator power and the No. 2 reactor power is ≥5%, it means that the No. 1 reactor has been connected to steam and its power contribution to the steam turbine generator set exceeds the generator basic load by 5%.

[0064] If either of the two conditions is met, variable A3 will be generated: "Two reactors are in operation, and the power of the steam-coordinated reactor exceeds the base load." This condition indicates that both reactors are in operation.

[0065] The interlock tripping of the generator set is controlled by the emergency shutdown interlock tripping steam turbine logic. The emergency shutdown interlock tripping steam turbine logic diagram is as follows: Figure 2 As shown in the figure, A1 represents the output of the first RS flip-flop; Ai represents the output of the Ith RS flip-flop, and i is 1, 2, 3, 4 and so on.

[0066] At the initial stage of startup, the operator needs to make all preparations before starting, so the operator has enough time to make the selection, so the selection is done manually by the operator.

[0067] The operator clicks the "PK1: Select Reactor 1 Power Operation" button through the human-machine interface. The pulse instruction keeps the signal as long-level signal A1 through the subsequent RS trigger link. Only when Reactor 1 is in power operation, if the "Reactor 1 Emergency Shutdown" condition occurs at this time, the long-level signal A1 and Reactor 1 Emergency Shutdown will generate an emergency shutdown and turbine trip signal through the AND gate. Figure 2 As shown, at this time, A1 becomes a long level, that is, A1 maintains a long 1 signal, and an AND is connected behind A1. AND has two inputs, and the other is the emergency shutdown of the No. 1 reactor. When both signals are 1, the AND output will become 1, so that the input of the OR gate connected to A5 is 1. After OR, A5 becomes 1. In this case, if the No. 1 reactor is manually selected to operate at power, then when the "No. 1 reactor emergency shutdown" condition occurs, the turbine will generate a trip command. In this embodiment, the above RS trigger is represented as a reset / set trigger.

[0068] Similarly, the operator clicks the "PK2: Select Reactor No. 2 Power Operation" button through the human-machine interface. The pulse instruction maintains the signal as the long level signal A2 through the subsequent RS trigger link. Only when Reactor No. 2 is operating at power, if the "Reactor No. 2 Emergency Shutdown" condition occurs at this time, the long level signal A2 and the Reactor No. 2 Emergency Shutdown will generate an emergency shutdown and turbine trip signal through the AND gate.

[0069] When the operator clicks the "PK3: Two-reactor power operation" button through the human-machine interface, this signal will pass through the RS trigger to reset the A1 and A2 signals, and the A1 and A2 signals will be set to "0". At this time, a single "reactor emergency shutdown" signal will not trigger the turbine trip. Only when the "No. 1 reactor emergency shutdown" and "No. 2 reactor emergency shutdown" are valid at the same time, will the emergency shutdown and turbine trip signal be generated.

[0070] To prevent human errors, the operator fails to operate "PK3: two-pile power operation" in time during the turbine power operation. We introduce the A3 signal and the PK3 signal into the OR gate together. The two have the same function and are used to reset the A1 and A2 signals, and set the turbine protection mode to the "two-pile power operation" mode.

[0071] No matter "PK1: Select reactor power operation of No. 1" or "PK2: Select reactor power operation of No. 2" mode is selected, the selected mode will be reset only by clicking the "PK4: Reset" button.

[0072] In this section, we will Figure 5 The basic process flow of the system is briefly described by taking the "Condition 2A - Cold Startup of Reactor No. 2" as an example. Figure 3 The main steam and start-stop system flow diagram shown in the figure is described in detail. To simplify the system flow, Figure 3 The flow chart shown does not show the steam traps and pre-start valves configured for each main valve, and the first letter "1" is omitted in each KKS code in the flow chart.

[0073] exist Figure 3 In the main steam system, the main steam pipe connection method is adopted. The main steam pipes from the two evaporators are combined into a main pipe through the bypass valve and led to the high-pressure cylinder. At the same time, it can also be led to the steam-water separator through the branch line. The steam-water separator is combined into a main pipe through the bypass valve and led to the high-pressure cylinder. Among them, the steam-water separator enters the condenser after being cooled and decompressed by the bypass valve. High-pressure combined steam valves are arranged on both sides of the high-pressure cylinder. The steam is respectively led out from the evaporator outlet manifold, and respectively through the pre-start valve configured by each main valve to form a main pipe and lead to the steam engine room. Before reaching the steam turbine, it is divided into two branch pipes and connected to the main steam valves on the left and right sides of the high-pressure cylinder respectively.

[0074] The pressure of the steam-water separator gradually increases with the increase of reactor power. When the pressure inside the steam-water separator reaches 5.0MPa(a) (the outlet temperature of the steam generator of the No. 2 reactor is ~265℃) and the liquid level in the steam-water separator stabilizes at the normal level, the bypass valves 11LBF20AA201 and 21LBF20AA201 are automatically put into operation. The bypass valves 11LBF20AA201 and 21LBF20AA201 control the internal pressure of the steam-water separator to be 5.0MPa(a). The steam enters the condenser after being cooled and reduced in pressure by the bypass valve.

[0075] When the steam temperature reaches 336.1℃, the outlet of the steam generator of the No. 2 reactor begins to produce steam. The outlet pressure of the steam generator of the No. 2 reactor is guaranteed by the regulating valves 1LBH10AA201 and 2LBH10AA201, and the flow rate is guaranteed by the electric speed-controlled feedwater pump and the feedwater regulating valve. Until the outlet of the steam generator of the No. 2 reactor is all dry saturated steam, the pressure in the steam-water separator at this stage is still controlled by the bypass valve 12LBF20AA201 at 5.0MPa(a).

[0076] When the outlet temperature of the steam generator of Reactor No. 2 reaches 400°C, valves 1LBH09AA101 and 2LBH09AA101 are interlocked and opened.

[0077] When valves 1LBH09AA101 and 2LBH09AA101 are fully opened, the bypass is changed to track the pressure behind the inlet regulating valve 12LBH10AA201 of the steam-water separator to maintain the pressure behind the inlet regulating valve at 5.0MPa(a).

[0078] After valve 12LBH09AA101 is fully opened for 30 seconds, valves 12LBH10AA102, 12LBH20AA101, 12LBH30AA101 and 12LBH50AA101 are interlocked and closed, and the steam-water separator is isolated.

[0079] The bypass valve 12LBF20AA201 controls the pressure behind the steam-water separator inlet regulating valve to rise from 5.0MPa(a) to 13.5MPa(a) according to the startup curve. During this process, the steam-water separator inlet regulating valve 12LBH10AA201 controls the outlet pressure of the steam generator of the No. 2 reactor to 13.9MPa(a).

[0080] When the outlet steam parameters of the steam generator of the No. 2 reactor reach a pressure difference of ≤0.2MPa and a temperature difference of ≤5℃ compared with the outlet steam parameters of the steam generator of the No. 1 reactor (13.9MPa(a), 571℃), the steam is cut to the main steam system pipeline of the No. 2 reactor.

[0081] Open the pre-start valves 12LBA20AA111 and 12LBA20AA112 on the main steam pipeline. When the pressure difference between the measuring points before and after the valves 12LBA20AA101 and 12LBA20AA102 is ≤0.2MPa and the temperature difference is ≤5℃, open the valves 12LBA20AA101 and 12LBA20AA102 in stages and close the pre-start valves 12LBA20AA111 and 12LBA20AA112.

[0082] The outlet pressure of the steam generator of the No. 2 reactor is controlled by the regulating valve 12LBH10AA201. The power of the steam turbine is slowly increased, the steam intake volume gradually increases, and the excess steam is discharged through the bypass valve 12LBF20AA201.

[0083] When the steam inlet of the steam turbine reaches 126.7kg / s, the bypass valve 12LBF20AA201 reaches the closed state, the control room manually closes the valve 12LBH10AA101, the valve 12LBH21AA101 interlocks to close, and the valve 12LBH10AA201 interlocks to fully open. The control room manually opens the valve 12LBF20AA101.

[0084] At this point, the start-stop stack pipeline where 12LBH10AA101 is located is cut off, and the steam from the steam generator outlet directly enters the turbine to perform work through the main lines 12LBA20AA101 and 12LBA20AA102.

[0085] It can be seen that when one reactor is running at full power and the turbine is connected to the grid for power generation, due to the overlap of various parameters and the large number of operating mode combinations, it is impossible to use the corresponding direct use of reactor power, main steam pressure, temperature parameters, etc. to determine whether the other reactor has completed steam connection and contributed to the turbine power. During the start and stop of the reactor, the reactor power and the generator power are not balanced, but in steady-state operation, the power of the two is balanced and corresponds one to one.

[0086] Since the reactor is shut down without stopping the machine, the turbine hot start condition is as follows, for example, condition 10B. Figure 6 As shown, at this time, the reactor is not started through the start-stop pipeline, but the steam at the steam generator outlet is directly discharged to the bypass system through 11 / 12LBA20AA101, 11 / 12LBA20AA102 reactor 1, reactor main steam electric isolation valve, main steam to bypass electric isolation valve 11 / 12LBF20AA101, so it is impossible to fully use the state of this valve to determine whether the reactor supplies steam to the steam turbine generator set.

[0087] The reactor is shut down urgently and the interlock will trip the feedwater pump. After the feedwater is isolated, the steam at the steam generator outlet will drop rapidly. In order to prevent the steam generator pressure from dropping too quickly, the steam generator outlet isolation valve will be interlocked and closed to cut off the steam supply to the secondary circuit system.

[0088] Two reactors are running with one machine. If both reactors are running at normal power and have supplied steam to the steam turbine normally, after a single reactor is shut down or the corresponding feedwater pump that supplies water to the steam generator is tripped, the distributed control system will trigger a rapid load reduction signal. After the steam turbine receives the rapid load reduction trigger signal, the coordinated control system will set the target load value based on the power level of the reactor that has not tripped. The steam turbine will reduce the power to the target setting value at the maximum load rejection speed. If both reactors are shut down in an emergency, the steam turbine will be triggered to trip urgently, and the corresponding bypass system will be activated to discharge excess steam.

[0089] Based on the reactor power characteristics and constant pressure operation requirements, the reactor startup and shutdown time is relatively long. Under ideal conditions, it takes about 720 minutes for the reactor to start from cold state to full power operation. Figure 4 As shown in working condition 1A.

[0090] Reactor emergency shutdown triggering turbine emergency tripping is a basic requirement for nuclear power unit protection. If both reactors experience emergency shutdown conditions, such as loss of plant power, triggering emergency shutdown protection of both reactors, the turbine should undoubtedly trip urgently. However, the two-reactor one-machine configuration has great particularity. During the power operation of a single reactor, the other reactor may be in various operating conditions such as "deep shutdown", "startup", "power reduction shutdown", etc. Figure 5 As shown in operating condition 2A, at this time, the No. 1 reactor is already running at full power, and the No. 2 reactor begins cold startup. Under ideal conditions, it takes about 500 minutes for the No. 2 reactor to start supplying heat to the steam turbine. Prior to this, only the No. 1 reactor supplies steam to the steam turbine. If an emergency shutdown accident occurs in the No. 1 reactor during this period, the steam turbine generator set must be interlocked and tripped.

[0091] The present invention will solve the problem of how to judge the operating status of another reactor and the steam share supplied to the steam turbine generator set during the power operation of a single reactor, so as to judge whether the emergency shutdown of the single reactor should interlock and trip the steam turbine.

[0092] The present invention can be extended to any two-reactor-one-machine nuclear power units. Combined with the system operation rules, the matching characteristics of the steam turbine and reactor power can be sorted out from numerous complex conditions. Through simple link processing, the operating relationship between the two reactors and the current steam turbine generator set can be determined. Combined with human factors engineering, manual selection is made by the operating personnel during startup, and manual and automatic modes are provided during power operation, which can prevent human errors and improve operational flexibility.

[0093] The present invention also takes into account the power contribution of the reactor connected with steam later to the steam turbine generator set. During the initial steam connection of the two reactors, if the power contribution of the reactor connected with steam later does not exceed the basic load, the other reactor may easily trigger the reverse power of the unit during the rapid load reduction period due to the low target load. In addition, various alarms will be triggered during the emergency shutdown of the reactor, and the operating personnel will have a heavy operating burden. At this time, tripping the steam turbine can more easily bring the unit to a safe state.

[0094] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for emergency shutdown of two reactors and one unit with a steam turbine, comprising a No. 1 reactor, a No. 2 reactor and a steam turbine generator set, characterized in that : The No. 1 reactor and the No. 2 reactor control the interlocking tripping of the steam turbine generator set according to the steam parallel working condition judgment logic; The steam parallel working condition judgment logic includes: Get the power of reactor 1; Get the power of Reactor 2; Get the generator power; The power difference between the generator power and the No. 1 reactor power is calculated by the SUM algorithm, and the obtained power difference is output to the high limit monitoring algorithm. If the difference between the generator power and the No. 1 reactor power is ≥5%, it indicates that the No. 2 reactor has been completed. The power difference between the generator power and the No. 2 reactor power is calculated by the SUM algorithm, and the obtained power difference is output to the high limit monitoring algorithm. If the difference between the generator power and the No. 2 reactor power is ≥5%, it indicates that the No. 1 reactor has been completed. If any of the conditions for the completion of the steam connection of Reactor No. 1 or Reactor No. 2 is met, it means that Reactor No. 1 and Reactor No. 2 are already in power operation; The interlocking tripping of the generator set is controlled by the emergency shutdown interlocking tripping steam turbine logic; The emergency shutdown interlock tripping steam turbine logic includes: Click the "PK1: Select No. 1 Reactor Power Operation" button through the human-machine interface, and the pulse instruction will maintain the signal as the long level signal A1 through the subsequent RS trigger link. Under the condition that only No. 1 reactor power is running, if the "No. 1 Reactor Emergency Shutdown" condition occurs, the long level signal A1 and the No. 1 Reactor Emergency Shutdown will generate an emergency shutdown and turbine trip signal through the AND gate; The emergency shutdown interlock tripping steam turbine logic also includes: By clicking the "PK2: Select No. 2 Reactor Power Operation" button through the human-machine interface, the pulse instruction maintains the signal as the long level signal A2 through the subsequent RS trigger link. Under the condition that only the No. 2 reactor is in power operation, if the "No. 2 Reactor Emergency Shutdown" condition occurs at this time, the long level signal A2 and the No. 2 Reactor Emergency Shutdown generate an emergency shutdown interlocking steam turbine signal through the AND gate; the emergency shutdown interlocking steam turbine trip logic includes: When the "PK3: Two-reactor power operation" button is clicked through the human-machine interface, the two-reactor power operation signals will pass through the RS trigger to reset the A1 and A2 signals, and the A1 and A2 signals will be set to "0". A single "reactor emergency shutdown" signal will not trigger the turbine tripping. When the "No. 1 reactor emergency shutdown" and "No. 2 reactor emergency shutdown" are valid at the same time, the execution will generate an emergency shutdown and turbine tripping signal.

2. The method for emergency shutdown and joint tripping of a two-reactuator reactor according to claim 1, characterized in that: The SUM algorithm includes: Get the generator power A; Get the power B of reactor No. 1 or reactor No. 2; Calculate the difference Y between the generator power and the stack power, where Y = AB.

3. The method for emergency shutdown and joint tripping of a two-reactuator reactor according to claim 1, characterized in that: The high limit monitoring algorithm includes: If the input value of the difference between the generator power and the stack power exceeds a fixed set value, the digital output flag is set to TRUE.

4. The method for emergency shutdown and joint tripping of steam turbines of two reactors in one unit according to claim 1, characterized in that: The emergency shutdown interlock tripping steam turbine logic includes: During the turbine power operation, if "PK3: two-pile power operation" is not operated in time, the A3 signal and the PK3 signal are introduced into the OR gate together. The A3 signal has the same function as the PK3 signal and is used to reset the A1 and A2 signals, and execute the turbine protection mode to the "two-pile power operation" mode.

5. The method for emergency shutdown and joint tripping of steam turbines of two reactors in one unit according to claim 1, characterized in that: The emergency shutdown interlock tripping steam turbine logic includes: clicking the "PK4: Reset" button and selecting the mode reset.

Citation Information

Patent Citations

  • Method and device for controlling reactor starting and stopping system of high-temperature gas cooled reactor nuclear power station

    CN103400621A