A parametric design method for shallow buried tunnels based on BIM

Through the parameterized design method of shallow buried tunnels based on BIM, the problem of low efficiency in shallow buried tunnel design in the existing technology is solved, and the efficient generation of the tunnel model and the storage of parameter information is realized, which is suitable for the entire life cycle of shallow buried tunnel engineering. application.

CN114528620BActive Publication Date: 2024-11-19TONGJI UNIV ARCHITECTURAL DESIGN INST GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210104136.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-28
Publication Date
2024-11-19
Estimated Expiration
2042-01-28

AI Technical Summary

Technical Problem

The lack of BIM parameterized design methods for shallow buried tunnels in the prior art, resulting in low design efficiency and high learning costs, and it is impossible to effectively apply BIM technology in shallow buried tunnel projects.

Method used

A parameterized design method for shallow buried tunnels based on BIM is provided. By obtaining geological exploration data and three-dimensional point coordinates of road centerlines, a tunnel centerline model is generated, and the tunnel net width and height are determined according to the design specifications, and the tunnel cross-section is carried out. Parameterized design, segment division and model generation, add auxiliary structural models, generate the final authentic model, and save design parameter information.

Benefits of technology

It improves the efficiency of three-dimensional design, solves the problem of lack of BIM design in shallow tunnels, provides the application basis of BIM model for the entire life cycle of shallow tunnel projects, and reduces the learning cost of designers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114528620B_ABST
    Figure CN114528620B_ABST
Patent Text Reader

Abstract

The present invention relates to a shallow buried tunnel parameter design method based on BIM, comprising the following steps: establishing a geological model according to geological survey data; establishing a spatial curve model of the tunnel centerline and its corresponding ground road centerline according to the overall design plan of the project; determining the tunnel net width and net height according to the specification, the design road grade and the speed; designing the tunnel cross section according to the geological conditions and the net width and net height, verifying by calculation, and establishing a parameterized tunnel cross section profile; dividing the tunnel according to the cross section type and the design segment length, generating a tunnel segment model according to the pile number to form a tunnel main body model; generating a tunnel auxiliary structure model, a cross bracing column model and an anti-pulling pile model according to the design, and obtaining the final tunnel overall model; generating a segment plan view, a cross section view, a segment parameter table, a pile position layout diagram and a pile position parameter table, and performing engineering quantity statistics. Compared with the prior art, the present invention solves the problem of the prior art lacking the use of BIM technology to design shallow buried tunnels, can improve the efficiency of three-dimensional design, and save the design parameter information in the BIM model.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an urban tunnel design method, and in particular to a BIM-based shallow buried tunnel parameterized design method. Background Art

[0002] BIM technology, based on three-dimensional digital technology, has the characteristics of visualization, parameterization, and collaboration. With the rapid promotion of BIM technology in the field of civil engineering, its application continues to deepen in the fields of design, construction, and operation and maintenance. It can reduce design adjustments, carry design information, improve design efficiency, guide construction, improve construction efficiency, and improve the informationization, digitization, and intelligence of tunnel operation and maintenance management. BIM technology has been widely used in civil building design, and it has also been applied to municipal tunnels. Municipal tunnels have the characteristics of strip distribution and follow the spatial curve. There are problems such as modeling difficulties, low efficiency, and high learning costs.

[0003] The patent with application number: CN201810000641.5 discloses a BIM-based highway tunnel design method, which is applicable to highway tunnels. The main modeling contents are lining structures, main tunnels, cross passages, support anchors, etc., which are not suitable for shallow buried tunnels. The patent with application number: CN201910939290.9 discloses a tunnel structure modeling method based on Dynamo, which uses Dynamo for visual programming. Although parameterization is performed, designers still need to learn how to use Dynamo, which has a high learning cost, and its modeling method is suitable for mountain tunnels that are divided into equally spaced small sections in horseshoe and ellipse shapes. At present, there is no BIM parametric design method for shallow buried tunnels. Summary of the invention

[0004] The purpose of the present invention is to provide a BIM-based parametric design method for shallow buried tunnels in order to overcome the defects of the above-mentioned prior art. The method solves the problem that the prior art lacks the use of BIM technology to design shallow buried tunnels, can improve the efficiency of three-dimensional design, and save the design parameter information in the BIM model.

[0005] The purpose of the present invention can be achieved by the following technical solutions:

[0006] The present invention provides a BIM-based shallow tunnel parametric design method, comprising the following steps:

[0007] S1: Acquire geological survey data, establish a geological model based on the geological survey data, and add geological attributes to the geological model in layers;

[0008] S2: Obtain the coordinates of the three-dimensional point on the road centerline, and generate the tunnel centerline model, tunnel flat curve model, ground road centerline model and ground road flat curve model in three-dimensional space according to the coordinates of the three-dimensional point on the road centerline, and add the starting pile number and the ending pile number information;

[0009] S3: Determine the clear width and height of the tunnel according to the design specifications, design road grade and design speed;

[0010] S4: According to the geological model and geological attributes of S1 and the clear width and clear height of the tunnel obtained by S3, the cross section of the tunnel is parametrically designed to obtain the cross section type of the tunnel;

[0011] S5: Determine the tunnel range according to the information of the starting pile number and the ending pile number, obtain the segment division design requirements, divide the tunnel into segments, and then determine the cross-sectional type of each segment based on the tunnel cross-sectional type in S4, batch generate tunnel segment models based on the model generated in S2, and then generate the tunnel main body model;

[0012] S6: Obtain the design requirements of the accessory structure model, the horizontal bracing column model and the anti-pulling pile model, and add the accessory structure model, the horizontal bracing column model and the anti-pulling pile model to the tunnel segment model in the tunnel main model of S5 to obtain the final tunnel model;

[0013] S7: Based on the tunnel model of S6, generate the tunnel segment plan, tunnel cross-section, tunnel segment parameter table, pile position layout diagram and pile position parameter table, and export the tunnel segment parameters, pile position parameters and engineering quantity statistics.

[0014] Preferably, the S1 is specifically:

[0015] Acquire geological survey data, establish a geological surface model based on the geological survey data; model the geological model by triangulated mesh surfaces between upper and lower geological layers of the geological surface model, and add geological attributes to the geological model in layers.

[0016] Preferably, the geological survey data includes drilling geological point information.

[0017] Preferably, S4 is specifically:

[0018] According to the geological model generated by S1 and the added geological attributes as well as the net width and net height of the tunnel obtained by S3, the tunnel cross section is parametrically designed through calculation. The tunnel cross section types include open section cross section and buried section cross section. The pavement thickness, width, plate thickness, wall thickness, chamfer and cushion layer of the tunnel cross section are determined according to the calculated design parameters to generate a variety of cross section profiles.

[0019] Preferably, the S5 comprises the following steps:

[0020] S5.1: Determine the tunnel range based on the starting pile number and the ending pile number information of S2, obtain the segment division design requirements, and then divide the tunnel into segments and mark the segment pile numbers;

[0021] S5.2: Calculate the corresponding point on the tunnel horizontal curve in S2 and the curve tangent vector corresponding to the corresponding point according to the starting and ending pile numbers of each segment, establish a vertical plane of the corresponding point by geometric method, make the vertical plane intersect with the tunnel centerline and the ground road centerline, obtain the three-dimensional point and three-dimensional point coordinates at the starting and ending pile numbers of each section; select points on the tunnel horizontal curve between the segment pile numbers at a certain interval, and calculate the corresponding three-dimensional points and three-dimensional point coordinates of the points selected between all segment pile numbers according to the method of obtaining the three-dimensional points and three-dimensional point coordinates at the pile numbers of each segment;

[0022] S5.3: Select the corresponding cross-section type of this section in the tunnel cross-section type of S4, place the cross-section contour at each 3D point obtained in S5.2, and rotate it according to the curve tangent vector of each 3D point so that the tunnel cross-section is perpendicular to the tunnel horizontal curve;

[0023] S5.4: For the open section of the tunnel, calculate the side wall height of each open section of the tunnel according to the three-dimensional elevation of the center line of the ground road obtained in S5.1 and the designed width and slope of the ground road, and use the tunnel cross section perpendicular to the horizontal curve of the tunnel in S5.3 to adjust the side wall height of each tunnel cross section; for the buried section of the tunnel, calculate the cover height of the buried section of the tunnel according to the parameters of the tunnel cross section type corresponding to the segment obtained in S4 and the center line of the ground road;

[0024] S5.5: Perform multi-section lofting on the multiple tunnel cross sections calculated and adjusted in S5.4 within the segment, generate a tunnel segment model, and add the tunnel segment parameters to the component properties of the tunnel segment model;

[0025] S5.6: Place the tunnel segment model generated in S5.5 at the corresponding stake number on the tunnel road centerline in S2 according to the segment stake number to generate the tunnel main body model.

[0026] Preferably, the tunnel segment parameters in S5.5 include segment pile number, cross-section type, tunnel centerline elevation, ground centerline design elevation, bottom plate side wall thickness, side wall height and material, etc.

[0027] Preferably, the step of adding the auxiliary structure model to the tunnel segment model in the tunnel main model in S5.6 is specifically as follows:

[0028] The component attribute information in S5.5 of the tunnel segment model is read, and the auxiliary structure model is designed for the tunnel segment model. The auxiliary structure includes the inspection road, anti-collision curb and road pavement.

[0029] Preferably, the width and height of the road pavement are automatically calculated based on the cross-sectional width of the tunnel segment, the width of the maintenance road or the kerb.

[0030] Preferably, the step of adding a cross bracing column model to the tunnel segment model in the tunnel main body model of S5.6 is specifically as follows:

[0031] Obtain the specific design requirements of the cross-bracing column model, calculate and adjust the cross-sectional dimensions of the cross-bracing, columns, and connecting beam components according to the design requirements, select the tunnel segment where the cross-bracing columns need to be added, read the segment pile number information, calculate the positioning points of the cross-bracing columns according to the designed layout spacing, and rotate according to the tangent vector to generate the cross-bracing column connecting beam model of the entire segment.

[0032] Preferably, the step of adding the pull-out pile model to the tunnel segment model in the tunnel main model of S5.6 is specifically as follows:

[0033] The design requirements of the pull-out pile model are obtained. According to the design requirements, the pull-out pile diameter and length parameters are selected, the layout form is selected, and the tunnel segment to be arranged is selected. According to the attribute information of the tunnel segment and the pile layout information, the pile positioning points are automatically calculated to generate the pull-out pile model.

[0034] Compared with the prior art, the present invention has the following advantages:

[0035] The present invention provides a parametric design method for shallow buried tunnels based on BIM, which solves the problem in the prior art that there is a lack of reference to BIM technology for designing shallow buried tunnels. The parametric design method for shallow buried tunnels based on BIM can improve the efficiency of three-dimensional design and save the designed parameter information in the BIM model, thus providing a basis for the application of BIM models in the entire life cycle of shallow buried tunnel projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 A flow chart of a BIM-based shallow tunnel parameter design method provided in this embodiment. DETAILED DESCRIPTION

[0037] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0038] Example

[0039] This embodiment provides a BIM-based shallow tunnel parametric design method, comprising the following steps:

[0040] S1: Establish a geological model based on geological exploration data and add geological attributes to the geological model in layers.

[0041] Based on the geological survey data, which specifically includes the information of drilling geological points, a geological surface model is established; the triangulated mesh between the upper and lower geological layers of the geological surface model is used to generate a geological model, and geological attributes are added to the geological model in layers.

[0042] S2: Generate the tunnel centerline model, tunnel horizontal curve model, ground road centerline model and ground road horizontal curve model in three-dimensional space according to the three-dimensional point coordinates of the road centerline provided by the road professional, and add the starting pile number and the ending pile number information.

[0043] S3: Determine the clear width and clear height of the tunnel based on the design specifications, design road grade and design speed.

[0044] With built-in specifications in the BIM software, the recommended clear width and clear height are quickly calculated, and the final clear width and clear height are determined by the designer.

[0045] The specific design specifications are "Highway Tunnel Design Specifications JTG3370.1-2018".

[0046] S4: Based on the geological model and geological attributes of S1 and the clear width and clear height of the tunnel obtained by S3, the tunnel cross section is parametrically designed to obtain the tunnel cross section type.

[0047] Specifically, according to the geological model generated by S1 and the added geological attributes, as well as the net width and net height of the tunnel obtained by S3, the tunnel cross section is parametrically designed through calculation, and the tunnel cross section types include open section cross section and buried section cross section. According to the calculated design parameters, the pavement thickness, width, plate thickness, wall thickness, chamfer and cushion layer of the tunnel cross section are determined to generate a variety of cross section profiles.

[0048] S5: Determine the scope of the tunnel according to the information of the starting pile number and the ending pile number, divide the tunnel into sections, and then determine the cross-sectional type of each section based on the tunnel cross-sectional type of S4, batch generate tunnel segment models based on the model generated by S2, and then generate the main tunnel model.

[0049] S5.1: Determine the tunnel range based on the starting pile number and the ending pile number information of S2, obtain the segment division design requirements, and then divide the tunnel into segments and mark the segment pile numbers;

[0050] S5.2: Calculate the corresponding point on the tunnel horizontal curve in S2 and the curve tangent vector corresponding to the corresponding point according to the starting and ending pile numbers of each segment, establish the vertical plane of the corresponding point by geometric method, make the vertical plane intersect with the center line of the tunnel and the center line of the ground road, obtain the three-dimensional points and three-dimensional point coordinates at the starting and ending pile numbers of each section; take points on the tunnel horizontal curve between the segment pile numbers at a certain interval, calculate the corresponding three-dimensional points and three-dimensional point coordinates of the points taken between all segment pile numbers according to the method of obtaining the three-dimensional points and three-dimensional point coordinates at each segment pile number.

[0051] S5.3: Select the corresponding cross-section type for this section in the tunnel cross-section type of S4, place this cross-section contour at each 3D point obtained in S5.2, and rotate it according to the curve tangent vector of each 3D point so that the tunnel cross-section is perpendicular to the tunnel horizontal curve.

[0052] S5.4: For the open section of the tunnel, calculate the side wall height of each open section of the tunnel based on the three-dimensional elevation of the center line of the ground road obtained in S5.1 and the preset road width and slope, and use the tunnel cross-section in S5.3 to adjust the side wall height of each tunnel cross-section at the point perpendicular to the horizontal curve of the tunnel; for the buried section of the tunnel, calculate the cover height of the buried section of the tunnel based on the parameters of the tunnel cross-section type corresponding to the segment obtained in S4 and the center line of the ground road.

[0053] S5.5: Perform multi-section lofting on the multiple tunnel cross sections calculated and adjusted in S5.4 within the segment, generate a tunnel segment model, and add the tunnel segment parameters to the component properties of the tunnel segment model.

[0054] The tunnel segment parameters include segment pile number, cross-section type, tunnel centerline elevation, ground centerline design elevation, bottom plate side wall thickness, side wall height and material, etc.

[0055] S5.6: Place the tunnel segment model generated in S5.5 at the corresponding stake number on the tunnel road centerline in S2 according to the segment stake number to generate the tunnel main body model.

[0056] S6: Add auxiliary structure models, cross bracing column models and pull-out pile models to the tunnel segment models of the tunnel main model in S5.6 as required to obtain the final tunnel model.

[0057] Auxiliary structure model: read the component attribute information in S5.5 of the tunnel segment model, and design an auxiliary structure model for the tunnel segment model. The auxiliary structure model includes the maintenance road, anti-collision curb and road pavement. Among them, for the road pavement, the width and height of the road pavement are automatically calculated according to the tunnel segment section width, maintenance road or anti-collision curb width;

[0058] Cross-bracing column model: obtain the specific design requirements of the cross-bracing column model, calculate and adjust the cross-sectional dimensions of the cross-bracing, columns, and connecting beam components according to the design requirements, select the tunnel segment where the cross-bracing columns need to be added, read the segment pile number information, calculate the positioning points of the cross-bracing columns according to the manually designed layout spacing, and generate the cross-bracing column connecting beam model of the entire segment according to the tangent vector rotation, and add the segment name attribute to the generated cross-bracing column connecting beam component.

[0059] The layout forms of the pull-out pile model include rectangular layout and plum blossom layout. Obtain the design requirements of the pull-out pile model, select the pull-out pile diameter and length parameters according to the design requirements, and select the layout form. Select the tunnel segment to be arranged, automatically calculate the pile positioning point according to the attribute information of the tunnel segment and the pile layout information, generate the pull-out pile model, and add the segment name attribute.

[0060] S7: Generate a tunnel segment plan, a tunnel cross-section, a tunnel segment parameter table, a pile position layout diagram and a pile position parameter table according to the final tunnel model obtained in S6, and export the tunnel segment parameters, pile position parameters and engineering quantity statistics.

[0061] By filtering the segment information, tunnel segment plan views and tunnel cross-section views are generated in batches according to the tunnel segments, and a tunnel segment parameter table is automatically generated; tunnel segments with piles are automatically judged, and a tunnel segment pile layout view and a pile position parameter table are generated.

[0062] Export to Excel with one click, classify by buried section and open section, export the structural information, parameters and engineering quantities of all tunnel sections, and export the parameter information and engineering quantities of tunnel pull-out piles.

[0063] The above methods are all developed using C# programming.

[0064] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.

Claims

1. A parametric design method for shallow buried tunnels based on BIM, characterized in that: The following steps are involved: S1: Acquire geological survey data, establish a geological model based on the geological survey data, and add geological attributes to the geological model in layers; S2: Obtain the coordinates of the three-dimensional point on the road centerline, and generate the tunnel centerline model, tunnel flat curve model, ground road centerline model and ground road flat curve model in three-dimensional space according to the coordinates of the three-dimensional point on the road centerline, and add the starting pile number and the ending pile number information; S3: Determine the clear width and height of the tunnel according to the design specifications, design road grade and design speed; S4: According to the geological model and geological attributes of S1 and the net width and net height of the tunnel obtained by S3, the cross section of the tunnel is parametrically designed to obtain the cross section type of the tunnel; S5: Determine the tunnel range according to the information of the starting pile number and the ending pile number, obtain the segment division design requirements, divide the tunnel into segments, and then determine the cross-sectional type of each segment based on the tunnel cross-sectional type in S4, batch generate tunnel segment models based on the model generated in S2, and then generate the tunnel main body model; S6: Obtain the design requirements of the accessory structure model, the horizontal bracing column model and the anti-pulling pile model, and add the accessory structure model, the horizontal bracing column model and the anti-pulling pile model to the tunnel segment model in the tunnel main model of S5 to obtain the final tunnel model; S7: Based on the tunnel model of S6, generate a tunnel segment plan, a tunnel cross-section, a tunnel segment parameter table, a pile position layout diagram and a pile position parameter table, and export the tunnel segment parameters, pile position parameters, and engineering quantity statistics; The S1 is specifically: Acquire geological survey data, establish a geological surface model based on the geological survey data; model the geological model by triangulating the surface between the upper and lower geological layers of the geological surface model, and add geological attributes to the geological model in layers; The geological survey data includes drilling geological point information; The S4 is specifically: According to the geological model generated by S1 and the added geological attributes, as well as the net width and net height of the tunnel obtained by S3, the tunnel cross section is parametrically designed through calculation. The tunnel cross section types include open section cross section and buried section cross section. The pavement thickness, width, plate thickness, wall thickness, chamfer and cushion layer of the tunnel cross section are determined according to the calculated design parameters, and various cross section profiles are generated; The S5 comprises the following steps: S5.1: Determine the tunnel range based on the starting pile number and the ending pile number information of S2, obtain the segment division design requirements, and then divide the tunnel into segments and mark the segment pile numbers; S5.2: Calculate the corresponding point on the tunnel horizontal curve in S2 and the curve tangent vector corresponding to the corresponding point according to the starting and ending pile numbers of each segment, establish a vertical plane of the corresponding point by geometric method, make the vertical plane intersect with the tunnel centerline and the ground road centerline, obtain the three-dimensional point and three-dimensional point coordinates at the starting and ending pile numbers of each section; select points on the tunnel horizontal curve between the segment pile numbers at a certain interval, and calculate the corresponding three-dimensional points and three-dimensional point coordinates of the points selected between all segment pile numbers according to the method of obtaining the three-dimensional points and three-dimensional point coordinates at the pile numbers of each segment; S5.3: Select the corresponding cross-section type of this section in the tunnel cross-section type of S4, place the cross-section contour at each 3D point obtained in S5.2, and rotate it according to the curve tangent vector of each 3D point so that the tunnel cross-section is perpendicular to the tunnel horizontal curve; S5.4: For the open section of the tunnel, calculate the side wall height of each open section of the tunnel according to the three-dimensional elevation of the center line of the ground road obtained in S5.1 and the designed width and slope of the ground road, and use the tunnel cross section perpendicular to the horizontal curve of the tunnel in S5.3 to adjust the side wall height of each tunnel cross section; for the buried section of the tunnel, calculate the cover height of the buried section of the tunnel according to the parameters of the tunnel cross section type corresponding to the segment obtained in S4 and the center line of the ground road; S5.5: Perform multi-section lofting on the multiple tunnel cross sections calculated and adjusted in S5.4 within the segment, generate a tunnel segment model, and add the tunnel segment parameters to the component properties of the tunnel segment model; S5.6: Place the tunnel segment model generated in S5.5 at the corresponding stake number on the tunnel road centerline in S2 according to the segment stake number to generate the tunnel main body model.

2. The BIM-based shallow tunnel parametric design method according to claim 1 is characterized in that: The tunnel segment parameters in S5.5 include segment pile number, cross-section type, tunnel centerline elevation, ground centerline design elevation, bottom plate side wall thickness, side wall height and material.

3. The BIM-based shallow tunnel parametric design method according to claim 1 is characterized in that: The specific steps for adding the auxiliary structure model to the tunnel segment model in the tunnel main model of S5.6 are as follows: The component attribute information in S5.5 of the tunnel segment model is read, and the auxiliary structure model is designed for the tunnel segment model. The auxiliary structure includes the inspection road, anti-collision curb and road pavement.

4. The BIM-based shallow tunnel parametric design method according to claim 3 is characterized in that: The width and height of the road pavement are automatically calculated according to the cross-sectional width of the tunnel segment, the width of the maintenance road or the anti-collision curb.

5. The BIM-based shallow tunnel parametric design method according to claim 1 is characterized in that: The specific steps for adding a cross bracing column model to the tunnel segment model in the tunnel main model of S5.6 are as follows: Obtain the specific design requirements of the cross-bracing column model, calculate and adjust the cross-sectional dimensions of the cross-bracing, columns, and connecting beam components according to the design requirements, select the tunnel segment where the cross-bracing columns need to be added, read the segment pile number information, calculate the positioning points of the cross-bracing columns according to the designed layout spacing, and rotate according to the tangent vector to generate the cross-bracing column connecting beam model of the entire segment.

6. The BIM-based shallow tunnel parametric design method according to claim 1 is characterized in that: The specific steps for adding the pull-out pile model to the tunnel segment model in the tunnel main model of S5.6 are as follows: The design requirements of the pull-out pile model are obtained. According to the design requirements, the pull-out pile diameter and length parameters are selected, the layout form is selected, and the tunnel segment to be arranged is selected. According to the attribute information of the tunnel segment and the pile layout information, the pile positioning points are automatically calculated to generate the pull-out pile model.