A method and system for calculating the flow rate of a run-of-river hydropower station based on water level

By installing water level gauges in the pressure forebay and tailrace systems of run-of-river hydropower stations, and using water level changes to calculate the power generation flow rate and flow deviation, the problem of difficult-to-determine inflow rate of run-of-river hydropower stations has been solved, enabling accurate flow calculation and a reasonable start-up plan.

CN114548715BActive Publication Date: 2024-11-26HENAN ZHENGDA WATER CONSERVANCY TECH CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202210126834.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-11
Publication Date
2024-11-26
Estimated Expiration
2042-02-11

AI Technical Summary

Technical Problem

The inflow of run-of-river hydropower stations is difficult to determine accurately. Existing flow measurement devices have large errors and are costly, making it difficult to formulate a reasonable start-up plan to match the inflow.

Method used

By installing water level measuring devices in the pressure forebay and tailrace system of a hydropower station, the power generation reference flow and flow deviation are calculated using water level changes. Combined with channel flow velocity and water level-area relationship, the inflow of a run-of-river hydropower station is estimated.

Benefits of technology

It enables more accurate calculation of the inflow of run-of-river hydropower stations, improving the rationality of start-up plans and the matching of power station operation.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The present invention provides a method for calculating the flow rate of a run-of-river hydropower station based on the water level. The method calculates the power generation flow rate of the power station by obtaining the water level of the pressure forebay and the tailwater level. At the same time, the flow deviation value is calculated according to the layout of the water diversion system, so as to obtain the flow rate of the hydropower station. The calculation method can better realize the calculation of the flow rate of the power station based on the operating performance of the power station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to water conservancy projects, and in particular to a calculation method and system for calculating the flow rate of a run-of-river hydropower station according to a water level. Background Art

[0002] Run-of-river hydropower stations are a common form of hydropower station structure in my country. They directly use natural runoff or channel flow to generate electricity. This type of hydropower station does not have the ability to regulate the incoming flow. Therefore, the water flow rate used for power generation needs to match the actual incoming flow of the power station. However, due to the uncertainty of the amount of water used by the unit, it is often difficult to determine a reasonable startup plan to adapt to the matching of the incoming flow in the actual process.

[0003] For the operation of run-of-river hydropower stations, it is necessary to know the incoming flow of the power station. However, the flow measuring device has a large error and the installation cost is high. In order to objectively reflect the quoted flow and deviation value of the power station, the water level can be used for calculation. If the flow is large, the water level rises, and vice versa. Therefore, the water level can be used to reversely calculate the flow. Summary of the invention

[0004] Based on the above technical problems, the present invention provides a method and system for calculating the flow rate of a run-of-river hydropower station according to the water level.

[0005] A method for calculating the flow rate of a run-of-river hydropower station according to the water level, wherein the run-of-river hydropower station comprises a water diversion channel, a pressure forebay, a pressure pipeline, a hydro-turbine generator set and a tailwater system, wherein the water diversion channel is a rectangular channel with a bottom width of b, the water diversion channel is connected to the pressure forebay, the pressure pipeline is connected to the pressure forebay, the pressure pipeline is connected to the hydro-turbine generator set, the hydro-turbine generator set is connected to the tailwater system, the hydro-turbine generator set is configured as n units, wherein n is an integer greater than or equal to 1, a water level measuring device is installed on the pressure forebay, and a tailwater level measuring device is installed in the tailwater system, and the flow rate is calculated as follows:

[0006] S1: Obtain the change in the water level of the pressure forebay in the time period T, assuming that the water level of the pressure forebay at the beginning of the time period is Hs1, and the water level at the end of the time period is Hs2;

[0007] S2: Obtain the tailwater level change in the time period T. The tailwater level is measured and obtained by the tailwater level measuring device. The tailwater level at the beginning of the time period is Hw1, and the tailwater level at the end of the time period is Hw2. The beginning and end times of the time period of the tailwater level and the forebay water level are consistent;

[0008] S3: obtaining an average tailwater level Hw within a time period T, wherein the average tailwater level is the average of Hw1 and Hw2, finding a tailwater level flow curve of the power station, and using Hw to obtain a power generation reference flow of the power station;

[0009] S4: Find the water level-area curve of the pressure forebay, and find the area A1 corresponding to Hs1 and the area A2 corresponding to Hs2;

[0010] S5: Determine the water flow velocity v in the water diversion channel according to the power generation reference flow rate and the bottom width and bottom slope of the water diversion channel;

[0011] S6: Calculate the change in water volume in the pressure forebay and channel during the period T, the change in water volume V = (A1 / 2 + A2 / 2 + v × T × b) × (Hs2-Hs1); when Hs1 is less than Hs2, V is a positive value, and when Hs1 is greater than Hs2, V is a negative value;

[0012] S7: The deviation value between the power station's referenced flow and the incoming flow is V / T; the incoming flow of the power station is equal to the sum of the referenced flow and the deviation value. When Hs1 is less than Hs2, the deviation value is positive, and when Hs1 is greater than Hs2, the deviation value is negative.

[0013] Preferably, the tailwater level flow curve in S3 can obtain the power generation reference flow of the power station according to any tailwater level.

[0014] Preferably, the tailwater flow curve is related to the layout of the tailwater pool and the tailwater channel of the power station.

[0015] Preferably, the water level-area curve of the pressure forepool can obtain the area corresponding to the pressure forepool according to any water level of the pressure forepool.

[0016] Preferably, the water diversion channel is a channel with a regular cross-section.

[0017] Preferably, the time period T is 3 minutes or 5 minutes.

[0018] A system that applies the above-mentioned method for calculating the flow rate of a run-of-river hydropower station based on the water level, characterized in that: the system includes a power generation reference flow calculation module and a deviation value calculation module, the power generation reference flow calculation module is used to calculate the power generation reference flow of the power station based on the tail water level, and the deviation value calculation module is used to calculate the deviation value based on the water level change of the forebay and the power generation reference flow.

[0019] Preferably, the system is characterized in that: the system further comprises an incoming flow calculation module, and the incoming flow calculation module is used to calculate the incoming flow of the power station according to the power generation reference flow and the deviation value.

[0020] The present invention arranges water level gauges on the forebay and tailwater of the hydropower station, and uses the water level gauges to reflect the operating status and water volume changes of the units respectively, and uses the tailwater level to reflect the water consumption of the units. Since the tailwater level is the water discharge of the units after power generation, it can reflect the actual water consumption of the power station, and the tailwater flow curve can be obtained through experiments or hydraulic calculation methods; the water level change in the forebay reflects the change in the water volume accommodated in the forebay, and combined with the influence of the end of the channel, it can more accurately reflect the actual water inflow of the power station.

[0021] Beneficial effects:

[0022] The present invention provides a method for calculating the flow rate of a run-of-river hydropower station based on the water level. The method calculates the power generation flow rate of the power station by obtaining the water level of the pressure forebay and the tailwater level. At the same time, the flow deviation value is calculated according to the layout of the water diversion system, so as to obtain the flow rate of the hydropower station. The calculation method can better realize the calculation of the flow rate of the power station based on the operating performance of the power station. DETAILED DESCRIPTION

[0023] The present invention provides a calculation method for calculating the flow rate of a run-of-river hydropower station according to a water level. The run-of-river hydropower station comprises a water diversion channel, a pressure forebay, a pressure pipeline, a hydro-turbine generator set and a tailwater system. The water diversion channel is a rectangular channel with a bottom width of b. The water diversion channel is connected to the pressure forebay, the pressure pipeline is connected to the pressure forebay, the pressure pipeline is connected to the hydro-turbine generator set, the hydro-turbine generator set is connected to the tailwater system, the hydro-turbine generator set is configured as n units, n is an integer greater than or equal to 1, a water level measuring device is installed on the pressure forebay, and a tailwater level measuring device is installed in the tailwater system. The calculation method of the flow rate is as follows:

[0024] S1: Obtain the change in the water level of the pressure forebay in the time period T, assuming that the water level of the pressure forebay at the beginning of the time period is Hs1, and the water level at the end of the time period is Hs2;

[0025] S2: Obtain the tailwater level change in the time period T. The tailwater level is measured and obtained by the tailwater level measuring device. The tailwater level at the beginning of the time period is Hw1, and the tailwater level at the end of the time period is Hw2. The beginning and end times of the time period of the tailwater level and the forebay water level are consistent;

[0026] S3: obtaining an average tailwater level Hw within a time period T, wherein the average tailwater level is the average of Hw1 and Hw2, finding a tailwater level flow curve of the power station, and using Hw to obtain a power generation reference flow of the power station;

[0027] S4: Find the water level-area curve of the pressure forebay, and find the area A1 corresponding to Hs1 and the area A2 corresponding to Hs2;

[0028] S5: Determine the water flow velocity v in the water diversion channel according to the power generation reference flow rate and the bottom width and bottom slope of the water diversion channel;

[0029] S6: Calculate the change in water volume in the pressure forebay and channel during the period T, the change in water volume V = (A1 / 2 + A2 / 2 + v × T × b) × (Hs2-Hs1); when Hs1 is less than Hs2, V is a positive value, and when Hs1 is greater than Hs2, V is a negative value;

[0030] S7: The deviation value between the power station's referenced flow and the incoming flow is V / T; the incoming flow of the power station is equal to the sum of the referenced flow and the deviation value. When Hs1 is less than Hs2, the deviation value is positive, and when Hs1 is greater than Hs2, the deviation value is negative.

[0031] Preferably, the tailwater level flow curve in S3 can obtain the power generation reference flow of the power station according to any tailwater level.

[0032] Preferably, the tailwater flow curve is related to the layout of the tailwater pool and the tailwater channel of the power station.

[0033] Preferably, the water level-area curve of the pressure forepool can obtain the area corresponding to the pressure forepool according to any water level of the pressure forepool.

[0034] Preferably, the water diversion channel is a channel with a regular cross-section.

[0035] Preferably, the time period T is 3 minutes or 5 minutes.

[0036] A system that applies the above-mentioned method for calculating the flow rate of a run-of-river hydropower station based on the water level, characterized in that: the system includes a power generation reference flow calculation module and a deviation value calculation module, the power generation reference flow calculation module is used to calculate the power generation reference flow of the power station based on the tail water level, and the deviation value calculation module is used to calculate the deviation value based on the water level change of the forebay and the power generation reference flow.

[0037] Preferably, the system is characterized in that: the system further comprises an incoming flow calculation module, and the incoming flow calculation module is used to calculate the incoming flow of the power station according to the power generation reference flow and the deviation value.

[0038] The tailwater flow curve is generally provided during the design of a power station, and can also be calculated based on the layout of the tailwater pool and tailwater channel according to hydraulics. Due to the large fluctuation of tailwater, when measuring the tailwater level, the average of multiple values ​​near the moment can be taken as the tailwater level at that moment, thereby eliminating noise and filtering.

[0039] The flow velocity of the water diversion channel is calculated by adopting the open channel hydraulic calculation method, taking into account the bottom width, bottom slope, roughness, etc. of the channel to calculate its flow velocity, which is proportional to the flow rate.

[0040] The principle logic of this method is that there is a deviation between the incoming flow and the power generation flow. If the water level in the forebay rises, it means that the incoming flow is greater than the power generation flow of the unit. Then, the water increase value caused by the rising water level in the forebay during the time period is calculated. In addition to affecting the volume of the pressure forebay, this water increase value also affects a part of the end of the channel. The part of the end of the channel can be obtained by multiplying the channel flow velocity by the time period to get the affected distance. This processing method can more accurately reflect the current power station's incoming flow relationship. If the pressure forebay rises faster, it means that the incoming flow is larger. Conversely, if the water level in the pressure forebay drops, it means that the incoming flow is less than the power station's reference flow. At this time, the power station's reference flow should be reduced, such as reducing the load.

[0041] The above-mentioned embodiments are only preferred embodiments of the present invention. The protection scope of the present invention should not be regarded as limited to the specific forms described in the embodiments. The protection scope of the present invention also includes equivalent technical means that can be thought of by those skilled in the art based on the concept of the present invention.

Claims

1. A method for calculating the flow rate of a run-of-river hydropower station according to the water level, wherein the run-of-river hydropower station comprises a water diversion channel, a pressure forebay, a pressure pipeline, a hydro-turbine generator set and a tailwater system, wherein the water diversion channel is a rectangular channel with a bottom width of b, the water diversion channel is connected to the pressure forebay, the pressure pipeline is connected to the pressure forebay, the pressure pipeline is connected to the hydro-turbine generator set, the hydro-turbine generator set is connected to the tailwater system, the number of the hydro-turbine generator sets is n, and n is an integer greater than or equal to 1, a water level measuring device is installed on the pressure forebay, and a tailwater level measuring device is installed in the tailwater system, and the method for calculating the flow rate is as follows: S1: Obtain the change in the water level of the pressure forebay in the time period T, assuming that the water level of the pressure forebay at the beginning of the time period is Hs1, and the water level at the end of the time period is Hs2; S2: Obtain the tailwater level change in the time period T. The tailwater level is measured and obtained by the tailwater level measuring device. The tailwater level at the beginning of the time period is Hw1, and the tailwater level at the end of the time period is Hw2. The beginning and end times of the time period of the tailwater level and the forebay water level are consistent; S3: obtaining an average tailwater level Hw within a time period T, wherein the average tailwater level is the average of Hw1 and Hw2, finding a tailwater flow curve of the power station, and using Hw to obtain a power generation reference flow of the power station; S4: Find the water level-area curve of the pressure forebay, and find the area A1 corresponding to Hs1 and the area A2 corresponding to Hs2; S5: Determine the water flow velocity v in the water diversion channel according to the power generation reference flow rate and the bottom width and bottom slope of the water diversion channel; S6: Calculate the change in water volume in the pressure forebay and channel during the period T, the change in water volume V = (A1 / 2 + A2 / 2 + v × T × b) × (Hs2-Hs1); when Hs1 is less than Hs2, V is a positive value, and when Hs1 is greater than Hs2, V is a negative value; S7: The deviation value between the power station's referenced flow and the incoming flow is V / T; the incoming flow of the power station is equal to the sum of the referenced flow and the deviation value. When Hs1 is less than Hs2, the deviation value is positive, and when Hs1 is greater than Hs2, the deviation value is negative.

2. The method for calculating the flow rate of a run-of-river hydropower station according to the water level as claimed in claim 1, characterized in that: The tailwater flow curve in S3 is used to obtain the power generation reference flow of the power station according to any tailwater level.

3. The method for calculating the flow rate of a run-of-river hydropower station according to the water level as claimed in claim 2, characterized in that: The tailwater flow curve is related to the layout of the tailwater pool and the tailwater channel of the power station.

4. The method for calculating the flow rate of a run-of-river hydropower station according to the water level as claimed in claim 1, characterized in that: The water level-area curve of the pressure forepool is used to obtain the area corresponding to the pressure forepool according to any water level of the pressure forepool.

5. The method for calculating the flow rate of a run-of-river hydropower station according to the water level as claimed in claim 1, characterized in that: The water diversion channel is a channel with a regular cross section.

6. The method for calculating the flow rate of a run-of-river hydropower station according to the water level as claimed in claim 1, characterized in that: The time period T is 3 minutes or 5 minutes.

7. A system using the method for calculating the flow rate of a run-of-river hydropower station according to the water level as claimed in any one of claims 1 to 6, characterized in that: The system includes a power generation reference flow calculation module and a deviation value calculation module. The power generation reference flow calculation module is used to calculate the power generation reference flow of the power station according to the tail water level, and the deviation value calculation module is used to calculate the deviation value according to the forebay water level change and the power generation reference flow.

8. The system for calculating the flow rate of a run-of-river hydropower station according to the water level as claimed in claim 7, characterized in that: The system further comprises an incoming flow calculation module, which is used to calculate the incoming flow of the power station according to the power generation reference flow and the deviation value.

Citation Information

Patent Citations

  • Automatic optimization method of radial flow hydropower station based on output regulation

    CN108252276A

  • Radial flow type hydropower station forebay water level adjusting method and system

    CN111810344A

  • Method and system for calculating generating flow of reservoir hydropower station unit

    CN113919718A

  • Method and system for calculating power generation flow of radial flow type hydropower station, and output adjusting method

    CN113919719A