Control method and system for blade hanger

Through the blade spreader control method and system, the length of the cable wind rope is adjusted by sensors and controllers to achieve high-precision angle adjustment of the blade spreader, solving the problem of low blade lifting accuracy and efficiency in the existing technology, and reducing offshore wind power Installation cost.

CN114572816BActive Publication Date: 2024-11-12CHENGDU SHIWEI TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210271571.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-08-26
Publication Date
2024-11-12
Estimated Expiration
2040-08-26

AI Technical Summary

Technical Problem

During the lifting of blades of wind turbines, it is difficult for the prior art to achieve high-precision and small angle adjustments, resulting in a long installation process and poor versatility, which increases the installation cost of offshore wind power.

Method used

A blade spreader control method and system is adopted to adjust the lead length of the cable spreader by combining counterweight units, blade fixtures, booms, winches and cable wind ropes, and the length sensor and controller are used to adjust the lead length of the cable wind ropes to achieve the height of the blade spreader. The accuracy is slightly adjusted to keep the flange surface at the root of the blade approximately parallel to the preset flange surface of the hub.

Benefits of technology

It improves the accuracy and efficiency of blade lifting, simplifies the connection between blades and wheel hubs, and reduces installation costs and time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114572816B_ABST
    Figure CN114572816B_ABST
Patent Text Reader

Abstract

Provided are a control method and system for a blade hanger, the blade hanger comprising a counterweight unit, a blade clamp, a hanger rod, a first winch, a second winch, a first wind scoop and a second wind scoop, the control method comprising: in response to the lead-out length information of the wind rope of the first winch and the lead-out length information of the wind rope of the second winch, determining that the lead-out length difference between the two wind ropes exceeds a first length difference range, controlling the first winch and the second winch to adjust the lead-out lengths of the corresponding wind ropes to adjust the lead-out length difference, thereby changing the second inclination angle of the blade hanger; in response to the lead-out length information of the wind rope of the first winch and the lead-out length information of the wind rope of the second winch, determining that the lead-out length difference between the two wind ropes remains within the first length difference range, controlling the first winch and the second winch to stop adjusting the lead-out lengths of the corresponding wind ropes to ensure that the flange surface of the blade root of the first blade clamped by the blade clamp is parallel to the preset flange surface of the hub on which the first blade is installed.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application is a divisional application of the invention patent application with application date of August 26, 2020, application number 202010873853.1, and invention name “Control method and system for blade hanger”. Technical Field

[0002] The present invention relates to the technical field of wind power generation, and more specifically, to a control method and system for a blade hanger. Background Art

[0003] As the capacity of wind turbines continues to increase, the size of wind turbine blades has also gradually increased. For example, the length of offshore wind turbine blades has exceeded 90 meters and the weight has exceeded 35 tons. Due to the weight of the blades, it is becoming increasingly difficult to accurately connect the blades to the hub during aerial operations.

[0004] With the rapid development of offshore wind power generation technology in my country. Offshore wind power has also developed rapidly and the technology has become increasingly mature. New high-power 8MW and 10MW models of different models are constantly being launched. Therefore, the hoisting process of wind turbines is constantly being improved, and the requirements for hoisting equipment and hoisting time required during the installation of wind turbines are getting higher and higher. At present, the hoisting method of single blades of high-power models is often horizontally installed, which requires the rotation of the impeller of the wind turbine. The rotation of the impeller of the direct-drive permanent magnet wind turbine is complicated and time-consuming, resulting in high hoisting costs for offshore units. Improving the installation efficiency of offshore wind power and saving the use time of ships can increase the installation speed of offshore wind power and save the investment cost of offshore wind power.

[0005] In the existing process of lifting blades, when the blade rotation angle is close to the required blade angle, the angle may be too much or too little. The blade angle cannot be accurately adjusted to the required angle in a short time. It takes a long time and multiple adjustments to reach the required angle. It is also related to the experience of the lifting equipment operator and is difficult to control, resulting in a long installation process and poor versatility. Summary of the invention

[0006] Exemplary embodiments of the present invention provide a control method and system for a blade hanger to achieve high-precision fine-angle adjustment of a blade clamp.

[0007] One aspect of the present invention provides a control method for a blade hoist, the blade hoist comprises a counterweight unit, a blade clamp, a suspension rod, a first winch, a second winch, a first wind lever and a second wind lever, the blade clamp is used to clamp the blade; the counterweight unit and the blade clamp are both connected to the suspension rod and are located on different sides of the suspension rod, and the first winch and the second winch are arranged on the counterweight unit; the first end of the first wind lever and the first end of the second wind lever are both connected to the counterweight unit, and the second end of the first wind lever and the second end of the second wind lever point to different sides away from the counterweight unit in opposite directions; the first winch and the second winch are respectively provided with a wind rope, and the second end of the first wind lever and the second end of the second wind lever are respectively provided with a guide wheel; after the wind rope of the first winch is led out from the first winch, it is connected to the boom of the lifting device through the guide wheel of the first wind lever; after the wind rope of the second winch is led out from the second winch, it is connected to the boom of the lifting device through the guide wheel of the second wind lever; the control method comprises: in response to a first wind rope received from a first length sensor The lead-out length information of the wind rope of the winch and the lead-out length information of the wind rope of the second winch received from the second length sensor determine that the lead-out length difference of the two wind ropes exceeds the first length difference range, and the first winch and the second winch are controlled to adjust the lead-out lengths of the corresponding wind ropes to adjust the lead-out length difference, thereby changing the second inclination angle of the blade hanger; in response to the lead-out length information of the wind rope of the first winch received from the first length sensor and the lead-out length information of the wind rope of the second winch received from the second length sensor, it is determined that the lead-out length difference of the two wind ropes remains within the first length difference range, and the first winch and the second winch are controlled to stop adjusting the lead-out lengths of the corresponding wind ropes to ensure that the flange surface of the blade root of the first blade clamped by the blade clamp is approximately parallel to the preset flange surface of the hub on which the first blade is installed; wherein, the blade hanger has a second reference line parallel to the extension direction of the first wind scoop and the second wind scoop, and the second inclination angle is the angle formed by the second reference line at the current position and the second reference line at the initial position.

[0008] In one embodiment of the present invention, in response to determining that the difference in the lead-out lengths of the two guy ropes exceeds a first length difference range based on the lead-out length information of the guy rope of the first winch received from the first length sensor and the lead-out length information of the guy rope of the second winch received from the second length sensor, the first winch and the second winch are controlled to adjust the lead-out lengths of the corresponding guy ropes to adjust the lead-out length difference, including: in response to determining that the difference in the lead-out lengths of the two guy ropes exceeds a lower limit value of the first length difference range based on the lead-out length information of the guy rope of the first winch received from the first length sensor and the lead-out length information of the guy rope of the second winch received from the second length sensor, the first winch and the second winch are controlled to adjust the lead-out lengths of the corresponding guy ropes to increase the lead-out length difference; in response to determining that the difference in the lead-out lengths of the two guy ropes exceeds an upper limit value of the first length difference range based on the lead-out length information of the guy rope of the first winch received from the first length sensor and the lead-out length information of the guy rope of the second winch received from the second length sensor, the first winch and the second winch are controlled to adjust the lead-out lengths of the corresponding guy ropes to reduce the lead-out length difference.

[0009] In one embodiment of the present invention, controlling the first winch and the second winch to adjust the corresponding lead-out lengths of the guy ropes to adjust the lead-out length difference includes: controlling the first winch to adjust the lead-out length of its guy rope to a first preset length, and controlling the second winch to adjust the lead-out length of its guy rope to a second preset length, so that the lead-out length difference remains within the first length difference range.

[0010] In one embodiment of the present invention, in response to determining that the lead-out length difference of the two wind ropes is maintained within a first length difference range based on the lead-out length information of the wind rope of the first winch received from the first length sensor and the lead-out length information of the wind rope of the second winch received from the second length sensor, the first winch and the second winch are controlled to stop adjusting the lead-out lengths of the corresponding wind ropes to ensure that the flange surface of the blade root of the first blade clamped by the blade clamp is roughly parallel to the preset flange surface of the hub on which the first blade is installed, including: in response to determining that the lead-out length difference of the two wind ropes is a first difference value based on the lead-out length information of the wind rope of the first winch received from the first length sensor and the lead-out length information of the wind rope of the second winch received from the second length sensor, the first winch and the second winch are controlled to stop adjusting the lead-out lengths of the corresponding wind ropes to ensure that the flange surface of the blade root of the blade is parallel to the preset flange surface.

[0011] In one embodiment of the present invention, a first length sensor is arranged on the first winch for detecting and sending the lead-out length information of the guy rope of the first winch; a second length sensor is arranged on the second winch for detecting and sending the lead-out length information of the guy rope of the second winch.

[0012] In one embodiment of the present invention, the control method also includes: in response to determining that the second inclination angle exceeds a preset angle range based on the second inclination information received from the second inclination sensor, controlling the first winch and the second winch to stop adjusting the lead-out length of the corresponding guy rope, and / or sending an alarm message.

[0013] In one embodiment of the present invention, a second inclination sensor is provided on the counterweight unit for detecting and sending second inclination information of the blade hanger.

[0014] According to another aspect of the present invention, a control system for a blade hoist is provided, wherein the blade hoist comprises a counterweight unit, a blade clamp, a boom, a first winch, a second winch, a first wind lever and a second wind lever, wherein the blade clamp is used to clamp the blade; the counterweight unit and the blade clamp are both connected to the boom and are located on different sides of the boom, and the first winch and the second winch are arranged on the counterweight unit; the first end of the first wind lever and the first end of the second wind lever are both connected to the counterweight unit, and the second end of the first wind lever and the second end of the second wind lever point to different sides away from the counterweight unit in opposite directions; the first winch and the second winch are respectively provided with a wind rope, and the second end of the first wind lever and the second end of the second wind lever are respectively provided with a guide wheel; after the wind rope of the first winch is led out from the first winch, it is connected to the boom of the lifting device through the guide wheel of the first wind lever; after the wind rope of the second winch is led out from the second winch, it is connected to the boom of the lifting device through the guide wheel of the second wind lever; the control system comprises a controller, and the controller is configured to: respond to the wind rope based on the wind rope from the first length sensor The first winch and the second winch are controlled to adjust the corresponding lead-out lengths of the wind ropes to adjust the lead-out length difference, thereby changing the second inclination angle of the blade hanger; in response to determining that the lead-out length difference of the two wind ropes is maintained within the first length difference range based on the lead-out length information of the wind rope of the first winch received from the first length sensor and the lead-out length information of the wind rope of the second winch received from the second length sensor, the first winch and the second winch are controlled to stop adjusting the lead-out lengths of the corresponding wind ropes to ensure that the flange surface of the blade root of the first blade clamped by the blade clamp is approximately parallel to the preset flange surface of the hub on which the first blade is installed; wherein the blade hanger has a second reference line parallel to the extension direction of the first wind scoop and the second wind scoop, and the second inclination angle is the angle formed by the second reference line at the current position and the second reference line at the initial position.

[0015] The control method and system of the blade hanger provided by the present invention have the following beneficial effects: based on the blade hanger provided by the present invention, the movement of the telescopic rod of the telescopic mechanism can be controlled according to the detected inclination information of the hanger, or the first winch and the second winch can be controlled to adjust the lead-out length of the corresponding cable wind rope, so as to realize high-precision small angle adjustment of the blade hanger, so that the flange surface at the root of the blade can remain roughly parallel to the preset flange surface of the hub, so as to facilitate and smoothly carry out the connection work between the blade and the hub.

[0016] Additional aspects and / or advantages of the present general inventive concept will be set forth in part in the following description and in part will be obvious from the description, or may be learned through practice of the present general inventive concept. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The above and other objects and features of the present invention will become more apparent through the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0018] Figure 1 is a perspective view showing a blade hanger according to an exemplary embodiment of the present invention.

[0019] Figure 2 is a perspective view showing a partial structure of a blade hanger according to an exemplary embodiment of the present invention.

[0020] Figure 3 yes Figure 2 Magnified view of part A.

[0021] Figure 4 is a perspective view showing a suspension rod of a blade hanger according to an exemplary embodiment of the present invention.

[0022] Figure 5 is a front view showing a suspension rod of a blade hanger according to an exemplary embodiment of the present invention.

[0023] Figure 6 is a perspective view showing a suspension point connection beam according to an exemplary embodiment of the present invention.

[0024] Figure 7 2 is a front view showing a suspension point connection beam according to an exemplary embodiment of the present invention.

[0025] Figure 8 Schematic diagram showing a blade being hoisted by a blade hoist according to an exemplary embodiment of the present invention.

[0026] Fig. 9 is a diagram showing an application scenario of a method for controlling a blade hanger according to an exemplary embodiment of the present invention.

[0027] Fig.10 is a flow chart showing a method for controlling a blade hanger according to an exemplary embodiment of the present invention.

[0028] Fig.11 1 is a schematic diagram showing the application of the control method of the blade hanger according to the exemplary embodiment of the present invention to the first flange surface of the hub.

[0029] Fig.12 is a flow chart illustrating another method for controlling a blade hanger according to an exemplary embodiment of the present invention.

[0030] Fig.13 3 is a schematic diagram showing the application of the control method of the blade hanger according to the exemplary embodiment of the present invention to the second flange surface of the hub.

[0031] Fig.14 3 is a schematic diagram showing the application of the control method of the blade hanger according to the exemplary embodiment of the present invention to the third flange surface of the hub.

[0032] Description of Figure Numbers:

[0033] 10: blade clamp; 11: clamp crossbeam; 12: clamping part;

[0034] 21: suspension rod; 22: suspension point connecting beam; 221: base; 222: first outer flange; 223: second outer flange; 241a: auxiliary groove; 222a, 223a: auxiliary rails; 244a, 245a: limiting protrusions; 222b, 223b: limiting grooves; 23: lifting ears; 241: top wall; 242: first side wall; 243: second side wall; 244: first inner flange; 245: second inner flange; 246: connecting hinge seat; 25: rolling element; 225: accommodating groove;

[0035] 30: telescopic mechanism; 40: counterweight unit; 41: hydraulic station; 42: generator; 50: drive assembly; 51: first winch; 52: second winch; 61: first cable wind pole; 62: second cable wind pole. DETAILED DESCRIPTION

[0036] Now, embodiments according to the present invention will be described in detail with reference to the accompanying drawings, examples of which are shown in the accompanying drawings, wherein like reference numerals refer to like components throughout.

[0037] First, refer to Figures 1 to 7 The blade hanger provided according to the exemplary embodiment of the present invention is described in detail. Figure 1 As shown, the blade hanger may include some or all of the following components: a blade clamp 10, a hanger rod 21, a hanger point connecting beam 22, a telescopic mechanism 30, a counterweight unit 40, a first winch 51, a second winch 52, a first wind cable rod 61 and a second wind cable rod 62.

[0038] For example, the blade hanger may include a counterweight unit 40, a blade clamp 10, a suspension point connection beam 22, a suspension rod 21 and a telescopic mechanism 30, wherein the blade clamp 10 is used to clamp the blade. A guide rail is formed on the suspension point connection beam 22, the first end of the suspension rod 21 is used to connect with the hook, and the second end of the suspension rod 21 is slidably connected to the guide rail; the counterweight unit 40 and the blade clamp 10 are located on different sides of the suspension rod 21 in the extension direction of the guide rail, and are respectively connected to the suspension point connection beam 22; the first end of the telescopic mechanism 30 is connected to the counterweight unit 40, and the second end of the telescopic mechanism 30 is connected to the second end of the suspension rod 21, so as to drive the suspension rod 21 to move along the guide rail through the telescopic rod movement of the telescopic mechanism 30.

[0039] Optionally, more than two telescopic mechanisms 30 may be provided, and the telescopic rods of the more than two telescopic mechanisms 30 may move simultaneously to drive the suspension rod 21 to move along the guide rail.

[0040] For another example, the blade hanger may include a counterweight unit 40, a blade clamp 10, a hanger rod 21, a first winch 51, a second winch 52, a first wind-catching rod 61 and a second wind-catching rod 62, and the blade clamp 10 is used to clamp the blade. The counterweight unit 40 and the blade clamp 10 are both connected to the boom 21 and are located on different sides of the boom 21, and the first winch 51 and the second winch 52 are arranged on the counterweight unit 40; the first end of the first wind lever 61 and the first end of the second wind lever 62 are both connected to the counterweight unit 40, and the second end of the first wind lever 61 and the second end of the second wind lever 62 point to different sides away from the counterweight unit 40 in opposite directions; the first winch 51 and the second winch 52 are respectively provided with a guy rope, and the second end of the first wind lever 61 and the second end of the second wind lever 62 are respectively provided with a guide wheel; after the guy rope of the first winch 51 is led out from the first winch 51, it is connected to the boom of the lifting equipment through the guide wheel of the first wind lever 61; after the guy rope of the second winch 52 is led out from the second winch 52, it is connected to the boom of the lifting equipment through the guide wheel of the second wind lever 62.

[0041] The suspension rod 21 may include a first end connected to a hook of a lifting device, and a second end for coupling with a suspension point connecting beam 22 on the counterweight unit 40. The first end of the suspension rod 21 may be provided with a lifting lug 23 for coupling with the hook, and the second end may be provided with a snap-fit ​​groove for coupling with the suspension point connecting beam 22. Figure 2 As shown, as an example, the suspension rod 21 may be formed to include an A-shaped body and a snap-in groove formed below the A-shaped body. A first end (i.e., the upper end) of the A-shaped body of the suspension rod 21 may be formed with a lifting ear 23 for connecting with a hook of a lifting device. The snap-in groove may be formed at a second end (i.e., the lower end) of the A-shaped body of the suspension rod 21. The opening of the snap-in groove may face downward to face the suspension point connecting beam 22, so that the guide rail of the suspension point connecting beam 22 is accommodated therein and the suspension rod 21 may slide along the guide rail.

[0042] Specifically, Figures 2 to 5 As shown, the engaging groove may include a top wall 241, a first side wall 242 and a second side wall 243 extending downward from both sides of the top wall 241, and a first inner flange 244 and a second inner flange 245 extending from one end of the first side wall 242 and the second side wall 243 away from the top wall 241 in a horizontal direction and facing each other by a predetermined length. In addition, a connecting hinge seat 246 may be formed inwardly at the middle of the top wall 241 of the engaging groove, and a second end of a telescopic mechanism 30 such as a hydraulic cylinder may be connected to the connecting hinge seat 246, and the engaging groove can roll along the guide rail of the suspension point connecting beam 22 (described in detail later).

[0043] The suspension point connecting beam 22 can be integrally formed as a guide rail, for example, the suspension point connecting beam 22 can be a T-shaped beam. Figure 2 , Figure 3 and Figure 6 As shown, the guide rail may include a base 221 and a first outer flange 222 and a second outer flange 223 extending laterally from the base 221. The first outer flange 222 and the second outer flange 223 may be inserted into the engaging groove of the suspension rod 21 and supported by the first inner flange 244 and the second inner flange 245, respectively. Under the telescopic action of the telescopic mechanism 30, the first inner flange 244 and the second inner flange 245 may slide along the first outer flange 222 and the second outer flange 223.

[0044] In addition, a receiving groove 225 may be formed on the base 221, and the second end of the telescopic mechanism 30 rolls along the track in the receiving groove 225. As an example, the second end of the telescopic mechanism 30 may be formed or provided with a roller, and the connecting hinge seat 246 provided in the engaging groove of the suspension rod 21 may be formed as two connecting legs and may be provided with an ear hole, and the roller may be provided between the two connecting legs and connected by a rotating shaft. By providing the receiving groove 225, the telescopic mechanism 30 can be hidden under the suspension rod 21, so that the telescopic mechanism 30 can be prevented from being exposed to rain and corrosion, thereby extending the service life of the telescopic mechanism 30.

[0045] Optionally, rolling elements 25 may be provided between the upper surface of the first inner flange 244 and the lower surface of the first outer flange 222 and between the upper surface of the second inner flange 245 and the lower surface of the second outer flange 223, respectively, to reduce the friction resistance when the first inner flange 244 and the second inner flange 245 slide along the first outer flange 222 and the second outer flange 223. The rolling element 25 may be a cylindrical roller or other similar components.

[0046] When the rolling element 25 is provided, when the roller at the second end of the telescopic mechanism 30 rolls along the track in the accommodating groove 225, the rolling element 25 can roll at the same time, so that the sliding motion between the suspension rod 21 and the guide rail can be further optimized into a rolling motion, thereby reducing the friction force, ensuring the safety of the force, and increasing the effective load of the telescopic mechanism 30.

[0047] In addition, if Figure 3 As shown, two auxiliary grooves 241a may be formed on the inner surface of the top wall 241 along the length direction of the engaging groove. Accordingly, an auxiliary track 222a may be formed on the upper surface of the first outer flange 222 along the length direction of the suspension point connecting the cross beam 22, and an auxiliary track 223a may be formed on the upper surface of the second outer flange 223 along the length direction of the suspension point connecting the cross beam 22. The auxiliary groove 241a can accommodate the auxiliary tracks 222a and 223a, and can slide relative to the auxiliary tracks 222a and 223a under the drive of the telescopic mechanism 30. Optionally, the auxiliary groove 241a may be formed as an arc-shaped groove (for example, a semicircular cross section), and the auxiliary tracks 222a and 223a may be formed as arc-shaped protrusions (for example, a semicircular cross section) that match the auxiliary groove 241a, but are not limited thereto.

[0048] By setting the auxiliary groove 241a and the auxiliary rails 222a and 223a, not only can the engaging groove of the suspension rod 21 be assisted to slide along the guide rail, but also because the auxiliary rails 222a and 223a are accommodated in the auxiliary groove 241a, the movement of the engaging groove can be guided to a certain extent, thereby avoiding the engaging groove from shifting in the lateral direction (i.e., the width direction of the engaging groove), making the suspension point movement process more stable.

[0049] Figure 3 Although the auxiliary groove 241a is shown to be formed on the inner surface of the top wall 241, and the auxiliary rails 222a and 223a are formed on the upper surface of the first outer flange 222 and the upper surface of the second outer flange 223, the positions of the auxiliary groove 241a and the auxiliary rails 222a and 223a can be interchanged as needed.

[0050] In addition, the ends of the upper surfaces of the first inner flange 244 and the second inner flange 245 may be respectively formed with upwardly protruding limiting protrusions 244a and 245a along the length direction of the engaging groove. Correspondingly, the lower surfaces of the first outer flange 222 and the second outer flange 223 may be formed with limiting grooves 222b and 223b that cooperate with the limiting protrusions 244a and 245a. The limiting protrusions 244a and 245a may be accommodated in the limiting grooves 222b and 223b, and can slide relative to the limiting grooves 222b and 223b under the drive of the telescopic mechanism 30. Of course, the formation positions of the limiting protrusions 244a and 245a and the limiting grooves 222b and 223b may also be interchangeable.

[0051] By further providing the limiting protrusions 244a and 245a and the limiting grooves 222b and 223b, the displacement of the engaging groove in the lateral direction can be further avoided. That is, by providing the limiting protrusions 244a and 245a and the limiting grooves 222b and 223b, the lateral eccentric load force that may exist during the hoisting process can be limited within the limiting grooves 222b and 223b, ensuring that when the lateral force is unbalanced, the engaging groove of the suspension rod 21 will not be displaced in the lateral direction or even one side of the engaging groove will be separated from the guide rail.

[0052] Alternatively, if Figure 5 and Figure 7 As shown, the distance between the surfaces facing each other of the first side wall 242 and the second side wall 243 is D1, the distance between the limiting groove 222b of the first outer flange 222 and the limiting groove 223b of the second outer flange 223 is D2, the distance between the end surfaces of the first outer flange 222 and the second outer flange 223 facing each other is D3, and the distance between the limiting protrusion 244a of the first inner flange 244 and the limiting protrusion 245a of the second inner flange 245 is D4. D1, D2, D3 and D4 can be designed as (D1-D3)<(D4-D2).

[0053] By designing D1, D2, D3 and D4 to satisfy (D1-D3)<(D4-D2), it is ensured that when subjected to lateral offset load, the force is transmitted to the first outer flange 222 and the second outer flange 223 instead of to the limiting groove 222b and the limiting groove 223b. Therefore, when the force is directly transmitted to the surface of the first outer flange 222 and the second outer flange 223 instead of to the edge of the limiting groove 222b and the limiting groove 223b, the force-bearing area can be increased, thereby avoiding the edges of the limiting groove 222b and the limiting groove 223b being damaged by the force, resulting in the displacement of the locking groove in the lateral direction, thereby further ensuring the safety of lifting.

[0054] In addition, in addition to the drive assembly 50, the counterweight unit 40 may also be provided with a power source (such as a hydraulic station, a pump station or a generator, etc.) for providing power to the telescopic mechanism 30. Optionally, a counterweight block (not shown) may be provided in the counterweight unit 40 as required.

[0055] When the telescopic mechanism 30 is a hydraulic cylinder, as shown in the figure, the blade hanger may include a hydraulic station 41, which is arranged on the counterweight unit 40, and the hydraulic station 41 is used to provide hydraulic oil to the telescopic mechanism 30. When the telescopic mechanism 30 is a cylinder, the blade hanger may include an air pump (not shown in the figure), which may be arranged on the counterweight unit 40, and the air pump is used to provide pressurized gas to the telescopic mechanism 30 and the backup telescopic mechanism 470. When the telescopic mechanism 30 is an electric push rod, the electric push rod has a motor, and the motor can drive the movement of the telescopic rod 422. As shown in the figure, the blade hanger may include a generator 42, and the generator 42 can supply power to the electric push rod.

[0056] Each winch (such as the first winch 51 or the second winch 52) may include a motor, a reducer and a winch, and the cable wind rope is wound on the winch. When the motor is controlled to run, the motor drives the winch to rotate forward or reverse through the reducer, thereby releasing or retracting the cable wind rope, thereby adjusting the lead-out length of the cable wind rope.

[0057] Optionally, the motor can be started and stopped by a frequency converter or by a soft starter.

[0058] Figure 8 Schematic diagram of a blade hanger for hoisting a blade according to an embodiment of the present invention is shown in FIG. When hoisting a blade, the two clamping parts 12 can respectively clamp different parts of the blade. The blade hanger can adjust the position of the hanging point according to the weight of the blade, and then adjust the posture of the blade during the hoisting process, so as to improve the balance of the blade during the hoisting process and obtain the desired posture. In addition, a required counterweight block (not shown) can also be provided, and the blade can reach the desired posture through the dual effects of the counterweight block and the adjustment of the hanging point.

[0059] The blade clamp 10 may include a clamp beam 11 and clamping portions 12 disposed at both ends of the clamp beam 11. The blade hanger may further include a driving assembly 50, which may be disposed on the counterweight unit 40 and used to drive the blade clamp 10 to rotate relative to the counterweight unit 40, thereby adjusting the pitch angle of the blade clamp 10. The clamp beam 11 is rotatably coupled to the driving assembly 50, so that the clamping portion 12 may be driven to rotate by the rotation of the clamp beam 11.

[0060] The drive assembly 50 can drive the blade clamp 10 to rotate at a larger angle (such as 360 degrees) relative to the counterweight unit 40, so that the blade clamp 10 can reach any desired angle. During the blade installation process, there is no need to turn the hub, saving blade lifting time and reducing costs.

[0061] The exemplary embodiments of the present invention provide two control methods for blade hangers, and the two control methods are applied in different scenarios. Fig. 9 is an application scenario diagram showing a control method for a blade hanger of an exemplary embodiment of the present invention. Fig. 9 The application scenarios of the control method are described.

[0062] The hub on which the blade is to be mounted comprises a first flange surface, a second flange surface and a third flange surface, wherein the first flange surface faces downward, and the axis of the first flange surface and the rotation axis of the hub are in the same vertical plane, and the vertical plane is perpendicular to Fig. 9 The hub is in the viewing direction and parallel to the axial direction of the tower. The hub can remain stationary during the installation of the blades.

[0063] Scenario 1: The blade clamped by the blade clamp is adjusted to the flange surface of its blade root, close to and facing the first flange surface of the hub.

[0064] Scenario 2: The blade clamped by the blade clamp is adjusted to the flange surface of its blade root, close to and facing the second flange surface or the third flange surface of the hub.

[0065] In scenario one, a blade hanger control method provided by an exemplary embodiment of the present invention is executed to make the flange surface of the blade root of the blade clamped by the blade clamp substantially parallel to the first flange surface of the hub on which the blade is mounted.

[0066] In scenario two, another blade hanger control method provided by an exemplary embodiment of the present invention is executed to make the flange surface of the blade root of the blade clamped by the blade clamp substantially parallel to the second flange surface or the third flange surface of the hub on which the blade is mounted.

[0067] Fig.10 is a flow chart showing a control method of a blade hanger according to an exemplary embodiment of the present invention, which control method is applied to scenario one.

[0068] Reference Fig.10 In step S710, in response to determining that the angle difference between the first inclination angle of the blade hanger and the first target inclination angle exceeds the first angle difference range based on the first inclination information received from the first inclination sensor, the telescopic rod movement of the telescopic mechanism 30 is controlled to drive the suspension rod 21 to move along the guide rail to reduce the angle difference.

[0069] The blade hanger has a first reference line perpendicular to the extension direction of the guide rail, and the first inclination angle is an angle formed by the first reference line in the current position and the first reference line in the vertical position.

[0070] Fig.11 2 is a schematic diagram showing the application of the control method of the blade hanger according to the exemplary embodiment of the present invention to the first flange surface of the hub. Fig.11 , straight line L1 represents the first reference line at the current position, straight line L2 represents the first reference line in the vertical position, and the angle between straight line L1 and straight line L2 is the first inclination angle.

[0071] When the suspension rod 21 moves along the guide rail, the position of the center of gravity of the blade suspension device relative to the suspension point will change, so that the blade suspension device as a whole will rotate relative to the suspension point, thereby changing the current position of the first reference line and causing the first inclination angle to change.

[0072] like Fig.11 As shown, in scenario 1, when the flange surface of the blade root of the first blade is parallel to the preset flange surface (i.e., the first flange surface) of the hub on which the first blade is installed, the angle between the swept surface of the first blade and the axial direction of the tower is β2, and at this time, the angle formed by the first reference line at the current position and the first reference line in the vertical position should be β1, that is, the first target inclination angle is β1. The purpose of step S710 is to reduce the angle difference between the first inclination angle and the first target inclination angle by driving the suspension rod 21 to move along the guide rail so that the expected first inclination angle approaches the first target inclination angle.

[0073] It should be noted that the first reference line is a virtual line used to define the first inclination angle and has no physical meaning.

[0074] It should be noted here that when the telescopic mechanism 30 is a hydraulic cylinder, the hydraulic station 41 can be directly controlled to adjust the oil supply state of each telescopic mechanism 30, thereby changing the movement state of the telescopic rod of each telescopic mechanism 30. For example, an action command can be sent to the electric proportional valve that controls the action of the hydraulic cylinder in the hydraulic station 41, thereby driving the hydraulic cylinder to move at a preset speed (such as 1 mm / s), thereby driving the boom 21 to move along the guide rail.

[0075] When the telescopic mechanism 30 is a cylinder, the air pump can be directly controlled to adjust the air supply state to each telescopic mechanism 30, thereby changing the motion state of the telescopic rod of each telescopic mechanism 30. When the telescopic mechanism 30 is an electric push rod, the running state of the motor in each electric push rod can be directly controlled to change the motion state of the telescopic rod of each telescopic mechanism 30.

[0076] In step S720, in response to determining that the angle difference between the first inclination angle of the blade hanger and the first target inclination angle is maintained within a first angle difference range based on the first inclination information received from the first inclination sensor, the telescopic rod of the telescopic mechanism 30 is controlled to stop moving to ensure that the flange surface of the blade root of the first blade clamped by the blade clamp 10 is approximately parallel to the preset flange surface of the hub on which the first blade is installed.

[0077] It can be understood that the smaller the angle difference is, the closer the flange surface of the root of the first blade is to being parallel to the preset flange surface of the hub on which the first blade is installed; in the optimal case, the angle difference can be zero, and the flange surface of the root of the first blade remains parallel to the preset flange surface of the hub on which the first blade is installed.

[0078] Due to some uncontrollable factors (such as the working conditions at the installation site, the working accuracy of the telescopic mechanism 30, or the detection accuracy of the first inclination sensor, etc.), it may take a long time to adjust the angle difference to zero, or it may not be completely guaranteed that the angle difference can be adjusted to zero. Based on the above reasons, a first angle difference range can be set, and the angle difference is maintained within the first angle difference range so that the flange surface of the blade root of the first blade clamped by the blade clamp 10 is roughly parallel to the preset flange surface of the hub on which the first blade is installed.

[0079] It should be noted that the first angle difference range should meet the following requirements: when the angle difference remains within the first angle difference range, the error in parallelism between the flange surface of the root of the first blade clamped by the blade clamp 10 and the preset flange surface of the hub on which the first blade is installed does not affect the connection between the two.

[0080] On the premise that the first angle difference range meets the above requirements, the first angle difference range can be determined according to actual design requirements. For example, the first angle difference range is set to 0 degrees to 0.5 degrees, but the first angle difference range is not limited thereto.

[0081] Optionally, a first inclination sensor may be provided on the counterweight unit 40 , and the first inclination sensor is used to detect and send first inclination information of the blade hanger.

[0082] In one embodiment of the present invention, step S710 includes the following operations:

[0083] In response to determining, based on the first inclination information received from the first inclination sensor, that the angle difference between the first inclination angle of the blade hanger and the first target inclination angle exceeds the first angle difference range, and the first inclination angle is greater than the first target inclination angle, the telescopic rod of the telescopic mechanism 30 is controlled to extend to drive the second end of the hanger 21 to move along the guide rail in the first moving direction to reduce the angle difference.

[0084] In response to determining, based on the first inclination information received from the first inclination sensor, that the angle difference between the first inclination angle of the blade hanger and the first target inclination angle exceeds the first angle difference range, and the first inclination angle is less than the first target inclination angle, the telescopic rod of the telescopic mechanism 30 is controlled to perform a contraction movement to drive the second end of the hanger 21 to move along the guide rail in the second moving direction to reduce the angle difference.

[0085] Here, the side of the suspension point close to the blade clamp 10 is defined as the front side of the suspension point, and the side of the suspension point close to the counterweight unit 40 is defined as the rear side of the suspension point. It can be understood that when the part of the blade hanger except the suspension rod 21 moves toward the front side of the suspension point, the first inclination angle of the blade hanger increases; when the part of the blade hanger except the suspension rod 21 moves toward the rear side of the suspension point as a whole, the first inclination angle of the blade hanger decreases.

[0086] When the angle difference between the first inclination angle of the blade hanger and the first target inclination angle exceeds the first angle difference range, and the first inclination angle is greater than the first target inclination angle, the telescopic rod of the telescopic mechanism 30 is controlled to extend to drive the second end of the suspension rod 21 to move along the guide rail in the first moving direction, that is, moving in the first moving direction causes the entire portion of the blade hanger other than the suspension rod 21 to move toward the rear side of the suspension point, thereby reducing the first inclination angle to approach the first target inclination angle, thereby achieving the purpose of reducing the angle difference. When the angle difference between the first inclination angle of the blade hanger and the first target inclination angle exceeds the first angle difference range, and the first inclination angle is less than the first target inclination angle, the telescopic rod of the telescopic mechanism 30 is controlled to retract to drive the second end of the suspension rod 21 to move along the guide rail in the second moving direction, that is, moving in the second moving direction causes the entire portion of the blade hanger other than the suspension rod 21 to move toward the front side of the suspension point, thereby increasing the first inclination angle to approach the first target inclination angle, thereby achieving the purpose of reducing the angle difference.

[0087] In one embodiment of the present invention, step S710 includes the following operations: controlling the extension length of the telescopic rod of the telescopic mechanism 30 to change to a preset length to drive the suspension rod 21 to move along the guide rail to reduce the angle difference; if the reduced angle difference still exceeds the first angle difference range, continuing to control the movement of the telescopic rod of the telescopic mechanism 30 to drive the suspension rod 21 to move along the guide rail to continue to reduce the angle difference.

[0088] The preset length may be a length value obtained through experiments or calculations, or may be an empirical value recorded in the process of installing blades using the same blade hanger control method. For example, using the blade hanger control method provided by the exemplary embodiment of the present invention, a previous blade of the same model as the first blade is installed, and when the flange surface of the blade root of the previous blade is approximately parallel to the preset flange surface of the hub on which the first blade is installed, the extension length of the telescopic rod of the telescopic mechanism 30 at this time is recorded, and the recorded extension length is used as the preset length.

[0089] When the extended length of the telescopic rod of the telescopic mechanism 30 is a preset length, the angle difference between the first inclination angle of the blade hanger and the first target inclination angle will decrease and there is a greater probability that it will remain within the first angle difference range. At this time, the flange surface of the blade root of the first blade clamped by the blade clamp 10 is roughly parallel to the preset flange surface of the hub on which the first blade is installed; even if the reduced angle difference still exceeds the first angle difference range, at this time, the reduced angle difference is also likely to be closer to the first angle difference range, and the telescopic rod movement of the telescopic mechanism 30 can continue to be controlled according to the previous embodiment to drive the hanger 21 to move along the guide rail, thereby continuing to reduce the angle difference.

[0090] In one embodiment of the present invention, step S720 includes the following operations: in response to determining that the angle difference between the first inclination angle of the blade hanger and the first target inclination angle is zero based on the first inclination angle information received from the first inclination angle sensor, controlling the telescopic rod of the telescopic mechanism 30 to stop moving, so as to ensure that the flange surface of the blade root of the first blade is parallel to the preset flange surface. Adjusting the flange surface of the blade root of the first blade to be parallel to the preset flange surface of the hub can reduce the difficulty of connecting the flange surface of the blade root to the preset flange surface of the hub.

[0091] In one embodiment of the present invention, the control method of the blade hanger applied to scenario one also includes the following operation: in response to receiving a limit switch trigger signal from a limit switch sensor arranged on the guide rail, controlling the telescopic rod of the telescopic mechanism 30 to stop moving.

[0092] The limit switch sensor is arranged on the guide rail of the suspension point connecting the crossbeam 22. Preferably, it can include two, which are respectively arranged on both sides of the guide rail. When the suspension rod 21 moves to the limit position along the guide rail, a limit switch trigger signal is sent. When the limit switch trigger signal is received, the telescopic rod of the telescopic mechanism 30 can be controlled to stop moving, which can limit the moving range of the suspension rod 21 (which is also equivalent to limiting the range of the extension length of the telescopic rod of the telescopic mechanism 30), thereby avoiding the first inclination angle of the blade hanger being too large or too small.

[0093] Fig.12 is a flow chart showing a control method of a blade hanger according to an exemplary embodiment of the present invention, and the control method is applied to scenario two.

[0094] Reference Fig.12 In step S810, in response to determining that the difference in the lead-out lengths of the two wind ropes exceeds a first length difference range based on the lead-out length information of the wind rope of the first winch 51 received from the first length sensor and the lead-out length information of the wind rope of the second winch 52 received from the second length sensor, the first winch 51 and the second winch 52 are controlled to adjust the lead-out lengths of the corresponding wind ropes to adjust the lead-out length difference, thereby changing the second inclination angle of the blade hanger.

[0095] The blade hanger has a second reference line parallel to the extension direction of the first wind-grabbing rod 61 and the second wind-grabbing rod 62, and the second inclination angle is the angle formed by the second reference line at the current position and the second reference line at the initial position.

[0096] Fig.13 3 is a schematic diagram showing the application of the control method of the blade hanger according to the exemplary embodiment of the present invention to the second flange surface of the hub. Fig.14 2 is a schematic diagram showing the application of the control method of the blade hanger according to the exemplary embodiment of the present invention to the third flange surface of the hub. Fig.13 and Fig.14 , straight line N1 represents the second reference line at the current position, straight line N2 represents the second reference line at the initial position, and the angle between straight line N1 and straight line N2 is the second inclination angle.

[0097] The initial position of the second reference line can be determined according to actual design requirements. In one embodiment of the present invention, the position of the second reference line when the lead-out length of the guy rope of the first winch 51 is the same as the lead-out length of the guy rope of the second winch 52 is used as the initial position of the second reference line.

[0098] It should be noted that for different preset flange surfaces (the second flange surface and the third flange surface) in scenario 2, the first length difference range may be different.

[0099] Reference Fig.13 When the flange surface of the root of the first blade is parallel to the second flange surface of the hub on which the first blade is installed, the angle formed by the second reference line at the current position and the second reference line at the initial position is α1, and the difference in the lead-out lengths of the two guy ropes is S1. Changing the difference in the lead-out lengths of the two guy ropes can adjust the size of the second inclination angle.

[0100] Depend on Fig.13 It can be known that α1 and S1 have the following relationship: Sin(α1)=|S1| / M, wherein M is the length between the second end of the first wind-catching rod 61 and the second end of the second wind-catching rod 62 .

[0101] The first length difference range is a length range including S1, and the first length difference range should meet the following requirements: when the lead-out length difference of the two guy ropes is within the first length difference range, the second inclination angle can be made close to or equal to α1.

[0102] Reference Fig.14When the flange surface of the root of the first blade is parallel to the third flange surface of the hub on which the first blade is installed, the angle formed by the second reference line at the current position and the second reference line at the initial position is α2, and the difference in the lead-out lengths of the two guy ropes is S2. The size of the second inclination angle can be adjusted by changing the difference in the lead-out lengths of the two guy ropes.

[0103] Depend on Fig.14 It can be known that α2 and S2 have the following relationship: Sin(α2)=|S2| / M, wherein M is the length between the second end of the first wind-catching rod 61 and the second end of the second wind-catching rod 62 .

[0104] The first length difference range is a length range including S2, and the first length difference range should meet the following requirements: when the lead-out length difference of the two guy ropes is within the first length difference range, the second inclination angle can be made close to or equal to α2.

[0105] Optionally, a first length sensor may be provided on the first winch 51 for detecting and sending information on the lead-out length of the guy rope of the first winch 51 ; a second length sensor may be provided on the second winch 52 for detecting and sending information on the lead-out length of the guy rope of the second winch 52 .

[0106] Step S820, in response to determining that the difference in the lead-out lengths of the two wind ropes is maintained within a first length difference range based on the lead-out length information of the wind rope of the first winch 51 received from the first length sensor and the lead-out length information of the wind rope of the second winch 52 received from the second length sensor, the first winch 51 and the second winch 52 are controlled to stop adjusting the lead-out lengths of the corresponding wind ropes to ensure that the flange surface of the blade root of the first blade clamped by the blade clamp 10 is approximately parallel to the preset flange surface of the hub on which the first blade is installed.

[0107] Reference Fig.13 If it is desired to install the first blade on the second flange surface of the hub, when the lead-out length difference of the two wind ropes is maintained within the first length difference range, the second inclination angle is close to or equal to α1, and at this time, the flange surface of the blade root of the first blade clamped by the blade clamp 10 is roughly parallel to the second flange surface of the hub on which the first blade is installed.

[0108] Reference Fig.14 If it is desired to install the first blade on the third flange surface of the hub, when the lead-out length difference of the two wind ropes is maintained within the first length difference range, the second inclination angle is close to or equal to α2, and at this time, the flange surface of the blade root of the first blade clamped by the blade clamp 10 is roughly parallel to the third flange surface of the hub on which the first blade is installed.

[0109] In one embodiment of the present invention, step S810 includes the following operations: in response to determining that the difference in the lead-out lengths of the two guy ropes exceeds a lower limit value of a first length difference range based on the lead-out length information of the guy rope of the first winch 51 received from the first length sensor and the lead-out length information of the guy rope of the second winch 52 received from the second length sensor, the first winch 51 and the second winch 52 are controlled to adjust the lead-out lengths of the corresponding guy ropes to increase the lead-out length difference.

[0110] Reference Fig.13 In the case where the first blade is mounted on the second flange surface of the hub, the lead-out length of the guy rope of the first winch 51 is less than the lead-out length of the guy rope of the second winch 52, and the difference between the lead-out length of the guy rope of the second winch 52 and the lead-out length of the guy rope of the first winch 51 is taken as the lead-out length difference. When the lead-out length difference between the two guy ropes exceeds the lower limit of the first length difference range, the first winch 51 is controlled to reduce the lead-out length of its guy rope, and the second winch 52 is controlled to increase the lead-out length of its guy rope, thereby increasing the lead-out length difference between the two guy ropes.

[0111] Reference Fig.14 In the case where the first blade is mounted on the third flange surface of the hub, the lead-out length of the cable rope of the first winch 51 is greater than the lead-out length of the cable rope of the second winch 52, and the difference between the lead-out length of the cable rope of the first winch 51 and the lead-out length of the cable rope of the second winch 52 is taken as the lead-out length difference. When the lead-out length difference between the two cable ropes exceeds the lower limit of the first length difference range, the first winch 51 is controlled to increase the lead-out length of its cable rope, and the second winch 52 is controlled to reduce the lead-out length of its cable rope, thereby increasing the lead-out length difference between the two cable ropes.

[0112] In response to determining that the difference in the lead-out lengths of the two guy ropes exceeds the upper limit value of a first length difference range based on the lead-out length information of the guy rope of the first winch 51 received from the first length sensor and the lead-out length information of the guy rope of the second winch 52 received from the second length sensor, the first winch 51 and the second winch 52 are controlled to adjust the lead-out lengths of the corresponding guy ropes to reduce the lead-out length difference.

[0113] Reference Fig.13 In the case where the first blade is mounted on the second flange surface of the hub, the lead-out length of the cable rope of the first winch 51 is less than the lead-out length of the cable rope of the second winch 52, and the difference between the lead-out length of the cable rope of the second winch 52 and the lead-out length of the cable rope of the first winch 51 is taken as the lead-out length difference. When the lead-out length difference between the two cable ropes exceeds the upper limit of the first length difference range, the first winch 51 is controlled to increase the lead-out length of its cable rope, and the second winch 52 is controlled to reduce the lead-out length of its cable rope, thereby reducing the lead-out length difference between the two cable ropes.

[0114] Reference Fig.14 In the case where the first blade is mounted on the third flange surface of the hub, the lead-out length of the guy rope of the first winch 51 is greater than the lead-out length of the guy rope of the second winch 52, and the difference between the lead-out length of the guy rope of the first winch 51 and the lead-out length of the guy rope of the second winch 52 is taken as the lead-out length difference. When the lead-out length difference between the two guy ropes exceeds the upper limit of the first length difference range, the first winch 51 is controlled to reduce the lead-out length of its guy rope, and the second winch 52 is controlled to increase the lead-out length of its guy rope, thereby reducing the lead-out length difference between the two guy ropes.

[0115] In one embodiment of the present invention, step S810 includes the following operations: controlling the first winch 51 to adjust the lead-out length of its guy rope to a first preset length, and controlling the second winch 52 to adjust the lead-out length of its guy rope to a second preset length, so that the lead-out length difference remains within the first length difference range.

[0116] The first preset length and the second preset length may be length values ​​obtained through experiments or calculations, or may be empirical values ​​recorded in the process of installing blades using the same blade hanger control method. For example, using the blade hanger control method provided by the exemplary embodiment of the present invention, a previous blade of the same model as the first blade is installed. When the flange surface of the blade root of the previous blade is approximately parallel to the preset flange surface of the hub on which the first blade is installed, the lead-out length of the cable rope of the first winch 51 and the lead-out length of the cable rope of the second winch 52 at this time are recorded, and the recorded lead-out lengths are used as the first preset length and the second preset length.

[0117] It can be understood that when the lead-out length of the wind rope of the first winch 51 is the first preset length and the lead-out length of the wind rope of the second winch 52 is the second preset length, the lead-out length difference of the two wind ropes will be reduced and there is a greater probability that it will remain within the first length difference range. At this time, the flange surface of the blade root of the first blade clamped by the blade clamp 10 is roughly parallel to the preset flange surface of the hub on which the first blade is installed; even if the lead-out length difference after reduction still exceeds the first angle difference range, at this time, the lead-out length difference is also likely to be closer to the first length difference range, and the first winch 51 and the second winch 52 can continue to be controlled according to the previous embodiment to adjust the corresponding lead-out length of the wind rope, thereby continuing to adjust the lead-out length difference.

[0118] In one embodiment of the present invention, step S820 includes the following operations: in response to determining that the difference in the lead-out lengths of the two wind ropes is a first difference based on the lead-out length information of the wind rope of the first winch 51 received from the first length sensor and the lead-out length information of the wind rope of the second winch 52 received from the second length sensor, the first winch 51 and the second winch 52 are controlled to stop adjusting the lead-out lengths of the corresponding wind ropes to ensure that the flange surface of the blade root of the blade is parallel to the preset flange surface.

[0119] When the difference in the lead-out lengths of the two wind ropes is the first difference, the angle formed by the second reference line at the current position and the second reference line at the initial position is exactly α1 or α2. At this time, the flange surface of the blade root of the first blade is adjusted to be parallel to the preset flange surface of the hub, which can reduce the difficulty of connecting the flange surface of the blade root with the preset flange surface of the hub.

[0120] As mentioned above, when the flange surface of the root of the first blade is parallel to the second flange surface of the hub on which the first blade is installed, the angle formed by the second reference line at the current position and the second reference line at the initial position is α1. At this time, the difference S1 in the lead-out lengths of the two wind ropes is the first difference. On the premise that the angle α1 and the length M between the second end of the first wind picking rod 61 and the second end of the second wind picking rod 62 are known, the first difference can be calculated by the following formula: Sin(α1)=|S1| / M.

[0121] As mentioned above, when the flange surface of the root of the first blade is parallel to the third flange surface of the hub on which the first blade is installed, the angle formed by the second reference line at the current position and the second reference line at the initial position is α2. At this time, the difference S2 in the lead-out lengths of the two wind ropes is the first difference. On the premise that the angle α2 and the length M between the second end of the first wind picking rod 61 and the second end of the second wind picking rod 62 are known, the first difference can be calculated by the following formula: Sin(α2)=|S2| / M.

[0122] In one embodiment of the present invention, the control method of the blade hanger applied to scenario two also includes the following operations: in response to determining that the second inclination angle exceeds a preset angle range based on the second inclination angle information received from the second inclination angle sensor, controlling the first winch 51 and the second winch 52 to stop adjusting the lead-out length of the corresponding guy rope, and / or sending an alarm message.

[0123] The second inclination sensor can be provided on the counterweight unit 40 to detect and send the second inclination information of the blade hanger. Setting the preset angle range can limit the lead-out length of the cable rope of the first winch 51 and the second winch 52, thereby preventing the second inclination of the blade hanger from being too large. When the second inclination exceeds the preset angle range, an alarm message is sent in time to remind the staff.

[0124] Based on the blade hanger provided by the present invention, the movement of the telescopic rod of the telescopic mechanism 30 can be controlled according to the detected inclination information of the hanger, or the first winch 51 and the second winch 52 can be controlled to adjust the lead-out length of the corresponding cable rope, so as to achieve high-precision small angle adjustment of the blade hanger, so that the flange surface at the root of the blade can remain roughly parallel to the preset flange surface of the hub, thereby facilitating and smoothly connecting the blade and the hub.

[0125] The exemplary embodiment of the present invention further provides a control system for a blade hanger, and the control system can execute any one of the two blade hanger control methods provided by the exemplary embodiment of the present invention.

[0126] The control system includes a controller, which can be configured to:

[0127] In response to the first inclination information received from the first inclination sensor, it is determined that the angle difference between the first inclination angle of the blade hanger and the first target inclination angle exceeds the first angle difference range, the telescopic rod of the telescopic mechanism 30 is controlled to move to drive the hanger 21 to move along the guide rail to reduce the angle difference; in response to the first inclination information received from the first inclination sensor, it is determined that the angle difference between the first inclination angle of the blade hanger and the first target inclination angle remains within the first angle difference range, the telescopic rod of the telescopic mechanism 30 is controlled to stop moving to ensure that the flange surface of the blade root of the first blade clamped by the blade clamp 10 is roughly parallel to the preset flange surface of the hub on which the first blade is installed; wherein the blade hanger has a first reference line perpendicular to the extension direction of the guide rail, and the first inclination angle is the angle formed by the first reference line at the current position and the first reference line at the vertical position. The specific content of the controller executing the above steps can refer to the relevant content in the above method embodiment, which will not be repeated here.

[0128] The controller may also be configured to: in response to determining that the difference in the lead-out lengths of the two wind ropes exceeds a first length difference range based on the lead-out length information of the wind rope of the first winch 51 received from the first length sensor and the lead-out length information of the wind rope of the second winch 52 received from the second length sensor, control the first winch 51 and the second winch 52 to adjust the lead-out lengths of the corresponding wind ropes to adjust the lead-out length difference, thereby changing the second inclination angle of the blade hanger; in response to determining that the difference in the lead-out lengths of the two wind ropes exceeds a first length difference range based on the lead-out length information of the wind rope of the first winch 51 received from the first length sensor and the lead-out length information of the wind rope of the second winch 52 received from the second length sensor The lead-out length information of the wind rope of the second winch 52 determines that the lead-out length difference of the two wind ropes is maintained within the first length difference range, and controls the first winch 51 and the second winch 52 to stop adjusting the lead-out length of the corresponding wind ropes to ensure that the flange surface of the blade root of the first blade clamped by the blade clamp 10 is roughly parallel to the preset flange surface of the hub on which the first blade is installed; wherein the blade hanger has a second reference line parallel to the extension direction of the first wind rod 61 and the second wind rod 62, and the second inclination angle is the angle formed by the second reference line at the current position and the second reference line at the initial position. The specific content of the controller executing the above steps can refer to the relevant content in the above method embodiment, which will not be repeated here.

[0129] The controller may include (but not limited to) a central processing unit (CPU), a digital signal processor (DSP), a microcomputer, a field programmable gate array (FPGA), a system on a chip (SoC), a microprocessor, an application specific integrated circuit (ASIC), etc. Optionally, the controller may be disposed on the blade hanger, but is not limited thereto. For example, the controller may implement remote control.

[0130] Based on the blade hanger provided by the present invention, the control method and system of the blade hanger provided by the present invention can control the movement of the telescopic rod of the telescopic mechanism according to the detected inclination information of the hanger, or control the first winch and the second winch to adjust the lead-out length of the corresponding cable wind rope, so as to realize high-precision small angle adjustment of the blade hanger, so that the flange surface at the root of the blade can remain roughly parallel to the preset flange surface of the hub, so as to facilitate and smoothly carry out the connection work between the blade and the hub.

[0131] While the invention has been particularly shown and described with reference to exemplary embodiments thereof, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the claims.

Claims

1. A method for controlling a blade hanger, characterized in that: The blade hanger comprises a counterweight unit, a blade clamp, a hanger rod, a first winch, a second winch, a first wind-catching rod and a second wind-catching rod, and the blade clamp is used to clamp the blade; The counterweight unit and the blade clamp are both connected to the boom and located on different sides of the boom, and the first winch and the second winch are arranged on the counterweight unit; The first end of the first wind-catching rod and the first end of the second wind-catching rod are both connected to the counterweight unit, and the second end of the first wind-catching rod and the second end of the second wind-catching rod point to different sides away from the counterweight unit in opposite directions; The first winch and the second winch are respectively provided with a wind rope, and the second end of the first wind-catching rod and the second end of the second wind-catching rod are respectively provided with a guide wheel; After being led out from the first winch, the wind rope of the first winch is connected to the boom of the lifting device through the guide wheel of the first wind rope rod; After being led out from the second winch, the wind rope of the second winch is connected to the boom of the lifting device through the guide wheel of the second wind rope rod; The control method comprises: In response to determining that a difference between the lead-out lengths of the two wind ropes exceeds a first length difference range based on the lead-out length information of the wind rope of the first winch received from the first length sensor and the lead-out length information of the wind rope of the second winch received from the second length sensor, controlling the first winch and the second winch to adjust the lead-out lengths of the corresponding wind ropes to adjust the lead-out length difference, thereby changing the second inclination angle of the blade hanger; In response to determining that the difference in the lead-out lengths of the two wind ropes is maintained within the first length difference range based on the lead-out length information of the wind rope of the first winch received from the first length sensor and the lead-out length information of the wind rope of the second winch received from the second length sensor, controlling the first winch and the second winch to stop adjusting the lead-out lengths of the corresponding wind ropes to ensure that the flange surface of the blade root of the first blade clamped by the blade clamp is substantially parallel to the preset flange surface of the hub on which the first blade is mounted; The blade hanger has a second reference line parallel to the extension direction of the first wind-grabbing rod and the second wind-grabbing rod, and the second inclination angle is an angle formed by the second reference line at the current position and the second reference line at the initial position.

2. The control method according to claim 1, characterized in that: In response to determining that the difference in the lead-out lengths of the two wind ropes exceeds a first length difference range based on the lead-out length information of the wind rope of the first winch received from the first length sensor and the lead-out length information of the wind rope of the second winch received from the second length sensor, controlling the first winch and the second winch to adjust the lead-out lengths of the corresponding wind ropes to adjust the lead-out length difference, the method comprises: In response to determining that a difference in the lead-out lengths of the two guy ropes exceeds a lower limit of a first length difference range based on the lead-out length information of the guy rope of the first winch received from the first length sensor and the lead-out length information of the guy rope of the second winch received from the second length sensor, controlling the first winch and the second winch to adjust the lead-out lengths of the corresponding guy ropes to increase the lead-out length difference; In response to determining that the difference in the lead-out lengths of the two guy ropes exceeds an upper limit value of a first length difference range based on the lead-out length information of the guy rope of the first winch received from the first length sensor and the lead-out length information of the guy rope of the second winch received from the second length sensor, the first winch and the second winch are controlled to adjust the lead-out lengths of the corresponding guy ropes to reduce the lead-out length difference.

3. The control method according to claim 1, characterized in that: The controlling the first winch and the second winch to adjust the lead-out lengths of the corresponding wind ropes to adjust the lead-out length difference comprises: The first winch is controlled to adjust the lead-out length of its guy rope to a first preset length, and the second winch is controlled to adjust the lead-out length of its guy rope to a second preset length, so that the lead-out length difference is maintained within the first length difference range.

4. The control method according to claim 1, characterized in that: In response to determining that the lead-out length difference of the two wind ropes is maintained within the first length difference range based on the lead-out length information of the wind rope of the first winch received from the first length sensor and the lead-out length information of the wind rope of the second winch received from the second length sensor, the first winch and the second winch are controlled to stop adjusting the lead-out lengths of the corresponding wind ropes to ensure that the flange surface of the blade root of the first blade clamped by the blade clamp is substantially parallel to the preset flange surface of the hub on which the first blade is mounted, comprising: In response to determining that the difference in the lead-out lengths of the two wind ropes is a first difference value based on the lead-out length information of the wind rope of the first winch received from the first length sensor and the lead-out length information of the wind rope of the second winch received from the second length sensor, the first winch and the second winch are controlled to stop adjusting the lead-out lengths of the corresponding wind ropes to ensure that the flange surface of the blade root of the blade is parallel to the preset flange surface.

5. The control method according to claim 1, characterized in that: The first length sensor is arranged on the first winch, and is used to detect and send the lead-out length information of the guy rope of the first winch; The second length sensor is arranged on the second winch, and is used for detecting and sending the lead-out length information of the wind rope of the second winch.

6. The control method according to claim 1, characterized in that: The control method further includes: in response to determining that the second inclination angle exceeds a preset angle range based on second inclination information received from a second inclination sensor, controlling the first winch and the second winch to stop adjusting the lead-out length of the corresponding guy rope, and / or sending an alarm message.

7. The control method according to claim 6, characterized in that: The second inclination sensor is arranged on the counterweight unit, and is used for detecting and sending the second inclination information of the blade hanger.

8. A control system for a blade hanger, characterized in that: The blade hanger comprises a counterweight unit, a blade clamp, a hanger rod, a first winch, a second winch, a first wind-catching rod and a second wind-catching rod, and the blade clamp is used to clamp the blade; The counterweight unit and the blade clamp are both connected to the boom and located on different sides of the boom, and the first winch and the second winch are arranged on the counterweight unit; The first end of the first wind-catching rod and the first end of the second wind-catching rod are both connected to the counterweight unit, and the second end of the first wind-catching rod and the second end of the second wind-catching rod point to different sides away from the counterweight unit in opposite directions; The first winch and the second winch are respectively provided with a wind rope, and the second end of the first wind-catching rod and the second end of the second wind-catching rod are respectively provided with a guide wheel; After being led out from the first winch, the wind rope of the first winch is connected to the boom of the lifting device through the guide wheel of the first wind rope rod; After being led out from the second winch, the wind rope of the second winch is connected to the boom of the lifting device through the guide wheel of the second wind rope rod; The control system includes a controller configured to: In response to determining that a difference between the lead-out lengths of the two wind ropes exceeds a first length difference range based on the lead-out length information of the wind rope of the first winch received from the first length sensor and the lead-out length information of the wind rope of the second winch received from the second length sensor, controlling the first winch and the second winch to adjust the lead-out lengths of the corresponding wind ropes to adjust the lead-out length difference, thereby changing the second inclination angle of the blade hanger; In response to determining that the difference in the lead-out lengths of the two wind ropes is maintained within the first length difference range based on the lead-out length information of the wind rope of the first winch received from the first length sensor and the lead-out length information of the wind rope of the second winch received from the second length sensor, controlling the first winch and the second winch to stop adjusting the lead-out lengths of the corresponding wind ropes to ensure that the flange surface of the blade root of the first blade clamped by the blade clamp is substantially parallel to the preset flange surface of the hub on which the first blade is mounted; The blade hanger has a second reference line parallel to the extension direction of the first wind-grabbing rod and the second wind-grabbing rod, and the second inclination angle is an angle formed by the second reference line at the current position and the second reference line at the initial position.