Wide-area coordinated dispatching method of multiple energy storage power stations in high-penetration renewable energy power systems
By screening and adjusting the power supply of energy storage power stations, the problem of scheduling multiple energy storage power stations in high-permeability new energy power system is solved, and the power generation and load balance of the power system is achieved, and the randomness and volatility of new energy power is suppressed. Promote the stable operation of the system.
Patent Information
- Application Number
- CN202210187128.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-28
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2042-02-28
AI Technical Summary
It is difficult to effectively achieve the balance between power generation and load of the power system in the high permeability new energy power system, and it is difficult to fully obtain the physical and economic characteristics of the energy storage power station, resulting in the coupling impact of the power system power balance.
Provide a wide-area coordination scheduling method for multi-energy storage power stations. By screening energy storage power stations that meet the scheduling response requirements, obtain the load value of the power system and the power of the new energy power, calculate the total power demand of the energy storage power station, and obtain each energy storage power station The power supply curve of the energy storage power station is determined, the charging and discharging equilibrium price and equilibrium measurement is determined, the power supply volume of the energy storage power station is adjusted until the safety calibration conditions are met, and the total power supply curve and price relationship of the energy storage power station is constructed.
Achieve reasonable and effective scheduling of multi-energy storage power stations, stabilize the randomness and volatility of wind power and solar power generation, increase the ability of the power system to absorb wind power and solar power generation, and promote the stable operation of high-permeability new energy power system without obtaining operations. Cost information.
Smart Images

Figure CN114583726B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power grid optimization and dispatching, and specifically relates to a method for wide-area coordinated dispatching of multiple energy storage power stations in a high-penetration new energy power system. Background Art
[0002] In order to achieve the goal of low-carbonization of the power system, it is necessary to build a clean, low-carbon, safe and efficient energy system, implement renewable energy substitution actions, and build a new power system with new energy as the main body. The characteristics and development trends of this power system are as follows: First, new energy sources such as wind power and solar power generation are connected to the power grid on a large scale. The proportion of new energy power sources in the power system continues to increase. The power system has gradually evolved into a high-penetration new energy power system. The randomness and volatility of wind power and solar power generation make it very difficult to balance the power generation and load of the power system; second, electrochemical energy storage power stations, electric vehicle charging piles and various adjustable resources on the load side participate in the operation and regulation of the power grid. The dispatching mode of the power system has changed from source following load to source-grid-load-storage interaction. Energy storage power stations have become important energy storage equipment in high-penetration new energy power systems due to their advantages of strong load tracking capability, fast response speed, precise control, and "two-way" regulation of charging and discharging. Optimizing the dispatching of energy storage power stations helps to achieve the balance between power generation and load in the power system, smooth the randomness and volatility of wind power and solar power generation, and increase the power system's ability to absorb wind power and solar power generation.
[0003] In the research on the dispatching of energy storage power stations in power systems, the literature: Modeling and optimal dispatching of battery energy storage power stations considering loss costs, Zhang Xinsong et al., Power System Technology, Vol. 41, No. 5, pp. 1541-1547, May 5, 2017. Considering the investment cost and charging and discharging loss cost of the energy storage power station, a combination model and optimal dispatching method of energy storage power stations with minimum operating cost and maximum wind power acceptance are proposed; the Chinese patent, application publication number CN113746118A, and the invention publication date of December 3, 2021 discloses a dispatching method, device, equipment and system based on an energy storage power station; the Chinese patent, application publication number CN113902281A, and the invention publication date of January 7, 2022 discloses an energy dispatching method and device for a distributed energy storage power station; the above research is to optimize the dispatching of energy storage power stations for the purpose of increasing the wind power absorption capacity of the power system, or to dispatch the energy storage power station itself from the perspective of controlling the charging and discharging working process and strengthening the trust of the blockchain. However, there are multiple energy storage stations in high-penetration new energy power systems, which are geographically distributed over a wide range and belong to different market players. The main bodies of energy storage stations are different, and the physical characteristics (such as power regulation rate, charging and discharging power curve, etc.) and economic characteristics (such as operating costs, etc.) of energy storage stations are also different. It is difficult to fully obtain the above information. At the same time, multiple energy storage stations have a coupled effect on the power balance of the power system. Therefore, the method based on the above literature cannot effectively solve the scheduling problem of multiple energy storage stations in high-penetration new energy power systems. Summary of the invention
[0004] The purpose of the present invention is to solve the above problems existing in the prior art and to provide a method for wide-area coordinated dispatching of multiple energy storage power stations in a high-penetration new energy power system.
[0005] To achieve the above objectives, the present invention provides the following technical solutions:
[0006] A method for wide-area coordinated dispatching of multiple energy storage power stations in a high-penetration new energy power system comprises the following steps in sequence:
[0007] Step A: selecting energy storage power stations that meet the dispatch response requirements based on the operating parameters of each energy storage power station in the power system;
[0008] Step B, first obtain the load value, wind power source power, solar power source power and conventional energy power source power of the power system during the target period of the dispatching operation day, and then calculate the total power demand of the energy storage power station of the power system during the target period of the dispatching operation day according to the power system power balance principle;
[0009] Step C: first obtain the power supply curves of each energy storage power station that meets the dispatch response requirements during the target period of the dispatch operation day, and then superimpose the power supply curves to obtain the total power supply curve of the energy storage power station;
[0010] Step D, with the goal of meeting the total power demand of the energy storage power station in the target period of the dispatching operation day, taking the total power supply of the energy storage power station equal to the total power demand as the supply and demand equilibrium point, and obtaining the charge and discharge equilibrium price and equilibrium amount;
[0011] Step E: Determine the energy storage power station that provides charging and discharging when supply and demand are balanced and its allocated power supply, i.e., the power supply plan of the energy storage power station, according to the charging and discharging equilibrium price and the power supply curve of each energy storage power station that meets the dispatch response requirements;
[0012] Step F: Perform a safety check on the power supply plan of the energy storage power station. If the safety check conditions are met, it will be used as a wide-area coordinated dispatching plan for multiple energy storage power stations. Otherwise, adjust the energy storage power stations that provide charging and discharging and their allocated power supply until the safety check conditions are met.
[0013] When the power system is in a low load or mid-load period, step C includes the following steps in sequence:
[0014] C1. Obtain the charging power supply curve of each energy storage power station that meets the dispatch response requirements during the target period of the dispatch operation day:
[0015] M i,ch,t =M i,ch,t (P ich,t )
[0016]
[0017] In the above formula, M i,ch,t (P ich,t ) is the charging power supply curve of the i-th energy storage power station in the target period t of the dispatching operation day, M i,ch,t is the charging price of the i-th energy storage power station during the target period t of the dispatching operation day, P ich,t The charging power supply of the i-th energy storage power station during the target period t of the scheduling operation day;
[0018] C2, based on the i-th energy storage power station at a given price M ch,t The charging power calculation of the power system energy storage power station at a given price M ch,t Total charging power at:
[0019]
[0020]
[0021] In the above formula, P s,ch,t For the power system energy storage power station at a given price M ch,t The total charging power at ich,t For the i-th energy storage power station at a given price Mch,t The charging power at this time, N is the number of energy storage power stations;
[0022] C3. Determine the total charging power supply curve of the power system energy storage power station:
[0023] M ch,t =M ch,t (P s,ch,t )
[0024] In the above formula, M ch,t (P s,ch,t ) is the total charging power supply curve of the energy storage power station of the power system during the target period t of the dispatching operation day;
[0025] When the power system is in the peak load period, step C includes the following steps in sequence:
[0026] S1. Obtain the discharge power supply curve of each energy storage power station that meets the dispatch response requirements during the target period of the dispatch operation day:
[0027] M i,dis,t =M i,dis,t (P idis,t )
[0028]
[0029] In the above formula, M i,dis,t (P idis,t ) is the discharge power supply curve of the i-th energy storage power station in the target period t of the dispatching operation day, M i,dis,t are the discharge prices of the i-th energy storage power station in the target period t of the dispatching operation day, P idis,t is the discharge power supply of the i-th energy storage power station during the target period t of the scheduling operation day;
[0030] S2, based on the i-th energy storage power station at a given price M dis,t The discharge power calculation of the power system energy storage power station at a given price M dis,t Total discharge power at:
[0031]
[0032]
[0033] In the above formula, P s,dis,t For the power system energy storage power station at a given price M dis,t The total discharge power, P idis,t For the i-th energy storage power station at a given price M dis,t The discharge power at this time, N is the number of energy storage power stations;
[0034] S3. Determine the total discharge power supply curve of the power system energy storage power station:
[0035] M dis,t =M dis,t (P s,dis,t )
[0036] In the above formula, M dis,t (P s,dis,t ) is the total discharge power supply curve of the energy storage power station in the target period t of the dispatching operation day.
[0037] In step D, when the power system is in a low load or mid-load period, the equilibrium price and equilibrium quantity are calculated according to the following formula:
[0038]
[0039] In the above formula, are charging equilibrium price and equilibrium quantity respectively, P d,ch,t is the total charging power demand of the energy storage power station in the power system during the target period t of the dispatching operation day, M ch,t (P s,ch,t ) is the total charging power supply curve of the energy storage power station in the target period t of the dispatching operation day, P s,cht The total charging power of the energy storage power station in the target period t of the dispatching operation day;
[0040] When the power system is in the peak load period, the equilibrium price and equilibrium quantity are calculated according to the following formula:
[0041]
[0042] In the above formula, are the discharge equilibrium price and equilibrium quantity, P d,dis,t M is the total discharge power demand of the power storage power station in the target period t of the dispatching operation day, dis,t (P s,dis,t ) is the total discharge power supply curve of the power storage power station in the target period t of the dispatching operation day, P s,dis,t It is the total discharge power of the energy storage power station in the target period t of the dispatching operation day.
[0043] In step E, when the power system is in a low load or mid-load period, the power supply amount allocated to each energy storage power station is calculated by the following formula:
[0044]
[0045] In the above formula, is the charging power supply allocated to the i-th energy storage power station during the target period t of the scheduling operation day, is the charging power supply corresponding to the charging equilibrium price on the charging power supply curve of the i-th energy storage power station in the target period t of the scheduling operation day, is the charging power supply curve M of the i-th energy storage power station during the target period t of the scheduling operation day i,ch,t (P ich,t ) is the inverse function of
[0046] When the power system is at peak load, the power supply allocated to each energy storage power station is calculated by the following formula:
[0047]
[0048] In the above formula, is the discharge power supply value allocated to the i-th energy storage power station during the target period t of the scheduling operation day, is the discharge power supply corresponding to the discharge equilibrium price on the discharge power supply curve of the i-th energy storage power station in the target period t of the dispatching operation day, is the discharge power supply curve M of the i-th energy storage power station during the target period t of the dispatching operation day i,dis,t (P idis,t ) is the inverse function of .
[0049] In step F, the safety verification conditions include:
[0050] Power balance constraints:
[0051]
[0052] In the above formula, P L,t , P w,t , P v,t , P g,t are the power system load value, wind power source power, solar power source power, and conventional energy power source power in the target period t of the dispatching operation day, respectively. ich,t , P idis,t are the charging and discharging power supply of the i-th energy storage power station in the target period t of the dispatching operation day, respectively, and N is the number of energy storage power stations;
[0053] Energy storage power station regulation capacity constraints:
[0054]
[0055] In the above formula, Q i,max is the maximum adjustable capacity of the i-th energy storage power station;
[0056] Node voltage constraints:
[0057] V j,min ≤|V j |≤V j,max
[0058] V j =|V j |∠θ j
[0059] θ jk =θ j -θ k
[0060]
[0061]
[0062] In the above formula, V j,max 、V j,min are the maximum and minimum voltage amplitudes allowed at the jth node in the power system, V j is the voltage of the jth node, |V j |,θ j are the voltage amplitude and phase of the jth node, θ jk is the voltage phase difference between the jth node and the kth node, θ k is the voltage phase of the kth node, P j , Q j are the active and reactive power of the jth node, respectively, |V k | is the voltage amplitude of the kth node, G jk , B jk are the real and imaginary parts of the complex admittance of the j-th node and the k-th node, respectively, j, k = 1, 2, ..., M, M is the number of nodes in the power system;
[0063] Branch flow constraints:
[0064] F jk,min ≤F jk ≤F jk,max
[0065] F jk =R e (S jk )
[0066]
[0067] In the above formula, F jk is the active power flow of the branch jk from the jth node to the kth node, F jk,max 、F jk,min are the maximum and minimum power flow transmission values allowed for branch jk, R e () is the function for obtaining the real part of a complex number, S jk is the complex power of branch jk, V j * , are the voltage conjugate values of the jth and kth nodes respectively, They are the conjugate values of the equivalent admittance of branch jk to ground and line respectively.
[0068] In step B, the total power demand of the energy storage power station of the power system is determined by the following formula:
[0069]
[0070] In the above formula, P d,ch,t , P d,dis,t are the total charging and discharging power requirements of the energy storage power station in the target period t of the dispatching operation day, P L,t , P w,t , P v,t , P g,t They are respectively the power system load value, wind power source power, solar power source power, and conventional energy power source power in the target period t of the dispatching operation day.
[0071] In step A, the conditions for satisfying the scheduling response requirements are that the following inequalities are all true:
[0072] P i,max ≥P i,max,req
[0073] ΔP i,max ≥ΔP i,max,req
[0074] Q i,max ≥Q i,max,req
[0075] In the above formula, P i,max , ΔP i,max , Q i,max are the maximum adjustable power, maximum adjustable power rate, and maximum adjustable capacity of the i-th energy storage power station, respectively. i,max,req , ΔP i,max,req , Q i,max,req They are respectively the lower limit requirements of the maximum adjustable power, maximum adjustable power rate, and maximum adjustable capacity of the power system dispatching agency for a single adjustment of the i-th energy storage power station.
[0076] Compared with the prior art, the present invention has the following beneficial effects:
[0077] The method for wide-area coordinated dispatching of multiple energy storage power stations in a high-penetration new energy power system of the present invention first selects energy storage power stations that meet the dispatching response requirements based on the operating parameters of each energy storage power station in the power system, and obtains the load value, wind power source power, solar power source power and conventional energy power source power of the power system during the target period of the dispatching operation day, and then calculates the total power demand of the energy storage power station of the power system during the target period of the dispatching operation day according to the power system power balance principle, and then obtains the power supply curve of each energy storage power station that meets the dispatching response requirements during the target period of the dispatching operation day, and superimposes each power supply curve to obtain the total power supply curve of the energy storage power station, and then takes meeting the total power demand of the energy storage power station of the power system during the target period of the dispatching operation day as the goal, takes the total power supply of the energy storage power station equal to the total power demand as the supply and demand equilibrium point, obtains the charging and discharging equilibrium price and equilibrium amount, and then determines the energy storage power station that provides charging and discharging when supply and demand are balanced according to the charging and discharging equilibrium price and the power supply curve of each energy storage power station that meets the dispatching response requirements, that is, the power of the energy storage power station Supply plan, and finally perform safety verification on the power supply plan of the energy storage power station. If the safety verification conditions are met, it will be used as a wide-area coordinated dispatching plan for multiple energy storage power stations. Otherwise, the energy storage power stations providing charging and discharging and their allocated power supply will be adjusted until the safety verification conditions are met. This method constructs the total power supply curve of the energy storage power station based on the power supply curve of each energy storage power station, determines the functional relationship between the price of charging and discharging services provided by the energy storage power station and the power supply, and then takes the total power supply of the energy storage power station equal to the total power demand as the supply and demand equilibrium point to obtain the energy storage power station providing charging and discharging services and its power supply. Finally, the power supply plan of the energy storage power station that meets the safety verification conditions is used as the result of the wide-area coordinated dispatching of multiple energy storage power stations. Without obtaining information such as the operating cost of each energy storage power station, the reasonable arrangement of the active power charging and discharging process of multiple energy storage power stations can be achieved to ensure the balance between power generation and load of the power system, thereby smoothing the randomness and volatility of wind power and solar power generation, increasing the ability of the power system to absorb wind power and solar power generation, and promoting the stable operation of high-penetration new energy power systems. Therefore, the present invention realizes the reasonable and effective scheduling of wide-area multi-energy storage power stations in a high-penetration new energy power system. BRIEF DESCRIPTION OF THE DRAWINGS
[0078] Figure 1 It is a flow chart of the present invention.
[0079] Figure 2 This is a schematic diagram of the structure of the high-penetration new energy power system described in Example 1.
[0080] Figure 3 This is a power supply curve diagram of the energy storage power station in Example 1. DETAILED DESCRIPTION
[0081] The present invention will be further described below in conjunction with specific implementations and drawings.
[0082] The present invention follows the characteristics that multiple energy storage power stations are widely distributed geographically and belong to different market players. Each energy storage power station independently provides a power supply curve for the target period of the scheduling operation day, effectively giving play to the initiative of each energy storage power station to collaborate in participating in the power generation and load balance of the new energy power system, thereby solving the problem of optimal scheduling of multiple energy storage power stations in a high-penetration new energy power system.
[0083] Embodiment 1:
[0084] See also Figure 1 , a wide-area coordinated dispatching method for multiple energy storage power stations in a high-penetration new energy power system. Figure 2 The high penetration rate new energy power system shown in the figure is taken as the object, and the system includes N energy storage power stations, wind power sources, solar power generation power sources, and conventional energy power sources such as water and fire. The N energy storage power stations are energy storage power station 1, energy storage power station 2, ..., energy storage power station N. Each energy storage power station is connected to the power system through a corresponding transformer, and all energy storage power stations have two operating modes: charging and discharging. The charging and discharging powers are respectively expressed by P ich,t , P idis,t The power injected into the power system by wind power, solar power and conventional energy power is represented by P w,t , P v,t , P g,t Indicates that the load of the new energy power system is expressed by P L,t Indicates that it absorbs power from the power system. The method is performed in the following steps:
[0085] 1. Based on the operating parameters of each energy storage power station in the power system, select the energy storage power station that meets the dispatch response requirements, wherein the conditions for meeting the dispatch response requirements are that the following inequalities are all true:
[0086] P i,max ≥P i,max,req
[0087] ΔP i,max ≥ΔP i,max,req
[0088] Q i,max ≥Q i,max,req
[0089] In the above formula, P i,max , ΔP i,max , Q i,max are the maximum adjustable power, maximum adjustable power rate, and maximum adjustable capacity of the i-th energy storage power station, respectively. i,max,req , ΔP i,max,req , Qi,max,req are the lower limit requirements of the maximum adjustable power, maximum adjustable power rate, and maximum adjustable capacity of the i-th energy storage power station for a single adjustment by the power system dispatching agency;
[0090] 2. Obtain the load value, wind power source power, solar power source power and conventional energy power source power of the power system during the target period of the dispatching operation day, where the load value is predicted by the load forecasting system, the wind power source power and solar power source power are predicted by the new energy power forecasting system, and the conventional energy power source power is determined by the dispatching plan;
[0091] 3. According to the power balance principle of the power system, the total power demand of the energy storage power station of the power system during the target period of the dispatching operation day is calculated:
[0092]
[0093] In the above formula, P d,ch,t , P d,dis,t are the total charging and discharging power requirements of the energy storage power station in the target period t of the dispatching operation day, P L,t , P w,t , P v,t , P g,t They are respectively the power system load value, wind power source power, solar power source power, and conventional energy power source power in the target period t of the dispatching operation day;
[0094] 4. Obtain the power supply curve M of each energy storage power station that meets the dispatch response requirements during the target period of the dispatch operation day i,t (P i,t ), which represents the functional relationship between the price and supply of charging or discharging services provided by the i-th energy storage station (see Figure 3 ), where the ordinate M i,t It represents the price of charging or discharging service provided by the i-th energy storage power station, which is determined by the market transaction price. i,t It represents the supply of charging or discharging services provided by the i-th energy storage power station. When the power system is in the low load or mid-load period, the charging power supply curve of each energy storage power station that meets the dispatch response requirements during the target period of the dispatch operation day is:
[0095] M i,ch,t =M i,ch,t (P ich,t )
[0096]
[0097] In the above formula, M i,ch,t (P ich,t) is the charging power supply curve of the i-th energy storage power station in the target period t of the dispatching operation day, M i,ch,t is the charging price of the i-th energy storage power station during the target period t of the dispatching operation day, P ich,t The charging power supply of the i-th energy storage power station during the target period t of the scheduling operation day;
[0098] When the power system is at peak load, the discharge power supply curve of each energy storage power station that meets the dispatch response requirements during the target period of the dispatch operation day is:
[0099] M i,dis,t =M i,dis,t (P idis,t )
[0100]
[0101] In the above formula, M i,dis,t (P idis,t ) is the discharge power supply curve of the i-th energy storage power station in the target period t of the dispatching operation day, M i,dis,t are the discharge prices of the i-th energy storage power station in the target period t of the dispatching operation day, P idis,t is the discharge power supply of the i-th energy storage power station during the target period t of the scheduling operation day;
[0102] 5. When the power system is in a low load or mid-load period, firstly based on the i-th energy storage station at a given price M ch,t The charging power calculation of the power system energy storage power station at a given price M ch,t The total charging power at that time is then used to determine the total charging power supply curve of the power system energy storage power station:
[0103] M ch,t =M ch,t (P s,ch,t )
[0104]
[0105]
[0106] In the above formula, M ch,t (P s,ch,t ) is the total charging power supply curve of the energy storage power station in the target period t of the dispatching operation day, P s,ch,t For the power system energy storage power station at a given price M ch,t The total charging power at ich,t For the i-th energy storage power station at a given price M ch,t The charging power at this time, N is the number of energy storage power stations;
[0107] When the power system is at peak load, the i-th energy storage station is first dis,t The discharge power calculation of the power system energy storage power station at a given price M dis,t The total discharge power at that time is then determined, and the total discharge power supply curve of the power system energy storage power station is determined:
[0108] M dis,t =M dis,t (P s,dis,t )
[0109]
[0110]
[0111] In the above formula, M dis,t (P s,dis,t ) is the total discharge power supply curve of the power storage power station in the target period t of the dispatching operation day, P s,dis,t For the power system energy storage power station at a given price M dis,t The total discharge power, P idis,t For the i-th energy storage power station at a given price M dis,t The discharge power at this time, N is the number of energy storage power stations;
[0112] 6. With the goal of meeting the total power demand of the energy storage power station in the target period of the dispatching operation day, the total power supply of the energy storage power station is equal to the total power demand as the supply and demand equilibrium point, and the charging and discharging equilibrium price and equilibrium amount are calculated based on the following method:
[0113] When the power system is in the low load or mid load period,
[0114]
[0115] In the above formula, are charging equilibrium price and equilibrium quantity respectively, P d,ch,t is the total charging power demand of the energy storage power station in the power system during the target period t of the dispatching operation day, M ch,t (P s,ch,t ) is the total charging power supply curve of the energy storage power station in the target period t of the dispatching operation day, P s,ch,t The total charging power of the energy storage power station in the target period t of the dispatching operation day;
[0116] When the power system is at peak load,
[0117]
[0118] In the above formula, are the discharge equilibrium price and equilibrium quantity, P d,dis,tM is the total discharge power demand of the power storage power station in the target period t of the dispatching operation day, dis,t (P s,dis,t ) is the total discharge power supply curve of the power storage power station in the target period t of the dispatching operation day, P s,dis,t The total discharge power of the energy storage power station in the power system during the target period t of the dispatching operation day;
[0119] 7. Determine the energy storage power station that provides charging and discharging when supply and demand are balanced and its allocated power supply, that is, the power supply plan of the energy storage power station, according to the following formula:
[0120] When the power system is in the low load or mid load period,
[0121]
[0122] In the above formula, is the charging power supply allocated to the i-th energy storage power station during the target period t of the scheduling operation day, is the charging power supply corresponding to the charging equilibrium price on the charging power supply curve of the i-th energy storage power station in the target period t of the scheduling operation day, is the charging power supply curve M of the i-th energy storage power station during the target period t of the scheduling operation day i,ch,t (P ich,t ) is the inverse function of
[0123] When the power system is at peak load,
[0124]
[0125] In the above formula, is the discharge power supply value allocated to the i-th energy storage power station during the target period t of the scheduling operation day, is the discharge power supply corresponding to the discharge equilibrium price on the discharge power supply curve of the i-th energy storage power station in the target period t of the dispatching operation day, is the discharge power supply curve M of the i-th energy storage power station during the target period t of the dispatching operation day i,dis,t (P idis,t ) is the inverse function of
[0126] 8. Perform safety check on the power supply plan of the energy storage power station. If the safety check conditions are met, it will be used as a wide-area coordinated dispatching plan for multiple energy storage power stations. Otherwise, the energy storage power stations providing charging and discharging and their allocated power supply will be adjusted until the safety check conditions are met. The safety check conditions include:
[0127] Power balance constraints:
[0128]
[0129] In the above formula, P L,t , P w,t , P v,t , P g,t are the power system load value, wind power source power, solar power source power, and conventional energy power source power in the target period t of the dispatching operation day, respectively. ich,t , P idis,t are the charging and discharging power supply of the i-th energy storage power station in the target period t of the dispatching operation day, respectively, and N is the number of energy storage power stations;
[0130] Energy storage power station regulation capacity constraints:
[0131]
[0132] In the above formula, Q i,max is the maximum adjustable capacity of the i-th energy storage power station;
[0133] Node voltage constraints:
[0134] V j,min ≤|V j |≤V j,max
[0135] V j =|V j |∠θ j
[0136] θ jk =θ j -θ k
[0137]
[0138]
[0139] In the above formula, V j,max 、V j,min are the maximum and minimum voltage amplitudes allowed at the jth node in the power system, V j is the voltage of the jth node, |V j |,θ j are the voltage amplitude and phase of the jth node, θ jk is the voltage phase difference between the jth node and the kth node, θ k is the voltage phase of the kth node, P j , Q j are the active and reactive power of the jth node, respectively, |V k | is the voltage amplitude of the kth node, G jk , B jkare the real and imaginary parts of the complex admittance of the j-th node and the k-th node, respectively, j, k = 1, 2, ..., M, M is the number of nodes in the power system;
[0140] Branch flow constraints:
[0141] F jk,min ≤F jk ≤F jk,max
[0142] F jk =R e (S jk )
[0143]
[0144] In the above formula, F jk is the active power flow of the branch jk from the jth node to the kth node, F jk,max 、F jk,min are the maximum and minimum power flow transmission values allowed for branch jk, R e () is the function for obtaining the real part of a complex number, S jk is the complex power of branch jk, V j * , are the voltage conjugate values of the jth and kth nodes respectively, They are the conjugate values of the equivalent admittance of branch jk to ground and line respectively.
Claims
1. Wide-area coordinated dispatching method of multiple energy storage power stations in high-penetration new energy power systems, Features: The scheduling method comprises the following steps in sequence: Step A: selecting energy storage power stations that meet the dispatch response requirements based on the operating parameters of each energy storage power station in the power system; Step B, first obtain the load value, wind power source power, solar power source power and conventional energy power source power of the power system during the target period of the dispatching operation day, and then calculate the total power demand of the energy storage power station of the power system during the target period of the dispatching operation day according to the power system power balance principle; Step C: first obtain the power supply curves of each energy storage power station that meets the dispatch response requirements during the target period of the dispatch operation day, and then superimpose the power supply curves to obtain the total power supply curve of the energy storage power station; When the power system is in a low load or mid-load period, step C includes the following steps in sequence: C1. Obtain the charging power supply curve of each energy storage power station that meets the dispatch response requirements during the target period of the dispatch operation day: M i,ch,t =M i,ch,t (P ich,t ) In the above formula, M i,ch,t (P ich,t ) is the charging power supply curve of the i-th energy storage power station in the target period t of the dispatching operation day, M i,ch,t is the charging price of the i-th energy storage power station during the target period t of the dispatching operation day, P ich,t The charging power supply of the i-th energy storage power station in the target period t of the scheduling operation day; C2, based on the i-th energy storage power station at a given price M ch,t The charging power calculation of the power system energy storage power station at a given price M ch,t Total charging power at: In the above formula, P s,ch,t For the power system energy storage power station at a given price M ch,t The total charging power at ich,t For the i-th energy storage station at a given price M ch,t The charging power at this time, N is the number of energy storage power stations; C3. Determine the total charging power supply curve of the power system energy storage power station: M ch,t =M ch,t (P s,ch,t ) In the above formula, M ch,t (P s,ch,t ) is the total charging power supply curve of the energy storage power station of the power system during the target period t of the dispatching operation day; When the power system is in the peak load period, step C includes the following steps in sequence: S1. Obtain the discharge power supply curve of each energy storage power station that meets the dispatch response requirements during the target period of the dispatch operation day: M i,dis,t =M i,dis,t (P idis,t ) In the above formula, M i,dis,t (P idis,t ) is the discharge power supply curve of the i-th energy storage power station in the target period t of the dispatching operation day, M i,dis,t are the discharge prices of the i-th energy storage power station in the target period t of the dispatching operation day, P idis,t is the discharge power supply of the i-th energy storage power station during the target period t of the scheduling operation day; S2, based on the i-th energy storage power station at a given price M dis,t The discharge power calculation of the power system energy storage power station at a given price M dis,t Total discharge power at: In the above formula, P s,dis,t For the power system energy storage power station at a given price M dis,t The total discharge power, P idis,t For the i-th energy storage station at a given price M dis,t The discharge power at this time, N is the number of energy storage power stations; S3. Determine the total discharge power supply curve of the power system energy storage power station: M dis,t =M dis,t (P s,dis,t ) In the above formula, M dis,t (P s,dis,t ) is the total discharge power supply curve of the energy storage power station in the target period t of the dispatching operation day; Step D, with the goal of meeting the total power demand of the energy storage power station in the target period of the dispatching operation day, taking the total power supply of the energy storage power station equal to the total power demand as the supply and demand equilibrium point, and obtaining the charge and discharge equilibrium price and equilibrium amount; Step E: Determine the energy storage power station that provides charging and discharging when supply and demand are balanced and its allocated power supply, i.e., the power supply plan of the energy storage power station, according to the charging and discharging equilibrium price and the power supply curve of each energy storage power station that meets the dispatch response requirements; Step F: Perform a safety check on the power supply plan of the energy storage power station. If the safety check conditions are met, it will be used as a wide-area coordinated dispatching plan for multiple energy storage power stations. Otherwise, adjust the energy storage power stations that provide charging and discharging and their allocated power supply until the safety check conditions are met.
2. According to the method for wide-area coordinated dispatching of multiple energy storage power stations in a high-penetration new energy power system of claim 1, Features: In step D, when the power system is in a low load or mid-load period, the equilibrium price and equilibrium quantity are calculated according to the following formula: In the above formula, are charging equilibrium price and equilibrium quantity respectively, P d,ch,t is the total charging power demand of the energy storage power station in the power system during the target period t of the dispatching operation day, M ch,t (P s,ch,t ) is the total charging power supply curve of the energy storage power station in the target period t of the dispatching operation day, P s,ch,t The total charging power of the energy storage power station in the target period t of the dispatching operation day; When the power system is in the peak load period, the equilibrium price and equilibrium quantity are calculated according to the following formula: In the above formula, are the discharge equilibrium price and equilibrium quantity, P d,dis,t M is the total discharge power demand of the power storage power station in the target period t of the dispatching operation day, dis,t (P s,dis,t ) is the total discharge power supply curve of the power storage power station in the target period t of the dispatching operation day, P s,dis,t It is the total discharge power of the energy storage power station in the target period t of the dispatching operation day.
3. According to the method for wide-area coordinated dispatch of multiple energy storage power stations in a high-penetration new energy power system of claim 1, Features: In step E, when the power system is in a low load or mid-load period, the power supply amount allocated to each energy storage power station is calculated by the following formula: In the above formula, is the charging power supply allocated to the i-th energy storage power station during the target period t of the scheduling operation day, is the charging power supply corresponding to the charging equilibrium price on the charging power supply curve of the i-th energy storage power station in the target period t of the scheduling operation day, is the charging power supply curve M of the i-th energy storage power station during the target period t of the scheduling operation day i,ch,t (P ich,t ) is the inverse function of When the power system is at peak load, the power supply allocated to each energy storage power station is calculated by the following formula: In the above formula, is the discharge power supply value allocated to the i-th energy storage power station during the target period t of the scheduling operation day, is the discharge power supply corresponding to the discharge equilibrium price on the discharge power supply curve of the i-th energy storage power station in the target period t of the dispatching operation day, is the discharge power supply curve M of the i-th energy storage power station during the target period t of the dispatching operation day i,dis,t (P idis,t ) is the inverse function of .
4. According to the method for wide-area coordinated dispatching of multiple energy storage power stations in a high-penetration new energy power system of claim 1, Features: In step F, the safety verification conditions include: Power balance constraints: In the above formula, P L,t , P w,t , P v,t , P g,t are the power system load value, wind power source power, solar power source power, and conventional energy power source power in the target period t of the dispatching operation day, respectively. ich,t , P idis,t are the charging and discharging power supply of the i-th energy storage power station in the target period t of the dispatching operation day, respectively, and N is the number of energy storage power stations; Energy storage power station regulation capacity constraints: In the above formula, Q i,max is the maximum adjustable capacity of the i-th energy storage power station; Node voltage constraints: V j,min ≤|V j |≤V j,max V j =|V j |∠θ j i jk =θ j -θ k In the above formula, V j,max 、V j,min are the maximum and minimum voltage amplitudes allowed at the jth node in the power system, V j is the voltage of the jth node, |V j |,θ j are the voltage amplitude and phase of the jth node, θ jk is the voltage phase difference between the jth node and the kth node, θ k is the voltage phase of the kth node, P j , Q j are the active and reactive power of the jth node, respectively, |V k | is the voltage amplitude of the kth node, G jk , B jk are the real and imaginary parts of the complex admittance of the j-th node and the k-th node, respectively, j, k = 1, 2, ..., M, M is the number of nodes in the power system; Branch flow constraints: F jk,min ≤F jk ≤F jk,max F jk =R e (S jk ) In the above formula, F jk is the active power flow of the branch jk from the jth node to the kth node, F jk,max 、F jk,min are the maximum and minimum power flow transmission values allowed for branch jk, R e () is the function for obtaining the real part of a complex number, S jk is the complex power of branch jk, are the voltage conjugate values of the jth and kth nodes respectively, They are the conjugate values of the equivalent admittance of branch jk to ground and line respectively.
5. According to the method for wide-area coordinated dispatching of multiple energy storage power stations in a high-penetration new energy power system of claim 1, Features: In step B, the total power demand of the energy storage power station of the power system is determined by the following formula: In the above formula, P d,ch,t , P d,dis,t are the total charging and discharging power requirements of the energy storage power station in the target period t of the dispatching operation day, P L,t , P w,t , P v,t , P g,t They are respectively the power system load value, wind power source power, solar power source power, and conventional energy power source power in the target period t of the dispatching operation day.
6. The method for wide-area coordinated dispatching of multiple energy storage power stations in a high-penetration new energy power system according to claim 1, Features: In step A, the conditions for satisfying the scheduling response requirements are that the following inequalities are all true: P i,max ≥P i,max,req ΔP i,max ≥ΔP i,max,req Q i,max ≥Q i,max,req In the above formula, P i,max , ΔP i,max , Q i,max are the maximum adjustable power, maximum adjustable power rate, and maximum adjustable capacity of the i-th energy storage power station, respectively. i,max,req , ΔP i,max,req , Q i,max,req They are respectively the lower limit requirements of the maximum adjustable power, maximum adjustable power rate, and maximum adjustable capacity of the power system dispatching agency for a single adjustment of the i-th energy storage power station.