A self-resetting, detachable and assembled earthquake-resistant bridge pier and construction method thereof
By adopting the design of self-returning and replaceable prefabricated earthquake-resistant piers in the bridge piers, and using prefabricated components and self-returning devices, the problems of insufficient seismic performance and low construction efficiency of prefabricated piers under high-intensity earthquakes are solved, and the piers are realized for quick repairs and reduced rebuild costs.
Patent Information
- Application Number
- CN202210251504.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-15
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-03-15
AI Technical Summary
The existing prefabricated bridge piers have insufficient seismic performance under high-severity earthquakes, low construction efficiency, and weak connecting nodes, making it difficult to achieve rapid repair and partial replacement, resulting in high reconstruction costs. Moreover, existing technology cannot effectively solve the residual displacement of the bridge piers after the earthquake. and the issue of prestressed tendon release.
A self-returning and removable prefabricated seismic-resistant bridge pier is designed, which uses prefabricated pier columns, prefabricated cover beams, caps and removable collars, and a self-returning device combined with unbonded steel bars, fixings and springs. Stress bars and carbon fiber strips increase compressive strength and ductility, and reinforcement connections are reinforced with side-tightening bolts and snap rings to enable self-resetting and rapid repair of the piers.
It significantly improves the construction efficiency, reduces the risk of high-altitude work, realizes bridge piers with small residual displacement under high-intensity earthquakes, is repairable and partially replaceable, reduces reconstruction costs, and enhances the seismic performance and rapid repair capabilities of the bridge piers.
Smart Images

Figure CN114592422B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of civil engineering and transportation, and in particular relates to a self-resetting, detachable and assembled earthquake-resistant bridge pier and a construction method thereof. Background Art
[0002] Prefabricated concrete bridge structures are concrete structures that are assembled and connected using prefabricated components as the main load-bearing components. They are one of the important directions for the development of my country's transportation industry. They have the advantages of controllable production quality standards, high degree of industrialization, short on-site operation time, less delays to existing traffic, and low environmental pollution. For prefabricated pier structures, connection nodes are often the weak link in the seismic resistance of the structure. However, the current research on the connection structure of prefabricated piers and their seismic performance is still immature, which is the focus and difficulty of the research on prefabricated bridges at this stage.
[0003] my country has a well-developed seismic belt, with a wide range of earthquake activities, high intensity and high frequency. Earthquakes such as Tangshan, Wenchuan and Yushu have caused a large number of damages and collapses to various bridge structures, causing serious economic losses to public transportation and society. In order to reduce the cost of reconstruction in the disaster area and speed up the reconstruction progress, in addition to some severely damaged bridge structures that need to be demolished and rebuilt, a large number of slightly and moderately damaged bridges can be repaired and reinforced after the technical condition level is assessed to meet the subsequent use function and bearing capacity requirements. At present, there are not many applications of prefabricated pier structures with recoverable functions in actual engineering. The following technical problems still exist in the research on the seismic performance and recoverability of prefabricated piers:
[0004] 1. At present, most bridge piers are constructed by cast-in-place method, which requires setting up an aerial casting platform around the pier. Workers need to tie steel bars, support formwork and cast concrete on site at high altitude. Due to the small high-altitude working surface and large wet work workload, the construction efficiency is low and the safety risk is high.
[0005] 2. For prefabricated bridge pier structures, connection nodes are prone to become weak links in the seismic resistance of the structure, especially the steel bar connections between components. Under the repeated action of earthquakes, peeling failure is prone to occur between the grouting sleeve and the steel bar.
[0006] 3. A large number of earthquake damage investigations and studies have shown that due to the lack of reasonable and feasible restorable structures in the structural design, the bridge piers produce large residual deformations under the action of earthquakes, making it difficult to push the piers back to their original positions for reinforcement. Even if they can be repaired, their reliability cannot be measured.
[0007] 4. In the seismic design of bridges, the connection between the bottom of the pier and the abutment, and the connection between the top of the pier and the cap beam are generally required to be energy-absorbing components, forming plastic hinges during earthquakes to dissipate seismic energy, while the middle part of the pier and the cap beam are designed as capacity protection components. Therefore, after an earthquake, even if the pier is damaged, it only occurs in a local area. At present, for safety reasons, the entire bridge structure is often dismantled, causing unnecessary economic losses.
[0008] 5. The invention patent application with publication number CN113373797A, “A prefabricated and assembled concrete seismic resistant bridge pier structure and repair method”, discloses the following technical scheme: the prefabricated and assembled concrete seismic resistant bridge pier structure includes a top cap, a foundation and a prefabricated concrete column connected between the top cap and the foundation by prestressed steel bars, a nested HRC column is arranged in the prefabricated concrete column, the nested HRC column includes an upper HRC column and a lower connecting block located in the plastic hinge area; the upper end of the lower connecting block is connected to the upper HRC column, and the lower end of the lower connecting block is connected to the foundation; the position of the prefabricated concrete column corresponding to the lower connecting block is set as a detachable part, and the lower connecting block is replaced by removing the detachable part. The prestressed segmented piers of this invention can meet the seismic requirements in high-intensity earthquake zones, and can provide the structure with energy dissipation and earthquake resistance functions by replacing damaged parts; however, it has the following shortcomings: ① HRC columns are nested inside the piers, and the deformation of the internal HRC columns is small, making it difficult to dissipate energy. At the same time, the reinforcement of the bottom of the piers may cause the transfer of plastic hinges, resulting in damage to the upper piers. ② The prestressed tendons inside the piers serve as self-resetting devices, and prestressing needs to be tensioned at the top of the cap beam. It is difficult to tension prestressing at high altitudes. At the same time, during local dismantling and repair after an earthquake, after releasing the prestress and replacing the prefabricated parts, since the upper structure has not been dismantled, there is not enough space to tension the prestress again. ③ The patent does not propose a corresponding method for removable steel bars, and the removable function is not strong.
[0009] In summary, developing a prefabricated bridge pier with small residual displacement under high-intensity earthquakes, which is repairable and can be partially replaced, is the key to achieving rapid repair and reducing reconstruction costs after bridge damage. However, at present, the application of prefabricated earthquake-resistant bridge piers with recoverable functions in actual engineering is still imperfect. Summary of the invention
[0010] In order to solve the above technical problems, the present invention discloses a self-resetting, detachable, assembled seismic-resistant bridge pier and a construction method thereof, which can greatly reduce the workload of wet operations and reduce construction risks. It also provides an assembled bridge pier with small residual displacement under high-intensity earthquake conditions, which can be repaired and partially replaced, and is conducive to the rapid repair of bridge earthquake damage.
[0011] To achieve the above purpose, the specific technical solutions of the present invention are as follows:
[0012] A self-resetting, detachable and assembled earthquake-resistant bridge pier, comprising:
[0013] Prefabricated piers, which are arranged vertically;
[0014] Precast cap beams supported on the tops of precast piers;
[0015] A cap, which is arranged at the bottom of the prefabricated pier column and is used to support the prefabricated pier column;
[0016] A prefabricated removable sleeve ring is arranged at the plastic hinge area at the bottom and / or top of the prefabricated pier column and is wrapped and fixed on the outside of the core concrete of the prefabricated pier column;
[0017] The self-resetting device is evenly arranged on the outside of the prefabricated detachable sleeve, and includes unbonded steel bars, fixings and springs. One end of the unbonded steel bars is inserted into the pedestal or prefabricated cap beam, and the other end passes through the detachable sleeve, is inserted into the spring and fixed by the self-resetting fixings.
[0018] The post-construction cast-in-place strip is arranged at the connection between the prefabricated removable sleeve and the prefabricated pier and / or cap beam.
[0019] Furthermore, the prefabricated pier includes three parts, namely, a pier common area, a pier core area and a pier embedded area, which are connected in sequence. The diameter of the pier common area matches the diameter of the bridge pier; the diameter of the pier core area is smaller than the diameter of the pier common area; and the pier embedded area is used to be embedded in a pedestal or a prefabricated cap beam.
[0020] Furthermore, the prefabricated removable collar comprises two prefabricated removable collar units, which are spliced together to surround the periphery of the pier core area, and their height matches the height of the pier core area. Both ends of each prefabricated removable collar unit are provided with raised prestressed anchor blocks, and annular prestressed tendons are provided inside. Both ends of the prestressed tendons respectively pass through the prestressed anchor blocks of the prefabricated removable collar unit in which they are located, and pass through the prestressed anchor blocks of the prefabricated removable collar unit on the opposite side, and are fixed by prestressed anchors.
[0021] Furthermore, a collar rib is provided inside the prefabricated removable collar, and the vertical position of the collar rib matches the position of the prestressed tendon;
[0022] The inner diameter of the prefabricated detachable sleeve is larger than the outer diameter of the core area of the pier column, the sleeve ribs press against the periphery of the prefabricated pier column, and the gap between the prefabricated detachable sleeve and the prefabricated pier column is filled with grouting material after the prestressed tendons are tensioned.
[0023] Furthermore, the core area of the pier column is wrapped with carbon fiber strips.
[0024] Furthermore, vertical energy-absorbing steel bars are arranged in the prefabricated removable ring, and pier longitudinal bars are evenly arranged around one end of the pier common area close to the pier core area. The number of the energy-absorbing steel bars matches that of the pier longitudinal bars, and they are connected one-to-one by a double-hole clamp.
[0025] Furthermore, the prefabricated removable sleeve is provided with vertical sleeve energy-absorbing steel bars, the pedestal / prefabricated cap beam is provided with pedestal embedded steel bars / cap beam embedded steel bars, and the sleeve energy-absorbing steel bars are connected with the pedestal embedded steel bars / cap beam embedded steel bars through a sleeve pre-embedded in the prefabricated removable sleeve.
[0026] Furthermore, the double-hole clamp includes two splints, which are spliced together to form a splint socket A and a splint socket B. One end of the splint socket A can match the inserted sleeve energy-absorbing steel bar, and one end of the splint socket B can match the inserted pier column longitudinal reinforcement. The two splints are fixed on both sides by splint fixing parts, and the other end of the splint socket A and the other end of the splint socket B are both provided with a clamping ring that can be screwed in.
[0027] Furthermore, an internal thread is provided at one end of the sleeve close to the ring energy-absorbing steel bar, and an external thread is provided at one end of the sleeve close to the sleeve. One end of the sleeve can be matched and screwed into one end of the ring energy-absorbing steel bar, and the other end can be matched and inserted into the pre-embedded steel bars of the pedestal / pre-embedded steel bars of the cap beam; a sleeve socket is reserved on one side of the sleeve, and a side-tightening bolt is provided on the sleeve socket to tighten the pre-embedded steel bars of the pedestal / pre-embedded steel bars of the cap beam; the prefabricated detachable sleeve is provided with a sleeve groove that can match the side-tightening bolt to penetrate.
[0028] The construction method of the self-resetting detachable assembled earthquake-resistant bridge pier described above comprises the following steps:
[0029] S1. Process prefabricated piers, prefabricated cap beams, caps, and prefabricated removable sleeves, and transport them to the construction site after processing;
[0030] S2. Install or cast-in-place caps, install prefabricated piers, inject grouting material into the gaps between caps and piers, and complete the installation of piers;
[0031] S3. Splice the prefabricated removable sleeve, complete the fixation of the prefabricated removable sleeve with the cap and the prefabricated pier, tension the prestressed tendons, inject grouting material, and complete the installation of the prefabricated removable sleeve;
[0032] S4. Install the self-resetting device, screw in the unbonded steel bar, install the spring, screw in the self-resetting fixing piece appropriately, apply a certain axial pressure, and complete the installation of the self-resetting device;
[0033] S5. Construct the post-cast joint to complete the construction of the self-resetting and removable assembled earthquake-resistant bridge piers.
[0034] The self-resetting, detachable and assembled earthquake-resistant bridge pier described above has the following advantages:
[0035] 1. The present invention is a prefabricated and assembled component, which is easy to construct, can reduce the workload of on-site high-altitude formwork engineering and wet work, effectively improve construction efficiency, and prefabrication of components in the factory can ensure construction quality.
[0036] 2. The present invention is provided with a pier core area, and two prefabricated removable sleeve ring units are fixed on the periphery of the pier core area using annular prestressing. At the same time, the annular prestressing can effectively improve the compressive strength and ductility of the internal core concrete, and prevent the longitudinal reinforcement of the pier from large deformation and deflection. In addition, a layer of carbon fiber strips is wrapped around the periphery of the pier core area to ensure that the energy consumption or damage parts of the bridge pier under the action of an earthquake appear on the prefabricated removable sleeve ring, and the core concrete of the pier core area can be guaranteed to be basically undamaged. When repairing, it is only necessary to simply repair the pier core area and replace the damaged prefabricated removable sleeve ring, which effectively realizes the rapid repairability of the bridge during earthquake disasters.
[0037] 3. The present invention has developed two types of steel bar connection structures suitable for high-intensity earthquake resistance, and at the same time realized the removable function of the ring energy-absorbing steel bar. The connection between the ring energy-absorbing steel bar and the embedded steel bar of the pedestal / embedded steel bar of the cap beam is achieved by setting a sleeve, and the side-tightening bolt is passed through the notch of the ring to tighten the embedded steel bar of the pedestal, which can not only enhance the friction between the sleeve and the embedded steel bar of the pedestal / embedded steel bar of the cap beam, but also utilize the shear resistance of the bolt to enhance the connection performance of the steel bar. For the connection between the ring energy-absorbing steel bar and the longitudinal reinforcement of the pier column, the present invention has developed a double-hole clamp with a clamp. After the ring energy-absorbing steel bar and the longitudinal reinforcement of the pier column pass through the double-hole clamp in opposite directions, they are screwed into the clamp, which also utilizes the friction between the steel bar and the clamp and the shear resistance of the clamp to enhance the connection performance of the steel bar. If the removable ring is damaged after the earthquake, the side-tightening bolt and the clamp can be loosened to remove the ring for replacement, which is convenient for installation.
[0038] 4. The present invention has developed a self-resetting device for bridge piers. The self-resetting device is evenly arranged around the removable sleeve ring. The lower part of the unbonded steel bar is buried in the cap. After the upper part passes through the removable sleeve ring, a self-resetting fixing member such as a nut is used to anchor the spring to the top of the prefabricated removable sleeve ring, and the self-resetting function of the bridge pier is realized by using the characteristics of the spring. Compared with the viscous damper, the pre-compression of the spring can apply a certain axial force to the bridge pier, effectively reducing the deformation of the bridge pier under the action of an earthquake. At the same time, it is more convenient to install and saves construction costs. Compared with the invention patent with application number 202110376941.5, which tensions prestress inside the pier column as a self-resetting device, the present invention arranges a self-resetting device on the outside of the ring energy-absorbing steel bar, which has a better self-resetting effect. At the same time, the spring also plays a role of preferential energy consumption, and the overall energy consumption effect of the pier is also better. The spring also protects the longitudinal reinforcement of the pier to a certain extent, that is, protects the pier; in addition, the structure also avoids tensioning the prestressed tendons of the self-resetting device on the top of the cap beam, which solves the problem that the prestressed tendons are difficult to tension again after the prestress is released during local repair of the plastic hinge area of the pier. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 It is a three-dimensional structural schematic diagram of the present invention.
[0040] Figure 2 It is a schematic diagram of the exploded structure of the prefabricated pier column and the prefabricated detachable sleeve ring of the present invention.
[0041] Figure 3 It is a three-dimensional perspective structural schematic diagram of the prefabricated pier column and the prefabricated detachable sleeve ring after installation.
[0042] Figure 4 It is a schematic diagram of the cross-sectional structure of the pier column insertion area after the grouting material is poured into the circular groove of the base.
[0043] Figure 5a It is a perspective structural diagram of the connection between the ring energy-absorbing steel bar, the pre-embedded steel bar of the cap and the sleeve; Figure 5b It is a schematic diagram of the exploded structure of the connection between the ring energy-absorbing steel bars, the embedded steel bars of the pedestal and the sleeve.
[0044] Figure 6 It is a schematic diagram of the three-dimensional structure of the connection between the ring energy-absorbing steel bars, the pier column longitudinal bars and the double-hole clamps.
[0045] Figure 7 It is a three-dimensional structural schematic diagram of the installation of a prefabricated detachable sleeve ring and a self-resetting device.
[0046] In the figure, a prefabricated pier 1, a pier common area 101, a pier core area 102, a pier embedded area 103, a prefabricated cap beam 2, a cap 3, a prefabricated removable sleeve 4, a self-resetting device 5, an unbonded steel bar 501, a self-resetting nut 502, a spring 503, an unbonded steel bar channel 504, an unbonded steel bar sleeve 505, an anchor block 506, a construction post-cast strip 6, a sleeve energy-absorbing steel bar 7, a double-hole clamp 8, a pier longitudinal reinforcement 9, a grouting material 10, a prestressed steel bar 11, a prestressed anchor block 12, a prestressed anchor 13, a sleeve rib 14, a carbon fiber strip 15, a cap circular groove 16, a circular groove positioning block 17, a cap embedded steel bar 18, a sleeve 19, a side-tightening bolt 20, a steel bar notch 21, a sleeve notch 22, a threaded retaining ring 23, a bolt 24, and a cap positioning block 25. DETAILED DESCRIPTION
[0047] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0048] In the description of the present invention, it should be noted that the terms "upper" and "lower" etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the product of the invention is usually placed when in use. These are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they should not be understood as limitations on the present invention.
[0049] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0050] A self-resetting, detachable and assembled earthquake-resistant bridge pier, such as Figure 1As shown, it includes a prefabricated pier 1, a prefabricated cap beam 2, a foundation 3, a prefabricated removable sleeve 4, a self-resetting device 5 and a construction post-cast strip 6, wherein: the prefabricated pier 1 is arranged vertically and is prefabricated with ordinary concrete; the prefabricated cap beam 2 is supported on the top of the prefabricated pier 1 and is prefabricated with ordinary concrete; the foundation 3 is arranged at the bottom of the prefabricated pier 1 and is used to support the prefabricated pier 1, and is also made of ordinary concrete, which can be prefabricated or cast-in-place; the prefabricated removable sleeve 4 is arranged at the plastic hinge area at the bottom and / or top of the prefabricated pier 1, wrapped and fixed on the outside of the core concrete of the prefabricated pier 1, and is prefabricated with ordinary concrete; the self-resetting device 5 is evenly arranged on the outside of the prefabricated removable sleeve 4, and includes unbonded steel bars 501, fixings and springs 503, one end of the unbonded steel bars 501 is inserted into the foundation 3 or the prefabricated cap beam 2, and the other end passes through the prefabricated removable sleeve 4, is inserted into the spring 503 and is fixed by the self-resetting fixings. The post-cast strip 6 is arranged at the connection between the prefabricated removable sleeve ring 4 and the prefabricated pier column 1 and / or the cap beam. Generally speaking, the prefabricated pier column 1, the prefabricated cap beam 2, the cap 3 and the prefabricated removable sleeve ring 4 are made of ordinary concrete, and the concrete used in the post-cast strip 6 is one grade higher than that of the prefabricated pier column 1.
[0051] Since the structure of the connection between the prefabricated pier 1 and the abutment 3 is basically the same as that of the connection between the prefabricated pier 1 and the prefabricated cap beam 2, the following part takes the connection structure between the prefabricated pier 1 and the abutment 3 as an example to illustrate that the connection structure between the prefabricated pier 1 and the prefabricated cap beam 2 is symmetrical.
[0052] Combination Figure 2 and 3 As shown, further, the prefabricated pier 1 includes three parts, which are connected in sequence, namely, the pier common area 101, the pier core area 102 and the pier embedded area 103. The diameter of the pier common area 101 matches the diameter of the bridge pier, and the diameter of the bridge pier is determined according to the needs of the bridge; the diameter of the pier core area 102 is smaller than the diameter of the pier common area 101, and is the part that can still remain basically intact at the plastic hinge after the earthquake, and does not need to be replaced; therefore, the height and diameter of the pier core area 102 need to be determined according to the height of the plastic hinge of the pier after the earthquake and the thickness of the concrete damage on the surface. The pier embedded area 103 is used to be embedded in the cap 3. The diameter of the pier embedded area 103 is the same as that of the pier core area 102, and the embedding depth needs to be determined according to the seismic requirements. For the cap 3, the pier common area 101, the pier core area 102 and the pier embedded area 103 are arranged from top to bottom.
[0053] It should be noted that the cap 3 is provided with a cap circular groove 16 for inserting the prefabricated pier 1. The diameter of the cap circular groove 16 is slightly larger than the diameter of the pier inserting area 103. Figure 4As shown, four circular groove positioning blocks 17 of a certain thickness are provided at the bottom of the circular groove 16 of the cap, and an inserting positioning groove is provided at the lower end of the pier column inserting area 103, which can match and insert the circular groove positioning block 17. After the pier column inserting area 103 is inserted into the circular groove 16 of the cap, it can be ensured that a certain gap is reserved between the pier column inserting area 103 and the side and bottom of the circular groove 16 of the cap, so that the grouting material 10 can be poured into the side gap and the bottom gap to enhance the integrity of the prefabricated pier column 1 and the cap 3. The connection of the pier column inserting area 103 inserted in the cap 3 can also consider the appropriate steel bar structure to ensure that it meets the seismic requirements of high-intensity areas.
[0054] Furthermore, the pier at the plastic hinge is provided with two parts, namely, a pier core area 102 and a prefabricated removable ring 4. The prefabricated removable ring 4 includes two prefabricated removable ring units. The two prefabricated removable ring units are spliced together to surround the periphery of the pier core area 102, and the height matches the height of the pier core area 102. Both ends of each prefabricated removable ring 4 unit are provided with raised prestressed anchor blocks 12, and annular prestressed tendons 11 are provided inside. Both ends of the prestressed tendons 11 respectively pass through the prestressed anchor blocks 12 of the prefabricated removable ring unit in which they are located, and pass through the prestressed anchor blocks 12 of the prefabricated removable ring unit on the opposite side, and are fixed by prestressed anchors 13. It is worth noting that the installation of the prestressed tendons 11 is to first set a prestressed pipe in the prefabricated removable sleeve 4, and then insert the prestressed tendons 11 into the prestressed pipe during installation, and then inject cement slurry. However, the section of the prestressed pipe where the prestressed tendons 11 that pass through the prestressed anchor block 12 on the opposite side (i.e., the end portion of the prestressed tendons 11 that is anchored) is located may not be injected with cement slurry, so that the prefabricated removable sleeve 4 can be quickly disassembled after the prestress is released. The height of the prefabricated sleeve 4 is generally consistent with the height of the core area 102 of the pier column (the height of the post-construction cast-in-place strip 6 is reserved), and the thickness of the prefabricated removable sleeve 4 is slightly greater than the thickness of the concrete damage on the surface of the plastic hinge of the pier column after the earthquake, so as to ensure that the concrete of the earthquake-damaged part appears on the prefabricated removable sleeve 4, and avoid cracking of the core concrete area 102. After the prefabricated removable sleeve 4 is installed on the periphery of the core area 102 of the pier column, the diameter of this part of the pier column is equal to or slightly greater than the diameter of the ordinary area 101 of the pier column. It should be particularly noted that the annular prestressed tendons 11 can not only fix the prefabricated removable ring 4 on the periphery of the pier core area 102, but also provide annular restraint force on the pier core area 102, effectively improve the compressive strength and ductility of the core concrete inside the pier, improve the seismic performance of the pier, protect the core concrete of the pier to a certain extent, and prevent the ring energy-absorbing steel bars 7 from large deformation and deflection.
[0055] Furthermore, a collar rib 14 is provided inside the prefabricated removable collar 4 , and the vertical position of the collar rib 14 matches the position of the prestressed tendons 11 , which can provide a transfer path for the annular prestress, so that the annular prestress can be effectively transferred to the pier core area 102 .
[0056] It should be noted that the inner diameter of the prefabricated removable ring 4 is slightly larger than the outer diameter of the pier core area 102, and a certain gap is reserved between the prefabricated removable ring 4 and the pier core area 102, but the ring rib 14 is pressed against the periphery of the prefabricated pier 1 to prevent the prefabricated removable ring 4 from cracking due to the tensioning of the prestressed tendons 11. After the tensioning of the prestressed tendons 11 is completed, the grouting material 10 is injected into the gap between the prefabricated removable ring 4 and the prefabricated pier 1 to enhance the integrity of the prefabricated removable ring 4 and the pier core area 102. The top of the pedestal 3 is also provided with four pedestal positioning blocks 25 of a certain thickness, and the bottom surface of the prefabricated removable ring 4 is provided with a ring positioning groove matching the pedestal positioning block 25. When the prefabricated removable ring 4 is installed, the ring positioning groove is matched to cover the pedestal positioning block 25, so that the positioning of the prefabricated removable ring 4 can be achieved. At the same time, it can also ensure that a certain gap is reserved between the bottom surface of the prefabricated removable ring 4 and the top surface of the pedestal 3. After the prestressed tendons 11 are tensioned, the grouting material 10 is also poured into the bottom surface gap to enhance the integrity of the prefabricated pier 1 and the pedestal 3.
[0057] Considering that the prefabricated removable collar 4 has been fixed to the outside of the pier core area 102 by the prestressed tendons 11, the strength of the grouting material 10 between the pier core area 102 and the prefabricated removable collar 4 should not be too high to facilitate the later replacement of the prefabricated removable collar 4.
[0058] Furthermore, the outer periphery of the core area of the pier is wrapped with a carbon fiber strip 15 to further improve the compressive strength and ductility of the core concrete of the pier, and can be used as a protective layer to ensure that the energy consumption or damage of the pier under the action of an earthquake appears on the prefabricated removable sleeve 4, and the internal core concrete of the core area 102 of the pier can be guaranteed to be basically undamaged. When repairing, it is only necessary to simply repair the core area 102 of the pier and replace the damaged prefabricated removable sleeve 4, which effectively realizes the rapid repairability of the bridge during earthquake disasters. It should be noted that the carbon fiber strip 15 is disconnected vertically and arranged at a small distance vertically, which can prevent the enhancement of the bending resistance of the plastic hinge area of the pier, so as to avoid the transfer of the plastic hinge of the pier. At the same time, the carbon fiber strip 15 can be used as an isolation layer, so that the prefabricated removable sleeve 4 can be easily separated from the core area 102 of the pier after being damaged by an earthquake, so as to facilitate replacement.
[0059] Further, such as Figure 5a and Figure 5bAs shown, a vertical sleeve energy-absorbing steel bar 7 is arranged in the prefabricated removable sleeve 4, and a prefabricated pre-embedded steel bar 18 is arranged in the cap 3. The sleeve energy-absorbing steel bar 7 and the prefabricated pre-embedded steel bar 18 are connected through a sleeve 19 pre-embedded in the prefabricated removable sleeve 4. Furthermore, an inner thread is arranged at one end of the sleeve 19 close to the sleeve energy-absorbing steel bar 7, and an outer thread is arranged at one end of the sleeve 19 close to the sleeve 19. One end of the sleeve 19 can be matched and screwed into one end of the sleeve energy-absorbing steel bar 7, and the other end can be matched and inserted into the prefabricated pre-embedded steel bar 18. A steel bar notch 21 is pre-opened on the upper part of the prefabricated pre-embedded steel bar 18, and a sleeve socket is reserved on one side of the sleeve 19. The sleeve socket is provided with a side screw bolt 20, and the side screw bolt 20 is pushed into the steel bar notch 21 to tighten the prefabricated pre-embedded steel bar 18; the prefabricated removable sleeve 4 is provided with a sleeve notch 22 that can match the side screw bolt 20 to penetrate. During production, first screw the sleeve 19 into the ring energy-absorbing steel bar 7, and then process the prefabricated removable sleeve 4. During installation, align the sleeve 19 with the pre-embedded steel bars 18 of the foundation, and then insert the pre-embedded steel bars 18 of the foundation into the lower half of the sleeve 19. The side-tightening bolts 20 are screwed into the reserved sleeve grooves 22 on the prefabricated removable sleeve 4 to tighten the pre-embedded steel bars 18 of the foundation, thus completing the connection between the lower part of the ring energy-absorbing steel bar 7 and the pre-embedded steel bars 18 of the foundation. The side-tightening bolts 20 can not only enhance the friction between the sleeve 19 and the pre-embedded steel bars 18 of the foundation, but also utilize the shear resistance of the bolts to enhance the connection performance of the steel bars, thereby ensuring that the steel bar connection structure does not fail under the action of an earthquake. The pre-embedded steel bars 18 of the foundation need to be reused after the earthquake, and a higher grade of steel bars can be used to prevent the pre-embedded steel bars 18 of the foundation from yielding before the ring energy-absorbing steel bars 7. Furthermore, if Figure 6 As shown, a vertical ring-shaped energy-absorbing steel bar 7 is arranged in the prefabricated removable ring 4, and a full-length pier column longitudinal reinforcement 9 is evenly arranged around the pier column common area 101, and one end of the pier column longitudinal reinforcement 9 extends to the upper part of the pier column core area 102. The number of the ring-shaped energy-absorbing steel bars 7 matches that of the pier column longitudinal reinforcement 9, and they are connected one-to-one by a double-hole clamp 8, that is, one double-hole clamp 8 fixes one pier column longitudinal reinforcement 9 and one ring-shaped energy-absorbing steel bar 7.
[0060] Furthermore, the double-hole clamp 8 includes two plywoods, which are spliced together to form a plywood socket A and a plywood socket B. One end of the plywood socket A can match the inserted sleeve energy-absorbing steel bar 7, and one end of the plywood socket B can match the inserted pier column longitudinal reinforcement 9. The two plywoods are fixed on both sides by plywood fixing parts. The plywood fixing parts of this embodiment are clamp bolts 24. Plywood through holes are provided on both sides of the plywood. The clamp bolts 24 pass through the plywood through holes to tighten and fix the two plywoods; the other end of the plywood socket A and the other end of the plywood socket B are both provided with a snap ring 23 that can be screwed in, that is, the other end of the plywood socket A and the other end of the plywood socket B are provided with external threads, and the snap ring 23 is provided with internal threads, and the snap ring 23 is screwed into the external threads of the plywood socket A and the plywood socket B. After the ring energy-absorbing steel bar 7 and the pier column longitudinal reinforcement 9 are aligned side by side, a certain overlap length is reserved, and the double-hole clamp 8 is tightened with the clamp bolt 24, and then the clamp ring 23 is screwed in. This structure utilizes the friction between the steel bar and the clamp and the shear resistance of the clamp ring to enhance the connection performance of the steel bar. At the same time, the double-hole clamp 8 can also ensure that the ring energy-absorbing steel bar 7 and the pier column longitudinal reinforcement 9 are not aligned vertically, and reserve lifting space when the prefabricated removable ring 4 is replaced, which is convenient for the installation and replacement of the prefabricated removable ring 4.
[0061] When the prefabricated removable collar 4 is replaced after an earthquake, the annular prestressed tendons 11 are released, the side tightening bolts 20 are loosened through the collar grooves 22, and after part of the damaged protective layer is chiseled off, the clamp bolts 24 and the retaining ring 23 are loosened, and the damaged prefabricated removable collar 4 can be removed; the collar grooves 22 reserved on the prefabricated removable collar 4 can also be used as reserved holes for lifting the prefabricated removable collar 4 after an earthquake, and the removal of the prefabricated removable collar 4 is completed by applying force upward through the collar grooves 22.
[0062] like Figure 7As shown, for the self-resetting device 5, the self-resetting device 5 is evenly arranged around the removable sleeve 4, preferably 4-8. A non-bonded steel sleeve 505 with internal threads is pre-embedded in the cap 3, and the non-bonded steel 501 with external threads is screwed into the non-bonded steel sleeve 505. A non-bonded steel channel 504 with a diameter slightly larger than the non-bonded steel 501 is embedded in the prefabricated removable sleeve 4, which can be made of PVC pipe to avoid friction between the non-bonded steel 501 and the prefabricated removable sleeve 4. After the upper part of the non-bonded steel 501 passes through the prefabricated removable sleeve 4, the spring 503 is anchored to the top of the prefabricated removable sleeve 4 by a self-resetting nut 502 (four anchoring positions can be set at the top of the prestressed tendon anchor block 12, and the remaining spring needs to be anchored by an additional anchor block 506 on the outer side of the removable sleeve 4), and the self-resetting function of the bridge pier is realized by using the characteristics of the spring. Its working principle is that under the action of an earthquake, the pier column sways, the tension side pier column deforms upward, the spring is compressed, and a self-resetting elastic force is generated to limit the further swaying of the pier column. In this process, it also plays a role in dissipating earthquake energy. When the prefabricated detachable ring 4 and the self-resetting device 5 are disassembled after the earthquake, the prefabricated detachable ring 4 can be replaced by loosening the unbonded steel bars 501 in the pedestal 3, and a new self-resetting device 5 can be installed.
[0063] Compared with viscous dampers, spring pre-compression can apply a certain axial force to the piers, effectively reducing the deformation of the piers under earthquakes. At the same time, it is more convenient to install and saves construction costs. Compared with the invention patent with application number 202110376941.5, which uses prestressing inside the pier column as a self-resetting device, the present invention sets a self-resetting device on the outside of the energy-absorbing steel bar, which has a better self-resetting effect. At the same time, the spring also plays a role of preferential energy consumption, and the overall energy consumption effect of the pier is also better. The spring also protects the energy-absorbing longitudinal reinforcement to a certain extent, that is, protects the pier; in addition, this method also avoids tensioning the prestressed tendons of the self-resetting device on the top of the cap beam, solving the problem that the prestressed tendons are difficult to tension again after the prestress is released during the local repair of the plastic hinge area of the pier.
[0064] The construction method of the self-resetting detachable assembled earthquake-resistant bridge pier described above comprises the following steps:
[0065] S1. Process the prefabricated pier 1, prefabricated cap beam 2, cap 3, and prefabricated removable sleeve 4, and transport them to the construction site after processing;
[0066] S2 installation or cast-in-place cap 3, installation of prefabricated pier 1, cap 3 and pier part of the gap injected grouting material 10, complete the pier installation;
[0067] S3. Splice the prefabricated removable sleeve 4, complete the prefabricated removable sleeve 4 and the cap 3, the prefabricated pier 1 fixed, tensioning ring to the prestressed tendons 11, inject grouting material 10, complete the installation of the prefabricated removable sleeve 4;
[0068] S4 installs the self-resetting device 5, screws into the unbonded steel bar 501, installs the spring 503, screws into the self-resetting fixture appropriately, applies a certain axial pressure, completes the installation of the self-resetting device 5;
[0069] S5. Construct post-cast strip 6 to complete the construction of the self-resetting, detachable and assembled earthquake-resistant bridge pier.
[0070] During operation, when the plastic hinge area of the bridge pier is damaged by earthquake, the annular prestressed tendons 11 are released, the unbonded steel bars 501 are screwed out, the side screw bolts 20 are loosened through the collar notches 22, and after the damaged protective layer of the post-construction cast-in-place strip 6 is removed, the clamp bolts 24 and the clamp ring 23 are loosened, and the prefabricated detachable collar 4 and the self-resetting device 5 are disassembled by applying force upward through the collar notches 22. After the new prefabricated detachable collar 4 is prefabricated, steps S3-S5 are repeated to quickly install the prefabricated collar 4 and the self-resetting device 5, so as to realize the rapid repair of the bridge pier after earthquake, and the construction is simple and fast.
Claims
1. A self-resetting, detachable and assembled earthquake-resistant bridge pier, characterized in that include: Prefabricated piers are arranged vertically and prefabricated with ordinary concrete; Precast cap beams supported on the tops of precast piers; A cap, which is arranged at the bottom of the prefabricated pier column and is used to support the prefabricated pier column; A prefabricated removable sleeve ring is arranged at the plastic hinge area at the bottom and / or top of the prefabricated pier column and is wrapped and fixed on the outside of the core concrete of the prefabricated pier column; The self-resetting device is evenly arranged on the outside of the prefabricated removable sleeve, including an unbonded steel bar, a fixing part and a spring. One end of the unbonded steel bar is inserted into the cap or the prefabricated cap beam, and the other end passes through the removable sleeve, is inserted into the spring and is fixed by the self-resetting fixing part; The post-cast strip is set at the connection between the prefabricated removable sleeve and the prefabricated pier and / or cap beam; The prefabricated pier column comprises three parts, namely, a pier column common area, a pier column core area and a pier column embedded area, which are connected in sequence. The diameter of the pier column common area matches the diameter of the bridge pier column; the diameter of the pier column core area is smaller than the diameter of the pier column common area; the pier column embedded area is used to be embedded in the pedestal or prefabricated cap beam; The prefabricated detachable collar includes two prefabricated detachable collar units, which are spliced together to surround the outer periphery of the core area of the pier column, and the height matches the height of the core area of the pier column. Both ends of each prefabricated detachable collar unit are provided with raised prestressed anchor blocks, and annular prestressed tendons are provided inside. Both ends of the prestressed tendons pass through the prestressed anchor blocks of the prefabricated detachable collar unit where they are located, and pass through the prestressed anchor blocks of the prefabricated detachable collar unit on the opposite side, and are fixed by prestressed anchors. The inner side of the prefabricated removable collar is provided with collar ribs, and the vertical position of the collar ribs matches the position of the prestressed tendons; The inner diameter of the prefabricated removable sleeve is larger than the outer diameter of the core area of the pier column, the sleeve ribs are pressed against the periphery of the prefabricated pier column, and the gap between the prefabricated removable sleeve and the prefabricated pier column is filled with grouting material after the prestressed tendons are tensioned; The core area of the pier column is wrapped with carbon fiber strips; The prefabricated removable sleeve is provided with vertical sleeve energy-absorbing steel bars, the pier column common area is evenly arranged with full-length pier column longitudinal bars, and one end of the pier column longitudinal bars extends to the upper part of the pier column core area, the sleeve energy-absorbing steel bars are matched in number with the pier column longitudinal bars, and are connected one-to-one by a double-hole clamp; The prefabricated detachable sleeve is provided with vertical sleeve energy-absorbing steel bars, the cap / prefabricated cap beam is provided with cap embedded steel bars / cap beam embedded steel bars, and the sleeve energy-absorbing steel bars are connected with the cap embedded steel bars / cap beam embedded steel bars through a sleeve pre-embedded in the prefabricated detachable sleeve; The double-hole clamp comprises two clamps, which are spliced together to form a clamp hole A and a clamp hole B. One end of the clamp hole A can be matched to insert the ring energy-absorbing steel bar, and one end of the clamp hole B can be matched to insert the pier column longitudinal reinforcement. The two sides of the two clamps are fixed by clamp fixing parts, and the other end of the clamp hole A and the other end of the clamp hole B are both provided with a clamp ring that can be screwed in. An internal thread is provided at one end of the sleeve close to the ring energy-absorbing steel bar, and an external thread is provided at one end of the sleeve close to the sleeve. One end of the sleeve can be matched and screwed into one end of the ring energy-absorbing steel bar, and the other end can be matched and inserted into the pre-embedded steel bars of the pedestal / pre-embedded steel bars of the cap beam; a sleeve socket is reserved on one side of the sleeve, and a side-tightening bolt is provided on the sleeve socket to tighten the pre-embedded steel bars of the pedestal / pre-embedded steel bars of the cap beam; the prefabricated detachable sleeve is provided with a sleeve groove that can match the insertion of the side-tightening bolt.
2. The construction method of the self-resetting detachable and assembled earthquake-resistant bridge pier according to claim 1 is characterized in that The following steps are involved: S1. Process prefabricated piers, prefabricated cap beams, caps, and prefabricated removable sleeves, and transport them to the construction site after processing; S2. Install or cast-in-place caps, install prefabricated piers, inject grouting material into the gaps between caps and piers, and complete the installation of piers; S3. Splice the prefabricated removable sleeve, complete the fixation of the prefabricated removable sleeve with the cap and the prefabricated pier, tension the prestressed tendons, inject grouting material, and complete the installation of the prefabricated removable sleeve; S4. Install the self-resetting device, screw in the unbonded steel bar, install the spring, screw in the self-resetting fixing piece appropriately, apply a certain axial pressure, and complete the installation of the self-resetting device; S5. Construct the post-cast joint to complete the construction of the self-resetting and removable assembled earthquake-resistant bridge piers.