Method and device for determining the conversion timing of two-three combined development of oil fields
By simulating and analyzing oil field development indicators under different conversion timings, the appropriate conversion timing is determined, which solves the problem of difficult selection of conversion timing in oil field development and improves recovery rate and economic benefits.
Patent Information
- Application Number
- CN202011437261.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-07
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2040-12-07
AI Technical Summary
In oil field development, it is difficult to determine the appropriate time to shift from secondary development to tertiary oil recovery with existing technology, resulting in poor oil field development results and affecting recovery rates and economic benefits.
By calling the reservoir numerical simulation software, the oil production, water production, water cut and recovery rate are simulated under different conversion timings, and evaluation indicators are obtained, such as recovery rate increase, precipitation and internal rate of return, and a conversion timing determination model is drawn. Figure to determine the appropriate timing for conversion.
It improves the oil field development effect, optimizes the recovery rate and economic benefits, and ensures the comprehensive consideration of technical value, social value and economic value.
Smart Images

Figure CN114592858B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of oilfield development, and in particular to a method and device for determining the conversion timing of two-three combined development of an oilfield. Background Art
[0002] The "two-three combination" technology is a technology that uses secondary development to improve the well network when the traditional primary development of old oil fields has basically reached its limit, and selects the opportunity to switch to tertiary oil recovery technology to further significantly improve the final recovery rate of the old oil fields. The reorganization of the well network of the secondary development takes into account the needs of subsequent tertiary oil recovery, which not only plays the role of improving the well network of the secondary development to expand the sweep coefficient, but also plays the role of tertiary oil recovery to improve the oil displacement efficiency. At the same time, it also gives full play to the synergistic effect of the two, so that the improved recovery rate is greater than the sum of the recovery rate of the secondary development alone and the tertiary oil recovery alone, achieving the effect of "1+1>2", and leaving room for a greater increase in the final recovery rate and economic benefits of the old oil fields.
[0003] After the secondary development layer well network is reorganized, tertiary oil recovery can be carried out immediately, or it can be switched to tertiary oil recovery after a period of water drive. When different conversion timings are adopted (i.e., switching to tertiary oil recovery when the secondary development reaches different water content), different oilfield development effects will be brought about, thereby bringing different technical values, social values and economic values. Therefore, a method for determining the conversion timing is urgently needed to determine the appropriate conversion timing from secondary development to tertiary oil recovery and improve the oilfield development effect. Summary of the invention
[0004] The embodiment of the present application provides a method and device for determining the conversion timing of secondary and tertiary oil recovery in an oil field, which can determine the appropriate conversion timing from secondary development to tertiary oil recovery, thereby improving the effect of oil field development. The technical solution is as follows:
[0005] On the one hand, a method for determining the conversion timing of the second-third combined development of an oil field is provided, comprising:
[0006] Calling reservoir numerical simulation software to simulate the oil production, water production, water content and recovery rate of the target oil field under the two-three combination mode at different conversion times, wherein the two-three combination mode refers to an oil field development mode of first secondary development and then switching to tertiary oil recovery;
[0007] Based on the oil production, water production, water content and recovery factor under the two-three combination mode at different conversion times, obtaining at least one evaluation index under the two-three combination mode at different conversion times, wherein the evaluation index is used to evaluate the development effect of the two-three combination mode;
[0008] Based on at least one evaluation index in the two-three combination mode of the different conversion timings, a conversion timing determination model diagram is drawn, wherein the conversion timing determination model diagram includes a relationship curve between each evaluation index and the conversion timing;
[0009] The conversion timing determination model diagram is displayed.
[0010] In a possible implementation, the displaying the conversion timing determination model diagram includes:
[0011] Based on the target constraint condition corresponding to the at least one evaluation indicator, the conversion timing corresponding to the target constraint condition is displayed in the conversion timing determination model diagram.
[0012] In a possible implementation, the at least one evaluation index includes recovery factor increase, water reduction and internal rate of return, the recovery factor increase refers to the recovery factor increased by the two-three combination method compared with basic water drive, the water reduction refers to the water production reduced by the two-three combination method compared with basic water drive, and the internal rate of return is obtained based on the oil production, water production, water content and recovery factor under the two-three combination method;
[0013] Before obtaining at least one evaluation index under the two-three combination mode at different conversion times based on the oil production, water production, water cut and recovery factor under the two-three combination mode at different conversion times, the method further includes:
[0014] The reservoir numerical simulation software is called to simulate the water production and recovery rate of the target oil field under basic water drive.
[0015] In a possible implementation, the oil production, water production, water cut and recovery factor under the two-three combination mode at different conversion timings are obtained to obtain at least one evaluation index under the two-three combination mode at different conversion timings, including:
[0016] Based on the recovery factor of the target oil field under the basic water flooding and the two-three combination methods at different conversion times, obtaining the recovery factor increase under the two-three combination methods at different conversion times;
[0017] Based on the water production of the target oil field under the basic water flooding and the two-three combination mode at different conversion times, obtaining the precipitation under the two-three combination mode at different conversion times;
[0018] Based on the oil production, water production, water content and recovery rate of the target oil field under the two-three combination method at the different conversion times, the internal rate of return under the two-three combination method at the different conversion times is obtained, and the internal rate of return is obtained through a target evaluation method.
[0019] In a possible implementation, the at least one evaluation indicator further includes a well pattern integrity rate, and the method further includes:
[0020] The reservoir numerical simulation software is called to simulate the well network integrity rate of the target oil field under the two-three combination mode at the different conversion timings.
[0021] In one possible implementation, the method further includes:
[0022] Calling the reservoir numerical simulation software to simulate the prediction data of oil production of the target oil field under basic water drive, secondary development alone, simultaneous implementation of secondary and tertiary oil recovery, and conversion to tertiary oil recovery when secondary development reaches different water contents, wherein the simultaneous implementation of secondary and tertiary oil recovery refers to conversion to tertiary oil recovery immediately after secondary development;
[0023] Based on the predicted data of the oil production changing with the production time, a diagram of the oil production prediction model is drawn, wherein the diagram of the oil production prediction model includes a curve of the relationship between the oil production and the production time under each development mode;
[0024] The oil production prediction model diagram is displayed.
[0025] On the one hand, a device for determining the conversion timing of the two-three combined development of an oil field is provided, comprising:
[0026] A simulation module is used to call the reservoir numerical simulation software to simulate the oil production, water production, water content and recovery rate of the target oil field under the two-three combination mode at different conversion times. The two-three combination mode refers to the oil field development mode of first secondary development and then switching to tertiary oil recovery;
[0027] an acquisition module, configured to acquire at least one evaluation index under the two-three combination mode at different conversion times based on the oil production, water production, water content and recovery factor under the two-three combination mode at different conversion times, wherein the evaluation index is used to evaluate the development effect of the two-three combination mode;
[0028] A drawing module, configured to draw a conversion timing determination model diagram based on at least one evaluation index in a two-three combination mode of the different conversion timings, wherein the conversion timing determination model diagram includes a relationship curve between each evaluation index and the conversion timing;
[0029] A display module is used to display the conversion timing determination model diagram.
[0030] In a possible implementation, the display module is used to display the conversion timing corresponding to the target constraint condition in the conversion timing determination model diagram based on the target constraint condition corresponding to the at least one evaluation indicator.
[0031] In a possible implementation, the at least one evaluation index includes recovery factor increase, water reduction and internal rate of return, the recovery factor increase refers to the recovery factor increased by the two-three combination method compared with basic water drive, the water reduction refers to the water production reduced by the two-three combination method compared with basic water drive, and the internal rate of return is obtained based on the oil production, water production, water content and recovery factor under the two-three combination method;
[0032] The oil production, water production, water content and recovery rate under the two-three combination mode at different conversion times, the simulation module is also used for:
[0033] The reservoir numerical simulation software is called to simulate the water production and recovery rate of the target oil field under basic water drive.
[0034] In a possible implementation, the acquisition module is used to:
[0035] Based on the recovery factor of the target oil field under the basic water flooding and the two-three combination methods at different conversion times, obtaining the recovery factor increase under the two-three combination methods at different conversion times;
[0036] Based on the water production of the target oil field under the basic water flooding and the two-three combination mode at different conversion times, obtaining the precipitation under the two-three combination mode at different conversion times;
[0037] Based on the oil production, water production, water content and recovery rate of the target oil field under the two-three combination method at the different conversion times, the internal rate of return under the two-three combination method at the different conversion times is obtained, and the internal rate of return is obtained through a target evaluation method.
[0038] In a possible implementation, the at least one evaluation index further includes a well pattern integrity rate, and the simulation module is further used for:
[0039] The reservoir numerical simulation software is called to simulate the well network integrity rate of the target oil field under the two-three combination mode at the different conversion timings.
[0040] In a possible implementation, the simulation module is further used to call the reservoir numerical simulation software to simulate the prediction data of the oil production of the target oil field changing with production time under basic water drive, secondary development alone, simultaneous implementation of the second and third combination, and conversion to tertiary oil recovery when secondary development reaches different water contents, wherein the second and third combination simultaneous implementation refers to conversion to tertiary oil recovery immediately after secondary development;
[0041] The drawing module is also used to draw an oil production prediction model diagram based on the prediction data of the oil production changing with the production time, and the oil production prediction model diagram includes a relationship curve between the oil production and the production time under each development mode;
[0042] The display module is also used to display the oil production prediction model diagram.
[0043] On the one hand, a computer device is provided, which includes one or more processors and one or more memories, wherein at least one program code is stored in the one or more memories, and the at least one program code is loaded and executed by the one or more processors to implement the method for determining the conversion timing of the second-third combined development of an oil field.
[0044] On the one hand, a computer-readable storage medium is provided, in which at least one program code is stored, and the at least one program code is loaded and executed by a processor to implement the method for determining the conversion timing of the two-three combined development of an oil field.
[0045] The beneficial effects brought by the technical solution provided by the embodiment of the present application include at least:
[0046] Aiming at the secondary development and tertiary development process of oil fields, the method of reservoir numerical simulation is used to predict the oil production, water production, water content and recovery rate when the oil field adopts different conversion timings. Based on these data, the development effect evaluation indicators corresponding to different conversion timings can be obtained, and the relationship curves between these evaluation indicators and the conversion timing can be plotted on the same graph to obtain a model graph for determining the conversion timing. The model graph is used to comprehensively consider the development effect evaluation indicators of different conversion timings, and the appropriate conversion timing from secondary development to tertiary oil recovery can be determined, thereby improving the development effect of the oil field. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0048] Figure 1 This is a flow chart of a method for determining the conversion timing of two-three combined development of an oil field provided in an embodiment of the present application;
[0049] Figure 2 This is a flow chart of a method for determining the conversion timing of two-three combined development of an oil field provided in an embodiment of the present application;
[0050] Figure 3 It is a schematic diagram of a conversion timing determination model diagram provided in an embodiment of the present application;
[0051] Figure 4It is a schematic diagram of an oil production prediction model diagram provided in an embodiment of the present application;
[0052] Figure 5 This is a structural schematic diagram of a device for determining a conversion timing for two-three combined development of an oil field provided in an embodiment of the present application;
[0053] Figure 6 It is a structural diagram of a terminal provided in an embodiment of the present application. DETAILED DESCRIPTION
[0054] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below with reference to the accompanying drawings.
[0055] In order to facilitate understanding of the technical solutions of the embodiments of the present application, some terms involved in the embodiments of the present application are explained below:
[0056] Reservoir numerical simulation software: Use computer modeling to simulate the development process of oil fields. By applying the method of reservoir numerical simulation, the changes in production indicators during the development of oil fields can be predicted. The production indicators include oil production, water production, water content and recovery rate, as well as the degree of recovery and well network integrity.
[0057] Basic water drive: refers to the oil field development method based on the current injection and production well network, through artificial supplementary water injection and displacement.
[0058] Secondary development: refers to the process of significantly improving the ultimate recovery rate of an oil field by adopting a technical route that reconstructs the underground recognition system, rebuilds the well network structure, and reorganizes the ground process flow after the oil field enters a high water-cut period.
[0059] Tertiary oil recovery: refers to the use of chemical substances to improve the properties of oil, gas, water and rocks to extract more oil.
[0060] The combination of secondary development and tertiary oil recovery refers to the ternary coupling of well network structure, fine water drive and chemical composite drive, giving full play to the synergistic fusion effect of the well network's control over reserves, water drive sweep coefficient and oil recovery efficiency, and maximizing the extent of increased recovery.
[0061] Synchronous implementation of secondary and tertiary recovery: immediately switch to tertiary recovery after secondary development. "Immediately" can be understood as a relatively short period of time, such as the shortest preparation time required to switch to tertiary recovery after secondary development.
[0062] The following first describes an example application scenario of the technical solution of an embodiment of the present application.
[0063] In the process of "two-three combination" development of oil fields, when different conversion timings are adopted, different development effects will be brought about due to different reservoir conditions and different timings of displacement medium change, resulting in changes in final recovery rate, precipitation, internal rate of return, etc., thus bringing different technical value, social value and economic value. When choosing the appropriate "two-three combination" conversion timing, it is necessary to comprehensively consider the technical value, social value and economic value of different conversion timings, and select the plan with the best comprehensive value to obtain the best development effect.
[0064] Taking Oilfield A as an example, Oilfield A has an annual oil production of 20,000 tons, a recovery rate of 25%, and a comprehensive water content of 92.5%. The next step is to adopt a "two-three combination" development method for development. It is necessary to optimize the design of the conversion timing under multiple objective constraints such as technical value, economic value, and social value. This can be achieved through the method provided in the embodiment of this application.
[0065] Figure 1 This is a flow chart of a method for determining the conversion timing of oilfield two-three combined development provided in an embodiment of the present application. The method is executed by a computer device, see Figure 1 , the method comprising:
[0066] 101. The computer equipment calls the reservoir numerical simulation software to simulate the oil production, water production, water content and recovery rate of the target oil field under the two-three combination method at different conversion times. The two-three combination method refers to the oil field development method of first secondary development and then switching to tertiary oil recovery.
[0067] 102. The computer device obtains at least one evaluation index under the two-three combination method at different conversion times based on the oil production, water production, water content and recovery rate under the two-three combination method at different conversion times. The evaluation index is used to evaluate the development effect of the two-three combination method.
[0068] 103. The computer device draws a conversion timing determination model diagram based on at least one evaluation indicator in a two-three combination mode of different conversion timings, wherein the conversion timing determination model diagram includes a relationship curve between each evaluation indicator and the conversion timing.
[0069] 104. A model diagram for determining the timing of display conversion of computer equipment.
[0070] The method provided in the embodiment of the present application is aimed at the secondary and tertiary development process of an oil field, in which secondary development is first performed and then switched to tertiary oil recovery. The method of reservoir numerical simulation is used to predict data such as oil production, water production, water content and recovery rate when the oil field adopts different conversion timings. Based on these data, development effect evaluation indicators corresponding to different conversion timings can be obtained, and the relationship curves between these evaluation indicators and the conversion timing are plotted on the same graph to obtain a model graph for determining the conversion timing. The model graph is used to comprehensively consider the development effect evaluation indicators of different conversion timings, and the appropriate conversion timing from secondary development to tertiary oil recovery can be determined, thereby improving the development effect of the oil field.
[0071] Above Figure 1 The process shown is the basic process of the embodiment of the present disclosure. The detailed process of the technical solution of the present disclosure is introduced below based on the basic process.
[0072] Figure 2 This is a flow chart of a method for determining the conversion timing of oilfield two-three combined development provided in an embodiment of the present application. The method is executed by a computer device, see Figure 2 , the method comprising:
[0073] 201. The computer equipment calls the reservoir numerical simulation software to simulate the oil production of the target oil field under the two-three combination mode at different conversion times.
[0074] Among them, different conversion opportunities refer to the opportunities of switching to tertiary oil recovery after secondary development, including switching to tertiary oil recovery immediately after secondary development (simultaneous implementation of secondary and tertiary oil recovery) and switching to tertiary oil recovery at different delays after secondary development. In one example, different conversion opportunities may include switching to tertiary oil recovery immediately after secondary development, switching to tertiary oil recovery in the first year after secondary development, switching to tertiary oil recovery in the second year after secondary development, ..., switching to tertiary oil recovery in the nth year after secondary development, where n is a positive integer.
[0075] Computer equipment can simulate the oil production under the combination of two or three modes at different conversion times based on the lithology, fluid and production dynamic data of the target oil field through reservoir numerical simulation software.
[0076] The oil production obtained through numerical simulation is also the predicted oil production. In one possible implementation, for any combination of two or three conversion timings, the oil production predicted through numerical simulation can include oil production at different production times in the future. Computer equipment can obtain the oil production at the end of the life cycle of the oil field (for example, the 20th year) as the oil production under the combination of two or three conversion timings.
[0077] The simulation of other indicators, such as water content, water production, recovery rate and well network integrity involved in the following steps is the same as the simulation of oil production, and will not be described in detail later.
[0078] 202. The computer equipment calls the reservoir numerical simulation software to simulate the water content of the target oil field under the two-three combination mode at different conversion times.
[0079] The simulation of water content in step 202 is similar to the simulation of oil production in step 201 and will not be described in detail.
[0080] 203. The computer equipment calls the reservoir numerical simulation software to simulate the recovery rate of the target oil field under the basic water drive and the two-three combination method at different conversion times. Based on the recovery rate under the basic water drive and the two-three combination method at different conversion times, the recovery rate increase under the two-three combination method at different conversion times is obtained. The recovery rate increase refers to the increased recovery rate of the two-three combination method compared with the basic water drive.
[0081] The recovery factor refers to the final degree of oil recovery in an oil field. The recovery factor increase can be used as an evaluation indicator of technical value.
[0082] For any combination of two or three methods at any conversion timing, the computer device can subtract the recovery rate under the basic water drive from the recovery rate under the combination of two or three methods at the conversion timing to obtain the recovery rate increase under the combination of two or three methods at the conversion timing. Taking the conversion timing of tertiary oil recovery in the first year after secondary oil recovery as an example, the computer device can subtract the recovery rate under the combination of two or three methods converted in the first year from the recovery rate under the basic water drive to obtain the recovery rate increase under the combination of two or three methods converted in the first year. In this way, for the combination of two or three methods at different conversion timings, the computer device can obtain the recovery rate increase under the combination of two or three methods at different conversion timings, that is, the recovery rate increase corresponding to different conversion timings.
[0083] The embodiment of the present application takes the recovery factor increase compared to basic water drive as an example. In some embodiments, the recovery factor increase can also be compared to secondary development alone. In this case, the computer equipment can simulate the recovery factor of the target oil field under secondary development alone to obtain the recovery factor increase of the combination of the two and three methods compared to secondary development alone.
[0084] 204. The computer equipment calls the reservoir numerical simulation software to simulate the water production of the target oil field under the basic water drive and the two-three combination mode at different conversion times. Based on the water production under the basic water drive and the two-three combination mode at different conversion times, the precipitation under the two-three combination mode at different conversion times is obtained. The precipitation refers to the reduced water production of the two-three combination mode compared with the basic water drive.
[0085] Since reducing water production can reduce water consumption in crude oil extraction and reduce the impact on the social environment, precipitation can be used as an evaluation indicator of social value.
[0086] For any combination of two or three conversion timings, the computer device can subtract the water production under the combination of two or three conversion timings from the water production under the basic water drive to obtain the precipitation under the combination of two or three conversion timings. Taking the conversion timing as the first year after secondary oil recovery to tertiary oil recovery as an example, the computer device can subtract the water production under the combination of two or three conversions in the first year from the water production under the basic water drive to obtain the precipitation under the combination of two or three conversions in the first year. In this way, for the combination of two or three conversions at different conversion timings, the computer device can obtain the precipitation under the combination of two or three conversions at different conversion timings, that is, the precipitation corresponding to different conversion timings.
[0087] 205. The computer equipment obtains the internal rate of return under the two-three combination method at different conversion times based on the oil production, water production, water content and recovery rate under the two-three combination method at different conversion times. The internal rate of return is obtained through the target evaluation method.
[0088] Among them, internal rate of return can be used as an evaluation indicator of economic value.
[0089] For any combination of two or three conversion opportunities, the computer device can use an economic evaluation method to obtain the internal rate of return under the combination of two or three conversion opportunities based on the oil production, water production, water content and recovery rate under the combination of two or three conversion opportunities. In one possible implementation, the computer device can use the oil production, water production, water content and recovery rate as input parameters of the internal rate of return formula and output the predicted internal rate of return. In this way, for the combination of two or three conversion opportunities at different conversion opportunities, the computer device can obtain the internal rate of return under the combination of two or three conversion opportunities at different conversion opportunities, that is, the internal rate of return corresponding to different conversion opportunities.
[0090] 206. The computer equipment calls the reservoir numerical simulation software to simulate the well network integrity rate of the target oil field under the combination of two and three methods at different conversion times.
[0091] Among them, the well network integrity rate can be used as an evaluation indicator of the well network perfection.
[0092] The above steps 203 to 206 are a possible implementation method for the computer device to obtain at least one evaluation index under the two-three combination method at different conversion times. This implementation method is only described by taking at least one evaluation index including recovery factor increase, precipitation, internal rate of return and well network integrity as an example. In some embodiments, other evaluation indicators can also be used to evaluate the development effect of the two-three combination method.
[0093] It should be noted that in the embodiment of the present application, only the acquisition of recovery rate increase, precipitation, internal rate of return and well network integrity is used as steps 203, 204, 205 and 206 as examples for explanation, which does not represent a specific execution order. The acquisition of these evaluation indicators can also be executed in other execution orders, and the embodiment of the present application does not limit this. Similarly, the simulation of oil production in step 201, the simulation of water content in step 202, the simulation of recovery rate in step 203, the simulation of water production in step 204 and the simulation of well network integrity in step 206 are not limited to a specific execution order, and the simulation of these production indicators can also be executed in other execution orders.
[0094] 207. The computer equipment draws a conversion timing determination model diagram based on the recovery rate increase, precipitation, internal rate of return and well network integrity rate under the two-three combination method of different conversion timings. The conversion timing determination model diagram includes the relationship curves between the recovery rate increase, precipitation, internal rate of return and well network integrity rate and the conversion timing.
[0095] The computer equipment can draw a curve of the relationship between the recovery factor increase and the conversion timing based on the recovery factor increase under the two-three combination method with different conversion timings. The computer equipment can draw a curve of the relationship between precipitation and conversion timing based on the precipitation under the two-three combination method with different conversion timings. The computer equipment can draw a curve of the relationship between the internal rate of return and the conversion timing based on the internal rate of return under the two-three combination method with different conversion timings. The computer equipment can draw a curve of the relationship between the well network integrity rate and the conversion timing based on the well network integrity rate under the two-three combination method with different conversion timings.
[0096] The computer device can draw the above-mentioned relationship curve graph in the same graph to obtain a conversion timing determination model graph, which can be used to determine the corresponding conversion timing, that is, the optimal conversion timing, based on one or more target constraints corresponding to the recovery factor increase, precipitation, internal rate of return and well network integrity.
[0097] Step 207 is a possible implementation method of drawing a conversion timing determination model diagram based on at least one evaluation indicator in a two-three combination mode of different conversion timings, wherein the conversion timing determination model diagram includes a relationship curve between each evaluation indicator and the conversion timing. In some embodiments, other evaluation indicators may also be used, and the conversion timing determination model diagram obtained in this way may include a relationship curve between other evaluation indicators and the conversion timing.
[0098] 208. A model diagram for determining the timing of display conversion of computer equipment.
[0099] The computer device can display the conversion timing determination model diagram to provide the conversion timing determination model diagram to the user in a visual manner, so that the user can determine the corresponding conversion timing according to the needs.
[0100] The computer device can also determine and display the corresponding conversion timing based on user needs. In one possible implementation, a conversion timing determination model diagram is displayed, including: based on the target constraint condition corresponding to at least one evaluation indicator, the conversion timing corresponding to the target constraint condition is displayed in the conversion timing determination model diagram.
[0101] Among them, at least one evaluation index includes at least one of the recovery factor increase, water precipitation, internal rate of return and well network integrity. The target constraint condition can be a single target or a multi-target constraint condition. For example, the target constraint condition can be a common constraint condition of the four targets of recovery factor increase (technical value), internal rate of return (economic value), water precipitation (social value) and well network integrity (well network improvement), or the optimal internal rate of return can be used as the only target constraint condition, or the highest recovery factor increase can be used as the only target constraint condition.
[0102] The conversion timing determination model diagram can be used to comprehensively evaluate the technical value, economic value, social value and well network improvement, and select the most suitable conversion timing. It can also be used for the design optimization of conversion timing based on single objective constraints.
[0103] See also Figure 3 , Figure 3 is a schematic diagram of a conversion timing determination model diagram provided in an embodiment of the present application. The oil field corresponding to the conversion timing determination model diagram may be the A oil field in the previous example. Figure 3 It can be seen that for Oilfield A, the "two-three combination" development method is adopted. The recovery rate increase (i.e., technical value), precipitation (i.e., social value) and well network integrity rate show a downward trend with the delay of the conversion time, but the decline of recovery rate increase and precipitation is small, and the decline of well network integrity rate is large; the internal rate of return (i.e., economic value) first increases and then decreases with the delay of the conversion time, and the internal rate of return is the highest when the conversion is in the third year. Under the joint constraints of the four goals of technical value, economic value, social value and well network improvement, the most suitable conversion time for Oilfield A's "two-three combination" is from the second to the fourth year. At the same time, the model can also be used for the optimization design of conversion timing under the condition of a single objective constraint; if the highest economic value is the only objective constraint, the conversion timing with the highest internal rate of return is preferred, and the most suitable conversion timing is the third year; if the highest final recovery rate is the only objective constraint, that is, the pursuit of recovering as much crude oil as possible, then the conversion timing with the largest recovery rate increase (that is, the highest final recovery rate) is preferred, and the most suitable conversion timing is the simultaneous implementation of "two-three combination". If the greatest social value is the only objective constraint, that is, when social value is given priority, then the conversion timing with the largest precipitation is preferred, and the most suitable conversion timing is the simultaneous implementation of "two-three combination".
[0104] The conversion timing determination model obtained in this application is a "two-three combination" (secondary development to tertiary oil production) full life cycle value chain model that comprehensively considers the technical value, economic value, social value and well network perfection. It can be used for the quantitative calculation or evaluation of the technical value, economic value and social value of the entire life cycle at different conversion timings during the "two-three combination" development of oil fields, and guide the optimal design or decision-making of the conversion timing of the "two-three combination" under multi-objective constraints. The method is easy to understand and simple to operate.
[0105] The method provided in the embodiment of the present application is aimed at the secondary and tertiary development process of an oil field, in which secondary development is first performed and then switched to tertiary oil recovery. The method of reservoir numerical simulation is used to predict data such as oil production, water production, water content and recovery rate when the oil field adopts different conversion timings. Based on these data, development effect evaluation indicators corresponding to different conversion timings can be obtained, and the relationship curves between these evaluation indicators and the conversion timing are plotted on the same graph to obtain a model graph for determining the conversion timing. The model graph is used to comprehensively consider the development effect evaluation indicators of different conversion timings, and the appropriate conversion timing from secondary development to tertiary oil recovery can be determined, thereby improving the development effect of the oil field.
[0106] Figure 2 The embodiment shown is to obtain a conversion timing determination model diagram to determine the conversion timing, wherein the conversion timing is distinguished by time (such as year), and the constraints corresponding to the evaluation index are used to determine the conversion timing. In some embodiments, the conversion timing can also be determined by other model diagrams, wherein the conversion timing can be distinguished by water content, and the constraints corresponding to the production index (oil production, water content) can be used to determine the conversion timing. The following will introduce an oil production prediction model diagram that can also be used to determine the conversion timing.
[0107] In an exemplary embodiment, a computer device calls a reservoir numerical simulation software to simulate the predicted data of oil production changing with production time in the target oil field under basic water drive, secondary development alone, simultaneous implementation of the secondary and tertiary recovery methods, and secondary development to different water contents before switching to tertiary oil recovery methods, and displays an oil production prediction model diagram drawn based on the predicted data.
[0108] The prediction data of oil production changing with production time may include oil production at different production times in the future, and the oil production prediction model diagram includes a curve of the relationship between oil production and production time under each development mode. The oil production may be annual oil production.
[0109] For each development method including basic water drive, secondary development alone, simultaneous implementation of secondary and tertiary recovery, and conversion to tertiary oil recovery when secondary development reaches different water contents, computer equipment can obtain predicted data on oil production changing with production time based on the lithology, fluid and production dynamic data of the target oil field through reservoir numerical simulation software.
[0110] The computer device can draw a relationship curve between the oil production and the production time under each development mode based on the predicted data of the oil production under each development mode and the production time, and draw these relationship curves on the same graph to obtain an oil production prediction model graph. Then, the computer device can display the oil production prediction model graph to provide the oil production prediction model graph to the user in a visual manner, so that the user can observe the predicted changes in oil production and determine the corresponding conversion timing according to needs.
[0111] See also Figure 4 , Figure 4 is a schematic diagram of an oil production prediction model diagram provided in an embodiment of the present application. The oil field corresponding to the oil production prediction model diagram may be the A oil field in the previous example. The horizontal axis is the production years, and 20 years is used as the evaluation period. Figure 4 From the curve of oil production and production time, it can be seen that the earlier the conversion time, the higher the early oil production, but the stable production period of the oil field is short, and the later production decreases greatly. For example, the early oil production of the tertiary oil recovery method immediately after the secondary development (two-three combination simultaneous implementation) is higher than the early oil production of the tertiary oil recovery method when the secondary development reaches a water content of 84%, and is also higher than the early oil production of the tertiary oil recovery method when the secondary development reaches a water content of 92%. Therefore, when it is necessary to obtain production as soon as possible, the early high-yield conversion time is preferred, such as the two-three combination simultaneous implementation method.
[0112] The computer device may also determine and display the corresponding conversion timing based on user needs. In one possible implementation, the oil production prediction model diagram drawn based on the prediction data is displayed, including: based on the first constraint condition corresponding to the oil production, the conversion timing corresponding to the first constraint condition is displayed in the oil production prediction model diagram. For example, the first constraint condition may be to obtain the production as soon as possible, then the computer device may mark the relationship curve between the oil production and the production time under the two-three combination synchronous implementation method in the oil production prediction model diagram, so that the user can intuitively see that the optimal conversion timing is to immediately switch to tertiary oil production after secondary development.
[0113] By applying the method of reservoir numerical simulation to different development methods of oil fields, the oil production data of oil fields when different development methods are adopted can be predicted, so that the relationship curves between oil production and production time under different development methods can be drawn into the same graph. Different development methods can include conversion timings distinguished by water content. The model graph obtained in this way takes into account the oil production corresponding to different conversion timings, and can determine the appropriate conversion timing from secondary development to tertiary oil recovery, thereby improving the development effect of oil fields.
[0114] Figure 5 Schematic diagram of a device for determining the conversion timing of oilfield two-three combined development provided in an embodiment of the present application. Figure 5 , the device comprises:
[0115] The simulation module 501 is used to call the reservoir numerical simulation software to simulate the oil production, water production, water content and recovery rate of the target oil field under the two-three combination mode at different conversion times. The two-three combination mode refers to the oil field development mode of first secondary development and then switching to tertiary oil recovery;
[0116] An acquisition module 502 is used to acquire at least one evaluation index under the two-three combination mode at different conversion times based on the oil production, water production, water content and recovery factor under the two-three combination mode at different conversion times, and the evaluation index is used to evaluate the development effect of the two-three combination mode;
[0117] A drawing module 503, configured to draw a conversion timing determination model diagram based on at least one evaluation index in a two-three combination mode of different conversion timings, wherein the conversion timing determination model diagram includes a relationship curve between each evaluation index and the conversion timing;
[0118] The display module 504 is used to display the conversion timing determination model diagram.
[0119] In a possible implementation, the display module 504 is used to determine, based on the target constraint condition corresponding to the at least one evaluation indicator, a transition timing corresponding to the target constraint condition displayed in the model diagram at the transition timing.
[0120] In a possible implementation, at least one evaluation index includes recovery factor increase, water reduction and internal rate of return, based on the oil production, water production, water content and recovery factor under the two-three combination mode at different conversion times, the recovery factor increase refers to the recovery factor increased by the two-three combination mode compared with the basic water drive, the reduction refers to the water production reduced by the two-three combination mode compared with the basic water drive, and the internal rate of return is obtained based on the oil production, water production, water content and recovery factor under the two-three combination mode;
[0121] The simulation module 501 is also used for:
[0122] The reservoir numerical simulation software is called to simulate the water production and recovery rate of the target oil field under basic water drive.
[0123] In a possible implementation, the acquisition module 502 is used to:
[0124] Based on the recovery of the target oil field under basic water flooding and the two-three combination method at different conversion times, the recovery increase of the two-three combination method at different conversion times is obtained;
[0125] Based on the water production of the target oilfield under the basic water flooding and the two-three combination mode at different conversion times, the precipitation under the two-three combination mode at different conversion times is obtained;
[0126] Based on the oil production, water production, water cut and recovery factor of the target oil field under the two-three combination mode at different conversion times, the internal rate of return under the two-three combination mode at different conversion times is obtained, and the internal rate of return is obtained through the target evaluation method.
[0127] In a possible implementation, the at least one evaluation index further includes a well pattern integrity rate, and the simulation module 501 is further used for:
[0128] The reservoir numerical simulation software is called to simulate the well network integrity rate of the target oil field under the two-three combination mode at different conversion times.
[0129] In a possible implementation, the simulation module 501 is also used to call the reservoir numerical simulation software to simulate the prediction data of the oil production of the target oil field under the basic water drive, the secondary development alone, the two-three combination simultaneous implementation and the secondary development to different water content when the water content is converted to the tertiary oil recovery mode. The two-three combination simultaneous implementation refers to the immediate conversion to tertiary oil recovery after the secondary development.
[0130] The drawing module 503 is also used to draw an oil production prediction model diagram based on the prediction data of oil production changing with production time, and the oil production prediction model diagram includes a relationship curve between oil production and production time under each development mode;
[0131] The display module 504 is also used to display the oil production prediction model diagram.
[0132] In the embodiment of the present application, for the secondary development and tertiary oil recovery combined development process of the oil field, the method of reservoir numerical simulation is applied to predict the oil production, water production, water content and recovery rate when the oil field adopts different conversion timings. Based on these data, the development effect evaluation indicators corresponding to the different conversion timings can be obtained, and the relationship curves between these evaluation indicators and the conversion timing are plotted on the same graph to obtain a model graph for determining the conversion timing. The model graph is used to comprehensively consider the development effect evaluation indicators of different conversion timings, and the appropriate conversion timing from secondary development to tertiary oil recovery can be determined, thereby improving the development effect of the oil field.
[0133] It should be noted that: the device for determining the timing of the conversion of the two-three combined development of an oil field provided in the above embodiment only uses the division of the above functional modules as an example when determining the timing of the conversion of the two-three combined development of an oil field. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the device for determining the timing of the conversion of the two-three combined development of an oil field provided in the above embodiment and the method for determining the timing of the conversion of the two-three combined development of an oil field belong to the same concept. The specific implementation process is detailed in the method embodiment and will not be repeated here.
[0134] An embodiment of the present application provides a computer device, which includes one or more processors and one or more memories, wherein at least one program code is stored in the one or more memories, and the at least one program code is loaded and executed by the one or more processors to implement the method for determining the conversion timing of the second-third combined development of an oil field provided in the above-mentioned embodiments.
[0135] In an exemplary embodiment, the computer device is provided as a terminal. The structure of the terminal is introduced below:
[0136] Figure 6 600 is a schematic diagram of a terminal structure provided by an embodiment of the present application. The terminal 600 may be: a smart phone, a tablet computer, an MP3 player (Moving Picture Experts Group Audio Layer III), an MP4 player (Moving Picture Experts Group Audio Layer IV), a laptop computer or a desktop computer. The terminal 600 may also be referred to as a user device, a portable terminal, a laptop terminal, a desktop terminal or other names.
[0137] Typically, the terminal 600 includes: one or more processors 601 and one or more memories 602 .
[0138] The processor 601 may include one or more processing cores, such as a 4-core processor, an 8-core processor, etc. The processor 601 may be implemented in at least one hardware form of DSP (Digital Signal Processing), FPGA (Field-Programmable Gate Array), and PLA (Programmable Logic Array). The processor 601 may also include a main processor and a coprocessor. The main processor is a processor for processing data in the awake state, also known as a CPU (Central Processing Unit); the coprocessor is a low-power processor for processing data in the standby state. In some embodiments, the processor 601 may be integrated with a GPU (Graphics Processing Unit), which is responsible for rendering and drawing the content to be displayed on the display screen. In some embodiments, the processor 601 may also include an AI (Artificial Intelligence) processor, which is used to process computing operations related to machine learning.
[0139] The memory 602 may include one or more computer-readable storage media, which may be non-transitory. The memory 602 may also include a high-speed random access memory, and a non-volatile memory, such as one or more disk storage devices, flash memory storage devices. In some embodiments, the non-transitory computer-readable storage medium in the memory 602 is used to store at least one program code, which is used to be executed by the processor 601 to implement the method for determining the conversion timing of the two-three combined development of the oil field provided in the method embodiment of the present application.
[0140] In some embodiments, the terminal 600 may further optionally include: a peripheral device interface 603 and at least one peripheral device. The processor 601, the memory 602 and the peripheral device interface 603 may be connected via a bus or a signal line. Each peripheral device may be connected to the peripheral device interface 603 via a bus, a signal line or a circuit board. Specifically, the peripheral device includes: at least one of a radio frequency circuit 604, a display screen 605, a camera assembly 606, an audio circuit 607, a positioning assembly 608 and a power supply 609.
[0141] The peripheral device interface 603 may be used to connect at least one peripheral device related to I / O (Input / Output) to the processor 601 and the memory 602. In some embodiments, the processor 601, the memory 602, and the peripheral device interface 603 are integrated on the same chip or circuit board; in some other embodiments, any one or two of the processor 601, the memory 602, and the peripheral device interface 603 may be implemented on a separate chip or circuit board, which is not limited in this embodiment.
[0142] The radio frequency circuit 604 is used to receive and transmit RF (Radio Frequency) signals, also known as electromagnetic signals. The radio frequency circuit 604 communicates with the communication network and other communication devices through electromagnetic signals. The radio frequency circuit 604 converts the electrical signal into an electromagnetic signal for transmission, or converts the received electromagnetic signal into an electrical signal. Optionally, the radio frequency circuit 604 includes: an antenna system, an RF transceiver, one or more amplifiers, a tuner, an oscillator, a digital signal processor, a codec chipset, a user identity module card, and the like. The radio frequency circuit 604 can communicate with other terminals through at least one wireless communication protocol. The wireless communication protocol includes, but is not limited to: a metropolitan area network, various generations of mobile communication networks (2G, 3G, 4G and 5G), a wireless local area network and / or a WiFi (Wireless Fidelity) network. In some embodiments, the radio frequency circuit 604 may also include circuits related to NFC (Near Field Communication), which is not limited in this application.
[0143] The display screen 605 is used to display the UI (User Interface). The UI may include graphics, text, icons, videos and any combination thereof. When the display screen 605 is a touch display screen, the display screen 605 also has the ability to collect touch signals on the surface or above the surface of the display screen 605. The touch signal can be input to the processor 601 as a control signal for processing. At this time, the display screen 605 can also be used to provide virtual buttons and / or virtual keyboards, also known as soft buttons and / or soft keyboards. In some embodiments, the display screen 605 can be one, set on the front panel of the terminal 600; in other embodiments, the display screen 605 can be at least two, respectively set on different surfaces of the terminal 600 or in a folding design; in other embodiments, the display screen 605 can be a flexible display screen, set on the curved surface or folding surface of the terminal 600. Even, the display screen 605 can also be set to a non-rectangular irregular shape, that is, a special-shaped screen. The display screen 605 can be made of materials such as LCD (Liquid Crystal Display), OLED (Organic Light-Emitting Diode, organic light-emitting diode).
[0144] The camera assembly 606 is used to capture images or videos. Optionally, the camera assembly 606 includes a front camera and a rear camera. Typically, the front camera is arranged on the front panel of the terminal, and the rear camera is arranged on the back of the terminal. In some embodiments, there are at least two rear cameras, which are any one of a main camera, a depth of field camera, a wide-angle camera, and a telephoto camera, so as to realize the fusion of the main camera and the depth of field camera to realize the background blur function, the fusion of the main camera and the wide-angle camera to realize the panoramic shooting and VR (Virtual Reality) shooting function or other fusion shooting functions. In some embodiments, the camera assembly 606 may also include a flash. The flash can be a monochrome temperature flash or a dual-color temperature flash. A dual-color temperature flash refers to a combination of a warm light flash and a cold light flash, which can be used for light compensation at different color temperatures.
[0145] The audio circuit 607 may include a microphone and a speaker. The microphone is used to collect sound waves from the user and the environment, and convert the sound waves into electrical signals and input them into the processor 601 for processing, or input them into the radio frequency circuit 604 to achieve voice communication. For the purpose of stereo acquisition or noise reduction, there may be multiple microphones, which are respectively arranged at different parts of the terminal 600. The microphone may also be an array microphone or an omnidirectional acquisition microphone. The speaker is used to convert the electrical signal from the processor 601 or the radio frequency circuit 604 into sound waves. The speaker may be a traditional film speaker or a piezoelectric ceramic speaker. When the speaker is a piezoelectric ceramic speaker, it can not only convert the electrical signal into sound waves audible to humans, but also convert the electrical signal into sound waves inaudible to humans for purposes such as ranging. In some embodiments, the audio circuit 607 may also include a headphone jack.
[0146] Positioning component 608 is used to locate the current geographical location of terminal 600 to implement navigation or LBS (Location Based Service). Positioning component 608 can be a positioning component based on the US GPS (Global Positioning System), China's Beidou system, Russia's Grenas system or the European Union's Galileo system.
[0147] The power supply 609 is used to power various components in the terminal 600. The power supply 609 can be an alternating current, a direct current, a disposable battery, or a rechargeable battery. When the power supply 609 includes a rechargeable battery, the rechargeable battery can support wired charging or wireless charging. The rechargeable battery can also be used to support fast charging technology.
[0148] In some embodiments, the terminal 600 further includes one or more sensors 610 , including but not limited to: an acceleration sensor 611 , a gyroscope sensor 612 , a pressure sensor 613 , a fingerprint sensor 614 , an optical sensor 615 , and a proximity sensor 616 .
[0149] The acceleration sensor 611 can detect the magnitude of acceleration on the three coordinate axes of the coordinate system established by the terminal 600. For example, the acceleration sensor 611 can be used to detect the components of gravity acceleration on the three coordinate axes. The processor 601 can control the display screen 605 to display the user interface in a horizontal view or a vertical view according to the gravity acceleration signal collected by the acceleration sensor 611. The acceleration sensor 611 can also be used for collecting game or user motion data.
[0150] The gyro sensor 612 can detect the body direction and rotation angle of the terminal 600, and the gyro sensor 612 can cooperate with the acceleration sensor 611 to collect the user's 3D actions on the terminal 600. The processor 601 can implement the following functions based on the data collected by the gyro sensor 612: motion sensing (such as changing the UI according to the user's tilt operation), image stabilization during shooting, game control, and inertial navigation.
[0151] The pressure sensor 613 can be set on the side frame of the terminal 600 and / or the lower layer of the display screen 605. When the pressure sensor 613 is set on the side frame of the terminal 600, it can detect the user's holding signal of the terminal 600, and the processor 601 performs left and right hand recognition or shortcut operation according to the holding signal collected by the pressure sensor 613. When the pressure sensor 613 is set on the lower layer of the display screen 605, the processor 601 controls the operability controls on the UI interface according to the user's pressure operation on the display screen 605. The operability controls include at least one of a button control, a scroll bar control, an icon control, and a menu control.
[0152] The fingerprint sensor 614 is used to collect the user's fingerprint, and the processor 601 identifies the user's identity based on the fingerprint collected by the fingerprint sensor 614, or the fingerprint sensor 614 identifies the user's identity based on the collected fingerprint. When the user's identity is identified as a trusted identity, the processor 601 authorizes the user to perform relevant sensitive operations, including unlocking the screen, viewing encrypted information, downloading software, paying, and changing settings. The fingerprint sensor 614 can be set on the front, back, or side of the terminal 600. When a physical button or a manufacturer logo is set on the terminal 600, the fingerprint sensor 614 can be integrated with the physical button or the manufacturer logo.
[0153] The optical sensor 615 is used to collect the ambient light intensity. In one embodiment, the processor 601 can control the display brightness of the display screen 605 according to the ambient light intensity collected by the optical sensor 615. Specifically, when the ambient light intensity is high, the display brightness of the display screen 605 is increased; when the ambient light intensity is low, the display brightness of the display screen 605 is reduced. In another embodiment, the processor 601 can also dynamically adjust the shooting parameters of the camera assembly 606 according to the ambient light intensity collected by the optical sensor 615.
[0154] The proximity sensor 616, also called a distance sensor, is usually arranged on the front panel of the terminal 600. The proximity sensor 616 is used to collect the distance between the user and the front of the terminal 600. In one embodiment, when the proximity sensor 616 detects that the distance between the user and the front of the terminal 600 is gradually decreasing, the processor 601 controls the display screen 605 to switch from the screen-on state to the screen-off state; when the proximity sensor 616 detects that the distance between the user and the front of the terminal 600 is gradually increasing, the processor 601 controls the display screen 605 to switch from the screen-off state to the screen-on state.
[0155] Those skilled in the art will understand that Figure 6 The structure shown in the figure does not constitute a limitation on the terminal 600, and the terminal 600 may include more or less components than those shown in the figure, or combine some components, or adopt a different component arrangement.
[0156] In an exemplary embodiment, a computer-readable storage medium storing at least one program code is also provided, such as a memory storing at least one program code, and the at least one program code is loaded and executed by a processor to implement the method for determining the conversion timing of the two-three combined development of an oil field in the above embodiment. For example, the computer-readable storage medium can be a read-only memory (ROM), a random access memory (RAM), a compact disc read-only memory (CD-ROM), a magnetic tape, a floppy disk, an optical data storage device, etc.
[0157] In an exemplary embodiment, a computer program product or a computer program is also provided, the computer program product or the computer program includes a program code, the program code is stored in a computer-readable storage medium. A processor of a computer device reads the program code from the computer-readable storage medium, and the processor executes the program code, so that the computer device executes the method for determining the conversion timing of the two-three combined development of an oil field in the above embodiment.
[0158] A person skilled in the art will understand that all or part of the steps to implement the above embodiments may be accomplished by hardware or by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, and the above-mentioned storage medium may be a read-only memory, a disk or an optical disk, etc.
[0159] The above description is only an optional embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
Claims
1. A method for determining the conversion timing of the second-third combined development of an oil field, It is characterized in that The method comprises: Calling reservoir numerical simulation software to simulate the oil production, water production, water content and recovery rate of the target oil field under the two-three combination mode at different conversion times, wherein the two-three combination mode refers to an oil field development mode of first secondary development and then switching to tertiary oil recovery; Based on the oil production, water production, water content and recovery factor under the two-three combination mode at different conversion times, obtaining at least one evaluation index under the two-three combination mode at different conversion times, the evaluation index is used to evaluate the development effect of the two-three combination mode; the at least one evaluation index includes recovery factor increase, water reduction and internal rate of return, the recovery factor increase refers to the recovery factor increased by the two-three combination mode compared with basic water drive, the water reduction refers to the water production reduced by the two-three combination mode compared with basic water drive, and the internal rate of return is obtained based on the oil production, water production, water content and recovery factor under the two-three combination mode; Based on at least one evaluation index in the two-three combination mode of the different conversion timings, a conversion timing determination model diagram is drawn, wherein the conversion timing determination model diagram includes a relationship curve between each evaluation index and the conversion timing; Displaying the conversion timing determination model diagram; Before obtaining at least one evaluation index under the two-three combination mode at different conversion times based on the oil production, water production, water content and recovery rate under the two-three combination mode at different conversion times, the method further comprises: calling reservoir numerical simulation software to respectively simulate the water production and recovery rate of the target oil field under basic water drive; Wherein, the oil production, water production, water content and recovery factor under the two-three combination mode at different conversion times are obtained, and at least one evaluation index under the two-three combination mode at different conversion times is obtained, including: Based on the recovery factor of the target oil field under the basic water flooding and the two-three combination methods at different conversion times, obtaining the recovery factor increase under the two-three combination methods at different conversion times; Based on the water production of the target oil field under the basic water flooding and the two-three combination mode at different conversion times, obtaining the precipitation under the two-three combination mode at different conversion times; Based on the oil production, water production, water content and recovery rate of the target oil field under the two-three combination method at the different conversion times, the internal rate of return under the two-three combination method at the different conversion times is obtained, and the internal rate of return is obtained through a target evaluation method.
2. The method for determining a conversion timing according to claim 1, It is characterized in that The displaying of the conversion timing determination model diagram includes: Based on the target constraint condition corresponding to the at least one evaluation indicator, the conversion timing corresponding to the target constraint condition is displayed in the conversion timing determination model diagram.
3. The method according to claim 1, It is characterized in that The at least one evaluation index further includes a well pattern integrity rate, and the method further includes: The reservoir numerical simulation software is called to simulate the well network integrity rate of the target oil field under the two-three combination mode at the different conversion timings.
4. The method for determining a conversion timing according to claim 1, It is characterized in that The method further comprises: Calling the reservoir numerical simulation software to simulate the prediction data of oil production of the target oil field under basic water drive, secondary development alone, simultaneous implementation of secondary and tertiary oil recovery, and conversion to tertiary oil recovery when secondary development reaches different water contents, wherein the simultaneous implementation of secondary and tertiary oil recovery refers to conversion to tertiary oil recovery immediately after secondary development; Based on the predicted data of the oil production changing with the production time, a diagram of the oil production prediction model is drawn, wherein the diagram of the oil production prediction model includes a curve of the relationship between the oil production and the production time under each development mode; The oil production prediction model diagram is displayed.
5. A device for determining the conversion timing of two-three combined development of oil fields, It is characterized in that The device comprises: A simulation module is used to call the reservoir numerical simulation software to simulate the oil production, water production, water content and recovery rate of the target oil field under the two-three combination mode at different conversion times. The two-three combination mode refers to the oil field development mode of first secondary development and then switching to tertiary oil recovery; an acquisition module, for acquiring at least one evaluation index under the two-three combination mode at different conversion times based on the oil production, water production, water content and recovery factor under the two-three combination mode at different conversion times, wherein the evaluation index is used to evaluate the development effect of the two-three combination mode; the at least one evaluation index includes an increase in recovery factor, a water reduction amount and an internal rate of return, wherein the increase in recovery factor refers to an increase in recovery factor of the two-three combination mode compared with basic water drive, the water reduction amount refers to a decrease in water production of the two-three combination mode compared with basic water drive, and the internal rate of return is obtained based on the oil production, water production, water content and recovery factor under the two-three combination mode; A drawing module, configured to draw a conversion timing determination model diagram based on at least one evaluation index in a two-three combination mode of the different conversion timings, wherein the conversion timing determination model diagram includes a relationship curve between each evaluation index and the conversion timing; A display module, used for displaying the conversion timing determination model diagram; The simulation module is also used to: Invoking reservoir numerical simulation software to respectively simulate the water production and recovery rate of the target oil field under basic water drive; The acquisition module is used for: Based on the recovery factor of the target oil field under the basic water flooding and the two-three combination methods at different conversion times, obtaining the recovery factor increase under the two-three combination methods at different conversion times; Based on the water production of the target oil field under the basic water flooding and the two-three combination mode at different conversion times, obtaining the precipitation under the two-three combination mode at different conversion times; Based on the oil production, water production, water content and recovery rate of the target oil field under the two-three combination method at the different conversion times, the internal rate of return under the two-three combination method at the different conversion times is obtained, and the internal rate of return is obtained through a target evaluation method.
6. The device according to claim 5, It is characterized in that The display module is used for: Based on the target constraint condition corresponding to the at least one evaluation indicator, the conversion timing corresponding to the target constraint condition is displayed in the conversion timing determination model diagram.
7. A computer device, It is characterized in that The computer device includes one or more processors and one or more memories, wherein the one or more memories store at least one program code, and the at least one program code is loaded and executed by the one or more processors to implement the method for determining the conversion timing of the two-three combined development of an oil field as described in any one of claims 1 to 4.
8. A computer-readable storage medium, It is characterized in that At least one program code is stored in the computer-readable storage medium, and the at least one program code is loaded and executed by the processor to implement the method for determining the conversion timing of the two-three combined development of an oil field as described in any one of claims 1 to 4.
Citation Information
Patent Citations
Oil deposit water-driving exploiting method of ultra-high water-containing period
CN103046910A
Calculating method of recovery efficiency under secondary-tertiary combined development mode
CN110242263A