A shield tunnel segment wall back grouting construction method and device
By using elastic grouting pipes and elbow grouting pipes combined with arc-shaped push plates in shield construction, the grouting cavity problem during synchronous grouting is solved, the uniform filling of cement slurry is achieved, and the tunnel is improved Safety and quality.
Patent Information
- Application Number
- CN202210386256.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-13
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2042-04-13
AI Technical Summary
In shield construction, due to the fast propulsion speed during synchronous grouting, it is difficult for cement slurry to form a separate solidified body, which easily forms a grouting cavity, affecting tunnel safety, and existing secondary grouting is difficult to completely remedy.
A method of post-grouting grouting construction for shield tunnel pipe sheet wall is adopted. By laying a slurry net when the shield machine is excavated, cement slurry is injected into the pipe sheet wall with elastic grouting pipe and elbow grouting pipe, and a curved push is used. Structures such as plates and hydraulic cylinders ensure uniform filling of cement slurry and reduce the probability of cavity.
It improves the filling uniformity of cement slurry and tunnel safety, reduces the probability of grouting cavity, and enhances the waterproofing and molding quality of the tunnel.
Smart Images

Figure CN114607398B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of shield construction, in particular to a shield tunnel segment wall back grouting construction method and device. Background Art
[0002] Shield grouting is a construction technology that injects cement slurry, chemical slurry, mixed slurry, etc. into the shield body and the back of the segments through the reserved grouting holes on the shield body and the segments to fill the gaps, control the ground settlement, block water or reinforce the ground. It mainly includes synchronous grouting and secondary grouting. Shield grouting construction technology is an indispensable auxiliary method in shield construction. It is a key to control surface settlement, ensure the safety of pipelines and buildings, and ensure the waterproof quality of the tunnel and the quality of the formed tunnel line.
[0003] A Chinese patent with the publication number CN111997653A discloses a shield tunnel segment wall back grouting construction method, including synchronous grouting and secondary reinforcement grouting, the secondary reinforcement grouting starts after the synchronous grouting solidifies and stabilizes; the synchronous grouting is carried out simultaneously with the shield tunneling, through the synchronous grouting system and the six symmetrically arranged grouting pipes built into the shield tail, while the shield advances forward to form the shield tail gap, three pumps and six pipelines are used for symmetrical simultaneous grouting, and the grouting method can adopt automatic control mode or manual control mode as needed; the automatic control mode is to set the grouting pressure value in advance in the control system of the synchronous grouting system, and the control system automatically adjusts the grouting speed according to the actual grouting pressure value, and automatically stops grouting when the grouting pressure value reaches the set value; the manual control mode is to manually adjust the grouting flow rate at any time according to the tunneling situation. The present invention can effectively solve the problems of stratum loss caused by shield construction, reconsolidation of remolded soil around the shield tunnel, and water infiltration.
[0004] When the shield machine performs synchronous grouting, since the advancement speed of the shield in this stratum is relatively fast and the automatic grouting outlets are all distributed at the top, it is difficult for the slurry to form a separate solidified body after injection, and it is easy to form a grouting cavity. Even if there is a secondary grouting to remedy it later, some cavities will still be missed, affecting the safety of the tunnel.
[0005] To this end, the present invention provides a shield tunnel segment wall back grouting construction method and device. Summary of the invention
[0006] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.
[0007] The technical solution adopted by the present invention to solve the technical problem is: a shield tunnel segment wall back grouting construction method described in the present invention, the construction method comprises the following steps:
[0008] S1: When the shield machine excavates the tunnel, after laying the pipe segments, a grouting net is laid between the pipe segments and the tunnel soil layer;
[0009] S2: The shield machine moves forward, and the grouting pump injects cement slurry into the segment wall synchronously. At the same time, the pressure gauge value is observed to judge the grouting effect;
[0010] S3: The secondary grouting equipment at the tail of the shield machine injects cement slurry into the wall of the segment through the grouting holes reserved in the segment, filling the remaining cavity behind the segment.
[0011] A shield tunnel segment wall back grouting construction device, the construction device is suitable for the above-mentioned shield tunnel segment wall back grouting construction method, the construction device comprises a shield machine, an elastic grouting pipe, an elbow grouting pipe and an arc-shaped push plate; the outer ring of the shield machine is provided with a plurality of elastic grouting pipes, one end of the elastic grouting pipe is connected to the grouting pump of the shield machine, the other end of the elastic grouting pipe is connected to the elbow grouting pipe, both sides of the top of the elbow end of the elbow grouting pipe are fixed with arc-shaped push plates, the bottom end of the arc-shaped push plate is slidably matched with the outer wall of the segment; when the shield machine is working, when it is excavating the tunnel, the shield machine The pipe segments are laid synchronously. After a circle of pipe segments is laid, the grouting pump injects cement slurry into the wall of the pipe segment through the elastic grouting pipe and the elbow grouting pipe. The reaction force generated when the cement slurry hits the pipe segment pushes the elbow grouting pipe to rotate upward, so that the arc push plate is separated from the pipe segment and reset, allowing the cement slurry to flow to the side of the pipe segment. The elbow grouting pipe approaches the pipe segment under the action of its own gravity, pushing the arc push plate to fit the pipe segment and push it to both sides, pushing the cement slurry evenly to both sides, thereby improving the uniformity of cement slurry filling, reducing the probability of cement slurry generating grouting cavities, and then improving the safety of the tunnel.
[0012] Preferably, the outer ring of the shield machine is provided with a receiving groove, the inner ring and the outer ring of the receiving groove are both provided with guide rails, a driving slider is slidably installed inside the top guide rail, the bottom of the driving slider is hinged to the top of the elbow grouting pipe, a hydraulic cylinder is provided inside the receiving groove, the piston rod of the hydraulic cylinder is fixedly connected to the driving slider, and a driven slider is slidably installed inside the bottom guide rail, a plurality of No. 1 springs are fixedly connected to the top of the driven slider, and the insert of the No. 1 spring is hinged to the bottom of the elbow grouting pipe; when working, the hydraulic cylinder pushes the driving slider to slide along the guide rail, pushes the elbow grouting pipe into the receiving groove, and drives the driven slider to slide along the bottom guide rail; the elbow grouting pipe is hinged with the driving slider, the influence on the rotation of the elbow grouting pipe is reduced; the elastic force of the No. 1 spring is used to increase the force of the elbow grouting pipe when it rotates and resets, thereby increasing the force of the arc push plate to push the cement slurry, thereby improving the filling efficiency of the cement slurry.
[0013] Preferably, a plurality of slots are provided at the bottom of the arc-shaped push plate, and a side wall of the slot is fixedly connected to a side of the elbow grouting pipe with an arc-shaped plate; during operation, when the arc-shaped push plate pushes the cement slurry, part of the cement slurry passes through the slot, and when the arc-shaped push plate is reset, the side wall of the arc-shaped plate fits the pipe segment, so that the arc-shaped push plate is separated from the pipe segment, thereby reducing the probability of scraping the cement slurry back.
[0014] Preferably, a plurality of elliptical protrusions are fixedly connected to the top outer wall of the arc plate; when working, the arc push plate is reset, so that the side wall of the arc plate slides against the pipe segment, and the elliptical protrusions jump and slide along the pipe segment to generate vibration, which shakes off the cement slurry on the surface of the arc push plate, thereby improving the cleanliness of the arc push plate, and then improving the effectiveness of the arc push plate in pushing the cement slurry.
[0015] Preferably, the top and bottom of the elbow grouting pipe are fixedly connected with a base, the outer ring of the base is slidably mounted with a top seat, a plurality of No. 2 springs are fixedly connected between the base and the top seat, and a plurality of rollers are fixedly connected to a side of the top seat away from the elbow grouting pipe; during operation, when the elbow grouting pipe flaps up and down, the rollers at the top and bottom respectively hit the top wall of the tunnel and the top wall of the pipe segment, causing the No. 2 spring to compress and reset, thereby improving the swing strength and swing amplitude of the elbow grouting pipe.
[0016] Preferably, a sealing ring is fixedly connected between the outer ring of the base and the outer ring of the top seat, and an elastic scraper is fixedly connected to the outer ring of the top seat, and the blade of the elastic scraper is slidably matched with the outer wall of the base; the sealing ring is used to block external dust from entering between the base and the top seat, thereby reducing the effect of a large amount of dust on the elastic force of the No. 2 spring; the elastic scraper scrapes the outer wall of the base to scrape off the attached dust, thereby reducing the effect of the attached dust on the sliding of the top seat.
[0017] Preferably, a rotating rod is rotatably installed at the top of the elbow of the elbow grouting pipe, and the rotating rod rotates through the outer wall of the elbow grouting pipe, a cross cone plate is fixedly connected to the bottom end of the rotating rod, and the cross cone plate is located inside the elbow grouting pipe, the top and bottom walls of the arc-shaped push plate are fixedly connected to a tube, and the inner wall of the tube is fixedly connected to a plurality of protrusions, and a cylindrical seat is fixedly connected to the top of the rotating rod, and a plurality of arc grooves are opened on the outer ring of the cylindrical seat, and a rotating arm is rotatably installed inside the arc groove, and a circular hole is opened inside the arc groove, and the inside of the circular hole is connected to the rotating arm An elastic pull rope is fixedly connected between the middle parts of the rotating arm, and a billiard ball is fixedly connected to the end of the rotating arm away from the arc groove, and the outer wall of the billiard ball slides with the inner wall of the barrel; when working, when the cement slurry is sprayed out from the elbow grouting pipe, the cross cone plate rotates, driving the rotating rod to rotate, and the cylindrical seat rotates. The centrifugal force generated makes the rotating arm rotate out of the arc groove, so that the billiard ball hits the inner wall of the barrel, and the protrusion makes the rotating arm jump and rotate, so that the billiard ball repeatedly hits the inner wall of the barrel, causing the arc-shaped push plate to shake, thereby further improving the cleanliness of the arc-shaped push plate.
[0018] Preferably, a plurality of fish scale spring pieces are fixedly connected to one side of the cross cone plate close to the inner wall of the elbow grouting pipe, and the edges of adjacent fish scale spring pieces overlap, and the outer walls of the fish scale spring pieces slide in cooperation with the inner wall of the elbow grouting pipe; the overlapping fish scale spring pieces block the cement slurry from approaching the turning rod, and the fish scale spring pieces on the top squeeze the inner wall of the elbow grouting pipe, so that the fish scale spring pieces bend and deform, and the fish scale spring pieces are pressed against each other, thereby further blocking the cement slurry flowing downward from approaching the turning rod, thereby improving the rotation stability of the turning rod.
[0019] The beneficial effects of the present invention are as follows:
[0020] 1. The present invention discloses a method and device for grouting behind the wall of a shield tunnel segment. The method comprises the following steps: an elastic grouting pipe, an elbow grouting pipe and an arc-shaped push plate are arranged. When the shield machine is excavating the tunnel, the shield machine simultaneously lays the segments. After a circle of segments is laid, the grouting pump injects cement slurry into the segment wall through the elastic grouting pipe and the elbow grouting pipe. The reaction force generated when the cement slurry impacts the segment pushes the elbow grouting pipe to rotate upward, so that the arc-shaped push plate is separated from the segment and reset, and the cement slurry flows to the side of the segment. The elbow grouting pipe approaches the segment under the action of its own gravity, pushes the arc-shaped push plate to fit the segment and pushes it to both sides, and pushes the cement slurry evenly to both sides, thereby improving the uniformity of cement slurry filling, reducing the probability of cement slurry generating grouting cavities, and thereby improving the safety of the tunnel.
[0021] 2. The present invention describes a shield tunnel segment wall back grouting construction method and device, which includes a cross-cone plate, a rotating rod, a barrel, a cylindrical seat, a rotating arm, a protrusion and a billiard ball; when cement slurry is sprayed out from the elbow grouting pipe, the cross-cone plate rotates, driving the rotating rod to rotate, causing the cylindrical seat to rotate, and the centrifugal force generated causes the rotating arm to rotate out of the arc groove, causing the billiard ball to hit the inner wall of the barrel, and the protrusion causes the rotating arm to jump and rotate, causing the billiard ball to repeatedly hit the inner wall of the barrel, causing the arc push plate to shake, thereby further improving the cleanliness of the arc push plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The present invention will be further described below in conjunction with the accompanying drawings.
[0023] Figure 1 is a three-dimensional diagram of the first embodiment of the present invention;
[0024] Figure 2 is a front view of the first embodiment of the present invention;
[0025] Figure 3 yes Figure 2 A partial enlarged view of the middle part;
[0026] Figure 4 yes Figure 3 Cross-section at BB;
[0027] Figure 5 yes Figure 3 A partial enlarged view of point C in the middle;
[0028] Figure 6 yes Figure 3 A partial enlarged view of point D in the middle;
[0029] Figure 7 yes Figure 6 A partial enlarged view of point E in the middle;
[0030] Figure 8 is a partial cross-sectional view of a cylindrical seat according to a second embodiment of the present invention;
[0031] Fig. 9 It is a flow chart of the construction method of the present invention;
[0032] In the figure: 1. Shield machine; 2. Elastic grouting pipe; 3. Elbow grouting pipe; 4. Arc push plate; 5. Storage groove; 6. Guide rail; 7. Driving slider; 8. Hydraulic cylinder; 9. Driven slider; 10. Spring No. 1; 11. Notch; 12. Arc plate; 13. Elliptical protrusion; 14. Base; 15. Top seat; 16. Spring No. 2; 17. Roller; 18. Sealing ring; 19. Elastic scraper; 20. Rotating rod; 21. Cross cone plate; 22. Bobbin; 23. Protrusion; 24. Cylindrical seat; 25. Arc groove; 26. Rotating arm; 27. Round hole; 28. Elastic pull rope; 29. Billiard ball; 30. Fish scale shrapnel; 31. Magnetic ball; 32. Magnet. DETAILED DESCRIPTION
[0033] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0034] Embodiment 1
[0035] like Fig. 9 As shown, a shield tunnel segment wall back grouting construction method according to an embodiment of the present invention comprises the following steps:
[0036] S1: When the shield machine excavates the tunnel, after laying the pipe segments, a grouting net is laid between the pipe segments and the tunnel soil layer;
[0037] S2: The shield machine moves forward, and the grouting pump injects cement slurry into the segment wall synchronously. At the same time, the pressure gauge value is observed to judge the grouting effect;
[0038] S3: The secondary grouting equipment at the tail of the shield machine injects cement slurry into the wall of the segment through the grouting holes reserved in the segment, filling the remaining cavity behind the segment.
[0039] like Figures 1 to 3As shown, a shield tunnel segment wall back grouting construction device is suitable for the above-mentioned shield tunnel segment wall back grouting construction method, the construction device comprises a shield machine 1, an elastic grouting pipe 2, an elbow grouting pipe 3 and an arc-shaped push plate 4; the outer ring of the shield machine 1 is provided with a plurality of elastic grouting pipes 2, one end of the elastic grouting pipe 2 is connected to the grouting pump of the shield machine 1, and the other end of the elastic grouting pipe 2 is connected to the elbow grouting pipe 3, and both sides of the top of the elbow end of the elbow grouting pipe 3 are fixedly connected with an arc-shaped push plate 4, and the bottom end of the arc-shaped push plate 4 is slidably matched with the outer wall of the segment; when working, the shield machine 1 is excavating the tunnel When the shield machine 1 lays the pipe segment synchronously, after a circle of pipe segments is laid, the grouting pump injects cement slurry into the pipe segment wall through the elastic grouting pipe 2 and the elbow grouting pipe 3. The reaction force generated when the cement slurry impacts the pipe segment pushes the elbow grouting pipe 3 to rotate upward, so that the arc push plate 4 is separated from the pipe segment and reset, so that the cement slurry flows to the side of the pipe segment. The elbow grouting pipe 3 approaches the pipe segment under the action of its own gravity, pushes the arc push plate 4 to fit the pipe segment and pushes it to both sides, pushing the cement slurry evenly to both sides, thereby improving the uniformity of cement slurry filling, reducing the probability of cement slurry generating grouting cavity, and then improving the safety of the tunnel.
[0040] The outer ring of the shield machine 1 is provided with a receiving groove 5, the inner ring and the outer ring of the receiving groove 5 are both provided with guide rails 6, a driving slider 7 is slidably installed inside the top guide rail 6, the bottom of the driving slider 7 is hinged to the top of the elbow grouting pipe 3, a hydraulic cylinder 8 is provided inside the receiving groove 5, the piston rod of the hydraulic cylinder 8 is fixedly connected to the driving slider 7, a driven slider 9 is slidably installed inside the bottom guide rail 6, a plurality of No. 1 springs 10 are fixedly connected to the top of the driven slider 9, and the No. 1 springs 10 are The insert is hinged to the bottom of the elbow grouting pipe 3; when working, the hydraulic cylinder 8 pushes the driving slider 7 to slide along the guide rail 6, pushes the elbow grouting pipe 3 into the receiving groove 5, and drives the driven slider 9 to slide along the bottom guide rail 6; the elbow grouting pipe 3 is hinged to the driving slider 7, so that the influence on the rotation of the elbow grouting pipe 3 is reduced; through the elastic force of the No. 1 spring 10, the force of the elbow grouting pipe 3 when it rotates and resets is increased, thereby increasing the force of the arc push plate 4 to push the cement slurry, thereby improving the filling efficiency of the cement slurry.
[0041] like Figure 3 to Figure 4 As shown, a plurality of slots 11 are provided at the bottom of the arc-shaped push plate 4, and a side wall of the slot 11 is fixedly connected with an arc-shaped plate 12 close to one side of the elbow grouting pipe 3; during operation, when the arc-shaped push plate 4 pushes the cement slurry, part of the cement slurry passes through the slot 11, and when the arc-shaped push plate 4 is reset, the side wall of the arc-shaped plate 12 fits the pipe segment, so that the arc-shaped push plate 4 is separated from the pipe segment, thereby reducing the probability of scraping the cement slurry back.
[0042] like Figure 4As shown, a plurality of elliptical protrusions 13 are fixedly connected to the top outer wall of the arc plate 12; when working, the arc push plate 4 is reset, so that the side wall of the arc plate 12 slides against the pipe segment, and the elliptical protrusions 13 jump and slide along the pipe segment to generate vibration, which shakes off the cement slurry on the surface of the arc push plate 4, thereby improving the cleanliness of the arc push plate 4, and then improving the effectiveness of the arc push plate 4 in pushing the cement slurry.
[0043] The top and bottom of the elbow grouting pipe 3 are fixedly connected with a base 14, and the outer ring of the base 14 is slidably mounted with a top seat 15. A plurality of No. 2 springs 16 are fixedly connected between the base 14 and the top seat 15, and a plurality of rollers 17 are fixedly connected to a side of the top seat 15 away from the elbow grouting pipe 3. During operation, when the elbow grouting pipe 3 flaps up and down, the rollers 17 at the top and bottom respectively hit the top wall of the tunnel and the top wall of the pipe segment, so that the No. 2 spring 16 is compressed and reset, thereby improving the swing strength and swing amplitude of the elbow grouting pipe 3.
[0044] like Figure 5 As shown, a sealing ring sheet 18 is fixedly connected between the outer ring of the base 14 and the outer ring of the top seat 15, and an elastic scraper 19 is fixedly connected to the outer ring of the top seat 15, and the blade of the elastic scraper 19 is slidably matched with the outer wall of the base 14; the sealing ring sheet 18 blocks the external dust from entering between the base 14 and the top seat 15, thereby reducing the influence of a large amount of dust on the elastic force of the No. 2 spring 16; the elastic scraper 19 scrapes the outer wall of the base 14 to scrape off the attached dust, thereby reducing the influence of the attached dust on the sliding of the top seat 15.
[0045] like Figure 6 As shown, a rotating rod 20 is rotatably installed at the top of the elbow of the elbow grouting pipe 3, and the rotating rod 20 rotates and penetrates the outer wall of the elbow grouting pipe 3, and a cross cone plate 21 is fixedly connected to the bottom end of the rotating rod 20, and the cross cone plate 21 is located inside the elbow grouting pipe 3, and a tube 22 is fixedly connected to the top and bottom walls of the arc-shaped push plate 4, and a plurality of protrusions 23 are fixedly connected to the inner wall of the tube 22, and a cylindrical seat 24 is fixedly connected to the top of the rotating rod 20, and a plurality of arc grooves 25 are opened on the outer ring of the cylindrical seat 24, and a rotating arm 26 is rotatably installed inside the arc groove 25, and a circular hole 27 is opened inside the arc groove 25, and the inside of the circular hole 27 is connected to the rotating arm 2 An elastic pull rope 28 is fixedly connected between the middle parts of 6, and a billiard ball 29 is fixedly connected to the end of the rotating arm 26 away from the arc groove 25, and the outer wall of the billiard ball 29 slides with the inner wall of the barrel 22; during operation, when the cement slurry is sprayed out from the elbow grouting pipe 3, the cross cone plate 21 rotates, driving the rotating rod 20 to rotate, and the cylindrical seat 24 rotates. The centrifugal force generated causes the rotating arm 26 to rotate out of the arc groove 25, causing the billiard ball 29 to hit the inner wall of the barrel 22, and the protrusion 23 causes the rotating arm 26 to jump and rotate, causing the billiard ball 29 to repeatedly hit the inner wall of the barrel 22, causing the arc push plate 4 to shake, thereby further improving the cleaning degree of the arc push plate 4.
[0046] like Figure 6 to Figure 7 As shown, a plurality of fish scale spring pieces 30 are fixedly connected to one side of the cross cone plate 21 close to the inner wall of the elbow grouting pipe 3, and the edges of adjacent fish scale spring pieces 30 overlap, and the outer wall of the fish scale spring pieces 30 slides with the inner wall of the elbow grouting pipe 3; the overlapping fish scale spring pieces 30 prevent cement slurry from approaching the rotating rod 20, and the top fish scale spring pieces 30 squeeze the inner wall of the elbow grouting pipe 3, so that the fish scale spring pieces 30 bend and deform, so that the fish scale spring pieces 30 are pressed against each other, thereby further preventing the cement slurry flowing downward from approaching the rotating rod 20, thereby improving the rotation stability of the rotating rod 20.
[0047] Embodiment 2
[0048] like Figure 8 As shown, compared with Example 1, another embodiment of the present invention is: a magnetic ball 31 is arranged inside the inner cavity of the billiard ball 29, and a magnet 32 is embedded on the inner wall of the arc groove 25, and the magnet 32 attracts the magnetic ball 31; when working, the rotating arm 26 rotates out of the arc groove 25, so that the magnetic ball 31 is away from the magnet 32, and the magnetic ball 31 moves inside the inner cavity of the billiard ball 29, and the magnetic ball 31 hits the inner wall of the billiard ball 29, thereby improving the cleanliness of the billiard ball 29, and at the same time, the intensity and frequency of the billiard ball 29 hitting the bobbin 22; at the same time, after the rotating arm 26 rotates into the arc groove 25, the magnetic ball 31 and the magnet 32 are attracted to fix the billiard ball 29 in the arc groove 25, thereby improving the storage stability of the rotating arm 26 and the billiard ball 29.
[0049] During operation: when the shield machine 1 is excavating the tunnel, the shield machine 1 simultaneously lays the pipe segments. After one circle of pipe segments is laid, the hydraulic cylinder 8 pushes the driving slider 7 to slide along the guide rail 6, pushes the elbow grouting pipe 3 into the receiving groove 5, and drives the driven slider 9 to slide along the bottom guide rail 6;
[0050] After the grouting pump injects cement slurry into the wall of the pipe segment through the elastic grouting pipe 2 and the elbow grouting pipe 3, the reaction force generated when the cement slurry impacts the pipe segment pushes the elbow grouting pipe 3 to rotate upward, so that the No. 1 spring 10 is compressed; at the same time, the roller 17 on the top hits the top wall of the tunnel, so that the No. 2 spring 16 on the top is compressed; the elbow grouting pipe 3 drives the arc push plate 4 to break away from the pipe segment and reset, so that the cement slurry flows to the side of the pipe segment; at the same time, when the cement slurry is sprayed out from the elbow grouting pipe 3, the cross cone plate 21 rotates, driving the rotating rod 20 to rotate, so that the cylindrical seat 24 rotates, and the centrifugal force generated makes the rotating arm 26 rotate out of the arc groove 25, so that the billiard ball 29 hits the inner wall of the barrel 22, and the protrusion 23 makes the rotating arm 26 jump and rotate, so that the billiard ball 29 repeatedly hits the inner wall of the barrel 22, so that the arc push plate 4 shakes, and the cement slurry on the surface of the arc push plate 4 is shaken off;
[0051] When the elbow grouting pipe 3 is rotated to the maximum angle, under the action of its own gravity, the elastic force of the No. 1 spring 10 and the No. 2 spring 16, the elbow grouting pipe 3 is moved downward, pushing the arc-shaped push plate 4 to fit the pipe segment to both sides, pushing the cement slurry evenly to both sides, thereby improving the uniformity of cement slurry filling, reducing the probability of cement slurry generating grouting cavities, and then improving the safety of the tunnel.
[0052] The above-mentioned front, back, left, right, top and bottom are all based on the figures in the specification. Figure 1 As a benchmark, according to the person's observation perspective, the side of the device facing the observer is defined as the front, the left side of the observer is defined as the left, and so on.
[0053] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the scope of protection of the present invention.
[0054] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A shield tunnel segment wall back grouting construction method, Features: The construction method includes the following steps: S1: When the shield machine excavates the tunnel, after laying the pipe segments, a grouting net is laid between the pipe segments and the tunnel soil layer; S2: The shield machine moves forward, and the grouting pump injects cement slurry into the segment wall synchronously. At the same time, the pressure gauge value is observed to judge the grouting effect; S3: The secondary grouting equipment at the tail of the shield machine injects cement slurry into the wall of the segment through the grouting holes reserved in the segment to fill the remaining cavity behind the segment; According to a shield tunnel segment wall back grouting construction method, a construction device is proposed, the construction device comprising a shield machine (1), an elastic grouting pipe (2), an elbow grouting pipe (3) and an arc-shaped push plate (4); a plurality of elastic grouting pipes (2) are arranged on the outer ring of the shield machine (1), one end of the elastic grouting pipe (2) is connected to a grouting pump of the shield machine (1), the other end of the elastic grouting pipe (2) is connected to an elbow grouting pipe (3), both sides of the top of the elbow end of the elbow grouting pipe (3) are fixedly connected to an arc-shaped push plate (4), and the bottom end of the arc-shaped push plate (4) is slidably matched with the outer wall of the segment; The outer ring of the shield machine (1) is provided with a receiving groove (5), the inner ring and the outer ring of the receiving groove (5) are both provided with guide rails (6), a driving slider (7) is slidably mounted inside the top guide rail (6), the bottom of the driving slider (7) is hinged to the top of the elbow grouting pipe (3), a hydraulic cylinder (8) is arranged inside the receiving groove (5), the piston rod of the hydraulic cylinder (8) is fixedly connected to the driving slider (7), a driven slider (9) is slidably mounted inside the bottom guide rail (6), a plurality of No. 1 springs (10) are fixedly connected to the top of the driven slider (9), and the insert of the No. 1 spring (10) is hinged to the bottom of the elbow grouting pipe (3).
2. A shield tunnel segment wall back grouting construction method according to claim 1, Features: A plurality of slots (11) are provided at the bottom of the arc-shaped push plate (4), and an arc-shaped plate (12) is fixedly connected to a side wall of the slot (11) close to the elbow grouting pipe (3).
3. A shield tunnel segment wall back grouting construction method according to claim 2, Features: A plurality of elliptical protrusions (13) are fixedly connected to the top outer wall of the arc-shaped plate (12).
4. A shield tunnel segment wall back grouting construction method according to claim 1, Features: The top and bottom of the elbow grouting pipe (3) are both fixedly connected to a base (14), the outer ring of the base (14) is slidably mounted with a top seat (15), a plurality of No. 2 springs (16) are fixedly connected between the base (14) and the top seat (15), and a plurality of rollers (17) are fixedly connected to a side of the top seat (15) away from the elbow grouting pipe (3).
5. A shield tunnel segment wall back grouting construction method according to claim 4, Features: A sealing ring sheet (18) is fixedly connected between the outer ring of the base (14) and the outer ring of the top seat (15), and an elastic scraper (19) is fixedly connected to the outer ring of the top seat (15). The blade of the elastic scraper (19) is slidably matched with the outer wall of the base (14).
6. A shield tunnel segment wall back grouting construction method according to claim 1, Features: A rotating rod (20) is rotatably mounted on the top of the elbow of the elbow grouting pipe (3), and the rotating rod (20) rotates to penetrate the outer wall of the elbow grouting pipe (3). A cross cone plate (21) is fixedly connected to the bottom end of the rotating rod (20), and the cross cone plate (21) is located inside the elbow grouting pipe (3). A tube (22) is fixedly connected to the top and bottom walls of the arc-shaped push plate (4), and a plurality of protrusions (23) are fixedly connected to the inner wall of the tube (22). A cylindrical seat (21) is fixedly connected to the top of the rotating rod (20). 24), the outer ring of the cylindrical seat (24) is provided with a plurality of arc grooves (25), a rotating arm (26) is rotatably mounted inside the arc groove (25), a circular hole (27) is provided inside the arc groove (25), an elastic drawstring (28) is fixedly connected between the inside of the circular hole (27) and the middle part of the rotating arm (26), a billiard ball (29) is fixedly connected to one end of the rotating arm (26) away from the arc groove (25), and the outer wall of the billiard ball (29) is slidably matched with the inner wall of the barrel (22).
7. A shield tunnel segment wall back grouting construction method according to claim 6, Features: A plurality of fish scale spring pieces (30) are fixedly connected to one side of the cross cone plate (21) close to the inner wall of the elbow grouting pipe (3), the edges of adjacent fish scale spring pieces (30) overlap, and the outer wall of the fish scale spring piece (30) is slidably matched with the inner wall of the elbow grouting pipe (3).
8. A shield tunnel segment wall back grouting construction method according to claim 6, Features: A magnetic ball (31) is arranged inside the inner cavity of the billiard ball (29), and a magnet (32) is embedded in the inner wall of the arc groove (25), and the magnet (32) attracts the magnetic ball (31).
