A formwork keel structure for construction
By adopting metal structure keels and hook components in building forms, the problems of complex installation and disassembly of existing forms are solved, rapid installation and convenient disassembly are achieved, engineering efficiency and safety are improved, and manpower and material consumption is reduced.
Patent Information
- Application Number
- CN202210362630.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-07
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-04-07
AI Technical Summary
The existing building formwork is complex and time-consuming during construction and disassembly, poses safety hazards, and is reused for limited times, which affects the efficiency and quality of the project.
The template keel structure with metal structure is equipped with hook components and side barrier components. It can quickly install and easily disassemble by connecting studs, movable cards, hook plates and locking nuts, ensuring the safety of the template and engineering efficiency.
The construction and dismantling process is simplified, manpower and material consumption is reduced, engineering efficiency is improved, the safety and quality of the formwork is ensured, and the loss of parts and assembly and dismantling time is reduced.
Smart Images

Figure CN114635560B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building templates, in particular to a building template keel structure. Background Art
[0002] At present, in the construction industry, casting formwork is used to shape concrete structures and components according to the specified position and geometric dimensions in engineering construction, so as to maintain their correct position. The materials of casting formwork used in my country's construction industry are wood, bamboo, plastic, steel, and aluminum castings. When pouring concrete, it is necessary to build the formwork used for pouring. The existing wood and bamboo formworks are mainly fixed by on-site carpentry. The installation period is long and the construction workers are required to have high proficiency. Generally, they are skilled workers, and the project is time-consuming and the labor cost is high. Moreover, after the cement hardens in the later stage, it is also time-consuming to disassemble. The formwork can only be reused a few times before it is scrapped.
[0003] However, the existing plastic, steel and aluminum casting template structures are relatively bulky, difficult to install and complex to disassemble due to their design characteristics, and require a lot of manpower, which is not conducive to the rapid advancement of the project.
[0004] In the process of disassembling the existing building formwork, both ends are fixed, so both ends need to be disassembled for demoulding; in the process of disassembling both ends, the formwork is likely to fall from a high altitude (generally 2.7-5 meters), which is prone to personnel safety accidents, and the formwork is easily damaged during the free fall from the high altitude, causing deformation or damage, affecting the use; and generally, at least two people are required to cooperate in demoulding during the disassembly process.
[0005] The following prior art was found through search:
[0006] Patent 1: Chinese patent application number: 202120448683.2 Application date: 2021-03-02, Patent name: A telescopic formwork keel connector. The utility model discloses a telescopic formwork keel connector, comprising an external formwork keel and an internal formwork keel, the internal formwork keel is detachably slidably penetrated in the inner cavity of the external formwork keel, characterized in that: at least one of the two ends of the external formwork keel is in an open form, and both ends of the internal formwork keel are in a closed form; when working, the internal formwork keel slides into or out of the inner cavity of the external formwork keel along the open end of the external formwork keel to achieve telescopic adjustment of the length of the entire formwork keel connector. The advantages of the utility model are: simple structure, easy installation and disassembly, wide range of use, strong practicality, and can well solve the problem of rising cost of formwork keel use caused by size changes of building surfaces on different floors or in different areas during on-site construction.
[0007] It mainly solves the telescopic problem and is a general technical reference material. It has no substantial technical contribution to the present invention and does not have any technical enlightenment effect.
[0008] Patent 2: Chinese patent application number: 201921034796.7 Application date: 2019-07-04, Patent name: A floor keel bracket for building formwork, the utility model discloses a floor keel bracket for building formwork, including a keel body, a bracket, a support rod, a first support edge and a second support edge, the keel body is in an inverted U shape, the bracket is inserted into the keel body from bottom to top, the upper end of the support rod abuts against the bracket to play a supporting role, and the first support edge and the second support edge are respectively detachably fixed horizontally on both sides of the lower edge of the keel body. Compared with the prior art, the utility model is a floor keel bracket for building formwork, which uses a support rod and a bracket to support the keel body, and uses the first support edge and the second support edge to support the aluminum formwork. After the pouring is completed, the first support edge and the second support edge can be removed, and the aluminum formwork can be removed, while the keel body still exists in the structure, thereby effectively improving the structural strength of the floor slab.
[0009] It discloses a floor keel bracket structure, which has a different structure and technical effects. It is a general technical reference material and has no substantial technical contribution to the present invention and no technical enlightenment effect.
[0010] Patent 3: Chinese patent application number: 202010681621.6 Application date: 2020-07-15, patent name: A floor early dismantling formwork device, the present invention relates to the field of construction equipment technology, and more specifically, to a floor early dismantling formwork device, including a plurality of formworks and a plurality of support units connected to and supporting the formworks, the support unit includes a frame unit for placing the formworks and a plurality of tripod units supporting the frame unit, the tripod unit is sequentially provided with an early dismantling head that is detachably connected to the frame unit and can lift the frame unit, and a single support top for supporting the early dismantling head and detachably connected thereto. The purpose of the present invention is to overcome the problems in the existing floor early dismantling formwork technology that it cannot be used on a large scale and is not conducive to the replacement and maintenance of parts, and the problem that the dismantling is cumbersome due to the presence of primary and secondary beams, and to provide a modular, assembleable, easy to dismantle, and suitable for large-area floor early dismantling formwork device without distinguishing between primary and secondary beams.
[0011] It discloses a floor early-dismantling formwork device, which has a different structure and technical effects. It belongs to general technical reference material and has no substantial technical contribution to the present invention and no technical enlightenment effect.
[0012] The present invention proposes a template keel structure for construction. After adopting the present invention, the construction and installation are simple, convenient and fast, and the disassembly is also convenient. The template will not fall off freely, which protects the template and enhances the safety of the project. The demolding of the group unit can be completed independently without the cooperation of multiple people, which greatly improves the project efficiency, saves time, saves a lot of manpower and material resources, and has good project quality. Summary of the invention
[0013] The purpose of the present invention is to provide a formwork keel structure for construction. After adopting the present invention, the construction and installation are simple, convenient and fast, and the disassembly is also convenient. The formwork will not fall off freely, which protects the formwork and enhances the safety of the project. The formwork can be dismantled by a small group unit independently without the cooperation of multiple people, which greatly improves the project efficiency, saves time, saves a lot of manpower and material resources, and has good project quality.
[0014] To achieve the above object, the present invention proposes the following technical solution: a template keel structure for construction, comprising a keel of a metal structure, a hook assembly fixed under the keel, and a side stop assembly arranged on the left and right sides of the keel for sealing and connecting;
[0015] The keel is a hollow square cross-section profile filled with square wood;
[0016] The hook assembly includes a connecting stud inserted into the keel and protruding downward from the keel, a movable card, a hook plate, a locking nut, and a fixing plate welded at the lower end of the connecting stud.
[0017] The hook plate arranged under the keel is a symmetrical structure and is vertically fixed under the keel, and both ends of the hook plate are tilted upward to form a hook structure;
[0018] The edge guard assembly includes a guard edge, which seals both ends of the keel and extends downward to protrude from the lower surface of the keel. A support plate is provided at the extension of the guard edge and is connected to the lower surface of the keel.
[0019] The hook components are arranged in one or more groups in the middle of the keel.
[0020] Furthermore, the hook components are arranged in four groups on the keel and are symmetrically arranged in the middle position of the keel.
[0021] Furthermore, the hook assembly includes a long hook plate and hook heads formed by bending upwards at both ends of the hook plate. A stud hole is provided in the middle of the hook plate, through which the connecting stud passes; after the connecting stud passes through the keel and the square wood in the keel, it passes through the movable card and the hook plate in turn, and then the locking nut is installed, and finally a fixing plate is welded at the lower end of the connecting stud.
[0022] Furthermore, the edge guard assembly also includes a support angle plate connecting the support plate and the edge guard, the support angle plate is vertically welded below the support plate, and the plug connector protruding at the front end of the support angle plate corresponds to the plug hole set on the edge guard and is welded together.
[0023] Furthermore, a protrusion is provided at the lowermost end of the outer side surface of the retaining edge, and a docking hole for connection is provided on the retaining edge.
[0024] Furthermore, the keel and the square wood arranged therein are correspondingly provided with connecting holes, the connecting studs pass through the connecting holes, and the upper ends of the connecting studs are larger than the hole diameter of the connecting holes and sink into the square wood, so that the upper surface of the keel is flush.
[0025] Furthermore, a cover plate is provided above the keel, which is an inverted U-shaped groove structure and is welded or bonded to the upper surface of the keel.
[0026] Furthermore, the cover plate completely covers the upper surface of the keel and the ribs on both sides, ensuring that the upper surface and the side edges are flat and neat.
[0027] Furthermore, the movable card is a long sheet structure, the outer surface of which is a long elliptical structure, and a movable groove is provided in the middle position; and the movable card can rotate freely on the hook plate.
[0028] Furthermore, the connecting stud can be replaced with a cylindrical plug with a plug hole, and the corresponding locking nut at the lower end of the connecting stud that plays a tightening role can be replaced with a plug piece.
[0029] Beneficial effects: The present invention provides a template keel structure for construction. After adopting the present invention, the construction and installation are simple, convenient and fast, and the disassembly is also convenient. The template will not fall off freely, which protects the template and enhances the safety of the project. The group unit demolding can be completed independently without the cooperation of multiple people, which greatly improves the project efficiency, saves time, saves a lot of manpower and material resources, and has good project quality.
[0030] The present invention discloses a keel structure for building formwork, which particularly adopts a structure of hollow profiles and square wood, thereby reducing the weight of the keel while ensuring the support of the keel; moreover, the hook assembly can be used flexibly, is not easily lost when assembled on the keel, can be directly installed and used, and parts will not be lost when disassembling, thus avoiding the trouble of looking for parts everywhere during the next assembly, and saving the time of assembly and disassembly.
[0031] The special design of the hook plate facilitates the fixing and removal of the template. The hook plate is specially designed so that the lower end of the side guard assembly is longer than the lower end height of the profile. By setting a movable card, the template head is mounted on the movable card during installation, and the movable card can be rotated during removal to separate the movable card from the template head, so that a gap is left between the bottom plate of the hook plate and the bottom of the keel. This ensures that the template head of the connected template can leave a movable gap between the hook plate and the concrete poured above, which is convenient for rotation and removal operations.
[0032] The template of the present invention adopts this structure, and its specially designed template head is a folding structure with a semi-closed cross-section. Its multiple folds form a G-shaped folding structure, and each fold is perpendicular to each other; the fold is integrally hung on the inner side of the hook head of the hook plate and can only be rotated 90 degrees upward and downward on the hook plate. Due to the existence of the hook head and the docking with the folded edge, a hanging is formed and it will not fall off, which ensures construction safety while facilitating disassembly. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The drawings are not intended to be drawn to scale. In the drawings, each identical or nearly identical component shown in various figures may be represented by the same reference numeral. For clarity, not every component is labeled in every figure. Embodiments of various aspects of the present invention will now be described by way of example and with reference to the accompanying drawings, in which:
[0034] Figure 1 It is a schematic diagram of the three-dimensional structure of the keel structure of the present invention.
[0035] Figure 2 It is a schematic diagram of the structural decomposition of each part of the keel structure of the present invention.
[0036] Figure 3 for Figure 1 Schematic diagram from top view.
[0037] Figure 4 for Figure 1 Center main view schematic.
[0038] Figure 5 for Figure 1 Center left schematic view.
[0039] Figure 6 for Figure 2 Schematic diagram of the middle hook assembly.
[0040] Figure 7 for Figure 2 Schematic diagram of the middle side guard assembly.
[0041] Figure 8 It is a schematic diagram of the template structure used in conjunction with the present invention.
[0042] Fig. 9The present invention is a schematic diagram of the assembly structure of the structure and the matching template during concrete pouring.
[0043] Fig.10 It is a schematic diagram of disassembling the structure of the present invention and the matching template after the concrete solidifies.
[0044] In the figure, the meanings of the reference numerals are as follows: 1, keel; 101, connection hole; 103, square wood; 2, cover plate;
[0045] 3. Hook assembly; 31. Connecting stud; 32. Movable card; 33. Hook plate; 34. Locking nut; 311. Fixing plate; 321. Movable groove; 331. Hook head; 332. Stud hole;
[0046] 4. side guard assembly; 41. side guard; 42. support plate; 43. gusset plate; 44. plug connector; 45. plug hole; 46. protrusion; 47. docking hole;
[0047] 8. Special formwork; 9. Formwork head; 91. First folding edge; 92. Second folding edge; 93. Third folding edge; 10. Support screw; 11. Cast-in-place concrete. DETAILED DESCRIPTION
[0048] In order to better understand the technical content of the present invention, specific embodiments are cited and described as follows in conjunction with the accompanying drawings. Various aspects of the present invention are described in this disclosure with reference to the accompanying drawings, in which many illustrative embodiments are shown. The embodiments of the present disclosure are not necessarily defined to include all aspects of the present invention. It should be understood that the various concepts and embodiments introduced above, as well as those described in more detail below, can be implemented in any of many ways, because the concepts and embodiments disclosed in the present invention are not limited to any implementation. In addition, some aspects disclosed in the present invention can be used alone, or in any appropriate combination with other aspects disclosed in the present invention.
[0049] See also Figure 1-7 The present invention discloses a template keel structure for construction, comprising a keel 1 of a metal structure, a hook assembly 3 fixed under the keel 1, and a side block assembly 4 arranged on the left and right sides of the keel 1 for sealing and connecting;
[0050] The keel 1 is a hollow square cross-section profile filled with square wood 103 ; the keel 1 has connecting holes 101 running through the upper and lower surfaces, and the square wood 103 embedded in the keel 1 is provided with holes corresponding to the connecting holes 101 .
[0051] The hook assembly 3 includes a connecting stud 31 inserted into the keel 1 and protruding downward from the keel 1, a movable card 32 sequentially hung on the connecting stud 31, a hook plate 33, a locking nut 34, and a fixing plate 311 welded at the lower end of the connecting stud 31;
[0052] The hook plate 33 provided below the keel 1 is a symmetrical structure and is vertically fixed below the keel 1, and both ends of the hook plate 33 are tilted upward to form a hook head 331 structure, and the hook head 331 structure is used to dock and fix with the template head 9 of the corresponding special template 8;
[0053] The edge guard assembly 4 includes a guard edge 41, which seals both ends of the keel 1, and the guard edge 41 extends downward to protrude from the lower surface of the keel 1, and a support plate 42 is provided at the extension of the guard edge 41 and connected to the lower surface of the keel 1;
[0054] The hook assembly 3 is provided in one or more groups in the middle of the keel 1. In this embodiment, four groups are provided. Figure 1 , Figure 2 shown.
[0055] Preferably, four groups of hook components are arranged on the keel and are symmetrically arranged in the middle position of the keel.
[0056] See also Figure 6 , is a schematic diagram of the hook assembly assembly of the structure of the present invention. Preferably, the hook assembly 3 includes a long hook plate 33, and hook heads 331 formed by bending upward at both ends of the hook plate 33, and a stud hole 332 is provided in the middle of the hook plate 33, through which the connecting stud 31 passes; after the connecting stud 31 passes through the keel 1 and the square wood 103 in the keel 1, it passes through the movable card 32 and the hook plate 33 in sequence, and then the locking nut 34 is installed thereon, and finally a fixing plate 311 is welded at the bottom end of the connecting stud 31, and the function of the fixing plate 311 is to prevent the locking nut 34 and other components on the connecting stud 31 from falling off.
[0057] See also Figure 7 , which is a schematic diagram of the assembly of the side guard assembly of the structure of the present invention. Preferably, the side guard assembly 4 also includes a gusset plate 43 connecting the support plate 42 and the side guard 41, the gusset plate 43 is vertically welded below the support plate 42, and the plug connector 44 protruding from the front end of the gusset plate 43 corresponds to the plug hole 45 provided on the side guard 41, and is welded together. Preferably, the front end of the support plate 42 connected to the side guard 41 is also protrudingly provided with a plug connector 44, which is inserted into the side guard 41 for fixed welding connection.
[0058] Preferably, a protrusion 46 is provided at the lowermost end of the outer side surface of the retaining edge 41; and a docking hole 47 for connection is provided on the retaining edge 41. The docking hole 47 is provided on the retaining edge 41 to facilitate connection and fixation with the top support, and can be connected by bolts or pins; it is convenient for the keel structure to overlap and cooperate with other building structures.
[0059] The protrusion 46 arranged on the outer surface of the lower end of the retaining edge 41 is arranged on the outer surface to avoid the two surfaces from being tightly fitted and stuck when connected and fixed with the top support, leaving a movable space for easy installation and disassembly.
[0060] Preferably, the keel 1 and the square wood 103 arranged therein are correspondingly provided with connecting holes 101, and the connecting stud 31 passes through the connecting hole 101, and the upper end projection area of the connecting stud 31 is larger than the inner diameter of the connecting hole 101 and sinks into the square wood 103, so that the upper surface of the keel 1 is flush.
[0061] See also Figure 1 , Figure 2 Preferably, a cover plate 2 is provided above the keel 1, which is an inverted U-shaped groove structure and is welded or bonded to the upper surface of the keel 1; the cover plate 2 completely covers the upper surface of the keel 1 and the retaining edges 41 on both sides, ensuring that the upper surface and the side edges are flat and neat. In this way, the keel structure is ensured to be flat and neat during the splicing process with other building structures.
[0062] Preferably, the movable card 32 is a long sheet structure, and its outer surface is an oblong structure, and a movable groove 321 is provided in the middle position thereof; and the movable card 32 can rotate freely on the hook plate 33 .
[0063] Preferably, the connecting stud 31 can be replaced with a cylindrical plug with a plug hole, and the corresponding locking nut 34 at the lower end of the connecting stud 31 for fastening can be replaced with a plug. This method is not illustrated and described in this application, but in actual process, a cylindrical or other similar plug structure can be selected as needed, and as long as the purpose of the present invention can be achieved, the structure should be within the protection scope of the present invention.
[0064] See also Figure 8-10 , Figure 8 This is a schematic diagram of the template structure used in conjunction with the present invention. Fig. 9 This is a schematic diagram of the assembly structure of the structure of the present invention and the matching template during concrete pouring. Fig.10 It is a schematic diagram of disassembling the structure of the present invention and the matching template after the concrete solidifies.
[0065] The template structure of the present invention is used for Figure 8 The template 8 in the template is assembled and installed, and the above-mentioned template keel structure is adopted, and the keel structure is used as the connecting seat of the template; the top supports connected to the two ends of the keel structure, and the support screws 10, support nuts, support sleeves, etc. connected in sequence below the top supports.
[0066] The template 8 is hung on the hook 331 of the hook plate 33 of the keel 1 through the template head 9 set at its front end. Figure 8 , Fig. 9Schematic diagram of the structure.
[0067] The template head 9 of the template 8 is a semi-closed folding structure in cross section, which is bent downward and then horizontally bent inward to form a first folding edge 91, and then vertically bent upward to form a second folding edge 92, and then bent vertically outward to form a third folding edge 93. Figure 8 , Fig. 9 Schematic diagram of the structure.
[0068] See also Figure 8 , Fig. 9 , the present invention adopts the following method when installing and disassembling the template: a method for disassembling and assembling the template with a keel structure, which is used to disassemble and assemble the template with a keel structure;
[0069] During installation: adjust the position of the hook plate 33 to make it perpendicular to the keel 1, and adjust the fixing piece 311 on the hook plate 3 to overlap with the hook plate 33; then insert the template head 9 of the template 8 into the hook plate 33 of the keel 1, and press on the fixing piece 311 at the same time; and ensure that the hook head 331 blocks the outside of the second folded edge 92 of the template head 9; see Fig. 9 The present invention is a schematic diagram of the assembly structure of the structure and the matching template during concrete pouring.
[0070] When disassembling: after the cast-in-place concrete 11 above solidifies, remove the locking structure at one end of the template 8, and rotate the fixing plate 311 to make it perpendicular to the hook plate 33, that is, let the template head 9 of the template 8 break away from the supporting effect of the fixing plate 311; when adjusting, adjust the locking nut 34 under the hook plate 33 to loosen it slightly before rotating the fixing plate 311;
[0071] Then remove the other end of the template 8, and make sure that the end of the template 8 with the template head 9 is hung on the hook head 331, so that the template 8 will be vertically rotated 90 degrees under the action of gravity, and finally the hook head 331 is blocked outside the third folded edge 93 of the template 8, and the template 8 is lowered from the horizontal position to the vertical position; at this time, the connection relationship between the template 8 and the hook plate 33 on the keel 1 is shown in FIG. Fig.10 .
[0072] Finally, the template 8 is lifted upwards, and the template head 9 is allowed to slide over the hook head 331 and then the template 8 is removed, thus completing the removal of the template.
[0073] The present invention adopts the template disassembly and assembly method with the keel structure. After the concrete above is solidified, the locking structure of the latch box at one end of the template is disassembled, and the template falls off a certain distance H downward; then the other end of the template is disassembled, and it is ensured that the end of the template with the template head is hung on the hook head, so that the template will be vertically rotated 90 degrees under the action of gravity, and finally the hook head blocks the outside of the third folded edge of the template, and the template is lowered from the horizontal position to the vertical position; finally, the template is lifted up, and the template head is allowed to slide over the hook head and then the template is removed, and the disassembly of the template is completed.
[0074] This method requires only one-person operation, which completely changes the previous method in which the template needed the cooperation of multiple people to disassemble and the template was exposed to gravity during the disassembly process. After loosening a locking connection, the template is rotated 90 degrees and hung on the keel, ensuring construction safety and protecting the template from falling, avoiding damage to itself due to falling gravity.
[0075] It should be noted that, in this article, the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.
[0076] This article uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. The above is only a preferred implementation of the present invention. It should be pointed out that due to the limitations of textual expression and the objective existence of infinite specific structures, ordinary technicians in this technical field can make several improvements, modifications or changes without departing from the principles of the present invention, and can also combine the above technical features in an appropriate manner; these improvements, modifications, changes or combinations, or the direct application of the inventive concept and technical solution to other occasions without improvement, should be regarded as the protection scope of the present invention.
Claims
1. A formwork keel structure for construction, characterized in that: include: A metal structure keel, a hook assembly fixed under the keel, and side guard assemblies arranged on the left and right sides of the keel for sealing and connecting; the keel is a hollow square cross-section profile filled with square wood; The hook assembly includes a connecting stud inserted into the keel and protruding downward from the keel, a movable card, a hook plate, a locking nut, and a fixing plate welded at the lower end of the connecting stud. The hook plate arranged under the keel is a symmetrical structure and is vertically fixed under the keel, and both ends of the hook plate are tilted upward to form a hook structure; The edge guard assembly includes a guard edge, which seals both ends of the keel and extends downward to protrude from the lower surface of the keel. A support plate is provided at the extension of the guard edge and is connected to the lower surface of the keel. The hook components are arranged in one or more groups in the middle of the keel.
2. A building formwork keel structure according to claim 1, characterized in that: The hook components are arranged in four groups on the keel and are symmetrically arranged in the middle position of the keel.
3. A building formwork keel structure according to claim 1, characterized in that: The hook assembly includes a long hook plate and hook heads formed by bending upwards at both ends of the hook plate. A stud hole is provided in the middle of the hook plate, and the connecting stud passes through it; after the connecting stud passes through the keel and the square wood in the keel, it passes through the movable card and the hook plate in turn, and then the locking nut is installed, and finally a fixing plate is welded to the lower end of the connecting stud.
4. A building formwork keel structure according to claim 1, characterized in that: The edge retaining assembly also includes a support angle plate connecting the support plate and the retaining edge. The support angle plate is vertically welded below the support plate, and the plug connector protruding from the front end of the support angle plate corresponds to the plug hole set on the retaining edge and is welded together.
5. A building formwork keel structure according to claim 1, characterized in that: A protrusion is arranged at the lowermost end of the outer side surface of the retaining edge, and a docking hole for connection is arranged on the retaining edge.
6. A building formwork keel structure according to any one of claims 1 to 5, characterized in that: The keel and the square wood arranged therein are correspondingly provided with connection holes, the connection studs pass through the connection holes, and the upper ends of the connection studs are larger than the inner diameter of the connection holes and sink into the square wood, so that the upper surface of the keel is flush.
7. A building formwork keel structure according to any one of claims 1 to 5, characterized in that: A cover plate is arranged above the keel, which is an inverted U-shaped groove structure and is welded or bonded to the upper surface of the keel.
8. A building formwork keel structure according to claim 7, characterized in that: The cover plate completely covers the upper surface of the keel and the ribs on both sides, ensuring that the upper surface and the side edges are flat and neat.
9. A building formwork keel structure according to any one of claims 1 to 5, characterized in that: The movable card is a long sheet structure, the outer surface of which is a long elliptical structure, and a movable groove is arranged in the middle position; and the movable card can rotate freely on the hook plate.
10. A building formwork keel structure according to any one of claims 1 to 5, characterized in that: The connecting stud can be replaced by a cylindrical plug with a plug hole, and the corresponding locking nut at the lower end of the connecting stud that plays a tightening role can be replaced by a plug piece.