Underground floor-adding replacement structure using existing building foundation structure and its construction method

By using the original engineering piles and structural columns to build a temporary steel column and underpinning beam structure, the problem of underpinning the superstructure in the underground space addition reconstruction was solved, the construction time and cost were shortened, and the basement was effectively expanded and waterproofed.

CN114635580BActive Publication Date: 2024-10-25SHANGHAI GEOTECHN INVESTIGATIONS & DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210230262.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-09
Publication Date
2024-10-25
Estimated Expiration
2042-03-09

AI Technical Summary

Technical Problem

In the existing technology, during the process of adding layers to the underground space, the original foundation floor needs to be removed, which makes it difficult to underpin the superstructure. The construction is difficult, the construction period is long and the cost is expensive.

Method used

The original engineering piles and structural columns combined with temporary steel columns and underpinning beams are used as the force transmission structure to hold up the superstructure. Core holes are drilled in the original engineering piles through drilling equipment, steel pipes are inserted and filled with concrete to form steel columns, and fixed Connect the original engineering piles and build underpinning beams to realize the building replacement. Then the original structural columns and underpinning beams are removed to complete the basement addition.

Benefits of technology

It effectively shortens the construction time, reduces costs, and utilizes the original structure to achieve basement expansion. The steel columns have good compression and bending resistance, and the underpinning beams have excellent bending resistance, ensuring load transfer and waterproofing of the new basement floor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114635580B_ABST
    Figure CN114635580B_ABST
Patent Text Reader

Abstract

The present invention discloses an underground floor-adding underpinning structure and a construction method thereof using an existing building foundation structure, wherein the underpinning structure comprises a plurality of structural units, each structural unit corresponds to an original structural column, and comprises: at least two horizontal underpinning beams surrounding the original structural column and fixedly connected to the original structural column, which are removed after the transformation is completed; wherein each underpinning beam is provided with a rigid support column, which vertically supports and fixedly connects the underpinning beam, and the rigid support column is inserted downward and fixedly connected to the original engineering pile corresponding thereto; during construction, after all structural units of the underground floor-adding underpinning structure are deployed in place, the stage of building the underground floor-adding is entered, and the underpinning structure is used to realize the casting of the new underground floor-adding structure and connect the original basement structure. The present invention utilizes the original engineering piles and structural columns, and arranges temporary steel columns and underpinning beams as force transmission structures therebetween, to jointly support the upper building, thereby solving the problem of temporary underpinning of the upper building.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building engineering, and in particular to an underground floor-adding underpinning structure and a construction method utilizing an existing building foundation structure. Background Art

[0002] At present, the existing underground space of a large number of old communities and public places in the city center cannot meet the growing demand for use, and the problem of adding floors to the underground space of existing buildings is imperative. Since the original foundation slab needs to be removed during the underground space addition and renovation, and the upper building usually needs to be retained, the upper building faces the problem of underpinning.

[0003] The existing technical method uses new engineering piles to complete the replacement of the upper building. This technical method is often restricted by the protection of existing buildings, and its construction is difficult, the construction period is long, and the cost is high. Summary of the invention

[0004] The purpose of the present invention is to provide an underground floor-adding replacement structure and a construction method thereof that utilizes the existing building foundation structure, utilizes the original engineering piles and structural columns to complete the upper building replacement, realizes the basement expansion and floor-adding reconstruction, saves construction time and cost, and creates good social benefits.

[0005] The object of the present invention is achieved as follows: an underground floor-adding underpinning structure utilizing an existing building foundation structure comprises a plurality of structural units, each structural unit corresponding to an original structural column, and comprising:

[0006] At least two horizontal underpinning beams that surround and are fixedly connected to the original structural columns and are removed after the renovation is completed;

[0007] Wherein, each underpinning beam is provided with a rigid support column, which vertically supports and is fixedly connected to the underpinning beam, and the rigid support column is inserted downward and fixedly connected to the original engineering pile corresponding to it.

[0008] Furthermore, the rigid support column is configured as a vertical steel column, and the steel column is formed by fixing a steel pipe and in-tube concrete filled in the steel pipe.

[0009] Furthermore, the replacement beam is a reinforced concrete component, one end face of the replacement beam is a rough surface and fixedly connected to the roughened surface of the original structural column, and a plurality of side connecting bars inserted into the replacement beam and the original structural column are provided at the portion where the replacement beam and the original structural column are connected.

[0010] Furthermore, the underpinning structure also includes a coring hole drilled in the original engineering pile by a hole-drilling device, and the steel column is coaxially inserted downward into the coring hole of the original engineering pile, and its outer wall is fixedly bonded to the inner wall of the coring hole.

[0011] Furthermore, the steel column is located inside the steel bar structure of the original engineering pile.

[0012] The underpinning structure of the present invention plays the following role: utilizing the original engineering piles and structural columns, with temporary steel columns and underpinning beams arranged therebetween as force transmission structures, to jointly support the upper building, thereby solving the problem of temporary underpinning of the upper building.

[0013] As another aspect of the present invention, a construction method is proposed, comprising the following steps:

[0014] S1. Use drilling equipment to penetrate the original basement floor and drill core holes in the original engineering piles;

[0015] S2. Lower the steel pipe to the designed elevation and insert it into the core hole of the original engineering pile;

[0016] S3, filling the steel pipe with concrete to form a steel column, and fixing the original engineering pile with the steel column;

[0017] S4. Cast the underpinning beam on the side wall of the original structural column, support the upper end of the steel column and insert the underpinning beam to the designed elevation;

[0018] Repeat steps S1 to S4, and after all structural units of the underground floor-adding support structure are deployed in place, enter the stage of constructing the underground floor-adding.

[0019] Furthermore, the stage of constructing the underground layer addition includes the following steps:

[0020] S5. Remove the part of the original structural column under the replacement beam and the original basement floor, then excavate to the design elevation of the new basement to form the bottom surface of the new basement floor, and cut off the part of the original engineering pile above the bottom surface of the new basement floor;

[0021] S6. Install a water-stop steel sheet vertically fixed to the steel column, and pour a new basement floor slab so that the water-stop steel sheet is within the structure of the new basement floor slab;

[0022] S7. After the new basement floor reaches the designed strength, pour the new underground floor structure and connect it to the original basement structure;

[0023] S8. After the new underground floor reaches the designed strength, the supporting beams and steel columns are removed to complete the renovation of the basement floor;

[0024] In step S7, new structural columns are cast, the new structural columns are supported and fixedly connected to the original structural columns, and the bottoms of the new structural columns are fixedly connected to the new basement floor as a whole.

[0025] The beneficial effects of the present invention are:

[0026] 1. It can make full use of the original engineering piles and original structural columns, greatly shorten the construction time, reduce the construction cost, and create good social benefits;

[0027] 2. The steel column has good compression, bending and compression buckling resistance, and the underpinning beam has good bending resistance, which can transfer the load of the upper building to the original engineering piles. In addition, the steel column is convenient for setting water-stop steel sheets, which is beneficial to the waterproofing of the new basement floor. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 The invention discloses an underground floor-adding and underpinning structure diagram utilizing an existing building foundation structure.

[0029] Figure 2 yes Figure 1 Middle aa section view.

[0030] Figure 3 yes Figure 1 Middle bb cross-sectional view.

[0031] Figure 4 This is a schematic diagram of the original basement structure.

[0032] Figure 5 yes Figure 4 1-1 cross-sectional view in.

[0033] Figure 6 It is a schematic diagram of drilling and coring in the original basement floor.

[0034] Figure 7 yes Figure 6 Sectional view 2-2 in.

[0035] Figure 8 It is a schematic diagram of lowering steel pipes.

[0036] Fig. 9 yes Figure 8 Sectional view 3-3 in.

[0037] Fig.10 It is a schematic diagram of the layout of steel columns.

[0038] Fig.11 yes Fig.10 Section view 4-4 in.

[0039] Fig.12 It is a schematic diagram of casting the underpinning beam.

[0040] Fig.13 It is a schematic diagram of chiseling out the original basement floor and the parts of the original structural columns under the replacement beams and excavating to the bottom surface of the new basement floor.

[0041] Fig.14 This is a schematic diagram of installing waterstop steel plates and pouring a new basement floor.

[0042] Fig.15 It is a schematic diagram of the pouring of the new underground three-story structure after the new base slab reaches the designed strength.

[0043] Fig.16 This is a schematic diagram of the completed basement floor renovation.

[0044] In the figure, 1 original engineering piles, 1a pile longitudinal reinforcement, 1b spiral hoops, 2 steel columns, 2a steel pipes, 2b concrete in pipes, 3 replacement beams, 4 original structural columns, 4a roughened surface, 5 side connecting bars, 6 original first underground floor top plate, 7 original second underground floor top plate, 8 original basement floor plate, 9 water-stop steel sheets, 10 bottom surface of new basement floor plate, 11 new basement floor plate, 12 reserved reinforcement bars, and 13 new structural columns. DETAILED DESCRIPTION

[0045] The following is combined with Figure 1-16 The present invention is further illustrated with reference to the accompanying drawings and specific embodiments.

[0046] The application scenarios of this embodiment are as follows:

[0047] like Figure 4 , 5 As shown, before the reconstruction, the original basement had only two floors, that is, only the original first underground floor top plate 6 and the original second underground floor top plate 7, which were fixedly connected and supported by a number of vertical original structural columns 4. The original basement floor plate 8 was provided at the bottom of the space of the second underground floor. The original basement floor plate 8 supported and fixedly connected the bottom of the original structural columns 4. A number of original engineering piles 1 deep into the underground foundation were fixedly connected to the bottom of the original basement floor plate 8, as shown in FIG. Figure 5 As shown, the reinforcement structure of the original engineering pile 1 is composed of pile longitudinal reinforcement 1a and spiral hoops 1b.

[0048] In order to add a third underground floor on the basis of the original basement, Figure 1 , 2 As shown, in this embodiment, an underground floor-adding replacement structure using an existing building foundation structure is used, including a plurality of structural units, each structural unit corresponding to an original structural column 4, which includes:

[0049] Two horizontal underpinning beams 3 surrounding the original structural column 4 and fixedly connected to the original structural column 4 are removed after the reconstruction is completed, so that the underpinning beams 3 and the original structural column 4 are connected to form a reinforced node.

[0050] Among them, each replacement beam 3 is provided with a rigid support column, which vertically supports and fixes the replacement beam 3, so that the above-mentioned reinforcement node has a stable support foundation, and the rigid support column is inserted downward and fixedly connected to the corresponding original engineering pile 1. After the transformation is completed, only the part of the rigid support column inserted into the new basement floor 11 is left.

[0051] As a preferred solution of this embodiment, Figure 1 , 2 As shown, the rigid support column is set as a vertical steel column 2, which is fixedly combined by a steel pipe 2a and a tube concrete 2b filled in the steel pipe 2a. The steel column 2 is coaxially fixedly inserted into the core hole pre-set in the original engineering pile 1, and its outer wall is fixedly bonded to the inner wall of the core hole by a special adhesive. The steel column 2 is inside the steel structure of the original engineering pile 1 to ensure the structural strength. The steel column 2 has good compression, bending and compression buckling resistance, and the underpinning beam 3 has good bending resistance, which can transfer the load of the upper building to the original engineering pile 1.

[0052] As a preferred solution of this embodiment, Figure 1 , 3 As shown, the underpinning beam 3 is a reinforced concrete member, one end face of the underpinning beam 3 is a rough surface and is fixedly connected to the roughened surface 4a of the original structural column 4, and a plurality of side connecting ribs 5 inserted into the underpinning beam 3 and the original structural column 4 are provided at the portion where the underpinning beam 3 and the original structural column 4 are connected.

[0053] View in sequence Figure 4-16 This embodiment discloses a preferred construction method for underground floor-adding and underpinning using an existing building foundation structure, which comprises the following steps:

[0054] S1, such as Figure 6 , 7 As shown, a hole is drilled in the original basement floor 8 by means of a hole-drilling device, and the hole-drilling device passes through the original basement floor 8 to remove part of the concrete in the middle of the original engineering pile 1, thereby leaving a core hole in the original engineering pile 1. The steel bar structure of the original engineering pile 1 is composed of pile longitudinal steel bars 1a and spiral hoops 1b. The core hole is located inside the steel bar structure and is as coaxial as possible with the original engineering pile 1.

[0055] S2, such as Figure 8 , 9 As shown, the sediment at the bottom of the core hole is cleaned and made as flat as possible, and then the steel pipe 2a is passed downward through the hole opened by the hole-opening device and inserted into the core hole of the original engineering pile 1, that is, the steel pipe 2a is lowered to the designed elevation so that the bottom of the steel pipe 2a presses the bottom of the core hole. At this time, the upper end of the steel pipe 2a is below the original top plate 7 of the second underground floor;

[0056] S3, such as Fig.10 , 11 As shown, the steel pipe 2a is filled with concrete to form a steel column 2, and the original engineering pile 1 and the steel column 2 are firmly bonded with high-strength grouting material, so that the original engineering pile 1 and the steel column 2 are fixedly combined;

[0057] S4, such as Figure 3 , 12As shown, the surface of the original structural column 4 is roughened and a number of side connecting ribs 5 are implanted, and then two replacement beams 3 are cast. The two replacement beams 3 extend horizontally to the two outer sides based on the original structural column 4, wherein the upper ends of the two steel columns 2 respectively support and insert the two replacement beams 3 until the designed elevation.

[0058] Repeat steps S1 to S4 to deploy all structural units of the underground floor-adding support structure, and then enter the stage of building the underground floor-adding. In the stage of building the underground floor-adding, the following steps need to be performed:

[0059] S5, such as Fig.13 As shown, after the strength of the underpinning beam 3 reaches the design requirement, the portion of the original structural column 4 under the underpinning beam 3 and the original basement floor 8 are chiseled out, and a number of reserved steel bars 12 (which may be the longitudinal steel bars originally present in the original structural column 4, or implanted steel bars) are left when the portion of the original structural column 4 under the underpinning beam 3 is chiseled out, so as to fix and connect the new structural column 13 later, and then excavate to the position of the design elevation of the new basement to form the bottom surface 10 of the new basement floor, and cut off the portion of the original engineering pile 1 above the bottom surface 10 of the new basement floor;

[0060] S6, such as Fig.13 , 14 As shown, a water-stop steel sheet 9 vertically fixedly connected to the steel column 2 is provided, and a new basement floor 11 is cast based on the bottom surface 10 of the new basement floor, so that the water-stop steel sheet 9 is in the structure of the new basement floor 11;

[0061] S7, such as Fig.15 As shown, after the new basement floor 11 reaches the design strength, the new underground three-story structure is cast and connected to the original basement structure. In this step, the new underground three-story top plate and several new structural columns 13 need to be cast. The steel column 2 passes through the new underground three-story top plate. The new underground three-story top plate is located directly above the new basement floor 11. The new structural column 13 is supported and fixedly connected to the original structural column 4, and the bottom of the new structural column 13 is fixedly combined with the new basement floor 11 as a whole;

[0062] S8, such as Fig.16 As shown, after the new third underground floor reaches the designed strength, the underpinning beam 3 is removed, and the portion of the steel column 2 above the new basement floor 11 is cut off, so that the upper surface of the new basement floor 11 is flush, thereby completing the basement floor addition reconstruction.

[0063] The above are preferred embodiments of the present invention. A person skilled in the art may make various changes or improvements on this basis. Without departing from the general concept of the present invention, these changes or improvements should fall within the scope of protection required by the present invention.

Claims

1. A construction method for underground floor addition and replacement using the existing building foundation structure. It is characterized in that The steps include: S1, using a hole-drilling device to penetrate the original basement floor (8) and drill a core hole in the original engineering pile (1); S2, lowering the steel pipe (2a) to the designed elevation, so that the steel pipe (2a) is inserted into the core hole of the original engineering pile (1); S3, filling the interior of the steel pipe (2a) with concrete to form a steel column (2), and fixing the original engineering pile (1) and the steel column (2) together; S4, pouring a replacement beam (3) on the side wall of the original structural column (4), so that the upper end of the steel column (2) supports and inserts the replacement beam (3) to the designed elevation; Repeat steps S1 to S4 until all structural units of the underground floor-adding support structure are in place, and then enter the stage of constructing the underground floor-adding; The phase of building the underground addition includes the following steps: S5, chiseling away the portion of the original structural column (4) below the underpinning beam (3) and the original basement floor (8), then excavating to the position of the designed elevation of the new basement to form the bottom surface of the new basement floor (10), and cutting off the portion of the original engineering pile (1) above the bottom surface of the new basement floor (10); S6. A water-stop steel sheet (9) vertically fixedly connected to the steel column (2) is provided, and a new basement floor slab (11) is cast, so that the water-stop steel sheet (9) is located within the structure of the new basement floor slab (11); S7, after the new basement floor (11) reaches the designed strength, a new underground floor structure is cast and connected to the original basement structure. In step S7, a new structural column (13) is cast, the new structural column (13) is supported and fixedly connected to the original structural column (4), and the bottom of the new structural column (13) is fixedly combined with the new basement floor (11) as a whole; S8. After the new underground floor reaches the designed strength, the support beam (3) and the steel column (2) are removed to complete the renovation of the basement floor.

2. An underground floor-adding replacement structure that utilizes the existing building foundation structure. It is characterized in that It is used to execute the method according to claim 1, comprising a plurality of structural units, each structural unit corresponding to an original structural column (4), and comprising: At least two horizontal underpinning beams (3) surrounding the original structural column (4) and fixedly connected to the original structural column (4) and removed after the reconstruction is completed; Each underpinning beam (3) is provided with a rigid support column, the rigid support column vertically supports and is fixedly connected to the underpinning beam (3), and the rigid support column is inserted downward and fixedly connected to the original engineering pile (1) corresponding to it.

3. According to claim 2, an underground floor-adding underpinning structure utilizing an existing building foundation structure, It is characterized in that The rigid support column is a vertical steel column (2), and the steel column (2) is formed by fixedly combining a steel pipe (2a) and in-pipe concrete (2b) filled in the steel pipe (2a).

4. According to claim 2, an underground floor-adding underpinning structure utilizing an existing building foundation structure, It is characterized in that The underpinning beam (3) is a reinforced concrete member, one end face of the underpinning beam (3) is a rough surface and is fixedly connected to the roughened surface (4a) of the original structural column (4), and a plurality of side connecting bars (5) inserted into the underpinning beam (3) and the original structural column (4) are provided at the portion where the underpinning beam (3) and the original structural column (4) are connected.

5. According to claim 3, an underground floor-adding underpinning structure utilizing an existing building foundation structure, It is characterized in that It also includes a core hole drilled in the original engineering pile (1) by a hole-drilling device, and the steel column (2) is coaxially inserted downward into the core hole of the original engineering pile (1), and its outer wall is fixedly bonded to the inner wall of the core hole.

6. According to claim 3, an underground floor-adding underpinning structure utilizing an existing building foundation structure, It is characterized in that The steel column (2) is located inside the steel bar structure of the original engineering pile (1).