A precise gas extraction method based on quantitative optimization of mining fracture field

Through on-site testing and model construction, combined with microseismic monitoring and similar simulations, the drilling location is accurately located, and a flexible hole protection system is used to solve the problems of inaccurate gas drainage and drilling deflection in the existing technology, and achieve Efficient and precise extraction of gas from fissure zones.

CN114658475BActive Publication Date: 2024-10-29CHONGQING UNIV
View PDF 13 Cites 0 Cited by

Patent Information

Application Number
CN202210314171.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-28
Publication Date
2024-10-29
Estimated Expiration
2042-03-28

AI Technical Summary

Technical Problem

Existing technology is difficult to achieve precise gas extraction in fracture zones, and is prone to deflection during drilling, making it unable to effectively ensure fine quantification of the fracture field and flexible hole protection.

Method used

Determine the scope of the fracture zone through on-site testing, quantitatively characterize the mining fractures, construct a mining fracture block fracture model and a fractal interpolation comprehensive evaluation model, combine microseismic monitoring and similar simulation tests, accurately locate the drilling location, and adopt a flexible active hole protection system Carry out drilling construction.

Benefits of technology

It achieves precise and efficient gas extraction in the fissure zone, ensures precise positioning of borehole locations and continuity of extraction, and avoids borehole deflection and areas with poor gas extraction results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114658475B_ABST
    Figure CN114658475B_ABST
Patent Text Reader

Abstract

The invention provides a method for accurate gas extraction based on the quantitative optimization of mining fracture fields, including conducting field tests; determining the range of fracture zones according to the field test results; quantitatively characterizing mining fractures; constructing a comprehensive evaluation model of fractal interpolation of mining fractures to determine the optimal spatial coordinates of fracture blocks; and accurately positioning the final hole of a directional long borehole based on the quantification of fracture fields and the comprehensive evaluation results of fractal interpolation of mining fractures. The invention is based on the quantification of mining fracture fields, and by constructing a comprehensive evaluation model of fractal interpolation of mining fractures, it realizes the quantitative characterization optimization of mining fractures, and then accurately locates the final hole position of the fracture zone gas extraction drilling hole, and finally combines the flexible active hole protection method to construct a directional long borehole, so as to realize and ensure the continuous and efficient gas extraction of the fracture zone pressure relief.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of mining engineering, and in particular to a precise gas extraction method based on quantitative optimization of mining fracture fields. Background Art

[0002] my country is a country with abundant coal resources, as well as a large coal production and consumption country. Coal will continue to be the "backbone" of my country's energy in the future. The safe production of coal mines is restricted by many disasters such as gas. Gas extraction through long boreholes in fracture zones is one of the main technical means to control excessive gas in coal mines. During coal seam mining, the overburden collapses, moves, and generates a large number of cracks, causing the pressure-relief gas to change from an adsorbed state to a free state and continuously desorb. Therefore, studying the distribution and fine quantification of mining fractures is of great significance for achieving accurate positioning of the gas extraction position in the fracture zone. However, the traditional empirical formula calculation and positioning is not enough to achieve accurate gas extraction in the fracture zone, and it is also necessary to ensure that no deviation occurs during the drilling of the borehole. At present, it is urgent to consider the two aspects of fine quantification of the fracture field and flexible hole protection, so as to achieve accurate, efficient and continuous extraction of pressure-relief gas in the fracture zone.

[0003] Therefore, it is urgent to develop a precise gas extraction method based on quantitative optimization of mining fracture fields. Summary of the invention

[0004] The purpose of the present invention is to provide a precise gas extraction method based on quantitative optimization of mining fracture fields to solve the problems existing in the prior art.

[0005] A method for accurate gas extraction based on quantitative optimization of mining fracture fields, characterized by comprising the following steps:

[0006] 1) Conduct field testing;

[0007] 2) Determine the scope of the fracture zone based on the field test results;

[0008] 3) Quantitative characterization of mining-induced fractures;

[0009] 3.1) Based on the masonry beam theory, a mining fracture block model is constructed to calculate the key parameters of the overburden fractures in the mining area;

[0010] 3.2) Combined with similar simulation tests, the images of overburden collapse and crack development after mining are binarized, then gridded, and finally the mining crack parameters such as opening, angle, area, and frequency are counted;

[0011] 4) Construct a comprehensive evaluation model of mining fracture fractal interpolation and determine the optimal fracture block spatial coordinates based on the evaluation results;

[0012] 4.1) Use correlation dimension to calculate the fractal dimension of fracture parameter index and build a comprehensive evaluation model of fractal interpolation of mining fractures;

[0013] 4.2) Determine the optimal spatial coordinates of the fractured block based on the comprehensive evaluation results of the fractal interpolation of the mining fractures;

[0014] 5) Based on the comprehensive evaluation results of fracture field quantification and fractal interpolation of mining fractures, the final hole of directional long drilling is accurately located.

[0015] Furthermore, a method for accurate gas extraction based on quantitative optimization of mining fracture fields is characterized in that, in steps 1 to 2), the field test includes:

[0016] The height of the fracture zone is observed using a microseismic monitoring system;

[0017] a) Several anchors are arranged at the top plate of the bottom extraction tunnel. The installed diameter is 20 mm. The upper end of the anchor is inserted 5 m into the top plate rock layer. The anchor is arranged perpendicular to the top plate, and the distance between two adjacent anchors is 48 m.

[0018] b) On-site deployment of microseismic monitoring system. It is worth mentioning that the system mainly consists of 4 parts: sensors (data collection), monitoring substations (data acquisition servers), cable transmission systems (real-time transmission of measured data to the industrial ring network), and industrial control servers (data storage terminals, responsible for receiving data transmitted through the industrial ring network); sensors are arranged on the top plate of the bottom extraction tunnel, and each sensor is connected to the signal acquisition control port of the underground substation through a signal line. The signal is transmitted from the main station through the industrial ring network to the host server terminal arranged above the well, and the connection with the underground workstation and data transmission are realized through cables. The distance between sensors is 48m, and the overall monitoring period is about 15 to 30 days.

[0019] c) After the equipment is transported and installed, monitoring and data collection can be carried out in a trigger mode, that is, the sensors and acquisition equipment are started, and the monitoring data is transmitted from the microseismic sensors arranged in the bottom pumping lane to the underground workstation through cables, and then transmitted to the data storage and processing terminal through optical fibers;

[0020] d) After data collection, the rupture signal is identified and waveform recognition and calculation are performed. The spatial and energy distribution diagrams of microseismic events are drawn to analyze the density distribution of microseismic events along the strike and dip of the working face, and a distribution model of microseismic events in the overlying rock formation is constructed. Finally, the distribution of the fracture zone range is obtained based on the height position of the dense events.

[0021] Furthermore, after data collection, filtering processing is first performed, and then the rupture waveform is converted from a time domain diagram to a frequency domain diagram using fast Fourier transform to quickly identify the rupture signal; waveform recognition is then performed, and after the rock rupture signal is identified, it is necessary to manually pick up the arrival of P waves and S waves to achieve the positioning of the rock rupture signal and the quantitative calculation of the source parameters, identify effective rock rupture events through waveform characteristics, and filter out the interference of events such as production blasting and mechanical vibration; finally, quantitative calculation of microseismic events is performed; based on the results of previous data processing, the duration of P waves and S waves and the amplitude of the vibration wave velocity in the duration period are obtained, and various required parameters in the inversion formula are extracted for inversion calculation, and finally the source location and source energy are determined; thereby drawing the spatial and energy distribution diagram of microseismic events, analyzing the density distribution of microseismic events along the strike and dip of the working face, constructing a distribution model of microseismic events in the overlying rock formation, and finally obtaining the distribution of the fracture zone range based on the height position of the dense events.

[0022] Further, in step 3.1), the mining-induced fracture block fracture model is constructed based on the masonry beam theory to calculate the key parameters of the overburden fractures in the mining area, including:

[0023] Based on the mining crack block fracture model of masonry beam theory, through cyclic iterative calculation, the calculation formula of the separation crack area can be obtained as follows:

[0024]

[0025] Where: S n,i,i-1 is the area of ​​the iteration triangle; p n,i,i-1 is half the length of the three sides of the iterated triangle; b n,i,i-1 is the length of the AC side in the iteration triangle; a n,i,i-1 is the length of the BC side in the iteration triangle; l is the length of the block;

[0026] The calculation formula of the fracture gap area is:

[0027]

[0028] Where: S′ n,i,i-1 is the area of ​​the iteration triangle; θ 1,1 is the angle between the first block at the edge of the goaf of the first rock layer in the mining fracture zone and the horizontal direction; f is the block width;

[0029] It is worth noting that through the above two formulas, two types of fracture area distribution laws can be calculated, and Matlab programming can be used to realize the visualization of fracture area distribution; the steps mainly include: inputting the length and width of the block model, calculating the fracture area, and then normalizing the fracture area by dividing the fracture area at each location by the maximum fracture area to obtain the dimensionless fracture area distribution; both overburden delamination and fracture fractures are suitable for this method.

[0030] Further, in step 4.1), the fractal dimension of the fracture parameter index is calculated by using the correlation dimension to construct a comprehensive evaluation model of fractal interpolation of mining fractures, including:

[0031] a) Preprocess the mining fracture evaluation index data to eliminate the index dimension and unify the index change direction;

[0032] The crack opening, angle, area and frequency of the mining crack parameters are used as evaluation indicators of mining cracks, and the indicators are normalized.

[0033] b) Establish multidimensional phase space;

[0034] c) Calculate the distance and average distance between two points in each dimension of phase space;

[0035] d) Calculate the probability that the distance between two points in each dimension of phase space is less than or equal to the upper limit of the distance;

[0036] e) If a fractal exists, calculate the result;

[0037] f) Based on the calculated fractal dimension results of each indicator, a comprehensive evaluation model of fractal interpolation of mining-induced fractures is constructed.

[0038] Further, in step 4.2), the optimal fracture block space coordinates are determined based on the comprehensive evaluation results of the fractal interpolation of the mining fractures, including:

[0039] The mining fractures are regarded as a fractal set, and its internal parameters are composed of various evaluation indicators. The higher the correlation degree of the indicator, the greater its influence on the comprehensive evaluation of mining fractures, that is, the larger the fractal dimension, the more important the mining fracture evaluation indicator. Then, based on the fractal interpolation comprehensive evaluation model of mining fractures, a comprehensive evaluation is carried out. According to the evaluation results, multiple fracture parameter coordinates are obtained, and then the spatial coordinates of multiple fracture blocks are determined.

[0040] Further, in step 5), the final hole of the directional long drilling is accurately positioned based on the comprehensive evaluation results of the fracture field quantification and the fractal interpolation of the mining fractures, including:

[0041] a) Determine the overall rock collapse angle;

[0042] The roof collapse angle is determined based on the results of simulation experiments and numerical simulation experiments; the drilling holes are generally arranged inside the collapse angle;

[0043] b) Determine the step distance of collapse of different rock layers;

[0044] The displacement function of masonry beam structure is used for calculation;

[0045] c) Select reasonable layers and reasonable distances, and accurately locate the drilling positions;

[0046] Based on the comprehensive evaluation results of fracture field quantification and mining fracture fractal interpolation, multiple fracture parameter coordinates after evaluation and optimization were obtained, and then multiple fracture block space coordinates were determined; but it still needs to be corrected in combination with the geological column chart. It is worth noting that it is necessary to avoid arranging directional long boreholes in weak rock formations, and determine the reasonable layer position and reasonable distance of the arrangement position after correction, so as to achieve accurate positioning of the borehole arrangement position;

[0047] d) Optimization of drilling arrangement position;

[0048] Arrange one more borehole in the same layer to verify the effectiveness of the optimized borehole layout, compare the results, and combine the drilling field concentration and flow rate in the on-site gas extraction related data to screen and avoid some areas with poor gas extraction effects; further accurately determine the design parameters of directional long drilling holes in the mining fracture zone to obtain the optimized gas extraction borehole layout.

[0049] Furthermore, in step 5), after the final hole of the directional long drilling is accurately positioned, a construction drilling site is arranged in the working face trench, and a flexible active hole protection method is used to construct the directional long drilling.

[0050] Furthermore, after the final position of the directional long borehole is determined, several drilling sites are arranged in the trench of the working face where mining is to be carried out. According to the anti-burst design of the working face, directional long boreholes are constructed in the drilling sites along the working face in the reverse mining direction.

[0051] The directional long drilling hole includes a sealing section, a layer-penetrating hole section and a drainage hole section; the sealing section is connected from the working face coal seam drilling site to the lower end of the layer-penetrating hole section; the layer-penetrating hole section is located between the working face coal seam and the roof fracture zone; the trajectory of the layer-penetrating hole section is a curve; the drainage hole section is located in the roof fracture zone; the drainage hole section is connected with the upper end of the layer-penetrating hole section; the drilling tool system and the flexible hole protection system are used to construct the directional long drilling hole.

[0052] Furthermore, the drilling tool system includes a drill bit and a drill rod; the drill bit is installed at the head end of the drill rod; the drill bit has a central hole; the central hole is connected to the inner cavity of the drill rod; the flexible hole protection system includes a front end fixing device, a flexible water injection support pipe and a flexible hole protection bracket;

[0053] The flexible water injection support pipe is provided with a water injection hole on its wall; the front end of the flexible water injection support pipe is connected and fixed with a front end fixing device, and the rear end is connected with a hydraulic pump; the front end fixing device has a supporting hook; the supporting hook adopts a compression spring structure; the flexible water injection support pipe is arranged in the inner cavity of the drill rod; the front end fixing device is arranged in the central channel of the drill bit; the supporting hook of the front end fixing device is engaged with the inner wall of the central channel;

[0054] The flexible hole-protecting support is a mesh structure; the flexible hole-protecting support comprises a plurality of annular support tubes arranged in sequence along the longitudinal direction; each annular support tube comprises a plurality of unit waves, and the unit waves are arranged in sequence along the circumferential direction; two adjacent annular support tubes are distributed in mirror symmetry; two adjacent annular support tubes are fixedly connected between two opposite wave peaks; the inner cavities of the two adjacent annular support tubes are connected; the inner cavities of the plurality of annular support tubes constitute a pipe network structure;

[0055] In a non-working state, a flexible hole protection bracket in a contracted state is sleeved on the pipe body of a flexible water injection support pipe; the water injection hole is connected to the inner cavity of the pipe network of the flexible hole protection bracket; when working, the drilling tool system transports the flexible hole protection system to a preset position; the flexible hole protection bracket sleeve and the flexible water injection support pipe in a contracted state can both be directionally deflected along with the drilling; then the front end fixing device extends from the central channel of the drill bit; the support hook claw unfolds and embeds into the coal seam on the inner wall of the borehole; the drilling tool system is exited; the hydraulic pump injects high-pressure water into the flexible water injection support pipe; the flexible hole protection bracket is pressurized and expanded to support the directional long borehole; the flexible hole protection bracket is fully expanded at the outer arc part of the curved end, and the inner arc is not fully expanded, so as to fully fit the borehole wall and realize active hole protection for the curved end.

[0056] Furthermore, the end of the flexible support is connected to a sealing casing, and the diameter of the casing is slightly larger than the diameter of the shrinking support; after the support is deployed, clay is used inside the sealing casing for short-term sealing, and concrete is used outside the casing for permanent sealing and connected to a gas extraction pipe for gas extraction;

[0057] After the extraction meets the standards, the flexible hole protection system will be recovered; stop injecting high-pressure water into the flexible support, and after the support rebounds and returns to the contracted state after the pressure is released, disconnect the connection between the casing and the gas extraction pipe, break the short-term hole sealing in the sealing casing, remove the flexible support and water injection support pipe from the sealing casing, realize the recovery of the flexible hole protection system, and permanently seal the borehole.

[0058] The technical effects of the present invention are unquestionable:

[0059] A. Based on the comprehensive evaluation model of mining fracture fractal interpolation, the quantitative mining fracture parameters were comprehensively evaluated, and the quantitative characterization and optimization of mining fractures were realized;

[0060] B. Mining fissures are channels for the migration of decompression gas. Based on the quantification of mining fissures, the final position of the gas extraction drilling hole in the fracture zone can be accurately located, and the drilling arrangement can be optimized, which is conducive to the accurate and efficient extraction of decompression gas in the fracture zone;

[0061] C. The precise positioning of the final hole position of the directional long drilling hole in the fracture zone based on the quantification of the fracture field combined with the flexible active hole protection ensures the continuous and efficient gas extraction in the fracture zone after decompression. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] Figure 1 This is a flow chart of a method for accurate gas extraction based on quantitative optimization of mining fracture fields according to the present invention;

[0063] Figure 2 For the present invention Figure 1 A schematic flow chart showing the specific implementation of the method;

[0064] Figure 3 It is a structural schematic diagram of a similar simulation test device;

[0065] Figure 4 It is a schematic diagram of the microseismic system structure;

[0066] Figure 5 It is the theoretical model of mining fracture block and the schematic diagram of calculation results;

[0067] Figure 6 This is a schematic diagram of the structure of the flexible hole protection system for directional long drilling;

[0068] Figure 7 This is a schematic diagram of the flexible hole protection work for directional long drilling. DETAILED DESCRIPTION

[0069] The present invention is further described below in conjunction with the embodiments, but it should not be understood that the above subject matter of the present invention is limited to the following embodiments. Without departing from the above technical ideas of the present invention, various substitutions and changes are made according to the common technical knowledge and customary means in the art, which should all be included in the protection scope of the present invention.

[0070] Embodiment 1:

[0071] This embodiment provides a method for accurate gas extraction based on quantitative optimization of mining fracture fields, including the following steps:

[0072] 1) Conduct field testing;

[0073] 2) Determine the scope of the fracture zone based on the field test results;

[0074] 3) Quantitative characterization of mining-induced fractures (combining theoretical analysis and similar simulation to obtain mining-induced fracture parameters):

[0075] 3.1) Based on the masonry beam theory, a mining fracture block model is constructed to calculate the key parameters of the overburden fractures in the mining area;

[0076] 3.2) Combined with similar simulation tests, the images of overburden collapse and crack development after mining are binarized, then gridded, and finally the mining crack parameters such as opening, angle, area, and frequency are counted;

[0077] 4) Construct a comprehensive evaluation model of mining fracture fractal interpolation and determine the optimal fracture block spatial coordinates based on the evaluation results;

[0078] 4.1) Use correlation dimension to calculate the fractal dimension of fracture parameter index and build a comprehensive evaluation model of fractal interpolation of mining fractures;

[0079] 4.2) Determine the optimal spatial coordinates of the fractured block based on the comprehensive evaluation results of the fractal interpolation of the mining fractures;

[0080] 5) Based on the comprehensive evaluation results of fracture field quantification and fractal interpolation of mining fractures, the final hole of directional long drilling is accurately positioned.

[0081] Embodiment 2:

[0082] The main structure of this embodiment is the same as that of embodiment 1. Furthermore, in step 5), after the final hole of the directional long drilling is accurately positioned, a construction drilling site is arranged in the working face slot, and a flexible active hole protection method is used to construct the directional long drilling.

[0083] Embodiment 3:

[0084] The main structure of this embodiment is the same as that of embodiment 1, wherein step 2) comprehensively determines the range of the fracture zone according to empirical formulas, similarity simulations, numerical simulations, and field tests, and specifically includes the following steps:

[0085] 2.1) Calculate the height of the fracture zone using empirical formula;

[0086]

[0087] In the formula, H li is the height of the fracture zone, m; ∑M is the cumulative thickness of the mined coal seam, m;

[0088] 2.2) Obtain the height of the fracture zone by similar simulation;

[0089] See also Figure 3 According to the physical and mechanical parameters of the coal and rock formations on site, based on similarity theory and the actual geological conditions of the working face, a rotatable similarity simulation test bench was used to study the evolution law of the mining fracture field, obtain the fracture zone height, and obtain the distribution characteristics of the mining fractures;

[0090] 2.3) Obtain the height of the fracture zone by numerical simulation;

[0091] 3DEC software is used to simulate the development and evolution of mining cracks, and a corresponding numerical model is constructed to study the development characteristics of cracks in the overlying rock strata after mining; the design model is a three-dimensional model, the model size is set proportionally according to the size of the coal seam, and the distance from the top of the model to the ground surface is obtained according to actual measurements; at the bottom of the coal seam model, the displacement in the X-axis and Y-axis directions is restricted, that is, the displacement speed in these directions is 0, and the model is only allowed to displace in the vertical direction. The model is subjected to vertical ground stress, which is determined by gravity acceleration, thickness and rock density, and is vertically downward; the Moore-Coulomb model is selected as the calculation model, and the Coulomb sliding model with surface contact is selected as the constitutive model of the joint; numerical simulation is carried out, and the height of the fracture zone is obtained according to the simulation results;

[0092] 2.4) Obtain the height of the fracture zone through field testing;

[0093] Conduct on-site measurements of the fracture zone range to obtain on-site fracture development characteristics; the on-site test can be carried out using the following methods: Figure 4 The microseismic monitoring system shown observes the height of the fracture zone, and uses field measurement and empirical formula to explore the height of the development of the fracture zone in the overburden rock; a number of seismic pickups are arranged in the monitoring area, and the vibration waveform caused by the rupture of the coal rock mass is picked up by the sensor. The principle is that the propagation speed of seismic waves in different materials is different. The speed change of the measured seismic wave signal at different times is used to establish a speed change graph to judge the damage of the rock formation. The seismic wave contains a lot of information, such as amplitude, frequency, and wave velocity. Among them, the relationship between wave velocity and geological conditions is the most significant. When the rock formation is damaged, the measured velocity change value is large, which can be used to more qualitatively judge the development of the fracture zone. At the same time, the approximate height position of the fracture zone can be quantitatively calculated based on the monitoring data; the method of observing the height of the fracture zone by the microseismic monitoring system has the characteristics of simple detection method, short monitoring cycle, low cost, etc., and can be moved and multi-point measurement can be performed;

[0094] The on-site test plan is:

[0095] a) Arrange a certain number of anchors at the top plate of the bottom extraction tunnel. The installed diameter is 20 mm. The upper end of the anchor is 5 m into the top plate rock layer. The anchor is arranged perpendicular to the top plate, and the distance between two adjacent anchors is 48 m.

[0096] b) Microseismic monitoring system for field monitoring, which mainly includes four parts: sensors (data collection), monitoring substations (data acquisition servers), cable transmission systems (real-time transmission of measured data to industrial ring networks), and industrial control servers (data storage terminals, responsible for receiving data transmitted through industrial ring networks); sensors are arranged on the top plate of the bottom extraction tunnel, and each sensor is connected to the signal acquisition control port of the underground substation through a signal line. The signal is transmitted from the main station through the industrial ring network to the host server terminal arranged above the well, and the connection with the underground workstation and data transmission are realized through cables. The distance between sensors is 48m, and the overall monitoring period is about 15 to 30 days;

[0097] c) After the equipment is transported and installed, monitor and collect data; use the trigger mode to start the sensor and acquisition equipment, and the monitoring data is transmitted from the microseismic sensors arranged in the bottom extraction lane to the underground workstation through cables, and then transmitted to the data storage and processing terminal through optical fiber;

[0098] d) After data acquisition, filtering is first performed, and then the rupture waveform is converted from a time domain diagram to a frequency domain diagram using fast Fourier transform to quickly identify the rupture signal; waveform recognition is then performed. After the rock rupture signal is identified, it is necessary to manually pick up the arrival of P waves and S waves to achieve the positioning of the rock rupture signal and the quantitative calculation of the source parameters. Effective rock rupture events are identified through waveform characteristics, and interference from production blasting and mechanical vibration events is filtered out; finally, quantitative calculation of microseismic events is performed; based on the results of previous data processing, the duration of P waves and S waves and the amplitude of the vibration wave velocity in the duration period are obtained, and various required parameters in the inversion formula are extracted for inversion calculation, and the source location and source energy are finally determined; thereby, the spatial and energy distribution diagrams of microseismic events are drawn, the density distribution of microseismic events along the strike and dip of the working face is analyzed, a distribution model of microseismic events in the overlying rock formation is constructed, and finally the distribution of the fracture zone range is obtained based on the height position of the dense events.

[0099] Embodiment 4:

[0100] The main structure of this embodiment is the same as that of embodiment 1, wherein step 3) combines theoretical analysis and similar simulation to obtain mining fracture parameters and quantitatively characterize mining fractures, specifically including the following steps:

[0101] 3.1) Based on the masonry beam theory, a mining fracture block model is constructed to calculate the key parameters of the overburden fractures in the mining area;

[0102] The following assumptions are made in the fracture development area: the model is a model when the overburden reaches full mining after a period of excavation; the inclination of the model is 0, and the overburden of the same layer is considered to be isotropic; the structure of the overburden in the fracture zone of the model after breaking is consistent with the structure of masonry beams; except for the "O" ring in the model, other parts only experience vertical settlement; the model assumes that the surface of the rock mass is smooth after breaking; the model assumes that the rock block is rectangular after breaking; it is assumed that the overburden fractures only have transverse delamination fractures and vertical fracture fractures;

[0103] The simplified model of the fracture development zone can be obtained by the above assumptions. The model represents the direction from the intake and return air lanes to the goaf from right to left. Broken fractures are generated between blocks in the same layer, and separation fractures are generated between blocks in different layers. The number of blocks decreases from bottom to top, indicating that the number of broken rock masses decreases as the distance from the coal seam roof increases.

[0104] See also Figure 5 Based on the mining crack block fracture model of masonry beam theory, through cyclic iterative calculation, the calculation formula of the separation crack area can be obtained as follows:

[0105]

[0106] Where: S n,i,i-1 is the area of ​​the iteration triangle; p n,i,i-1 is half the length of the three sides of the iterated triangle; b n,i,i-1 is the length of the AC side in the iteration triangle; a n,i,i-1 is the length of the BC side in the iteration triangle; l is the length of the block;

[0107] The calculation formula of the fracture gap area is:

[0108]

[0109] Where: S′ n,i,i-1 is the area of ​​the iteration triangle; θ 1,1 is the angle between the first block at the edge of the goaf of the first rock layer in the mining fracture zone and the horizontal direction; f is the block width;

[0110] Through the above two formulas, two types of fracture area distribution laws can be calculated, and Matlab programming can be used to realize the visualization of fracture area distribution; the main steps include: inputting the length and width of the block model, calculating the fracture area, and then normalizing by dividing the fracture area of ​​each location by the maximum fracture area to obtain the dimensionless fracture area distribution; both overburden delamination and fracture fracture are suitable for this method;

[0111] 3.2) Combined with similar simulation tests, the images of overburden collapse and crack development after mining are binarized, then gridded, and finally the mining crack parameters such as opening, angle, area, and frequency are counted;

[0112] Embodiment 5:

[0113] The main structure of this embodiment is the same as that of embodiment 1, wherein step 4) constructs a comprehensive evaluation model of mining fracture fractal interpolation, and determines the optimal fracture block space coordinates based on the evaluation results, which specifically includes the following steps:

[0114] 4.1) Use correlation dimension to calculate the fractal dimension of fracture parameter index and build a comprehensive evaluation model of fractal interpolation of mining fractures;

[0115] a) Preprocess the mining fracture evaluation index data to eliminate the index dimension and unify the index change direction;

[0116] The parameters of mining cracks such as crack opening, angle, area, and frequency are used as evaluation indicators of mining cracks. Assume that the i-th indicator The data vector is:

[0117]

[0118] In the formula, q is the number of samples of the parameter to be evaluated; p is the number of indicators of the object to be evaluated, that is, the mining crack parameters such as crack opening, angle, area, frequency, etc.

[0119] After normalizing the indicators, the final indicator data vector is shown as follows;

[0120] X i =(x i1 ,x i2 ,…x iq ) (5)

[0121] b) Establish multidimensional phase space;

[0122]

[0123] c) Calculate the distance r between two points in each dimension of phase space mn (s) and the average distance Δx s ;

[0124]

[0125] Where m, n represent the number of points in different phase spaces, m, n = 1, 2, ..., q-s+1; s = 1, 2, ..., ω; ω is the maximum phase space dimension;

[0126] d) Calculate the distance between two points in each dimension of phase space that is less than or equal to the upper limit of the distance r skThe probability C k (s);

[0127]

[0128] In the formula, r sk is the upper limit of the specified distance, k is generally twice the dimension of the phase space, and H is the Heaviside function, whose value is determined by the following formula:

[0129]

[0130] e) If a fractal exists, calculate the result;

[0131]

[0132] Where D s is the fractal dimension of each dimensional phase space, if D s As the dimension of the phase space increases, it tends to an extreme value, and this extreme value is the fractal dimension D of the i-th index space. i ;

[0133] f) According to the calculated fractal dimension results of each index, a comprehensive evaluation model of fractal interpolation of mining fractures is constructed;

[0134] According to the influence of crack parameters on the development of mining cracks, the range of each evaluation standard level is determined; Matlab software is used to randomly generate T standard samples according to uniform distribution, and the same set of random values ​​is used for each indicator. If there are E evaluation standard levels, T×E evaluation samples can be formed, and the corresponding experience level of each evaluation sample is y(f);

[0135] The comprehensive evaluation value of the fth standard sample is:

[0136]

[0137] For E evaluation levels, let the evaluation value z(f)∈[S e ,S e ], establish a scatter plot of the comprehensive evaluation value z(f) of the f-th sample and the experience level y(f), and according to the scatter plot, establish the corresponding fractal interpolation evaluation model:

[0138]

[0139] 4.2) Determine the optimal spatial coordinates of the fractured block based on the comprehensive evaluation results of the fractal interpolation of the mining fractures;

[0140] The mining fractures are regarded as a fractal set, and its internal parameters are composed of various evaluation indicators. The higher the correlation degree of the indicator, the greater its influence on the comprehensive evaluation of mining fractures, that is, the larger the fractal dimension, the more important the mining fracture evaluation indicator. Then, based on the fractal interpolation comprehensive evaluation model of mining fractures, a comprehensive evaluation is carried out. According to the evaluation results, multiple fracture parameter coordinates are obtained, and then the spatial coordinates of multiple fracture blocks are determined.

[0141] Embodiment 6:

[0142] The main structure of this embodiment is the same as that of embodiment 1, wherein step 5) accurately locates the final hole of the directional long drilling based on the comprehensive evaluation results of the fracture field quantification and the fractal interpolation of the mining fracture, and specifically includes the following steps:

[0143] 5.1) Determine the overall rock collapse angle;

[0144] The roof collapse angle is determined based on the results of simulation experiments and numerical simulation experiments; the drilling holes are generally arranged inside the collapse angle;

[0145] 5.2) Determine the step distance of collapse of different rock layers;

[0146] The masonry beam structure displacement function is used for calculation, and the formula is as follows:

[0147]

[0148] Where: h is the distance from the masonry beam structure to the coal seam roof; l is the length of the fractured rock block, that is, the initial collapse step of the roof rock layer; σ t is the tensile strength of the rock mass; q is the load borne by the rock mass;

[0149] In addition to its own weight, any rock layer in the overburden of the mining area is generally subject to the load generated by the interaction with the adjacent overlying rock layers. Generally speaking, the load of the mining rock layer is non-uniformly distributed, but for the convenience of analyzing the problem, it is assumed that the rock layer load is uniformly distributed. Assuming that there are m layers of rock above the coal seam, considering the load formed by the influence of the nth layer on the first layer, it is calculated as follows:

[0150]

[0151] Where: E i is the elastic modulus of the rock formation; h i is the thickness of the rock layer; i is the bulk density of the rock formation; through the above formula, combined with the on-site geological parameters, the collapse step distance of different rock formations can be calculated, mainly the initial collapse step distance, and the boreholes are usually arranged within the initial collapse step distance of the corresponding rock formation; in the horizontal direction, the extraction position of the roof directional long borehole is determined by the collapse angle and the initial collapse step distance;

[0152] 5.3) Select reasonable layer and reasonable distance, and accurately locate the drilling position;

[0153] Based on the comprehensive evaluation results of fracture field quantification and mining fracture fractal interpolation, multiple fracture parameter coordinates after evaluation and optimization were obtained, and then multiple fracture block space coordinates were determined; but it is still necessary to make corrections in combination with the geological columnar diagram to avoid arranging directional long boreholes in weak rock formations. After correction, the reasonable layer position and reasonable distance of the arrangement position were determined, and then the accurate positioning of the borehole arrangement position was achieved;

[0154] 5.4) Optimization of drilling layout;

[0155] Arrange one more borehole in the same layer to verify the effectiveness of the optimized borehole layout, compare the results, and combine them with the on-site gas extraction data, including drilling field concentration, flow rate, etc., to screen and avoid some areas with poor gas extraction effects; further accurately determine the design parameters of directional long drilling in the mining fracture zone to obtain the optimized gas extraction borehole layout.

[0156] Embodiment 7:

[0157] The main structure of this embodiment is the same as that of embodiment 2, wherein Figure 6 and Figure 7 , a construction drilling site is arranged in the working face trench, and a flexible active hole protection method is used to construct a directional long borehole, which specifically includes the following steps:

[0158] According to the drilling optimization results, several drilling sites are arranged in the working face;

[0159] According to the design of the anti-blowout prevention of the working face, a directional long borehole is constructed in the drilling field along the reverse mining direction of the working face; the directional long borehole includes a sealing section, a layer penetration section and an extraction section; the sealing section is connected from the working face coal seam drilling field to the lower end of the layer penetration section; the layer penetration section is located between the working face coal seam and the roof fracture zone; the trajectory of the layer penetration section is a curve; the extraction section is located in the roof fracture zone; the extraction section is connected with the upper end of the layer penetration section; the directional long borehole is constructed by using a drilling tool system and a flexible hole protection system; the drilling tool system includes a drill bit and a drill rod; the drill bit is installed at the head end of the drill rod; the drill bit has a central channel; the central channel is connected with the inner cavity of the drill rod; the flexible hole protection system includes a front fixing device, a flexible water injection support pipe and a flexible hole protection bracket;

[0160] The flexible water injection support pipe is provided with a water injection hole on its wall; the front end of the flexible water injection support pipe is connected and fixed with a front end fixing device, and the rear end is connected with a hydraulic pump; the front end fixing device has a supporting hook; the supporting hook adopts a compression spring structure; the flexible water injection support pipe is arranged in the inner cavity of the drill rod; the front end fixing device is arranged in the central channel of the drill bit; the supporting hook of the front end fixing device is engaged with the inner wall of the central channel;

[0161] The flexible hole-protecting support is a mesh structure; the flexible hole-protecting support comprises a plurality of annular support tubes arranged in sequence along the longitudinal direction; each annular support tube comprises a plurality of unit waves, and the unit waves are arranged in sequence along the circumferential direction; two adjacent annular support tubes are distributed in mirror symmetry; two adjacent annular support tubes are fixedly connected between two opposite wave peaks; the inner cavities of the two adjacent annular support tubes are connected; the inner cavities of the plurality of annular support tubes constitute a pipe network structure;

[0162] In a non-working state, a flexible hole protection bracket in a contracted state is sleeved on the pipe body of the flexible water injection support pipe; the water injection hole is connected to the inner cavity of the pipe network of the flexible hole protection bracket; when working, the drilling tool system transports the flexible hole protection system to a preset position; the flexible hole protection bracket sleeve and the flexible water injection support pipe in a contracted state can be directional deflected along with the drilling; then the front end fixing device extends from the central channel of the drill bit; the support hook claw is unfolded and embedded in the coal seam on the inner wall of the borehole; the drilling tool system is exited; the hydraulic pump injects high-pressure water into the flexible water injection support pipe; the flexible hole protection bracket is pressurized and expanded to support the directional long borehole; the flexible hole protection bracket is fully expanded at the outer arc part of the curved end, and the inner arc is not fully expanded, so as to fully fit the borehole wall and realize active hole protection for the curved end;

[0163] The end of the flexible support is connected to a sealing casing, the diameter of which is slightly larger than the diameter of the shrinking support. After the support is deployed, clay is used inside the sealing casing for short-term sealing, and concrete is used outside the casing for permanent sealing and connected to a gas extraction pipe for gas extraction;

[0164] Connect gas extraction pipeline to carry out gas extraction;

[0165] After the extraction meets the standards, the flexible hole protection system will be recovered; stop injecting high-pressure water into the flexible support, and after the support rebounds and returns to the contracted state after the pressure is released, disconnect the connection between the casing and the gas extraction pipe, break the short-term hole sealing in the sealing casing, remove the flexible support and water injection support pipe from the sealing casing, realize the recovery of the flexible hole protection system, and permanently seal the borehole.

Claims

1. A method for accurate gas extraction based on quantitative optimization of mining fracture fields, characterized in that: The following steps are involved: 1) Conduct field testing; 2) Determine the scope of the fracture zone based on the field test results; 3) Quantitative characterization of mining-induced fractures; 3.1) Based on the masonry beam theory, a mining fracture block model is constructed to calculate the key parameters of the overburden fractures in the mining area; 3.2) Combined with similar simulation tests, the images of overburden collapse and crack development after mining are binarized, then gridded, and finally the mining crack parameters are counted; the mining crack parameters include opening, angle, area and frequency; 4) Construct a comprehensive evaluation model of mining fracture fractal interpolation and determine the optimal fracture block spatial coordinates based on the evaluation results; 4.1) Use correlation dimension to calculate the fractal dimension of fracture parameter index and build a comprehensive evaluation model of fractal interpolation of mining fractures; 4.2) Determine the optimal spatial coordinates of the fractured block based on the comprehensive evaluation results of the fractal interpolation of the mining fractures; 5) Based on the quantification of the fracture field and the comprehensive evaluation results of the fractal interpolation of the mining fractures, the final hole of the directional long borehole is accurately located; after the final hole of the directional long borehole is accurately located, several drilling sites are arranged in the trench of the working face where mining is to be carried out, and directional long boreholes are constructed in the drilling sites along the reverse mining direction of the working face according to the design of the anti-burst design of the working face; The directional long drilling hole includes a sealing hole section, a layer penetration hole section and a drainage hole section; the sealing hole section is connected from the working face coal seam drilling site to the lower end of the layer penetration hole section; the layer penetration hole section is located between the working face coal seam and the roof fracture zone; the trajectory of the layer penetration hole section is a curve; the drainage hole section is located in the roof fracture zone; the drainage hole section is connected with the upper end of the layer penetration hole section; the drilling tool system and the flexible hole protection system are used to construct the directional long drilling hole; The drilling tool system includes a drill bit and a drill rod; the drill bit is installed at the head end of the drill rod; the drill bit has a central hole; the central hole is connected to the inner cavity of the drill rod; the flexible hole protection system includes a front end fixing device, a flexible water injection support pipe and a flexible hole protection bracket; The flexible water injection support pipe is provided with a water injection hole on its wall; the front end of the flexible water injection support pipe is connected and fixed with a front end fixing device, and the rear end is connected with a hydraulic pump; the front end fixing device has a supporting hook; the supporting hook adopts a compression spring structure; the flexible water injection support pipe is arranged in the inner cavity of the drill rod; the front end fixing device is arranged in the central channel of the drill bit; the supporting hook of the front end fixing device is engaged with the inner wall of the central channel; The flexible hole-protecting support is a mesh structure; the flexible hole-protecting support comprises a plurality of annular support tubes arranged in sequence along the longitudinal direction; each annular support tube comprises a plurality of unit waves, and the unit waves are arranged in sequence along the circumferential direction; two adjacent annular support tubes are distributed in mirror symmetry; two adjacent annular support tubes are fixedly connected between two opposite wave peaks; the inner cavities of the two adjacent annular support tubes are connected; the inner cavities of the plurality of annular support tubes constitute a pipe network structure; In a non-working state, the flexible hole protection bracket in a compact state is sleeved on the pipe body of the flexible water injection support pipe; the water injection hole is connected to the inner cavity of the pipe network of the flexible hole protection bracket; when working, the drilling tool system transports the flexible hole protection system to a preset position; the flexible hole protection bracket and the flexible water injection support pipe in a compact state can be directional deflected along with the drilling; then the front end fixing device extends from the central hole of the drill bit; the support hook claw is unfolded and embedded in the coal seam on the inner wall of the borehole; Exit the drilling tool system; the hydraulic pump injects high-pressure water into the flexible water injection support pipe; the flexible hole protection bracket is pressurized and expanded to support the directional long drilling hole; the flexible hole protection bracket is fully expanded at the outer arc part of the curved end, and the inner arc is not fully expanded, so as to fully fit the borehole wall and realize active hole protection for the curved end.

2. A method for accurate gas extraction based on quantitative optimization of mining fracture fields as claimed in claim 1, characterized in that: In steps 1-2), the field test includes: The height of the fracture zone is observed using a microseismic monitoring system; a) Several anchors are arranged at the top plate of the bottom extraction tunnel. The installed diameter is 20 mm. The upper end of the anchor is inserted 5 m into the top plate rock layer. The anchor is arranged perpendicular to the top plate, and the distance between two adjacent anchors is 48 m. b) Arrange microseismic monitoring system for on-site monitoring; c) Using the trigger mode, start the sensors and acquisition equipment, and the monitoring data is transmitted from the microseismic sensors arranged in the bottom pumping lane to the underground workstation through cables, and then transmitted to the data storage and processing terminal through optical fibers; d) After data collection, the rupture signal is identified and waveform recognition and calculation are performed. The spatial and energy distribution diagrams of microseismic events are drawn to analyze the density distribution of microseismic events along the strike and dip of the working face, and a distribution model of microseismic events in the overlying rock formation is constructed. Finally, the distribution of the fracture zone range is obtained based on the height position of the dense events.

3. A method for accurate gas extraction based on quantitative optimization of mining fracture fields as claimed in claim 1, characterized in that: In step 3.1), the mining fracture block fracture model is constructed based on the masonry beam theory to calculate the key parameters of the overburden fractures in the mining area, including: Based on the mining crack block fracture model of masonry beam theory, through cyclic iterative calculation, the calculation formula of the separation crack area can be obtained as follows: Where: S n,i,i-1 is the area of ​​the iteration triangle; p n,i,i-1 is half the length of the three sides of the iterated triangle; b n,i,i-1 is the length of the AC side in the iteration triangle; a n,i,i-1 is the length of the BC side in the iteration triangle; l is the length of the block; The calculation formula of the fracture gap area is: Where: S′ n,i,i-1 is the area of ​​the iteration triangle; θ 1,1 It is used to set the angle between the first block at the edge of the goaf of the first layer of rock in the mining fracture zone and the horizontal direction; f is the block width.

4. A method for accurate gas extraction based on quantitative optimization of mining fracture fields as claimed in claim 1, characterized in that: In step 4.1), the fractal dimension of the fracture parameter index is calculated by using the correlation dimension to construct a comprehensive evaluation model of fractal interpolation of mining fractures, including: a) Preprocess the mining fracture evaluation index data to eliminate the index dimension and unify the index change direction; The crack opening, angle, area and frequency of the mining crack parameters are used as evaluation indicators of mining cracks, and the indicators are normalized. b) Establish multidimensional phase space; c) Calculate the distance and average distance between two points in each dimension of phase space; d) Calculate the probability that the distance between two points in each dimension of phase space is less than or equal to the upper limit of the distance; e) If a fractal exists, calculate the result; f) Based on the calculated fractal dimension results of each indicator, a comprehensive evaluation model of fractal interpolation of mining-induced fractures is constructed.

5. A method for accurate gas extraction based on quantitative optimization of mining fracture fields as claimed in claim 1, characterized in that: In step 4.2), the optimal fracture block space coordinates are determined based on the comprehensive evaluation results of the fractal interpolation of the mining fractures, including: The mining fractures are regarded as a fractal set, and its internal parameters are composed of various evaluation indicators. The higher the correlation degree of the indicator, the greater its influence on the comprehensive evaluation of mining fractures, that is, the larger the fractal dimension, the more important the mining fracture evaluation indicator. Then, based on the fractal interpolation comprehensive evaluation model of mining fractures, a comprehensive evaluation is carried out. According to the evaluation results, multiple fracture parameter coordinates are obtained, and then the spatial coordinates of multiple fracture blocks are determined.

6. A method for accurate gas extraction based on quantitative optimization of mining fracture fields as described in claim 1 or 5, characterized in that: In step 5), the final hole of the directional long drilling is accurately positioned based on the comprehensive evaluation results of the fracture field quantification and the fractal interpolation of the mining fractures, including: a) Determine the overall rock collapse angle; The roof collapse angle is determined based on the results of simulation experiments and numerical simulation experiments; the drilling holes are generally arranged inside the collapse angle; b) Determine the step distance of collapse of different rock layers; The displacement function of masonry beam structure is used for calculation; c) Select reasonable layers and reasonable distances, and accurately locate the drilling positions; Based on the comprehensive evaluation results of fracture field quantification and mining fracture fractal interpolation, multiple fracture parameter coordinates after evaluation and optimization were obtained, and then multiple fracture block space coordinates were determined; however, corrections still need to be made in combination with geological columnar diagrams; d) Optimization of drilling arrangement position; Arrange one more borehole in the same layer to verify the effectiveness of the optimized borehole layout, compare the results, and combine the drilling field concentration and flow rate in the on-site gas extraction related data to screen and avoid some areas with poor gas extraction effects; further accurately determine the design parameters of directional long drilling holes in the mining fracture zone to obtain the optimized gas extraction borehole layout.

7. A method for accurate gas extraction based on quantitative optimization of mining fracture fields as claimed in claim 1, characterized in that: The end of the flexible hole protection bracket is connected to a sealing casing, and the diameter of the sealing casing is slightly larger than the diameter of the contracted flexible hole protection bracket; after the flexible hole protection bracket is deployed, clay is used inside the sealing casing for short-term sealing, and concrete is used outside the sealing casing for permanent sealing and connected to a gas extraction pipe for gas extraction; After the extraction meets the standards, the flexible hole protection system will be recovered; stop injecting high-pressure water into the flexible hole protection bracket, and after the flexible hole protection bracket rebounds and returns to the contracted state after the pressure is released, disconnect the connection between the sealing casing and the gas extraction pipe, break the short-term hole sealing in the sealing casing, remove the flexible hole protection bracket and the water injection support pipe from the sealing casing, realize the recovery of the flexible hole protection system, and permanently seal the borehole.

Citation Information

Patent Citations

  • Filling and hole protecting method aiming at low-permeability soft coal seam gas extraction borehole

    CN104879088A

  • Fracture fractal dimension index-based mining overburden rock quality evaluation method

    CN105781543A

  • Technical method of gas extraction in mining fractured zone based on kilometer directional drilling

    CN107083988A

  • Anti-hole-collapse apparatus and method for extraction and boring of coal seam

    CN108979541A

  • Rock mass fracture statistics and fractal method

    CN109085105A