A method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage
Through empirical modal decomposition and energy storage climbing power change rate distribution technology, the charging and discharging of multiple types of energy storage is coordinated, and the power fluctuation and equipment life problems in the energy storage system are solved, and the grid stability and service life of energy storage equipment are improved. .
Patent Information
- Application Number
- CN202210211692.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-04
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-03-04
AI Technical Summary
The prior art is difficult to effectively coordinate the charging and discharging coordination between multiple types of energy storage, resulting in intermittent energy output power fluctuations affecting the power grid, and energy storage components are prone to overcharge and discharge, affecting the life of the equipment.
Empirical modal decomposition (EMD) is used to decompose the imbalanced power into inherent modal functions of different time scales, and these modal functions are allocated according to the rate of change of energy storage climbing power, and the preliminary follow-up power of the battery, supercapacitor and flywheel are determined. Update the final power according to the respective discharge depth and response speed to ensure coordination and coordination.
By dynamically optimizing the distribution of active power, the impact of intermittent energy output power fluctuations on the power grid is reduced, overcharging and overdischarging of energy storage components is avoided, and the stability of the power grid and the life of energy storage equipment is improved.
Smart Images

Figure CN114696348B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power distribution network and energy storage, and in particular relates to a method for dynamically optimizing active power distribution for coordinating multiple types of energy storage. Background Art
[0002] Nowadays, new energy sources such as wind power and photovoltaics have been widely used, and the problems they bring are becoming more and more prominent. Since wind power and other resources are uncontrollable natural resources, their output is highly random, and the resulting volatility and intermittency of wind power bring problems such as voltage fluctuations and power fluctuations to the grid.
[0003] Energy storage technology can store and release energy, alleviate grid voltage and grid power fluctuations, and therefore add energy storage systems to renewable energy power generation systems. Since single energy storage has great limitations, hybrid energy storage systems are needed to adjust the quality of power input, smooth output fluctuations, and safely connect renewable energy to the grid.
[0004] However, while studying how hybrid energy storage systems can absorb new energy, adjust power quality, and eliminate grid power fluctuations, we must also solve the problem of how to reasonably allocate hybrid energy storage systems, increase the reliability and stability of the grid during operation, and extend the service life of energy storage equipment. Summary of the invention
[0005] The technical problem to be solved by the present invention is how to reasonably coordinate the charging and discharging coordination between multiple types of energy storage, with the aim of reducing the impact of intermittent energy output power fluctuations on the power grid, avoiding overcharging and over-discharging of energy storage elements, and greatly improving the life of multiple types of energy storage.
[0006] The present invention solves the above technical problems through the following technical solutions: A method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage, comprising the following steps:
[0007] Step 1: Obtain the unbalanced power to be compensated by the power difference between the power generation end and the load end;
[0008] Step 2: Perform empirical mode decomposition (EMD) on the unbalanced power to decompose the original nonlinear signal into intrinsic mode function (IMF) components of different time scales and independent of each other;
[0009] Step 3: Based on the energy storage climbing power change rate as the distribution principle, the sum of the inherent modal function components before the maximum climbing power change rate is used as the initial following power of the energy storage battery, and the remaining inherent modal function components are distributed according to the energy storage climbing power change rate. The sum of the inherent modal function components before the maximum climbing power change rate is used as the initial following power of the supercapacitor, and the sum of the remaining inherent modal function component powers is the initial following power of the flywheel;
[0010] Step 4, converting the obtained preliminary following power of the battery and the supercapacitor into current for control, and converting the preliminary following power of the flywheel into controlling the speed of the flywheel;
[0011] Step 5: Based on the discharge depth, response speed and other characteristic parameters of the battery, supercapacitor and flywheel, and considering their coordination and cooperation, update their preliminary follow-up powers to obtain the final powers of the battery, supercapacitor and flywheel.
[0012] Preferably, in step 1, the unbalanced power required to be compensated is obtained by using the unbalanced power between the power generation end and the load end, and the formula used is:
[0013] P HESS =P power -P load
[0014] Among them, P HESS Represents unbalanced power; P power Represents the power at the generating end; P load Represents the load end power.
[0015] Preferably, the step 2 comprises:
[0016] (1) Identify unbalanced power P HESS All extreme points in the equation are fitted with the corresponding upper and lower envelopes through the cubic spline interpolation algorithm;
[0017] (2) Calculate the average value m1(t) of the upper and lower envelopes;
[0018] (3)P HESS Subtract m1(t) to get the intermediate signal h1(t), and regard h1(t) as the new unbalanced power P HESS , repeat step (1) and perform K screenings until h1(t) = P HESS -m1(t) satisfies the following IMF conditions, c1(t) = h1(t), c1(t) is P HESS The first IMF component of ; the IMF condition is: in the entire time range, the number of extreme points and zero-crossing points is equal or the difference does not exceed 1, and at any time point, the local mean is 0;
[0019] Separating the IMF component c1(t) from the unbalanced power, we get the first residual component:
[0020] r1(t)=P HESS -c1(t)
[0021] Take the remaining component r1(t) as the new original data, repeat the above steps to finally get the remaining IMF components and residual components, as follows:
[0022]
[0023] Among them, c2(t), c3(t), c n (t) are the 2nd, 3rd, and nth IMF components, r2(t), r3(t), r n (t) are the 2nd, 3rd, and nth residual components respectively. Finally, the unbalanced power is decomposed into different IMF components with frequencies from high to low and a monotonous residual signal.
[0024] Preferably, the method in step 3 comprises:
[0025] Based on the decomposed residual signal, the IMF components from low frequency to high frequency are accumulated one by one. Each accumulation of an IMF component forms a new power signal. Each accumulation calculates the climbing power of the new power signal. The climbing power calculation formula is as follows:
[0026] P r (t)=|P(t)-P(t+Δt)|
[0027] Where Δt is the sampling interval, P r (t) is the energy storage climbing power at time t, and P(t) is the energy storage output power at time t;
[0028] The formula for calculating the climbing power change rate is as follows:
[0029]
[0030] Among them, P r (s) is the energy storage ramp power of the signal after the residual component decomposed by EMD is accumulated with s IMF components; P r (s+1) is the energy storage ramp power of the signal after the residual component decomposed by EMD is accumulated with s+1 IMF components, F r (s) is the rate of change of energy storage climbing power;
[0031] The initial battery following power is determined as follows:
[0032] Assume that when s = i, F r(s)Maximum
[0033] p b =c n +c n-1 +…+c n-i+1 +r n (t)
[0034] Among them, P b Indicates the initial following power of the battery;
[0035] Repeat the above steps for the remaining IMF components. When s=j, F r (s) is maximum, then the initial following power of the supercapacitor is determined by the following formula:
[0036] P sc =c n-i +c n-i-1 +…+c n-i-j+1
[0037] Among them, P sc Indicates the initial follow-up power of the supercapacitor;
[0038] The initial follow power of the flywheel is determined by the following formula;
[0039] P f =P HESS -P b -P sc ;
[0040] Among them, P f Indicates the initial follow-up power of the flywheel.
[0041] Preferably, the method formula in step 4 is:
[0042]
[0043]
[0044]
[0045] Where U b , U sc Represent the battery and supercapacitor terminal voltages respectively, ω n It represents the given following angular velocity of the flywheel, and J represents the moment of inertia.
[0046] Preferably, the respective working states are divided according to the discharge depth of the battery and the supercapacitor and the speed of the flywheel, specifically:
[0047] Battery discharge depth (DOD b), 0 to 0.2 is the charging forbidden area, 0.2 to 0.4 is the charging warning area, 0.4 to 0.6 is the normal working area, 0.6 to 0.8 is the discharge warning area, and 0.8 to 1.0 is the discharge forbidden area;
[0048] Supercapacitor discharge depth (DOD sc ), 0-0.1 is the charging forbidden area, 0.1-0.3 is the charging warning area, 0.3-0.7 is the normal working area, 0.7-0.9 is the discharge warning area, and 0.9-1.0 is the discharge forbidden area;
[0049] Flywheel speed (ω f ), less than 200 is the discharge prohibited area, between 200 and 314 is the discharge warning area, between 314 and 1800 is the normal working area, between 1800 and 2000 is the charging warning area, and greater than 2000 is the charging prohibited area;
[0050] The critical values of the charge and discharge stages of the three energy storages, batteries, supercapacitors, and flywheels, are shown in the following table:
[0051] Energy Storage <![CDATA[DOD min ]]> <![CDATA[DOD L ]]> <![CDATA[DOD H ]]> <![CDATA[DOD max ]]> Battery 0.2 0.4 0.6 0.8 Supercapacitor 0.1 0.3 0.7 0.9 flywheel 200 314 1800 2000
[0052] Among them, DOD min Indicates the charging prohibition threshold; DOD L Indicates the charging warning threshold; DOD H Indicates the discharge warning threshold; DOD max Indicates the discharge prohibition threshold.
[0053] Preferably, the three energy storages of battery, supercapacitor and flywheel for compensating unbalanced power have priority and coordinate with each other, as follows:
[0054] The compensation priorities of the three energy storages are: flywheel>supercapacitor>battery; when a certain energy storage is in the discharge or charge prohibited zone, it will no longer discharge or charge, and its uncompensated unbalanced power will be compensated by the remaining energy storage according to its own working status; for example, when the supercapacitor is in an overcharge or over-discharge state, its uncompensated unbalanced power will be compensated by the flywheel. If the flywheel cannot fully compensate, the remaining unbalanced power will be compensated by the battery.
[0055] Preferably, in step 5, the preliminary following power is updated according to the working status and remaining capacity of the battery, the supercapacitor and the flywheel, and the formula used includes:
[0056]
[0057]
[0058] The first formula is the calculation formula for updating the following power when the energy storage is in the discharge prohibited area and the warning area, which is the discharge adjustment formula; the second formula is the calculation formula for updating the following power when the energy storage is in the charging prohibited area and the warning area, which is the charging adjustment formula; where P represents the initial following power; P' represents the final following power; DOD x Indicates the current discharge depth of the energy storage system; DOD max Indicates the discharge prohibition threshold; DOD H Indicates the discharge warning threshold; DOD min Indicates the charging prohibition threshold; DOD L Indicates the charging warning threshold; when the energy storage is in the discharge or charging prohibited zone, the energy storage will no longer be charged or discharged, and the final power will be 0; when the energy storage system discharge depth is between the charge / discharge prohibited zone and the charging warning zone, the charging power of the energy storage system will be reduced / increased proportionally.
[0059] Compared with the prior art, the present invention adopts the above technical solution and has the following beneficial effects:
[0060] 1. The present invention provides a method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage. By performing two dynamic optimization allocations of active power, the coordinated power allocation among batteries, supercapacitors, and flywheels is improved, and the rationality of the multiple types of energy storage systems is improved.
[0061] 2. The present invention provides a method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage, which reduces the impact of intermittent energy output power fluctuations on the power grid, improves the stability of the power grid output, and thus improves the reliability of the power grid.
[0062] 3. The present invention provides a method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage, which avoids the overcharging and over-discharging of energy storage elements, improves the coordinated control of charging and discharging between batteries, supercapacitors, and energy storage, and greatly increases the life of multiple types of energy storage equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0063] Figure 1 It is a flow chart of a method for coordinating dynamic optimization allocation of active power of multiple types of energy storage disclosed in an embodiment of the present application;
[0064] Figure 2 It is a strategy diagram for controlling the charging and discharging state of an energy storage device for coordinating a method for dynamically optimizing the active power distribution of multiple types of energy storage disclosed in an embodiment of the present application;
[0065] Figure 3 A schematic diagram of a simulation of a battery state of charge in a method for coordinating dynamic optimization allocation of active power of multiple types of energy storage disclosed in an embodiment of the present application;
[0066] Figure 4 A schematic diagram of a simulation of the charge state of a supercapacitor in a method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage disclosed in an embodiment of the present application;
[0067] Figure 5 A simulation schematic diagram of the flywheel speed in a method for coordinating the dynamic optimization distribution of active power of multiple types of energy storage disclosed in an embodiment of the present application. DETAILED DESCRIPTION
[0068] The present invention provides a method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage, which specifically includes the following steps:
[0069] Step 1: Propose a method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage, and obtain the required unbalanced power compensation through the unbalanced power between the power generation end and the load end.
[0070] The unbalanced power required to be compensated is obtained by the unbalanced power between the power generation end and the load end. Specifically,
[0071] P HESS =P power -P load
[0072] Among them, P HESS Represents unbalanced power; P power Represents the power at the generating end; P load Represents the load end power.
[0073] Step 2: Decompose the unbalanced power into independent intrinsic mode function (IMF) components by means of empirical mode decomposition (EMD). The specific method is as follows:
[0074] (1) Identify unbalanced power P HESS All extreme points in the equation are fitted with the corresponding upper and lower envelopes through the cubic spline interpolation algorithm;
[0075] (2) Calculate the average value m1(t) of the upper and lower envelopes;
[0076] (3)P HESS Subtract m1(t) to get the intermediate signal h1(t), and regard h1(t) as the new unbalanced power P HESS , repeat step (1) and perform K screenings until h1(t) = P HESS -m1(t) satisfies the following IMF conditions, c1(t) = h1(t) c1(t) is P HESSThe first IMF component of , where the IMF conditions are: in the entire time range, the number of extreme points and zero crossing points is equal or the difference does not exceed 1, and at any time point, the local mean is 0.
[0077] Separating the IMF component c1(t) from the unbalanced power, we get the first residual component:
[0078] r1(t)=P HESS -c1(t)
[0079] Take the remaining component r1(t) as the new original data, repeat the above steps to finally get the remaining IMF components and residual components, as follows:
[0080]
[0081] Among them, c2(t), c3(t), c n (t) are the 2nd, 3rd, and nth IMF components, r2(t), r3(t), r n (t) are the 2nd, 3rd, and nth residual components respectively. Finally, the unbalanced power is decomposed into different IMF components with frequencies from high to low and a monotonous residual signal.
[0082] Step 3: Based on the energy storage climbing power change rate as the distribution principle, the sum of the inherent modal function component powers before the maximum climbing power change rate is the initial following power of the battery, and the remaining inherent modal function components are again distributed based on the energy storage climbing power change rate. The sum of the inherent modal function component powers before the maximum climbing power change rate is the initial following power of the supercapacitor, and the sum of the remaining inherent modal function component powers is the initial following power of the flywheel.
[0083] Based on the decomposed residual signal, the IMF components from low frequency to high frequency are accumulated one by one. Each accumulation of an IMF component forms a new power signal. Each accumulation calculates the climbing power of the new power signal. The climbing power calculation formula is as follows:
[0084] P r (t)=|P(t)-P(t+Δt)|
[0085] Where Δt is the sampling interval, P r (t) is the energy storage climbing power at time t, and P(t) is the energy storage output power at time t;
[0086] The formula for calculating the climbing power change rate is as follows:
[0087]
[0088] Among them, P r(s) is the energy storage ramp power of the signal after the residual component decomposed by EMD is accumulated with s IMF components; P r (s+1) is the energy storage ramp power of the signal after the residual component decomposed by EMD is accumulated with s+1 IMF components, F r (s) is the rate of change of energy storage climbing power.
[0089] The initial battery following power is determined as follows:
[0090] Assume that when s = i, F r (s)Maximum
[0091] p b =c n +c n-1 +…+c n-i+1 +r n (t)
[0092] Among them, P b Indicates the initial following power of the battery;
[0093] Repeat the above steps for the remaining IMF components. When s=j, F r (s) is maximum, then the initial following power of the supercapacitor is determined by the following formula:
[0094] P sc =c n-i +c n-i-1 +…+c n-i-j+1
[0095] Among them, P sc Indicates the initial follow-up power of the supercapacitor;
[0096] The initial follow power of the flywheel is determined by the following formula;
[0097] P f =P HESS -P b -P sc ;
[0098] Among them, P f Indicates the initial follow-up power of the flywheel.
[0099] Step 4: Convert the obtained preliminary following power of the battery and supercapacitor into current for control, and convert the preliminary following power of the flywheel into the speed control of the flywheel; the formula used is as follows:
[0100]
[0101]
[0102]
[0103] Where U b , U sc Represent the battery and supercapacitor terminal voltages respectively, ω n It represents the given following angular velocity of the flywheel, and J represents the moment of inertia.
[0104] Step 5: Based on the discharge depth, response speed and other characteristic parameters of the battery, supercapacitor and flywheel, and considering their coordination and cooperation, update their respective preliminary follow-up powers to obtain their final powers. The charge and discharge ranges of the battery, supercapacitor and flywheel are as follows:
[0105] Battery discharge depth (DOD b ), 0 to 0.2 is the charging forbidden area, 0.2 to 0.4 is the charging warning area, 0.4 to 0.6 is the normal working area, 0.6 to 0.8 is the discharge warning area, and 0.8 to 1.0 is the discharge forbidden area;
[0106] Supercapacitor discharge depth (DOD sc ), 0-0.1 is the charging forbidden area, 0.1-0.3 is the charging warning area, 0.3-0.7 is the normal working area, 0.7-0.9 is the discharge warning area, and 0.9-1.0 is the discharge forbidden area;
[0107] Flywheel speed (ω f ), less than 200 is the discharge prohibited area, between 200 and 314 is the discharge warning area, between 314 and 1800 is the normal working area, between 1800 and 2000 is the charging warning area, and greater than 2000 is the charging prohibited area;
[0108] Specifically, the critical values of the charge and discharge stages of batteries, supercapacitors, and flywheels are shown in the following table:
[0109] Energy Storage <![CDATA[DOD min ]]> <![CDATA[DOD L ]]> <![CDATA[DOD H ]]> <![CDATA[DOD max ]]> Battery 0.2 0.4 0.6 0.8 Supercapacitor 0.1 0.3 0.7 0.9 flywheel 200 314 1800 2000
[0110] Among them, DOD min Indicates the charging prohibition threshold; DOD L Indicates the charging warning threshold; DOD H Indicates the discharge warning threshold; DOD max Indicates the discharge prohibition threshold.
[0111] The three types of energy storage to compensate for unbalanced power, namely, batteries, supercapacitors and flywheels, have priority and coordinate with each other, as follows:
[0112] The compensation priority of the three energy storages is: flywheel>supercapacitor>battery. When a certain energy storage is in the discharge or charge prohibited area, it will no longer be discharged or charged, and its uncompensated unbalanced power will be compensated by the other energy storages according to their own working conditions. For example, when the supercapacitor is in an overcharge or over-discharge state, its uncompensated unbalanced power will be compensated by the flywheel. If the flywheel cannot fully compensate, the remaining unbalanced power will be compensated by the battery.
[0113] The initial following power is updated according to the working status and remaining capacity of the battery, supercapacitor and flywheel. The formula used includes:
[0114]
[0115]
[0116] The first formula is the calculation formula for updating the following power when the energy storage is in the discharge prohibited area and the warning area, which is the discharge adjustment formula; the second formula is the calculation formula for updating the following power when the energy storage is in the charging prohibited area and the warning area, which is the charging adjustment formula; where P represents the initial following power; P' represents the final following power; DOD x Indicates the current discharge depth of the energy storage system; DOD max Indicates the discharge prohibition threshold; DOD H Indicates the discharge warning threshold; DOD min Indicates the charging prohibition threshold; DOD L Indicates the charging warning threshold; when the energy storage is in the discharge or charging prohibited zone, the energy storage will no longer be charged or discharged, and the final power will be 0; when the energy storage system discharge depth is between the charge / discharge prohibited zone and the charging warning zone, the charging power of the energy storage system will be reduced / increased proportionally.
[0117] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage, characterized in that: The following steps are involved: Step 1: Obtain the unbalanced power to be compensated by the power difference between the power generation end and the load end; Step 2: Perform empirical mode decomposition (EMD) on the unbalanced power, fit the extreme points by cubic spline interpolation, calculate the mean of the upper and lower envelopes, and gradually subtract them to obtain the intermediate signal. Repeat this process to screen out the empirical mode components IMF and residual components that meet the conditions, and finally decompose the original nonlinear signal into intrinsic mode function (IMF) components with different time scales and independent of each other. Each IMF represents the local characteristics of the signal. Step 3: Based on the energy storage climbing power change rate as the distribution principle, the sum of the inherent modal function components before the maximum climbing power change rate is used as the initial following power of the energy storage battery, and the remaining inherent modal function components are distributed according to the energy storage climbing power change rate. The sum of the inherent modal function components before the maximum climbing power change rate is used as the initial following power of the supercapacitor, and the sum of the remaining inherent modal function component powers is the initial following power of the flywheel; Step 4, converting the obtained preliminary following power of the battery and the supercapacitor into current for control, and converting the preliminary following power of the flywheel into controlling the speed of the flywheel; Step 5: Based on the discharge depth, response speed and other characteristic parameters of the battery, supercapacitor and flywheel, and considering their coordination and cooperation, update their preliminary follow-up powers to obtain the final powers of the battery, supercapacitor and flywheel.
2. A method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage as claimed in claim 1, characterized in that: In step 1, the unbalanced power required to be compensated is obtained by using the unbalanced power between the power generation end and the load end, and the formula used is: P HESS =P power -P load Among them, P HESS Represents unbalanced power; P power Represents the power at the generating end; P load Represents the load end power.
3. A method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage as claimed in claim 1, characterized in that: The step 2 comprises: (1) Identify unbalanced power P HESS All extreme points in the equation are fitted with the corresponding upper and lower envelopes through the cubic spline interpolation algorithm; (2) Calculate the average value m1(t) of the upper and lower envelopes; (3)P HESS Subtract m1(t) to get the intermediate signal h1(t), and regard h1(t) as the new unbalanced power P HESS , repeat step (1) and perform K screenings until h1(t) = P HESS -m1(t) satisfies the following IMF conditions, c1(t) = h1(t), c1(t) is P HESS The first IMF component of ; the IMF condition is: in the entire time range, the number of extreme points and zero-crossing points is equal or the difference does not exceed 1, and at any time point, the local mean is 0; Separating the IMF component c1(t) from the unbalanced power, we get the first residual component: r1(t)=P HESS -c1(t) Take the remaining component r1(t) as the new original data, repeat the above steps to finally get the remaining IMF components and residual components, as follows: Among them, c2(t), c3(t), c n (t) are the 2nd, 3rd, and nth IMF components, r2(t), r3(t), r n (t) are the 2nd, 3rd, and nth residual components respectively. Finally, the unbalanced power is decomposed into different IMF components with frequencies from high to low and a monotonous residual signal.
4. A method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage according to claim 1, characterized in that: The method in step 3 comprises: Based on the decomposed residual signal, the IMF components from low frequency to high frequency are accumulated one by one. Each accumulation of an IMF component forms a new power signal. Each accumulation calculates the climbing power of the new power signal. The climbing power calculation formula is as follows: P r (t)=|P(t)-P(t+Δt)| Where Δt is the sampling interval, P r (t) is the energy storage climbing power at time t, and P(t) is the energy storage output power at time t; The formula for calculating the climbing power change rate is as follows: Among them, P r (s) is the energy storage ramp power of the signal after the residual component decomposed by EMD is accumulated with s IMF components; P r (s+1) is the energy storage ramp power of the signal after the residual component decomposed by EMD is accumulated with s+1 IMF components, F r (s) is the rate of change of energy storage climbing power; The initial battery following power is determined as follows: Assume that when s = i, F r (s)Maximum p b =c n +c n-1 +…+c n-i+1 +r n (t) Among them, P b Indicates the initial following power of the battery; Repeat the above steps for the remaining IMF components. When s=j, F r (s) is maximum, then the initial following power of the supercapacitor is determined by the following formula: P sc =c n-i +c n-i-1 +…+c n-i-j+1 Among them, P sc Indicates the initial follow-up power of the supercapacitor; The initial follow power of the flywheel is determined by the following formula; P f =P HESS -P b -P sc ; Among them, P f Indicates the initial follow-up power of the flywheel.
5. A method for coordinating dynamic optimization allocation of active power of multiple types of energy storage as claimed in claim 1, characterized in that: The method formula in step 4 is: Where U b , U sc Represent the battery and supercapacitor terminal voltages respectively, ω n It represents the given following angular velocity of the flywheel, and J represents the moment of inertia.
6. A method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage according to claim 1, characterized in that: The working states of batteries and supercapacitors are divided according to their discharge depth and the speed of the flywheel. Specifically: Battery discharge depth (DOD b ), 0 to 0.2 is the charging forbidden area, 0.2 to 0.4 is the charging warning area, 0.4 to 0.6 is the normal working area, 0.6 to 0.8 is the discharge warning area, and 0.8 to 1.0 is the discharge forbidden area; Supercapacitor discharge depth (DOD sc ), 0-0.1 is the charging forbidden area, 0.1-0.3 is the charging warning area, 0.3-0.7 is the normal working area, 0.7-0.9 is the discharge warning area, and 0.9-1.0 is the discharge forbidden area; Flywheel speed (ω f ), less than 200 is the discharge prohibited area, between 200 and 314 is the discharge warning area, between 314 and 1800 is the normal working area, between 1800 and 2000 is the charging warning area, and greater than 2000 is the charging prohibited area; The critical values of the charge and discharge stages of the three energy storages, batteries, supercapacitors, and flywheels, are shown in the following table: Among them, DOD min Indicates the charging prohibition threshold; DOD L Indicates the charging warning threshold; DOD H Indicates the discharge warning threshold; DOD max Indicates the discharge prohibition threshold.
7. A method for coordinating the dynamic optimization allocation of active power of multiple types of energy storage according to claim 1, characterized in that: The three energy storages of battery, supercapacitor and flywheel have priority and coordinate with each other to compensate for the unbalanced power, as follows: The compensation priorities of the three energy storages are: flywheel>supercapacitor>battery; when a certain energy storage is in the discharge or charge prohibited zone, it will no longer discharge or charge, and its uncompensated unbalanced power will be compensated by the remaining energy storage according to its own working status; for example, when the supercapacitor is in an overcharge or over-discharge state, its uncompensated unbalanced power will be compensated by the flywheel. If the flywheel cannot fully compensate, the remaining unbalanced power will be compensated by the battery.
8. A method for coordinating dynamic optimization allocation of active power of multiple types of energy storage as claimed in claim 1, characterized in that: In step 5, the preliminary following power is updated according to the working status and remaining capacity of the battery, supercapacitor and flywheel, and the formula used includes: The first formula is the calculation formula for updating the following power when the energy storage is in the discharge prohibited area and the warning area, which is the discharge adjustment formula; the second formula is the calculation formula for updating the following power when the energy storage is in the charging prohibited area and the warning area, which is the charging adjustment formula; where P represents the initial following power; P' represents the final following power; DOD x Indicates the current discharge depth of the energy storage system; DOD max Indicates the discharge prohibition threshold; DOD H Indicates the discharge warning threshold; DOD min Indicates the charging prohibition threshold; DOD L Indicates the charging warning threshold; when the energy storage is in the discharge or charging prohibited zone, the energy storage will no longer be charged or discharged, and the final power will be 0; when the energy storage system discharge depth is between the charge / discharge prohibited zone and the charging warning zone, the charging power of the energy storage system will be reduced / increased proportionally.
