Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

555results about How to "Improve modeling efficiency" patented technology

Three-dimensional geological modeling parameter optimization method and system based on deep learning

The invention provides a three-dimensional geological modeling parameter optimization method and system based on deep learning, and relates to the field of geological prospecting and modeling.The method comprises the steps that drilling data and remote sensing data of a geological prospecting area are obtained, and multi-source geological data of three-dimensional geological modeling are formed; generating geological profile map data of the geological features according to the drilling data, generating landform profile map data corresponding to the topographic features according to the remote sensing data, and extracting boundary information of the geological exploration area; carrying out gridding processing on a three-dimensional space, dividing a geologic body of the geological exploration area into a plurality of small grid units, and defining geological modeling parameters; the preliminary three-dimensional geological grid model is constructed according to the geological profile map data, the landform contour map data and the boundary information, the size and the resolution of the grid are dynamically adjusted according to the geological change area, the three-dimensional geological model is obtained through optimization and adjustment, the modeling precision is improved, manual intervention is reduced, and computing resources are saved.
Owner:崂山国家实验室

Data communication method and system based on information security

The invention discloses a data communication method and system based on information security, and belongs to the technical field of data communication, and the data communication method comprises the stages of preparation, transmission, intrusion detection and defense, receiving verification and cleaning ending. The two parties authenticate and exchange keys during preparation; encrypting data by using a symmetric key and an AES algorithm; automatic defense is performed after intrusion detection; the receiver verifies the data; and cleaning the resources at the end, and performing log optimization on the system. According to the invention, through innovatively improving the intrusion detection and defense method, based on real-time network flow monitoring, intrusion analysis based on machine learning and an automatic defense mechanism, the detection accuracy and efficiency are greatly improved, and false alarms and missing alarms are reduced; defense capability and flexibility are enhanced, attacks are intelligently blocked and isolated, and cooperative emergency response is rapid; data communication security technology progress and expansion are promoted, and network security is powerfully guaranteed.
Owner:CHONGQING WITKEY TECH CO LTD

Transformer substation three-dimensional parametric modeling method and system based on engineering design drawing

The invention discloses a transformer substation three-dimensional parametric modeling method and system based on engineering design drawings. The method comprises the following steps: standardizing and correcting a design completion drawing of the transformer substation, and outputting a standardized drawing; the method comprises the following steps of: identifying buildings and power grid equipment and facility components in a transformer substation based on a standardized drawing, extracting geometric information and converting spatial positions to obtain a topological relation, converting extracted geometric parameters into information with definite constraint semantics, and forming modeling parameters according to the obtained spatial positions, semantic attributes, model parameters and the topological relation; and selecting a proper parameterization modeling method to carry out automatic model construction according to the modeling parameters in combination with machine account data, equipment, implementation classification and a predefined model component library. According to the method, the automatic construction technology of the parameterized model is researched by focusing on pattern recognition and semantic and topology extraction, 'associated automatic generation 'of the three-dimensional model of the transformer substation from zero to integer is realized, and the method has low-cost whole-station modeling capability.
Owner:NARI INFORMATION & COMM TECH

Satellite-borne multi-band synthetic aperture radar signal processing optimization method and system

The invention provides a satellite-borne multi-band synthetic aperture radar signal processing optimization method and system, and relates to the technical field of signal processing, and the method comprises the steps: obtaining original echo data of a satellite-borne multi-band synthetic aperture radar, carrying out Doppler center frequency estimation, carrying out two-dimensional matrix product operation, and obtaining compensation echo data; distance direction position information and scattering intensity information are obtained based on a distance direction matching filtering algorithm of sub-band decomposition; determining spatial distribution density, performing adaptive block processing, and performing phase error modeling in each block to generate a continuous phase correction function; performing wavelet domain convolution operation to obtain corrected echo data, obtaining a multi-band two-dimensional image, extracting a multi-dimensional feature vector through a deep neural network, performing weight learning, performing nonlinear weighted fusion, and performing adaptive histogram equalization enhancement to determine a synthetic aperture radar imaging result.
Owner:CHANGDE YUNCHUANG TECHNOLOGY DEVELOPMENT CO LTD

Geographic scene parameterization three-dimensional modeling method and system driven by large language model, storage medium and program product

The invention discloses a geographic scene parameterization three-dimensional modeling method and system driven by a large language model, a storage medium and a program product, belongs to the field of geographic information science, and solves the problems that a geographic 3D scene reconstruction method is time-consuming in the data acquisition and processing process, generated models and scenes lack semantic information and the like. The method comprises the following steps: constructing a progressive three-dimensional scene modeling knowledge graph of a geographic scene; a reasoning context screening mechanism based on spatial autocorrelation and information entropy is constructed based on the geographic entity space and the progressive three-dimensional scene modeling knowledge graph, and a prompt text used for LLMs reasoning is obtained; constructing an implicit association reasoning rule between entities guided by a thinking chain based on a prompt text of LLMs reasoning, and updating a progressive three-dimensional scene modeling knowledge graph; and performing parameterized geographic scene three-dimensional modeling based on a three-dimensional model generation method of a primitive model and modeling object semantics and the updated progressive three-dimensional scene modeling knowledge graph. The method is used for parameterized geographic scene three-dimensional modeling.
Owner:ARMOR ACADEMY OF CHINESE PEOPLES LIBERATION ARMY +1

Point cloud semantic segmentation method and model based on density perception and feature enhancement

The invention relates to a point cloud semantic segmentation method and model based on density perception and feature enhancement, and the method comprises the steps: firstly, carrying out the dynamic density perception sampling in an input point cloud, and carrying out the grouping according to the semantic feature distance; then, after multi-level extraction of deep semantic information, enhancement of relative position information is carried out, and local features of different areas are enhanced; and finally, guiding to recover sampling points according to semantic homogeneity in the up-sampling of the decoder, and fusing the point-level semantic features and the channel-level semantic features by using a bidirectional self-attention mechanism. The model comprises a point cloud input module, a down-sampling module, a cross attention module, a position feature enhancement module, an up-sampling module, a point cloud output module and a trigger threshold judgment module. The method is tested on public data sets S3DIS and Scannet, mIoU reaches 73.0% and 74.8% respectively and is increased by 2.6% and 4.2% respectively relative to a baseline model, and the effectiveness of the method is proved.
Owner:NORTH CHINA ELECTRIC POWER UNIV

Terrain digital twin scene surveying and mapping system based on three-dimensional modeling

The invention discloses a topographic digital twinborn scene surveying and mapping system based on three-dimensional modeling, and relates to the technical field of surveying and mapping science, and the system comprises the following components: an intelligent topographic feature analysis module, a self-adaptive modeling strategy selection module, a self-learning and optimization module and a topographic digital twinborn scene construction and display module. Through the intelligent topographic feature analysis module and the self-adaptive modeling strategy selection module, topographic features can be automatically analyzed, a proper modeling strategy can be matched, a grid simplification algorithm is adopted in a flat area, unnecessary details are effectively removed, key features are kept, the model precision is ensured, and the modeling efficiency is improved. A multi-resolution curved surface modeling technology is adopted in a complex terrain, the model precision is flexibly adjusted, so that the surveying and mapping precision and the modeling efficiency are remarkably improved, in addition, the system is further integrated with a self-learning and optimizing module, modeling parameters and strategies can be continuously optimized, and the surveying and mapping precision and the modeling efficiency are further improved.
Owner:NANTONG DADI SURVEYING & MAPPING CO LTD

Complex pore rock mass finite element modeling method and system based on digital core

The invention discloses a complex pore rock mass finite element modeling method and system based on a digital core, and belongs to the technical field of computers.The method comprises the steps that after a complex pore rock mass sample is subjected to CT scanning, a CT image is processed, and a binary image is obtained; establishing an original three-dimensional digital core model of the rock microstructure according to the binary image; determining first voxel data according to the CT scanning parameters, the size of the CT image and the actual size of the complex pore rock mass sample; based on a nearest neighbor interpolation method and a scaling factor, resampling the first voxel data to reduce the number of voxels to obtain second voxel data, and further generating a first complex pore rock mass finite element model; and adjusting a scaling factor according to the precision difference between the three-dimensional digital core model and the first finite element model, and finally obtaining a target complex pore rock mass finite element model. According to the method, the modeling calculation amount is reduced through resampling, and the modeling efficiency and precision are improved by adjusting the scaling factor.
Owner:WUHAN UNIV OF TECH

Method for automatically generating BIM model based on point cloud data

The invention discloses a method for automatically generating a BIM model based on point cloud data. The method comprises the following steps: step 1, preprocessing original point cloud data; 2, carrying out the semantic segmentation of the point cloud of the building construction; step 3, segmenting point cloud instances of the building components; 4, performing IFC construction reverse Revit modeling based on the point cloud data and the point cloud instance segmentation result, and converting the point cloud data into a three-dimensional BIM model of the building component; 5, after reverse modeling of the building components is completed, all the building components are recombined and integrated based on the coordinate data, a complete three-dimensional BIM building model is formed, accurate positions and relations of all the building components in the global coordinate system are ensured, and overall optimization of the BIM building model is conducted. The invention relates to the technical field of information, and can solve the problems that in the prior art, modeling based on point cloud data depends on manual stroking and mold turning, the efficiency is low, and errors are large.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Language model-based battery health state prediction method, device and product

The invention provides a method, a device and a product for predicting the state of health of a battery based on a language model, and the method comprises the steps: obtaining the time-varying data of the electrical parameters of a target battery at an application side, carrying out the processing, and obtaining the input data according with the input characteristics of the language model, thereby achieving the prediction of the state of health of the battery. The battery health state corresponding to the target battery is obtained through the output characteristics of the target language model, and the pre-trained model backbone in the basic language model is frozen and the adjustable component is trained at the training side by taking the physical principle of the battery as a physical constraint condition, so that the target language model is obtained. By utilizing the generalization ability of the pre-trained model backbone and the generalization ability brought by the interpretability of the physical constraint, the demand for training data in the model training process is reduced, the modeling process is optimized, and the modeling efficiency is improved, so that the effectiveness of the battery health state prediction is improved.
Owner:XIAMEN UNIV PINGTAN RES INST +1

Custom multi-dimensional analysis configuration method, system and equipment based on constellation model and medium

The invention discloses a user-defined multi-dimensional analysis configuration method, system and equipment based on a constellation model and a medium, belongs to the technical field of data analysis, and aims to solve the technical problem that basic data such as dimensions, indexes and data models in multi-dimensional analysis are complicated to construct. According to the technical scheme, according to the method, the dimensionality, the index and the incidence relation between the fact table and the dimensionality table configured by the model table are imported, the mapping between the dimensionality tables is automatically imported into the correlation table, the attribute and the model relation, the model maintenance cost is reduced, and the model maintenance time is shortened; ordered model construction is realized through dimensions, indexes, fact tables, dimension tables, data models and self-defined multi-dimensional query, multi-fact-table dimensions screen application configuration scenes of reverse mapping of property of the fact tables, required indexes are flexibly selected from the fact tables through dragging operation, and according to a cascade mode of the indexes and the dimensions, the application configuration scenes of reverse mapping of property of the property of the fact tables are selected to be matched with the property of the property of the property of the property of the property of the property of the property of the property of the property of the property of the property of the property. And automatically screening out the generality dimension for display.
Owner:INSPUR SOFTWARE TECH CO LTD

Three-dimensional geological model construction method based on potential field interpolation and deep learning coupling

The invention provides a three-dimensional geologic model construction method based on potential field interpolation and deep learning coupling. The method comprises the following steps: S1, constructing a sample data set and carrying out normalization processing; s2, according to the characteristics of the sample data, determining a stratum contact relation in a region by using a variation coefficient between upper and lower stratums; s3, designing a loss function based on a scalar field construction rule and an adaptive stratigraphic sequence; s4, designing a three-dimensional geological prediction model based on the convolutional residual implicit hierarchical network architecture, wherein the three-dimensional geological prediction model comprises a concise full-connection module, a complex convolutional residual module and a hierarchical integration module; s5, fitting a pre-training plane according to sample data features, and capturing stratum features in the region to obtain a similar ideal stratum plane; and S6, predicting a three-dimensional geologic model, loading the pre-trained network parameters to each layer of convolutional residual implicit network for training, enabling the model to converge and output a predicted scalar field value, and then performing contour surface extraction to obtain the three-dimensional geologic model.
Owner:CHINA RAILWAY FIRST SURVEY & DESIGN INST GRP

Bridge finite element model construction method based on three-dimensional laser point cloud

The invention discloses a rapid bridge finite element model construction method based on three-dimensional laser point cloud, and the method comprises the steps: carrying out the omnibearing scanning of a bridge through a high-precision three-dimensional laser scanner, and obtaining complete three-dimensional point cloud data; importing point cloud data obtained by multiple times of scanning into processing software, and carrying out data splicing, alignment and fusion; performing fine processing on the spliced point cloud model to ensure geometric accuracy; exporting the processed point cloud model in a geometric file format, importing the geometric model into finite element analysis software, and performing grid division; and finally, endowing the model with material attributes, boundary conditions and load conditions, and rapidly obtaining stress and deformation data of the bridge structure through static analysis. The method can be used for quickly constructing the finite element model of the construction bridge, the modeling efficiency and geometric accuracy are greatly improved, a solid data basis is provided for construction control of a bridge structure, and the safety and reliability of bridge engineering are improved.
Owner:SHANGHAI CIVIL ENG GRP CO LTD OF CREC +2

Point cloud fusion method based on image and laser and power grid model modeling method thereof

The invention discloses an image and laser-based point cloud fusion method and a power grid model modeling method thereof, and the method comprises the steps: S1, obtaining an image point cloud and a laser point cloud, and respectively extracting point cloud curvature feature points on the surfaces of the point clouds; s2, adopting a point cloud feature histogram algorithm, and performing coarse registration according to the point cloud curvature feature points of the point cloud surfaces of the image point cloud and the laser point cloud extracted in S1 to obtain an initial transformation relation between the image point cloud and the laser point cloud; s3, performing downsampling on the image point cloud and the laser point cloud obtained in the step S1, and performing fine registration on the downsampled image point cloud and laser point cloud by adopting an ICP registration algorithm based on point-to-surface according to the initial transformation relation obtained in the step S2; and S4, converting the image point cloud and the laser point cloud to be under the same reference according to the fine registration in the S3, and fusing the image point cloud and the laser point cloud. According to the method, the technical advantages of ground three-dimensional laser scanning and oblique photogrammetry are effectively combined, and the point cloud cavity problem caused by the technical characteristics of the oblique photogrammetry and the three-dimensional laser scanning is eliminated.
Owner:JIANG SU XUN HUI KE JI GU FEN YOU XIAN GONG SI

Deep learning method for predicting tensile mechanical property of high-toughness concrete

The invention discloses a deep learning method for predicting tensile mechanical properties of high-toughness concrete, and belongs to the technical field of concrete tensile mechanical property prediction.The deep learning method comprises the steps that firstly, a CNN deep learning model is used for replacing traditional machine learning, and the feature mining capacity and prediction capacity of a network are improved; secondly, the Bayesian technology is utilized to realize full-automatic optimization of various hyper-parameters, so that the time consumption is reduced, and the prediction precision is further improved. According to the method, 154 experimental samples collected from literatures prove that the provided BO-CNN method has good prediction capability in predicting the ECC tensile strength and the ultimate tensile strain.
Owner:GUANGDONG UNIV OF TECH

Business modeling guiding method and system, electronic equipment and storage medium

The embodiment of the invention provides a business modeling guiding method and system, electronic equipment and a storage medium, and belongs to the technical field of artificial intelligence. The method comprises the steps of obtaining object label information of a target object and model demand information input by the object in response to a modeling guide instruction of the object on a visual interface, and then performing model recommendation processing according to the object label information and the model demand information to obtain a recommended model list; the model recommendation processing comprises model recommendation based on similar users and model recommendation based on object demands, displaying a recommendation model list which comprises a plurality of recommendation models meeting user preferences and demands, determining a target model in response to a model selection instruction for the recommendation model list, and recommending the target model to the user. And determining a business model according to the target model and the target parameters thereof. According to the invention, personalized business modeling guidance can be provided for the user, and the business modeling efficiency of the user is improved.
Owner:CHINA TELECOM CORP LTD

Airfield pavement engineering three-dimensional model modeling method, system and equipment and storage medium

The invention discloses an airport pavement engineering three-dimensional model modeling method, system and device and a storage medium, and the method comprises the steps: obtaining elevation characters, terrain grids and flatness range boundary geometric information in an airport pavement engineering CAD two-dimensional drawing, and creating a three-dimensional terrain based on Revit; configuring road surface structure design parameters in the three-dimensional terrain; obtaining all region filling conforming to a specific layer naming rule, and based on Boolean operation, performing region filling in the three-dimensional terrain to generate a pavement structure; obtaining pavement sign information, and projecting in the three-dimensional terrain to generate a pavement sign; the method comprises the following steps: acquiring geometric information of a plate seam line, generating a closed outer contour of each pavement plate according to a pavement structure, generating pavement blocks in a three-dimensional terrain, and obtaining angular point positioning points of the blocks; generating a slab joint according to the projection of the block corner positioning points in the three-dimensional terrain; and according to projection of the block corner positioning points in the three-dimensional terrain and calculation, a dowel bar is generated, and establishment of the airport pavement engineering three-dimensional model is completed.
Owner:NORTHWEST DESIGN & RES INST OF CIVIL AVIATION AIRPORT CONSTR GRP CO LTD

Virtual reality system and method for natural environment simulation

The invention provides a virtual reality system and method for natural environment simulation, and the method comprises the steps: obtaining the initial data of natural environment elements, and the initial data comprise the geographic coordinates and timestamps; performing terrain modeling on the initial data by using a fractal algorithm to generate a virtual terrain model; processing the vegetation and hydrological information by applying a physics-based rendering technology; in a virtual reality environment, various sounds in a natural environment are simulated through an omnibearing environment sound effect; dynamically adjusting the weather change in the virtual environment according to the climate information and the timestamp by using an adaptive climate simulation algorithm; in combination with a multi-user interaction system, behavior data of users in a virtual environment are analyzed through a machine learning algorithm, and the performance and user experience of a virtual reality system are optimized. The problems of insufficient data precision, insufficient sense of reality, poor interactivity and the like in the existing natural environment simulation technology are solved, and the sense of reality, the sense of immersion and the user experience of the virtual reality environment are remarkably improved.
Owner:NANJING MOTAI INFORMATION TECHNOLOGY CO LTD

Engine turbine blade digital twin model modeling method based on data driving

The invention relates to the technical field of aero-engine design and simulation, in particular to an engine turbine blade digital twin model modeling method based on data driving. According to the engine turbine blade digital twin modeling method based on data driving, high-dimensional response data are obtained by combining a small amount of sampling with physical model deviation; constructing a model parameter to a full-field response popular structure through popular learning dimensionality reduction; uncertainties are analyzed by adopting chaos polynomial expansion, and uncertainty mapping from parameters to popular characteristics is established; and a random moment mapping model is constructed, and rapid prediction of multi-physical field performance probability behaviors is realized. The fluctuation characteristics are quantized and visualized, a non-intrusive digital twinning framework is established, and the multi-field coupling problem is flexibly solved; physical test dependence is reduced, and a solid guarantee is provided for multi-working-condition performance prediction and optimization of the turbine blade.
Owner:HUNAN UNIV

Virtual geographic scene fusion modeling method and device and computer equipment

ActiveCN119027607AAchieve diverse interaction modesRealize visual expressionInput/output for user-computer interactionKernel methodsPattern recognitionModel reconstruction
The invention relates to a virtual geographic scene fusion modeling method and device and computer equipment. The method comprises the steps of obtaining training sample optimization data; processing the terrain scene of the terrain optimization data by using a triangulated irregular network model; performing three-dimensional model reconstruction and texture coordinate mapping processing on the ground feature optimization data according to a three-dimensional modeling algorithm to obtain a ground feature model; fusing the terrain scene and the ground feature model to obtain a geographic scene fusion model; and obtaining spatial position parameters of the VR equipment according to the scale and the scaling of the geographic scene fusion model, and sending the geographic scene fusion model and the spatial position parameters to the VR equipment. According to the method, efficient classification, data simplification and feature suction are carried out on massive three-dimensional data by adopting a machine learning mode, so that effective scene modeling data are extracted, the data redundancy is greatly reduced, the modeling efficiency is improved, and fusion modeling is carried out on a geographic scene by adopting a spatial constraint relation to break through an existing modeling mode.
Owner:HANGZHOU CITY BRAIN CO LTD

Spectral adaptive incremental learning modeling method and system

The invention discloses a spectrum adaptive incremental learning modeling method and system, which can adaptively amplify the number of hidden layer nodes of a neural network in a learning process, thereby reducing the interference of manual parameter setting and avoiding the generation of a redundant network structure. According to the technical scheme, the method comprises the following steps: acquiring a batch of samples, acquiring spectral data and physicochemical property data of the samples, and constructing a spectral analysis data set; preprocessing the acquired spectral data, and removing abnormal samples and spectral wavelengths containing obvious noise; randomly dividing the analysis data set into a training set and a test set; constructing a spectrum adaptive incremental learning model by using the training set; and performing predictive analysis on the test set by using the obtained model.
Owner:EAST CHINA UNIV OF SCI & TECH

Treatment method and device for structural optimization of electrolyte formula components

The embodiment of the invention relates to a processing method and device for carrying out structure optimization on electrolyte formula components. The method comprises the following steps: constructing a structure optimization model; constructing a first data set and a second data set; performing pre-training based on the first data set, and performing tuning based on the second data set; after the optimization is finished, taking an electrolyte formula input by a user as a current electrolyte formula, performing corresponding three-dimensional molecular structure modeling according to each component molecular sequence of the current electrolyte formula, and performing three-dimensional structure optimization on each component modeling structure based on a structure optimization model; forming a corresponding formula component structure optimization record by each component molecular sequence, the corresponding component type and the component optimization structure; and forming a corresponding formula structure optimization report by all the obtained formula component structure optimization records, and feeding back the report to a user. According to the method, the influence of human factors on the molecular structure modeling quality can be reduced, and the modeling quality and the modeling efficiency are improved.
Owner:BEIJING DP TECH CO LTD

Rapid three-dimensional modeling method, medium and system based on seabed point cloud data

The invention provides a rapid three-dimensional modeling method based on seabed point cloud data, a medium and a system, and belongs to the technical field of seabed depth measurement, and the method comprises the steps: firstly, obtaining low-resolution point cloud data through spatial downsampling, and carrying out the multivariate mixed decomposition of the low-resolution point cloud data, and obtaining a stable component and a variable component; constructing an initial three-dimensional grid model based on the stable component, and then dividing the initial three-dimensional grid model into a plurality of sub-regions by adopting a self-adaptive partitioning strategy; and performing partition processing on the original point cloud data according to sub-regions to obtain a plurality of high-resolution point cloud data blocks. And next, performing anomaly identification and noise reduction processing on each high-resolution point cloud data block, reconstructing a corrected high-resolution point cloud data block, performing grid reconstruction and boundary registration, and constructing a complete high-resolution seabed scene three-dimensional model. And the final high-quality seabed scene three-dimensional model is obtained through processing, so that the technical problem that the existing three-dimensional seabed model cannot fully reflect the detail characteristics of the submarine topography is solved.
Owner:QINGDAO GUOCEN HAIYAO INFORMATION TECH CO LTD

Modeling method and device of pouring assembly, storage medium and electronic equipment

The invention provides a modeling method and device for a pouring assembly, a storage medium and electronic equipment. The method comprises the steps that parameter information of the pouring assembly to be modeled is obtained; the parameter information comprises general parameters, module parameters of each module of the pouring assembly and dependency parameters among the modules; according to the module parameters of each module and the general parameters, constructing a model of each module; and the models of the modules are combined according to the dependency parameters between the modules, and the component model of the pouring component is obtained. By applying the method provided by the embodiment of the invention, the modeling efficiency of the pouring assembly can be improved.
Owner:SHENZHEN SHICHUANG TENGYANG TECHNOLOGY CO LTD

Digital twin modeling method, device and equipment and storage medium

The invention provides a digital twin modeling method, device and equipment and a storage medium, and relates to the technical field of digital twin modeling, and the method comprises the steps: obtaining initial point cloud data; obtaining preprocessed point cloud data; obtaining first point cloud feature information according to the preprocessed point cloud data; carrying out object classification and segmentation processing to obtain second point cloud feature information; generating an interactive twin model; and acquiring real-time state information, and updating the interactive twinborn model according to the real-time state information. Convolutional feature extraction processing based on point cloud data is realized by generating the point cloud image, global and local features of the point cloud can be efficiently extracted, the modeling efficiency and precision are improved, the high modeling precision is beneficial to guaranteeing the precision of an interactive twinborn model to accurately reflect an actual scene, and the method is suitable for large-scale popularization and application. And meanwhile, the high modeling efficiency is beneficial to realizing synchronous change of the interactive twinborn model and an actual scene, the monitoring and interaction real-time performance of digital twinborn is improved, and the monitoring and management requirements of a machine room can be met.
Owner:INSPUR TIANYUAN COMM INFORMATION SYST CO LTD

3D airport model construction method and system based on GIS system

The invention belongs to the technical field of civil airport digitization, and discloses a 3D airport model construction method and system based on a GIS system. The method comprises the steps that in the two-dimensional vector GIS data processing process, the three-dimensional modeling process, the abnormal data processing process and the process link execution process, the captured current execution context abnormal information is subjected to generation of an abnormal unique ID, packaging into a message notification object and sending to a monitor, the monitor temporarily stores abnormal data, and after the whole process link is executed, the abnormal data is uniformly displayed to a user for viewing. The method does not depend on heavy BIM commercial software, and the whole scheme is free and light. Based on the above characteristics, a GIS data 3D modeling method depending on BIM software as transition is abandoned, a lightweight GIS data 3D modeling method is adopted, the use cost is reduced, and the modeling efficiency is improved.
Owner:QINGDAO CIVIL AVIATION KAIYA SYST INTEGRATION CO LTD

A simulation modeling method and device based on graphic matching recognition

The present invention discloses a simulation modeling method based on graphic matching recognition, comprising: obtaining configuration information of drawings in a source file of a first format, the configuration information including line segment information and text information; generating a redrawn picture and a mapping table according to the obtained configuration information, wherein the redrawn picture includes a library composed of line segments and connecting line segments between the libraries, and the mapping table includes a mapping relationship between text content and line segments and their position coordinates; identifying the library category, the attributes of the connecting line segments, and the parameter attributes in the mapping table in the redrawn picture according to a preset feature information library; converting the identified library category, the attributes of the connecting line segments, and the parameter attributes into a simulation model file; importing the simulation model file into a simulation modeling software to generate an executable simulation model. Correspondingly, a simulation modeling device based on graphic matching recognition is also provided. The simulation modeling method can improve modeling efficiency and modeling accuracy.
Owner:CHINA NUCLEAR POWER ENGINEERING CO LTD

Double-curvature arch dam BIM (Building Information Modeling) generation method, device and equipment and storage medium

The invention relates to the technical field of hydraulic engineering modeling, and discloses a double-curvature arch dam BIM model generation method and device, equipment and a storage medium. The method comprises the following steps: on the basis of elevation parameter information and a parameter equation of a target arch dam model, creating a basic body of the target arch dam model through a Dynamo programming plug-in; determining a target component required by the target arch dam model according to a simulation analysis task needing to be executed; in the Dynamo programming plug-in, the basic body and the target component are loaded; and under the condition that the type of the target component is one or more, running a fusion code, combining the basic body and the target component, and generating the target arch dam model. By adopting the method, high-precision arch dam models of different structures can be quickly generated, the modeling efficiency and the modeling precision of the arch dam models are improved, and the time cost and the labor cost are saved.
Owner:THREE GORGES GROUP IND DEVELOPMENT (BEIJING) CO LTD +1

Method for predicting mechanical property of woven composite material structure

The invention relates to a mechanical property prediction method for a woven composite material structure, and the method comprises the steps: obtaining a microscopic CT image of the woven composite material structure; carrying out image preprocessing on the CT image; segmenting a fiber bundle in the preprocessed image to obtain a segmented fiber bundle image; extracting a fiber bundle trend center line from the segmented fiber bundle image; establishing a macroscopic geometric model of the woven composite material structure, and performing unit grid division on the geometric model; establishing a relation between a fiber bundle trend center line and a geometric model unit; calculating mechanical property parameters of each unit one by one; and calculating the macromechanical response of the composite material structure. According to the method for predicting the mechanical property of the woven composite material structure, the grid division independent of the microstructure characteristics is adopted, so that the modeling efficiency can be improved, the modeling difficulty can be reduced, and the method is easy to implement.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS