A device and method for monitoring coal dust collection by drilling cuttings method in underground coal mines
By using horizontal conduits and tensioning jaws in the detection of underground drilling chips of coal mines, the problems of coal dust dissipation and insufficient collection are solved, more accurate impact ground pressure monitoring is achieved, and work efficiency and safety are improved. sex.
Patent Information
- Application Number
- CN202210278402.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-21
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-03-21
AI Technical Summary
When detecting impact ground pressure by drilling chips in the coal mine underground, the coal powder is prone to drift, resulting in insufficient collection and pollution, affecting the accuracy of the detection data.
A coal powder collection device including a horizontal conduit, a collection conduit and a tensioner is designed. The coal powder is fixed by using a tensioner and a clamp of flexible material. All the drilled coal powder is collected into the collection bag through the collection conduit. Avoid loss and pollution of coal powder.
It improves the collection accuracy and operability of coal powder, enhances the monitoring accuracy of impact ground pressure, reduces the loss rate of coal powder, and improves work efficiency.
Smart Images

Figure CN114705481B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mine drilling cuttings construction, and discloses a coal dust collection device and method for monitoring coal mine drilling cuttings underground. Background Art
[0002] In the process of underground coal mining, the impact of rock burst is becoming more and more serious due to the continuous increase in mining depth. When rock burst occurs, coal and rock are thrown out, support is damaged, rock collapse occurs, tunnels are blocked, and casualties occur, which has become one of the major disasters restricting mine production and safety. At present, the main prediction methods for rock burst are rock mechanics method and geophysical method. Among the rock mechanics methods, the drill cuttings method has been widely used in coal mines as the simplest and most convenient monitoring method.
[0003] At present, when coal mines use the drill cuttings method to detect rock burst, they use a 42mm diameter twist drill rod to drill into the coal body, and use woven bags or plastic sheets spread on the ground to collect the drilled coal powder. This method makes it easy for the coal powder to float everywhere, which also pollutes the surrounding working environment. At the same time, the amount of coal powder collected is inaccurate, resulting in the drill cuttings method detection data cannot truly reflect the impact hazard status of the construction site. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides a device and method for collecting coal dust by drilling cuttings in underground coal mines. During the construction of coal dust monitoring holes, the discharged coal dust falls into the collection bag from the bottom, so that all the drilled coal dust can be collected, and the phenomenon of insufficient coal dust collection is eliminated. At the same time, the accuracy and operability of coal dust sampling are improved, and powerful hardware support is provided for better and more accurate determination of the impact risk. It is mainly used for drilling coal dust monitoring holes in mining heads with impact risks in coal mines, collecting all the drilled coal dust, and improving the local monitoring and early warning capabilities of impact ground pressure.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A device for monitoring coal powder collection by the drill cuttings method in underground coal mines comprises a horizontal conduit, a collecting conduit and a tensioning claw, wherein the collecting conduit is connected to the front of the horizontal conduit; the tensioning claw is a tough steel bar with a barb at the front end, and a plurality of tensioning claws are evenly distributed and connected to the inner wall of the front end of the horizontal conduit in a radial shape; a movable clamp is sleeved on the tensioning claw.
[0007] Furthermore, the lower end of the collecting conduit is connected to a coal powder collecting device.
[0008] Furthermore, a detachable cover is provided at the lower end of the collecting conduit.
[0009] Furthermore, the clamp is made of a flexible material, and a rigid ring is embedded at the inner edge of the flexible material.
[0010] Furthermore, a handle is connected to the upper portion of the horizontal conduit.
[0011] A method for collecting coal dust by monitoring the drilling cuttings method in underground coal mines, which adopts a device for collecting coal dust, and its specific steps are as follows:
[0012] Step 1: Use a drill rod to drill into the coal body to a depth of 0.3m and prefabricate a monitoring hole;
[0013] Step 2: insert the tensioning claw into the monitoring hole and fix the device for collecting coal powder on the coal body;
[0014] Step 3: The drill rod is inserted from the rear end of the horizontal guide tube, the monitoring hole is constructed, and the coal powder is collected by drilling.
[0015] Furthermore, during the process of drilling out the coal powder in step three, the drill rod is pulled out multiple times and / or the drill rod is controlled to reverse, so as to drive the coal powder to be discharged from the monitoring hole.
[0016] Compared with the prior art, the present invention has achieved the following technical effects:
[0017] The present invention solves the problems of insufficient coal powder collection and large coal dust, improves the accuracy of coal powder measurement, increases the accuracy of detecting impact ground pressure, is easy to use, economical and practical, can greatly improve work efficiency, and reduce the coal powder loss rate. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 : A schematic diagram of the structure of the device for collecting coal powder of the present invention;
[0019] Figure 2 : A schematic structural diagram of the clamp 4 of the present invention;
[0020] Figure 3 : Schematic diagram of collecting coal powder in the present invention;
[0021] Figure 4 : Another schematic diagram of collecting coal powder according to the present invention. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0023] like Figure 1 As shown, a coal dust collection device for monitoring coal dust by drilling cuttings method in coal mines is used. A section of 3-inch steel pipe is selected as a horizontal conduit 1, and a hole is opened in the front wall of the 3-inch steel pipe; a section of 0.2m 3-inch steel pipe is selected and welded in the hole to serve as a collection conduit 2; the horizontal conduit 1 and the collection conduit 2 are connected to each other.
[0024] A steel bar with toughness is selected, and a barb is made at its front end to serve as the tensioning claw 3. The rear ends of multiple tensioning claws 3 are evenly distributed and welded to the front inner wall of the horizontal conduit 1. The tensioning claws 3 after welding are radially opened in all directions. The length of the tensioning claw 3 is less than 0.3m. The clamp 4 is sleeved on the tensioning claw 3 and can slide on the tensioning claw 3. The clamp 4 is used to bundle the tensioning claw 3 and control the tightening and opening of the tensioning claw 3.
[0025] In order to facilitate the operation of the device for collecting coal powder, a handle 5 is welded on the upper part of the horizontal conduit 1.
[0026] like Figure 2 As shown, the clamp 4 is made of a flexible material 41 , and a rigid ring 42 is embedded at the inner edge of the flexible material 41 to prevent the clamp 4 from being radially deformed under the tension of the tensioning claw 3 .
[0027] like Figure 3 As shown, a coal powder collecting device 21, such as a collecting bag or a collecting box, is connected to the lower end of the collecting duct 2. The drilled coal powder flows into the powder collecting device 21 through the collecting duct 2, thereby completely collecting the coal powder and isolating it from the external environment to avoid contamination of the coal powder, thereby improving the accuracy and operability of coal powder sampling.
[0028] like Figure 4 As shown, a detachable cover 22 is connected to the lower end of the collecting conduit 2, and a connection method such as thread or buckle can be adopted to use the collecting conduit 2 as a device for collecting coal powder. After the coal powder is drilled out, the detachable cover 22 is opened and the coal powder is taken out. In the same way, all the coal powder is collected and isolated from the external environment, so that the coal powder is prevented from being contaminated, and the accuracy and operability of coal powder sampling are improved.
[0029] In the process of collecting coal dust by the drilling cuttings method, a monitoring hole is first prefabricated with a drill rod, that is, a 0.3m depth is drilled into the coal body; then the tensioning claw 3 is pushed into the monitoring hole, and as the tensioning claw 3 goes deeper into the monitoring hole, the clamp 4 contacts the coal body and slides backward, and the tensioning claw 3 automatically opens and buckles in the monitoring hole to fix the coal dust collecting device on the coal body. The clamp 4 made of flexible material 41 is located between the horizontal conduit 1 and the coal body, which can fill the gap between the horizontal conduit 1 and the coal body to prevent coal dust from spilling; then the drill rod is passed through the horizontal conduit 1 to start constructing the coal dust monitoring hole. During the process of drilling coal dust, the drill rod is pulled and / or the drill rod is reversed for multiple times to drive the coal dust to be discharged from the monitoring hole, and the discharged coal dust is collected through the collecting conduit 2.
[0030] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A device for collecting coal dust using a drilling cuttings method for monitoring coal dust in underground coal mines, comprising a horizontal conduit (1), a collecting conduit (2) and a tensioning claw (3), characterized in that: The collecting duct (2) is connected to the front of the horizontal duct (1); the tensioning claw (3) is a tough steel bar with a barb at the front end, and a plurality of tensioning claws (3) are evenly distributed and connected to the inner wall of the front end of the horizontal duct (1) in a radial pattern; a movable clamp (4) is sleeved on the tensioning claw (3); the clamp (4) is made of a flexible material (41), and a rigid ring (42) is embedded at the inner edge of the flexible material (41).
2. A device for collecting coal dust using a drilling cuttings method in underground coal mines according to claim 1, characterized in that: The lower end of the collecting conduit (2) is connected to a coal powder collecting device (21).
3. A device for collecting coal dust using drilling cuttings method in underground coal mines according to claim 1, characterized in that: A detachable cover (22) is provided at the lower end of the collecting conduit (2).
4. A device for collecting coal dust using a drilling cuttings method in underground coal mines according to claim 1, characterized in that: A handle (5) is connected to the upper portion of the horizontal conduit (1).
5. A method for collecting coal dust by monitoring the drilling cuttings in underground coal mines, characterized in that: The coal powder collection device according to any one of claims 1 to 4 is used for construction, and the specific steps are as follows: Step 1: Use a drill rod to drill into the coal body to a depth of 0.3m and prefabricate a monitoring hole; Step 2: insert the tensioning claw (3) into the monitoring hole, and fix the device for collecting coal powder on the coal body; Step 3: The drill rod is inserted from the rear end of the horizontal guide tube (1), the monitoring hole is constructed, and the coal powder is collected by drilling.
6. The method for collecting coal dust by monitoring the drilling cuttings in underground coal mines according to claim 5, characterized in that: During the process of drilling out the coal powder in step three, the drill rod is pulled out multiple times and / or the drill rod is controlled to reverse, so as to drive the coal powder to be discharged from the monitoring hole.