Intelligent control method for gantry hoisting on railway lines
The wireless control device controls the entire process of the railway line gantry crane, which solves the problems of low hoisting efficiency and insufficient safety in the existing technology, enables efficient and safe hoisting and replacement of line components of different lengths, and adapts to complex working conditions. need.
Patent Information
- Application Number
- CN202210493452.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-07
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-05-07
AI Technical Summary
Existing railway line gantry crane transportation equipment has problems such as low operating efficiency, low safety, high cost and inconvenience to use. Especially when hoisting long or heavy line components, human control is difficult to synchronize, and there are problems such as swinging, deformation and safety of heavy objects. Hidden danger.
Wireless control devices are used to control the entire process of multiple door crane devices, and hoisting operations are realized through wireless synchronized collaborative control, ensuring real-time control of the transportation, deployment, hoisting and recovery processes of door crane devices, and providing safety interlocking and multi-machine synchronization Function, suitable for replacement of line components of different lengths.
It improves operating efficiency and safety, reduces costs, enables smooth replacement of various line components, avoids heavy object swings and safety hazards during hoisting, adapts to complex working conditions, and simplifies equipment maintenance and operation.
Smart Images

Figure CN114715781B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of railway engineering machinery, and in particular to an intelligent control method for gantry hoisting for laying, replacing and hoisting track line components. Background Art
[0002] At present, the mileage of high-speed railways in my country has reached 35,000 kilometers, and the volume of passenger traffic has reached 70% of the total passenger traffic. Its normal operation has an increasing impact on national travel and business activities. Therefore, on-site lifting, replacement and maintenance of high-speed railway line components has become a top priority in the field of track engineering machinery line maintenance technology. At present, line components are mainly lifted and replaced by rail cranes, cantilever cranes, etc. For the replacement of longer and heavier line components, such as rails, point rails, switch cores and other components, when multiple rail cranes are used for operation, manual control is often difficult to achieve synchronization, and heavy objects swing and deform greatly, which seriously affects construction efficiency; when using cantilever cranes for operation, the cantilever is very easy to touch the contact network on the upper part of the railway line, and there are serious safety hazards in the operation; other single-point or two-point lifting methods are not suitable for replacement parts with large length and volume. After lifting, the weight of large line components is transferred to the line through the bogie, which causes great damage to the line. The gantry cranes currently widely used in the lifting industry have the following technical defects:
[0003] 1) Due to its large structure and inflexible operation, it is not easy to transport it to the railway line for operation;
[0004] 2) The height and width of the gantry crane legs cannot be adjusted, the horizontal span spacing and the height from the ground are fixed, which makes it difficult to adapt to the complex working conditions of different ground heights and different line widths on site;
[0005] 3) A single gantry crane cannot meet the needs of replacing parts of different lengths, takes up a lot of space, is heavy, and is inconvenient to transport and place;
[0006] 4) There are safety risks, low operating efficiency, and a low degree of integration of transportation, layout, and operating processes. At the same time, there is the possibility of occupying adjacent lines and exceeding the limit during the operation.
[0007] In the prior art, the following technical solutions are mainly related to the present invention:
[0008] Prior art 1 is a Chinese utility model patent applied by Shaanxi Jiangfeng Construction Engineering Co., Ltd. on April 29, 2014 and announced on November 19, 2014, with the announcement number CN203950150U. The utility model discloses a group crane synchronous control system, including a control terminal, a main controller, a sub-controller, and a remote monitoring computer. The main controller is used to execute the command of the control terminal and receive the information fed back by the sub-controller; the sub-controller is used to execute the command of the main controller and receive the information collected by the tension sensor; the control terminal and the main controller and the remote monitoring computer adopt a wireless communication control method; the main controller receives the control instructions sent by the remote monitoring computer to realize the control of the forward / reverse / stop of all electric hoist motors; an A / D converter is provided to collect the output signal of the tension sensor, which is sent to the single-chip microcomputer through the SPI interface, converted into a tension signal, and then sent to the remote monitoring computer for display to the user. The system is easy to operate, improves the safety performance of the group crane system, has an overload shutdown alarm, and a response speed of milliseconds, which is particularly suitable for the lifting operation with obstructed vision and prone to collision and scratching.
[0009] However, the group crane synchronization control system of the prior art 1 is applied to the construction industry, and its control object is a tower crane. The synchronization control precision requirement is not high, the system integration level is low, and it is not convenient to operate and maintain. Summary of the invention
[0010] In view of this, the purpose of the present invention is to provide an intelligent control method for railway gantry hoisting to solve the technical problems of low operating efficiency, low safety, high cost and inconvenience in use of existing control methods.
[0011] In order to achieve the above-mentioned invention object, the present invention specifically provides a technical implementation scheme of a railway line gantry hoisting intelligent control method, and the railway line gantry hoisting intelligent control method comprises the following steps:
[0012] S10) When replacing line components, several door hanging devices and lifting platforms are transported to the operation site by the first flat car according to the lifting requirements;
[0013] S20) After arriving at the work site, the lifting platform is controlled by the wireless control device to deploy the gantry crane device in place according to the position and sequence, the first flat car drives away, and the small outrigger leveling control is performed according to the inclination of the gantry crane device;
[0014] S30) performing wireless synchronous coordinated control of the deployed gantry crane device through the wireless control device to complete the lifting operation of the line component; during the operation of the gantry crane device, synchronously controlling the lateral movement and lifting of the line component;
[0015] S40) After the lifting operation is completed, the first flat car enters, recovers the door hanging device and fixes it thereon, and the first flat car drives away.
[0016] Furthermore, the control process of the wireless control device includes the following steps:
[0017] The operator inputs the operation instructions through the control panel, and the operation instructions are transmitted to the processor. The processor receives the data from each wireless networking sub-node module through the wireless networking central node module and makes fault judgment based on the received data;
[0018] The processor performs calculations and judgments based on the operation instructions and the received data to determine whether the corresponding control logic requirements are met. For operation instructions that meet the control logic requirements, they can be sent to each wireless networking sub-node module through the wireless networking center node module, and the processor outputs the calculation results that meet the control logic requirements and fault judgment information to the display;
[0019] The controller receives operation instructions from the wireless networking sub-node module, and controls the servo motor to drive the corresponding mechanism of the door hanging device or the lifting platform through the driver; the sensor collects detection data of the corresponding mechanism of the door hanging device or the lifting platform, and transmits it to the wireless networking sub-node module through the driver and the controller in turn, and the wireless networking sub-node module sends the data to the wireless networking center node module.
[0020] Furthermore, the operation instructions are sent to each wireless networking sub-node module through the wireless networking central node module, and then the controller parses the local control instructions according to the communication protocol and its own communication address and executes the corresponding action; the data transmitted from each wireless networking sub-node module to the wireless networking central node module is received by the wireless networking central node module using a queuing polling method.
[0021] Furthermore, the operating instructions of the gantry crane device include lifting and lowering and lateral movement of the lifting device, lifting and lowering and lateral movement of the legs, and lifting and lowering of the small legs; the operating instructions of the lifting platform include platform rotation, lifting and longitudinal movement.
[0022] Further, the step S10) includes:
[0023] During the process of transporting the gantry crane device by the first flat car, the wireless control device can enter the transport mode by selection, and monitor the fixing and locking status of the gantry crane device and the lifting platform in real time through the display.
[0024] Further, the step S20) includes:
[0025] When the gantry crane and the line components required for the operation are transported to the operation site, the wireless control device can enter the deployment mode by selecting, by operating the buttons of the lifting platform control area and the gantry crane control area on the control panel, and then the processor performs control logic operations according to the operating instructions, the gantry crane and the lifting platform status, to realize the lifting platform clamping of the gantry crane, the lateral movement and lifting of the legs, the rotation, lifting and longitudinal movement of the lifting platform, and finally realize the safe deployment of several gantry cranes from the first flat car to the track surface.
[0026] Further, the step S30) includes:
[0027] When the gantry crane device is deployed, the wireless control device can enter the operation mode by selecting and operating the buttons in the gantry crane device control area. The processor then performs control logic operations according to the operating instructions and the status of the gantry crane device, thereby realizing the coordinated operation of the outrigger lifting, small outrigger lifting, lifting transverse movement, lifting and lifting, and lifting unlocking for several gantry crane devices selected for use. At the same time, the real-time position and load of each gantry crane device are negatively feedback adjusted, ultimately achieving smooth replacement of line components.
[0028] Further, the step S20) includes:
[0029] S201) When the door hanging device is deployed, the wireless control device enters the deployment mode by selection;
[0030] S202) controlling the lifting platform to rise by the wireless control device until the door hanging device is lifted and separated from the installation plane of the first flat car, stopping the rising action, and prompting the operator to perform the clamping and locking operation of the door hanging device;
[0031] S203) controlling the clamping and locking mechanism of the lifting platform through the wireless control device to lock the door hanging device, and after detecting the clamping and locking signal, operating the lifting platform to continue to rise, and the rising height is controlled by the operator;
[0032] S204) When the lifting platform rises to the highest position, the lifting platform is controlled to rotate by the wireless control device, and when a signal that the lifting platform rotates to 90° is detected, the lifting platform stops rotating;
[0033] S205) Controlling the lifting platform to move longitudinally by operating the platform longitudinal movement button until the laser line on the gantry crane device is aligned with the ground mark, and at the same time controlling the outrigger to move horizontally to above the track pavement by operating the outrigger transverse movement button to complete the placement and alignment of the gantry crane device;
[0034] S206) controlling the lifting platform to descend and the legs to extend by means of a wireless control device until the small legs are close to the ground and stop, and then unlocking the clamping locking mechanism;
[0035] S207) operating the outrigger one-touch ground button on the control panel, and at the same time, driving each small outrigger to extend through a small torque and touch the ground respectively without supporting the entire door hanging device, so as to achieve the purpose of no empty legs; operating the small outrigger to continue to extend synchronously or the lifting platform to descend until the door hanging device is separated from the lifting platform;
[0036] S208) operating the one-key leveling button on the control panel, each leg and the small leg automatically extend and retract to adjust the horizontal and vertical levels of the door hanging device to be less than the set value, and the leveling of the door hanging device is completed. At this time, the deployment of the first door hanging device is completed;
[0037] S209) transporting the lifting platform to the deployment position of the second door hanging device by the first flat car;
[0038] S210) controlling the lifting platform through the wireless control device to lift the second door hanging device to the highest position, and then controlling the lifting platform to rotate 180°, and repeating steps S205) to S208) to complete the deployment of the second door hanging device;
[0039] S211) Repeat steps S202) to S209) to complete the deployment of other door hanging devices.
[0040] Furthermore, the door hanging device includes a lifting device, and the lifting device includes a transverse running mechanism and a hook connected to the transverse running mechanism and used for lifting the line components. The step S30) includes:
[0041] S301) before lifting and placing the line components, releasing the hook lock and unlocking the transverse travel mechanism through the wireless control device;
[0042] S302) The second flat car drives into the designated operation area and completes longitudinal alignment according to the laser line on the door hanging device to align the end of the line component on the second flat car with the end of the line component to be replaced;
[0043] S303) Synchronously controlling the transverse travel mechanism of each door hanging device to move to a specified position through a wireless control device, controlling the hook to descend, and fine-tuning the position of the transverse travel mechanism so that the transverse travel mechanism is located directly above the lifting point;
[0044] S304) After the hook hooks the line component, the lifting rope of the hook is in a relaxed state, and the hook of each door hanging device is controlled to rise by operating the one-touch pre-tightening button on the control panel, and automatically stops when the lifting rope is straightened;
[0045] S305) operating the synchronous lifting button on the control panel to synchronously lift the line components to a specified height; during this period, operating the synchronous lateral movement button on the control panel as needed to control the synchronous lateral movement of all the hooks;
[0046] S306) During the hoisting process, the lifting displacement, lateral displacement and hook tension of each lifting device are monitored to determine whether the lifting devices are synchronized. If the tension, lifting displacement or lateral displacement of a hook is detected to be significantly different from that of other lifting devices during the operation, all lifting devices are immediately stopped, and the abnormal parts and parameters are displayed on the display to remind the operator to perform individual control, and the lifting devices are adjusted to a reasonable position before continuing the synchronous action;
[0047] S307) After the line component is lifted, the second flat car drives away from the operation area and places the line component at the designated position through synchronous control, thereby completing the placement of the line component.
[0048] Further, the step S40) includes:
[0049] S401) When the door hanging device is recovered, the hook and the transverse travel mechanism are locked at zero position;
[0050] S402) The first flat car transports the lifting platform to the bottom of the door hanging device in the operation area, controls the longitudinal movement of the lifting platform through the wireless control device, fine-tunes the lifting platform and the door hanging device to complete the alignment, and the lifting platform continues to rise until the small legs of the door hanging device are lifted off the ground;
[0051] S403) prompting the operator to perform a clamping and locking operation on the door hanging device, and controlling the clamping and locking mechanism of the lifting platform through the wireless control device to lock the door hanging device, thereby completing the clamping and locking;
[0052] S404) controlling the gantry crane device to quickly retract the outriggers and the small outriggers by operating the outrigger one-touch retraction button, and to move them horizontally to their respective zero-position locking positions, thereby completing the first gantry crane device retraction;
[0053] S405) Control the lifting platform through the wireless control device to lift the first door hanging device to the highest position, then control the lifting platform to rotate 180 degrees, and transport the lifting platform to the bottom of the second door hanging device through the first flat car, and repeat steps S402) to S404) to complete the recovery of the second door hanging device;
[0054] S406) controlling the lifting platform to rise by wireless remote control, lifting the two door hanging devices to the highest position, then controlling the lifting platform to rotate 90° to the initial position, unlocking the clamping locking mechanism, controlling the lifting platform to descend to the initial position, and operating the locking mechanisms of various moving parts of the door hanging devices to lock them;
[0055] S407) Repeat steps S402) to S406) to complete the recovery of other door hanging devices;
[0056] S408) After all door hanging devices are retracted and locked in sequence, the mode selection button on the control panel is switched to the transportation mode to facilitate monitoring of the locking status of the door hanging devices and the lifting platform before and during transportation.
[0057] Furthermore, before the door hanging device is deployed and placed, the following steps are also included:
[0058] S101) Turn on the laser switch and lighting switch on the control box of each door hanging device;
[0059] S102) manually releasing the locking rope and positioning pin of the door hanging device on the first flat car;
[0060] S103) Manually unlocking the legs and small legs of the door hanging device;
[0061] S104) Manually unlocking the lifting, rotating and longitudinal movement mechanisms of the lifting platform.
[0062] Further, a tilt sensor is arranged on the truss of the door hanging device, and the step S20) comprises:
[0063] After the gantry crane is deployed, the tilt status data of the gantry crane is obtained through the tilt sensor. When a small leg of the gantry crane sinks and causes the gantry crane to tilt, the processor calculates the lifting height of the remaining small legs based on the tilt status data to achieve leveling of the gantry crane and avoid the occurrence of the false leg phenomenon.
[0064] By implementing the technical solution of the intelligent control method for railway line gantry hoisting provided by the present invention, the following beneficial effects are achieved:
[0065] (1) The intelligent control method for gantry crane operation on railway lines of the present invention can realize the overall control of the whole process of multiple gantry cranes by using a wireless control device, solve the real-time control of the operation process of gantry crane transportation, deployment, lifting, recovery, etc., as well as the control problems of safety interlocking, multi-machine synchronization, emergency measures, etc., with high operation efficiency and safety, low cost, and easy operation and control;
[0066] (2) The railway line gantry lifting intelligent control method of the present invention is suitable for the replacement of a whole set of turnouts as well as the replacement of a single point rail, turnout core, etc., and can realize the transportation, placement, position adjustment and replacement of various line components of different lengths through the wireless reconnection consistency control of the synchronous lateral movement, lifting and lowering actions of multiple gantry cranes during the lifting process;
[0067] (3) The intelligent control method for gantry crane operation on railway lines of the present invention ensures the safety of the operation process to the greatest extent possible through real-time safety interlock monitoring of multiple gantry cranes and lifting platforms during transportation, coordinated operation and safety interlocking with the lifting platform during the recovery of the gantry crane, real-time monitoring of the locking of the gantry crane and the lifting platform, and emergency control measures and intelligent fault maintenance in various fault situations;
[0068] (4) The intelligent control method for gantry crane operation on railway lines of the present invention has legs of the gantry crane device arranged on both sides of the railway line. The replacement of line components will not occupy the space of the adjacent line, and there is no safety risk of over-limit operation. The operation is flexible and can well adapt to the operation requirements under complex line conditions. At the same time, the gantry crane device has a simple structure, small space occupation, light weight, high reliability, easy maintenance and repair, low manufacturing cost and high operation efficiency.
[0069] (5) The intelligent control method for gantry hoisting of railway lines of the present invention has the functions of lateral movement, lifting and leveling of the legs. The lateral span spacing and the height from the ground of the legs are adjustable, which can meet the functions required by different ground working conditions of different lines. The placement and recovery of the gantry hoist can be achieved through a lifting platform with adjustable height. There is no risk of touching the contact network during the lifting process.
[0070] (6) The intelligent control method for gantry crane operation on railway lines of the present invention can intelligently control various operation links of multiple gantry cranes through integrated wireless intelligent control, which can solve the intelligent control of operation processes such as transportation, deployment, lifting, and recovery, as well as technical problems such as multi-machine synchronization and safety monitoring; multiple gantry cranes and lifting platform flat cars can touch the ground with one button when deployed, avoiding dangerous phenomena such as empty legs; during the deployment of the gantry crane, the gantry crane cooperates with the lifting platform, and the hooks of multiple gantry cranes are tensioned with one button, which can avoid uneven force on the group cranes and even deformation of the objects being lifted; when the gantry crane is recovered, the control system is set with a one-button retraction function to avoid the technical problems of time-consuming and low efficiency of retracting multiple legs one by one; the gantry crane is placed on the track surface, and the horizontality of the truss is monitored in real time, which can effectively avoid uneven ground bearing capacity, such as tilting or even overturning of pits after being loaded. BRIEF DESCRIPTION OF THE DRAWINGS
[0071] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other embodiments can be obtained based on these drawings without creative work.
[0072] Figure 1It is a system structure block diagram of a specific embodiment of the wireless control system based on the railway line gantry hoisting intelligent control method of the present invention;
[0073] Figure 2 It is a control principle block diagram of an operating mechanism of a specific embodiment of a wireless control system based on the railway line gantry hoisting intelligent control method of the present invention;
[0074] Figure 3 It is a system structure block diagram of a gantry crane control system of a specific embodiment of the wireless control system based on the railway line gantry crane intelligent control method of the present invention;
[0075] Figure 4 It is a system structure block diagram of a lifting platform control system of a specific embodiment of the wireless control system based on the railway line gantry hoisting intelligent control method of the present invention;
[0076] Figure 5 It is a schematic diagram of the three-dimensional structure of a wireless control device of a specific embodiment of the wireless control system based on the railway line gantry hoisting intelligent control method of the present invention;
[0077] Figure 6 It is a plan view of a control panel of a wireless control device of a specific embodiment of the wireless control system based on the intelligent control method for gantry hoisting of railway lines of the present invention;
[0078] Figure 7 It is a flow chart of transport-deployment-operation-recovery of a specific embodiment of the intelligent control method for railway line gantry hoisting of the present invention;
[0079] Figure 8 It is a schematic diagram of the transport structure of the gantry crane device in a specific embodiment of the intelligent control method for gantry crane transportation on railway lines of the present invention;
[0080] Fig. 9 It is a schematic diagram of the transport structure of the gantry crane device in another viewing angle in a specific embodiment of the railway line gantry crane intelligent control method of the present invention;
[0081] Fig.10 It is a schematic diagram of the three-dimensional structure of a gantry crane device (excluding the front shielding of the truss) in a specific embodiment of the intelligent control method for gantry crane transportation of railway lines of the present invention;
[0082] Fig.11 The present invention Fig.10 A schematic diagram of a local enlarged structure;
[0083] Fig.12 The present invention Fig.10 A schematic diagram of a partially enlarged structure of another part;
[0084] Fig.13It is a schematic diagram of the structure of the lifting mechanism of the gantry crane device in a specific embodiment of the railway line gantry crane intelligent control system based on the method of the present invention;
[0085] Fig.14 It is a schematic diagram of the structure of the transverse travel mechanism of the gantry crane device in a specific embodiment of the railway line gantry crane intelligent control system based on the method of the present invention;
[0086] Fig.15 It is a schematic structural diagram of a leg transverse movement mechanism of a gantry crane device in a specific embodiment of an intelligent control system for gantry crane transportation of a railway line based on the method of the present invention;
[0087] Fig.16 It is a schematic diagram of the lower leg structure of a gantry crane device in a specific embodiment of the railway line gantry crane intelligent control system based on the method of the present invention;
[0088] Fig.17 It is a schematic diagram of the hoisting structure of a single gantry hoist device of a specific embodiment of the railway line gantry hoisting intelligent control system based on the method of the present invention;
[0089] Fig.18 It is a schematic diagram of the hoisting structure of multiple gantry hoisting devices of a specific embodiment of the railway line gantry hoisting intelligent control system based on the method of the present invention;
[0090] Fig.19 It is a structural schematic diagram of a specific embodiment of a railway line gantry hoisting intelligent control system (excluding a wireless control system) based on the method of the present invention;
[0091] Fig. 20 It is a flow chart of an operation method of a specific embodiment of the railway line gantry hoisting intelligent control method of the present invention;
[0092] Fig.21 It is a flow chart of an operation method further refined in a specific embodiment of the railway line gantry hoisting intelligent control method of the present invention;
[0093] Fig. 22 It is a schematic diagram of a gantry crane device transportation (first flat car transportation) step in a specific embodiment of the railway line gantry crane intelligent control method of the present invention;
[0094] Fig.23 It is a schematic diagram of the steps of deploying the gantry crane device (withdrawing the first flat car) in a specific embodiment of the intelligent control method for gantry crane transportation on a railway line of the present invention;
[0095] Fig.24 It is a schematic diagram of a new line component unloading (second flat car withdrawal) step in a specific embodiment of the railway line gantry hoisting intelligent control method of the present invention;
[0096] Fig.25 It is a schematic diagram of the hoisting steps of the gantry hoist device in a specific embodiment of the intelligent control method for gantry hoisting of railway lines of the present invention;
[0097] Fig.26 It is a schematic diagram of a second flat car driving-in step in a specific embodiment of the railway line gantry hoisting intelligent control method of the present invention;
[0098] Fig. 27 It is a schematic diagram of the step of recovering old line components (entry of the first flat car) in a specific embodiment of the railway line gantry hoisting intelligent control method of the present invention;
[0099] Fig.28 It is a schematic diagram of a gantry crane device recovery step in a specific embodiment of the railway line gantry crane intelligent control method of the present invention;
[0100] Fig.29 It is a program flow chart of the control logic of the lateral movement of the legs of the gantry crane device in a specific embodiment of the railway line gantry crane intelligent control method of the present invention;
[0101] Fig.30 It is a program flow chart of the control logic of the lateral movement of the legs of the gantry crane device in a specific embodiment of the railway line gantry crane intelligent control method of the present invention;
[0102] Fig.31 It is a program flow chart of the lifting and lateral movement control logic of the gantry crane device in a specific embodiment of the railway line gantry crane intelligent control method of the present invention;
[0103] Fig.32 It is a program flow chart of the lifting and lowering control logic of the hook of the gantry crane device in a specific embodiment of the railway line gantry crane intelligent control method of the present invention;
[0104] In the figure: 1- small leg, 2- lower left leg, 3- upper left leg, 4- truss, 5- ring chain, 6- hook, 7- lifting mechanism, 8- transverse travel mechanism, 9- upper right leg, 10- lower right leg, 11- load beam, 12- lifting drive motor, 13- reducer, 14- first transmission gear, 15- second transmission gear, 16- ring chain, 17- installation box, 18- transverse drive motor, 19- first reducer, 20- running wheel, 21- driving sprocket, 22- driven sprocket, 23- running rail, 24- long slot hole, 25- slider, 26- guide rail, 27- installation plate, 28- transverse drive motor, 29- second reducer, 30- driving gear, 31- driven gear Wheel, 32-first rack, 33-second rack, 34-screw, 35-screw nut, 36-screw bearing, 37-telescopic square tube, 38-fixed square tube, 39-supporting square tube, 40-crossbeam, 41-lifting drive motor, 42-third reducer, 43-power unit, 44-clamping and locking mechanism, 45-locating pin, 46-longitudinal movement mechanism, 47-locking rope, 48-lifting device, 49-battery, 100-door lifting device, 200-lifting platform, 300-first flat car, 400-second flat car, 500-new line components, 600-old line components, 700-hoisting device, 800-basic rail, 900-track pavement (roadbed), 1000-rail car. DETAILED DESCRIPTION
[0105] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0106] As attached Figure 1 To Attachment Fig.32 As shown, a specific embodiment of the intelligent control method for gantry hoisting of railway lines of the present invention is given, and the present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0107] At present, most of the lifting equipment used to replace large components (such as turnout components, track plates and rails, etc.) on my country's rail lines have technical defects such as low efficiency, low safety, high cost, and inconvenient use. In order to solve the common technical problems of lifting equipment used in existing rail lines, the embodiment of the present invention provides an intelligent control method and system for gantry lifting of railway lines, which specifically adopts an intelligent gantry crane device 100 (gantry crane) with adjustable span and height, and uses an integrated intelligent wireless remote control device to intelligently control various operating links (including transportation, deployment, lifting, and recovery) of multiple gantry crane devices 100. The specific embodiment of the present invention also provides a wireless control system for gantry lifting of rail lines based on rail flat car transportation, which uses an intelligent wireless control device to control multiple gantry crane devices 100 and lifting platforms 200 for collaborative operation, and finally realizes the safe and stable operation of railway track line laying and on-site maintenance. The specific embodiment of the present invention also provides a gantry crane device 100 applied to the intelligent control system of gantry lifting of railway lines. The following specific embodiments take the railway turnout laying and replacement operation as an example to introduce the railway line gantry lifting intelligent control method of the present invention in detail.
[0108] Example 1
[0109] As attached Fig. 20 As shown, an embodiment of the intelligent control method for railway line gantry hoisting of the present invention specifically includes the following steps:
[0110] S10) When replacing line components, several door hanging devices 100 and lifting platforms 200 are transported to the work site by the first flat car 300 according to the lifting requirements;
[0111] S20) After arriving at the work site, the lifting platform 200 is controlled by the wireless control device to deploy the door hanging device 100 in place according to the position and sequence, the first flat car 300 drives away, and the small leg leveling control is performed according to the inclination of the door hanging device 100;
[0112] S30) wirelessly and synchronously controlling the deployed gantry crane 100 through the wireless control device to complete the lifting operation of the line component; during the operation of the gantry crane 100, synchronously controlling the lateral movement and lifting of the line component;
[0113] S40) After the lifting operation is completed, the first flat car 300 enters, recovers the door hanging device 100 and fixes it thereon, and the first flat car 300 drives away.
[0114] As attached Fig.21 As shown in the figure, as a further detailed embodiment of the operation method of the rail line gantry lifting system described in this embodiment, in step S10), the gantry lifting device 100 retracts the left leg and the right leg, and fixes them on the first flat car 300 and transports them to the work site, as shown in the attached Fig. 22In step S20), after arriving at the construction site, the gantry crane 100 is deployed through the lifting platform 200, the left and right legs of the gantry crane 100 are extended and supported to the track surface 900, the horizontality of the truss 4 is adjusted, and the first flat car 300 is withdrawn, as shown in the attached figure. Fig.23 In step S30), the door hanging device 100 lifts the new line component 500 placed on the second flat car 400 and transported to the bottom thereof, and the second flat car 400 is withdrawn, as shown in the attached figure. Fig.24 The door hanging device 100 moves the new line component 500 to one side of the line and places it, and lifts the old line component 600 and moves it to the other side of the line, as shown in the attached figure. Fig.25 The door crane 100 lifts the new line component 500 and moves it horizontally to the line, and lifts the old line component 600, and the second flat car 400 enters, as shown in the attached figure. Fig.26 After the door hanging device 100 places the old line component 600 on the second flat car 400, the second flat car 400 moves away, as shown in the attached figure. Fig. 27 In step S40), the first flat car 300 enters, and the door hanging device 100 is recovered to the first flat car 300 through the lifting platform 200, and the first flat car 300 leaves, completing the replacement of the railway line components, as shown in the attached figure. Fig.28 shown.
[0115] The number of gantry cranes 100 is determined according to the length of the line components, and multiple gantry cranes 100 are deployed and recovered through the first flat car 300 and the lifting platform 200, and the replacement of long and large railway line components is achieved through the multi-point synchronous operation of multiple gantry cranes 100. At the same time, the spacing and height of the left and right legs of the gantry crane 100 can be adjusted to meet the needs of different track pavement conditions. When performing the lifting operation of railway line components, the overall load of the gantry crane 100 acts on the track pavement 900 of the railway line through the small leg 1. The pressure of the load acting on the track pavement 900 can be effectively dispersed by leveling, so as to reduce the damage to the railway line caused by the operation of the gantry crane 100.
[0116] Before the entire operation vehicle sets out, the control cabinet is first installed on the door crane device 100, the main power switch on each door crane control cabinet is turned on, and the mode selection button on the wireless control device is turned to the transport mode position. The operation vehicle runs to the designated location of the operation site and performs preparations before placing the door crane device 100, including: turning on the laser switch and lighting switch on each door crane control cabinet; manually releasing the locking rope and positioning pin of the door crane device 100 on the rail flat car; manually unlocking the left and right legs and left and right small legs of the door crane device 100; and manually unlocking the lifting, rotation and longitudinal movement mechanism 46 of the lifting platform 200.
[0117] The control process of the wireless control device includes the following steps:
[0118] The operator inputs the operation instructions through the control panel, and the operation instructions are transmitted to the processor. The processor receives the data from each wireless networking sub-node module through the wireless networking central node module and makes fault judgment based on the received data;
[0119] The processor performs calculations and judgments based on the operation instructions and the received data to determine whether the corresponding control logic requirements are met. For operation instructions that meet the control logic requirements, they can be sent to each wireless networking sub-node module through the wireless networking center node module. The processor outputs the calculation results that meet the control logic requirements and fault judgment information to the display;
[0120] The controller receives the operation instructions from the wireless networking sub-node module, and controls the servo motor to drive the corresponding mechanism of the door hanging device or lifting platform through the driver. The sensor collects the detection data of the corresponding mechanism of the door hanging device or lifting platform, and transmits it to the wireless networking sub-node module through the driver and controller in turn, and the wireless networking sub-node module sends the data to the wireless networking central node module.
[0121] The operation instructions are sent to each wireless networking sub-node module through the wireless networking central node module, and then the controller parses the local control instructions according to the communication protocol and its own communication address and executes the corresponding action. The wireless networking central node module receives data transmitted from each wireless networking sub-node module to the wireless networking central node module in a queue polling manner. The operation instructions of the gantry crane device include lifting and lateral movement of the lifting device, lifting and lateral movement of the legs, and lifting and lowering of the small legs. The operation instructions of the lifting platform include platform rotation, lifting and longitudinal movement.
[0122] The above step S10) further comprises:
[0123] During the process of the first flat car 300 transporting the door hanging device 100, the wireless control device can enter the transportation mode by selection, and monitor the fixing and locking conditions of the door hanging device 100 and the lifting platform 200 in real time through the display.
[0124] The above step S20) further comprises:
[0125] After the gantry crane 100 and the line components required for the operation are transported to the operation site, the wireless control device can enter the deployment mode by selecting, by operating the buttons of the lifting platform control area and the gantry crane control area on the control panel, and then the processor performs control logic operations according to the operating instructions, the gantry crane and the lifting platform status, to realize the lifting platform 200 clamping the gantry crane 100, the lateral movement and lifting of the legs, the rotation, lifting and longitudinal movement of the lifting platform, and finally realize the safe deployment of several gantry cranes 100 from the first flat car 300 to the rail pavement (i.e., roadbed) 900.
[0126] The above step S30) further comprises:
[0127] When the gantry crane device 100 is deployed, the wireless control device can enter the operation mode by selecting and operating the buttons in the control area of the gantry crane device. Then, the processor performs control logic operations according to the operation instructions and the state of the gantry crane device, so as to realize the coordinated operation of the leg lifting, small leg lifting, lifting and lateral movement, lifting and lifting, and lifting and unlocking of several gantry crane devices 100 selected for use. At the same time, the real-time position and load of each gantry crane device 100 are negatively feedback adjusted, so as to finally realize the smooth replacement operation of the line components.
[0128] Before the door hanging device 100 is deployed and placed, the following steps are also included:
[0129] S101) Turn on the laser switch and lighting switch on the control box of each door hanging device 100;
[0130] S102) manually releasing the locking rope 47 and the positioning pin 45 of the door hanging device 100 on the first flat car 300;
[0131] S103) Manually unlocking the legs and the small legs 1 of the door hanging device 100;
[0132] S104) Manually unlock the lifting, rotating and longitudinal movement mechanisms 46 of the lifting platform 200.
[0133] The above step S20) further comprises:
[0134] S201) When the door hanging device 100 is deployed, the wireless control device enters the deployment mode by selection;
[0135] S202) controlling the lifting platform 200 to rise by the wireless control device until the door hanging device 100 is lifted and separated from the installation plane of the first flat car 300, stopping the rising action, and prompting the operator to perform the clamping and locking operation of the door hanging device 100;
[0136] S203) The clamping locking mechanism 44 of the lifting platform 200 is controlled by the wireless control device to lock the door hanging device 100, and after the clamping locking signal is detected, the lifting platform 200 is operated to continue to rise, and the rising height is controlled by the operator;
[0137] S204) When the door hanging device 100 rises to the highest position, the lifting platform 200 is controlled to rotate by the wireless control device, and when a signal that the lifting platform 200 rotates to 90° is detected, the lifting platform 200 stops rotating;
[0138] S205) Control the lifting platform 200 to move longitudinally by operating the platform longitudinal movement button until the laser line on the door hanging device 100 is aligned with the ground mark, and at the same time control the support leg to move horizontally to above the track pavement 900 by operating the support leg transverse movement button to complete the placement and alignment of the door hanging device 100;
[0139] S206) The lifting platform 200 is controlled to descend and the legs are extended by the wireless control device until the small legs 1 are close to the ground and stop (at this time, the distance from the ground is greater than the extended stroke of the legs, but less than the extended stroke of the small legs 1, such as: when the small legs 1 are 200 mm from the ground, the small legs 1 can at least extend 200 mm), and then the clamping locking mechanism 44 is unlocked;
[0140] S207) Operate the one-touch-to-ground button on the control panel, and at the same time drive with a small torque (e.g., first provide the driving motor of the small leg 1 with 20% to 30% of the rated current, and its rotational torque is correspondingly only 20% to 30%. When the leg is extended to touch the ground, the torque is small and insufficient to support the entire door hanging device 100) so that each small leg 1 extends and touches the ground respectively and cannot support the entire door hanging device 100 (e.g., one of the small legs 1 touches the ground first, and the other three small legs 1 have not yet touched the ground, then the small leg 1 that touches the ground first will automatically stop extending, and after the other three small legs 1 have each touched the ground, all of them will automatically stop extending), so as to achieve the purpose of no empty legs; operate the small legs 1 to continue to extend synchronously or the lifting platform 200 to descend, until the door hanging device 100 is separated from the lifting platform 200;
[0141] S208) Press the one-key leveling button on the control panel to automatically extend and retract the legs and the small legs 1 to adjust the horizontal and vertical levels of the door hanging device 100 to be less than the set values, and the leveling of the door hanging device 100 is completed. At this time, the deployment of the first door hanging device 100 is completed;
[0142] S209) transporting the lifting platform 200 to the deployment position of the second door hanging device 100 by the first flat car 300;
[0143] S210) Controlling the lifting platform 200 through the wireless control device to lift the second door hanging device 100 to the highest position, and then controlling the lifting platform 200 to rotate 180°, and repeating steps S205) to S208) to complete the deployment of the second door hanging device 100;
[0144] S211) Repeat steps S202) to S209) to complete the deployment of other door hanging devices 100.
[0145] A tilt sensor is arranged on the truss 4 of the door hanging device 100, and step S20) further comprises:
[0146] After the gantry crane 100 is deployed, the tilt state data of the gantry crane 100 is obtained through the tilt sensor. When a small leg 1 of the gantry crane 100 sinks and causes the gantry crane 100 to tilt, the processor calculates the lifting height of the remaining small legs 1 according to the tilt state data to achieve leveling of the gantry crane 100 and avoid the virtual leg phenomenon. After the gantry crane 100 is placed, the gantry crane 100 may tilt and overturn due to different ground bearing capacities. Therefore, this embodiment sets a tilt sensor and a bubble level on the gantry crane 100. Among them, the tilt sensor is used to monitor the change of the inclination angle in real time, and the bubble level is used for visual confirmation when the tilt sensor fails or misjudgments. When one of the legs of the gantry crane 100 supports the sinking of the ground load, causing the gantry crane 100 to tilt, the tilt sensor monitors the tilt angle and feeds back to the controller. When the tilt angle is greater than a certain value, the gantry crane 100 alarms and displays a prompt on the display. At the same time, the controller calculates the lifting and lowering data of the other legs of the gantry crane 100 to control the gantry crane 100 to level it and avoid overturning due to empty legs.
[0147] The above step S40) further comprises:
[0148] S401) When the door hanging device 100 is recovered, the hook 6 and the transverse travel mechanism 8 are locked at zero position;
[0149] S402) The first flat car 300 transports the lifting platform 200 to the bottom of the door hanging device 100 in the working area, controls the longitudinal movement of the lifting platform 200 through the wireless control device, fine-tunes the lifting platform 200 and the door hanging device 100 to complete the alignment, and the lifting platform 200 continues to rise until the small leg 1 of the door hanging device 100 is lifted off the ground;
[0150] S403) prompting the operator to perform the clamping and locking operation of the door hanging device 100, and controlling the clamping and locking mechanism 44 of the lifting platform 200 through the wireless control device to lock the door hanging device 100, thereby completing the clamping and locking;
[0151] S404) Controlling the door hanging device 100 to quickly retract the legs and the small legs 1 by operating the one-touch retraction button of the legs, and moving them horizontally to their respective zero-position locking positions, thereby completing the recovery of the first door hanging device 100;
[0152] S405) Control the lifting platform 200 through the wireless control device to lift the first door hanging device 100 to the highest position, then control the lifting platform to rotate 180 degrees, and transport the lifting platform 200 to the bottom of the second door hanging device 100 through the first flat car 300, and repeat steps S402) to S404) to complete the recovery of the second door hanging device 100;
[0153] S406) Control the lifting platform 200 to rise by wireless remote control, lift the two door hanging devices 100 to the highest position, then control the lifting platform 200 to rotate 90° to the initial position, unlock the clamping locking mechanism 44, control the lifting platform 200 to descend to the initial position, and operate the locking mechanisms of various moving parts of the door hanging device 100 to lock;
[0154] S407) Repeat steps S402) to S406) to complete the recovery of other door hanging devices 100;
[0155] S408) After all door hanging devices 100 are collected and locked in sequence, the mode selection button on the control panel is switched to the transportation mode, so as to monitor the locking status of the door hanging device 100 and the lifting platform 200 before and during transportation.
[0156] Leg extension and lateral movement control logic: The extension and lateral movement control of the legs is the control of a single gantry device 100. There is no need to perform synchronous control of multiple gantry devices 100. Only logical judgment is required. The control logic is as shown in the attached figure. Fig.29 and attached Fig.30 shown.
[0157] The leg extension and retraction control logic in the above step S20) and step S40) further includes:
[0158] S501) When the outrigger extension button is turned on, if any of the outrigger locking signal, outrigger limit signal, motor fault signal, battery fault signal and emergency stop signal is detected, the wireless control device will display an alarm;
[0159] S502) If any of the outrigger locking signal, outrigger limit signal, motor fault signal, battery fault signal and emergency stop signal is not detected, execute the next step;
[0160] S503) the lifting drive motor 41 is actuated;
[0161] S504) determining whether the lateral inclination angle of the door hanging device 100 is less than or equal to a set value;
[0162] S505) If yes, execute the next step, if no, jump to step S503) to execute;
[0163] S506) determining whether the outrigger height is equal to a set value;
[0164] S507) If yes, the lifting drive motor 41 stops moving, if not, jump to step S503) to execute.
[0165] The leg lateral movement control logic in the above step S20) and step S40) further includes:
[0166] S601) When the outrigger lateral movement button is turned on, if any of the outrigger lateral movement locking signal, lateral movement limit signal, lateral movement drive motor fault signal, battery fault signal and emergency stop signal is detected, the wireless control device will display an alarm;
[0167] S602) If any of the outrigger lateral movement locking signal, lateral movement limit signal, lateral movement drive motor fault signal, battery fault signal and emergency stop signal is not detected, the lateral movement drive motor 28 will operate until it reaches the desired position.
[0168] The door hanging device 100 includes a lifting device 48, and the lifting device 48 includes a transverse running mechanism 8, and a hook 6 connected to the transverse running mechanism 8 and used to lift the line components. The hook 6 is connected to a lifting device 700, and the lifting device 700 is used to clamp the line components. The above step S30) further includes:
[0169] S301) When the (new) line component 500 is lifted and placed, the hook 6 is manually unlocked, and the transverse travel mechanism 8 is unlocked by the wireless control device;
[0170] S302) The second flat car 400 enters the designated operation area and completes longitudinal alignment according to the laser line on the door hanging device 100 to align the end of the (new) line component 500 on the second flat car 400 with the end of the (old) line component 600 to be replaced;
[0171] S303) Synchronously controlling the transverse running mechanism 8 of each door hanging device 100 to move to a specified position through a wireless control device, controlling the hook 6 to descend, and fine-tuning the position of the transverse running mechanism 8 so that the transverse running mechanism 8 is located directly above the lifting point;
[0172] S304) After the hook 6 hooks the line component, the lifting rope of the hook 6 (i.e., the ring chain 16) is in a relaxed state. By operating the one-touch pre-tightening button on the control panel, the hook 6 of each gantry lifting device 100 is controlled to rise, and when the lifting rope is straightened, it stops automatically; for example, taking four gantry lifting devices 100 for group lifting operation as an example, during actual operation, the lifting ropes of the hooks 6 of the four gantry lifting devices 100 need to be relaxed first for easy clamping; after clamping the line component, the lifting rope of each hook 6 is in a relaxed state, and at this time, the relaxation amount of the lifting rope of each hook 6 is not completely consistent. If the lifting is performed synchronously directly, it is easy for the lifting ropes of some hooks 6 to be tensioned first, while the lifting ropes of other hooks 6 are not stressed. If the lifting is continued, the lifting device 48 will be overloaded and the lifting line components will be deformed; therefore, it is necessary to first provide 20-30% current drive to the lifting drive motor 12, that is, the lifting force is only 20-30% and is not enough to lift the line components, and is only enough to tension the lifting rope of each hook 6 (eliminate the previous slack state); after the lifting ropes of all hooks 6 are tensioned, 100% torque is synchronously provided to synchronously lift the line components;
[0173] S305) operate the synchronous lifting button on the control panel to synchronously lift the line components to a specified height; during this period, operate the synchronous lateral movement button on the control panel as needed to control all the hooks 6 to move synchronously;
[0174] S306) During the hoisting process, the lifting displacement, lateral displacement and tension of the hook 6 of each lifting device 48 are monitored to determine whether the lifting devices 48 are synchronized. If the tension, lifting displacement or lateral displacement of a hook 6 is detected to be significantly different from that of other lifting devices 48 during the operation, all lifting devices 48 are immediately stopped, and the abnormal parts and parameters are displayed on the display to remind the operator to perform individual control, and the lifting devices 48 are adjusted to a reasonable position before continuing the synchronous action;
[0175] S307) After the new line component 500 (new turnout) is lifted, the second flat car 400 leaves the operation area and places the new line component 500 at a designated position through synchronous control, thereby completing the placement of the new line component 500.
[0176] According to the above steps of lifting and placing the new line component 500, the old line component 600 (old turnout) is lifted out, the new line component 500 is lifted in, and the old line component 600 is lifted and placed on the rail flat car. During the operation, the display of the wireless control device displays the information of the lateral movement, vertical displacement, hook tension, lateral inclination angle of each lifting device 100, etc.
[0177] Hoisting device synchronous lifting and lateral movement control logic: The lateral movement control of the hoisting device 48 requires multiple gantry devices 100 to act synchronously. The detected signal is the signal of 8 gantry devices 100. As long as one of the gantry devices 100 does not meet the action condition, the processor stops sending the operation instruction and prompts the fault information. The control logic is as shown in the attached figure. Fig.31 and attached Fig.32 shown.
[0178] The synchronous lateral movement control logic of the group cranes in the above step S30) further includes:
[0179] S701) When the lifting and lateral movement button is turned on, if any of the lifting device lateral movement locking signal, lateral movement limit signal, lateral drive motor fault signal, battery fault signal and emergency stop signal is detected, the wireless control device will display an alarm;
[0180] S702) If any of the following signals is not detected: a lifting device transverse locking signal, a transverse limit signal, a transverse drive motor fault signal, a battery fault signal, and an emergency stop signal, then the next step is executed;
[0181] S703) determining whether all door hanging devices 100 communicate normally, the lateral inclination angle is less than or equal to the set value, the hook tension is less than or equal to the set value, and the lifting drive motor 12 is not in motion;
[0182] S704) If all conditions are met, the lateral drive motor 18 is activated; if any condition is not met, the wireless control device displays an alarm.
[0183] The group crane synchronous lifting control logic in the above step S30) further includes:
[0184] S801) When the hook lifting button is turned on, if any of the following signals is detected: hook rising to position signal, lifting drive motor fault signal, battery fault signal and emergency stop signal, the wireless control device will display an alarm;
[0185] S802) If any of the hook rising into place signal, the lifting drive motor fault signal, the battery fault signal and the emergency stop signal is not detected, the next step is executed;
[0186] S803) determining whether all door hanging devices 100 are communicating normally, the lateral inclination angle is less than or equal to the set value, the hook tension is less than or equal to the set value, and the lateral drive motor 18 is not in motion;
[0187] S804) If all conditions are met, the lifting drive motor 12 is activated; if any condition is not met, the wireless control device displays an alarm.
[0188] The intelligent control method for railway line gantry hoisting described in the specific embodiment of the present invention can intelligently control each operation link of multiple gantry cranes 100 through integrated wireless intelligent control, and can solve the intelligent control of operation processes such as transportation, deployment, hoisting, and recovery, as well as technical problems such as multi-machine synchronization and safety monitoring. When multiple gantry cranes 100 and lifting platforms 200 are deployed by the first flat car 300, they can touch the ground with one key, which can avoid dangerous phenomena such as virtual legs; during the deployment of the gantry crane 100, the paper pieces of the lifting platform 200 are coordinated, and the hooks 6 of the multiple gantry cranes 100 are tensioned with one key, which can avoid uneven force in group lifting operations and even deformation of the lifting objects; when the gantry crane 100 is recovered, the control system is set with a one-key retraction function, which can avoid the technical problems of long time and low efficiency of retracting multiple legs one by one; the gantry crane 100 is placed on the track pavement 900, and the horizontality of the truss 4 is monitored in real time, which can effectively avoid uneven ground bearing capacity, such as the problem that the gantry crane 100 tilts or even overturns after the pit is loaded.
[0189] Example 2
[0190] An embodiment of a wireless control system for gantry crane operation on a rail line based on the method described in Embodiment 1 of the present invention, wherein the gantry crane device 100 and the lifting platform 200 are control objects of the wireless control system for gantry crane operation on a rail line. Figure 1 , 3As shown in Figure 4, the wireless control system for gantry crane operation on the rail line specifically includes: a wireless control device, a gantry crane control system and a lifting platform control system. The wireless control device includes a display, a control panel, a processor and a wireless networking center node module. The gantry crane control system and the lifting platform control system both include a wireless networking sub-node module and a local control system. The local control system includes a controller, a driver, a sensor and a servo motor (including a lifting drive motor 12, a lateral drive motor 18, a lateral drive motor 28 and a lifting drive motor 41, etc.). The operator inputs the operation instruction through the control panel, and the operation instruction is transmitted to the processor. The processor receives data from each wireless networking sub-node module through the wireless networking center node module and performs fault judgment based on the received data. The processor performs calculation judgment based on the operation instruction and the received data to determine whether the corresponding control logic requirements are met. For the operation instruction that meets the control logic requirements, it can be sent to each wireless networking sub-node module through the wireless networking center node module, and the processor outputs the calculation results and fault judgment information that meet the control logic requirements to the display. The controller receives the operation instructions from the wireless networking sub-node module, and controls the servo motor through the driver to drive the corresponding mechanism of the door hanging device 100 or the lifting platform 200 (including the lifting drive motor 12, the lateral drive motor 18, the lateral drive motor 28, the lifting drive motor 41 of the door hanging device 100, and the clamping and locking mechanism 44, the lifting mechanism, the rotating mechanism, the longitudinal movement mechanism 46 of the lifting platform 200, etc.). The sensor collects the detection data of the corresponding mechanism of the door hanging device or the lifting platform, and transmits it to the wireless networking sub-node module through the driver and the controller in turn, and the wireless networking sub-node module sends the data to the wireless networking central node module.
[0191] When replacing large components of the track line, several gantry cranes 100, lifting platforms 200, and other materials such as lifting tools (can also be omitted) are transported to the work site by rail flat cars according to the needs of the lifting objects. Use a wireless intelligent remote control system (i.e., a wireless control system) to control the lifting platform 200 to deploy multiple gantry cranes 100 in place according to position and sequence, and the rail flat car will leave, and then the lifting operation can be carried out. The lifting operation is carried out by wireless synchronous and coordinated control of the arranged multiple gantry cranes 100. After the lifting operation is completed, the rail flat car enters, and then the gantry crane 100 is recovered to the rail flat car, and then the gantry crane 100 is fixed on the rail flat car and driven away from the work site.
[0192] The overall topology of the wireless intelligent remote control system based on the gantry crane for railway track lines is shown in the attached figure. Figure 1As shown. The system mainly includes three parts: an integrated wireless control device, a gantry device control system and a lifting platform control system. Among them, the wireless control device adopts an integrated control box structure design, integrating the display, control panel, processor (main control CPU) and wireless networking center node module M1 at the hardware layer. The gantry device control system is a general term for the local control systems of several gantry devices 100 (taking 8 as an example). Each gantry local control system includes a wireless networking sub-node module (M1-1...n1), a controller, a sensor, a servo motor and its driver and other components. The wireless networking sub-node modules respectively communicate in duplex with the wireless networking center node module to realize data transmission and reception between the gantry device 100 and the wireless control device, thereby realizing the uploading of signals such as sensor detection, servo motor status, power device monitoring, etc. of the gantry device 100 and the issuance of remote control instructions. Similarly, the lifting platform control system is the general term for the local control systems of several lifting platforms 200 (taking 2 as an example). Each lifting platform local control system includes a wireless networking sub-node module (M2-1...n2), controllers, sensors, servo motors and their drivers and other components. The wireless networking sub-node modules respectively perform duplex communication with the wireless networking central node modules, thereby realizing data transmission and reception between the lifting platform 200 and the wireless control device.
[0193] The mechanism for duplex communication between the wireless networking sub-node modules of the gantry crane control system and the lifting platform control system and the central node of the wireless networking central node module is as follows: the operation instructions are sent to each wireless networking sub-node module through the wireless networking central node module, and all wireless networking sub-node modules receive the operation instruction signal at the same time, and then the controller parses the local control instructions according to the communication protocol and its own communication address and executes the corresponding action. The wireless networking central node module uses a queue polling method to receive data in sequence for the data uploaded by each wireless networking sub-node module to the wireless networking central node module, so the time delay of a polling cycle is the sum of the time for all wireless networking sub-node modules (n1+n2) participating in the networking to send signals. The operation instructions of the gantry crane include lifting and lowering and lateral movement of the lifting device, lifting and lowering and lateral movement of the outriggers, and lifting and lowering of the small outriggers. The operation instructions of the lifting platform include platform rotation, lifting and lowering, and longitudinal movement.
[0194] The schematic diagram of the wireless control device using an integrated wireless remote control box is shown in the attached figure. Figure 5 As shown in the figure, the integrated wireless control device adopts a flip-top structure design, and the (touch) display screen is installed on the box cover for human-machine interaction during the control process. At the same time, a lighting lamp is set on the box cover to facilitate nighttime operation. The main components installed in the box are the control panel, the main control CPU (i.e., the processor), the lithium battery, and the wireless networking center node module. The schematic diagram of the control panel is shown in the attached figure. Figure 6As shown in the figure, it is mainly divided into three functional areas: wireless control device, door hanging device and lifting platform. The functional areas of the control panel are clearly divided, which is convenient for operators to use, and can effectively improve operating efficiency and reduce misoperation. It should be noted that the functional operation of the control panel can be realized in the form of physical switches, buttons, etc., or in the form of virtual touch buttons, as shown in the attached figure. Figure 5 and attached Figure 6 The wireless control device shown uses a physical switch to complete various functional operations.
[0195] In addition to the above advantages, the wireless control device also includes (but is not limited to) the following main functions:
[0196] 1) The operator can input various operation instructions including one-key touchdown, one-key recovery and one-key preload to the processor through the integrated remote control or control panel.
[0197] 2) The data received by the wireless networking central node module can be sent to the processor via the CAN bus.
[0198] 3) The processor can perform logical operations based on various operating instructions and received data to determine whether the control logic requirements of the rail line gantry crane wireless control system are met; for the operation results and instructions that meet the control logic, the signal can be wirelessly sent through the wireless networking center node module; for the operation results and fault information that meet the control logic, the fault information can be displayed through the (touch) display screen.
[0199] 4) When the wireless control device loses power, the software setting parameters of the wireless control device can be automatically saved and memorized, and there is no need to reset the relevant parameters after restarting the device.
[0200] 5) Lifting, lowering and translation control functions of the gantry crane device: Based on user instructions and in combination with various state quantities of the system, each gantry crane device 100 is controlled through a processor and a wireless module (i.e., a collective term for a wireless networking central node module and a wireless networking sub-node module) to achieve synchronous lifting and lateral synchronous translation control functions of each gantry crane device 100.
[0201] 6) Transverse movement and extension control function of the gantry crane legs: According to user instructions and combined with various system status quantities, the processor and wireless module are combined to control the transverse movement and extension function of each gantry crane leg, and the lifting and lowering control function of the small leg can be realized at the same time.
[0202] 7) Lifting platform rotation and lifting control function: According to user instructions and in combination with various state quantities of the system, the rotation and lifting functions of each lifting platform 200 are controlled through the processor and the wireless module.
[0203] 8) Lifting platform adjusts the position control function of the door hanging device: According to the user's instructions and in combination with the various state quantities of the system, the clamping action of each lifting platform 200 is controlled through the processor and the wireless module to realize the position adjustment function of the door hanging device 100.
[0204] 9) Locking driving and emergency safety function: collect the locking status data through the wireless module and notify the user through the (touch) display screen. In the emergency state, notify each subsystem to enter the emergency state through the wireless module.
[0205] 10) Data transmission function: The wireless control device can realize two-way data transmission and meet the low time delay requirements (the response delay of the entire electrical system is less than 100ms).
[0206] The wireless control system controls the main operation links of multiple gantry cranes 100, including the "transportation, deployment, lifting, and recovery" process, as well as the "maintenance", "safety guidance", "manual operation" and other modes, as shown in the attached Figure 7 shown.
[0207] The following is an introduction to the control methods for key operating processes:
[0208] 1) During the transportation of the gantry crane device by the rail flat car, the wireless control device can choose to enter the "transportation mode" to monitor the fixing and locking status of the gantry crane device 100 and the lifting platform 200 in real time, and can display the monitoring status to the driving driver through the display screen to ensure the transportation safety of the gantry crane device 100.
[0209] 2) After the gantry crane 100 and the objects required for the operation (such as line components, etc.) are transported to the operation site, the wireless control device can choose to enter the "layout mode" by operating the "lifting platform control area" and "gantry crane control area" buttons on the control panel. Then, the wireless control device performs safety logic operations according to the operation commands, the state of the gantry crane, and the state of the lifting platform, so as to realize the clamping of the gantry crane 100 by the lifting platform 200, the lateral movement and lifting of the legs of the gantry crane, and the 90° rotation and lifting of the lifting platform, and finally realize the safe deployment of multiple gantry cranes 100 from the transport flat car to the rail pavement (i.e., roadbed) 900.
[0210] 3) After the gantry crane 100 is deployed, the wireless control device can choose to enter the "operation mode" by operating the "gantry crane control area" button on the control panel. Then, the wireless control device performs safety logic operations according to the operation command and the state of the gantry crane, and realizes the coordinated operation of the outrigger lifting and lowering, small outrigger lifting and lowering, lifting device lateral movement and lifting, lifting device unlocking and other actions for the multiple gantry cranes 100 selected for use. At the same time, the real-time position and load of each gantry crane 100 are negatively feedback adjusted, and finally the smooth replacement operation of large components (such as turnout components, track plates and rails, etc.) on the track line is realized.
[0211] 4) After completing the on-site replacement of large components, the wireless control device can choose to enter the "recovery mode" and perform an operation process that is basically opposite to the "deployment mode" to complete the recovery of the door hanging device 100 to the transport flat car.
[0212] The wireless control device has four control modes, namely: 1. Safety-oriented operation mode: interlocking control according to the sequential operation process of "deployment, hoisting, and recovery". 2. Manual operation mode: does not distinguish between the previous and subsequent action processes, but needs to detect the safety interlocking logic of a single action (no risk of equipment damage). 3. Emergency mode: directly output the response action after inputting the action command (to prevent sensor failure, there is a risk of damaging the equipment, and a password is required to enter). The wireless control device can perform intelligent human-computer interaction in the "safety-oriented" mode to complete the relevant operations of the above four main operation links. When the site cannot meet the intelligent operation conditions required by the "safety-oriented" mode due to special reasons, it can also switch to the "manual" mode for emergency operation. When performing human-computer interaction, real-time prompts are given for fault information that cannot meet the action conditions. In addition, the wireless control device is also provided with a maintenance mode, which can be enabled when the door crane device 100 and the lifting platform 200 fail or during the debugging stage. In this mode, relevant actions not related to maintenance will be safely interlocked. When the wireless network fails, the local control mode of the door crane device can also be switched to achieve the purpose of emergency operation and emergency recovery of the door crane device. The rail line gantry crane wireless control system described in the specific embodiment of the present invention can control the group lifting operation of multiple gantry crane devices 100, and ultimately achieve the purpose of safe, stable and efficient operation.
[0213] The wireless control system for gantry hoisting of rail lines described in the specific embodiment of the present invention mainly includes two control objects, namely, a gantry crane device 100 and a lifting platform 200, and can realize the safe, stable and efficient control operation of the whole process of the gantry crane group hoisting when replacing large components on the rail line (including transportation, deployment, hoisting, recovery and other processes). The wireless control system for gantry hoisting of rail lines adopts a wireless remote control mode, which can effectively avoid close contact between operators and gantry crane devices, and can prevent equipment and materials from causing harm to operators during the hoisting operation, effectively ensuring the personal safety of operators. The wireless control system can realize the safety monitoring of the transportation process of the gantry crane device 100, as well as the safety interlocking control logic of the construction process, effectively ensuring the safety of railway transportation and equipment, and also ensuring the safe construction of the operation process. The wireless control device adopts an integrated control box structure design, which reduces the number of wireless control devices required for the gantry crane device 100 and the lifting platform 200, improves the convenience of operation, and also avoids the technical risk of mutual interference of multiple wireless signals at the operation site, and improves the stability and reliability of wireless communication. The wireless module adopts a duplex communication mechanism and low time delay, which ensures the realization of the real-time automatic adjustment function of negative feedback during the collaborative operation of multi-gantry cranes, thereby improving the stability of the lifting operation materials. The "safety-oriented" mode design of the wireless control device "institutionalizes" the entire gantry lifting system usage process at the software level, greatly simplifies the system operation difficulty, reduces the possibility of human error, and improves on-site operation efficiency. The "manual operation" mode and maintenance mode design of the wireless control device improves the emergency handling capability of the entire system.
[0214] Example 3
[0215] An embodiment of an intelligent control system for gantry crane transportation of a railway line applied by the method described in an embodiment of the present invention specifically comprises: a wireless control system, a gantry crane device 100, a lifting platform 200, a first flat car 300 and a second flat car 400 (the first flat car 300 and the second flat car 400 are collectively referred to as rail flat cars). The first flat car 300 is used to transport the gantry crane device 100 and the lifting platform 200, and the second flat car 400 is used to transport line components. The control objects of the wireless control system are as follows: Figure 8 and 9 As shown in FIG. 1 , it comprises a plurality of door hanging devices 100, a plurality of lifting platforms 200 and a power device 43. Fig.19 As shown, it is a schematic diagram of the structure of the railway line gantry lifting intelligent control system in the transport state, the gantry lifting device 100 and the lifting platform 200 are both arranged on the first flat car 300, the gantry lifting device 100 is further fixed on the lifting platform 200, and the lifting platform 200 has lifting and rotating functions. The new line component 500 for replacement is placed on the second flat car 400.
[0216] When replacing line components, several gantry cranes 100 and lifting platforms 200 are transported to the work site by the first flat car 300 according to the lifting needs. After arriving at the work site, the lifting platform 200 is controlled by the wireless control device to deploy the gantry crane 100 in place according to the position and sequence, and the first flat car 300 drives away. The deployed gantry crane 100 is wirelessly and synchronously controlled by the wireless control device to complete the lifting operation of the line components. After the lifting operation is completed, the first flat car 300 enters and recovers the gantry crane 100 and fixes it on it, and the first flat car 300 drives away.
[0217] The railcar 1000 provides power to transport the gantry crane 100 placed on the first flat car 300 and the new line component 500 placed on the second flat car 400 to the construction area. In the process of transporting the gantry crane 100 by the first flat car 300, the wireless control device can enter the transportation mode by selection, and monitor the fixing and locking conditions of the gantry crane 100 and the lifting platform 200 in real time through the display. After arriving at the designated construction area, the gantry crane 100 places the legs on both sides of the gantry crane 100 in the designated area of the track pavement 900 on both sides of the basic rail 800 of the line through the lifting and rotating actions of the lifting platform 200 on the first flat car 300.
[0218] Before the door hanging device 100 is deployed, turn on the laser button and lighting button on each door hanging device control box. Manually release the locking rope 47 and positioning pin 45 of the door hanging device 100 on the first flat car 300. Manually unlock the legs and small legs 1 of the door hanging device 100. Manually unlock the lifting, rotation and longitudinal movement mechanisms of the lifting platform 200.
[0219] After the gantry crane 100 and the line components required for the operation are transported to the operation site, the wireless control device can enter the deployment mode by selecting, by operating the buttons of the lifting platform control area and the gantry crane control area on the control panel, and then the processor performs control logic operations according to the operating instructions, the gantry crane and the lifting platform status, to realize the lifting platform 200 clamping the gantry crane 100, the lateral movement and lifting of the legs, the rotation, lifting and longitudinal movement of the lifting platform, and finally realize the safe deployment of several gantry cranes 100 from the first flat car 300 to the rail pavement (roadbed) 900.
[0220] When the gantry crane device 100 is deployed, the wireless control device can enter the operation mode by selecting and operating the buttons in the control area of the gantry crane device. Then, the processor performs control logic operations according to the operation instructions and the state of the gantry crane device, so as to realize the coordinated operation of the leg lifting, small leg lifting, lifting and lateral movement, lifting and lifting, and lifting and unlocking of several gantry crane devices 100 selected for use. At the same time, the real-time position and load of each gantry crane device 100 are negatively feedback adjusted, so as to finally realize the smooth replacement operation of the line components.
[0221] The action functions of the door hanging device 100 include the action of the lifting device and the action of the legs. The lifting device 48 has the functions of lateral movement and lifting, which are controlled by two motors respectively. At the same time, a limit button is set to detect the limit position to avoid exceeding the limit. The leg action includes the extension and lateral movement of the left leg and the right leg. Each leg realizes the lateral movement and extension and retraction actions respectively through two motors. The system structure function implementation method is shown in the attached figure. Figure 2 shown.
[0222] Example 4
[0223] As attached Fig.10 As shown, an embodiment of a gantry crane device 100 applied to the railway line gantry crane intelligent control system described in Example 3 specifically includes:
[0224] Truss 4;
[0225] It is arranged on the truss 4 and can be moved horizontally along the truss 4 (such as attached Fig.10 The lateral movement running mechanism 8 moves in the direction indicated by W in the figure to adjust the hoisting position; the lateral movement running mechanism 8 includes a lifting mechanism 7, which can drive the ring chain 16 to move up and down in the vertical direction, and a lifting device 700 is provided at the end of the ring chain 16, and the lifting device 700 is clamped to realize the transportation of the railway line components;
[0226] The left leg and the right leg are movably arranged at the lower part of the left and right ends of the truss 4, respectively, and the left leg and the right leg can move laterally along the truss 4 to adjust the lateral span of the door hanging device. The left leg and the right leg are arranged on both sides of the railway line, without occupying the adjacent line for operation, and there is no risk of over-limit operation.
[0227] The left leg and the right leg can be moved vertically (such as attached Fig.10 The truss 4 is lifted and lowered in the direction indicated by H in the figure to adjust the height of the truss 4 from the track pavement (roadbed) 900.
[0228] The lower part of the left leg and the right leg is provided with a small leg 1, through which the fine-leveling function of the left leg, the right leg and the door hanging device 100 can be realized. The small leg 1 can realize fine-leveling of the height according to the flatness of the track pavement 900.
[0229] The railway line component replacement gantry crane device 100 described in Example 4 has multifunctional and adaptive characteristics. The two lateral legs of the device are supported on the track pavement 900 on both sides of the line. The legs on both sides can be moved horizontally, raised and lowered, and leveled to meet the operating requirements of different line ground conditions. The two lateral legs of the gantry crane device 100 are supported on the left and right sides of the line. The replacement of old and new line components is carried out in the inner empty part of the gantry crane device 100. There is no need to occupy the adjacent line space during the operation of the line, there is no risk of touching the contact network, and no ballast damage will be caused to the line. The legs of the gantry crane device 100 have a lateral movement function, which can adapt to the working conditions of different ground widths on both sides of the line. The legs of the gantry crane device 100 have a vertical telescopic adjustment function, which can be used for working conditions at different ground heights, and the line components that need to be replaced can be lifted to different working heights.
[0230] As attached Fig.11 As shown, the left leg includes an upper left leg 3 connected to the truss 4, and a lower left leg 2 movably connected to the upper left leg 3, and the upper left leg 3 can be lifted and moved vertically relative to the lower left leg 2. Fig.12 As shown, the right leg includes a right upper leg 9 connected to the truss 4, and a right lower leg 10 movably connected to the right upper leg 9, and the right upper leg 9 can be lifted and lowered vertically relative to the right lower leg 10.
[0231] As attached Fig.13 As shown, the lifting mechanism 7 includes a lifting drive motor 12, a reducer 13, a first transmission gear 14 and a second transmission gear 15. The lifting drive motor 12 drives the first transmission gear 14 to rotate through the reducer 13, and the first transmission gear 14 drives the second transmission gear 15 to rotate, and the second transmission gear 15 is connected to the ring chain 16. The ring chain 16 can be lifted and lowered in the vertical direction by the forward and reverse rotation of the lifting drive motor 12. The lifting and lifting structure of the lifting mechanism 7 adopts the mode of matching the ring chain 16 with the gear, which can effectively prevent slipping during the lifting process.
[0232] As attached Fig.14 As shown, the transverse travel mechanism 8 also includes an annular chain 5, an installation box 17, a transverse drive motor 18, a first reducer 19, a running wheel 20, a driving sprocket 21, a driven sprocket 22 and a running rail 23. The lifting mechanism 7 is arranged in the installation box 17, and the running wheel 20 is arranged at the bottom of the installation box 17. The running rail 23 is arranged on the inner side of the bottom of the truss 4 in the transverse direction, and the running wheel 20 cooperates with the running rail 23. The transverse drive motor 18 drives the driving sprocket 21 to rotate through the first reducer 19, and the driving sprocket 21 rotates to drive the annular chain 5 to rotate, and the driven sprocket 22 provides auxiliary positioning for the rotation of the annular chain 5. The two ends of the annular chain 5 are connected to the installation box 17, and the lifting mechanism 7 is driven by the forward and reverse rotation of the transverse drive motor 18 to realize the horizontal transverse movement function.
[0233] As attached Fig.15 As shown, the bottom of the truss 4 is provided with a long slot 24 in the horizontal direction, and the upper part of the left upper leg 3 and the upper part of the right upper leg 9 is longitudinally (as shown in the attached figure). Figure 6 Slide blocks 25 are provided on both sides of the truss 4 (in the direction shown in the middle). A guide rail 26 is provided at the bottom of the truss 4 in the horizontal direction. A mounting plate 27 is provided on the upper part of the left upper leg 3 and the right upper leg 9. The mounting plate 27 passes through the long slot 24 upward. A traverse driving motor 28, a second reducer 29, a driving gear 30 and a driven gear 31 are provided on the mounting plate 27. A first rack 32 and a second rack 33 are provided in parallel with each other at the bottom of the truss 4 in the horizontal direction. The traverse driving motor 28 drives the driving gear 30 to rotate through the second reducer 29. The driving gear 30 is meshed with the first rack 32, and the driven gear 31 is meshed with the second rack 33 to provide auxiliary positioning for the traverse of the legs. The guide rail 26 cooperates with the slide block 25 to provide guidance for the traverse movement of the left upper leg 3 and the right upper leg 9. The traverse movement of the left upper leg 3 and the right upper leg 9 is achieved by the forward and reverse rotation of the traverse driving motor 28.
[0234] As attached Fig.16 As shown, the upper left leg 3 and the upper right leg 9 both include a screw 34, a screw nut 35, a screw bearing 36 and a telescopic square tube 37. The screw 34 is arranged in the telescopic square tube 37, the screw nut 35 is fixed to the inner bottom side of the telescopic square tube 37, and the screw 34 and the screw nut 35 cooperate. The upper part of the screw 34 is fixed to the inside of the telescopic square tube 37 through the screw bearing 36. The lower left leg 2 and the lower right leg 10 both include a fixed square tube 38, a supporting square tube 39, a crossbeam 40 and a bearing beam 11. The fixed square tube 38 is sleeved on the outside of the telescopic square tube 37, the supporting square tube 39 is arranged on the left and right sides of the fixed square tube 38, the upper part of the fixed square tube 38 is fixed to one end of the supporting square tube 39, and the lower part of the fixed square tube 38 is fixed to the supporting square tube 39 through the crossbeam 40. The other end of the supporting square tube 39 is fixed to the load-bearing beam 11, and a lifting drive motor 41 and a third reducer 42 are provided on the load-bearing beam 11. The lower part of the screw rod 34 extends out of the bottom of the telescopic square tube 37 and the fixed square tube 38 and is connected to the second reducer 42. The third reducer 42 is driven by the forward and reverse rotation of the lifting drive motor 41, and then the screw rod 34 is driven to rotate, and the screw rod nut 35 and the telescopic square tube 37 are driven to move up and down by the rotation of the screw rod 34, so as to realize the extension and retraction of the left and right legs. A battery 49 is provided on the crossbeam 40.
[0235] As attached Fig.17As shown in FIG. 1 , it is a schematic diagram of the placement and operation of a single gantry crane 100. The legs of the gantry crane 100 on both sides of the horizontal direction are supported on the track surface 900 on both sides of the line. The distance between the legs of the gantry crane 100 is adjustable in the W direction and the height from the ground in the H direction. Embodiment 3 further arranges multiple gantry cranes 100 with multifunctional adaptive characteristics along the operation direction of the railway line (such as the attached Fig.18 The group of cranes (in the direction indicated by L in the figure) forms a group crane group, which works together to complete the intelligent laying and replacement of long and large components of the railway line. Fig.18 As shown, it is a schematic diagram of the placement and operation of multiple gantry cranes 100 along the line operation direction L. By performing lifting operations at multiple points of multiple gantry cranes 100, the replacement operation of railway line components of various sizes can be realized. The gantry crane 100 can realize the lifting and translation of railway line components through a set of driving mechanisms, and realize the lifting and handling functions of railway line components. The gantry crane 100 effectively reduces the total height of the lifting space, simplifies the structure, reduces the volume, and the height of the legs is adjustable, which can automatically adapt to the different heights of the track pavement 900 on both sides of the line.
[0236] Example 4 adopts an intelligent gantry crane with adjustable span and height, and uses integrated wireless intelligent control to intelligently control various operating links of multiple gantry crane devices 100, which can solve the intelligent control of operating processes such as transportation, deployment, lifting, and recovery, as well as technical problems such as multi-machine synchronization and safety monitoring.
[0237] In the description of this application, it should be noted that when an element is referred to as being "fixed on" or "set on" another element, it can be directly on the other element or indirectly set on the other element; when an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0238] It should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0239] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, "multiple" and "several" mean two or more, unless otherwise clearly and specifically defined.
[0240] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the conditions under which this application can be implemented. Therefore, they have no substantive technical significance. Any structural modification, change in proportional relationship or adjustment of size should still fall within the scope of the technical content disclosed in this application without affecting the effects and purposes that can be achieved by this application.
[0241] By implementing the technical solution of the railway line gantry hoisting intelligent control method described in the specific embodiment of the present invention, the following technical effects can be produced:
[0242] (1) The railway line gantry crane intelligent control method described in the specific embodiment of the present invention can use a wireless control device to realize the overall control of the whole process of multiple gantry cranes, solve the real-time control of the operation process of gantry crane transportation, deployment, lifting, recovery, etc., as well as the control problems of safety interlocking, multi-machine synchronization, emergency measures, etc., with high operation efficiency and safety, low cost, and easy operation and control;
[0243] (2) The railway line gantry lifting intelligent control method described in the specific embodiment of the present invention is applicable to the replacement of a whole set of turnouts as well as the replacement of a single point rail, turnout core, etc., and can realize the transportation, placement, position adjustment and replacement of various line components of different lengths through the wireless reconnection consistency control of the synchronous lateral movement, lifting and lowering actions of multiple gantry cranes during the lifting process;
[0244] (3) The intelligent control method for gantry crane operation on railway lines described in the specific embodiment of the present invention ensures the safety of the operation process to the greatest extent possible through real-time safety interlock monitoring of multiple gantry cranes and lifting platforms during transportation, coordinated operation and safety interlocking with the lifting platform during the recovery of the gantry crane, real-time monitoring of the locking of the gantry crane and the lifting platform, and emergency control measures and intelligent fault maintenance in various fault situations;
[0245] (4) The railway line gantry crane intelligent control method described in the specific embodiment of the present invention has legs straddling the two sides of the railway line. The replacement of line components will not occupy the adjacent line space, and there is no safety risk of over-limit operation. The operation is flexible and can well adapt to the operation requirements under complex line conditions. At the same time, the gantry crane has a simple structure, small space occupation, light weight, high reliability, easy maintenance and repair, low manufacturing cost, and high operation efficiency.
[0246] (5) The intelligent control method for gantry crane operation on railway lines described in the specific embodiment of the present invention has the functions of lateral movement, lifting and leveling of the legs. The lateral span spacing and the height from the ground of the legs are adjustable, which can meet the functions required by different ground working conditions of different lines. The placement and recovery of the gantry crane can be achieved through a lifting platform with adjustable height. There is no risk of touching the contact network during the lifting process.
[0247] (6) The intelligent control method for gantry crane operation on railway lines described in the specific embodiment of the present invention can intelligently control various operation links of multiple gantry cranes through integrated wireless intelligent control, which can solve the intelligent control of operation processes such as transportation, deployment, lifting, and recovery, as well as technical problems such as multi-machine synchronization and safety monitoring; multiple gantry cranes and lifting platform flat cars can touch the ground with one button when deployed, avoiding dangerous phenomena such as empty legs; during the deployment of the gantry crane, the gantry crane works in coordination with the lifting platform, and the hooks of multiple gantry cranes are tensioned with one button, which can avoid uneven force on the group cranes and even deformation of the objects being lifted; when the gantry crane is recovered, the control system is set with a one-button retraction function to avoid the technical problems of time-consuming and low efficiency of retracting multiple legs one by one; the gantry crane is placed on the track surface, and the horizontality of the truss is monitored in real time, which can effectively avoid uneven ground bearing capacity, such as tilting or even overturning of pits after being loaded.
[0248] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0249] The above is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as above in the preferred embodiment, it is not used to limit the present invention. Any technician familiar with the art can make many possible changes and modifications to the technical solution of the present invention by using the methods and technical contents disclosed above without departing from the spirit and technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any simple modification, equivalent replacement, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the scope of protection of the technical solution of the present invention.
Claims
1. An intelligent control method for gantry hoisting on a railway line, characterized in that: The following steps are involved: S10) When replacing line components, several gantry cranes and lifting platforms are transported to the work site via the first flat car according to the lifting requirements; S20) After arriving at the work site, the lifting platform is controlled by the wireless control device to deploy the gantry crane device in place according to the position and sequence, the first flat car drives away, and the small outrigger leveling control is performed according to the inclination of the gantry crane device; S30) wirelessly and synchronously controlling the deployed gantry crane device through the wireless control device to complete the lifting operation of the line component; during the operation of the gantry crane device, synchronously controlling the lateral movement and lifting of the line component; S40) After the lifting operation is completed, the first flat car enters, retracts the door hanging device and fixes it thereon, and the first flat car leaves; The step S10) further comprises: During the process of transporting the door crane device by the first flat car, the wireless control device can enter the transport mode by selection, and monitor the fixing and locking conditions of the door crane device and the lifting platform in real time through the display; The step S20) further comprises: S201) When the door hanging device is deployed, the wireless control device enters the deployment mode by selection; S202) controlling the lifting platform to rise by the wireless control device until the door hanging device is lifted and separated from the installation plane of the first flat car, stopping the rising action, and prompting the operator to perform the clamping and locking operation of the door hanging device; S203) Controlling the clamping and locking mechanism of the lifting platform through the wireless control device to lock the door hanging device, and after detecting the clamping and locking signal, operating the lifting platform to continue to rise, and the rising height is controlled by the operator; S204) When the lifting platform rises to the highest position, the lifting platform is controlled to rotate by the wireless control device, and when a signal that the lifting platform rotates to 90° is detected, the lifting platform stops rotating; S205) The lifting platform is controlled to move longitudinally by operating the platform longitudinal movement button until the laser line on the gantry crane device is aligned with the ground mark, and the outrigger is controlled to move horizontally to above the track surface by operating the outrigger transverse movement button to complete the placement and alignment of the gantry crane device; S206) Control the lifting platform to descend and the outriggers to extend by means of a wireless control device, until the outriggers stop when they are close to the ground, and then unlock the clamping locking mechanism; S207) Operate the outrigger one-touch ground button on the control panel, and at the same time drive each small outrigger to extend through a small torque and touch the ground respectively without supporting the entire gantry crane device, so as to achieve the purpose of no empty legs; operate the small outrigger to continue to extend synchronously or the lifting platform to descend until the gantry crane device is separated from the lifting platform; S208) Press the one-touch leveling button on the control panel to automatically extend and retract the legs and small legs to adjust the horizontal and vertical levels of the portal crane to be less than the set values, and the leveling of the portal crane is completed. At this time, the deployment of the first portal crane is completed; S209) transporting the lifting platform to a deployment position of the second gantry crane device by the first flat car; S210) Controlling the lifting platform through the wireless control device to lift the second door hanging device to the highest position, and then controlling the lifting platform to rotate 180 degrees, and repeating steps S205) to S208) to complete the deployment of the second door hanging device; S211) Repeat steps S202) to S209) to complete the deployment of other door hanging devices; The door hanging device includes a lifting device, and the lifting device includes a transverse running mechanism and a hook connected to the transverse running mechanism and used for lifting the line components; the step S30) further includes: S301) before lifting and placing the line components, release the hook lock and unlock the transverse travel mechanism through the wireless control device; S302) The second flat car drives into the designated operation area and completes longitudinal alignment according to the laser line on the door hanging device to align the end of the line component on the second flat car with the end of the line component to be replaced; S303) Synchronously controlling the transverse travel mechanism of each gantry crane device to move to a specified position through a wireless control device, controlling the hook to descend, and fine-tuning the position of the transverse travel mechanism so that the transverse travel mechanism is located directly above the lifting point; S304) After the hook hooks the line component, the lifting rope of the hook is in a relaxed state, and the hook of each door hanging device is controlled to rise by operating the one-touch pre-tightening button on the control panel, and the lifting rope stops automatically when the lifting rope is straightened; S305) Operate the synchronous lifting button on the control panel to synchronously lift the line components to a specified height; during this period, operate the synchronous lateral movement button on the control panel as needed to control the synchronous lateral movement of all the hooks; S306) During the hoisting process, the lifting displacement, lateral displacement and hook tension of each lifting device are monitored to determine whether the lifting devices are synchronized. If the tension, lifting displacement or lateral displacement of a hook is detected to be significantly different from that of other lifting devices during the operation, all lifting devices are immediately stopped, and the abnormal parts and parameters are displayed on the display to remind the operator to perform individual control, and the lifting devices are adjusted to a reasonable position before continuing the synchronous action; S307) After the line component is lifted, the second flat car drives away from the operation area and places the line component at a designated position through synchronous control, thereby completing the placement of the line component.
2. The intelligent control method for railway line gantry hoisting according to claim 1 is characterized in that: The control process of the wireless control device comprises the following steps: The operator inputs the operation instructions through the control panel, and the operation instructions are transmitted to the processor. The processor receives the data from each wireless networking sub-node module through the wireless networking central node module and makes fault judgment based on the received data; The processor performs calculations and judgments based on the operation instructions and the received data to determine whether the corresponding control logic requirements are met. For operation instructions that meet the control logic requirements, they can be sent to each wireless networking sub-node module through the wireless networking center node module, and the processor outputs the calculation results that meet the control logic requirements and fault judgment information to the display; The controller receives operation instructions from the wireless networking sub-node module, and controls the servo motor to drive the corresponding mechanism of the door hanging device or the lifting platform through the driver; the sensor collects detection data of the corresponding mechanism of the door hanging device or the lifting platform, and transmits it to the wireless networking sub-node module through the driver and the controller in turn, and the wireless networking sub-node module sends the data to the wireless networking center node module.
3. The intelligent control method for railway line gantry hoisting according to claim 2 is characterized in that: The operation instructions are sent to each wireless networking sub-node module through the wireless networking central node module, and then the controller parses the local control instructions according to the communication protocol and its own communication address and executes the corresponding action; the data transmitted from each wireless networking sub-node module to the wireless networking central node module is received by the wireless networking central node module using a queuing polling method.
4. The intelligent control method for railway line gantry hoisting according to claim 2 or 3, characterized in that: The operating instructions of the gantry crane device include lifting and lowering and lateral movement of the lifting device, lifting and lowering and lateral movement of the legs, and lifting and lowering of the small legs; the operating instructions of the lifting platform include platform rotation, lifting and longitudinal movement.
5. The intelligent control method for railway line gantry hoisting according to claim 4 is characterized in that: The step S20) further comprises: When the gantry crane and the line components required for the operation are transported to the operation site, the wireless control device can enter the deployment mode by selecting, by operating the buttons of the lifting platform control area and the gantry crane control area on the control panel, and then the processor performs control logic operations according to the operating instructions, the gantry crane and the lifting platform status, to realize the lifting platform clamping of the gantry crane, the lateral movement and lifting of the legs, the rotation, lifting and longitudinal movement of the lifting platform, and finally realize the safe deployment of several gantry cranes from the first flat car to the track surface.
6. The intelligent control method for railway line gantry hoisting according to claim 5 is characterized in that: The step S30) further comprises: When the gantry crane device is deployed, the wireless control device can enter the operation mode by selecting and operating the buttons in the gantry crane device control area. The processor then performs control logic operations according to the operating instructions and the status of the gantry crane device, thereby realizing the coordinated operation of the outrigger lifting, small outrigger lifting, lifting transverse movement, lifting and lifting, and lifting unlocking for several gantry crane devices selected for use. At the same time, the real-time position and load of each gantry crane device are negatively feedback adjusted, ultimately achieving smooth replacement of line components.
7. The intelligent control method for railway line gantry hoisting according to claim 1, 2, 3, 5 or 6, characterized in that: The step S40) further comprises: S401) When the door hanging device is recovered, the hook and the transverse travel mechanism are locked at zero position; S402) The first flat car transports the lifting platform to the bottom of the gantry crane device in the operation area, controls the longitudinal movement of the lifting platform through the wireless control device, fine-tunes the lifting platform and the gantry crane device to complete the alignment, and the lifting platform continues to rise until the small legs of the gantry crane device are lifted off the ground; S403) prompting the operator to perform a clamping and locking operation on the door hanging device, and controlling the clamping and locking mechanism of the lifting platform through the wireless control device to lock the door hanging device, thereby completing the clamping and locking; S404) By operating the one-touch retraction button of the outriggers, the gantry crane device is controlled to quickly retract the outriggers and the small outriggers, and move them horizontally to their respective zero-position locking positions, thereby completing the retraction of the first gantry crane device; S405) Control the lifting platform through the wireless control device to lift the first door hanging device to the highest position, then control the lifting platform to rotate 180 degrees, and transport the lifting platform to the bottom of the second door hanging device through the first flat car, and repeat steps S402) to S404) to complete the recovery of the second door hanging device; S406) Control the lifting platform to rise by wireless remote control, lift the two door hanging devices to the highest position, then control the lifting platform to rotate 90° to the initial position, unlock the clamping locking mechanism, control the lifting platform to descend to the initial position, and operate the locking mechanisms of various moving parts of the door hanging device to lock; S407) Repeat steps S402) to S406) to complete the recovery of other door hanging devices; S408) After all door hanging devices are retracted and locked in sequence, the mode selection button on the control panel is switched to the transportation mode, so as to monitor the locking status of the door hanging devices and the lifting platform before and during transportation.
8. The intelligent control method for railway line gantry hoisting according to claim 7 is characterized in that: Before the door hanging device is deployed and placed, the following steps are also included: S101) Turn on the laser switch and lighting switch on the control box of each door hanging device; S102) Manually releasing the locking rope and positioning pin of the door hanging device on the first flat car; S103) Manually unlocking the legs and small legs of the door hanging device; S104) Manually unlock the lifting, rotating and longitudinal movement mechanisms of the lifting platform.
9. The intelligent control method for railway line gantry hoisting according to claim 2, 3, 5, 6 or 8, characterized in that: A tilt sensor is arranged on the truss of the door hanging device, and the step S20) further comprises: When the gantry crane device is deployed, the tilt status data of the gantry crane device is obtained through the tilt sensor. When a small leg of the gantry crane device sinks and causes the gantry crane device to tilt, the processor calculates the lifting height of the remaining small legs according to the tilt status data to achieve leveling of the gantry crane device and avoid the occurrence of the virtual leg phenomenon.
Citation Information
Patent Citations
Group tower crane synchronous control system
CN203950150U
Method for operating railway turnout laying device
CN107620234A
Hydraulic span and height adjustable gantry crane
CN203159047U