A directional permeability enhancement method combining CO2 phase change fracturing and hydraulic fracturing

Through the coordinated application of CO2 phase transformation cracking and hydraulic fracturing technology, the problems of small impact and high construction difficulty of existing coal seam reaming technology have been solved, and the ventilation permeability of large-scale coal seam and the improvement of gas extraction efficiency have been achieved.

CN114738041BActive Publication Date: 2024-12-06SICHUAN RONG GRP YIBIN CHUANNAN CONSTRUCT ENG CO LT +1
View PDF 26 Cites 0 Cited by

Patent Information

Application Number
CN202210556443.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-19
Publication Date
2024-12-06
Estimated Expiration
2042-05-19

AI Technical Summary

Technical Problem

Existing coal seam reaming technologies such as loose blasting, CO2 phase transition cracking, hydraulic punching, hydraulic fracturing and coal seam acidification have limitations in actual applications, including small impact range, high construction risk, high difficulty, high cost and It is difficult to effectively improve the air permeability of the coal seam and the gas extraction effect due to its impact on coal quality.

Method used

The mutual combination of CO2 phase transformation cracking and hydraulic fracturing technology is adopted. By constructing control holes and measure holes in the coal seam, the coordinated operation of CO2 phase transformation cracking and hydraulic fracturing is carried out to control the crack expansion direction and achieve large-scale penetration enhancement. and directional extraction.

Benefits of technology

It effectively improves the air permeability of the coal seam and gas extraction efficiency, realizes the complementary advantages of the two penetration-enhancing methods, and significantly improves the gas extraction effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114738041B_ABST
    Figure CN114738041B_ABST
Patent Text Reader

Abstract

The present invention discloses a CO 2 A directional permeability enhancement method combining phase change fracturing and hydraulic fracturing, S1: construction measure holes and control holes; S2: through CO 2 The phase change fracturing device completes the detonation of the measure hole; S3: The hydraulic fracturing device completes the hydraulic fracturing of the measure hole. 2 The combination of phase change fracturing technology and hydraulic fracturing technology, and fracturing first and then fracturing, can not only effectively reduce the initiation pressure of hydraulic fracturing, but also control the expansion direction of the cracks produced by hydraulic fracturing, thereby achieving the purpose of increasing the permeability of coal seams and improving the efficiency of gas extraction; the combination of the two can not only increase the permeability of coal seams on a large scale, but also control the direction of expansion of coal seam cracks, realize the complementary advantages of the two permeability enhancement methods, directional permeability enhancement of coal seams and greatly improve the gas extraction effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of blasting cracking test of mine blasting holes, and specifically relates to a CO 2 A directional permeability enhancement method that combines phase change fracturing with hydraulic fracturing. Background Art

[0002] In recent years, with the needs of national economic transformation and green development, my country's coal consumption has fluctuated to a certain extent, but its share in the country's total energy consumption is still more than 50%, which is enough to prove that coal is still the most consumed energy in my country at this stage. In order to meet the development of my country's social economy, it is necessary to continuously mine coal, and one of the difficulties in mining coal is to solve the problem of coal mine gas. In response to this problem, one of the fundamental technical measures is gas extraction, which can not only effectively reduce the gas in the coal seam and improve the safety of coal mining, but also the extracted gas can be used as a clean energy after treatment. However, most of my country's coal seams have complex occurrence conditions and poor permeability, which seriously affects the effect of gas extraction. In order to improve the effect of coal seam gas extraction, pre-splitting blasting permeability enhancement technology (for example: loosening blasting, CO 2 Phase change fracturing), hydraulic permeability enhancement technology (for example: hydraulic punching, hydraulic fracturing), chemical modification permeability enhancement technology (for example: coal seam acidification) and other coal seam permeability enhancement theories and technologies.

[0003] The above technologies all have limitations in practical applications. 2 Taking phase change fracturing, hydraulic punching, hydraulic fracturing and coal seam acidification as examples, loosening blasting technology can improve the permeability of coal seams by chemical blasting in coal seams, but its blasting impact range is small and the construction risk is high; CO 2 Phase change fracturing technology is to improve the permeability of coal seams through physical blasting. 2 The adsorption capacity is higher than that of CH 4 , a large amount of CO 2 Gas to CH 4 It also has a certain displacement effect, so it can also replace CH in the coal seam. 4 , but its blasting impact range is also small; hydraulic punching technology can achieve coal seam permeability improvement by punching out the coal body within a certain range around the borehole to expand the range of fractures around the borehole, but punching is difficult in hard coal, and it is easy to cause hole collapse and bury drill tools in soft coal; hydraulic fracturing technology can achieve large-scale coal seam permeability improvement, but the fractures caused by fracturing are uncontrollable; coal seam acidification technology improves the permeability of coal seams by injecting acid into the coal seam to dissolve or corrode the cement in the coal seam, minerals in the pores and fractures, and blockages, but its permeability improvement range is small, the cost is high, and it may have an adverse effect on the coal quality. Summary of the invention

[0004] The present invention proposes a CO 2 A directional permeability enhancement method that combines phase change fracturing with hydraulic fracturing. 2 The combination of phase change fracturing technology and hydraulic fracturing technology can not only increase the permeability of coal seams on a large scale, but also control the direction of coal seam crack expansion, thereby achieving complementary advantages of the two permeability enhancement methods, directional permeability enhancement of coal seams and significantly improving gas extraction effects.

[0005] To this end, the technical solution adopted by the present invention is: a CO 2 The directional permeability enhancement method of phase change fracturing and hydraulic fracturing comprises the following steps:

[0006] S1: Construction of measure holes and control holes. First, a control hole of a certain depth is constructed in the coal seam, and then a measure hole of a certain depth is constructed at a certain distance from the control hole. When the control hole and the measure hole are constructed to the corresponding specified depth, they need to be flushed;

[0007] S2: Complete the detonation of the measure hole and release CO according to the blasting design plan. 2 After the phase change cracking device is assembled, it is put into the measure hole and the CO is adjusted. 2 The position of the phase change fracturing device is adjusted to the right position, and then the detonation is completed. After the detonation is completed, the CO is recovered. 2 Phase change cracking device;

[0008] S3: Complete the hydraulic fracturing of the measure hole. After assembling the hydraulic fracturing device, send it into the measure hole for hydraulic fracturing according to different pressure modes. During the fracturing process, observe in real time whether there is water flowing out of the control hole. When water flows in the control hole, continue fracturing for a certain period of time to allow the water flow to bring out a large amount of coal dust from the control hole. Simply flush the control hole. When there is no more coal dust in the water flowing out of the control hole, stop fracturing, recover the hydraulic fracturing device, seal the measure hole and the control hole, connect them to the grid and pump them together, and regularly detect and record the extraction parameters.

[0009] As a preferred embodiment of the above scheme, the CO used in S2 2 The phase change fracturing device comprises an end blasting tube, a fracturing hole sealer, a fracturing connecting rod and a rear blasting tube, wherein the rear end of the end blasting tube is provided with an end blasting threaded hole for connecting with the front end of the fracturing hole sealer, and a row of end perforations are arranged radially along the axis of the end blasting tube, one end of all the end perforations penetrates the end blasting tube outwardly, and the other end is connected through an end connection hole arranged in the end blasting tube, and the rear end of the end connection hole is connected with the end pressure pipe joint arranged at the rear end of the end blasting tube, and the rear end of the end pressure pipe joint is provided with a CO 2 The end-fracture pressure pipe connected to the gas cylinder;

[0010] The fracturing hole sealer comprises a fracturing hole sealing rod, the front end of which is provided with a hole sealing connector with external threads for connecting with the rear end of the end blasting tube or the rear end of the rear blasting tube, the rear end of which is provided with a hole sealing threaded hole for connecting with the front end of the fracturing connecting rod, a fracturing hole sealing capsule is fixedly sleeved in the middle of the fracturing hole sealing rod, and a fracturing hole sealing liquid injection joint is provided at the rear end of the fracturing hole sealing capsule for communicating with a fracturing hole sealing liquid injection pipe and injecting a sealing liquid into the fracturing hole sealing capsule;

[0011] The front end of the fracturing connecting rod is provided with a fracturing connecting head with external threads for connecting with the rear end of the fracturing hole sealer, and the rear end of the fracturing connecting rod is provided with a connecting blasting threaded hole for connecting with the front end of the rear blasting tube;

[0012] The front end of the rear-connected blasting tube is provided with a rear-connected connector with external threads for connecting to the rear end of the fracturing connecting rod, the rear end of the rear-connected blasting tube is provided with a rear-connected blasting threaded hole for connecting to the front end of the fracturing hole sealer, a row of rear-connected perforations are arranged radially along the axis on the rear-connected blasting tube, one end of all the rear-connected perforations penetrates the rear-connected blasting tube outwardly, and the other end is connected through the rear-connected connecting hole arranged in the rear-connected blasting tube, the rear end of the rear-connected connecting hole is connected with the rear-connected pressure pipe joint arranged at the rear end of the rear-connected blasting tube, and the rear end of the rear-connected pressure pipe joint is provided with a hole for CO 2 The gas cylinder is connected to a fracturing pressure pipe.

[0013] Further preferably, a sealing rod pipeline through hole for passing an end fracturing pressure tube or a fracturing sealing injection tube or a rear-connected fracturing pressure tube is provided in the fracturing sealing rod, a row of sealing pipe through holes connected to the sealing rod pipeline through hole is provided at the front end of the fracturing sealing rod, a connecting rod pipeline through hole for passing an end fracturing pressure tube or a fracturing sealing injection tube or a rear-connected fracturing pressure tube is provided on the fracturing connecting rod, a row of connecting pipe through holes connected to the connecting rod pipeline through hole is provided at the front end of the fracturing connecting rod, a rear-connected pipeline through hole for passing an end fracturing pressure tube or a fracturing sealing injection tube is provided on the rear-connected blasting tube, and the rear-connected pipeline through hole is not connected to the rear-connected perforation.

[0014] Further preferably, the hydraulic fracturing device used in S3 comprises an end fracturing barrel, a fracturing sealer and a rear fracturing barrel, wherein the end fracturing barrel is provided with an end fracturing through hole along the axis thereof for the fracturing fluid to pass through, and the rear end of the end fracturing through hole is provided with an end fracturing threaded hole for connecting with the front end of the rear fracturing barrel or with a fracturing fluid joint;

[0015] The rear-connected fracturing tube is provided with a rear-connected fracturing through hole for fracturing fluid to pass through and having a diameter equal to that of the end fracturing through hole along the axis, the rear-connected fracturing tube is provided with a row of fracturing perforations connected to the rear-connected fracturing through hole along the axis, the front end of the rear-connected fracturing tube is provided with a fracturing connector for connecting to the rear end of the end fracturing tube or the rear end of the previous rear-connected fracturing tube, and the rear end of the rear-connected fracturing tube is provided with a rear-connected fracturing threaded hole for connecting to the front end of the next rear-connected fracturing tube or to a fracturing fluid joint;

[0016] The fracturing sealer is provided with a fracturing tube through hole for the end fracturing tube or the rear fracturing tube to pass through, and the fracturing sealer includes a ring-shaped fracturing sealing capsule, and the front and rear ends of the fracturing sealing capsule are both provided with fracturing sealing fixing heads for fixing on the end fracturing tube or the rear fracturing tube, and the rear end of the fracturing sealing capsule is provided with a fracturing sealing injection joint for connecting with a fracturing sealing injection pipe and injecting sealing liquid into the fracturing sealing capsule.

[0017] Further preferably, the fracturing and sealing fixing head includes a gripper and a connecting section arranged between the gripper and the fracturing and sealing capsule, the fracturing and sealing fixing head is equipped with a pipe clamp, one end of the inner hole of the pipe clamp is arranged as a locking section with a gradually decreasing diameter, and the other end is arranged as a tightening section for tightening on the connecting section; after the locking section of the pipe clamp is matched with the gripper, and the tightening section is matched with the connecting section, it is put on the fracturing and sealing fixing head and tightened, and when tightening, the locking section continuously squeezes the gripper, so that the gripper holds the end fracturing cylinder or the rear fracturing cylinder tightly, so as to fix the fracturing sealer on the end fracturing cylinder or the rear fracturing cylinder.

[0018] Further preferably, the rear-connected fracturing barrel is provided with a fracturing pipe groove for the fracturing sealing and injection pipe to pass through, and the fracturing pipe groove is also provided with a fracturing sealing cover, and the two side walls of the fracturing pipe groove are provided with fracturing sealing grooves, and the fracturing sealing cover is provided with a fracturing sealing protrusion at a position corresponding to the fracturing sealing groove, and the end of the fracturing sealing protrusion is arranged in an arc shape.

[0019] More preferably, a two-stage fracturing method is adopted in S2, comprising the following steps:

[0020] S21: CO 2The phase change fracturing device is assembled by placing the end blasting tube, the fracturing hole sealer, the fracturing connecting rod, the rear blasting tube, the fracturing hole sealer and the fracturing connecting rod in sequence, and then passing the end fracturing pressure tube and the rear fracturing pressure tube through the hole of the hole sealer pipe at the rear side and entering the hole of the hole sealer pipe, so that each fracturing hole sealer injection pipe passes through the hole of the connecting pipe at the rear side and enters the hole of the connecting rod pipe, and then tightening the end blasting tube, the fracturing hole sealer, the fracturing connecting rod, the rear blasting tube, the fracturing hole sealer and the fracturing connecting rod in sequence through the threads, and then sending them into the measure hole, and adjusting the position of the end perforation and the rear perforation to ensure that the perforation is in the direction of the control hole;

[0021] S22: Fracturing preparation, each fracturing sealing injection pipe after passing through the through hole of the connecting rod pipeline at the last end is connected to a manual pressure pump capable of injecting sealing liquid, and the end fracturing pressure pipe and the subsequent fracturing pressure pipe after passing through the through hole of the connecting rod pipeline at the last end are connected to the gas cylinder through the pressure pump;

[0022] S23: Fracturing is performed. First, the sealing liquid is injected into the two fracturing sealing capsules through different manual pressure pumps to expand the two fracturing sealing capsules. When the expansion pressure is not less than 10Mpa, the sealing is completed. Then, the pressure pump, the end fracturing pressure pipe and the rear fracturing pressure pipe are used to simultaneously or delayed detonate the end blasting tube and the rear blasting tube, so that high-pressure CO is ejected from the corresponding perforations. 2 The airflow creates a large number of blasting cracks in the corresponding coal seam. At the same time, the gas around the measure hole and the blasting cracks will be desorbed or absorbed by CO 2 The gas is displaced into the measure hole, and after the fracturing explosion is completed, the pressure of the fracturing sealing capsule is released, all parts are retracted and disconnected.

[0023] Further preferably, the full-stage fracturing method is adopted in S3, comprising the following steps:

[0024] S31: Assembling the hydraulic fracturing device, fixing the fracturing sealer on the end fracturing tube through a pipe clamp, then connecting the fracturing seal injection pipe to a manual pressure pump, connecting the fracturing fluid joint to a fracturing fluid tank with a pressure pump through a fracturing fluid pipe, and then delivering the fracturing fluid into the measure hole;

[0025] S32: hydraulic fracturing, injecting sealing liquid into the fracturing sealing capsule through a manual pressure pump to expand the fracturing sealing capsule, and completing the sealing when the expansion pressure is not less than 10MPa, and then using the pressure pump and the fracturing liquid pipe to let the fracturing liquid in the fracturing liquid tank enter the measure hole through the end fracturing through hole to implement hydraulic fracturing. Under the action of hydraulic fracturing, the burst gap will further expand until it is interconnected with the control hole. At this time, water flow can be observed in the control hole. When there is no more coal dust in the water flowing out of the control hole, the fracturing is stopped;

[0026] S33: Seal the hole, cancel the pressure in the fracturing sealing capsule, retract the hydraulic fracturing device, disconnect it, and seal the measure hole and the control hole. After the sealing is completed, connect the measure hole and the control hole to the grid for pumping, and regularly check and record the pumping parameters.

[0027] Further preferably, in S2 and S3, CO 2 Drilling rigs are used to put in and take out phase change fracturing devices and hydraulic fracturing devices.

[0028] The beneficial effects of the present invention are: 2 The combination of phase change fracturing technology and hydraulic fracturing technology, and fracturing first and then fracturing, can not only effectively reduce the initiation pressure of hydraulic fracturing, but also control the expansion direction of the cracks produced by hydraulic fracturing, thereby achieving the purpose of increasing the permeability of coal seams and improving the efficiency of gas extraction; the combination of the two can not only increase the permeability of coal seams on a large scale, but also control the direction of expansion of coal seam cracks, realize the complementary advantages of the two permeability enhancement methods, directional permeability enhancement of coal seams and greatly improve the gas extraction effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the fracturing in the present invention.

[0030] Figure 2 It is a schematic diagram of fracturing in the present invention.

[0031] Figure 3 CO in the present invention 2 Schematic diagram of the phase change cracking device.

[0032] Figure 4 It is a schematic diagram of the end blasting tube in the present invention.

[0033] Figure 5 It is a schematic diagram of the fracture sealing rod in the present invention.

[0034] Figure 6 Schematic diagram of the fracturing connecting rod in the present invention.

[0035] Figure 7 It is a schematic diagram of the rear-connected blasting tube in the present invention.

[0036] Figure 8 It is a schematic diagram of the end fracturing tube in the present invention.

[0037] Fig. 9 It is a schematic diagram of the first embodiment of the rear-connected fracturing tube in the present invention.

[0038] Fig.10 It is a schematic diagram of the fracturing sealing cover in the present invention.

[0039] Fig.11It is a schematic diagram of the fracturing sealer in the present invention.

[0040] Fig.12 It is a schematic diagram of the pipe clamp in the present invention.

[0041] Fig.13 It is a schematic diagram of the second embodiment of the rear-connected blasting tube in the present invention.

[0042] Explanation of the reference numerals: 1-measure hole, 2-control hole, 3-end blasting tube, 3a-end blasting threaded hole, 3b-end perforation, 3c-end connection hole, 4-fracturing sealing rod, 4a-sealing hole connector, 4b-sealing hole threaded hole, 4c-sealing rod pipeline through hole, 4d-sealing hole pipeline through hole, 5-fracturing connecting rod, 5a-fracturing connecting head, 5b-connecting blasting threaded hole, 5c-connecting rod pipeline through hole, 5d-connecting pipeline through hole, 6-rear blasting tube, 6a-rear connecting head, 6b-rear blasting threaded hole, 6c-rear perforation, 6d-rear connecting hole, 6e-rear pipeline through hole, 7-end pressure pipe joint, 8-end fracturing pressure pipe, 9-fracturing sealing capsule, 10-fracturing sealing injection pipe, 11-fracturing sealing injection joint, 12-rear pressure pipe Connector, 13-fracturing pressure pipe, 14-end fracturing tube, 14a-end fracturing through hole, 14b-end fracturing threaded hole, 15-fracturing tube, 15a-fracturing through hole, 15b-fracturing perforation, 15c-fracturing connector, 15d-fracturing threaded hole, 15e-fracturing pipe groove, 15f-fracturing sealing groove, 16-fracturing fluid connector, 17-fracturing seal Hole capsule, 18-fracturing sealing fixed head, 18a-gripper, 18b-connecting section, 19-fracturing sealing injection pipe, 20-fracturing sealing injection joint, 21-pipe clamp, 21a-locking section, 21b-tightening section, 22-fracturing sealing cover, 22a-fracturing sealing protrusion, 23-manual pressure pump, 24-fracturing fluid pipe, 25-fracturing fluid tank, 26-blasting gap, 27-drilling rig. DETAILED DESCRIPTION

[0043] The present invention will be further described below by way of embodiments and in conjunction with the accompanying drawings:

[0044] like Figure 1-13 As shown, a CO 2 The directional permeability enhancement method of phase change fracturing and hydraulic fracturing specifically includes the following steps:

[0045] Step 1: construct measure hole 1 and control hole 2. First, construct a control hole 2 of a certain depth in the coal seam. The diameter of control hole 2 is determined according to the extraction needs, generally not less than 75mm. Then, construct a measure hole 1 of a certain depth at a certain distance from control hole 2. The diameter of the measure hole is generally not less than 94mm. When control hole 2 and measure hole 1 are constructed to the corresponding specified depth, they need to be flushed. After the flushing is completed, CO 2 Phase change fracturing and hydraulic fracturing.

[0046] Step 2: Complete the detonation of measure hole 1 and release CO according to the blasting design plan. 2 After the phase change cracking device is assembled, it is put into the measure hole 1 and the CO is adjusted. 2 The position of the phase change fracturing device is adjusted to the right position, and then the detonation is completed. After the detonation is completed, the CO is recovered. 2 Phase change cracking device.

[0047] Among them, CO 2 The specific structure of the phase change fracturing device includes an end blasting tube 3, a fracturing hole sealer, a fracturing connecting rod 5 and a rear blasting tube 6. The rear end of the end blasting tube 3 is provided with an end blasting threaded hole 3a for connecting with the front end of the fracturing hole sealer. At the same time, a row of end perforations 3b are arranged radially along the axis on the end blasting tube 3. One end of all the end perforations 3b penetrates the end blasting tube 3 outwardly, and the other end is connected through an end connection hole 3c arranged in the end blasting tube 3. The rear end of the end connection hole 3c is connected with the end pressure pipe joint 7 arranged at the rear end of the end blasting tube 3, and the rear end of the end pressure pipe joint 7 is provided with a CO 2 The end of the gas cylinder connection causes the pressure pipe to fracture 8.

[0048] The specific structure of the fracturing sealer includes a fracturing sealing rod 4, at the front end of which is provided a sealing connector 4a with an external thread for connecting to the rear end of the end blasting tube 3 or the rear end of the rear blasting tube 6, and at the rear end of the fracturing sealing rod 4 is provided a sealing threaded hole 4b for connecting to the front end of the fracturing connecting rod 5, a fracturing sealing capsule 9 is fixedly sleeved in the middle of the fracturing sealing rod 4, and at the rear end of the fracturing sealing capsule 9 is provided a fracturing sealing injection joint 11 for communicating with a fracturing sealing injection tube 10 and injecting sealing liquid into the fracturing sealing capsule 9.

[0049] A fracturing connector 5a with external threads for connecting to the rear end of the fracturing sealer is provided at the front end of the fracturing connecting rod 5, and a connecting blasting threaded hole 5b for connecting to the front end of the rear blasting tube 6 is provided at the rear end of the fracturing connecting rod 5.

[0050] A rear connection head 6a with external threads for connecting to the rear end of the fracturing connecting rod 5 is arranged at the front end of the rear blasting tube 6, and a rear blasting threaded hole 6b for connecting to the front end of the fracturing hole sealer is arranged at the rear end of the rear blasting tube 6. A row of rear perforations 6c are arranged radially along the axis of the rear blasting tube 6, and one end of all the rear perforations 6c penetrates the rear blasting tube 6 outwardly, and the other end is connected through a rear connection hole 6d arranged in the rear blasting tube 6, and the rear end of the rear connection hole 6d is connected to the rear pressure pipe joint 12 arranged at the rear end of the rear blasting tube 6, and a rear end of the rear pressure pipe joint 12 is arranged for CO 2 The gas cylinder is connected to a fracturing pressure pipe 13.

[0051] In order to prevent damage to the fracturing sealing injection pipe 10 or the rear fracturing pressure pipe 13, a sealing rod pipeline through hole 4c is provided in the fracturing sealing rod 4 for the end fracturing pressure pipe 8 or the fracturing sealing injection pipe 10 or the rear fracturing pressure pipe 13 to pass through, and a row of sealing pipe through holes 4d connected to the sealing rod pipeline through hole 4c is provided at the front end of the fracturing sealing rod 4. A connecting rod pipeline through hole 5c is provided on the fracturing connecting rod 5 for the end fracturing pressure pipe 8 or the fracturing sealing injection pipe 10 or the rear fracturing pressure pipe 13 to pass through, and a row of connecting pipe through holes 5d connected to the connecting rod pipeline through hole 5c is provided at the front end of the fracturing connecting rod 5. A rear pipeline through hole 6e is provided on the rear blasting tube 6 for the end fracturing pressure pipe 8 or the fracturing sealing injection pipe 10 to pass through, and the rear pipeline through hole 6e is not connected to the rear perforation 6c. A rear-connected pipeline groove for the end fracturing pressure pipe 8 or the fracturing sealing injection pipe 10 to pass through can also be provided on the rear-connected blasting tube 6, and the rear-connected pipeline groove is equipped with a rear-connected pipeline sealing cover structure that is the same as the fracturing sealing cover, and rear-connected sealing grooves are provided at both ends of the rear-connected pipeline groove.

[0052] In CO 2 Phase change fracturing uses full-stage fracturing. 2 The phase change cracking device specifically comprises the following steps:

[0053] 1. CO 2 The phase change fracturing device is assembled by placing the end blasting tube 3, the fracturing sealer, the fracturing connecting rod 5, the rear blasting tube 6, the fracturing sealer and the fracturing connecting rod 5 in sequence, and then passing the end fracturing pressure tube 8 and the rear fracturing pressure tube 13 through the rear sealing pipe through hole 4d to enter the sealing rod pipe through hole 4c, and then passing each fracturing sealer injection tube 10 through the rear connecting pipe through hole 5d to enter the connecting rod pipe through hole 5c, and then tightening the end blasting tube 3, the fracturing sealer, the fracturing connecting rod 4, the rear blasting tube 6, the fracturing sealer and the fracturing connecting rod 4 in sequence through the threads, and then sending them into the measure hole 1, and adjusting the positions of the end perforation 3b and the rear perforation 6c to ensure that the perforation is in the direction of the control hole;

[0054] 2. Preparation for fracturing: connect each fracturing sealing injection pipe 10 after passing through the connecting rod pipeline through hole 5c at the rear end to a manual pressure pump 23 that can inject sealing liquid, and connect the end fracturing pressure pipe 8 and the subsequent fracturing pressure pipe 13 after passing through the connecting rod pipeline through hole 5c at the rear end to the gas cylinder through the pressure pump.

[0055] 3. To perform fracturing, firstly, the sealing liquid is injected into the two fracturing sealing capsules 9 through different manual pressure pumps 23 to expand the two fracturing sealing capsules 9. When the expansion pressure is not less than 10 MPa, the sealing is completed. Then, the pressure pump, the end fracturing pressure pipe 8 and the rear fracturing pressure pipe 13 are used to simultaneously or delayed detonate the end blasting tube 3 and the rear blasting tube 6, so that high-pressure CO is ejected from the corresponding perforations. 2 The gas flow creates a large number of blasting cracks 26 on the corresponding coal seam. At the same time, the gas around the measure hole 1 and the blasting cracks 26 will be desorbed or absorbed by CO 2 The gas is displaced and enters the measure hole 1. After the fracturing explosion is completed, the pressure of the fracturing sealing capsule is cancelled, and all parts are recovered and disconnected. When recovering the parts, gas protection measures should be taken to avoid fumigation or excessive gas in the return air flow.

[0056] Step 3: Complete the hydraulic fracturing of measure hole 1. After assembling the hydraulic fracturing device according to different pressure modes, send it into the measure hole 1 for hydraulic fracturing. During the fracturing process, observe in real time whether there is water flowing out of the control hole 2. When water flows in the control hole 2, continue fracturing for a certain period of time to allow the water flow to bring out a large amount of coal dust from the control hole 2. Simply flush the control hole 2. When there is no longer a large amount of coal dust in the water flowing out of the control hole 2, stop fracturing, recover the hydraulic fracturing device, seal the measure hole and the control hole 2, connect them to the grid and pump, and regularly detect and record the extraction parameters.

[0057] The specific structure of the hydraulic fracturing device includes an end fracturing tube 14, a fracturing sealer and a rear fracturing tube 15. The end fracturing tube 14 is provided with an end fracturing through hole 14a along the axis for the fracturing fluid to pass through. The rear end of the end fracturing through hole 14a is provided with an end fracturing threaded hole 14b for connecting to the front end of the rear fracturing tube 15 or to the fracturing fluid connector 16.

[0058] A rear-connected fracturing hole 15a for fracturing fluid to pass through and having the same diameter as the end fracturing hole 14a is arranged along the axis line on the rear-connected fracturing tube 15. At the same time, a row of fracturing perforations 15b connected to the rear-connected fracturing hole 15a are arranged along the axis line on the rear-connected fracturing tube 15. A fracturing connector 15c for connecting to the rear end of the end fracturing tube 14 or the rear end of the previous rear-connected fracturing tube 15 is arranged at the front end of the rear-connected fracturing tube 15. A rear-connected fracturing threaded hole 15d for connecting to the front end of the next rear-connected fracturing tube 15 or to the fracturing fluid connector 16 is arranged at the rear end of the rear-connected fracturing tube 15.

[0059] A fracturing tube through hole is provided on the fracturing sealer for the end fracturing tube 14 or the rear fracturing tube 15 to pass through. The specific structure of the fracturing sealer includes an annular fracturing sealing capsule 17. The front and rear ends of the fracturing sealing capsule 17 are provided with fracturing sealing fixing heads 18 for fixing on the end fracturing tube 14 or the rear fracturing tube 15. A fracturing sealing injection joint 20 is provided at the rear end of the fracturing sealing capsule 17 for connecting with a fracturing sealing injection pipe 19 and injecting sealing liquid into the fracturing sealing capsule 17.

[0060] The specific structure of the fracturing and sealing fixed head 18 includes a gripper 18a and a connecting section 18b arranged between the gripper 18a and the fracturing and sealing capsule 17. The fracturing and sealing fixed head 18 is equipped with a pipe hoop 21. One end of the inner hole of the pipe hoop 21 is set as a locking section 21a with a gradually decreasing diameter, and the other end is set as a tightening section 21b for tightening on the connecting section. After the locking section 21a of the pipe hoop 21 corresponds to the gripper 18a, and the tightening section 21b corresponds to the connecting section 18b, it is then put on the fracturing and sealing fixed head 18 and tightened. When tightening, the locking section 21a continuously squeezes the gripper 18a, so that the gripper 18a holds the end fracturing tube or the rear fracturing tube tightly, so as to fix the fracturing sealer on the end fracturing tube or the rear fracturing tube.

[0061] To facilitate the fixation of the fracturing and sealing injection pipe, a fracturing pipe groove 15e for the fracturing and sealing injection pipe 19 to pass through is provided on the rear fracturing tube 15. The fracturing pipe groove 15e is also equipped with a fracturing sealing cover 22. Fracturing sealing grooves 15f are provided on both side walls of the fracturing pipe groove 15e. A fracturing sealing protrusion 22a is provided on the fracturing sealing cover 22 at a position corresponding to the fracturing sealing groove 15f, and the end of the fracturing sealing protrusion 22a is provided with an arc shape.

[0062] The hydraulic fracturing adopts the full-stage fracturing method. Based on the above hydraulic fracturing device, the specific hydraulic fracturing includes the following steps:

[0063] 1. Assembly of hydraulic fracturing device: fix the fracturing sealer on the end fracturing tube 14 through the pipe clamp 21, then connect the fracturing seal injection pipe 19 to the manual booster pump 23, connect the fracturing fluid connector 16 to the fracturing fluid tank 25 with the booster pump through the fracturing fluid pipe 24, and then send it into the measure hole 1.

[0064] 2. Hydraulic fracturing: inject sealing liquid into the fracturing sealing capsule 17 through the manual pressure pump 23 to expand the fracturing sealing capsule 17. When the expansion pressure is not less than 10MPa, the sealing is completed. Then, the fracturing liquid in the fracturing liquid tank 25 is passed through the end fracturing hole 14a by the pressure pump and the fracturing liquid pipe 24 to enter the measure hole 1 to implement hydraulic fracturing. Under the action of hydraulic fracturing, the burst gap 26 will further expand until it is interconnected with the control hole 2. At this time, water flow can be observed in the control hole 2. When there is no longer a large amount of coal dust in the water flowing out of the control hole 2, the fracturing is stopped.

[0065] 3. Seal the holes, cancel the pressure in the fracturing sealing capsule, retract the hydraulic fracturing device, disconnect it, and seal the measure hole 1 and the control hole 2. After the sealing is completed, connect the measure hole 1 and the control hole 2 to the grid for pumping, and regularly check and record the pumping parameters.

[0066] In this embodiment, CO 2 The phase change fracturing device and the hydraulic fracturing device are both put in and taken out by a drilling rig 27. The fracturing sealing capsule 9 and the fracturing sealing capsule 17 are both equipped with pressure sensors.

Claims

1. A directional permeability enhancement method combining CO2 phase change fracturing and hydraulic fracturing, characterized in that: The following steps are involved: S1: constructing a measure hole (1) and a control hole (2), first constructing a control hole (2) of a certain depth in the coal seam, and then constructing a measure hole (1) of a certain depth at a certain distance from the control hole (2). When the control hole (2) and the measure hole (1) are constructed to the corresponding specified depth, they need to be flushed; S2: completing the detonation of the measure hole (1), and according to the blasting design plan, the CO2 phase change fracturing device is assembled and sent into the measure hole (1), and the position of the CO2 phase change fracturing device is adjusted. After the adjustment is in place, the detonation is completed. After the detonation is completed, the CO2 phase change fracturing device is retracted; S3: completing the hydraulic fracturing of the measure hole (1), and inserting the assembled hydraulic fracturing device into the measure hole (1) according to different pressure modes for hydraulic fracturing, and observing in real time whether water flows out of the control hole (2) during the fracturing process. When water flows out of the control hole (2), continue fracturing for a certain period of time to allow the water flow to bring out a large amount of coal dust from the control hole (2), and simply flush the control hole (2). When the water flowing out of the control hole (2) no longer contains a large amount of coal dust, stop fracturing, recover the hydraulic fracturing device, seal the measure hole and the control hole (2), connect them to the grid for extraction, and regularly detect and record the extraction parameters; The CO2 phase change fracturing device used in S2 comprises an end blasting tube (3), a fracturing hole sealer, a fracturing connecting rod (5) and a rear blasting tube (6), wherein the rear end of the end blasting tube (3) is provided with an end blasting threaded hole (3a) for connecting to the front end of the fracturing hole sealer, and a row of end perforations (3b) are provided radially along the axis of the end blasting tube (3), one end of all the end perforations (3b) penetrates the end blasting tube (3) outwardly, and the other end is connected through an end connection hole (3c) provided in the end blasting tube (3), the rear end of the end connection hole (3c) is connected to an end pressure pipe joint (7) provided at the rear end of the end blasting tube (3), and the rear end of the end pressure pipe joint (7) is provided with an end fracturing pressure pipe (8) for connecting to a CO2 gas cylinder; The fracturing hole sealer comprises a fracturing hole sealing rod (4), the front end of the fracturing hole sealing rod (4) being provided with a hole sealing connector (4a) with external threads for connecting to the rear end of the end blasting tube (3) or the rear end blasting tube (6), the rear end of the fracturing hole sealing rod (4) being provided with a hole sealing threaded hole (4b) for connecting to the front end of the fracturing connecting rod (5), the middle part of the fracturing hole sealing rod (4) being fixedly sleeved with a fracturing hole sealing capsule (9), the rear end of the fracturing hole sealing capsule (9) being provided with a fracturing hole sealing liquid injection joint (11) for communicating with a fracturing hole sealing liquid injection pipe (10) and injecting a sealing liquid into the fracturing hole sealing capsule (9); The front end of the fracturing connecting rod (5) is provided with a fracturing connecting head (5a) with external threads for connecting to the rear end of the fracturing hole sealer, and the rear end of the fracturing connecting rod (5) is provided with a connecting blasting threaded hole (5b) for connecting to the front end of the rear blasting tube (6); The front end of the rear blasting tube (6) is provided with a rear connection head (6a) with external threads for connecting to the rear end of the fracturing connecting rod (5); the rear end of the rear blasting tube (6) is provided with a rear blasting threaded hole (6b) for connecting to the front end of the fracturing hole sealer; a row of rear perforations (6c) are provided radially along the axis of the rear blasting tube (6); one end of all the rear perforations (6c) penetrates the rear blasting tube (6) outwardly, and the other end is connected through a rear connection hole (6d) provided in the rear blasting tube (6); the rear end of the rear connection hole (6d) is connected to a rear pressure pipe joint (12) provided at the rear end of the rear blasting tube (6); and the rear end of the rear pressure pipe joint (12) is provided with a rear fracturing pressure pipe (13) for connecting to a CO2 gas cylinder; The fracturing sealing rod (4) is provided with a sealing rod pipeline through hole (4c) for the end fracturing pressure pipe (8) or the fracturing sealing injection pipe (10) or the rear fracturing pressure pipe (13) to pass through, the front end of the fracturing sealing rod (4) is provided with a row of sealing pipe through holes (4d) connected to the sealing rod pipeline through hole (4c), and the fracturing connecting rod (5) is provided with a terminal fracturing pressure pipe (8) or the fracturing sealing injection pipe (10). or a connecting rod pipeline through hole (5c) through which a rear-connected fracturing pressure pipe (13) passes, the front end of the fracturing connecting rod (5) is provided with a row of connecting pipeline through holes (5d) connected to the connecting rod pipeline through hole (5c); the rear-connected blasting tube (6) is provided with a rear-connected pipeline through hole (6e) through which an end fracturing pressure pipe (8) or a fracturing sealing injection pipe (10) passes, and the rear-connected pipeline through hole (6e) is not connected to the rear-connected perforation (6c).

2. The directional permeability enhancement method of CO2 phase change fracturing and hydraulic fracturing according to claim 1 is characterized by: The hydraulic fracturing device used in S3 comprises an end fracturing tube (14), a fracturing sealer and a rear fracturing tube (15); an end fracturing through hole (14a) for fracturing fluid to pass through is arranged along the axis of the end fracturing tube (14); a rear end of the end fracturing through hole (14a) is arranged with an end fracturing threaded hole (14b) for connecting to the front end of the rear fracturing tube (15) or to a fracturing fluid connector (16); The rear-connected fracturing tube (15) is provided with a rear-connected fracturing through hole (15a) along the axis thereof, through which fracturing fluid passes and having a diameter equal to that of the end fracturing through hole (14a); the rear-connected fracturing tube (15) is provided with a row of fracturing perforations (15b) connected to the rear-connected fracturing through hole (15a) along the axis thereof; the front end of the rear-connected fracturing tube (15) is provided with a fracturing connector (15c) for connecting to the rear end of the end fracturing tube (14) or the rear end of the previous rear-connected fracturing tube (15); the rear end of the rear-connected fracturing tube (15) is provided with a rear-connected fracturing threaded hole (15d) for connecting to the front end of the next rear-connected fracturing tube (15) or to a fracturing fluid connector (16); The fracturing sealer is provided with a fracturing tube through hole for the end fracturing tube (14) or the rear fracturing tube (15) to pass through, and the fracturing sealer comprises an annular fracturing sealer capsule (17), and both the front and rear ends of the fracturing sealer capsule (17) are provided with fracturing sealer fixing heads (18) for fixing to the end fracturing tube (14) or the rear fracturing tube (15), and the rear end of the fracturing sealer capsule (17) is provided with a fracturing sealer injection joint (20) for communicating with a fracturing sealer injection pipe (19) and injecting sealing liquid into the fracturing sealer capsule (17).

3. The directional permeability enhancement method of CO2 phase change fracturing and hydraulic fracturing according to claim 2 is characterized by: The fracturing and sealing fixed head (18) comprises a gripper (18a) and a connecting section (18b) arranged between the gripper (18a) and the fracturing and sealing capsule (17); the fracturing and sealing fixed head (18) is provided with a pipe clamp (21); one end of the inner hole of the pipe clamp (21) is provided with a locking section (21a) with a gradually decreasing diameter, and the other end is provided with a tightening section (21b) for tightening on the connecting section; after the locking section (21a) of the pipe clamp (21) is aligned with the gripper (18a), and the tightening section (21b) is aligned with the connecting section (18b), the locking section (21a) is put on the fracturing and sealing fixed head (18) and tightened; when tightening, the locking section (21a) continuously squeezes the gripper (18a), so that the gripper (18a) holds the end fracturing cylinder or the rear fracturing cylinder tightly, thereby fixing the fracturing sealer on the end fracturing cylinder or the rear fracturing cylinder.

4. The directional permeability enhancement method of CO2 phase change fracturing and hydraulic fracturing according to claim 2 or 3, characterized in that: The rear-connected fracturing tube (15) is provided with a fracturing pipe groove (15e) for a fracturing sealing and injection pipe (19) to pass through, and the fracturing pipe groove (15e) is also provided with a fracturing sealing cover (22). The two side walls of the fracturing pipe groove (15e) are provided with fracturing sealing grooves (15f), and the fracturing sealing cover (22) is provided with a fracturing sealing protrusion (22a) at a position corresponding to the fracturing sealing groove (15f), and the end of the fracturing sealing protrusion (22a) is arranged in an arc shape.

5. The directional permeability enhancement method of CO2 phase change fracturing and hydraulic fracturing according to claim 1, characterized in that: In S2, a two-stage fracturing method is adopted, which includes the following steps: S21: Assembling the CO2 phase change fracturing device, placing the end blasting tube (3), the fracturing sealer, the fracturing connecting rod (5), the rear blasting tube (6), the fracturing sealer and the fracturing connecting rod (5) in sequence, then passing the end fracturing pressure tube (8) and the rear fracturing pressure tube (13) through the rear side sealing pipe through hole (4d) and then entering the sealing rod pipe through hole (4c), then passing each fracturing sealer injection tube (10) through the rear side connecting pipe through hole (5d) and then entering the connecting rod pipe through hole (5c), then tightening the end blasting tube (3), the fracturing sealer, the fracturing connecting rod (4), the rear blasting tube (6), the fracturing sealer and the fracturing connecting rod (4) in sequence through the threads, and then sending them into the measure hole (1), and adjusting the positions of the end perforation (3b) and the rear end perforation (6c) to ensure that the perforation is oriented in the direction of the control hole; S22: fracturing preparation, each fracturing sealing liquid injection pipe (10) after passing through the connecting rod pipeline through hole (5c) at the rear end is connected to a manual pressure pump (23) capable of injecting sealing liquid, and the end fracturing pressure pipe (8) and the subsequent fracturing pressure pipe (13) after passing through the connecting rod pipeline through hole (5c) at the rear end are connected to the gas cylinder through the pressure pump; S23: fracturing is performed. First, sealing liquid is injected into two fracturing sealing capsules (9) through different manual pressure pumps (23) to expand the two fracturing sealing capsules (9). When the expansion pressure is not less than 10 MPa, the sealing is completed. Then, the pressure pump, the end fracturing pressure pipe (8) and the rear fracturing pressure pipe (13) are used to simultaneously or delayed detonate the end blasting tube (3) and the rear blasting tube (6) so that high-pressure CO2 gas flows out from the corresponding perforations, thereby causing a large number of blasting gaps (26) in the corresponding coal seams. At the same time, the gas around the measure hole (1) and the blasting gaps (26) will be desorbed or replaced by CO2 gas and enter the measure hole (1). After the fracturing blasting is completed, the pressure of the fracturing sealing capsules is cancelled, and all parts are withdrawn and disconnected.

6. The directional permeability enhancement method of CO2 phase change fracturing and hydraulic fracturing according to claim 4, characterized in that: The full-stage fracturing method is used in S3, which includes the following steps: S31: Assembling the hydraulic fracturing device, fixing the fracturing sealer on the end fracturing tube (14) through a pipe clamp (21), then connecting the fracturing sealer injection pipe (19) to a manual pressure pump (23), connecting the fracturing fluid connector (16) to a fracturing fluid tank (25) with a pressure pump through a fracturing fluid pipe (24), and then injecting the fracturing fluid into the measure hole (1); S32: hydraulic fracturing, injecting sealing liquid into the fracturing sealing capsule (17) through a manual pressure pump (23) to expand the fracturing sealing capsule (17). When the expansion pressure is not less than 10 MPa, the sealing is completed. Then, the fracturing liquid in the fracturing liquid tank (25) is introduced into the measure hole (1) through the end fracturing through hole (14a) through the pressure pump and the fracturing liquid pipe (24) to implement hydraulic fracturing. Under the action of hydraulic fracturing, the burst gap (26) will further expand until it is connected with the control hole (2). At this time, water flow can be observed in the control hole (2). When the water flowing out of the control hole (2) no longer contains a large amount of coal dust, the fracturing is stopped; S33: sealing the holes, canceling the pressure in the fracturing sealing capsule, retracting the hydraulic fracturing device, disconnecting it, and sealing the measure hole (1) and the control hole (2). After the sealing is completed, the measure hole (1) and the control hole (2) are connected to the grid for pumping, and the pumping parameters are regularly tested and recorded.

7. The directional permeability enhancement method of CO2 phase change fracturing and hydraulic fracturing according to claim 1 is characterized by: In S2 and S3, the CO2 phase change fracturing device and the hydraulic fracturing device are both put in and taken out using a drilling rig (27).

Citation Information

Patent Citations

  • A method of improving the wetted radius of high pressure water injection of lowly permeable coal seams through sublevel presplitting

    AU2016231635A1

  • Four-period-five-purpose hole-drilling high-efficiency gas extracting process

    CN102337919A

  • Advanced pre-splitting method for lump coal mining

    CN103924956A

  • Multi-point control hydraulic fracturing, permeability-increasing and outburst-eliminating method

    CN104594868A

  • Liquid CO2 phase transition multipoint fracturing and permeability increasing method

    CN105201481A