BIM-based narrow space hoisting construction method, system, equipment and storage medium

By obtaining and analyzing construction environment information based on BIM, generating collision warning areas, and monitoring overlap situations in real time, the problem of low safety in lifting construction in narrow spaces is solved, and the reduction of safety accidents and improvement of construction safety is achieved.

CN114742456BActive Publication Date: 2024-11-15中铁广州工程局集团第三工程有限公司 +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202210487893.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-06
Publication Date
2024-11-15
Estimated Expiration
2042-05-06

AI Technical Summary

Technical Problem

When hoisting in a narrow space, there is a risk of the hoisting equipment colliding with other fixed buildings or construction equipment, which is a high possibility of safety accidents.

Method used

Using a BIM-based method, the construction environment information, the dimensional parameters of the lifting assembly and the lifting personnel information are obtained, the collision warning area is generated, and the overlap of these areas is monitored in real time, and collisions are prevented through sound and light signals and equipment braking measures.

Benefits of technology

It effectively reduces the probability of safety accidents in lifting construction in narrow spaces, improves construction safety, and ensures that lifting personnel take timely preventive measures by reasonably setting up collision warning areas and real-time monitoring measures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114742456B_ABST
    Figure CN114742456B_ABST
Patent Text Reader

Abstract

The present application discloses a BIM-based confined space hoisting construction method, system, equipment and storage medium. The BIM-based confined space hoisting construction method comprises: obtaining construction environment information, size parameters of a hoisting assembly and hoisting personnel information, the construction environment information comprises the size parameters of obstacles in the construction site, the hoisting assembly refers to a combination of components to be hoisted and required hoisting equipment, and the hoisting personnel information comprises the hoisting personnel's proficiency information in operating the hoisting equipment; generating collision warning areas for obstacles and hoisting assemblies based on the construction environment information, the size parameters of the hoisting assembly and the hoisting personnel information; acquiring the position information of each collision warning area in real time, so as to generate warning information when the collision warning areas overlap and send it to the hoisting personnel terminal; the present application has the effect of improving the safety of confined space hoisting construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of hoisting construction, and in particular to a BIM-based narrow space hoisting construction method, system, equipment and storage medium. Background Art

[0002] With the development of the construction industry, steel structures are increasingly being used in large buildings. The steel structure system is easy to use to build buildings with unique shapes. The existing steel structure construction methods commonly used include installation of steel trusses in whole sections and lifting of steel trusses in loose parts, which brings great challenges to the lifting construction.

[0003] In actual construction, we often encounter scenarios where hoisting construction needs to be carried out in a small space. The technical requirements for hoisting construction workers are extremely high. If they are not careful, the hoisted objects or booms may easily collide with other fixed buildings or construction equipment, causing property or personal safety losses.

[0004] With respect to the above-mentioned related technologies, the inventor believes that there is a problem of high risk of hoisting in a narrow space. Summary of the invention

[0005] In order to improve the safety of hoisting construction in a narrow space, the present application provides a BIM-based hoisting construction method, system, equipment and storage medium for a narrow space.

[0006] The first invention objective of this application is achieved by adopting the following technical solution:

[0007] The BIM-based narrow space hoisting construction method includes:

[0008] Acquire construction environment information, size parameters of the hoisting assembly, and hoisting personnel information, wherein the construction environment information includes the size parameters of each obstacle in the construction site, the hoisting assembly refers to a combination of the component to be hoisted and the required hoisting equipment, and the hoisting personnel information includes the hoisting personnel's proficiency in operating the hoisting equipment;

[0009] Generate collision warning areas for each obstacle and the hoisting assembly based on the construction environment information, the size parameters of the hoisting assembly and the hoisting personnel information;

[0010] The position information of each collision warning area is obtained in real time, so as to generate warning information when the collision warning areas overlap and send it to the hoisting personnel terminal.

[0011] By adopting the above technical scheme, the construction environment information, the size parameters of the lifting assembly and the lifting personnel information are obtained to obtain the size parameters of each obstacle in the construction site, the size parameters of the combination of the component to be lifted and the required lifting equipment, and the lifting personnel's operating proficiency information for the lifting equipment, and these data related to the safety of the lifting construction are centrally analyzed and processed; collision warning areas of each obstacle and the lifting assembly are generated according to the construction environment information, the size parameters of the lifting assembly and the lifting personnel information, which are used to provide safety prompts for the subsequent lifting construction of the lifting personnel, wherein collision warning areas of different sizes are generated according to the different operating proficiency of the lifting personnel for the lifting equipment, thereby improving the rationality of the setting of the collision warning area; the position information of each collision warning area is obtained in real time, so as to generate warning information when the collision warning areas overlap and send it to the lifting personnel terminal, so as to inform the lifting personnel that they are in a dangerous state, so that the lifting personnel can take measures in time, provide anti-collision safety measures for the lifting construction, and reduce the probability of safety accidents.

[0012] In a preferred example of the present application, the step of generating a collision warning area between each obstacle and the hoisting assembly based on the construction environment information, the size parameters of the hoisting assembly and the hoisting personnel information includes:

[0013] Based on the construction environment information and the size parameters of the hoisting assembly, a first-level warning area is established for each obstacle and the hoisting assembly;

[0014] Determine a secondary warning parameter based on the hoisting personnel information, wherein the secondary warning parameter refers to a parameter used to determine the size of the secondary warning area;

[0015] A secondary warning area is established on the surface adjacent to the primary warning area based on the secondary warning parameters, and the primary warning area and the secondary warning area are combined to obtain a collision warning area.

[0016] By adopting the above technical scheme, a first-level warning area is established for each obstacle and lifting assembly based on the construction environment information and the size parameters of the lifting assembly. The first-level warning area is determined based on non-personnel factors in the lifting construction, and is used to determine the high-risk range of collision of each obstacle and the lifting assembly in the lifting construction; the lifting personnel information includes the lifting personnel's operating proficiency information on the lifting equipment, and the second-level warning parameters are determined based on the lifting personnel information, so as to subsequently determine the size of the second-level warning area; a second-level warning area is established on the surface adjacent to the first-level warning area based on the second-level warning parameters, wherein the second-level warning area is determined based on the personnel factors in the lifting construction, and is used to evaluate the safety impact of the personnel factors in the lifting construction on the lifting construction; the first-level warning area and the second-level warning area are merged to obtain a collision warning area, so that the collision warning area comprehensively considers the impact of non-personnel factors and personnel factors on safety in the lifting construction, and improves the scientific nature of the anti-collision safety measures taken in the lifting construction.

[0017] In a preferred example of the present application, the warning information includes collision warning information and collision braking information. When the collision warning areas overlap, the step of generating the warning information and sending it to the hoisting personnel terminal includes:

[0018] When the collision warning areas overlap, the overlap of the collision warning areas is determined. If only the secondary warning areas overlap, a collision warning message is generated and sent to the hoisting personnel terminal, so that the hoisting personnel terminal prompts the hoisting personnel with sound and light signals;

[0019] If there is an overlap between the collision warning area and the first-level warning area, collision braking information is generated and sent to the hoisting personnel terminal, so that the hoisting personnel terminal controls the hoisting equipment to brake.

[0020] By adopting the above technical scheme, when the collision warning areas overlap, the overlap of the collision warning areas is judged so that different safety measures can be taken according to different overlap types. When only the overlap between the second-level warning areas occurs, the safety threat to the lifting construction is relatively small, and a collision warning information is sent to the lifting personnel terminal, so that the lifting personnel terminal sends out an audible and visual signal to remind the lifting personnel to pay attention to safety; if any first-level warning area overlaps with other collision warning areas, the safety threat to the lifting construction is relatively large, and a collision braking information is sent to the lifting personnel terminal, so that the lifting personnel terminal controls the braking of the lifting equipment to prevent safety accidents caused by operating errors of the lifting personnel.

[0021] In a preferred example of the present application, after the step of establishing a first-level warning area for each obstacle and the hoisting assembly based on the construction environment information and the size parameters of the hoisting assembly, the step further includes:

[0022] The construction environment information includes real-time wind speed forecast information of the construction site. The range of each first-level warning area is corrected based on the wind speed forecast information, and the range of each first-level warning area is positively correlated with the wind speed forecast information.

[0023] By adopting the above technical scheme, after the first-level warning areas for various obstacles and lifting assemblies in the lifting construction are established, during the actual lifting construction, the wind speed forecast information of the construction site is obtained in real time. Since the wind at the construction site will cause the boom of the lifting equipment and the components to be lifted to swing, and the greater the wind speed, the greater the swing amplitude, therefore, the volume of each first-level warning area is corrected based on the wind speed forecast information, so that the volume of each first-level warning area is positively correlated with the wind speed forecast information, thereby improving the scientific nature of the volume setting of the first-level warning area, thereby further improving the safety of the lifting construction.

[0024] In a preferred example of the present application, the step of determining the secondary warning parameter based on the hoisting personnel information specifically includes:

[0025] A secondary warning parameter is determined based on the operation proficiency information of the hoisting personnel, and the secondary warning parameter is negatively correlated with the operation proficiency information.

[0026] By adopting the above technical scheme, in actual lifting construction, the secondary warning parameters used to determine the size of the secondary warning area are determined based on the lifting personnel's operating proficiency information on the lifting equipment. Since the higher the lifting personnel's operating proficiency, the lower the possibility of lifting safety accidents, the secondary warning parameters are negatively correlated with the lifting personnel's operating proficiency information, and then the size of the secondary warning area is negatively correlated with the lifting personnel's operating proficiency information, thereby improving the rationality of the setting of the size of the secondary warning area.

[0027] In a preferred example of the present application, the step of determining the secondary warning parameter based on the hoisting personnel information further includes:

[0028] Obtain the fatigue information of the hoisting personnel in real time and input it into the preset fatigue evaluation model to generate fatigue score data;

[0029] The secondary warning parameter is corrected based on the fatigue score data so that the secondary warning parameter is positively correlated with the fatigue score data.

[0030] By adopting the above technical scheme, since safety accidents are prone to occur when hoisting workers perform hoisting construction when they are tired, the fatigue information of the hoisting workers is obtained in real time and input into the fatigue evaluation model to obtain fatigue score data to judge the current fatigue state of the hoisting workers; based on the fatigue score data, the secondary warning parameters used to determine the size of the secondary warning area are corrected, so that the secondary warning parameters are positively correlated with the fatigue score data, and the factors of the fatigue state of the hoisting workers are taken into consideration when determining the secondary warning parameters, thereby improving the scientific nature of the setting of the size of the secondary warning area, thereby improving the safety of hoisting construction.

[0031] In a preferred example of the present application, the step of obtaining fatigue information of the hoisting personnel in real time also includes:

[0032] Obtain the accumulated working time data of hoisting personnel in real time;

[0033] Image information of the hoisting personnel during the hoisting construction is acquired in real time, and fatigue movements of the hoisting personnel are identified from the image information to form fatigue movement counting information.

[0034] By adopting the above technical scheme, the accumulated working time data of the hoisting personnel can be obtained in real time, so as to preliminarily judge the fatigue degree of the hoisting personnel based on the accumulated working time of the hoisting personnel; the image information of the hoisting personnel when performing the hoisting construction can be obtained in real time, and the image information can be recognized to count the number of times the hoisting personnel make fatigue actions during the hoisting construction process, and form fatigue action counting information, so as to facilitate the subsequent comprehensive evaluation of the actual fatigue state of the hoisting personnel according to the working time and body movement reactions of the hoisting personnel, thereby improving the accuracy of the fatigue scoring data, and further improving the scientific nature of the setting of the range size of the secondary warning area.

[0035] In a preferred example of the present application, after the step of obtaining fatigue information of the hoisting personnel in real time and inputting it into a preset fatigue evaluation model to generate fatigue score data, the method further includes:

[0036] The fatigue score data is compared with a preset fatigue threshold, and when the fatigue score data is greater than the fatigue threshold, fatigue prompt information is generated and sent to the management terminal.

[0037] By adopting the above technical solution, a fatigue threshold is set, and the fatigue score data is compared with the fatigue threshold. When the fatigue score data is greater than the fatigue threshold, a fatigue prompt message is generated and sent to the management terminal, so that the management personnel can promptly know the current fatigue status of the workers performing the lifting construction, so as to take measures such as replacing the lifting personnel or providing the lifting personnel with refreshing supplies, so as to reduce the possibility of safety accidents caused by the lifting personnel operating the lifting equipment in a fatigued state.

[0038] In a preferred example of the present application, the step of establishing a secondary warning area on a surface adjacent to the primary warning area based on the secondary warning parameter includes:

[0039] A corresponding secondary warning area is generated based on each primary warning area and the secondary warning parameter. The secondary warning area is set adjacent to the surface of the primary warning area, and the distance between each surface of the secondary warning area and the surface of the primary warning area is the secondary warning parameter.

[0040] By adopting the above technical solution, a corresponding secondary warning area is generated based on each primary warning area and the secondary warning parameter, wherein the secondary warning area is arranged adjacent to the surface of the primary warning area, so that the secondary warning area is wrapped in the primary warning area, and the distance between the surface of the secondary warning area and the surface of the primary warning area at each location is the secondary warning parameter, so that the range size of the secondary warning area can be changed according to the change of the secondary warning parameter, thereby improving the convenience of setting the range size of the secondary warning area.

[0041] The second invention objective of this application is achieved by the following technical solution:

[0042] The BIM-based narrow space hoisting construction system includes:

[0043] A hoisting-related information acquisition module is used to acquire construction environment information, size parameters of a hoisting assembly, and hoisting personnel information. The construction environment information includes the size parameters of each obstacle in the construction site. The hoisting assembly refers to a combination of a component to be hoisted and required hoisting equipment. The hoisting personnel information includes the hoisting personnel's proficiency in operating the hoisting equipment.

[0044] A collision warning area generation module, used to generate collision warning areas between obstacles and the hoisting assembly based on the construction environment information, the size parameters of the hoisting assembly and the hoisting personnel information;

[0045] The collision warning information generation module is used to obtain the position information of each collision warning area in real time, so as to generate warning information and send it to the hoisting personnel terminal when the collision warning areas overlap.

[0046] By adopting the above technical scheme, the construction environment information, the size parameters of the lifting assembly and the lifting personnel information are obtained to obtain the size parameters of each obstacle in the construction site, the size parameters of the combination of the component to be lifted and the required lifting equipment, and the lifting personnel's operating proficiency information for the lifting equipment, and these data related to the safety of the lifting construction are centrally analyzed and processed; collision warning areas of each obstacle and the lifting assembly are generated according to the construction environment information, the size parameters of the lifting assembly and the lifting personnel information, which are used to provide safety prompts for the subsequent lifting construction of the lifting personnel, wherein collision warning areas of different sizes are generated according to the different operating proficiency of the lifting personnel for the lifting equipment, thereby improving the rationality of the setting of the collision warning area; the position information of each collision warning area is obtained in real time, so as to generate warning information when the collision warning areas overlap and send it to the lifting personnel terminal, so as to inform the lifting personnel that they are in a dangerous state, so that the lifting personnel can take measures in time, provide anti-collision safety measures for the lifting construction, and reduce the probability of safety accidents.

[0047] The third invention objective of this application is achieved by the following technical solution:

[0048] A computer device includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the above-mentioned BIM-based narrow space hoisting construction method are implemented.

[0049] The fourth invention objective of this application is achieved by the following technical solution:

[0050] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned BIM-based narrow space hoisting construction method.

[0051] In summary, the present application includes at least one of the following beneficial technical effects:

[0052] 1. Obtain construction environment information, size parameters of hoisting assemblies and hoisting personnel information to obtain size parameters of obstacles in the construction site, size parameters of the assembly of components to be hoisted and required hoisting equipment, and information on the hoisting personnel's proficiency in operating hoisting equipment, and centrally analyze and process these data related to hoisting construction safety; generate collision warning areas for obstacles and hoisting assemblies based on construction environment information, size parameters of hoisting assemblies and hoisting personnel information, which are used to provide safety tips for hoisting construction of hoisting personnel in the future, wherein collision warning areas of different sizes are generated according to the different proficiency of hoisting personnel in operating hoisting equipment, thereby improving the rationality of setting collision warning areas; obtain the location information of each collision warning area in real time, so as to generate warning information when each collision warning area overlaps and send it to the hoisting personnel terminal, so as to inform the hoisting personnel that they are in a dangerous state, so that the hoisting personnel can take measures in time, provide anti-collision safety measures for hoisting construction, and reduce the probability of safety accidents.

[0053] 2. Based on the construction environment information and the size parameters of the lifting assembly, a first-level warning area is established for each obstacle and lifting assembly respectively. The first-level warning area is determined based on non-personnel factors in the lifting construction, and is used to determine the high-risk collision range of each obstacle and lifting assembly in the lifting construction; the lifting personnel information includes the lifting personnel's operating proficiency information on the lifting equipment, and the second-level warning parameters are determined based on the lifting personnel information, so as to subsequently determine the size of the second-level warning area; based on the second-level warning parameters, a second-level warning area is established on the surface adjacent to the first-level warning area, wherein the second-level warning area is determined based on the personnel factors in the lifting construction, and is used to evaluate the safety impact of the personnel factors in the lifting construction on the lifting construction; the first-level warning area and the second-level warning area are merged to obtain the collision warning area, so that the collision warning area comprehensively considers the impact of non-personnel factors and personnel factors on safety in the lifting construction, and improves the scientific nature of the anti-collision safety measures taken in the lifting construction.

[0054] 3. In actual hoisting construction, the secondary warning parameters used to determine the size of the secondary warning area are determined based on the hoisting personnel's operating proficiency information of the hoisting equipment. Since the higher the hoisting personnel's operating proficiency, the lower the possibility of hoisting safety accidents, the secondary warning parameters are negatively correlated with the hoisting personnel's operating proficiency information, and then the size of the secondary warning area is negatively correlated with the hoisting personnel's operating proficiency information, thereby improving the rationality of the setting of the size of the secondary warning area. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1 It is a flow chart of a narrow space hoisting construction method based on BIM in one embodiment of the present application;

[0056] Figure 2It is a flowchart of step S20 in the narrow space hoisting construction method based on BIM in one embodiment of the present application;

[0057] Figure 3 It is a flowchart of step S21 in a narrow space hoisting construction method based on BIM in one embodiment of the present application;

[0058] Figure 4 It is a flowchart of step S22 in the narrow space hoisting construction method based on BIM in one embodiment of the present application;

[0059] Figure 5 is another flow chart of step S22 in the BIM-based narrow space hoisting construction method in one embodiment of the present application;

[0060] Figure 6 It is a flowchart of step S222 in a narrow space hoisting construction method based on BIM in one embodiment of the present application;

[0061] Figure 7 is another flow chart of step S222 in the narrow space hoisting construction method based on BIM in one embodiment of the present application;

[0062] Figure 8 It is a principle block diagram of a narrow space hoisting construction system based on BIM in one embodiment of the present application;

[0063] Fig. 9 It is a schematic diagram of a device in an embodiment of the present application. DETAILED DESCRIPTION

[0064] The following is combined with Figure 1-9 This application is described in further detail.

[0065] In one embodiment, if Figure 1 As shown, the present application discloses a narrow space hoisting construction method based on BIM, which specifically includes the following steps:

[0066] S10: Obtain construction environment information, dimensional parameters of the hoisting assembly and hoisting personnel information. The construction environment information includes the dimensional parameters of each obstacle in the construction site. The hoisting assembly refers to the combination of the component to be hoisted and the required hoisting equipment. The hoisting personnel information includes the hoisting personnel's proficiency in operating the hoisting equipment.

[0067] In this embodiment, obstacles refer to objects that may collide with lifting equipment or components to be lifted near the construction site during the lifting construction process, including buildings, electric poles, vehicles, construction equipment, etc.; operating proficiency information refers to the operating proficiency information of the lifting personnel performing the lifting construction on the lifting equipment required for this lifting construction; lifting personnel information refers to information on personnel factors that may affect the safety of the lifting construction, including operating proficiency information of the lifting personnel on various lifting equipment.

[0068] Specifically, the size parameters of each obstacle in the construction site and the size parameters of the lifting assembly are obtained. When obtaining the size parameters of the obstacles, the size parameters of the target building under the current construction progress can be obtained through surveying and mapping, and the future size parameters of the target building can be determined by combining the size parameters currently measured by the target building with the design drawings or BIM models of the target building. The target building refers to the building to be completed corresponding to this lifting construction; the size parameters of the lifting assembly need to be calculated based on the size parameters of the components to be lifted and the size parameters of the lifting equipment. The size parameters of the components to be lifted can be obtained through surveying and mapping, or directly obtained from the design drawings, and the size parameters of the lifting equipment can be directly obtained from the corresponding instructions.

[0069] Specifically, while obtaining the size parameters of each obstacle in the construction site and the size parameters of the lifting assembly, the lifting personnel's operating proficiency information for the lifting equipment required for this lifting construction is obtained to generate the lifting personnel information, wherein one lifting construction can be completed using multiple lifting personnel and / or multiple sets of lifting equipment. The lifting personnel information of a lifting personnel includes the personnel's operating proficiency information for various lifting equipment. In this embodiment, the lifting equipment refers to a truck crane.

[0070] Specifically, the proficiency information of a hoisting operator for a certain hoisting equipment can be determined based on the hoisting operator's cumulative operating time for the hoisting equipment. The cumulative operating time can be a specific number of operating hours or the number of years required to obtain the operating qualification for the type of hoisting equipment.

[0071] Furthermore, when calculating the cumulative operating time of a hoisting personnel on type A hoisting equipment, the operating time of the hoisting personnel on other types of hoisting equipment can also be converted based on a preset conversion rate and added to the cumulative operating time of type A hoisting equipment; for example, a hoisting personnel has used type A hoisting equipment for 1,000 hours and type B hoisting equipment for 1,000 hours. If, and in the preset calculation rules for the cumulative operating time of type A hoisting equipment, the conversion rate of type B hoisting equipment is 50%, then the cumulative operating time of the hoisting personnel on type A hoisting equipment is 1,500 hours; wherein, when setting the calculation rules for the cumulative operating time of type A hoisting equipment, the conversion rate for other types of hoisting equipment should be determined based on the degree of similarity in the operations between various types of hoisting equipment and type A hoisting equipment. The higher the degree of similarity, the higher the corresponding conversion rate.

[0072] S20: Generate collision warning areas between obstacles and the hoisting assembly based on the construction environment information, the size parameters of the hoisting assembly and the hoisting personnel information.

[0073] Specifically, collision warning areas for various obstacles and hoisting assemblies are generated based on construction environment information, size parameters of the hoisting assembly and information of hoisting personnel, wherein the collision warning area includes a primary warning area and a secondary warning area, the primary warning area is generated according to the construction environment information and size parameters of the hoisting assembly, and the scope of the primary warning area is determined based on non-human factors that may affect the safety of the hoisting construction; the secondary warning area is generated according to the information of the hoisting personnel, and the scope of the secondary warning area is determined based on human factors that may affect the safety of the hoisting construction; therefore, the human factors and non-human factors that may affect the safety in the hoisting construction are comprehensively considered to generate the collision warning area, thereby improving the scientific nature of the generation of the collision warning area.

[0074] Specifically, collision warning areas are generated for each obstacle and lifting assembly. In actual construction, since the distance between some obstacles is small, the collision warning areas between some obstacles are bound to overlap. Therefore, the collision warning areas of the obstacles with smaller spacing should be merged to prevent safety warning measures from being frequently triggered.

[0075] Furthermore, since the physical volume of each obstacle will change as the construction progresses, the collision warning area of ​​each obstacle and the hoisting assembly is updated regularly or in real time to make the collision warning area more consistent with the actual construction situation.

[0076] S30: Acquire the position information of each collision warning area in real time, so as to generate warning information when the collision warning areas overlap and send it to the hoisting personnel terminal.

[0077] Specifically, the position information of each collision warning area is obtained in real time. The position information of fixed obstacles can be determined according to the design drawings or BIM models of the target building and updated regularly. The position information of mobile obstacles and hoisting assemblies can be obtained in real time by setting a positioning device on the mobile obstacles and the hoisting assemblies. The positioning device can be a GPS locator, RFID tag, Bluetooth module, etc., or it can be positioned by ultrasonic positioning or image recognition technology.

[0078] Specifically, the overlap status between the collision warning areas is determined based on the position information of each collision warning area. When overlap between the collision warning areas is detected, a warning message is generated and sent to the hoisting personnel terminal to prompt the hoisting personnel to take safety measures in time to prevent safety accidents.

[0079] Specifically, since the distance between the component to be hoisted and the target building is short when the component to be hoisted is hoisted close to the target installation position, if the target building is also marked as an obstacle when defining the obstacle, the position information of the target installation position of the component to be hoisted should be obtained, and the distance between the component to be hoisted and the target installation position should be detected in real time, and the collision warning area of ​​the target building should be temporarily shielded when the distance between the component to be hoisted and the target installation position is less than a preset distance threshold, so as to prevent normal hoisting construction tasks from being misjudged as dangerous hoisting behaviors, thereby hindering normal construction.

[0080] In this embodiment, construction environment information, dimensional parameters of the lifting assembly and lifting personnel information are obtained to obtain dimensional parameters of each obstacle in the construction site, dimensional parameters of the combination of the component to be lifted and the required lifting equipment, and information on the operating proficiency of the lifting personnel in the lifting equipment, and these data related to the safety of the lifting construction are centrally analyzed and processed; collision warning areas of each obstacle and the lifting assembly are generated according to the construction environment information, dimensional parameters of the lifting assembly and lifting personnel information, which are used to provide safety prompts for the subsequent lifting construction of the lifting personnel, wherein collision warning areas of different sizes are generated according to the different operating proficiency of the lifting personnel in the lifting equipment, thereby improving the rationality of the setting of the collision warning area; the location information of each collision warning area is obtained in real time, so as to generate warning information when the collision warning areas overlap and send it to the lifting personnel terminal, so as to inform the lifting personnel that they are in a dangerous state, so that the lifting personnel can take measures in time, provide anti-collision safety measures for the lifting construction, and reduce the probability of safety accidents.

[0081] In one embodiment, if Figure 2 As shown, in step S20, it includes:

[0082] S21: Establishing a first-level warning area for each obstacle and the hoisting assembly based on the construction environment information and the size parameters of the hoisting assembly.

[0083] Specifically, the physical volume of each obstacle is determined based on the size parameters of each obstacle in the construction environment information, the physical volume of the lifting assembly is determined based on the size parameters of the lifting assembly, a safety distance parameter is set, and a first-level warning area is set based on the physical volume of each obstacle and the lifting assembly, wherein the distance between any point on the surface of the first-level warning area and the surface of the obstacle or lifting assembly corresponding to the first-level warning area is greater than or equal to the safety distance parameter, wherein the value of the safety distance parameter can be determined according to actual construction requirements.

[0084] Specifically, since the bottoms of most obstacles, lifting equipment, and components to be lifted that are not in a lifted state are in contact with the ground or the tops of other obstacles, during lifting construction, the area at the bottom or top of some obstacles, lifting equipment, and lifting components in the first-level warning area should be shielded according to actual conditions to reduce misjudgment of the safety status during lifting construction.

[0085] S22: Determine a secondary warning parameter based on the hoisting personnel information, where the secondary warning parameter refers to a parameter used to determine the size of the secondary warning area.

[0086] Specifically, the secondary warning parameter is determined based on the lifting personnel information, wherein the secondary warning parameter is length dimension data, which is used to determine the size of the secondary warning area when the secondary warning area is set later, and the value of the secondary warning parameter is positively correlated with the size of the secondary warning area.

[0087] S23: establishing a secondary warning area on a surface adjacent to the primary warning area based on the secondary warning parameter, and merging the primary warning area and the secondary warning area to obtain a collision warning area.

[0088] Specifically, after the primary warning area is established, a secondary warning area is established based on the range of the primary warning area and the secondary warning parameters, wherein the secondary warning area is located on the surface of the primary warning area; the primary warning area and the secondary warning area are merged to obtain a collision warning area.

[0089] Specifically, since the bottoms of most obstacles, lifting equipment, and components to be lifted that are not in a lifted state are in contact with the ground or the tops of other obstacles, during lifting construction, the area at the bottom or top of some obstacles, lifting equipment, and lifting components in the secondary warning area should be shielded according to actual conditions to reduce misjudgment of the safety status during lifting construction.

[0090] In one embodiment, in step S23, it includes:

[0091] S231: Generate a corresponding secondary warning area based on each primary warning area and the secondary warning parameter. The secondary warning area is set adjacent to the surface of the primary warning area. The distance between each surface of the secondary warning area and the surface of the primary warning area is the secondary warning parameter.

[0092] Specifically, a secondary warning area is established based on the range of the primary warning area and the secondary warning parameter and the surface adjacent to the primary warning area. The secondary warning area is generated by extending outward based on the surface of the primary warning area, wherein the distance between any point on the surface of the secondary warning area and the surface of the first warning area corresponding to the secondary warning area is greater than or equal to the value of the secondary warning parameter, wherein the value of the secondary warning parameter is determined based on the information of the hoisting personnel.

[0093] In one embodiment, in step S30, the warning information includes collision warning information and collision braking information, and also includes:

[0094] S31: When the collision warning areas overlap, the overlap of the collision warning areas is determined. If only the secondary warning areas overlap, collision warning information is generated and sent to the hoisting personnel terminal, so that the hoisting personnel terminal prompts the hoisting personnel with sound and light signals.

[0095] In this embodiment, the hoisting personnel terminal refers to an electronic terminal installed on the hoisting equipment operating console, which is used to send information to the hoisting personnel and can control the hoisting equipment.

[0096] Specifically, the position information of each collision warning area is obtained in real time. When overlap between the collision warning areas is detected, the overlap of the collision warning areas is judged based on the position information of the collision warning areas. If overlap only occurs between the secondary warning areas, it is considered that the safety threat to the lifting construction is small, and collision warning information is generated and sent to the lifting personnel terminal, so that the lifting personnel terminal sends out sound and light signals to remind the lifting personnel to pay attention to safety to prevent safety accidents.

[0097] S32: If there is an overlap between the collision warning area and the first-level warning area, collision braking information is generated and sent to the hoisting personnel terminal, so that the hoisting personnel terminal controls the hoisting equipment to brake.

[0098] Specifically, if there is overlap between any first-level warning area and the first-level warning area or the second-level warning area in other collision warning areas, it is considered that the safety threat to the lifting construction is relatively large, and collision braking information is generated and sent to the lifting personnel terminal, so that the lifting personnel terminal controls the braking of the lifting equipment to prevent safety accidents caused by operating errors of the lifting personnel.

[0099] In one embodiment, if Figure 3 As shown, after step S21, it also includes:

[0100] S211: The construction environment information includes real-time wind speed forecast information of the construction site. The range of each first-level warning area is corrected based on the wind speed forecast information. The range of each first-level warning area is positively correlated with the wind speed forecast information.

[0101] In this embodiment, the construction environment information also includes wind speed prediction information.

[0102] Specifically, the wind speed forecast information of the construction site is obtained in real time, which can be obtained through the weather forecast issued by the authoritative meteorological agency, or through the wind speed detection device installed at the construction site; because the wind at the construction site will cause the boom of the lifting equipment and the components to be lifted to swing, and the greater the wind speed, the greater the swing amplitude, therefore, the range of each first-level warning area is corrected based on the wind speed forecast information, which is specifically achieved by correcting the preset safety distance parameter so that the safety distance parameter is positively correlated with the wind speed forecast information, and then the range of each first-level warning area is positively correlated with the wind speed forecast information.

[0103] In one embodiment, if Figure 4 As shown, in step S22, it specifically includes:

[0104] S221: Determine a secondary warning parameter based on the operation proficiency information of the hoisting personnel, where the secondary warning parameter is negatively correlated with the operation proficiency information.

[0105] Specifically, the secondary warning parameters are determined according to the operating proficiency information of the hoisting personnel on the hoisting equipment, so that the secondary warning parameters are negatively correlated with the operating proficiency information. Since the secondary warning parameters are used to determine the size of the secondary warning area, the effect of making the range of the secondary warning area negatively correlated with the proficiency of the hoisting personnel on the currently operated hoisting equipment is achieved, thereby improving the rationality of the range size setting of the secondary warning area.

[0106] In one embodiment, if Figure 5 As shown, in step S22, it also includes:

[0107] S222: Obtain fatigue information of the hoisting personnel in real time and input it into a preset fatigue evaluation model to generate fatigue score data.

[0108] In this embodiment, the fatigue evaluation model refers to a data processing model for processing input fatigue information to generate fatigue scoring data.

[0109] Specifically, the fatigue information of the hoisting personnel is obtained in real time and input into a preset fatigue evaluation model. The fatigue evaluation model has several data processing algorithms preset in it, which are used to set weights for various types of fatigue information. After weighted calculation, fatigue score data is generated to determine the current fatigue state of the hoisting personnel, and the fatigue score data is added to the hoisting personnel information.

[0110] S223: Correcting the secondary warning parameter based on the fatigue score data so that the secondary warning parameter is positively correlated with the fatigue score data.

[0111] In this embodiment, the hoisting personnel information includes fatigue score data.

[0112] Specifically, the secondary warning parameters are corrected based on the fatigue score data so that the values ​​of the secondary warning parameters are positively correlated with the values ​​of the fatigue score data, so as to increase the consideration of the fatigue state of the hoisting personnel when setting the secondary warning area, thereby improving the scientific nature of the setting of the size of the secondary warning area and thus improving the safety of the hoisting construction.

[0113] In one embodiment, if Figure 6 As shown, in step S222, it also includes:

[0114] S224: Obtain the accumulated working time data of the hoisting personnel in real time.

[0115] In this embodiment, the fatigue information includes the accumulated working time data and fatigue action count information of the hoisting personnel.

[0116] Specifically, the cumulative work data of the hoisting personnel can be determined through the hoisting personnel's punch-in records. When obtaining the cumulative working time data of the hoisting personnel, in addition to obtaining the working time of the hoisting personnel performing the hoisting construction, the time for the hoisting personnel to perform other types of work should also be obtained for sum calculation.

[0117] S225: Acquire image information of the hoisting personnel when performing hoisting construction in real time, and identify fatigue movements of the hoisting personnel from the image information to form fatigue movement counting information.

[0118] Specifically, image information of the hoisting personnel when performing hoisting construction is obtained, wherein the image information can be obtained in real time through a camera set near the hoisting equipment operating table, and the real-time obtained image information is input into a trained motion recognition model for motion analysis to identify fatigue movements made by the hoisting personnel, wherein fatigue movements include yawning, stretching, squinting, closing eyes, lowering the head and other movements; at the same time, the number of times the hoisting personnel make various fatigue movements is counted to form fatigue movement counting information.

[0119] Specifically, different weights are set for different types of fatigue actions, and the weights of various types of fatigue actions are input into the fatigue action counting information, and fatigue information is generated based on the accumulated working time data of the hoisting personnel and the fatigue action counting information.

[0120] Furthermore, in the present embodiment, when the fatigue evaluation model calculates the fatigue score data of the hoisting personnel, each fatigue action is converted into a score according to the weight, and the accumulated working time of the hoisting personnel is also converted into a score. Preferably, referring to the standard that the single driving time shall not exceed 4 hours in traffic regulations, 0.4 points are counted for every 1 minute of accumulated working time, and the fatigue actions made by the hoisting personnel are counted from 1 to 5 points according to the weight; when the fatigue is less than 50 points, the secondary warning parameters may not be corrected. When the fatigue score is greater than or equal to 50 points and less than 100 points, for example, the fatigue score is X, then 1+ The value of ((X-50) / 10)×0.1 is rounded up as a correction multiple to correct the secondary warning parameters. When the fatigue score data reaches 100 points, personnel change information should be sent to the management personnel terminal and the hoisting personnel terminal; among them, for actions such as squinting, closing the eyes, and lowering the head, it can be set that such actions are only confirmed as fatigue actions when they last for more than 1 second to reduce misidentification; at the same time, for actions such as squinting, closing the eyes, and lowering the head, it can also be set that when the duration of such actions exceeds 5 seconds, the duration is divided by 5 and the value obtained and rounded up is used as the number of fatigue actions.

[0121] In one embodiment, if Figure 7 As shown, after step S222, the following further includes:

[0122] S226: Compare the fatigue score data with a preset fatigue threshold. When the fatigue score data is greater than the fatigue threshold, generate fatigue prompt information and send it to the administrator terminal.

[0123] In this embodiment, the fatigue threshold refers to a threshold used to determine whether the fatigue score data of the hoisting personnel has reached a threshold that requires taking fatigue suppression measures.

[0124] Specifically, the fatigue score data of the hoisting personnel is compared with a preset fatigue threshold, where the fatigue threshold can be set between 50 and 100 points according to actual needs, for example, it can be set to 70 points, and the number of fatigue thresholds can be one or more. When the fatigue score data of the hoisting personnel is greater than the fatigue threshold, a fatigue prompt message is generated and sent to the management terminal so that the management personnel can be informed of the fatigue status of the hoisting personnel and take measures such as replacing the hoisting personnel or distributing refreshing drinks or supplies to the hoisting personnel to reduce the safety impact of the hoisting personnel's fatigue work on the hoisting construction.

[0125] It should be understood that the serial numbers of the steps in the above embodiments do not imply a sequence of execution. The execution sequence of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0126] In one embodiment, a BIM-based narrow space hoisting construction system is provided, and the BIM-based narrow space hoisting construction system corresponds to the BIM-based narrow space hoisting construction method in the above-mentioned embodiment.

[0127] like Figure 8 As shown in the figure, the BIM-based narrow space hoisting construction system includes a hoisting related information acquisition module, a collision warning area generation module and a collision warning information generation module. The detailed description of each functional module is as follows:

[0128] The hoisting related information acquisition module is used to obtain the construction environment information, the size parameters of the hoisting assembly and the hoisting personnel information. The construction environment information includes the size parameters of each obstacle in the construction site. The hoisting assembly refers to the combination of the component to be hoisted and the required hoisting equipment. The hoisting personnel information includes the hoisting personnel's proficiency in operating the hoisting equipment;

[0129] A collision warning area generation module is used to generate collision warning areas between various obstacles and the hoisting assembly based on construction environment information, size parameters of the hoisting assembly and hoisting personnel information;

[0130] The collision warning information generation module is used to obtain the position information of each collision warning area in real time, so as to generate warning information and send it to the hoisting personnel terminal when the collision warning areas overlap.

[0131] For the specific limitations of the BIM-based narrow space hoisting construction system, please refer to the limitations of the BIM-based narrow space hoisting construction method in the above text, which will not be repeated here; the various modules in the above-mentioned BIM-based narrow space hoisting construction system can be fully or partially implemented through software, hardware and their combination; the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the corresponding operations of the above-mentioned modules.

[0132] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Fig. 9As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data such as construction environment information, size parameters of the hoisting assembly, hoisting personnel information, secondary warning parameters, fatigue information, fatigue scoring data, fatigue action counting information, accumulated working time data, fatigue threshold and fatigue prompt information. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a narrow space hoisting construction method based on BIM is implemented.

[0133] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program:

[0134] S10: Acquire construction environment information, size parameters of the hoisting assembly, and hoisting personnel information. The construction environment information includes the size parameters of each obstacle in the construction site. The hoisting assembly refers to the combination of the component to be hoisted and the required hoisting equipment. The hoisting personnel information includes the hoisting personnel's proficiency in operating the hoisting equipment.

[0135] S20: generating collision warning areas of various obstacles and the hoisting assembly based on the construction environment information, the size parameters of the hoisting assembly and the hoisting personnel information;

[0136] S30: Acquire the position information of each collision warning area in real time, so as to generate warning information when the collision warning areas overlap and send it to the hoisting personnel terminal.

[0137] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:

[0138] S10: Acquire construction environment information, size parameters of the hoisting assembly, and hoisting personnel information. The construction environment information includes the size parameters of each obstacle in the construction site. The hoisting assembly refers to the combination of the component to be hoisted and the required hoisting equipment. The hoisting personnel information includes the hoisting personnel's proficiency in operating the hoisting equipment.

[0139] S20: generating collision warning areas of various obstacles and the hoisting assembly based on the construction environment information, the size parameters of the hoisting assembly and the hoisting personnel information;

[0140] S30: Acquire the position information of each collision warning area in real time, so as to generate warning information when the collision warning areas overlap and send it to the hoisting personnel terminal.

[0141] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be implemented by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.

[0142] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.

[0143] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, it should be understood by those skilled in the art that the technical solutions described in the aforementioned embodiments may still be modified, or some of the features thereof may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. The BIM-based narrow space hoisting construction method is characterized by: The steps of the narrow space hoisting construction method based on BIM include: Acquire construction environment information, size parameters of the hoisting assembly, and hoisting personnel information, wherein the construction environment information includes the size parameters of each obstacle in the construction site, the hoisting assembly refers to a combination of the component to be hoisted and the required hoisting equipment, and the hoisting personnel information includes the hoisting personnel's proficiency in operating the hoisting equipment; Generate collision warning areas for each obstacle and the hoisting assembly based on the construction environment information, the size parameters of the hoisting assembly and the hoisting personnel information; The step of generating collision warning areas of obstacles and the hoisting assembly based on the construction environment information, the size parameters of the hoisting assembly and the hoisting personnel information comprises: Based on the construction environment information and the size parameters of the hoisting assembly, a first-level warning area is established for each obstacle and the hoisting assembly; Determine a secondary warning parameter based on the hoisting personnel information, wherein the secondary warning parameter refers to a parameter used to determine the size of the secondary warning area; The step of determining the secondary warning parameter based on the hoisting personnel information specifically includes: Obtain the cumulative operation time of the hoisting personnel on the target type of hoisting equipment and other types of hoisting equipment respectively; Determine the conversion rate of the accumulated operation time corresponding to the other types of lifting equipment according to the similarity between the operations of the other types of lifting equipment and the target type of lifting equipment, and determine the operation proficiency information of the lifting personnel on the target type of lifting equipment and other types of lifting equipment according to the conversion rate and the accumulated operation time of the lifting personnel on the target type of lifting equipment and other types of lifting equipment; Determining a secondary warning parameter based on the operation proficiency information of the hoisting personnel, wherein the secondary warning parameter is negatively correlated with the operation proficiency information; Establishing a secondary warning area based on the secondary warning parameter on the surface adjacent to the primary warning area, and merging the primary warning area and the secondary warning area to obtain a collision warning area; The step of establishing a secondary warning area on a surface adjacent to the primary warning area based on the secondary warning parameter comprises: Generate a corresponding secondary warning area based on each of the primary warning areas and the secondary warning parameter, wherein the secondary warning area is arranged adjacent to the surface of the primary warning area, and the distance between each point on the surface of the secondary warning area and the surface of the primary warning area is the secondary warning parameter; Acquire the position information of each collision warning area in real time, so as to generate warning information when the collision warning areas overlap and send it to the hoisting personnel terminal; The warning information includes collision warning information and collision braking information. The step of acquiring the position information of each collision warning area in real time to generate warning information when the collision warning areas overlap and send the warning information to the hoisting personnel terminal includes: When the collision warning areas overlap, determining the overlap of the collision warning areas; If only the secondary warning areas overlap, a collision warning message is generated and sent to the hoisting personnel terminal, so that the hoisting personnel terminal prompts the hoisting personnel with sound and light signals; If there is an overlap between the collision warning area and the first-level warning area, collision braking information is generated and sent to the hoisting personnel terminal, so that the hoisting personnel terminal controls the hoisting equipment to brake.

2. The BIM-based narrow space hoisting construction method according to claim 1 is characterized in that: After the step of establishing a first-level warning area for each obstacle and the hoisting assembly based on the construction environment information and the size parameters of the hoisting assembly, the method further includes: The construction environment information includes real-time wind speed forecast information of the construction site. The range of each first-level warning area is corrected based on the wind speed forecast information, and the range of each first-level warning area is positively correlated with the wind speed forecast information.

3. The BIM-based narrow space hoisting construction method according to claim 1 is characterized in that: The step of determining the secondary warning parameter based on the hoisting personnel information also includes: Obtain the fatigue information of the hoisting personnel in real time and input it into the preset fatigue evaluation model to generate fatigue score data; The secondary warning parameter is corrected based on the fatigue score data so that the secondary warning parameter is positively correlated with the fatigue score data.

4. The BIM-based narrow space hoisting construction method according to claim 1 is characterized in that: The steps of obtaining the fatigue information of the hoisting personnel in real time also include: Obtain the accumulated working time data of hoisting personnel in real time; Image information of the hoisting personnel during the hoisting construction is acquired in real time, and fatigue movements of the hoisting personnel are identified from the image information to form fatigue movement counting information.

5. The BIM-based narrow space hoisting construction method according to claim 4 is characterized in that: After the step of obtaining the fatigue information of the hoisting personnel in real time and inputting it into the preset fatigue evaluation model to generate fatigue score data, the method further includes: The fatigue score data is compared with a preset fatigue threshold, and when the fatigue score data is greater than the fatigue threshold, fatigue prompt information is generated and sent to the management terminal.

6. The BIM-based narrow space hoisting construction system is characterized by: include: A hoisting-related information acquisition module is used to acquire construction environment information, size parameters of a hoisting assembly, and hoisting personnel information. The construction environment information includes the size parameters of each obstacle in the construction site. The hoisting assembly refers to a combination of a component to be hoisted and required hoisting equipment. The hoisting personnel information includes the hoisting personnel's proficiency in operating the hoisting equipment. A collision warning area generation module, used for generating collision warning areas for each obstacle and the lifting assembly based on the construction environment information, the size parameters of the lifting assembly and the lifting personnel information; the step of generating collision warning areas for each obstacle and the lifting assembly based on the construction environment information, the size parameters of the lifting assembly and the lifting personnel information comprises: establishing a first-level warning area for each obstacle and the lifting assembly based on the construction environment information and the size parameters of the lifting assembly; determining a second-level warning parameter based on the lifting personnel information, wherein the second-level warning parameter refers to a parameter used to determine the size of the second-level warning area; the step of determining the second-level warning parameter based on the lifting personnel information specifically comprises: obtaining the accumulated operation time of the lifting personnel on the target type of lifting equipment and other types of lifting equipment respectively; determining the corresponding operation time of the other types of lifting equipment according to the similarity between the operation of the other types of lifting equipment and the target type of lifting equipment The conversion rate of the accumulated operation time is used, and the operation proficiency information of the hoisting personnel on the target type of hoisting equipment and other types of hoisting equipment is determined according to the conversion rate and the accumulated operation time of the hoisting personnel on the target type of hoisting equipment and other types of hoisting equipment; a secondary warning parameter is determined based on the operation proficiency information of the hoisting personnel, and the secondary warning parameter is negatively correlated with the operation proficiency information; a secondary warning area is established based on the secondary warning parameter on the surface adjacent to the primary warning area, and the primary warning area and the secondary warning area are merged to obtain a collision warning area; the step of establishing a secondary warning area based on the secondary warning parameter on the surface adjacent to the primary warning area includes: generating a corresponding secondary warning area based on each of the first-level warning areas and the secondary warning parameter, the secondary warning area is set adjacent to the surface of the first-level warning area, and the distance between each surface of the secondary warning area and the surface of the first-level warning area is the secondary warning parameter; A collision warning information generation module is used to obtain the position information of each collision warning area in real time, so as to generate warning information and send it to the hoisting personnel terminal when the collision warning areas overlap; the warning information includes collision warning information and collision braking information. The step of obtaining the position information of each collision warning area in real time, so as to generate warning information and send it to the hoisting personnel terminal when the collision warning areas overlap, includes: when the collision warning areas overlap, judging the overlap of the collision warning areas; if only the secondary warning areas overlap, generating collision warning information and sending it to the hoisting personnel terminal, so that the hoisting personnel terminal prompts the hoisting personnel with sound and light signals; if there is an overlap between the collision warning area and the primary warning area, generating collision braking information and sending it to the hoisting personnel terminal, so that the hoisting personnel terminal controls the braking of the hoisting equipment.

7. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the BIM-based narrow space hoisting construction method as described in any one of claims 1 to 5 are implemented.

8. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the BIM-based narrow space hoisting construction method as described in any one of claims 1 to 5 are implemented.

Citation Information

Patent Citations

  • BIM (Building Information Model)-based tower crane collision prevention system and security and protection system

    CN107879260A

  • Vehicle collision early warning method and device

    CN111994074A

  • Hoisting simulation construction method and system based on BIM

    CN112069698A

  • Vehicle anti-collision early warning method and system based on braking distance

    CN113335274A

  • Vehicle early warning method and device

    CN113744561A