A combined connection method for assembled building

Through the staggered distribution of supports, sleeve ends and combined ends and the pouring of high-strength grouting materials, the problems of inaccurate steel bar alignment and uneven connections during the construction of prefabricated buildings are solved, achieving rapid installation and stable connection, and improving the efficiency of the prefabricated buildings. Assembly speed and connection strength extend the life of the building.

CN114753636BActive Publication Date: 2024-10-01HENAN XUNLONG IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210458866.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-27
Publication Date
2024-10-01
Estimated Expiration
2042-04-27

AI Technical Summary

Technical Problem

During the construction process of existing prefabricated buildings, there are problems such as inaccurate steel bar alignment, uneven connections, long construction period, high production costs, and difficult transportation. In addition, a large number of bolts and fixtures are required for connection, which affects the service life.

Method used

The supporting parts are staggered with the socket end and the combined end. The composite plate is formed by pouring high-strength grouting material. The sliding insertion of the combined end and the socket end and the filling of the high-strength grouting material ensure balanced stress between the supporting parts. and stable connection, reducing external fixing and welding time, improving assembly speed and connection stability.

Benefits of technology

It achieves balanced stress and stable connection of support parts, improves assembly speed and connection strength, reduces fixing time and welding consumption, and enhances the service life and stability of the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114753636B_ABST
    Figure CN114753636B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of building equipment, and discloses a modular connection method for assembled buildings, the connection method comprising: S1, fixing and connecting a plurality of sleeve ends and a combination end to the two ends of a plurality of support members respectively, so as to form a plurality of modular connection members; S2, making the support members on the plurality of connection members parallel to each other, continuously pouring high-strength grouting material on parts of the support members, so as to form a plurality of modular boards after solidification; S3, making the combination end of another modular board slide and the sleeve end of the fixed modular board during the assembly process, and there is a gap between the combination end and the sleeve end after the sliding connection; by connecting the support members with the sleeve end and the combination end, the spacing between the support members is always the same when they are cast and formed, so as to ensure that the forces between the support members are balanced after forming, and to improve the service life; and by fixing the sleeve end and the combination end, the outdoor fixing time of the support members is reduced, and the assembly speed is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building equipment, and in particular relates to a modular connection method for assembled buildings. Background Art

[0002] The main advantage of prefabricated buildings is that modular production and processing methods can improve construction efficiency. In existing technologies, most prefabricated buildings still require reserved reinforcement positions to be cast and connected on site during construction. This method cannot effectively reduce the construction period. At the same time, in order to adapt to different installation locations, most of the parts of some prefabricated buildings use non-standard products, and special structures are installed at the connection parts for fixing. This method requires multiple sets of molds for casting and molding. Not only is the production cost high, but the special structural design also easily causes a high space occupancy rate for individual components, making transportation more difficult and requiring a small amount of transportation per time.

[0003] The patent with application number CN2019105479570 discloses a combined connection system for prefabricated buildings and its construction method. Although it solves the low requirement for the accuracy of steel bar positioning during the construction of prefabricated houses, it also requires multiple sleeves to be placed separately during pouring to realize the pouring of the load-bearing part. As a result, inaccurate placement of the sleeves may affect the load-bearing during the placement process.

[0004] Furthermore, during the assembly process of prefabricated buildings, a large number of bolts and other fixings are required to fix the load-bearing structure of the house. Due to the particularity of the connection position, the load-bearing capacity of the house is unbalanced, which affects its service life. Summary of the invention

[0005] The purpose of the present invention is to solve the above problems. The present invention provides a method for connecting assembled buildings, which has the advantages of quick installation and stable connection.

[0006] To achieve the above object, the present invention provides the following technical solution: a method for connecting assembled buildings, the method comprising:

[0007] S1. Fixedly connect a plurality of sleeve ends and combined ends to two ends of a plurality of support members to form a plurality of combined connecting members.

[0008] S11. The fixing positions of the supporting members, the sleeve ends and the combined ends on two adjacent connecting members are staggered.

[0009] S2. The supporting members on the plurality of connecting members are arranged parallel to each other, and high-strength grouting material is continuously poured on the supporting members to form a plurality of composite panels after solidification.

[0010] S21. Distribute the connectors evenly in the mold according to the shape of the wall forming mold, and during the distribution of the connectors, the height direction of the support members is perpendicular to the ground.

[0011] S2101. According to the mold casting method, the height direction of the support is parallel to the ground.

[0012] S3. During the assembly process, the combined end of another combined board is slidably plugged into the socket end of the fixed combined board, and a gap exists between the combined end and the socket end after the sliding connection.

[0013] S31. During the assembly process, the combined end of another combined board is completely embedded in the sleeve end, so that the open end of the sleeve cavity on the sleeve end is completely blocked, and during the assembly process, the support members located on the sleeve end and the combined end are staggered and distributed with each other without conflict.

[0014] S4, enabling the grouting equipment to fill the gap between the sleeve end and the combined end with high-strength grouting material through the feed port.

[0015] S41. Perform a pre-filling inspection on the high-strength grouting material to be poured to ensure that the high-strength grouting material can flow and fill in the gap after passing through the feed port.

[0016] S5. After the gap is filled with high-strength grouting material, part of the high-strength grouting material overflows through the observation port.

[0017] S6. After overflow, the observation port is closed, and at the same time, the pressure in the gap is maintained continuously through the feed port by the filling equipment.

[0018] S61. After the observation port is sealed, the pouring pressure of the pouring equipment is adjusted to 0.1Mpa for pressure maintenance. During the pressure maintenance process, the seal is opened and closed randomly and quickly to observe the overflow of the high-strength grouting material from the observation port.

[0019] S6101. The time interval between opening and closing the seal during the pressure holding process is less than or equal to 1 second.

[0020] According to the assembly sequence from bottom to top during the assembly of the house, the sleeve cavity opening of the sleeve end of each combined board is always upward.

[0021] Compared with the prior art, the present invention has the following beneficial effects:

[0022] 1. By connecting the support parts with the socket ends and the combined ends, the spacing between the support parts is always the same when they are cast, ensuring balanced force between the support parts after molding and improving service life. In addition, by fixing the socket ends and the combined ends, the outdoor fixing time of the support parts is reduced and the assembly speed is improved.

[0023] 2. Through the mutual plug-in between the socket end and the combined end, the supports can be quickly aligned with each other during the connection process, reducing the time consumed by welding to fix the steel bars. At the same time, through the plug-in between the socket end and the combined end, the connection welding points on the support are reduced, thereby improving the stability of the support during use.

[0024] 3. The combined end is connected with the sleeve cavity in the sleeve end, so that when the two combined panels are fixed with high-strength grouting material, the combined end and the sleeve cavity are mutually locked, and the two combined panels are stably connected to each other without being affected by external forces, which reduces the restriction time of the combined panels during the lifting process and improves the assembly rate. In addition, the support members on the combined end and the sleeve end overlap in the sleeve cavity, and are fixed with high-strength grouting material to improve the connection strength of the combined panels at the joints of the prefabricated house and improve the connection stability. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the process structure of the present invention;

[0026] Figure 2 It is a schematic diagram of the structure of the overall components of the present invention;

[0027] Figure 3 It is a schematic diagram of the structure when the integral components of the present invention are connected;

[0028] Figure 4 It is a schematic diagram of the structure of the feed port and the observation port in the present invention;

[0029] Figure 5 It is a cross-sectional view of the integrated component combination structure of the present invention.

[0030] Description of the drawings: 1. socket end; 11. socket cavity; 12. movable sleeve; 2. combination end; 21. closing plate; 22. embedded part; 3. support member; 4. feed port; 5. observation port. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] like Figure 1-Figure 5 As shown, a method for combined connection of assembled buildings, the connection method comprising:

[0033] S1. Fixedly connect a plurality of sleeve ends 1 and combination ends 2 to two ends of a plurality of support members 3 to form a plurality of combined connection members.

[0034] In this embodiment, the support member 3 is preferably a construction steel bar, and the support member 3 is fixedly provided with a socket end 1 and a combination end 2 at both ends distributed along the length direction. The support member 3 passes through the socket end 1 and the combination end 2, and the two ends of the support member 3 are respectively flush with their ports. A sleeve cavity 11 for connecting the combination end 2 is opened in the sleeve end 1. On the same set of connecting parts, the opening direction of the sleeve cavity 11 is located on the side away from the combination end 2, that is, the side of the support member 3 close to the sleeve end 1 passes through the sleeve cavity 11.

[0035] When the support member 3 is fixedly connected to the socket end 1 and the combination end 2, the fixing method can be selected from slide rail and groove connection, welding and other welding forms. In this embodiment, in order to increase the connection stability between the support member 3 and the socket end 1 and the combination end 2, the fixing method of the support member 3 is preferably welding.

[0036] S11. The support members 3 on two adjacent connecting members are staggeredly distributed with the fixed positions of the socket end 1 and the combination end 2. While ensuring that the support members 3 can bear the load, the socket end 1 and the combination end 2 will not conflict with each other during the connection process, thereby affecting the stability of the connection. At the same time, after the support members 3 with overlapping connection parts are fixed, the supporting strength is large, ensuring the stability of the connection position.

[0037] When constructing different buildings, the required steel bars and bearing capacity requirements are different, and thus the number of support members 3 needs to be increased or decreased, wherein the range of the number change is between 2-12. In this embodiment, the number of support members 3 is preferably 8, and the 8 support members 3 are evenly distributed on the socket end 1 and the combined end 2, so that the support members 3 are evenly stressed during use and have a strong bearing capacity.

[0038] S2. Make the support members 3 on several connecting members parallel to each other, continuously pour high-strength grouting material on parts of the support members 3, so that they form several combined plates after solidification. Select different numbers of connecting members according to different usage functions. When it is necessary to carry a columnar component, use a separate connecting member to pour high-strength grouting material, so that it will eventually solidify into a column structure with the same length and width as the connecting member; when a plate-like structure is required, multiple connecting members are evenly distributed in parallel, and then the multiple connecting members are uniformly poured and solidified to form a plate-like structure that needs to be installed.

[0039] According to the required thickness and length of the wall and the usage requirements, different numbers of connectors are selected for arrangement. During the arrangement process, in order to ensure that the connector fully exerts its supporting bearing capacity, the support member 3 on the connector is made to have the same angle as the ground, thereby ensuring that after the composite board solidifies, the subsequent unified installation of the composite board is facilitated and the bearing capacity of the connector is maximized.

[0040] S21. According to the shape of the mold for forming the wall, the connecting parts are evenly distributed in the mold. During the distribution of the connecting parts, the height direction of the support member 3 is perpendicular to the ground. According to the casting and installation habits, the end face of the opening of the sleeve cavity 11 on the sleeve end 1 penetrates the mold and contacts the ground, thereby avoiding the sleeve cavity 11 being poured with high-strength grouting material, which affects the stability during the connection. At the same time, in order to ensure the normal casting of the mold, there is a gap fit between the sleeve end 1 and the mold, and the casting height of the mold just completely covers the support member 3 between the sleeve end 1 and the combination end 2.

[0041] S2101. According to the purpose of use and personal casting habits, according to the mold casting method, the height direction of the support member 3 is parallel to the ground, and the same mold processing is realized. At the same time, the composite board formed by different casting methods can choose a suitable transportation method without damaging the composition of the composite board.

[0042] Taking the casting of multiple connecting parts as an example, when the connecting parts are cast in a vertical state to the ground, the two largest surfaces of the cast composite board are vertical to the ground; when the connecting parts are cast in a parallel state to the ground, one of the largest surfaces of the cast composite board is in conflict with the ground, so a stable transportation method is selected according to different center of gravity positions.

[0043] S3. During the assembly process, the combination end 2 of another combination board is slidably plugged into the socket end 1 of the fixed combination board, and a gap exists between the combination end 2 and the socket end 1 after the sliding connection.

[0044] When assembling the prefabricated building, the combined panels are butted against each other to form the load-bearing columns and walls of the prefabricated building, so as to meet the purpose of rapid installation of the prefabricated building. At the same time, during the butt-joining process of the combined panels, the combined end 2 of another combined panel is inserted into the sleeve cavity 11 on the already fixed combined panel. During the insertion process, in order to ensure that the combined end 2 is quickly sleeved in the sleeve cavity 11, the length and width of the combined end 2 are smaller than the length and width of the sleeve cavity 11, and at the same time, it is convenient for the subsequent high-strength grouting material to fix the position between the two, and the high-strength grouting material flows and fills the gap.

[0045] An embedded portion 22 is provided on the combined end 2, extending into the sleeve cavity 11 through the embedded portion 22. At the same time, the length of the embedded portion 22 is the same as the depth of the sleeve cavity 11, and the end face of the support member 3 close to the combined end 2 is flush with the end face of the embedded portion 22, and the support members 3 are evenly distributed on the periphery of the embedded portion 22.

[0046] S31. During the assembly process, the combined end 2 of the other combined board is completely embedded in the sleeve end 1, so that the open end of the sleeve cavity 11 on the sleeve end 1 is completely blocked, and during the assembly process, the support members 3 located on the sleeve end 1 and the combined end 2 are staggered and distributed with each other without conflict, so that when the gap is filled with high-strength grouting material, it will not flow out with the port of the sleeve cavity 11, affecting the connection strength.

[0047] The combined end 2 also includes a closing plate 21 that can seal the opening of the sleeve cavity 11. One end of the closing plate 21 is fixedly connected to one end of the embedded portion 22, and the support member 3 passes through the closing plate 21 and is fixedly connected to the embedded portion 22. At the same time, since the embedded portion 22 can be completely embedded in the sleeve cavity 11, when the embedded portion 22 is sleeved with the sleeve cavity 11, the closing plate 21 just seals the port of the sleeve cavity 11.

[0048] After the connection, the support members 3 are staggered with each other in the tube cavity 11, so that the bearing strength at the connection position is increased. At the same time, the support members 3 are staggered with each other, so as to avoid the disadvantage of weak connection at the connection position of the prefabricated building, thereby improving the stability of the prefabricated building.

[0049] S4, use the grouting equipment to fill the gap between the sleeve end 1 and the combination end 2 with high-strength grouting material through the feed port 4, stir the high-strength grouting material to a concentration that meets the filling requirements, fill it into the supply box, and pass the high-strength grouting material into the gap through a press.

[0050] The casing cavity 11 is penetrated with a feed port 4, which is located near the opening end of the casing cavity 11. In order to facilitate filling of the feed port 4 with high-strength grouting material, the feed port 4 is located on the outer wall of the prefabricated building.

[0051] S41. Since the gap between the socket end 1 and the combined end 2 is small, it is necessary to inspect the poured high-strength grouting material before filling to ensure that the high-strength grouting material can flow and fill in the gap after passing through the feed port 4, to avoid the high hardness of the high-strength grouting material affecting the integrity of the filling, and to avoid the high-strength grouting material having a low concentration and failing to solidify or failing to meet the fixing requirements after solidification, thereby ensuring the safety of the connection between the socket end and the combined end 2.

[0052] S5. After the gap is filled with high-strength grouting material, part of the high-strength grouting material overflows through the observation port 5.

[0053] Since the casing cavity 11 is a closed space, it is impossible to effectively distinguish the pouring conditions of the high-strength grouting material in the casing cavity 11, which may easily lead to a small or large amount of pouring in the casing cavity 11, thereby affecting the tightness of the connection between the two composite panels, affecting the safe use of the house, and thus an observation port 5 is opened on the same side wall as the feed port 4, and the observation port 5 is connected to the tube cavity 11. At the same time, the position of the observation port 4 is far away from the opening end of the casing cavity 11, and then when the gap in the casing cavity 11 is filled, it will flow out from the port of the observation port 4, prompting the filling personnel that the gap is filled. It should be noted that the diameter of the observation port 5 is smaller than the diameter of the feed port 4.

[0054] S6. After the overflow, the port of the observation port 5 is closed, and at the same time, the pressure in the gap is continuously maintained through the feed port 4 by the perfusion equipment.

[0055] Due to the characteristic of high-strength grouting material in filling gaps, that is, there are gaps between high-strength grouting materials, bubbles will occur after solidification, affecting the stability of the connection. Then, the port of the observation port 5 is closed by a sealing plug, and the high-strength grouting material in the gap is pressurized to ensure that the distance between the high-strength grouting materials in the gap is reduced, thereby improving the stability after solidification.

[0056] S61. After sealing the observation port 5, adjust the pouring pressure of the pouring equipment to 0.1Mpa for pressure maintenance. By maintaining the pressure of 0.1Mpa, the high-strength grouting material can move normally in the gap of the tube cavity 11 without causing excessive pressure in the gap to affect the sealing condition of the sealing plug. The pressure maintenance time is 1 minute. During the pressure maintenance process, the mutual distance between the high-strength grouting materials is adjusted to make them closer to each other. At the same time, since the distance between the high-strength grouting materials is reduced during the pressure maintenance process, the originally filled gap will appear incomplete, affecting the fixing strength. Then, during the pressure maintenance process, the seal is randomly opened and closed quickly to observe the overflow of the high-strength grouting material from the observation port 5 to ensure that the high-strength grouting material in each sampled observation port 5 can overflow, and ensure that the high-strength grouting material in the gap remains sufficient.

[0057] S6101. During the pressure-maintaining process, the time interval between opening and closing the seal is less than or equal to 1 second. After the inspection is completed, the port of the observation port 5 is quickly re-sealed to avoid excessive overflow of high-strength grouting material, resulting in incomplete grouting.

[0058] According to the assembly sequence from bottom to top during the assembly of the house, the opening of the sleeve cavity 11 of the sleeve end 1 of each composite plate is always facing upward, thereby ensuring that the high-strength grouting material can overflow from the observation port 5 only after the gap in the pipe cavity 11 is completely poured with high-strength grouting material.

[0059] Meanwhile, the cross-sectional shapes of the sleeve end 1 and the combination end 2 can be circular, rectangular, corrugated or other shapes suitable for buildings.

[0060] When the sleeve end 1 and the combined end 2 are corrugated, the combined end 2 is sleeved in the sleeve cavity 11 and filled with high-strength grouting material. After the high-strength grouting material solidifies, the corrugated high-strength grouting material and the inner wall of the corrugated sleeve cavity 11 can be mutually conflicted and squeezed within a small distance, so that the high-strength grouting material and the sleeve cavity 11 are tightly connected and highly stable.

[0061] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0062] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for combined connection of assembled buildings, characterized in that: The connection method includes: S1, fixing and connecting a plurality of sleeve ends and combined ends to two ends of a plurality of supporting members respectively to form a plurality of combined connecting members; S2, making the supporting members on the plurality of connecting members parallel to each other, continuously pouring high-strength grouting material on the supporting members to form a plurality of composite panels after solidification; S3, during the assembly process, the combined end of another combined board is slidably plugged into the socket end of the fixed combined board, and a gap exists between the combined end and the socket end after the sliding connection; S4, allowing the grouting equipment to fill the gap between the sleeve end and the combined end with high-strength grouting material through the feed port; S5. After the high-strength grouting material has filled the gap, the high-strength grouting material overflows through the observation port; S6. After the overflow, the port of the observation port is closed, and at the same time, the pressure in the gap is maintained continuously through the feed port by the perfusion equipment; S11, the fixed positions of the supporting members, the sleeve ends and the combined ends on two adjacent connecting members are staggered; S31. During the assembly process, the combined end of another combined board is completely embedded in the sleeve end, so that the open end of the sleeve cavity on the sleeve end is completely blocked, and during the assembly process, the support members located on the sleeve end and the combined end are staggered and distributed with each other without conflict; S41. Perform a pre-filling inspection on the high-strength grouting material to be poured to ensure that the high-strength grouting material can flow and fill in the gap after passing through the feed port; S61. After the observation port is sealed, the pouring pressure of the pouring equipment is adjusted to 0.1 MPa for pressure maintenance. During the pressure maintenance process, the seal is opened and closed randomly and quickly to observe the overflow of the high-strength grouting material from the observation port; S6101. The time interval between opening and closing the seal during the pressure holding process is less than or equal to 1 second; An embedded part is provided on the combined end, which extends into the sleeve cavity through the embedded part. At the same time, the length of the embedded part is the same as the depth of the sleeve cavity, and the end face of the support member on the side close to the combined end is flush with the end face of the embedded part. The support members are evenly distributed on the periphery of the embedded part. The combined end also includes a closing plate that can seal the opening of the sleeve cavity. One end of the closing plate is fixedly connected to one end of the embedded part, and the support member passes through the closing plate and is fixedly connected to the embedded part. At the same time, since the embedded part can be completely embedded in the sleeve cavity, when the embedded part is sleeved with the sleeve cavity, the closing plate just seals the port of the sleeve cavity; the cross-section of the sleeve end and the combined end is corrugated, and the high-strength grouting material is filled after the combined end is sleeved in the sleeve cavity. When the high-strength grouting material solidifies, the corrugated high-strength grouting material and the inner wall of the corrugated sleeve cavity can be mutually conflicted and squeezed within a small distance, so that the high-strength grouting material and the sleeve cavity are tightly connected.

2. A method for combined connection of prefabricated buildings according to claim 1, characterized in that: S21. Distribute the connectors evenly in the mold according to the shape of the wall forming mold, and during the distribution of the connectors, the height direction of the support members is perpendicular to the ground.

3. A method for combined connection of prefabricated buildings according to claim 2, characterized in that: S2101. According to the mold casting method, the height direction of the support is parallel to the ground.

4. A method for combined connection of prefabricated buildings according to claim 3, characterized in that: According to the assembly sequence from bottom to top during the assembly of the house, the sleeve cavity opening of the sleeve end of each combined board is always upward.