A deep high water pressure double fracture grouting simulation test device

By designing a deep high-water-pressure double-crack grouting simulation test device, the problem that existing devices cannot simulate the grout diffusion in high-water-pressure strata and disconnected fissures has been solved, and the accurate simulation of the deep stratum grouting environment and grout diffusion have been achieved. The study of laws provides a theoretical basis for practical engineering.

CN114778384BActive Publication Date: 2024-10-01BEIJING CHINA COAL MINE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210254069.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-15
Publication Date
2024-10-01
Estimated Expiration
2042-03-15

AI Technical Summary

Technical Problem

The existing grouting simulation test device cannot satisfy the simulation of high water pressure formation environment, and cannot study the grout diffusion in double cracks that are not connected to each other and have different crack openings, which affects the accuracy and practical application value of the test results.

Method used

A deep high-water pressure double-crack grouting simulation test device is designed, including a grout supply system, a double-crack grouting model group, an automatic pressure monitoring system and a hydrostatic pressure control system, which can simulate two independent and different channels in a high water pressure environment. The slurry diffusion law in the cracks with a wide opening is ensured by the metering pump, slurry storage tank and stirring device to ensure high-pressure stirring of the slurry. The pressure sensor and programmable logic controller are used to monitor and control the hydrostatic pressure to simulate the actual grouting environment of deep formations.

Benefits of technology

It has realized the research on the slurry diffusion law and the accurate evaluation of grouting parameters in the grouting environment of deep high-water pressure formations, provided a theoretical basis for practical engineering applications, and can simulate the influence of cracks with different openings on grouting parameters, and perform high-pressure This ensures stable grout performance and is as close to the real grouting environment as possible.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114778384B_ABST
    Figure CN114778384B_ABST
Patent Text Reader

Abstract

The present invention discloses a deep high-water pressure double-fracture grouting simulation test device, comprising a slurry supply system, a double-fracture grouting model group, an automatic pressure monitoring system and a hydrostatic pressure control system; the fluid outlet end of the slurry supply system is fluidly connected with the fluid inlet end of the double-fracture grouting model group, the detection end of the automatic pressure monitoring system is in contact with the slurry flowing on the double-fracture grouting model group, the control signal output end of the automatic pressure monitoring system is electrically connected with the control signal input end of the hydrostatic pressure control system; the fluid outlet end of the double-fracture grouting model group is fluidly connected with the fluid inlet end of the hydrostatic pressure control system. The present invention can realize the study of the slurry diffusion law between independent fractures with different openings in the grouting environment of deep high-water pressure formations, and the evaluation of the water blocking effect of slurry stone body after grouting is completed, providing a relatively accurate and valuable reference for the selection of relevant slurry parameters in actual engineering.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of grouting simulation, in particular to a deep high water pressure double fracture grouting simulation test device. Background Art

[0002] Grouting is a widely used stratum reinforcement and anti-seepage water blocking technology in geotechnical engineering. As the depth of the stratum increases, the stratum environment faced during grouting becomes more complex, and the difficulty of blocking and reinforcement will become greater and greater. At present, the grouting rules obtained in shallow strata are not sufficient to guide the working conditions faced during grouting in deep strata, so it is necessary to explore the law of slurry diffusion in deep high-water pressure strata.

[0003] Most of the existing fracture grouting simulation test devices at home and abroad cannot meet the simulation requirements of high water pressure formation environment. Since they cannot consider the influence of high water pressure in the formation on the diffusion of slurry, the accuracy and application value of the test results are affected to a certain extent. In addition, for the model tests of fracture grouting, most of them are studies on the diffusion law of slurry in single fractures or multiple fractures that are crossed and connected. However, when there are unconnected fractures in the grouting section and the fracture openings are different, there is insufficient experimental research on the diffusion of slurry in the fractures, which cannot provide a theoretical basis for practical application. Summary of the invention

[0004] To this end, the technical problem to be solved by the present invention is to provide a deep high-water pressure double-fracture grouting simulation test device for the diffusion law of slurry in two independent fractures with different openings under a high water pressure environment, so as to meet the simulation of the conditions of unconnected fractures in deep formations and grouting sections, make up for the shortcomings of related model experiments, and provide certain theoretical references for engineering applications.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0006] A deep high-water pressure double-fracture grouting simulation test device comprises a slurry supply system, a double-fracture grouting model group, an automatic pressure monitoring system and a hydrostatic pressure control system; the fluid outlet end of the slurry supply system is fluidly connected with the fluid inlet end of the double-fracture grouting model group, the detection end of the automatic pressure monitoring system is in contact with the slurry flowing on the double-fracture grouting model group, the control signal output end of the automatic pressure monitoring system is electrically connected with the control signal input end of the hydrostatic pressure control system; the fluid outlet end of the double-fracture grouting model group is fluidly connected with the fluid inlet end of the hydrostatic pressure control system; the hydrostatic pressure control system controls the fluid outflow of the double-fracture grouting model group.

[0007] The above-mentioned deep high-water pressure double-fracture grouting simulation test device, the slurry supply system includes a metering pump, a slurry storage cylinder and a slurry storage cylinder stirring device; the metering pump drives the slurry storage cylinder stirring device to drive the fluid in the slurry storage cylinder to flow into the double-fracture grouting model group; the slurry storage cylinder and the slurry storage cylinder stirring device constitute a high-pressure fracture grouting pressure stirring device, and the high-pressure fracture grouting pressure stirring device can adopt the pressure stirring device in the prior art (a device for stirring under certain pressure conditions in a container), or it can adopt the patent application number 202210131919.9, application date February 14, 2022, and invention name A laboratory high-pressure fracture grouting pressure stirring device and a laboratory high-pressure fracture grouting pressure stirring device in a grouting system.

[0008] The above-mentioned deep high-water pressure double-fracture grouting simulation test device, the double-fracture grouting model group includes a first fracture model, a first pipe tee, a second fracture model and a second pipe tee; the fluid outlet end of the slurry supply system is fluidly connected with the fluid inlet pipe of the first pipe tee, one fluid outlet pipe of the first pipe tee is fluidly connected with the fluid inlet end of the first fracture model, and the other fluid outlet pipe of the first pipe tee is fluidly connected with the fluid inlet end of the second fracture model; the fluid outlet end of the first fracture model is fluidly connected with one fluid inlet end of the second pipe tee, the fluid outlet end of the second fracture model is fluidly connected with the other fluid inlet end of the second pipe tee, and the fluid outlet pipe of the second pipe tee is fluidly connected with the fluid inlet end of the hydrostatic pressure control system; the first fracture model and the second fracture model are both equipped with pressure sensors of the automatic pressure monitoring system.

[0009] The deep high-water pressure double-fracture grouting simulation test device, wherein the first fracture model comprises a fracture model specimen with reserved threaded holes and a fracture model specimen without reserved threaded holes; along the flow direction of the test slurry: the fracture model specimen with reserved threaded holes and the fracture model specimen without reserved threaded holes are connected end to end and fluid is conducted, and the fracture model specimen with reserved threaded holes and the fracture model specimen without reserved threaded holes are arranged at intervals;

[0010] The second fracture model also includes a fracture model specimen with reserved threaded holes and a fracture model specimen without reserved threaded holes; along the flow direction of the test slurry: the fracture model specimen with reserved threaded holes and the fracture model specimen without reserved threaded holes are connected end to end and fluid is conducted, and the fracture model specimen with reserved threaded holes and the fracture model specimen without reserved threaded holes are spaced apart;

[0011] The pressure sensor is installed on the reserved threaded hole fracture model specimen through the threaded hole on the reserved threaded hole fracture model specimen, and the detection end of the pressure sensor is located in the test slurry flow channel; the fracture openings of the first fracture model and the second fracture model are different.

[0012] The above-mentioned deep high-water pressure double-fracture grouting simulation test device, the automatic pressure monitoring system also includes a programmable logic controller and a computer; the electrical signal output end of the pressure sensor is electrically connected to the first electrical signal input end of the programmable logic controller, the first electrical signal output end of the programmable logic controller is electrically connected to the electrical signal input end of the computer, the electrical signal output end of the computer is electrically connected to the second electrical signal input end of the programmable logic controller; the second electrical signal output end of the programmable logic controller is electrically connected to the signal input end of the hydrostatic pressure control system.

[0013] In the above-mentioned deep high-water pressure double-fracture grouting simulation test device, an exhaust valve, a pressure sensor and a stop valve are sequentially installed on the grouting pipeline between the first pipe fitting tee and the first fracture model along the fluid flow direction, and a stop valve is installed on the grouting pipeline between the first fracture model and the second pipe fitting tee;

[0014] An exhaust valve, a pressure sensor and a stop valve are sequentially installed on the grouting pipeline between the first pipe tee and the second fracture model along the fluid flow direction, and a stop valve is installed on the grouting pipeline between the second fracture model and the second pipe tee.

[0015] The above-mentioned deep high-water pressure double-fracture grouting simulation test device, the hydrostatic pressure control system includes a micro-flux high-pressure differential pressure control device, a needle valve, a control pipeline and a measuring cup, the micro-flux high-pressure differential pressure control device is in fluid communication with the double-fracture grouting model group through the control pipeline, the micro-flux high-pressure differential pressure control device and the needle valve are both installed on the control pipeline, and the micro-flux high-pressure differential pressure control device controls the opening degree of the needle valve; the fluid outlet end of the control pipeline faces the fluid inlet end of the measuring cup.

[0016] The above-mentioned deep high-water pressure double-fracture grouting simulation test device, the micro-flux high-pressure differential pressure control device includes a worm gear group I, a worm gear group II and a servo motor; the second signal output end of the programmable logic controller is electrically connected to the signal input end of the servo motor; the power output end of the servo motor is drivingly connected to one end of the worm of the worm gear group I, the other end of the worm of the worm gear group I is meshed with the worm wheel of the worm gear group I, one end of the worm of the worm gear group II is fixedly connected to the inner ring of the worm wheel of the worm gear group I, the other end of the worm of the worm gear group II is meshed with the worm wheel of the worm gear group II, the valve stem operating end of the needle valve is fixedly connected to the inner ring of the worm wheel of the worm gear group II; the worm wheel of the worm gear group II controls the valve stem operating end to rotate the valve stem of the needle valve; the transmission ratios of the worm gear group I and the worm gear group II are both 1:60.

[0017] In the above-mentioned deep high-water pressure double-fracture grouting simulation test device, the first fracture model is prepared by using a steel pipe mold with reserved threaded holes and a steel pipe mold without reserved threaded holes; the steel pipe mold with reserved threaded holes and the steel pipe mold without reserved threaded holes are fixedly connected in the form of a flange; threaded holes are reserved on the steel pipe mold with reserved threaded holes; a prefabricated mortar test block is filled into the steel pipe mold with reserved threaded holes to prepare the fracture model specimen with reserved threaded holes, and a prefabricated mortar test block is filled into the steel pipe mold without reserved threaded holes to prepare the fracture model specimen without reserved threaded holes.

[0018] In the above-mentioned deep high-water pressure double-fracture grouting simulation test device, the fracture openings of the first fracture model and the second fracture model are between 1 and 8 mm; the lengths of the fracture model specimen with reserved threaded holes and the fracture model specimen without reserved threaded holes are both 500 mm.

[0019] The technical solution of the present invention achieves the following beneficial technical effects:

[0020] The deep high-water-pressure double-fracture grouting simulation test device of the present invention can realize the study of the slurry diffusion law between independent fractures with different openings in the grouting environment of deep high-water-pressure formations, as well as the evaluation of the water blocking effect of the slurry stone body after the grouting is completed. It can summarize the influence of fractures with different openings on grouting parameters such as grouting pressure under the same grouting conditions, and provide a relatively accurate and valuable reference for the selection of relevant grouting parameters in actual projects (in actual projects, the same grouting main pipe is usually used, and then grouting is performed into fractures with different openings through different grouting branches respectively connected to the grouting main pipe).

[0021] The present invention is provided with two rows of fracture models with different openings, which can simulate the simultaneous grouting of independent fractures with different openings in the same grouting section. The free combination of the openings of the two rows of fracture models within the range of 1-8mm can be used to explore the influence of parallel fractures with different openings on grouting parameters during grouting; and to study the relevant laws of grouting slurry diffusion in parallel double fracture grouting models with any two different opening combinations in the range of 1-8mm; the agitator of the slurry storage cylinder in the slurry supply system of the device can ensure the stability of the slurry performance under long-term high grouting pressure, improve the problem of abnormal water separation of the slurry at the sudden change position of the cross-section of the slurry pipeline of the slurry supply system under high-pressure grouting, and ensure that the state of the slurry entering the fracture grouting model meets the test requirements ; The device can create a 5-15MPa hydrostatic pressure environment in a double fracture model through a hydrostatic pressure control system; the entire device can simulate the actual situation of grouting in deep formations, can withstand a pressure of 38MPa, meet the characteristics of high hydrostatic pressure grouting environments in deep formations, and can be as close to the actual grouting environment as possible; the pressure monitoring device can collect and record the pressure value per meter in the fracture model at a minimum collection frequency of 1s; in addition, in the present invention, the hydrostatic pressure control system can maintain the terminal hydrostatic pressure at the required value of 5-15MPa at a small flow rate of 5-25mL / min at the upstream of the entire device, i.e., when the metering pump input flow rate is at a small flow rate of 5-25mL / min, and the error is within the range of 0.05-0.1MPa. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 A schematic structural diagram of a deep high water pressure double fracture grouting simulation test device of the present invention;

[0023] Figure 2 A schematic diagram of a crack model specimen mold used in an embodiment of the present invention;

[0024] Figure 3 A schematic structural diagram of a micro-flux high-pressure differential pressure control device used in an embodiment of the present invention.

[0025] The reference numerals in the figure are represented as follows: 1-metering pump; 2-slurry storage cylinder; 3-slurry storage cylinder stirring device; 4-exhaust valve; 5-pressure sensor; 6-stop valve; 7-double-fracture grouting model group; 8-micro-flux high-pressure difference pressure control device; 9-programmable logic controller; 10-computer; 11-measuring cup; 12-prefabricated mortar test block; 13-reserved threaded hole steel pipe mold; 14-non-reserved threaded hole steel pipe mold; 15-needle valve; 16-first pipe fitting tee; 17-second pipe fitting tee; 18-servo motor; 19-worm gear group I; 20-worm gear group II. DETAILED DESCRIPTION

[0026] The deep high water pressure double fracture grouting simulation test device of this embodiment is as follows Figure 1As shown, from the upstream of the device to the downstream of the end of the device, there are the slurry supply system, the double fracture grouting model group 7, the automatic pressure monitoring system, and the hydrostatic pressure control system;

[0027] The slurry supply system includes a metering pump 1 and a slurry storage cylinder 2; the fluid outlet end of the slurry storage cylinder 2 is fluidly connected to the double-fracture grouting model group 7; the metering pump 1 pumps the grouting liquid in the slurry storage cylinder 2 into the double-fracture grouting model group 7; [In some other embodiments, a slurry supply system with the following structure can also be used as a substitute: that is, in addition to the metering pump 1 and the slurry storage cylinder 2, the slurry supply system can also include a slurry storage cylinder stirring device 3; the metering pump 1 drives the slurry storage cylinder stirring device 3 to drive the fluid in the slurry storage cylinder 2 to flow into the double-fracture grouting model group 7; the slurry storage cylinder 2 and the slurry storage cylinder stirring device 3 constitute a high-pressure fracture grouting pressure stirring device, and the high-pressure fracture grouting pressure stirring device adopts a patent application number "202210131919.9", application date February 14, 2022, and invention name "A laboratory high-pressure fracture injection The laboratory high-pressure fracture grouting pressure stirring device in the embodiment of "slurry belt pressure stirring device and grouting system" is disclosed; in the slurry supply system, a metering pump 1 and a slurry storage cylinder 2 are combined, one side of the slurry storage cylinder 2 is clean water or oil, and the other side stores the test slurry, and the water pushes the slurry to realize the control of the input amount and slurry pressure of the slurry in the fracture model by using a precision metering pump; a slurry storage cylinder stirring device 3 is provided on the slurry storage cylinder 2, which is installed on the slurry side of the slurry storage cylinder 2 to ensure that the slurry flowing out of the slurry storage cylinder 2 to the slurry delivery pipeline will not affect the test effect due to the static and high-pressure water separation effect, thereby ensuring that the properties of the slurry entering the fracture model are not affected by irrelevant factors; in addition, the high-pressure fracture grouting pressure stirring device composed of the slurry storage cylinder 2 and the slurry storage cylinder stirring device 3 can also adopt the pressure stirring device in the prior art (a device for stirring under certain pressure conditions in a container)].

[0028] The double-fracture grouting model group includes a first fracture model 71, a first pipe tee 16, a second fracture model 72 and a second pipe tee 17; the fluid outlet end of the slurry supply system is fluidly connected to the fluid inlet pipe of the first pipe tee 16, one fluid outlet pipe of the first pipe tee 16 is fluidly connected to the fluid inlet end of the first fracture model 71, and the other fluid outlet pipe of the first pipe tee 16 is fluidly connected to the fluid inlet end of the second fracture model 72; the fluid outlet end of the first fracture model 71 is fluidly connected to one fluid inlet end of the second pipe tee 17, the fluid outlet end of the second fracture model 72 is fluidly connected to the other fluid inlet end of the second pipe tee 17, and the fluid outlet pipe of the second pipe tee 17 is fluidly connected to the fluid inlet end of the hydrostatic pressure control system; the first fracture model 71 and the second fracture model 72 are both installed with the pressure sensor 5 of the automatic pressure monitoring system.

[0029] The first fracture model 71 includes a fracture model specimen with a reserved threaded hole and a fracture model specimen without a reserved threaded hole; along the flow direction of the test slurry: the fracture model specimen with a reserved threaded hole and the fracture model specimen without a reserved threaded hole are connected end to end and fluidly conductive, and the fracture model specimen with a reserved threaded hole and the fracture model specimen without a reserved threaded hole are arranged at intervals; the second fracture model 72 also includes a fracture model specimen with a reserved threaded hole and a fracture model specimen without a reserved threaded hole; along the flow direction of the test slurry: the fracture model specimen with a reserved threaded hole and the fracture model specimen without a reserved threaded hole are connected end to end and fluidly conductive, and the fracture model specimen with a reserved threaded hole and the fracture model specimen without a reserved threaded hole are arranged at intervals; the fracture openings of the first fracture model 71 and the second fracture model 72 are different. The fracture openings of the first fracture model 71 and the second fracture model 72 are between 1 and 8 mm. The lengths of the crack model specimen with reserved threaded holes and the crack model specimen without reserved threaded holes are both 500 mm.

[0030] The first crack model 71 uses a steel pipe mold 13 with reserved threaded holes and a steel pipe mold 14 without reserved threaded holes; the steel pipe mold 13 with reserved threaded holes and the steel pipe mold 14 without reserved threaded holes are fixedly connected in the form of a flange; the steel pipe mold 13 with reserved threaded holes is reserved with threaded holes; the prefabricated mortar test block 12 is filled into the steel pipe mold 13 with reserved threaded holes, and the specimen of the crack model with reserved threaded holes is prepared by pouring; the prefabricated mortar test block 12 is filled into the steel pipe mold 14 without reserved threaded holes, and the specimen of the crack model without reserved threaded holes is prepared by pouring. The crack opening is reserved and formed during casting in the steel pipe mold; the length of the crack in the first crack model 71 and the second crack model 72 depends on the number of groups of connected specimens;

[0031] The automatic pressure monitoring system includes a pressure sensor 5, a programmable logic controller 9 and a computer 10; the electric signal output end of the pressure sensor 5 is electrically connected to the first electric signal input end of the programmable logic controller 9, the first electric signal output end of the programmable logic controller 9 is electrically connected to the electric signal input end of the computer 10, the electric signal output end of the computer 10 is electrically connected to the second electric signal input end of the programmable logic controller 9; the second electric signal output end of the programmable logic controller 9 is electrically connected to the signal input end of the hydrostatic pressure control system; the pressure sensor 5 is respectively installed on the reserved threaded hole fracture model specimen through the threaded holes on the reserved threaded hole fracture model specimen. The pressure sensor is threadedly connected with the reserved threaded hole in each meter of the fracture model specimen; the programmable logic controller 9 collects, displays and records the signal of the pressure sensor 5; the computer 10 stores the pressure value obtained by the programmable logic controller 9, and can also output data or display data in a graphical manner. On the grouting pipeline between the first pipe tee 16 and the first fracture model 71, an exhaust valve 4, a pressure sensor 5 and a stop valve 6 are installed in sequence along the fluid flow direction, and on the grouting pipeline between the first fracture model 71 and the second pipe tee 17, a stop valve 6 is installed; on the grouting pipeline between the first pipe tee 16 and the second fracture model 72, an exhaust valve 4, a pressure sensor 5 and a stop valve 6 are installed in sequence along the fluid flow direction, and on the grouting pipeline between the second fracture model 72 and the second pipe tee 17, a stop valve 6 is installed.

[0032] The hydrostatic pressure control system includes a micro-flux high-pressure differential pressure control device 8, a needle valve 15, a control pipeline and a measuring cup 11. The micro-flux high-pressure differential pressure control device 8 is in fluid communication with the dual-fracture grouting model group 7 through the control pipeline. The micro-flux high-pressure differential pressure control device 8 and the needle valve 15 are both installed on the control pipeline. The micro-flux high-pressure differential pressure control device 8 controls the opening degree of the needle valve 15; the fluid outlet end of the control pipeline faces the fluid inlet end of the measuring cup 11.

[0033] like Figure 3As shown, the micro-flux high-pressure differential pressure control device 8 includes a worm gear group I 19, a worm gear group II 20 and a servo motor 18; the second signal output end of the programmable logic controller 9 is electrically connected to the signal input end of the servo motor 18; the power output end of the servo motor 18 is drivingly connected to one end of the worm of the worm gear group I 19, the other end of the worm of the worm gear group I 19 is meshed with the worm of the worm gear group I 19, and the worm of the worm gear group II 20 is meshed with the worm of the worm gear group I 19. One end of the worm is fixedly connected to the inner ring of the worm wheel of the worm gear group I 19, the other end of the worm of the worm gear group II 20 is meshed with the worm wheel of the worm gear group II 20, and the valve stem operating end of the needle valve 15 is fixedly connected to the inner ring of the worm wheel of the worm gear group II 20; the worm wheel of the worm gear group II 20 controls the valve stem operating end to rotate the valve stem of the needle valve 15; the transmission ratios of the worm gear group I 19 and the worm gear group II 20 are both 1:60.

[0034] The programmable logic controller 9 used in this embodiment is a Siemens S7-200 SMART CPU; the pressure sensor 5 is produced by Hefei Changhong Measurement and Control Technology Co., Ltd., and the model is CH-804; the measurement range of the pressure sensor 5 is 0-40MPa, the input voltage is 24V DC, and the output current is 4-20mA.

[0035] Working process and principle:

[0036] After the test slurry for grouting is output from the slurry storage cylinder of the slurry supply system, it enters the double fracture grouting model group 7 through the high-pressure pipe and the first pipe tee respectively; [In some other embodiments, the following connection method can also be adopted: after the slurry is output from the slurry storage cylinder, it enters the four-way joint at the front end of the first fracture model 71 and the second fracture model 72 respectively through the high-pressure pipe and the three-way joint. In addition to being fluid-conducting with the high-pressure pipe connected to the three-way joint, the four-way joint is also arranged in sequence along the fluid direction on the pipelines to the first fracture model 71 and the second fracture model 72. The slurry then enters the double-fracture grouting model group 7. Since the pressure sensors 5 are arranged every 1 m on the first fracture model 71 and the second fracture model 72, the real-time change of the pressure in the specimen of the model group during the grouting process can be monitored. The pressure signal monitored by the pressure sensor 5 is transmitted to the computer 10 through the programmable logic controller 9, which can not only perform real-time curve analysis on the collected pressure values, but also call and process the monitoring history with a minimum division value of 1 s.

[0037] The ends of the first fracture model 71 and the second fracture model 72 respectively pass through the stop valve 6 and converge with the second pipe tee 17 at the end, and then are connected to the needle valve 15 combined with the micro-flux high-pressure differential pressure control device 8. The micro-flux high-pressure differential pressure control device 8 adjusts the needle valve 15 to maintain the high hydrostatic pressure value required for the test; during the test, the required hydrostatic pressure value is set in the programmable logic controller, and then the programmable logic controller analyzes and processes the real-time measured value of the pressure sensor at the end of the fracture grouting model, timely and accurately adjusts the needle valve, changes its flux and thus realizes pressure control;

[0038] In this embodiment, the specific process of controlling the needle valve 15 is as follows (taking the target pressure value to be controlled as 10 MPa during the grouting simulation test as an example):

[0039] Step A: Connect the pressure sensor 5 to the fluid system whose pressure environment needs to be controlled, and use the programmable logic controller 9 to process the signal collected by the pressure sensor 5;

[0040] Step B: According to the pressure value and the absolute value of the pressure change rate obtained after processing, the programmable logic controller 9 controls the servo motor 18 to make the servo motor 18 take action: when the pressure value is within the range of 10±0.05MPa, the pressure value is continuously monitored for 5s. If the absolute value of the pressure change rate is ≤0.01MPa / s, the servo motor 18 does not take action temporarily; if the absolute value of the pressure change rate is >0.01MPa / s, the pressure value is judged again. At this time, if the instantaneous pressure value is maintained within the range of 10±0.05MPa, the servo motor 18 drives the worm gear group to control the valve stem of the needle valve 15 to rotate 0.5° at a time. If the instantaneous pressure value exceeds the range of 10±0.05MPa, the servo motor 18 drives the worm gear group to control the valve stem of the needle valve 15 to rotate 1.0° at a time;

[0041] Step C: Continue to collect pressure values. When the pressure value exceeds the range of 10±0.05MPa, determine whether the pressure value exceeds the range of 10±0.1MPa. When the pressure value is maintained within the range of 10±0.1MPa, continue to monitor the pressure value for 5s. If the absolute value of the pressure change rate is ≤0.01Mpa / s, output the action requirements of the servo motor 18: If the current instantaneous pressure value is still maintained within the range of 10±0.1MPa, the servo motor 18 drives the worm gear group to control the valve stem of the needle valve 15 to rotate 1.0°. If the current instantaneous pressure value is still maintained within the range of 10±0.1MPa, the servo motor 18 drives the worm gear group to control the valve stem of the needle valve 15 to rotate 1.0°. When the pressure value exceeds the range of 10±0.1MPa, the servo motor 18 drives the worm gear group to control the valve stem of the needle valve 15 to rotate 2.0°; if the absolute value of the pressure change rate is >0.01Mpa / s: if the current instantaneous pressure value is still within the range of 10±0.1MPa, the servo motor 18 drives the worm gear group to control the valve stem of the needle valve 15 to rotate 2.0°; if the current instantaneous pressure value exceeds the range of 10±0.1MPa, the servo motor 18 drives the worm gear group to control the valve stem of the needle valve 15 to rotate 5.0°;

[0042] Step D: Continue to collect pressure values. When the pressure value exceeds the range of 10±0.1MPa: if the absolute value of the pressure change rate is >0.01Mpa / s, the servo motor 18 drives the worm gear group to control the valve stem of the needle valve 15 to rotate 5.0°; if the absolute value of the pressure change rate is ≤0.01Mpa / s, the pressure value is determined again. If the current instantaneous pressure value is still maintained within the range of 10±0.1MPa, the servo motor 18 drives the worm gear group to control the valve stem of the needle valve 15 to rotate 1.0°; if the current instantaneous pressure value exceeds the range of 10±0.1MPa, the servo motor 18 drives the worm gear group to control the valve stem of the needle valve 15 to rotate 2.0°. In some other embodiments, the valve stem rotation angle of the needle valve 15 can be adjusted according to actual conditions, such as the structure of the needle valve 15, the required pressure value to be maintained, and the upstream flow conditions of the system.

[0043] During the test, the fluid passing through the needle valve 15 is stored in the measuring cup 11 for observation; after the grouting is completed, the amount of fluid stored in the measuring cup 11 can be compared with the input amount of the metering pump 1 in the front-end grouting system; after a period of maintenance, the metering pump 1 can be connected with a high-pressure pipe from the first fracture model 71 and the end stop valve 6 of the second fracture model to perform back pressure water operation to evaluate the effect of slurry filling and water blocking during the test; after the back pressure water is completed, the steel pipe mold of the fracture grouting model can be cored using a drilling rig to observe the diffusion of slurry in the fractures formed by casting.

[0044] The deep high-water pressure double-fracture grouting simulation device of this embodiment can maintain the terminal hydrostatic pressure at the required value of 5-15MPa with an error range of 0.05-0.1MPa when the metering pump input flow rate is a small flow rate of 5-25mL / min upstream of the entire device.

[0045] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the claims of this patent application.

Claims

1. A deep high water pressure double fracture grouting simulation test device, characterized in that: The invention comprises a slurry supply system, a double fracture grouting model group (7), an automatic pressure monitoring system and a hydrostatic pressure control system; the fluid outlet end of the slurry supply system is fluidly connected to the fluid inlet end of the double fracture grouting model group, the detection end of the automatic pressure monitoring system is in contact with the slurry flowing on the double fracture grouting model group, the control signal output end of the automatic pressure monitoring system is electrically connected to the control signal input end of the hydrostatic pressure control system; the fluid outlet end of the double fracture grouting model group is fluidly connected to the fluid inlet end of the hydrostatic pressure control system; the hydrostatic pressure control system controls the outflow of fluid from the double fracture grouting model group; The dual-fracture grouting model group comprises a first fracture model (71), a first pipe tee (16), a second fracture model (72) and a second pipe tee (17); the fluid outlet end of the slurry supply system is fluidly connected to the fluid inlet pipe of the first pipe tee (16), one fluid outlet pipe of the first pipe tee (16) is fluidly connected to the fluid inlet end of the first fracture model (71), and the other fluid outlet pipe of the first pipe tee (16) is fluidly connected to the fluid inlet end of the second fracture model (72); the fluid outlet end of the first fracture model (71) is fluidly connected to one fluid inlet end of the second pipe tee (17), the fluid outlet end of the second fracture model (72) is fluidly connected to the other fluid inlet end of the second pipe tee (17), and the fluid outlet pipe of the second pipe tee (17) is fluidly connected to the fluid inlet end of the hydrostatic pressure control system; the first fracture model (71) and the second fracture model (72) are both installed with pressure sensors (5) of the automatic pressure monitoring system; The hydrostatic pressure control system comprises a micro-flux high-pressure differential pressure control device (8), a needle valve (15), a control pipeline and a measuring cup (11); the micro-flux high-pressure differential pressure control device (8) is in fluid communication with the dual-fracture grouting model group (7) via the control pipeline; the micro-flux high-pressure differential pressure control device (8) and the needle valve (15) are both installed on the control pipeline; the micro-flux high-pressure differential pressure control device (8) controls the opening degree of the needle valve (15); the fluid outlet end of the control pipeline faces the fluid inlet end of the measuring cup (11); The micro-flux high-pressure differential pressure control device (8) comprises a worm gear group I (19), a worm gear group II (20) and a servo motor (18); a second signal output end of a programmable logic controller (9) is electrically connected to a signal input end of the servo motor (18); a power output end of the servo motor (18) is drivingly connected to one end of a worm of the worm gear group I (19), the other end of the worm of the worm gear group I (19) is meshed with a worm wheel of the worm gear group I (19), and the worm gear of the worm gear group II (20) is meshed with a worm wheel of the worm gear group I (19). One end of the worm is fixedly connected to the inner ring of the worm wheel of the worm gear group I (19), the other end of the worm of the worm gear group II (20) is meshed with the worm wheel of the worm gear group II (20), and the valve stem operating end of the needle valve (15) is fixedly connected to the inner ring of the worm wheel of the worm gear group II (20); the worm wheel of the worm gear group II (20) controls the valve stem operating end to rotate the valve stem of the needle valve (15); the transmission ratios of the worm gear group I (19) and the worm gear group II (20) are both 1:

60.

2. The deep high water pressure double fracture grouting simulation test device according to claim 1 is characterized in that: The slurry supply system comprises a metering pump (1), a slurry storage cylinder (2) and a slurry storage cylinder stirring device (3); the metering pump (1) drives the slurry storage cylinder stirring device (3) to drive the fluid in the slurry storage cylinder (2) to flow into the double fracture grouting model group; the slurry storage cylinder (2) and the slurry storage cylinder stirring device (3) constitute a high-pressure fracture grouting pressure stirring device.

3. The deep high water pressure double fracture grouting simulation test device according to claim 1 is characterized in that: The first fracture model (71) comprises a fracture model specimen with a reserved threaded hole and a fracture model specimen without a reserved threaded hole; along the flow direction of the test slurry: the fracture model specimen with a reserved threaded hole and the fracture model specimen without a reserved threaded hole are connected end to end and fluid is conducted, and the fracture model specimen with a reserved threaded hole and the fracture model specimen without a reserved threaded hole are spaced apart; The second fracture model (72) also includes a fracture model specimen with a reserved threaded hole and a fracture model specimen without a reserved threaded hole; along the flow direction of the test slurry: the fracture model specimen with a reserved threaded hole and the fracture model specimen without a reserved threaded hole are connected end to end and fluid is conducted, and the fracture model specimen with a reserved threaded hole and the fracture model specimen without a reserved threaded hole are spaced apart; The pressure sensor (5) is installed on the reserved threaded hole fracture model specimen via a threaded hole on the reserved threaded hole fracture model specimen, and a detection end of the pressure sensor (5) is located in a test slurry flow channel; the first fracture model (71) and the second fracture model (72) have different fracture openings.

4. The deep high water pressure double fracture grouting simulation test device according to claim 3 is characterized in that: The automatic pressure monitoring system further comprises a programmable logic controller (9) and a computer (10); the electric signal output end of the pressure sensor (5) is electrically connected to the first electric signal input end of the programmable logic controller (9), the first electric signal output end of the programmable logic controller (9) is electrically connected to the electric signal input end of the computer (10), the electric signal output end of the computer (10) is electrically connected to the second electric signal input end of the programmable logic controller (9); the second electric signal output end of the programmable logic controller (9) is electrically connected to the signal input end of the hydrostatic pressure control system.

5. The deep high water pressure double fracture grouting simulation test device according to claim 4 is characterized in that: An exhaust valve (4), a pressure sensor (5) and a stop valve (6) are installed in sequence along the fluid flow direction on the grouting pipeline between the first pipe fitting tee (16) and the first fracture model (71), and a stop valve (6) is installed on the grouting pipeline between the first fracture model (71) and the second pipe fitting tee (17); An exhaust valve (4), a pressure sensor (5) and a stop valve (6) are installed in sequence along the fluid flow direction on the grouting pipeline between the first pipe fitting tee (16) and the second fracture model (72), and a stop valve (6) is installed on the grouting pipeline between the second fracture model (72) and the second pipe fitting tee (17).

6. The deep high water pressure double fracture grouting simulation test device according to claim 3 is characterized in that: The first crack model (71) is prepared by using a steel pipe mold with a reserved threaded hole (13) and a steel pipe mold without a reserved threaded hole (14); the steel pipe mold with a reserved threaded hole (13) and the steel pipe mold without a reserved threaded hole (14) are fixedly connected in the form of a flange; the steel pipe mold with a reserved threaded hole (13) is provided with a reserved threaded hole; a prefabricated mortar test block (12) is filled into the steel pipe mold with a reserved threaded hole (13) to prepare the crack model specimen with a reserved threaded hole, and a prefabricated mortar test block (12) is filled into the steel pipe mold without a reserved threaded hole (14) to prepare the crack model specimen without a reserved threaded hole.

7. The deep high water pressure double fracture grouting simulation test device according to claim 3 is characterized in that: The crack openings of the first crack model (71) and the second crack model (72) are between 1 and 8 mm; and the lengths of the crack model specimen with reserved threaded holes and the crack model specimen without reserved threaded holes are both 500 mm.