Method for improving power system flexibility based on energy storage capacity configuration
Bayesian neural network is used to predict the net load of the power system and optimize the energy storage battery capacity configuration. The battery energy storage is used to participate in different adjustment modes, which solves the problem of insufficient flexibility of the power system and achieves more efficient flexibility adjustment and system stability. promote.
Patent Information
- Application Number
- CN202210351735.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-02
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-04-02
AI Technical Summary
As the proportion of renewable energy in the power system increases, the uncertainty and volatility of system operation increase, resulting in system power imbalance. The existing technology lacks effective flexible adjustment methods to improve the flexibility of the power system, especially traditional Gensets and battery storage have limitations in providing flexible regulation services.
Use Bayesian neural network to predict the net load of the power system, optimize the capacity configuration of energy storage batteries, participate in the flexibility adjustment of different modes through battery energy storage, establish an optimization model that maximizes total revenue, and use Yalmip optimization toolbox and Cplex The algorithm package performs optimization solutions and optimizes the charging and discharging strategies of battery energy storage to improve system flexibility.
It effectively improves the flexibility of the power system and alleviates wind, solar and load shedding problems caused by insufficient climbing or landslide capabilities. Battery energy storage can not only provide power generation output but also meet load demand, improving flexible adjustment efficiency. The risk of optimization results is reduced and the feasibility and economy of the optimization results are ensured.
Smart Images

Figure CN114825323B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for improving the flexibility of an electric power system. Background Art
[0002] At present, renewable energy represented by wind power and solar energy is developing rapidly, and its share in the power system is also increasing. The rapid development of renewable energy has alleviated the problems of environmental pollution and energy shortage to a certain extent, but it has also brought some serious problems to the power system. As the proportion of renewable energy in the power generation side of the power system increases, the uncertainty and volatility of the system operation also increase, which brings huge challenges to the safe operation of the system.
[0003] In order to minimize the negative impact of various uncertainties, the power system must have a certain degree of resilience and response capabilities, that is, the flexibility of the power system needs to be improved. The system power imbalance caused by insufficient system climbing / slipping capabilities is gradually becoming one of the main factors affecting the safe and stable operation of the system. To address this problem, flexible ramping products (FRP) have been proposed to meet the net load changes between two scheduling periods in real-time scheduling. The so-called net load is the difference between the output of renewable energy and the actual load during system operation, that is, flexible ramping products can be regarded as a means of regulation to improve the flexibility of the power system.
[0004] However, most of the current research on flexibility is still in the theoretical analysis stage, lacking a unified definition and practical verification. Although the academic community has conducted preliminary discussions on the feasibility and mechanism of providing FRP for some resources on the supply and demand sides of the power system, only traditional generators are currently used to provide FRP in practical applications. This is mainly because the output of traditional units is relatively stable and easy to adjust, and the proportion of traditional units in the power structure is still very high. Among the existing patent results, most of them only consider the frequency regulation services provided by battery energy storage, and do not involve the provision of FRP, such as 202011382567.1 and 202011637092.6; and for the current provision of flexible regulation services, generally only traditional generators are used, such as 202011311862.8. In a few results that use battery energy storage to provide flexible regulation, the impact of the acceptance probability of FRP services provided by BES aggregators on the flexibility of the power system is not considered, such as 201911020073.6. However, with the continuous increase in the penetration rate of renewable energy, on the one hand, changes in the power structure have prompted more new resources to participate in the power system dispatching. On the other hand, the volatility and uncertainty brought by intermittent renewable energy require more flexible resources. We should increase research on new FRP supply resources and put them into practical engineering applications as soon as possible. Summary of the invention
[0005] In order to alleviate the negative impact of renewable energy, the present invention proposes a technology and method for improving the flexibility of a power system based on energy storage capacity configuration for flexible regulation products.
[0006] The present invention is a method for configuring energy storage capacity to improve the flexibility of power systems based on Bayesian neural networks. The Bayesian neural network is used to accurately predict the flexibility requirements of the power system and optimize the capacity configuration of the energy storage battery. While improving the flexibility of the power system, the capacity configuration of the energy storage battery is optimized.
[0007] In order to achieve the above object, the technical solution of the present invention is:
[0008] A method for improving power system flexibility based on energy storage capacity configuration includes the following steps:
[0009] S1: The Bayesian deep neural network method is used to predict and estimate the net load of the power system. On this basis, the acceptance probability level of FRP is divided according to the predicted net load fluctuation.
[0010] S2: Select battery energy storage as a new source of FRP, and develop a model for BES to participate in flexibility regulation based on the differences in the charging and discharging characteristics of battery energy storage (BES).
[0011] S3: Analyze the optimization strategy of BES aggregators participating in power system flexibility regulation and propose a battery energy storage capacity optimization configuration model.
[0012] S4: Taking a 24-hour day as a cycle, according to the predicted flexibility demand distribution, the established model is used to call the Cplex algorithm package on Matlab equipped with the Yalmip optimization toolbox for optimization solution.
[0013] Further, in step S1, using the Bayesian deep neural network method to predict and estimate the net load of the power system specifically includes:
[0014] S1-1: The net load of the power system is predicted and estimated through the Bayesian deep neural network. The net load fluctuation of one day is randomly selected from the net load data of one year obtained by neural network training, and the waveform is decomposed through multi-scale morphology to obtain a 24-hour flexibility demand image. Through the analysis of the flexibility demand effect diagram, the flexibility demand is divided into three levels, and each level corresponds to an acceptance probability of FRP.
[0015] S1-2: As the upward / downward flexibility demand increases, the system's regulation capability requirements also gradually increase, so the probability of FRP provided by BES being accepted in the power system also gradually increases. And through empirical data, the maximum probability of FRP winning the bid is set to 0.9.
[0016] Furthermore, in step S2, the modes in which the BES can participate in flexibility adjustment are as follows:
[0017] S2-1: Depending on the different energy flows in the power system, energy storage batteries can participate in different modes of regulation to improve system flexibility. There are six modes for energy storage to participate in power system flexibility regulation. The following lists the physical behaviors, product types, revenue sources, and cost losses corresponding to each mode.
[0018] When the energy storage battery is in a discharging state, there are three modes: in the emdsg (discharge in energy market) mode, BES provides active power to the power system through discharge, and BES can obtain electricity sales revenue on the day before, but the charging process will cause battery loss; in the regup (upward regulation) mode, BES provides upward frequency regulation services for the system, and can obtain two parts of benefits. One is the capacity benefit obtained on the day before, which is related to the winning capacity of BES and the upward frequency regulation clearing price; the other is that in real-time scheduling, if the ISO calls the upward frequency regulation service, it is equivalent to BES providing energy to the power system through discharge. This part of the benefit is calculated according to the real-time clearing price of energy. At the same time, calling the upward frequency regulation service will cause battery loss to BES; in the raup (upward FRP) mode, BES provides the system with upward FRP, and the benefits obtained and the costs incurred are similar to those in the regup mode. The difference is that the regup mode provides frequency regulation capacity benefits, while the raup mode provides FRP capacity benefits.
[0019] When the energy storage battery is in the charging state, there are also three modes: in the regdn (downward regulation) mode, BES provides downward frequency regulation services. Unlike upward frequency regulation, BES can only obtain day-ahead capacity benefits by providing downward frequency regulation services. Because if ISO calls the downward frequency regulation service in real-time scheduling, it is equivalent to BES obtaining energy from the power system. This part of energy can be used for forward arbitrage, so it cannot obtain repeated subsidies from ISO. Similarly, the discharge process will also cause battery loss; in the radn (downward FRP) mode, BES provides the system with downward FRP, and the benefits and costs obtained are similar to the regdn mode; note that in the emchg (charge in energy market) mode, BES obtains energy from the power system. In addition to the battery loss caused by the charging process, BES also needs to pay energy costs, and BES cannot obtain benefits in this mode. However, the emchg mode is of great significance for maintaining the state of charge (SOC) of BES, and the energy stored by charging can be used for long-term power system flexibility regulation.
[0020] Furthermore, in step S3, the battery energy storage capacity optimization configuration model is a power system flexibility regulation optimization model with the goal of maximizing total revenue, specifically including:
[0021] S3-1: Introduce the impact of FRP on the objective function and constraints, and establish a BES capacity configuration optimization model. The goal of the BES aggregator is to maximize revenue, as shown in formula (1):
[0022] max{R en +R reg +R ra -C reg -C ra -C deg} (1)
[0023] Where: R en , R reg and R ra They are respectively the income from providing energy, frequency regulation services and FRP; C reg and C ra are the deviation risk costs of providing frequency regulation services and providing FRP in real-time scheduling; C deg It is the battery depletion subsidy paid to BES.
[0024] The benefits of providing energy are shown in formula (2):
[0025]
[0026] Where: Δt is the day-ahead clearing time, is the electricity price in time period t the day before, is the discharge efficiency of BES b, and are respectively the discharging (analogous to a generator set) and charging (analogous to an electrical load) powers of BES b in period t.
[0027] The benefits of providing frequency regulation services include the capacity benefits of day-ahead planning and the additional call benefits obtained from real-time scheduling, as shown in formula (3):
[0028]
[0029] Where: is the capacity price of the day-ahead up / down frequency regulation service, The capacity of up / down frequency modulation services declared by the BES aggregator; regup (π regdn ) is the probability of the up (down) frequency modulation service being accepted the day before. From the previous strategy analysis, we know that the frequency modulation capacity reported by the BES aggregator is fully accepted by the ISO, so π regup =π regdn =1;ρ regup is the probability that the up-modulation is called in real time, is the electricity price in real time period t.
[0030] Similarly, the benefit of providing FRP is shown in formula (4):
[0031]
[0032] Where: β is the price threshold of the demand curve set by ISO, The number of upward (downward) FRPs declared by the BES aggregator; π raup (π radn ) is the probability that the upward (downward) FRP is accepted on the previous day, ρ raup The probability of being called for the upward FRP in real time.
[0033] The first part of the right side of equation (4) represents the capacity benefit obtained by BES providing FRP on the day-ahead. Unlike the frequency regulation service that is fully accepted on the day-ahead, the number and probability of FRP being accepted on the day-ahead is related to the level of system regulation capacity required on the day-ahead, so the situation on different operating days is not consistent. The second part represents the additional call benefit obtained by the FRP accepted on the day-ahead in real time, and the probability ρ of the BES aggregator being called to provide FRP raup Closely related to the real-time operating status of the system.
[0034] In real-time dispatch, the range of ISO's frequency regulation service calls to BES aggregators is between zero and the capacity accepted on the day before. BES aggregators run the optimization model based on the predicted probability values, and the optimization results obtained may not completely match the actual situation. Therefore, BES aggregators need to consider the situation where the real-time dispatch value of the frequency regulation service is greater than the expected value. In this case, it is assumed that the BES aggregator purchases energy at the real-time electricity price to deal with the deviation between the expected value and the actual value. BES aggregators consider the risk cost brought by real-time deviations on the day before, thereby ensuring that the optimization results are risk-averse and providing the deviation risk cost C of the frequency regulation service. reg As shown below:
[0035]
[0036] ω regup =π regup ρ regup (1-ρ regup ) (6)
[0037]
[0038] ω regdn =π regdn ρ regdn (1-ρ regdn ) (8)
[0039]
[0040] The first part of the right side of equation (5) represents the deviation risk cost of providing up-regulation service, ω regup The conditional probability of deviation is shown in formula (6), which is the product of the probabilities of three independent events: 1) The probability that the upper frequency regulation service is accepted a day ago π regup ; 2) The probability of the frequency modulation service being called in real time ρ regup ; 3) The probability that the actual value being called is greater than the expected value (1-ρ regup ). It represents the expected deviation value of the frequency regulation service, which is the difference between the declared frequency regulation capacity and the expected value of real-time scheduling, as shown in formula (7). It should be noted that the BES aggregator declares the frequency regulation capacity on the day before. After that, the actual frequency increase capacity is between 0 and Since BES aggregators are risk-averse, the extreme case (actual call capacity equals the maximum value) is adopted. ) optimization results, effectively reducing the risk of real-time deviation.
[0041] Similarly, the second part of the right side of equation (5) represents the deviation risk cost of providing down-modulation, which is defined in the same way as the deviation risk cost of up-modulation service. The corresponding deviation probability ωregdn and the expected value of deviation Sr t egdn As shown in equations (8) and (9) respectively.
[0042] Provide the deviation risk cost C of FRP ra The risk cost of deviation from frequency regulation service C reg The definition of is similar, as shown in equations (10)-(14). regup (ω regup ) is the deviation probability of providing upward (downward) FRP, is the expected value of the upward (downward) FRP deviation at time t.
[0043]
[0044] ω raup =π raup ρ raup (1-ρ raup ) (11)
[0045]
[0046] ω radn =π radn ρ radn (1-ρ radn ) (13)
[0047]
[0048] In addition, BES aggregators are only agents of multiple BESs, not their real owners. Since the charging and discharging process will cause battery loss, BES aggregators need to pay BES owners a certain subsidy. Assuming that battery loss is only related to the number of battery charge and discharge times, and is not affected by the depth of charge and discharge, the battery loss subsidy C that BES aggregators need to pay is deg As shown in equations (15)-(16). b , m b and B.C. b They are the profit protection factor of BES b, battery construction cost, the slope of the battery life-cycle number approximate function and the battery capacity. These related parameters can be found in the battery manufacturer's manual. b The subsidy intensity required by the owner of BES b is generally greater than 1. The higher the value, the more subsidies BES b will receive for each unit of service provided. However, it means higher economic costs for BES aggregators and will affect the optimization strategy of BES aggregators.
[0049]
[0050]
[0051] E b is the total energy exchanged between BES b and the power system during charging and discharging, and is composed of three parts according to the different products provided, as shown in formula (18). Indicates the energy change caused by calling the up (down) frequency modulation service. Represents the energy change caused by invoking upward (downward) FRP.
[0052] S3-2: The overall setting of the objective function is as above, and the constraints related to the optimization model are as follows:
[0053] -Energy changes caused by calling frequency modulation services
[0054]
[0055]
[0056] Constraints (17) and (18) reflect the relationship between the BES energy change caused by the frequency regulation service in real-time scheduling and the frequency regulation capacity reported by the BES aggregator on the day before. The BES aggregator meets the frequency regulation requirements of the real-time system by optimizing the configuration of the multiple BESs it manages, and can provide both up- and down-frequency regulation services. The frequency regulation capacity reported by the BES aggregator on the day before When scheduling, the real-time call probability needs to be considered to avoid the problem of insufficient battery energy in real-time scheduling.
[0057] -Energy changes caused by calling FRP
[0058]
[0059]
[0060] Similar to the constraints for invoking frequency regulation services, constraints (19) and (20) reflect the relationship between the BES energy changes caused by FRP in real-time scheduling and the FRP capacity declared by the BES aggregator on the day before.
[0061] Battery state of charge limit
[0062]
[0063]
[0064]
[0065]
[0066]
[0067] Constraints (21)-(25) reflect the battery state of charge restrictions of each BES. Among them, constraint (21) reflects the relationship between the charging / discharging process and the battery state of charge of the BES, constraints (22) and (23) emphasize that the total energy change in real-time scheduling cannot exceed the available energy stored in the BES battery, constraint (24) stipulates the upper limit of the battery state of charge, and constraint (25) indicates that the state of charge of each BES after the optimization cycle ends should be equal to the initial value at the beginning of the optimization cycle to avoid unnecessary disputes.
[0068] - Rated power and ramp rate limits
[0069]
[0070]
[0071]
[0072]
[0073]
[0074] Constraints (26) and (27) reflect the charging and discharging power limits of the BES, where is the maximum charge and discharge power of BES b, 0 / 1 variable ζ t,b represents the availability of BES b in time period t (1 means it can provide service). Due to physical constraints, a single BES cannot be charged and discharged at the same time, so a 0 / 1 variable σ is introduced. t,b , σ t,b 1 indicates discharging, and 0 indicates charging, which correspond to constraints (26) and (27) respectively. Constraints (28) and (29) reflect the charging and discharging power regulation limits of BES. up / r dn is the adjustment rate. In practical problems, constraints (28) and (29) are usually not binding because, as a fast-response resource, BES has a response speed that is difficult to achieve with other flexible resources. Under special conditions, BES aggregators may also strategically declare their adjustment rates to obtain higher profits.
[0075] Constraints (30) specify all non-negative variables in the optimization model.
[0076] Furthermore, in step S4, the constructed model is used to call the Cplex algorithm package on Matlab equipped with the Yalmip optimization toolbox to perform optimization and solution, which specifically includes:
[0077] S4-1: Building a solution tool;
[0078] The program was programmed in the MATLAB R2016a software platform equipped with the YALMIP optimization toolbox, and the efficient solver CPLEX was called to perform optimization calculations. The optimization calculations were performed on a PC equipped with an Intel(R) Core(TM) i5-7200U CPU@2.50GHz processor and 8GB RAM, and the software environment was the Windows 10 operating system.
[0079] S4-2: Set optimization plans and indicators;
[0080] In order to clearly compare the effectiveness of the optimization model constructed in this paper on improving the flexibility of the power system, two schemes are set for comparative observation: (1) the acceptance probability of FRP is set to a fixed value of 0.5; (2) a set of probability data that changes with demand is set as the acceptance probability of FRP according to the fluctuation of flexibility demand within a day.
[0081] Based on the quantitative analysis indicators considered, the capacity reserved by BES for the six services and the revenue structure of BES aggregators under the two schemes are analyzed: (1) the capacity reserved by BES for the emdsg mode; (2) the capacity reserved by BES for the emchg mode; (3) the capacity reserved by BES for the regup mode; (4) the capacity reserved by BES for the regdn mode; (5) the capacity reserved by BES for the raup mode; (6) the capacity reserved by BES for the radn mode; and (7) the revenue composition of BES aggregators.
[0082] The working principle of the present invention is:
[0083] 1. Use the Bayesian neural network prediction method to predict the net load of the power generation system, and obtain the prediction of net load fluctuation within a day based on historical data.
[0084] 2. The input net load signal is decomposed at multiple scales using a multi-scale morphological method, and the flexibility requirements are analyzed based on the intermediate frequency signal obtained from the decomposition.
[0085] 3. Based on the flexibility demand analysis, the acceptance probability of FRP is further analyzed and the various levels of FRP acceptance probability are refined to improve the flexibility of the power system.
[0086] 4. Battery energy storage is selected as the source of FRP, and different modes of energy storage participating in the flexibility regulation of the power system are formulated. According to the different energy flows in the power system, battery energy storage can provide different types of products according to different participation modes.
[0087] 5. The proposed model takes into account both BES battery loss and real-time scheduling deviation risks, and verifies through examples that the present invention can effectively predict flexibility requirements and obtain capacity configuration plans for battery energy storage under various modes.
[0088] The advantages of the present invention are:
[0089] 1. It can improve the operational flexibility of the power system and effectively alleviate the problems of wind power abandonment, solar power abandonment and load shedding caused by insufficient climbing or landslide capacity.
[0090] 2. Battery energy storage can be used as a power generation resource to provide power output, and can also be used as a load to generate a certain amount of electricity demand, so it can provide both upward and downward FRPs at the same time. Compared with other resources, its flexible adjustment ability is better. In addition, the longer the storage cycle, the longer the adjustment ability can be maintained, thereby improving the flexibility and adjustment efficiency of the power system.
[0091] 3. Use the Bayesian neural network method to predict the load of the power system, so as to configure flexible adjustment resources in advance. Compared with other deep networks, the Bayesian neural network has a special probability layer structure that can obtain a more stable prediction model based on a smaller amount of data, thereby improving the efficiency of prediction.
[0092] 4. The mathematical morphology method can more intuitively and quickly decompose the predicted net load fluctuation time domain curve into a superposition of a set of time series under any fluctuation period division by constructing a group of structural elements, so it is very suitable for flexibility assessment.
[0093] 5. By considering both BES battery loss and real-time scheduling deviation risk, the possibility of the optimization result not being completely consistent with the actual situation is reduced, thereby ensuring that the optimization result is risk-averse. And by constraining energy changes, battery state of charge, rated power and climbing power, the feasibility of the optimization result is further guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS
[0094] Figure 1 It is a schematic diagram of the probability layer structure of the Bayesian neural network of the present invention.
[0095] Figure 2 It is a flexibility requirement effect diagram of the present invention.
[0096] Figures 3(a) and 3(b) are real-time price curves for different products, where Figure 3(a) is a schematic diagram of the day-ahead (DA) and real-time (RT) market energy prices, and Figure 3(b) is a schematic diagram of the frequency regulation service capacity price.
[0097] Figure 4 It is a curve chart of net load probability forecast distribution forecast results.
[0098] Figure 5 It is a schematic diagram of the number of products (sum of 24 time periods) provided by BES aggregators for different modes under a fixed FRP acceptance probability.
[0099] Figure 6 It is a schematic diagram of the profit composition of BES aggregator under fixed FRP acceptance probability.
[0100] Figure 7 It is a schematic diagram of the impact of FRP's acceptance probability on the profit structure of BES aggregators.
[0101] Figure 8 It is a schematic diagram of the number of products (total of 24 time periods) provided by BES aggregators for different modes under a set FRP acceptance probability.
[0102] Fig. 9 It is a schematic diagram of the profit composition of BES aggregators under the set FRP acceptance probability. Specific implementation methods
[0103] The present invention will be further described below in conjunction with the accompanying drawings.
[0104] Reference Figures 1 to 9 A method for participating in power system flexibility regulation using battery energy storage as a resource providing flexibility regulation capacity, comprising the following steps:
[0105] S1: The Bayesian deep neural network method is used to predict and estimate the net load of the power system. On this basis, the probability level of flexible ramping product (FRP) being accepted on the day before is reasonably divided according to the predicted net load fluctuation.
[0106] S2: Based on the differences in charging and discharging characteristics of battery energy storage (BES), the mode of BES participating in power system flexibility regulation is analyzed, and the structural composition of different product services provided by BES and their impact on power system flexibility are summarized.
[0107] S3: Next, the optimization strategy of BES aggregators participating in power system flexibility regulation is analyzed, and an optimization model with the goal of maximizing total revenue is proposed.
[0108] S4: Finally, this paper establishes a BES optimization model based on four groups of BES aggregators with different parameters, A, B, C, and D. Through example analysis and comparative case analysis, the effectiveness of the proposed model and method is verified.
[0109] Furthermore, in step S1, the method for reasonably dividing the probability level of FRP being accepted on the previous day is as follows:
[0110] S1-1: We randomly select the net load fluctuation of one day from the data of one year, and decompose the waveform through multi-scale morphology to obtain the 24-hour flexibility demand image. Through the analysis of the flexibility demand effect diagram, we divide the flexibility demand into three levels, each of which corresponds to a day-ahead acceptance probability of FRP.
[0111] S1-2: As the upward / downward flexibility demand increases, the system's regulation capacity requirements also gradually increase, so the acceptance probability of the FRP provided by the BES aggregator in the power system also gradually increases. Since the BES aggregator provides FRP at the demand curve price threshold instead of quoting zero price, the acceptance probability of FRP is generally not 1, that is, it will not appear that all the capacity used to provide FRP will be accepted. Therefore, the maximum acceptance probability of FRP is set to 0.9.
[0112] Furthermore, in step S2, the sources of revenue and cost of different product services provided by BES are as follows:
[0113] S2-1: According to the different energy flows in the power system, energy storage batteries can provide different types of products according to different participation modes and obtain corresponding benefits. There are six modes for energy storage to participate in the flexibility regulation of the power system. The corresponding physical behavior, product type, source of benefits and cost loss are given for each mode.
[0114] Furthermore, in step S3, the power system flexibility regulation optimization model with the goal of maximizing total revenue is as follows:
[0115] S3-1: Introduce the influence of FRP on the objective function and constraints, and establish the optimization model of BES aggregator participating in power system flexibility regulation. The goal of BES aggregator is to maximize its own benefits, as shown in formula (1):
[0116] max{R en +R reg +R ra -C reg -C ra -C deg} (1)
[0117] Where: R en , R reg and R ra They are respectively the income from providing energy, frequency regulation services and FRP; C reg and C ra are the deviation risk costs of providing frequency regulation services and providing FRP in real-time scheduling; C deg It is the battery depletion subsidy paid to BES.
[0118] The benefits of providing energy are shown in formula (2):
[0119]
[0120] Where: Δt is the day-ahead clearing time, is the electricity price in time period t the day before, is the discharge efficiency of BES b, and are respectively the discharging (analogous to a generator set) and charging (analogous to an electrical load) powers of BES b in period t.
[0121] The benefits of providing frequency regulation services include the capacity benefits of day-ahead planning and the additional call benefits obtained from real-time scheduling, as shown in formula (3):
[0122]
[0123] Where: is the capacity price of the day-ahead up / down frequency regulation service, The capacity of up / down frequency modulation services declared by the BES aggregator; regup (π regdn ) is the probability of the up (down) frequency modulation service being accepted the day before. From the previous strategy analysis, we know that the frequency modulation capacity reported by the BES aggregator is fully accepted by the ISO, so π regup =π regdn =1;ρ regup is the probability that the up-modulation is called in real time, is the electricity price in real time period t.
[0124] Similarly, the benefit of providing FRP is shown in formula (4):
[0125]
[0126] Where: β is the price threshold of the demand curve set by ISO, The number of upward (downward) FRPs declared by the BES aggregator; π raup (π radn ) is the probability that the upward (downward) FRP is accepted on the previous day, ρ raup The probability of being called for the upward FRP in real time.
[0127] The first part of the right side of equation (4) represents the capacity benefit obtained by BES providing FRP on the day-ahead. Unlike the frequency regulation service that is fully accepted on the day-ahead, the number and probability of FRP being accepted on the day-ahead is related to the level of system regulation capacity required on the day-ahead, so the situation on different operating days is not consistent. The second part represents the additional call benefit obtained by the FRP accepted on the day-ahead in real time, and the probability ρ of the BES aggregator being called to provide FRPraup Closely related to the real-time operating status of the system.
[0128] In real-time dispatch, the range of ISO's frequency regulation service calls to BES aggregators is between zero and the capacity accepted on the day before. BES aggregators run the optimization model based on the predicted probability values, and the optimization results obtained may not completely match the actual situation. Therefore, BES aggregators need to consider the situation where the real-time dispatch value of the frequency regulation service is greater than the expected value. In this case, it is assumed that the BES aggregator purchases energy at the real-time electricity price to deal with the deviation between the expected value and the actual value. BES aggregators consider the risk cost brought by real-time deviations on the day before, thereby ensuring that the optimization results are risk-averse and providing the deviation risk cost C of the frequency regulation service. reg As shown below:
[0129]
[0130] ω regup =π regup ρ regup (1-ρ regup ) (6)
[0131]
[0132] ω regdn =π regdn ρ regdn (1-ρ regdn ) (8)
[0133]
[0134] The first part of the right side of equation (5) represents the deviation risk cost of providing up-regulation service, ω regup The conditional probability of deviation is shown in formula (6), which is the product of the probabilities of three independent events: 1) The probability that the upper frequency regulation service is accepted a day ago π regup ; 2) The probability of the frequency modulation service being called in real time ρ regup ; 3) The probability that the actual value being called is greater than the expected value (1-ρ regup ). It represents the expected deviation value of the frequency regulation service, which is the difference between the declared frequency regulation capacity and the expected value of real-time scheduling, as shown in formula (7). It should be noted that the BES aggregator declares the frequency regulation capacity on the day before. After that, the actual frequency increase capacity is between 0 and Since BES aggregators are risk-averse, the extreme case (actual call capacity equals the maximum value) is adopted. ) optimization results, effectively reducing the risk of real-time deviation.
[0135] Similarly, the second part of the right side of equation (5) represents the deviation risk cost of providing down-modulation, which is defined in the same way as the deviation risk cost of up-modulation service. The corresponding deviation probability ω regdn and deviation from expected value As shown in equations (8) and (9) respectively.
[0136] Provide the deviation risk cost C of FRP ra The risk cost of deviation from frequency regulation service C reg The definition of is similar, as shown in equations (10)-(14). regup (ω regup ) is the deviation probability of providing upward (downward) FRP, is the expected value of the upward (downward) FRP deviation at time t.
[0137]
[0138] ω raup =π raup ρ raup (1-ρ raup ) (11)
[0139]
[0140] ω radn =π radn ρ radn (1-ρ radn ) (13)
[0141]
[0142] In addition, BES aggregators are only agents of multiple BESs, not their real owners. Since the charging and discharging process will cause battery loss, BES aggregators need to pay BES owners a certain subsidy. Assuming that battery loss is only related to the number of battery charge and discharge times, and is not affected by the depth of charge and discharge, the battery loss subsidy C that BES aggregators need to pay is deg As shown in equations (15)-(16). b , m b and B.C. b They are the profit protection factor of BES b, battery construction cost, the slope of the battery life-cycle number approximate function and the battery capacity. These related parameters can be found in the battery manufacturer's manual. bThe subsidy intensity required by the owner of BES b is generally greater than 1. The higher the value, the more subsidies BES b will receive for each unit of service provided. However, it means higher economic costs for BES aggregators and will affect the optimization strategy of BES aggregators.
[0143]
[0144]
[0145] E b is the total energy exchanged between BES b and the power system during charging and discharging, and is composed of three parts according to the different products provided, as shown in formula (18). Indicates the energy change caused by calling the up (down) frequency modulation service. Indicates the energy change caused by calling upward (downward) FRP
[0146] S3-2: The overall setting of the objective function is as above, and the constraints related to the optimization model are as follows:
[0147] -Energy changes caused by calling frequency modulation services
[0148]
[0149]
[0150] Constraints (17) and (18) reflect the relationship between the BES energy change caused by the frequency regulation service in real-time scheduling and the frequency regulation capacity reported by the BES aggregator on the day before. The BES aggregator meets the frequency regulation requirements of the real-time system by optimizing the configuration of the multiple BESs it manages, and can provide both up- and down-frequency regulation services. The frequency regulation capacity reported by the BES aggregator on the day before When scheduling, the real-time call probability needs to be considered to avoid the problem of insufficient battery energy in real-time scheduling.
[0151] -Energy changes caused by calling FRP
[0152]
[0153]
[0154] Similar to the constraints for invoking frequency regulation services, constraints (19) and (20) reflect the relationship between the BES energy change caused by FRP in real-time scheduling and the FRP capacity declared by the BES aggregator on the day-ahead.
[0155] Battery state of charge limit
[0156]
[0157]
[0158]
[0159]
[0160]
[0161] Constraints (21)-(25) reflect the battery state of charge restrictions of each BES. Among them, constraint (21) reflects the relationship between the charging / discharging process and the battery state of charge of the BES, constraints (22) and (23) emphasize that the total energy change in real-time scheduling cannot exceed the available energy stored in the BES battery, constraint (24) stipulates the upper limit of the battery state of charge, and constraint (25) indicates that the state of charge of each BES after the optimization cycle ends should be equal to the initial value at the beginning of the optimization cycle to avoid unnecessary disputes.
[0162] - Rated power and ramp rate limits
[0163]
[0164]
[0165]
[0166]
[0167]
[0168] Constraints (26) and (27) reflect the charging and discharging power limits of the BES, where is the maximum charge and discharge power of BES b, 0 / 1 variable ζ t,b represents the availability of BES b in time period t (1 means it can provide service). Due to physical constraints, a single BES cannot be charged and discharged at the same time, so a 0 / 1 variable σ is introduced. t,b , σ t,b 1 indicates discharging, and 0 indicates charging, which correspond to constraints (26) and (27) respectively. Constraints (28) and (29) reflect the charging and discharging power regulation limits of BES. up / r dn is the adjustment rate. In practical problems, constraints (28) and (29) are usually not binding because, as a fast-response resource, BES has a response speed that is difficult to achieve with other flexible resources. Under special conditions, BES aggregators may also strategically declare their adjustment rates to obtain higher profits.
[0169] Constraints (30) specify all non-negative variables in the optimization model.
[0170] Further, in step S4, the comparison case is as follows:
[0171] (1) The training goal of the Bayesian neural network is to minimize the relative entropy of two probability distributions. First, the light intensity data, which has the most important impact on the photovoltaic output, and the wind speed data, which has the most important impact on the wind turbine output, are preprocessed. Then, the photovoltaic output, wind turbine output, and the load power at the corresponding time are input for prediction. The probability distribution of the net load can be obtained, and the specific fluctuation of the corresponding flexibility demand can be obtained.
[0172] (2) By setting the acceptance probability of FRP, the reserved capacity of energy storage for the six modes in the two methods is as follows. When the fixed FRP acceptance probability is 0.5, BES reserves 27MW of capacity for emdsg mode, 7.58MW of capacity for emchg mode, 324MW of capacity for regup mode, 126MW of capacity for regdn mode, 108MW of capacity for raup mode and 288MW of capacity for radn mode; when the acceptance probability of FRP is set according to the predicted value of flexibility, BES reserves 23.46MW of capacity for emdsg mode, 7.58MW of capacity for emchg mode, 252MW of capacity for regup mode, 108MW of capacity for regdn mode, 180MW of capacity for raup mode and 319.33MW of capacity for radn mode.
[0173] The energy changes caused by frequency regulation services and FRP provided by BES in different groups are compared. The results show that: 1) Since the unit charging and discharging cost of BES in group A is the highest, the products it provides have no economic advantages, so it is rarely used; 2) The unit charging and discharging cost of BES in group B is also high, and it is only used to provide a small amount of up / down frequency regulation services and upward FRP; 3) BES in groups C and D have good economic performance and are the main providers of various products, and are mostly used to provide upward frequency regulation services, because this gives BES aggregators the opportunity to obtain both day-ahead capacity benefits and real-time call benefits.
[0174] In order to enable those skilled in the art to better understand the present invention, this paper adopts two methods to estimate the probability of winning the bid of FRP before the deadline:
[0175] Method 1: Based on the current development of FRP, it can be reasonably analyzed that FRP will not be fully accepted a day ago, so the probability of winning the bid of FRP a day ago is taken as a fixed value of 0.5.
[0176] Method 2: The data of photovoltaic, wind turbine and actual load are predicted through Bayesian deep neural network to obtain the fluctuation of net load. Then, the net load curve is decomposed into different frequency bands according to the mathematical morphology algorithm to extract the upward and downward flexibility requirements under different fluctuation rates. According to the data of flexibility requirements, the probability of winning the bid of FRP in the first day is divided into three levels.
[0177] Then, a set of changing probability data is set as the day-ahead winning probability of FRP according to the flexibility demand situation in 24 hours a day.
[0178] Finally, each parameter is input into the optimization model, and the BES aggregator optimization model is run to obtain the optimization strategy and benefit-cost structure of the two sets of parameters participating in the flexibility regulation of the power system; then, a sensitivity analysis is conducted on the day-ahead acceptance probability of FRP to study its impact on the optimization strategy and total revenue of the BES aggregator. MATLAB is used to build the model, and the efficient solver CPLEX is called for solution.
[0179] According to these two different methods, case analysis is carried out respectively (see Method 1 for details) Figure 5 , Figure 6 , see Method 2 Figure 8 , Fig. 9 ).
[0180] By comparing the product quantity graphs provided by the two methods, it can be found that when the acceptance probability of FRP is set according to the flexibility demand of the day, the number of upward FRPs and downward FRPs provided by BES aggregators increases significantly, and correspondingly, the number of products providing upward and downward frequency regulation decreases significantly, indicating that in this case, BES aggregators are more accurate in allocating capacity.
[0181] By comparing the revenue composition of the two methods, it can be found that from the perspective of revenue, providing frequency regulation services is still the largest source of revenue for BES aggregators, but the revenue from providing frequency regulation has decreased significantly, while the revenue from providing FRP and energy services has increased significantly; correspondingly, from the perspective of cost composition, the deviation risk cost of providing frequency regulation services is still the highest, but the gap with the risk cost of providing FRP and energy services has been reduced to a very small difference. Under this method, BES aggregators further improve the flexibility regulation capability of the power system by increasing the number of FRP products, so that the power system can still maintain a high degree of flexibility when the penetration rate of new energy continues to increase.
[0182] It can be concluded that based on the net load data predicted by the Bayesian neural network, the flexibility demand is analyzed through multi-scale morphology. According to the specific situation of flexibility demand within a day, the method of reasonably setting the FRP acceptance probability can enable BES aggregators to better allocate their capacity resources and improve the regulation capacity of the power system.
[0183] In summary, this paper combines the Bayesian neural network prediction and multi-scale morphological methods to study the mechanism of battery energy storage providing FRP for the flexibility regulation of the power system. The Bayesian neural network prediction method is used to predict the net load of the power generation system, and the specific situation of the net load fluctuation within a day is obtained; then the input net load signal is multi-scale decomposed by the multi-scale morphological method, and the flexibility demand is analyzed according to the decomposed intermediate frequency signal; finally, an optimization model for BES aggregators to participate in the flexibility regulation of the power system is proposed. The proposed model takes into account the BES battery loss cost and the real-time scheduling deviation risk cost. The effectiveness of the proposed model is verified through example demonstration and parameter setting analysis.
[0184] In this specification, the schematic description of the present invention does not necessarily refer to the same embodiment or example, and those skilled in the art may combine and combine different embodiments or examples described in this specification. In addition, the contents described in the embodiments of this specification are merely an enumeration of the implementation forms of the inventive concept, and the protection scope of the present invention should not be considered as limited to the specific forms described in the implementation cases. The protection scope of the present invention also includes equivalent technical means that those skilled in the art can think of based on the inventive concept.
Claims
1. A method for improving power system flexibility based on energy storage capacity configuration, comprising the following steps: S1: The Bayesian deep neural network method is used to predict and estimate the net load of the power system. On this basis, the acceptance probability level of the flexible ramping product (FRP) is divided according to the predicted net load fluctuation; S2: Battery energy storage (BES) is selected as a new source of FRP, and a mode of BES participating in power system flexibility regulation is formulated according to the difference in BES charging and discharging characteristics; the mode of BES participating in power system flexibility regulation is as follows: S2-1: Depending on the different energy flows in the power system, energy storage batteries can participate in different modes of regulation to improve system flexibility. There are six modes for energy storage to participate in power system flexibility regulation. The following lists the physical behaviors, product types, revenue sources, and cost losses corresponding to each mode. When the energy storage battery is in the discharge state, there are three modes: In the emdsg (discharge in energy market) mode, the BES provides active power to the power system through discharge. The BES can obtain electricity sales revenue in the day ahead, but the charging process will cause battery loss; In the regup (upward regulation) mode, BES provides the system with upward frequency regulation services, which can obtain two parts of benefits. One is the capacity benefit obtained a day ago, which is related to the BES's bid-winning capacity and the upward frequency regulation clearing price. The other is that if the ISO calls the upward frequency regulation service in real-time scheduling, it is equivalent to BES providing energy to the power system through discharge. This part of the benefit is calculated according to the real-time clearing price of energy. At the same time, calling the upward frequency regulation service will cause battery loss to BES. In the raup (upward FRP) mode, BES provides the system with upward FRP. The benefits and costs obtained are similar to those in the regup mode. The difference is that the regup mode provides frequency regulation capacity benefits, while the raup mode provides FRP capacity benefits. When the energy storage battery is in the charging state, there are also three modes: In the regdn (downward regulation) mode, BES provides downward frequency regulation services. Unlike upward frequency regulation, BES can only obtain day-ahead capacity benefits by providing downward frequency regulation services. This is because if the ISO calls the downward frequency regulation service in real-time scheduling, it is equivalent to BES obtaining energy from the power system. This energy can be used for forward arbitrage, so it is impossible to obtain repeated subsidies from the ISO. Similarly, the discharge process will also cause battery loss; in the radn (downward FRP) mode, BES provides the system with downward FRP, and the benefits and costs obtained are similar to those in the regdn mode; In the emchg (charge in energy market) mode, BES obtains energy from the power system. In addition to the battery loss caused by the charging process, BES also needs to pay energy fees, and BES cannot obtain any income in this mode. However, the emchg mode is important for maintaining the state-of-charge (SOC) of the BES, and the energy stored by charging can be used for regulating the flexibility of the long-term power system; S3: Analyze the optimization strategy of BES aggregators participating in the flexibility regulation of the power system, and propose a battery energy storage capacity optimization configuration model; the battery energy storage capacity optimization configuration model is a power system flexibility regulation optimization model with the goal of maximizing total benefits, specifically including: S3-1: Introducing the impact of FRP on the objective function and constraints, the BES capacity configuration optimization model is established; the goal of the BES aggregator is to maximize the profit, as shown in formula (1): max{R en +R reg +R ra -C reg -C ra -C deg }(1)Where: R en , R reg and R ra They are respectively the income from providing energy, frequency regulation services and FRP; C reg and C ra are the deviation risk costs of providing frequency regulation services and providing FRP in real-time scheduling; C deg is the battery depletion subsidy paid to BES; The benefits of providing energy are shown in formula (2): Where: Δt is the day-ahead clearing time, is the electricity price in time period t the day before, is the discharge efficiency of BESb, and are the discharging (analogous to the generator set) and charging (analogous to the power load) power of BESb in period t respectively; The benefits of providing frequency regulation services include the capacity benefits of day-ahead planning and the additional call benefits obtained from real-time scheduling, as shown in formula (3): Where: is the capacity price of the day-ahead up / down frequency regulation service, The capacity of up / down frequency modulation services declared by the BES aggregator; regup (π regdn ) is the probability of the up (down) frequency modulation service being accepted the day before. From the previous strategy analysis, we know that the frequency modulation capacity reported by the BES aggregator is fully accepted by the ISO, so π regup =π regdn =1;ρ regup is the probability that the up-modulation is called in real time, is the electricity price in real time period t; Similarly, the benefit of providing FRP is shown in formula (4): Where: β is the price threshold of the demand curve set by ISO, The number of upward (downward) FRPs declared by the BES aggregator; π raup (π radn ) is the probability that the upward (downward) FRP is accepted on the previous day, ρ raup is the probability of the upward FRP being called in real time; The first part of the right side of equation (4) represents the capacity benefit obtained by BES providing FRP on the day before. Unlike the frequency regulation service that is fully accepted on the day before, the number and probability of FRP being accepted on the day before is related to the level of system regulation capacity required on the day before, so the situation on different operating days is not consistent. The second part represents the additional call benefit obtained by the FRP accepted on the day before in real time. The probability ρ of the BES aggregator being called to provide FRP raup Closely related to the real-time operating status of the system; In real-time dispatch, the range of frequency regulation service calls made by ISO to BES aggregators is between zero and the capacity accepted on the day before. BES aggregators run the optimization model based on the predicted probability value, and the optimization results obtained may not completely conform to the actual situation. Therefore, BES aggregators need to consider the situation where the real-time dispatch value of frequency regulation service is greater than the expected value. In this case, it is assumed that BES aggregators purchase energy at the real-time electricity price to deal with the deviation between the expected value and the actual value. BES aggregators consider the risk cost brought by the real-time deviation on the day before, so as to ensure that the optimization result is risk-averse and provide the deviation risk cost C of frequency regulation service. reg As shown below: oh regup =π regup r regup (1-p regup ) (6) oh regdn =π regdn r regdn (1-p regdn ) (8) The first part of the right side of equation (5) represents the deviation risk cost of providing up-regulation service, ω regup The conditional probability of deviation is shown in formula (6), which is the product of the probabilities of three independent events: 1) The probability that the upper frequency regulation service is accepted a day ago π regup ; 2) The probability of the frequency modulation service being called in real time ρ regup ; 3) The probability that the actual value being called is greater than the expected value (1-ρ regup ); represents the expected deviation value of the frequency regulation service, which is the difference between the declared frequency regulation capacity and the expected value of real-time scheduling, as shown in formula (7); it should be noted that the BES aggregator declares the frequency regulation capacity on the day before. After that, the actual frequency increase capacity is between 0 and Since BES aggregators are risk-averse, the extreme case (actual call capacity equals the maximum value) is adopted. ) optimization results, effectively reducing the risk of real-time deviation; Similarly, the second part of the right side of equation (5) represents the deviation risk cost of providing down-modulation, which is defined in the same way as the deviation risk cost of up-modulation service. The corresponding deviation probability ω regdn and deviation from expected value As shown in formula (8) and (9) respectively; Provide the deviation risk cost C of FRP ra The risk cost of deviation from frequency regulation service C reg The definition of is similar, as shown in equations (10)-(14); where ω regup (ω regup ) is the deviation probability of providing upward (downward) FRP, is the expected value of the deviation of the upward (downward) FRP at time t; oh raup =π raup r raup (1-p raup ) (11) oh radn =π radn r radn (1-p radn ) (13) In addition, BES aggregators are only agents of multiple BESs, not their real owners. Since the charging and discharging process will cause battery loss, BES aggregators need to pay BES owners a certain subsidy. Assuming that battery loss is only related to the number of battery charge and discharge times, and is not affected by the depth of charge and discharge, the battery loss subsidy C that BES aggregators need to pay is deg As shown in equations (15)-(16); where ψ b , m b and B.C. b They are the profit guarantee factor of BESb, battery construction cost, the slope of the battery life-cycle number approximate function and the battery capacity; the profit guarantee factor ψ b The subsidy intensity required by the owner of BESb. The higher the value, the more subsidies BESb will receive for each unit of service it provides. However, it means higher economic costs for BES aggregators and will affect their optimization strategies. E b is the total energy exchanged between BESb and the power system during charging and discharging. It consists of three parts according to the different products provided, as shown in formula (18); Indicates the energy change caused by calling the up (down) frequency modulation service. represents the energy change caused by invoking upward (downward) FRP; S3-2: The overall setting of the objective function is as above, and the constraints related to the optimization model are as follows: Energy changes caused by calling frequency modulation services Constraints (17) and (18) reflect the relationship between the BES energy change caused by the frequency regulation service in real-time scheduling and the frequency regulation capacity reported by the BES aggregator on the day before. The BES aggregator meets the frequency regulation requirements of the real-time system by optimizing the configuration of multiple BESs it manages, and can provide both up- and down-frequency regulation services. The frequency regulation capacity reported by the BES aggregator on the day before When scheduling, the real-time call probability needs to be considered to avoid the problem of insufficient battery energy in real-time scheduling; Energy changes caused by calling FRP: Similar to the constraints for invoking frequency regulation services, constraints (19) and (20) reflect the relationship between the BES energy changes caused by FRP in real-time scheduling and the FRP capacity declared by the BES aggregator on the day-ahead; Battery state of charge limits: Constraints (21)-(25) reflect the battery state of charge restrictions of each BES; among them, constraint (21) reflects the relationship between the charging / discharging process and the battery state of charge of the BES, constraints (22) and (23) emphasize that the total energy change in real-time scheduling cannot exceed the available energy stored in the BES battery, constraint (24) stipulates the upper limit of the battery state of charge, and constraint (25) indicates that the state of charge of each BES after the optimization cycle ends should be equal to the initial value at the beginning of the optimization cycle to avoid unnecessary disputes; Rated power and ramp rate limits Constraints (26) and (27) reflect the charging and discharging power limits of the BES, where p b max is the maximum charge and discharge power of BESb, 0 / 1 variable ζ t,b represents the availability of BESb in time period t (1 means it can provide service); a single BES is restricted by physical conditions and cannot be charged and discharged at the same time, so a 0 / 1 variable σ is introduced t,b , σ t,b 1 indicates discharging, and 0 indicates charging, corresponding to constraints (26) and (27), respectively. Constraints (28) and (29) reflect the charging and discharging power regulation limits of BES. up / r dn To adjust the rate; Constraints (30) specify all non-negative variables in the optimization model; S4: Taking a 24-hour day as a cycle, according to the predicted flexibility demand distribution, the established model is used to call the Cplex algorithm package on Matlab equipped with the Yalmip optimization toolbox for optimization solution.
2. A method for improving the flexibility of a power system based on energy storage capacity configuration as claimed in claim 1, wherein in step S1, using a Bayesian deep neural network method to predict and estimate the net load of the power system specifically comprises: S1-1: The net load of the power system is predicted and estimated through a Bayesian deep neural network. The net load fluctuation of one day is randomly selected from the net load data of one year obtained through neural network training, and the waveform is decomposed through multi-scale morphology to obtain a 24-hour flexibility demand image. Through the analysis of the flexibility demand effect diagram, the flexibility demand is divided into three levels, and each level corresponds to an acceptance probability of FRP. S1-2: As the upward / downward flexibility demand increases, the system's regulation capability requirements also gradually increase, so the probability of the FRP provided by BES being accepted in the power system also gradually increases; and the maximum probability of FRP winning the bid is set to 0.9 based on empirical data.
3. A method for improving the flexibility of a power system based on energy storage capacity configuration as claimed in claim 2, wherein in step S4, using the built model to call the Cplex algorithm package on Matlab equipped with the Yalmip optimization toolbox for optimization and solution specifically includes: S4-1: Building a solution tool; The program was programmed in the MATLAB R2016a software platform equipped with the YALMIP optimization toolbox, and the efficient solver CPLEX was called to perform optimization calculations. The optimization calculations were performed on a PC equipped with an Intel(R) Core(TM) i5-7200U CPU@2.50GHz processor and 8GB RAM, and the software environment was the Windows 10 operating system. S4-2: Set optimization plans and indicators; In order to clearly compare the effectiveness of the optimization model built in this paper on improving the flexibility of the power system, two schemes are set for comparative observation: (1) the acceptance probability of FRP is set to a fixed value of 0.5; (2) a set of probability data that changes with demand is set as the acceptance probability of FRP according to the fluctuation of flexibility demand within a day; Based on the quantitative analysis indicators considered, the capacity reserved by BES for the six services and the revenue structure of BES aggregators under the two schemes are analyzed: (1) the capacity reserved by BES for the emdsg mode; (2) the capacity reserved by BES for the emchg mode; (3) the capacity reserved by BES for the regup mode; (4) the capacity reserved by BES for the regdn mode; (5) the capacity reserved by BES for the raup mode; (6) the capacity reserved by BES for the radn mode; and (7) the revenue composition of BES aggregators.