A method for measuring the gas leakage in the main control room of a nuclear power plant using a constant concentration method

By injecting tracer gas into the multi-region space of the nuclear power plant main control room and monitoring the concentration in real time, using the constant concentration method to measure the method, the problem of leakage detection in multi-region space in the existing technology is solved, and gases in the main control room of the nuclear power plant are realized The precise measurement of internal leakage ensures the safety of the operator.

CN114838879BActive Publication Date: 2024-11-15CHINA INST FOR RADIATION PROTECTION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210299573.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-25
Publication Date
2024-11-15
Estimated Expiration
2042-03-25

AI Technical Summary

Technical Problem

The prior art lacks efficient methods when measuring the gas leakage in the main control room of nuclear power plants, especially in the detection of multi-region spaces. The constant concentration method technology is rarely used, making it difficult to meet the accurate measurement requirements under the actual operating conditions of nuclear power plants. .

Method used

The constant concentration method is used to measure the measurement method, by injecting tracer gas into the single area space of the main control room of the nuclear power plant, and using a gas analyzer to monitor the concentration in real time, maintaining the tracer concentration within the set range through the control system, and calculating the gas leakage in the gas The mass conservation formula is used to determine the air exchange volume in multiple regions.

Benefits of technology

It realizes accurate and efficient measurement of gas leakage in multiple areas of the main control room of the nuclear power plant, ensures the effectiveness of the evaluation of the habitability of the main control room, and ensures the safety of operators in the accident situation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114838879B_ABST
    Figure CN114838879B_ABST
Patent Text Reader

Abstract

The present invention relates to a method for measuring the amount of gas leakage in the main control room of a nuclear power plant by a constant concentration method, belonging to the technical field of nuclear safety and civil safety, and the method comprises the following steps: S1, injecting tracer gas into each single area according to the volume of the main control room of the nuclear power plant and the target concentration of the tracer; S2, sampling and concentration measurement of the tracer gas in each single area, and continuous cycle analysis until the tracer concentration in each single area space reaches a constant; S3, dynamically replenishing the tracer gas into each single area space according to the difference between the tracer concentration value of each single area and the target concentration value, so as to achieve the stability of the tracer concentration in each single area and within the set fluctuation range; S4, calculating the amount of gas leakage in the main control room of a multi-space nuclear power plant according to the supplementary tracer flow value, the air supply flow of the main control room and the tracer concentration value of each single area. The present invention can accurately and efficiently realize the measurement of the amount of leakage of the multi-area main control room without filtered air entering, and then effectively evaluate the habitability of the main control room.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of nuclear safety and civil safety, and specifically is a method for measuring the internal leakage of gas in a main control room of a nuclear power plant by using a constant concentration method. Background Art

[0002] The main control room of a nuclear power plant is a key location for the operation and control of a nuclear power plant. It is extremely important to ensure the habitability of the main control room under accident conditions. A key parameter for determining the habitability of the main control room is the measurement of the unfiltered air leakage. The measurement of the unfiltered air leakage in the main control room is performed to ensure that the staff in the main control room will not be exposed to radiation and chemical poisons that exceed the design standards under accident conditions.

[0003] To measure the internal leakage of unfiltered air, it is necessary to inject tracer gas into the test space to be tested, and then use the law of conservation of mass to calculate the internal leakage of the main control room based on the change behavior of the tracer gas concentration or total mass. The leakage measurement in the main control room usually adopts three tracer gas measurement methods: concentration decay method, constant injection method and constant concentration method. Compared with the three test methods, the concentration decay method is more suitable for confined spaces with only air circulation, the constant flow method is more suitable for confined spaces with pressurized air supply, and the constant concentration method is more suitable for complex geometric spaces. Among them, the constant flow method and the constant concentration method can test the working conditions where the ventilation volume changes with time under unstable conditions. They have a wider range of applications and are closer to the actual operating conditions of the main control room of a nuclear power plant. Compared with the constant concentration method, the constant flow method requires fewer instruments and control equipment, and the test time is shorter. However, like the concentration decay method, the ASTM E741-11 standard recommends that the test range is the internal leakage of a single area space. In terms of multi-area detection, ASTM E741-11 recommends the constant concentration method.

[0004] At present, the domestic main control room leakage measurement technology mostly adopts the constant flow method, and the constant concentration method is rarely used. Summary of the invention

[0005] In order to solve the defects of the prior art, the purpose of the present invention is to provide a method for measuring the internal leakage of gas in the main control room of a nuclear power plant using a constant concentration method. This method can accurately and efficiently realize the internal leakage measurement of multi-zone main control rooms without filtered air entering, and then the habitability of the main control room can be effectively evaluated to ensure that the main control room operators do not lose the ability to control the reactor under accident conditions.

[0006] In order to achieve the above purpose, a technical solution adopted by the present invention is:

[0007] A method for measuring the amount of gas leakage in a main control room of a nuclear power plant by a constant concentration method, the method using a device for measuring the amount of gas leakage in a main control room of a nuclear power plant, the device comprising an injection system, a sampling system, a sample preparation system, an analysis system and a control system;

[0008] The main control room of the nuclear power plant comprises a plurality of single-area spaces physically isolated from each other, each of which is connected to an external ventilation system, and each of which is provided with a tracer injection port and a tracer sampling port; the injection system is connected to the tracer injection port of each single-area space of the main control room of the nuclear power plant, and injects tracer gas into each single-area space at a set flow rate according to a logic control program of the control system; the sampling system is connected to the tracer sampling port of each single-area space of the main control room of the nuclear power plant, and extracts tracer gas from each single-area space at a set flow rate according to a logic control program of the control system and provides it to the sample preparation system; the sample preparation system is connected to the analysis system, and is used to provide the analysis system with a tracer gas sample of stable pressure, flow rate and precise volume; the analysis system comprises a gas analyzer, and is used to accurately measure the concentration of the tracer gas extracted from each single-area space of the main control room of the nuclear power plant, and realize real-time online analysis; the tracer concentration in each single-area space is dynamically adjusted to maintain stability through the logic control program of the control system;

[0009] The method comprises the following steps:

[0010] S1. According to the volume of the main control room of the nuclear power plant and the target concentration of the tracer, the injection system is turned on to inject a set flow rate of tracer gas into each single area space of the main control room of the nuclear power plant;

[0011] S2, sampling and concentration measurement of the tracer gas in each single area space of the main control room of the nuclear power plant through the sampling system and the analysis system, and continuously analyzing the change of the tracer gas concentration over time until the tracer concentration in each single area space remains within the set fluctuation range;

[0012] S3, according to the difference between the tracer concentration value of each single-region space and the target concentration value or the highest concentration in all single-region spaces, the injection system is controlled by the logic control program of the control system to dynamically replenish appropriate tracer gas into each single-region space of the main control room of the nuclear power plant, so as to achieve the stability of the tracer concentration in each single-region space and keep it within the set fluctuation range;

[0013] S4, according to the supplementary tracer flow value Q calculated in real time by the control system i , the air flow rate Q of the main control room of the nuclear power plant d And the tracer concentration value C of each single area space, the gas leakage in the main control room of the multi-space nuclear power plant is calculated, and the calculation formula is:

[0014] Qi =QQ d

[0015] in:

[0016] Q i The internal leakage of the habitable area of ​​the main control room, in m 3 / h;

[0017] Q d is the air volume of the ventilation system in the habitable area of ​​the main control room under the test conditions, in m 3 / h;

[0018] Q is the ventilation volume of the habitable area of ​​the main control room, in m 3 / h.

[0019] Further, the method for measuring the gas leakage in the main control room of a nuclear power plant by using the constant concentration method as described above,

[0020] When the tracer gas sampling concentration C(t) in each single area is equal to the target concentration C t When the deviation of ' is less than 10%, the calculation formula of average ventilation flow is:

[0021]

[0022] in:

[0023] is the average ventilation volume, in m3 / h;

[0024] t is time, unit is h;

[0025] Q in (t,i) is the amount of tracer gas injected, in m 3 / h;

[0026] C in Injection concentration for tracer gas;

[0027] N is the number of single-region spaces;

[0028] When the tracer gas sampling concentration C(t) in each single area is equal to the target concentration C t When the deviation of ' is less than 2%, the calculation formula of instantaneous ventilation volume is:

[0029]

[0030] in:

[0031] Q in (t,i) is the amount of tracer gas injected, in m 3 / h;

[0032] C t' is the target concentration of tracer gas.

[0033] Furthermore, in the method for measuring the amount of gas leakage in the main control room of a nuclear power plant by using the constant concentration method as described above, the injection system comprises a tracer high-pressure gas source for providing a tracer gas of set concentration, a flow control device, a first flow path switching valve and a grid injection unit (14) connected in sequence according to a gas path, wherein the grid injection unit is a plurality of groups of tracer gas injection pipe networks with manifolds, and the tracer gas is transported to a representative position of a corresponding single-region space through each group of pipe networks.

[0034] Furthermore, in the method for measuring the amount of gas leakage in the main control room of a nuclear power plant using the constant concentration method as described above, the sampling system includes a gridded sampling circuit, a second flow path switching valve and a gas sampling pump connected in sequence according to the gas path, and the gridded sampling circuit is a plurality of groups of tracer gas sampling pipe networks with manifolds, and tracer gas at a representative position in the corresponding single-area space is obtained through each group of pipe networks.

[0035] Furthermore, in the method of measuring the gas leakage in the main control room of a nuclear power plant by the constant concentration method as described above, each single-area space is provided with a fan or other equipment that can quickly mix the airflow in the area to achieve uniform distribution.

[0036] Furthermore, in the method for measuring the amount of gas leakage in the main control room of a nuclear power plant using the constant concentration method as described above, the sample preparation system includes a sample chamber and a quantitative sampling ring, the gas inlet of the sample chamber is connected to the gas sampling pump, and the gas outlet of the quantitative sampling ring is connected to the gas analyzer in the analysis system, and a tracer gas sample with stable pressure and flow is provided to the analysis system through the sample chamber; and a tracer gas sample with a precise volume is provided to the analysis system through the quantitative sampling ring.

[0037] Furthermore, in the method for measuring the amount of gas leakage in the main control room of a nuclear power plant using the constant concentration method as described above, a third flow path switching valve is arranged between the sample chamber and the gas sampling pump, and a first gas outlet of the third flow path switching valve is connected to the sample chamber, and a second gas outlet thereof is connected to the main control room of the nuclear power plant via a first reinjection loop.

[0038] Furthermore, in the method for measuring the internal leakage of gas in the main control room of a nuclear power plant using the constant concentration method as described above, a fourth flow path switching valve is arranged between the quantitative injection loop and the gas analyzer, and the first gas outlet of the fourth flow path switching valve is connected to the gas analyzer, and the second gas outlet thereof is connected to the main control room of the nuclear power plant via a second reinjection loop.

[0039] Furthermore, in the method for measuring the gas leakage in the main control room of a nuclear power plant by using the constant concentration method as described above, the sample chamber has pressure regulation and a self-contained gas cleaning function, or is a cavity structure that does not adsorb tracer gas.

[0040] Furthermore, in the method for measuring the internal leakage of gas in the main control room of a nuclear power plant by using the constant concentration method as described above, the gas analyzer is a gas chromatograph containing a specific filling column.

[0041] The method for measuring the internal leakage of gas in the main control room of a nuclear power plant by using the constant concentration method of the present invention has the following significant technical effects:

[0042] The present invention is aimed at a reactor type with a main control room of multiple space areas in a nuclear power plant. By delivering a tracer gas with a measured flow rate and a known concentration to each area, the tracer gas concentration of the space is maintained constant, and then the air exchange volume of the space can be calculated using the mass conservation formula, thereby realizing the measurement of the total air exchange volume of the multi-area space; after the total exchange volume is measured, the filtered and purified air volume measured separately is subtracted to obtain the non-filtered purified air volume that has a greater impact on the safety of the main control room personnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 A schematic diagram of the structure of a device for measuring the amount of gas leakage in a main control room of a nuclear power plant using a constant concentration method provided in an embodiment of the present invention;

[0044] Figure 2 A flow chart of a method for measuring the amount of gas leakage in a main control room of a nuclear power plant using a constant concentration method provided in an embodiment of the present invention;

[0045] Figure 1 In: 1-injection system, 2-sampling system, 3-sample preparation system, 4-analysis system, 5-control system, 6-nuclear power plant main control room, 11-tracer high-pressure gas source, 12-flow control equipment, 13-first flow path switching valve, 14-grid injection unit, 21-grid sampling loop, 22-second flow path switching valve, 23-gas sampling pump, 31-third flow path switching valve, 32-sample chamber, 33-quantitative injection loop, 34-fourth flow path switching valve, 35-first reinjection loop, 36-second reinjection loop, 61~65-single area space of the main control room. DETAILED DESCRIPTION

[0046] The present invention is further described below in conjunction with specific embodiments and the accompanying drawings.

[0047] Figure 1The schematic diagram of the structure of a device for measuring the gas leakage in the main control room of a nuclear power plant by a constant concentration method provided by an embodiment of the present invention is shown. The device mainly includes an injection system 1, a sampling system 2, a sample preparation system 3, an analysis system 4 and a control system 5 according to functions. The main control room of the nuclear power plant includes a plurality of single-area spaces physically isolated from each other, each of which is connected to an external ventilation system, and each of which is provided with a tracer injection port and a tracer sampling port. The injection system 1 injects tracer gas into each single-area space of the main control room 6 of the nuclear power plant through the tracer injection port, and the sampling system 2 samples the tracer gas from each single-area space of the main control room 6 of the nuclear power plant through the tracer sampling port, and then provides the analysis system 4 with tracer gas of stable pressure and flow through the sample preparation system 3. The control system 5 realizes the mutual coordination among the injection system 1, the sampling system 2, the sample preparation system 3 and the analysis system 4, and the dynamic adjustment of the tracer concentration in each single-area space to maintain stability.

[0048] The injection system 1 mainly includes a tracer high-pressure gas source 11, a flow control device 12 and a grid injection unit 14 connected in sequence according to a gas path, and the grid injection unit 14 is correspondingly connected to the tracer injection port of each single-area space of the nuclear power plant main control room 6. The injection system 1 injects tracer gas continuously or within a set time period into the representative position of each single-area space of the main control room in a set flow rate or a dynamically adjusted flow rate according to the logic control program of the control system 5.

[0049] The tracer injection bottle 11 is a high-pressure gas cylinder or other high-pressure gas source carrier, which is used to provide tracer gas of a certain concentration. The flow control device 12 is a gas flow meter or other flow control device with signal control, which can match the corresponding number of flow control devices 12 according to the number of single-area spaces in the main control room, and inject the set flow of tracer gas into the corresponding main control area through the flow control device 12; or all flow paths share one flow control device 12, and a first flow path switching valve 13 is set between the flow control device 12 and the grid injection unit 14, and the tracer gas is injected into the single-area space of the main control room of the corresponding flow path at the set flow rate within a certain time period in a sequential cycle manner through the first flow path switching valve 13. The grid injection unit 14 is a plurality of groups of tracer gas injection pipe networks with manifolds, and each group of pipe networks transports the tracer gas to the representative position of the corresponding single-area space of the main control room. A certain number of fans or other devices that can quickly mix the airflow in the area are configured in each single-area space of the main control room of the nuclear power plant, and the tracer gas is quickly diffused in each single area through the fans in the area to achieve uniform distribution of tracer concentration in the entire single area. The material of the gridded injection unit 14 is glass, stainless steel, polypropylene, polyethylene, nylon or other pipelines to which the tracer gas is not easily attached or pipelines with inner coatings.

[0050] The sampling system 2 mainly includes a gas sampling pump 23 and a grid sampling circuit 21 connected in sequence according to the gas path, and also includes attached gas flow blocking components or check components, sampling arrangement brackets, etc. The grid sampling circuit 21 is connected to the tracer sampling ports located in each single area space of the nuclear power plant main control room 6. The sampling system 2 extracts tracer gas from the representative position of each single area space of the main control room continuously or within a set time period in a set flow rate and provides it to the sample preparation system 3 according to the logic control program of the control system 5.

[0051] The grid sampling loop 21 is a plurality of groups of tracer gas sampling pipe networks with manifolds, through which the tracer gas at the representative position in the single-area space corresponding to the main control room can be obtained. The material of the grid sampling loop 21 is consistent with the grid injection unit 14. The gas sampling pump 23 can set the sampling flow rate and sampling pressure. The same number of gas sampling pumps 23 can be set according to the number of single-area spaces in the main control room, and each gas sampling pump 23 is connected to each flow path of the grid sampling loop 21 in a one-to-one correspondence; or all flow paths share one gas sampling pump 23, and a second flow path switching valve 22 is set between the gas sampling pump 23 and the grid sampling loop 21. The tracer gas of a single-area space is transported to the sample preparation system 3 in a sequential cycle according to the set requirements through the second flow path switching valve 22.

[0052] The gridded sampling loops 21 distributed in each single area space can sample simultaneously or individually according to the set requirements under the cooperation of the second flow path switching valve 22 and the gas sampling pump 23. At the same time, the loop gas that does not enter the sample chamber 32 during sampling returns to the original sampling space by reinjection.

[0053] The sample preparation system 3 includes a third flow path switching valve 31, a sample chamber 32, a quantitative injection loop 33 and a fourth flow path switching valve 34 which are connected in sequence according to the gas path. The air inlet of the third flow path switching valve 31 is connected to the gas sampling pump 23 of the sampling system 2, the first air outlet of the third flow path switching valve 31 is connected to the sample chamber 32, and its second air outlet is connected to the first reinjection loop 35, and the other end of the first reinjection loop 32 is connected to the main control room 6 of the nuclear power plant; the first air outlet of the second flow path switching valve 35 is connected to the gas analyzer in the analysis system 4, and its second air outlet is connected to the second reinjection loop 36, and the other end of the second reinjection loop 36 is connected to the main control room 6 of the nuclear power plant.

[0054] The third flow path switching valve 31 can deliver the tracer gas in the grid sampling loop 21 to the sample chamber 32 through valve switching, or cooperate with the first reinjection loop 35 to reinject the gas into the sampling space corresponding to the main control room 6 of the nuclear power plant. The sample chamber 32 is used to provide a tracer gas sample with stable pressure and flow to the quantitative injection loop 33 and the analysis system 4; the sample chamber 32 can be a cavity structure that does not adsorb tracer gas, or a device with pressure adjustment and self-contained gas cleaning function. The quantitative injection loop 33 is used to provide the analysis system 4 with a precise volume of tracer gas sample. The fourth flow path switching valve 34 can deliver the gas sample in the quantitative injection loop 33 to the gas analyzer in the analysis system 2 through valve switching, or when the gas analyzer analyzes the sample gas, the third flow path switching valve 31 and the fourth flow path switching valve 34 cooperate to continuously pass the next analysis gas through the quantitative injection loop 33 and reinject the gas into the main control room to achieve the purpose of cleaning the quantitative injection loop 33.

[0055] The analysis system 4 includes a gas analyzer, which is a gas chromatograph containing a specific filling column or other analytical instrument or sensor capable of accurately measuring tracers. Through the cooperation of the sample preparation system 3, sample analysis and measurement can be continuously performed to achieve the purpose of online real-time analysis.

[0056] The control system 5 mainly includes hardware equipment such as computers, multi-channel relays, PID adjustment modules, and automatic control programs. The automatic control program realizes the mutual coordination between the injection system 1, the sampling system 2, the sample preparation system 3, and the analysis system 4, as well as the dynamic adjustment of the tracer concentration in each single-area space to maintain stability. The automatic control program of the control system 5 measures the tracer gas concentration at the representative position of each single-area space through the gas analyzer and controls the grid injection unit 14 to inject an appropriate amount of tracer gas into each single-area space in the habitable area of ​​the main control room, and maintains the tracer gas in the habitable area of ​​the main control room within a fixed concentration value range through dynamic adjustment.

[0057] Based on the above experimental device, the present invention provides a method for measuring the gas leakage in the main control room of a nuclear power plant by using a constant concentration method. Figure 2 The method comprises the following steps:

[0058] S1. According to the volume of the main control room of the nuclear power plant and the target concentration of the tracer, the injection system is turned on to inject the set flow rate of tracer gas into each single area space of the main control room of the nuclear power plant.

[0059] In this embodiment, the main control room of the nuclear power plant includes five single-area spaces ( Figure 1 In the normal air supply circuit of the main control room of the nuclear power plant, an appropriate amount of sulfur hexafluoride tracer gas is injected at a set flow rate.

[0060] S2. Sampling and concentration measurement of tracer gas in each single area space of the main control room of the nuclear power plant through the sampling system and the analysis system, and continuously analyzing the change of tracer gas concentration over time until the tracer concentration in each single area space remains within the set fluctuation range.

[0061] S3. According to the difference between the tracer concentration value of each single-region space and the target concentration value or the highest concentration in all single-region spaces, the injection system is controlled by the logic control program of the control system to dynamically replenish appropriate tracer gas into each single-region space in the main control room of the nuclear power plant, so as to achieve the stability of the tracer concentration in each single-region space and keep it within the set fluctuation range.

[0062] S4, according to the supplementary tracer flow value Q calculated in real time by the control system i , the air flow rate Q of the main control room of the nuclear power plant d And the tracer concentration value C of each single area space, the gas leakage in the main control room of the multi-space nuclear power plant is calculated, and the calculation formula is:

[0063] Q i =QQ d

[0064] in:

[0065] Q i The internal leakage of the habitable area of ​​the main control room, in m 3 / h;

[0066] Q d is the air volume of the ventilation system in the habitable area of ​​the main control room under the test conditions, in m 3 / h;

[0067] Q is the ventilation volume of the habitable area of ​​the main control room, in m 3 / h.

[0068] When the tracer gas sampling concentration C(t) in each single area is equal to the target concentration C t When the deviation of ' is less than 10%, the calculation formula of average ventilation flow is:

[0069]

[0070] in:

[0071] is the average ventilation volume, in m3 / h;

[0072] t is time, unit is h;

[0073] Q in (t,i) is the amount of tracer gas injected, in m 3 / h;

[0074] C in Injection concentration for tracer gas;

[0075] N is the number of single-region spaces;

[0076] When the tracer gas sampling concentration C(t) in each single area is equal to the target concentration C t When the deviation of ' is less than 2%, the calculation formula of instantaneous ventilation volume is:

[0077]

[0078] in:

[0079] Q in (t,i) is the amount of tracer gas injected, in m 3 / h;

[0080] C t ' is the target concentration of tracer gas.

[0081] The present invention provides a method for measuring the gas internal leakage of a main control room of a nuclear power plant by using a constant concentration method. For a reactor type with a main control room of multiple space areas in a nuclear power plant, by delivering a tracer gas with a measured flow rate and a known concentration to each area, the tracer gas concentration of the space is maintained constant, and then the air exchange volume of the space can be calculated using the mass conservation formula, thereby realizing the measurement of the total air exchange volume of the multi-region space; after the total exchange volume is measured, the filtered and purified air volume measured separately is subtracted to obtain the non-filtered purified air volume that has a greater impact on the safety of the main control room personnel.

[0082] The above embodiments are merely illustrative of the present invention, and the present invention may also be implemented in other specific ways or other specific forms without departing from the gist or essential features of the present invention. Therefore, the described embodiments should be considered illustrative rather than restrictive in any respect. The scope of the present invention should be described by the appended claims, and any changes equivalent to the intent and scope of the claims should also be included within the scope of the present invention.

Claims

1. A method for measuring the amount of gas leakage in a main control room of a nuclear power plant by a constant concentration method, the method using a device for measuring the amount of gas leakage in a main control room of a nuclear power plant, the device comprising an injection system (1), a sampling system (2), a sample preparation system (3), an analysis system (4) and a control system (5); The nuclear power plant main control room comprises a plurality of single-area spaces that are physically isolated from each other, each of which is connected to an external ventilation system, and each of which is provided with a tracer injection port and a tracer sampling port; the injection system (1) is connected to the tracer injection port of each single-area space in the nuclear power plant main control room, and injects tracer gas into each single-area space at a set flow rate according to the logic control program of the control system (5); the sampling system (2) is connected to the tracer sampling port of each single-area space in the nuclear power plant main control room, and injects tracer gas into each single-area space according to the set flow rate according to the logic control program of the control system (5); The control program extracts tracer gas from each single-region space at a set flow rate and provides it to the sample preparation system (3). The sampling system (2) comprises a gridded sampling circuit (21), a second flow path switching valve (22) and a gas sampling pump (23) which are sequentially connected according to a gas path. The sample preparation system (3) is connected to the analysis system (4) to provide the analysis system (4) with a tracer gas sample with a stable pressure, flow rate and precise volume. The sample preparation system (3) comprises a sample chamber (32) and a quantitative injection loop (33). The sample chamber ( The sample chamber (32) has a pressure regulating function and a self-contained gas cleaning function, or is a hollow structure that does not absorb tracer gas. The gas inlet of the sample chamber (32) is connected to the gas sampling pump (23), and the gas outlet of the quantitative injection loop (33) is connected to the gas analyzer in the analysis system (4). The sample chamber (32) provides a tracer gas sample with a stable pressure and flow rate to the analysis system (4); the quantitative injection loop (33) provides a tracer gas sample with a precise volume to the analysis system (4); and the sample chamber (32) and the gas sampling pump (23) are connected to the gas sampling pump (23). A third flow path switching valve (31) is provided between the gas sampling pump (23), a first gas outlet of the third flow path switching valve (31) is connected to the sample chamber (32), and a second gas outlet thereof is connected to the main control room (6) of the nuclear power plant via a first reinjection loop (35); a fourth flow path switching valve (34) is provided between the quantitative injection loop (33) and the gas analyzer, a first gas outlet of the fourth flow path switching valve (34) is connected to the gas analyzer, and a second gas outlet thereof is connected to the main control room (6) of the nuclear power plant via a second reinjection loop (36); The analysis system (4) includes a gas analyzer for accurately measuring the concentration of tracer gas extracted from each single-zone space in the main control room of the nuclear power plant to achieve real-time online analysis; the tracer concentration in each single-zone space is dynamically adjusted to maintain stability through the logic control program of the control system (5); The method comprises the following steps: S1. According to the volume of the main control room of the nuclear power plant and the target concentration of the tracer, the injection system is turned on to inject a set flow rate of tracer gas into each single area space of the main control room of the nuclear power plant; S2, sampling and concentration measurement of the tracer gas in each single area space of the main control room of the nuclear power plant through the sampling system and the analysis system, and continuously analyzing the change of the tracer gas concentration over time until the tracer concentration in each single area space remains within the set fluctuation range; S3, according to the difference between the tracer concentration value of each single-region space and the target concentration value or the highest concentration in all single-region spaces, the injection system is controlled by the logic control program of the control system to dynamically replenish appropriate tracer gas into each single-region space of the main control room of the nuclear power plant, so as to achieve the stability of the tracer concentration in each single-region space and keep it within the set fluctuation range; S4, according to the supplementary tracer flow value Q calculated in real time by the control system i , the air flow rate Q of the main control room of the nuclear power plant d And the tracer concentration value C of each single area space, the gas leakage in the main control room of the multi-space nuclear power plant is calculated, and the calculation formula is: Q i =Q-Q d in: Q i The internal leakage of the habitable area of ​​the main control room, in m 3 / h; Q d is the air volume of the ventilation system in the habitable area of ​​the main control room under the test conditions, in m 3 / h; Q is the ventilation volume of the habitable area of ​​the main control room, in m 3 / h.

2. The method for measuring the gas leakage in the main control room of a nuclear power plant by using the constant concentration method according to claim 1, characterized in that: When the tracer gas sampling concentration C(t) in each single area is equal to the target concentration C t When the deviation of ' is less than 10%, the calculation formula of average ventilation flow is: in: is the average ventilation volume, in m3 / h; t is time, unit is h; Q in (t,i) is the tracer gas injection rate, in m3 / h; C in Injection concentration for tracer gas; N is the number of single-region spaces; When the tracer gas sampling concentration C(t) in each single area is equal to the target concentration C t When the deviation of ' is less than 2%, the calculation formula of instantaneous ventilation volume is: in: Q in (t,i) is the tracer gas injection rate, in m3 / h; C t ' is the target concentration of tracer gas.

3. The method for measuring the internal leakage of gas in the main control room of a nuclear power plant by using a constant concentration method according to claim 1, characterized in that: The injection system (1) comprises a tracer high-pressure gas source (11) for providing a tracer gas of set concentration, a flow control device (12), a first flow path switching valve (13) and a gridded injection unit (14) which are sequentially connected according to a gas path. The gridded injection unit (14) is a plurality of groups of tracer gas injection pipe networks with manifolds, and the tracer gas is transported to a representative position of a corresponding single-region space through each group of pipe networks.

4. The method for measuring the internal leakage of gas in the main control room of a nuclear power plant by using a constant concentration method according to claim 3, characterized in that: The gridded sampling circuit (21) is a plurality of groups of tracer gas sampling pipe networks with manifolds, and the tracer gas at a representative position in a corresponding single-region space is obtained through each group of pipe networks.

5. The method for measuring the gas leakage in the main control room of a nuclear power plant by using a constant concentration method according to any one of claims 1 to 4, characterized in that: Each single-zone space is equipped with a fan or other equipment that can quickly mix the airflow in the area to achieve uniform distribution.