A method for replacing fixed pulley block of metallurgical crane
By using Y-shaped rope pulling tools and lifting equipment, the replacement process of the metallurgical crane's fixed pulley block is simplified, which solves the problem of maintenance personnel's safety and low efficiency, achieves faster and safer replacement operations, and ensures the normal operation of the crane.
Patent Information
- Application Number
- CN202210587987.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-27
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-05-27
AI Technical Summary
During the replacement process of the fixed pulley block of a metallurgical crane, maintenance personnel need to enter a small space to perform high-risk edge operations, and conventional methods are time-consuming and labor-intensive, affecting operating efficiency and safety.
The Y-shaped rope pulling tool is used in conjunction with the lifting equipment and crane trolley to simplify the pulling out and reinstallation of the steel rope through the marking and hoisting process, avoiding manual pulling and ensuring safe and efficient operations.
The maintenance time is shortened, operation safety is improved, manpower investment is reduced, and the normal operation and replacement efficiency of the crane are ensured.
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of equipment maintenance, and in particular to a method for replacing a fixed pulley block of a metallurgical crane. Background Art
[0002] In steel enterprises, the operation rate of metallurgical cranes is very high, and each crane needs to replace the fixed pulley block periodically every two years. The workload of replacing the fixed pulley block is very large, and each time the maintenance personnel need to enter the narrow space under the drum and work on the edge. Each fixed pulley block has multiple pulleys, and the corresponding steel ropes need to be lifted out separately. When the steel rope is separated from the pulley, it needs to be tied with hemp rope and pulled by manpower, which is not only time-consuming and labor-intensive, but also cannot guarantee the safety of the operation, resulting in long maintenance time and high risk, which seriously affects the normal operation of the crane. Summary of the invention
[0003] The present invention provides a method for replacing a fixed pulley block of a metallurgical crane, which is simpler, safer, easier to operate and more efficient than conventional operation methods, shortens the maintenance operation time, ensures the safety of maintenance operators, and ensures the effective operation rate of the crane.
[0004] In order to achieve the above object, the present invention adopts the following technical solutions:
[0005] A method for replacing a fixed pulley block of a metallurgical crane comprises the following steps:
[0006] 1) Make a rope pulling tool;
[0007] The rope pulling tool is a Y-shaped structure, which is welded by an operating rod and a V-shaped pull head. The operating rod is made of a steel pipe, and the V-shaped pull head is made of steel bars. One end of the operating rod is the hand-held end, and the V-shaped pull head at the other end is used to directly pull the steel rope.
[0008] 2) Before replacing the fixed pulley block, weld the lifting lugs on the top of the pulley cover, use the lifting equipment to lift the pulley cover to the designated location and fix it; then remove the U-shaped pressure plate fixing studs on both sides of the fixed pulley block from the pulley seat and remove the U-shaped pressure plate;
[0009] 3) Mark the multiple steel ropes in the fixed pulley block separately, use the lifting equipment to lift each steel rope in turn, use the rope pulling tool to pull the rope and cooperate with the crane trolley to lift each steel rope out to both sides of the pulley seat in turn;
[0010] 4) After replacing the fixed pulley block, use the lifting equipment to lift each steel rope in turn, use the rope pulling tool and cooperate with the crane trolley to install each steel rope back into the corresponding pulley groove of the fixed pulley block in turn according to the mark to complete the replacement of the fixed pulley block.
[0011] In the step 2), the lifting equipment is an electric hoist.
[0012] In the step 3), the process of using the rope-pulling tool to pull the rope and cooperating with the movement of the crane trolley to lift each steel rope to both sides of the pulley seat in turn is specifically as follows: the crane trolley first moves a distance A in one direction outside the pulley seat to pull the steel rope on the side away from the drum out of the pulley groove; then the crane trolley moves a distance B in the opposite direction, and the distance B is twice the distance A, and then the rope-pulling tool is used to pull the steel rope on the other side out of the pulley groove.
[0013] In the step 4), the rope-pulling tool is used in conjunction with the movement of the crane trolley to reinstall each steel rope into the pulley groove of the fixed pulley block in sequence according to the mark. The specific process is: the crane trolley first moves a distance A in one direction outside the pulley seat, and pulls the steel rope on the side close to the drum into the corresponding pulley groove; then the crane trolley moves a distance B in the opposite direction, and the distance B is twice the distance A, and then the rope-pulling tool is used to pull the steel rope on the other side into the corresponding pulley groove.
[0014] Compared with the prior art, the present invention has the following beneficial effects:
[0015] 1) By making a Y-shaped rope pulling tool, it can replace the hemp rope used in conventional maintenance, saving time and effort, while effectively ensuring the safety of operators;
[0016] 2) When lifting and retrieving the rope, the steel rope is reinstalled into the pulley groove in sequence in coordination with the movement of the trolley, saving manpower and maintenance time;
[0017] 3) Mark each steel rope to avoid mistakes that may lead to rework. DETAILED DESCRIPTION
[0018] The present invention provides a method for replacing a fixed pulley block for a metallurgical crane, comprising the following steps:
[0019] 1) Make a rope pulling tool;
[0020] The rope pulling tool is a Y-shaped structure, which is welded by an operating rod and a V-shaped pull head. The operating rod is made of a steel pipe, and the V-shaped pull head is made of steel bars. One end of the operating rod is the hand-held end, and the V-shaped pull head at the other end is used to directly pull the steel rope.
[0021] 5) Before replacing the fixed pulley block, weld the lifting lugs on the top of the pulley cover, use the lifting equipment to lift the pulley cover to the designated location and fix it; then remove the U-shaped pressure plate fixing studs on both sides of the fixed pulley block from the pulley seat and remove the U-shaped pressure plate;
[0022] 6) Mark the multiple steel ropes in the fixed pulley block separately, use the lifting equipment to lift each steel rope in turn, use the rope pulling tool to pull the rope and cooperate with the crane trolley to lift each steel rope out to both sides of the pulley seat in turn;
[0023] 7) After replacing the fixed pulley block, use the lifting equipment to lift each steel rope in turn, use the rope pulling tool and cooperate with the crane trolley to install each steel rope back into the corresponding pulley groove of the fixed pulley block in turn according to the mark to complete the replacement of the fixed pulley block.
[0024] In the step 2), the lifting equipment is an electric hoist.
[0025] In the step 3), the process of using the rope-pulling tool to pull the rope and cooperating with the movement of the crane trolley to lift each steel rope to both sides of the pulley seat in turn is specifically as follows: the crane trolley first moves a distance A in one direction outside the pulley seat to pull the steel rope on the side away from the drum out of the pulley groove; then the crane trolley moves a distance B in the opposite direction, and the distance B is twice the distance A, and then the rope-pulling tool is used to pull the steel rope on the other side out of the pulley groove.
[0026] In the step 4), the rope-pulling tool is used in conjunction with the movement of the crane trolley to reinstall each steel rope into the pulley groove of the fixed pulley block in sequence according to the mark. The specific process is: the crane trolley first moves a distance A in one direction outside the pulley seat, and pulls the steel rope on the side close to the drum into the corresponding pulley groove; then the crane trolley moves a distance B in the opposite direction, and the distance B is twice the distance A, and then the rope-pulling tool is used to pull the steel rope on the other side into the corresponding pulley groove.
[0027] The following embodiments are implemented on the premise of the technical solution of the present invention, and provide detailed implementation methods and specific operation processes, but the protection scope of the present invention is not limited to the following embodiments.
[0028] [Example]
[0029] In this embodiment, the fixed pulley block of a 450 / 80t metallurgical crane used in a steel plant is replaced. The specific process is as follows:
[0030] A Y-shaped rope pulling tool is made using one-inch steel pipes and steel bars.
[0031] Before replacing the pulley block, weld the lifting lugs on the top of the pulley cover in advance, use an electric hoist to lift the pulley cover to the designated location and fix it, remove the M20 U-shaped pressure plate fixing studs on both sides of the pulley block from the pulley seat, and take off the U-shaped pressure plate.
[0032] Mark the six steel ropes separately, and after the electric hoist lifts the steel rope, use the rope pulling tool to pull the rope and cooperate with the crane trolley to lift each steel rope to both sides of the pulley seat in turn. Specifically: the crane trolley first moves 3 meters in one direction, pulls the steel rope away from the drum out of the pulley groove, and then moves 6 meters in the opposite direction, and uses the rope pulling tool to pull the steel rope on the other side out of the pulley groove.
[0033] Rope retraction is a key step in replacing the pulley block. Use a rope pulling tool for each steel rope and cooperate with the crane trolley to move, and reinstall each steel rope into the corresponding pulley groove of the fixed pulley block in sequence according to the mark to complete the pulley block replacement operation. Specifically: the crane trolley first moves 3 meters in one direction, pulls the steel rope on the side close to the drum into the corresponding pulley groove, then moves 6 meters in the opposite direction, and uses the rope pulling tool to pull the steel rope on the other side into the corresponding pulley groove.
[0034] After adopting the Y-shaped rope pulling tool, hemp rope is no longer used when lifting the steel rope, and maintenance personnel do not need to enter the lower part of the drum, thus ensuring the safety of the operators. In addition, after adopting the Y-shaped rope pulling tool, there is no need for manual pulling when lifting and returning the rope. The steel rope can be smoothly returned to the groove through the reciprocating operation of the crane trolley.
[0035] This embodiment adopts the method of the present invention to replace the fixed pulley block. It only takes 2 hours to replace each set of fixed pulley blocks, which effectively reduces the downtime of the fixed pulley block replacement operation of the 450t crane, ensures the safety of the maintenance workers, and ensures the effective operation rate of the crane.
[0036] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A method for replacing a fixed pulley block of a metallurgical crane, characterized in that: The steps include: 1) Make a rope pulling tool; The rope pulling tool is a Y-shaped structure, which is welded by an operating rod and a V-shaped pull head. The operating rod is made of a steel pipe, and the V-shaped pull head is made of steel bars. One end of the operating rod is the hand-held end, and the V-shaped pull head at the other end is used to directly pull the steel rope. 2) Before replacing the fixed pulley block, weld the lifting lugs on the top of the pulley cover, use the lifting equipment to lift the pulley cover to the designated location and fix it; then remove the U-shaped pressure plate fixing studs on both sides of the fixed pulley block from the pulley seat and remove the U-shaped pressure plate; 3) Mark the multiple steel ropes in the fixed pulley block separately, use the lifting equipment to lift each steel rope in turn, use the rope pulling tool to pull the rope and cooperate with the crane trolley to lift each steel rope out to both sides of the pulley seat in turn; the specific process is: the crane trolley first moves a distance A in one direction outside the pulley seat, and pulls the steel rope on the side away from the drum out of the pulley groove; then the crane trolley moves a distance B in the opposite direction, and the distance B is twice the distance A, and then uses the rope pulling tool to pull the steel rope on the other side out of the pulley groove; 4) After replacing the fixed pulley block, use the lifting equipment to lift each steel rope in turn, use the rope pulling tool and cooperate with the crane trolley to move, and install each steel rope back into the corresponding pulley groove of the fixed pulley block in turn according to the mark to complete the replacement of the fixed pulley block; the specific process is: the crane trolley first moves a distance A in one direction outside the pulley seat, and pulls the steel rope close to the drum side into the corresponding pulley groove; then the crane trolley moves a distance B in the opposite direction, and the distance B is twice the distance A, and then uses the rope pulling tool to pull the steel rope on the other side into the corresponding pulley groove.
2. A method for replacing a fixed pulley block of a metallurgical crane according to claim 1, characterized in that: In the step 2), the lifting equipment is an electric hoist.