A winter insulation construction method for asphalt concrete in severe cold areas

By using a combination method of temperature sensors, canvas, insulation quilts, transition materials and tarpaulins in asphalt concrete construction in severe cold areas, the economic, quality and efficiency problems in traditional construction methods are solved, and local materials and waste-free construction are achieved. construction, ensuring construction quality and environmental isolation effect.

CN114875853BActive Publication Date: 2024-10-18CHINA HYDROPOWER ELEVENTH ENG BUREAU (ZHENGZHOU) CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210452339.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-27
Publication Date
2024-10-18
Estimated Expiration
2042-04-27

AI Technical Summary

Technical Problem

In severe cold areas, the traditional overwintering construction method of asphalt concrete core walls has the problems of economic waste, environmental pollution, difficulty in cleaning materials, and poor construction efficiency and quality.

Method used

An overwintering insulation construction method for asphalt concrete in severe cold areas is adopted, including burying temperature sensors, covering canvas, insulation quilts, transition materials and tarpaulins to form an insulation pile, achieving local materials and waste-free construction.

Benefits of technology

Through this method, the construction quality is guaranteed, economic waste is avoided, effective isolation from the external environment is achieved, the formation of frozen blocks of transition materials is prevented, and the good condition of the asphalt concrete is ensured and meets the construction requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114875853B_ABST
    Figure CN114875853B_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for wintering insulation of asphalt concrete in severe cold regions, and belongs to the technical field of core wall construction. A construction method for wintering insulation of asphalt concrete in severe cold regions comprises the following steps: S1, burying a temperature sensor; S2, covering with canvas; S3, covering with insulation quilt; S4, covering with transition material; S5, covering with waterproof cloth. The invention solves the economic, quality, efficiency and other drawbacks brought by the traditional method, realizes the use of local materials, has no waste, and ensures the construction quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of core wall construction, and in particular to a winter insulation construction method for asphalt concrete in severe cold regions. Background Art

[0002] For the winter construction of asphalt concrete core rockfill dams in water conservancy projects in severe cold regions, similar projects currently mainly adopt:

[0003] 1) After wintering, a layer of asphalt concrete core wall is removed, resulting in economic waste and environmental pollution;

[0004] 2) Cover with soil; however, it is difficult to source the material and to clean up after the winter. Summary of the invention

[0005] The purpose of the present invention is to solve the problems of economy, quality, efficiency and other drawbacks brought by traditional methods in the prior art, and to propose a winter insulation construction method for asphalt concrete in severe cold areas; to achieve local material use, no waste, and ensure construction quality.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions:

[0007] A method for wintering insulation of asphalt concrete in severe cold regions comprises the following steps:

[0008] S1, buried temperature sensor;

[0009] S2, canvas covered;

[0010] S3, covered with thermal insulation blanket;

[0011] S4, covering transition material;

[0012] S5, covered with waterproof cloth.

[0013] In some embodiments, in step S1:

[0014] A temperature sensor is buried every 50m.

[0015] In some embodiments, in step S1:

[0016] At the top of the core wall, use a coring machine to make a 3~5cm deep cavity and bury the temperature sensor in it.

[0017] In some embodiments, in step S2:

[0018] The canvas covering width is more than three times the width of the core wall.

[0019] In some embodiments, in step S3:

[0020] The insulation blanket coverage width is more than twice the width of the core wall.

[0021] In some embodiments, in step S3:

[0022] The thermal insulation quilt is made of cotton quilt with a thickness of more than one centimeter.

[0023] In some embodiments, in step S4:

[0024] The diameter of the transition material pile is more than twice the depth of the frozen soil.

[0025] In some embodiments, in step S4:

[0026] The transition material is selected according to the actual on-site environment;

[0027] One or more of crushed materials, natural gravel and stones are used.

[0028] In some embodiments, the transition material continues to be used in construction after wintering and is directly used on both sides of the core wall.

[0029] In some embodiments, in step S5:

[0030] The heat-insulating pile formed by the transition material is covered with rainproof cloth for waterproofing, in order to prevent the transition material from freezing due to the melting of snow in the spring.

[0031] Compared with the prior art, the present invention provides a winter insulation construction method for asphalt concrete in severe cold areas, which has the following beneficial effects.

[0032] 1. The present invention has a hole for burying a temperature sensor to obtain the core wall temperature; a heat preservation blanket and a transition material are provided for covering, and a heat preservation pile is formed by the transition material to fully ensure isolation from the external environment and ensure the overall protection effect; the heat preservation pile is covered with waterproof material to prevent the melting of snow water after the spring and the formation of frozen blocks in the transition material.

[0033] 2. The present invention solves the economic, quality and efficiency drawbacks of the traditional method; it realizes the use of local materials without waste and ensures the construction quality.

[0034] Other advantages, objectives and features of the present invention will be described in part in the following description; and in part, will be apparent to those skilled in the art based on an examination of the following; or, may be taught from the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 It is a structural schematic diagram of the present invention.

[0036] Figure 2 Construction drawing for covering the thermal insulation blanket.

[0037] Figure 3 This is the construction drawing for covering the transition material.

[0038] Figure 4 Construction drawing for covering with tarpaulin.

[0039] Figure 5 This is the operation diagram for on-site temperature measurement.

[0040] Figure 6 This is the relationship table between the outside temperature and the core wall temperature.

[0041] Figure 7 These are the construction drawings and inner core drawings for coring after wintering.

[0042] In the figure:

[0043] 1. Temperature sensor; 2. Canvas; 3. Thermal insulation quilt; 4. Transition material; 5. Waterproof cloth; 6. Edge bag. DETAILED DESCRIPTION

[0044] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0045] Reference Figure 1-7 A method for wintering insulation of asphalt concrete in severe cold regions comprises the following steps:

[0046] S1, buried temperature sensor 1;

[0047] S2, covering canvas 2;

[0048] S3, covered with thermal insulation quilt 3;

[0049] S4, covering transition material 4;

[0050] S5, covered with waterproof cloth 5.

[0051] In step S1: a temperature sensor 1 is buried every 50 m.

[0052] Specifically, a core drilling machine is used to drill a cavity with a depth of 3 to 5 cm at the top of the core wall, and the temperature sensor 1 is buried therein.

[0053] It can be understood that the line of the temperature sensor 1 should extend beyond the outside of the transition material 4;

[0054] That is, the line is longer than the maximum radius of the pile to facilitate connecting equipment and acquiring data.

[0055] like Figure 5 As shown, the external end is plugged in for connection to carry out communication.

[0056] Similarly, a temperature sensor 1 with a built-in power supply and wireless transmission module may also be used; however, the cost will be increased accordingly.

[0057] In step S2: the canvas 2 covering width is more than three times the core wall width.

[0058] Spread canvas 2 on the core wall with its center aligned with the center of the core wall to keep the coverage on both sides the same and fully ensure the coverage effect.

[0059] In step S3: the covering width of the thermal insulation blanket 3 is more than twice the width of the core wall.

[0060] The thermal insulation blanket 3 is a cotton blanket spread on the upper layer of the canvas 2; similarly, the coverage of the thermal insulation blanket 3 on both sides of the core wall is kept consistent.

[0061] When using a quilt, its thickness is required to be more than one centimeter to ensure sufficient thermal insulation effect.

[0062] It is understandable that other types of thermal insulation quilts may also be used, such as thermal insulation quilts made of chemical fiber materials, thermal insulation quilts made of foamed polyethylene materials, thermal insulation quilts made of rock wool, etc., and the thickness may be set accordingly.

[0063] In step S4: the diameter of the pile of transition material 4 is more than twice the depth of frozen soil, so as to fully ensure isolation from the external environment and ensure the overall protection effect.

[0064] The transition material 4 is different in each project and is selected according to the actual on-site environment; one or more of crushed materials, natural gravel, and stones can be used.

[0065] At the same time, transition material 4 is used when construction continues after wintering; it can be directly used on both sides of the core wall to achieve reuse and no waste.

[0066] In step S5: the heat-insulating pile formed by the transition material 4 is covered with a rainproof cloth for waterproofing, so as to prevent the transition material 4 from forming frozen blocks due to the melting of snow water in spring.

[0067] It can be understood that edge pressing bags 6 are provided at the foot and top of the pile to press and fix the rainproof cloth; wherein the edge pressing bags 6 are woven bags filled with transition material 4.

[0068] Similarly, the transition material 4 can also be directly piled up to perform edge pressing.

[0069] The Jilin Dunhua Pumped Storage Power Station Project is located in Dunhua City, Jilin Province, where the winter is extremely cold and long; the extreme minimum temperature is -44.3℃, the frozen soil depth is 1.84m, and the winter protection time for the concrete core wall is 5 months (November to March).

[0070] By adopting the technical solution provided in this application, the upper and lower reservoir dams experienced a total of 5 wintering periods during the construction period; cost savings and quality assurance were achieved, and the invention of this construction method was unanimously praised by all parties involved in the construction.

[0071] See also Figure 2-7 , which is the specific construction drawing of this project.

[0072] like Figure 6 The records show that the insulation effect of the core wall is stable and can still be maintained above 5 degrees Celsius at the lowest temperature;

[0073] like Figure 7 As shown, after sampling and testing after wintering, the asphalt concrete was in good condition and all met the requirements.

[0074] In the present invention, a temperature sensor 1 is buried in a hole to obtain the core wall temperature; an insulation blanket 3 and a transition material 4 are provided for covering, and an insulation pile is formed by the transition material 4 to fully ensure isolation from the external environment and ensure the overall protection effect; the insulation pile is covered with waterproofing to prevent the melting of snow water after the spring and the formation of frozen blocks in the transition material 4.

[0075] The asphalt concrete winter insulation construction method in severe cold regions provided in this application solves the economic, quality, efficiency and other drawbacks brought by the traditional methods; it realizes the use of local materials without waste and ensures the construction quality.

[0076] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A method for wintering insulation of asphalt concrete in severe cold regions, characterized in that: Applicable to environments with an extreme minimum temperature of -44.3℃, frozen soil depth of 1.84m, and wintering time of up to 5 months; The following steps are involved: S1, buried temperature sensor (1); Wherein, a temperature sensor (1) is buried every 50m; Specifically, a 3-5 cm deep cavity is dug at the top of the core wall using a coring machine, and the temperature sensor (1) is buried therein; S2, covering canvas (2); The canvas (2) covers a width that is more than three times the width of the core wall; Specifically, the canvas (2) is spread on the core wall, with its center aligned with the center of the core wall, so as to keep the coverage range on both sides the same and fully ensure the coverage effect; S3, covered with thermal blanket (3); The width of the insulation blanket (3) is more than twice the width of the core wall; Specifically, the thermal insulation quilt (3) is a cotton quilt with a thickness of more than one centimeter; S4, covering transition material (4); The diameter of the transition material (4) pile is more than twice the depth of the frozen soil, so as to fully ensure isolation from the external environment and ensure the overall protection effect; Transition material (4) is selected according to the actual on-site environment; one or more of crushed material, natural gravel, and stone are used; In addition, the transition material (4) can continue to be used in construction after wintering and can be directly used on both sides of the core wall to achieve reuse and no waste; S5, covered with a tarpaulin (5); The heat-insulating pile formed by the transition material (4) is covered with a rainproof cloth to prevent the transition material from freezing due to melting of snow in the spring. A pressure bag (6) is arranged at the foot and top of the pile to fix the edge; The edge pressing bag (6) is a woven bag filled with transition material (4); Alternatively, the transition material (4) is directly piled up to perform edge pressing.